DUOFLANGE ... THE MOST COSTEFFECTIVE FLANGE CONNECTION SYSTEM EVER OFFERED... AND IPP MAKES IT! Two high performance choices. DUOFORGE... the forged flange and stubendcombination DUOCAST... the ductile iron flange and forged stub-end combination. IPP MAKES IT TO LAST The DUOFORGE flange and slip-on stub-ends are manufactured in sizes 1" 24" from ASTM A105 forged steel... the standard of the industry. The DUOCAST flange is made of tough, corrosion resistant ductile iron conforming to ASTM A 395. Both systems are rated at
IPP MAKES IT EASY TO INSTALL DUOFLANGE eliminates the labor cost of two-hole alignment of the flanges. This can save up to 30% of the labor associated with installing the flanges. Because the IPP DUOFLANGE is free to rotate on the welded stub end, it is easy to fit-up to mating welded flanges. No need for permanent leveling, squaring and mating the bolt holes. Simply turn the DUOFLANGE until the bolt holes are aligned and install the bolts, nuts and washers. One man can do the job efficiently.
FEATURES/BENEFITS
Meets ANSI B16.5 dimensional criteria for complete interchange ability with Class 150 slip-on flanges Two-piece system -- easy to installeliminates two-hole alignment process Forged flange conforms to ASTM A 105 Class 150 Cast ductile iron flange conforms to ASTM A 395 No special equipment required for field installation DUOFLANGE system actually reduces pipe wall stresses DUOFLANGES are reusable - the flange itself is not welded
Class 150 for operating pressures up to 275 psi. IPP has supplied special flange systems up to 34" Class 400.
Pipe Size 1" 1.5" 2" 2.5" 3" 4" 5" 6" 8" 10" 12" 14" 16" 18" 20" 24"
A 4.25 5.00 6.00 7.00 7.50 9.00 10.00 11.00 13.50 16.00 19.00 21.00 23.50 25.00 27.50 32.00
F 1.79 2.43 2.95 3.61 4.24 5.39 6.53 7.61 9.69 11.92 13.92 15.29 17.29 19.37 21.39 25.44
G .56 .69 .75 .88 .94 .94 .94 1.0 0 1.1 2 1.1 9 1.2 5 1.3 8 1.4 4 1.5 6 1.6 9 1.8 8
B 3.12 3.88 4.75 5.50 6.00 7.50 8.50 9.50 11.75 14.25 17.00 18.75 21.25 22.75 25.00 29.50
nxd 4X.63 4X.63 4X.75 4X.75 4X.75 8X.75 8X.88 8X.88 8X.88 12X1.0 0 12X1.0 0 12X1.1 3 16X1.1 3 16X1.2 5 20X1.2 5 20X1.3 8
C 2.00 2.88 3.63 4.13 5.00 6.19 7.31 8.50 10.63 12.75 15.00 16.25 18.50 21.00 23.00 27.25
D 1.36 1.95 2.44 2.94 3.57 4.57 5.66 6.72 8.72 10.88 12.88 14.14 16.16 18.18 20.20 24.25
E 1.73 2.35 2.88 3.52 4.17 5.30 6.40 7.52 9.62 11.79 13.79 15.16 17.16 19.24 21.26 25.31
H .69 .88 1.0 0 1.1 3 1.1 9 1.3 1 1.4 4 1.5 6 1.7 5 1.9 4 2.1 9 2.2 5 2.5 0 2.6 9 2.8 8 3.2 5
T .18 .20 .23 .29 .30 .34 .37 .43 .44 .45 .45 .53 .53 .53 .73 .73
R .06 .09 .13 .13 .13 .13 .13 .13 .20 .25 .25 .25 .25 .25 .25 .50
Flange Weight 1.64 2.69 4.16 6.58 7.50 9.89 10.66 12.42 19.75 25.91 41.70 60.36 74.26 77.60 100.10 140.70
Please contact IPP for the distributor closest to you. Discounts Available on Request
DUOFLANGE ASSEMBLY
DUOFLANGE MATERIAL SPECIFICATIONS DUOFORGE FLANGE AND SLIP ON STUB-END Forged Steel ASTM A 105
Tensile Strength Yield Strength Elongation Hardness (max) 70,000 psi min 36,000 psi min 22% 187 2" min HB
Flange stub-end assembly meets ANSI B16.5 dimensional criteria Class 150. Same temperature/pressure curve applies.
COMPARATIVE ANALYSIS OF VON MISE STRESS LEVELS IN STANDARD PIPE SECTIONS, SIZE 24"
Finite element analysis actually proves DUOFLANGE reduces pipe wall stress by transferring loads from the pipe wall to the more massive stub-end.
FIG 1
AWWA C207 Slip-on Flange Class E (275 psi) Table 4
FIG 2
AWWA C207 Steel Hub Flange Class E (275 psi) or ANSI 816.5 Slip-on, Class 150 Table 3
FIG 3
IPP DUOFLANGE with Slip-on Stub-end (275 psi)
The highest stress level in pipe section is near fillet weld. DUOFLANGE reduces stress levels by 37% (see figure 3)
Stress level in pipe section near fillet weld significantly reduced with hub or slip-on flange but exceeds DUOFLANGE stress level by 27%
DUOFLANGE produces the lowest pipe stress level by transferring loads into the forged stub-end.