Minutes of Meeting

Meeting Purpose: Date Time Mode From 2/Feb/11 To present PTBC on HCL's Understanding on Thaler Application Room Bali Recorded by Raja Gunasekaran 4:00 PM Duration 150 Minutes

1:30 PM To Presentation to PTBC and C&W Participants E-mail Present theresia.tristini@commb Yes ank.co.id GunasekaranS@hcl.com Yes imran.yusuf@commban Yes k.co.id rosalina.ratih@commba Yes nk.co.id

Name Theresia Tristini Gunasekaran Subramanian Imran Yusuf Rosalina Ratih

Name "Same as Participant List"

Distribution Department E-mail

PTBC IT_Core Team IT_Core@commbank.co.i Yes (Susilowati, Halim Charlik) d Raja Gunasekaran RajaGs@hcl.com Yes

HCL Onsite & Offshore HCL_Thaler@commbank Yes Team (Mani Kant, Ashok .co.id GR, Rajni Kant V , Ravichandra K, Muralidharan V ,Narendra B, Madhu T) Nicolas Vansillette nicolas.vansillette@com Yes mbank.co.id Agenda 1. HCL to present on understanding on Thaler application 2. PTBC and C&W to validate our understanding and provide feedback 3. PTBC to review and provide sign-off for the understanding document delivered by HCL on 20-Jan-11 Discussion Summary Raja started the HCL's understanding presentation on Thaler application and briefed about the project status and milestone. Raja informed that HCL has invested 3 more additional resources for this project knowing the criticality of the project and smooth transition.

Raja highlighted that in due course of time in steady state, HCL will bring productivity improvement and value adds for PTBC. Offshore team (Muralidharan V, Madhukumar and Narendra B) were introduced to PTBC and C&W team. The entire team presented our understanding on Thaler application (both functionally and technically) to the entire participants. Theresia & Imran highlighted that the slide-9 (architecture for Vietnam), the following corrections: (a) The intrabank and remittance should be through SWIFT instead of RTGS. PPT is updated accordingly (b) There is no dataware house system (c) there is no Securities (d) X-Link shares both Vietnam and Indonesia Susi asked HCL to have a detailed slide on Bond Management on corporate action, as there are several incidents happening. HCL will work on this and will circulate. Susi asked HCL to check the in the system whether direct debit for foreign currency is allowed or not. Also requested to validate HCL whether the limitation like duration, amount can be changed. HCL has to check any topup of loan amount is possible in Thaler. Under slide-22 (Deposits), Charlik informed that change in ownership (ZNM1) is no longer used in PTBC Under slide-27 (FX), Charlik informed that the front office validation is not there for FX. The status will change directly from 0050 to 1000. HCL / Charlik has to validate whether MM behave in similar fashion as of FX on front office validation.

Action Item Sl. No. 1022011.01

Activity Application architecture for Vietnam has to be changed as per PTBC comments Prepare a detailed Bond Management on corporate action HCL to check whether direct debit on foreign currency is allowed in Thaler HCL to check on loans limitation, amount, duration, etc and update PTBC

Owner HCL

Target Date 2-Feb-11

Status Closed

Previous Reference (if any) Updated Added new slide for securities (bonds)in the PPT Foreign CCY Loan (USD) can have FCY (USD) direct debit a\c . However the cross currency settings is not allowed . Only the modification of the Tenor is allowed for Loan ,Not amount

1022011.02

HCL

4-Feb-11

Closed

1022011.03

HCL

4-Feb-11

Closed

1022011.04

HCL

4-Feb-11

Closed

1022011.05

HCL to validate whether MM has front office validation in Vietnam

HCL

4-Feb-11

Closed

MM contract does not have any Front office validation . 2-Feb-11 7-Feb-11

Circulated by : Circulated by :

Raja Gunasekaran Mani Kant Jha

Circulated on: Circulated on:

Remarks

mooth transition.

C.

ants.

g. HCL will work on

idate HCL whether

0050 to 1000.

ous Reference (if

ed

new slide for ties (bonds)in the

n CCY Loan (USD) ave FCY (USD) direct a\c . However the currency settings is owed .

he modification of nor is allowed for Not amount

ntract does not any Front office tion .

11 11

Вам также может понравиться