Вы находитесь на странице: 1из 3

CURRICULUM VITAE

NAME NATIONALITY MARITAL STATUS LANGUAGE QUALIFICATIONS S1-Degree Ocean Engineering, Program of Study Hydrodynamics and Floating Structure, Faculty of Ocean Technology, ITS-Surabaya. EDUCATION/TRAINING January 2010 As The Final Project Reliability Analysis of Scantling Support Structure System Gas Processing Module Belanak FPSO Due to Extreme Load July 2011 INDOSAFE PRATAMA Basic Offshore Safety Induction and Emergency Training (BOSIET)
Consist of Basic Life Support, Basic Fire Fighting, and HUET using METS & Sea Survival

FAHMY ARDHIANSYAH (MR.) Indonesian Single English and Bahasa Indonesia

INSTITUT TEKNOLOGI SEPULUH NOPEMBER (ITS)

May. 2011

Page 1 of 3

PROFESSIONAL EXPERIENCES May 2011 Present PT. GLOBAL MARITIME Naval Engineer / Naval Architect He was involved in the following major projects: Client : PT. TRADA MARITIME Tbk. (July 2011) - Mooring Analysis of FSO Lentera Bangsa Client : PT. MEINDO/TOTAL (July 2011) - Lifting Stability Analysis of SWIBER CHAI SISI NUBI MWS Module Client : PT. Pertalahan Arnebatara Natuna. (June 2011) - Mooring Analysis of MT. Cyrus Client : Conoco Philips Indonesia. (July 2011) - Fuel Loading 220 KL HSD to FOS Universe at Pertamina Terminal, Tual Client : Conoco Philips Indonesia. (July 2011) - Fuel Loading 220 KL HSD to FOS Universe at Pertamina Terminal, Tual Client : Conoco Philips Indonesia. (June 2011) - Fuel Loading 50 KL HSD to FOS Gemini at Pertamina Terminal, Merak Client : Conoco Philips Indonesia. (June 2011) - Loading 350 KL HSD to Vessel "Era Merah Putih at Pertamina Terminal, Tual Client : Conoco Philips Indonesia. (May 2011) - Loading 750 KL HSD to Vessel "Posh Value at Pertamina Terminal, Tual Client : Conoco Philips Indonesia. (May 2011) - Loading 750 KL HSD to Vessel "Posh Voyager at Pertamina Terminal, Tual. Nov 2010 April 2010 PT. CITRA MAS Asst. Naval Engineer / Naval Architect He was involved in the following major projects:
Jun. 2011 Page 2 of 3

Client : Indonesian Ministry of Transportation (Nov 2010) - Design and Engineering of PATROL BOAT 45 metres.

Client : Indonesian Police Department (Nov 2010) - Design and Engineering of PATROL BOAT 60 metres. July 2009 Sept 2009 TOTAL E&P INDONESIE On the Job Training He was involved in the following major projects: Client : TOTAL E&P INDONESIE (July 2011) - Well Connection GTS TMX-18&21, Tambora Offshore Field. Client : TOTAL E&P INDONESIE (July 2011) - Jacket Structure In-place analysis of SISI NUBI MWPN2 Platform.

This CV is a true statement of my qualifications and work experience.

Signed by:

_______________________________ Fahmy Ardhiansyah

Jun. 2011

Page 3 of 3

Вам также может понравиться