Академический Документы
Профессиональный Документы
Культура Документы
a e
(tO/90) (ri) 90906-OH
f" ul IxCX W M
sh'i o.n.,
Sol LI) II-H. I."air.
>
ja
I 4
W P0.0 0 z C W
lu a oM 0> MC2 i 00U, .00
co 13 cmU H.
c .0 0 IL
10. U.
Zp 0_ 06Zo r 0
NA
a. 20
Ci
z z a: ci
0-
0:
z3:
=)
-0) LCUI
1,
I I I I I I I I I I I I I
$ 24-95
1600 West Main Street Willimantic, CT 06226-1128 (800) 338-0901 FAX (860) 450-7019
BICC CABLES CABLE INSTALLATION MANUAL TABLE OF CONTENTS 1. Introduction ................................................. 11. Preinstallation ............................................... A. Overview ................................................. B. Cable Inspection ........................................... C. Cable Handling ......................... D. Cable Storage ............................................. E. Preinstallation Checklist ..................................... Ill. Installation .................................................. A. Overview ........ B. Ambient Temperatu're' C . Equipm ent ................................................ 1. Checklist .............................................. 2. Diagram s ............................................. D. Conduit Fill .............................................. 1. Overview ............................................. 2. Form ulae ............................................. 3. Raceway Data ......................................... a. Rigid Conduit Information ............................ b. Duct Inform ation ................................... c. Sweep Elbow Radius ................................. d. Conduit Spacing ................................... e. Durasheath EP, 600v ................................ f. Unicon FREP, 600v .................................. g. Durasheath EP, 5kv ................................. h. EP - Lead ......................................... i. UniBlend .......................................... j. UniShield ......................................... E. Mechanical Fit of Cable in Raceway .... ..................... 1. Configuration .......................................... 2. W eight Correct Factor ................................... 3. Clearance ............................................. 4. Jam Ratio ............................................. 5. Coefficient of Dynamic Friction. ........................... F. Physical Limitations of Cables ............ .................. 1. Overview ............................................. 2. Maximum Pulling Tensions .................. ............ a. O verview ...................... ..... ............. b. On Pulling Device ............ ...................... c. On Conductor ....................................... 1. Form ulae ....................................... 2. Conductor Data .................................. 3. Si Units ......................................... 4. In Parallel or in Assemblies ......................... 5. Multiconductor Cables ............................. 6. Verticle Bend, Pulling Up ........................... 7. Verticle Bend, Pulling Down ......................... 8. Horizontal Pull ................................... 4 5 5 5 5 7 7 8 8 8 9 9 10 13 13 13 13 15 16 17 18 19 22 24 26 30 34 38 38 38 40 40 41 42 42 42 42 42 43 43 44 45 46 47 48 48 48
BICC CABLES CABLE INSTALLATION MANUAL TABLE OF CONTENTS 9. Inclined Pull ...................................... 1 0. Horizontal Bend ................................... 11. Around Bends ..................................... 12. Calculation Correlation .............................. 13. Bend M ultiplier .................................... 3. Sidewall Loading ....................................... 4. Training and Bending .................................... 5. Calculation Examples ................................... 6. Installation Checklist .................................... IV. Splicing &Terminating ........................................ A. Why Shield Power Cables? ................................. B. Splicing & Terminating Overview ............................. C. Precautions .............................................. D. Equipment ............................................... E. Medium Voltage Cable Components .......................... F. Cable Preparation ......................................... G. Tape Termination ......................................... H. Tape Splice .............................................. 1.Tape Construction Materials ................................ J. Accessory Manufacturers .................................. Splicing and Terminating Checklist ........................... V. Testing .................................................... A. Overview ................................................ B. Equipm ent ............................................... C. Procedures ............................................... D. High Potential (HiPot) Testing ................................ E. Common Problems ........................................ F. Equipment Suppliers ....................................... G. ICEA, NEMA and IEEE Standard 400 .......................... H. AEIC CS5 & CS6-87, Section K .............................. 1. Test Report Format ........................................ J. Fault Testing ............................................. K.- ac Testing ............................................... L. Insulation Testing ......................................... M .Testing Checklist .......................................... IV. Appendix .................................................. A. Circuit Design Considerations ............................... 1. Calculation Procedures .................................. 2. Calculation Input ....................................... 3. Pull Box Sizing ......................................... 4. Dynamometer Correction ................................ 5. Suspending Cable ...................................... 6. Overall Diameter of Multiconductor Assemblies .............. B. Purging Water from Strand or Shield .......................... C. Sym bols ................................................ D. Cable Installation Data Sheet ................................ 48 48 49 49 49 51 52 55 58 60 60 61 62 62 63 65 67 69 71 72 73 74 74 74 74 75 76 76 77 77 78 79 79 79 79 80 80 80 81 82 83 84 85 86 88 89
k.
Th data and recommendationsthat follow are based on information currently availableand beli ved to be reliable.BICC Cables makes no guaranteeof the results and assumes no obligation or liability whatsoever in connection with these recommendations.
11. PREINSTALLATION A. OVERVIEW To ensure safety during cable installation and reliability once the cable is installed, you should confirm the following prior to installation. * The cable selected is proper for your application * The cable has not been damaged in transit or storage. Review all applicable, state and national codes to verity that the cable chosen is appropriate for the job. Also, consult your local building authority. Next, you must identify any existing cable damage and prevent any further damage from occuring. This is done through proper cable inspection, handling and storage. B. CABLE INSPECTION Inspect every cable reel for damage before accepting the shipment. Be particularly alert for cable damage if: * * * * * * * * A reel is laying flat on its side Several reels are stacked Other freight is stacked on a reel Nails have been driven into reel flanges to secure shipping blocks A reel flange is damaged A cable covering is removed, stained or damaged A cable end seal is removed or damaged A reel has been dropped (hidden damage likely)
C. CABLE HANDLING Remove all nails and staples from the reel flanges before moving a reel, and avoid all objects that could crush, gouge or impact the cable when moving. NEVER use the cable as a means to move a reel When unreeling, observe recommended bending radii, use swivels to prevent twisting and avoid overruns.
PREINSTALLATION (CONT.)
Upended heavy reels will often arrive damaged. Refuse or receive subject to inspection for hidden damage.
F,
Lower reels from truck using hydraulic gate, hoist or fork lift. LOWER CAREFULLY.
Always load with flanges on edge and check and block securely.
PREINSTALLATION (CONT.)
D. Cable Storage Cables should be stored on hard surfaces so that reel flanges cannot sink. Small reels may weigh several hundred pounds while large reels can exceed 1000 pounds. Prevent impact damage by: Aligning reels flange to flange Using guards across flanges when different reel sizes are stored together * Maintaining adequate aisles and barricades to prevent equipment from hitting the cable. Seal the ends of all cable stored outdoors, and reseal both ends when a length is cut from the reel. E. Preinstallation Checklist Code Review Review local, state and national codes relating to cable installation Consult local inspection authority Cable Inspection Check for shipping damage before accepting shipment Confirm tlat the cable specified was received Reseal cable ends Cable Handling Remove nails and staples from reel flanges Calculate and observe recommended bending radii Use swivels and avoid overruns when unreeling Cable Storage Provide firm support for reels Protect cable from mechanical damage and from liquid spills Check cable end seals periodically Advise all splicers, installers and handlers of all special instructions
111. INSTALLATION
A. Overview A survey of customer complaints revealed that 92% of the cables in question failed due to mechanical damage. When does mechanical damage usually occur? During installation. In tact, most cables are subjected to more mechanical stress during installation than they ever experience in actual operation. Needless to say, handling and pulling your cable according to manufacturer's recommendations is extremely important. There are five main considerations in any cable installation: * * * * * Ambient Temperature Equipment Conduit Fill Mechanical Fit in Raceway Physical Limitations
These considerations were developed and refined by installers of paper-lead cables. Two excellent references are the "Underground Systems Reference Book" and "Pipeline Design for Pipe Type Feeders The former was published by Edison Electric Institute in 1931 and was last revised in 1957. The latter was an AIEE paper (#53-389) by R.C. Rifqnburg, published in POWER APPARATUS & SYSTEMS in December, 1953. B. Ambient Temperature Low temperatures are a cause for concern when installing cable. The following are temperatures below which cable should not be installed. CP/EP - 1/C CPE Jacket CPE/EP - 1/C - 31 OF - 31OF - 31OF FREP, PE, XLPIE - 1 /C PVC - 58OF + 14OF
CIP = Chlorosulfonated Polyethylene (HypalonO), CPE = Chlorinated Polyethylene, EP = Ethylene Propylene. FREP = Flame Retardant EP PVC = Polyvinyl Chloride. During cold weather installation, cable should be pulled more slowly and trained in place the same day it is removed from storage. Do not impact, drop, kink or bend cable sharply in low temperatures.
INSTALLATION (CONT.)
B. EQUIPMENT The proper use of appropriate equipment is crucial to a successful cable installation. The equipment needed for most installations is detailed in the following checklist. CHECK LIST M portable electric generator E] extension cords & GFCl M pump, diaphragm F] make-up air blower & hose [:] manhole cover hooks E] warning flags, signs electrostatic kV tester electric safety blankets and clamps radios or telephones gloves flood lamps fishtape or string blower/vacuum hand line M duct cleaning mandrels M duct testing mandrels F1 capstan type puller Ej snatch blocks short ropes for temp tie-offs M guide-in flexible tubing (elephant trunks) several wire rope slings of various lengths M reel arbor M ree1jacks reel brakes E] cable cutter lint free rags cable pulling lubricant prelubing devices plywood sheets M diameter tape M 50 ft measuring tape M silicone caulking (to seal cable ends) M shackles/clevis M gang rollers; with at least 4 11effective radius M hand winces (come-a-long)
manhole edge sheave pulling rope swivels E] basket grip pullers M 0-1/5/10 kip dynamometer
GUIDE IN TUBE
Reels on truck
11111111777 PI
Setup for duct close to floor
The feed-in setup should unreel the cable with a natural curvature (Fig. 1) as opposed to a reverse "S" curvature (Fig. 2).
IMPROPER
PROPER
(Fig.,2)
(Fig. 1)
CAPSTAN
I I I PULLING ROPE
I I I I &K
11
INSTALLATION (CONT.)
EQUIPMENT
SINGLE SHEAVE
Single Sheaves may be used only for GUIDING cables. Arrange multiple blocks to hold bending radii whenever cable is deflected.
SHEAVE ASSEMBLY
For pulling around bends, use conveyor sheave assemblies of the appropriate radius series.
The pulleys must be positioned to ensure that the effective curvature is smooth and deflected evenly at each pulley. Never allow a polygon curvature to occur. (Fig. C) The fit of the pulley around the cable, is also important when polling heavy weights (ex. pulleys at the top of a vertical drop).
Fig. C
RADIUS
Remember to use the radius of the surface over which the cable is bent, not the outside flange diameter of the pulley. A "10 inch" cable sheave typically has an inside (bending) radius of 3 inches,
NEVER ALLOW
12
INSTALLATION (CONT.) D. CONDUIT FILL 1. Overview Heat is generated as current passes through conductor. The safe dissipation of this heat to the surrounding conduit is a major consideration during cable installation and dictates allowable conduit fill. Conduit fill is the percentage of area inside the conduit occupied by cable. It determines the maximum ampacity of the enclosed cables since an increase in the number of current-carrying conductors in the conduit decreases the amount of current each conductor can carry without exceeding its temperature rating. Consult the applicable codes for your maximum specified conduit fill and for the influence that fill has on circuit ampacity. The effect of conduit fill on jamming, clearance and friction is covered in Section E, Mechanical Fit of Cable in Raceway. 2. Formulae Conduit fill is calculated as follows: % Fill= 1: Conductor Area X 100 Raceway Area For round conduits and cables with equal diameters: 0/b Fill= (d/D)' n X 100 3. Data The following pages contain the data needed to calculate conduit fill for various BICC cables. WHERE': d D n 1/c cable diameter ID of conduit number of conductors
13
INSTALLATION (CONT)
EQUIPMENT
BICC CABLES APPROVAL LIST CABLE PULLING LUBRICANTS
Name of Lubricant
Manufacturer
POLYWATERQD A, G, & J
Wirepull
Other lubricants may be suitable for use with BICC Cable designs. Contact the lubricant manufacturer about the compatibility of their products with specific cables. Cable lubricants should be currently I.I.L. listed. Contact lubricant manufacturer for-proof of approval.
14
co co a
Lo 'T L
ci CDa
0 N oCD a
co
to
r-
co a
Ln 00 CM "C\l M aac)
Lo Lo
o rM m C)0
tR cli
m C.)
Lo
Ln (D r,: 0)
co -c
'IT
Lr)
t-- & t-
'T c)
Lr)C) Cl
Lr)
Lr)U')
0Cv
E La
Lo0
-'tr
Cj
CD Ln CY)
C)
C) C) 0
a) a) c c,4 c,) Lo
C)
C) (D c6
CD
u)
00
>
7 oj
m -q
a0
-q
M 0
z
0 L)
E EC) 0 "
L)
C> CD CD CDCD t N Lo M
(D 0 C) -Wm m F- a vm
0 0 0 a 0 a m co C\l C\j ID m M
(n u
0
F)
CO (D 0
Ln
T
0 M r04 M V
00
Co
Ln -
0) M M co Ir- (n c\j
L)
Ln
CO c\J c6 r-
co C: C)
ECD Eu-)
cr) co 0 ci w to M
0) Lo ra " 04 ,T Lo w
P,
c\J
00 'q c) N Lo 0 clJ
- c) tn C) CMM
0) -
0 0 .0 a) 10 C L) m
LU
04 mC,4
C(D o
'IS'a) 0 c\j V 00 co
0-
0 -
CY)
C\, c\j
1- 0 'IT (D 00 0 0 a)
Lo CD tl-
c\l M 0 a)
0
o
4)
'n C E m q 6 :3
0 C LY -0 C c
L) U Ln
L) U
CN
co>q c\j
Ln
(D co
15
co
W
o CO
0Lo
I-T
M 0 0 0
CD wo m MM
0 co
'cr
W 11
u
0 0
co 0
0 0 0
tn Ln rl- rm ao Lo
C\j C--,m
o 0
U') "TI
a
LL -i ,4 r-- r-m m q v
qU)
t2 m
-
(D (D 0)
-
M L0 (D c\j
L'i
W , -j 0
CD CD
Lo CD
C)-
(6
fn 3: z C m
0
0
1- -i as <C\jm
M M
0 0 0
rm P- OD qU)
z < cc
0m
o o o
co
u)
o o
(D aD
(D W
Ln
r-
U') Lo0
c\l c\j
L0 Lr)
Lo (D
W
0
tn r- 00
a) 0 M
Ln Co C\i o ,:r m
WN c\jM c\j 04
W
v
Lo (D
W
r4m7
c\l
"T
Lo (D
(7)M
MC)
Lc)
vCO Lo
(o
o o
77 o o
C\j C\j o o o
L0 00 NC\l
o o
-j W
00 00v
-C\l
CD CD - M m
co
-i W co
ao co co - - -
I-T co (D
C\J -
(D co
0 z 0
co Lo 0
0 -
Ln ko r.- rM (o C) m 00 Lr)
C\) N m
cn tn (D c\l
0
v
M0
C) o o
V) Co 0
C) - M 0
Lr)
v
X) (D
Lo (D
o o C)
'T OD a) CY) 0
0 0 0
Lo (D
M - CD NrN ---
0 0 0
Lo Ln
(D CD P-
u
>
rn-A cn cm -i rIt 0 c) c) C) o c; M 11
u > 0 Ln r(7) M U)
r- - c\l 0 c\l tn
c\j co
o
M W
0 tr) V)
0 0 0
M M W (NJ
U') Lo (D
Iq U') CD
cj m Cv co
'IT v tn 7 'q u)
M
Lo C14 (D W
0 LL
z
a
v CO Ln 0 o
(nt m cj
-,z, in W
M
U
M
0
0 0 co 0 0 -
CD 0)
W)
CD CD
0 o 0 o
W r- co
0 o 0 o 0 o 0 C) d
Lo o
, N 0 0 0 0
Lo
Ln Loo
NCD m
co cc) a) C)00 0 00 x m m ao
a) m c, 00 co
CD LoN M OD Iq c\j c\j M
c,) co
W
(D
0) U) v
U') Lo
>
0. a 0
'IT ko CO 0
c\j (D M to m
rflM00
LU-J
Lo Lo ui _j >
M IT
0 N
v -,T c\l N
0
W
Ln
Lo 1-
fl- M (D
Lo flco
04
Ln Ln
0)0M Lo (D
C\i
c\j
C.) -a
uj cn zz
M T 0 o
u
M .14
NLn Lo to (D (D
0 0 0
o o M (D o
Ln C\j C\j 0 I- N
0 0 0
0 o o rl. T)
Cl co CC)
m
L) c\j
N co
0 0
o 0
W
Mm
co
v Ln Lo
5 o M Z :) 0 ).(-)
LIJ
o
uj
, a)
0
-Ln
0
v v
W Ir
CZ
a: , C co
-i
cm
LLJ
LLJ
.0
4) LL C)
0 0
to (D
ao C\j q - - 0M
CM
C\j
c\j
c\j
U) CD
C;)
16
I I
INSTALLATION (CONT.)
RACEWAY DATA
~~~~~This the inside radius for manufactured rigid steel conduit elbows. table lists
The inside radius (R,) equals the centerline radius (Rj)less half of the conduit inside diameter (0).
12
ELBOW CENTERLINE RADIUS OnChes) 15 18 24 30 36 42 -48 Elbow inside Radius (feet) Conduit Size 3.46 3.96 1 l'1/4
l'1/2
0.96
I 1
1.94 2.44 2.94 3.44 3.94 1.91 2.41 2.91 3.41 3.91
1.18 1.43 1.93 2.43 2.93 3.43 3.93 1.15 1.40 1.90 2.40 2.90 3.40 3.90
1.37 1.35 1.87 2.37 2.87 1.85 2.35 2.85 1.83 2.33 2.83 2.29 2.79 2.75 3.37 3.35 3.87 3.85
~~~~~~~~~21/2 0.77
3 3%/ 4 5 6 0.96 1.10 1.17 1.79 2.25
2%1
3
3'/2
4 5 6
EXAMPLE:
I.
0.5D)/12
=~~~~~~~~~~ =1.16
15S
0.5(2.067)]
12
ft
~~~~~~~~~~~~~~~17
co
.0
Lo Ln 0
00
a,
cq
Lo
(D
(o r-0 0 U) x 0 Jo
lp :3
ci lp 0. mLo (D r-
Lo cl
tn
w0CN cl? C! Lo
(D
co
M M
o0(o
CN L662
c:
z u 4 CL cn
4L6
Z;i
LU C14 M
z c 6
mLo Mr-
000 cl)0 L6
z z 0
Lr)
C-i C-i
-ci .qr
r C-
C14
00
M r, 0M(P Ci . . .
Lr)
0co0C,4
(P
Ln Ln
0 .2 cn S
CL U) 'o
(o
m C'4
CN to
mLo 00 c'),
00 C-4 ;*-' q
C) Lr) L6
C-
f-iH
(n,
(D
c t:
Ul) 04 C'4
00
cl
Lo
rl- C)
c'JM
CN
m cl) M
C140C,4 (D MNT
Lr) li LL)
E o
o CL r14 CO w M CN Ln 0 m N 0m0N Lo co Lo0
CN C, C- C- r-i
HH'i
L6
E 3 c Em Ec Je y 0 c ID
v L) 0 c 4) u
Ln r c
cn (D 0 r4 N H
-M
m to cl HM' Iq
CDmc)C
c Ul)
_lz
CN N M
_lz
M -CT Ln (.0
18
c\j 0 Co Co 1* c'J
E
C) 0 C)0 CD 0 0 0 0 00 0 - 4 Ln 0 LO 0 CD 0 Ln 0
V) mcnm qv)w P- 0
Ln
Ln i cm
C\j
CD cv co
co
cq
LO m cm "
Lo co
Z\j 'IT V)
mw!
U. ci N CQ N
m Zn co cn 'T
C6 z 0 LU
0 M 0
(n rcv cv o r co cv ;o
cli C.) m
(D ZNZo cn Ul w ;-- a)
0 z 0
C-4
c\1 c\1
Lc) LO
V
0
Q C
xb 4 0 m
no
co Kr "T tn
Lo cj m Zo U-) V) U')
m ZT cli V) Iq
ao LO
r go -0 E
.2 4)
ez 8
0 -'O U-) 0= Mc
LLI
cr x
U)' r0 3: e CM E 5 -5 3: 10 -ra 8r, 0 S.r A ",:g ?) 0 10 r 0 > y.E z r w C D E -0 2 cm U) C 0 C 0 it0 V I= CDMC B r- 'm0 i ISM E ;t -g 91 U) 'a U 0 IE 7,
ui cc 11 - U) c\1 (D CD w 0) C,) M C) r- U-) 'IT cm N V) CD C) c\j w c\1 rto V) to to c\j 0 C) C) C) 0 N 04 V) 11:r Ln CD tci ci ci C5 c) c:5 ci 0 6 0 6 ci 6 6 ci
F0 U) 0) 0) CD co PCD CD V) to
c, Cs
OX U z
M -
c\j
00
Ln C) c\1 V) "cr
CD 1-T CY) T LO
ci 0
tn c) 0 0
M GO 1-T
(D CO r 6 6
LO c\J W
CD CD 0 0) ci C5 0 -
c-J CD c\j
CIJ M
c\1
0 a. cm C
00 too r -
-= OE
3:
C
"T c\j 0 - CD CD C\J -
pc C\J V) "T
000 UDOLO N V) V)
C)
E E
co
'o 2
=3 L)
CO
cn 0 0
CN
CD 0
C-4
M M CN r4
C4 (-
CD CIJ
CO
CD
C CD c\l 00 W V U CD cl
Ln00 rj C-)rj
(n cv
Lc) C14 C4 rN
0
x
M
a) CN CN -x (N cn o CO tn
cu CD
rn
C.)n
b
w z PO v 0) Ln
M C icU
> M
CD U
r0
C 00M N X-10 0 U M
C
E
C-)
M 00
Lo n
C, ry > 0
Cl 'a Z p CD
M Q0 Ln Ln 0) lmM Lo 'T
eVLo -
C4 C4
E Wz w ? ou o EWC
E 0
E 4) a 4) o MZ
M CDUD Lncn 'M C4 73 (n
ko '.T M C14 0U) CD cl
C, Cl cn
to CO M r4
E a cl. cl.
CD C (D M
M
z 0
0
2!, M
;a.-
U
Lo
MCN
cc M r SU
M.
= cc 75 C E
a
U 4) w a. W t:
z
Ur
UD cn ct0 0
t o
q)
Ln
EC
U M ClM 0 0. CD C 44))?. -L <
(1) M Z -(1) > 0M 0M
t zC14
Crj
C)
a c o
CD -7 CNM 0 C)
(D -a CD C) a 0
Lo C14 04 -
o c, o a
M 00 to "
cn cly Lc) W M
o c:.
W r,
'T C4 C-) 1w
CO 00 (3, N M (D P, C", -T X)
CD Lc)0
6 W
Lo w 0 00 M -
E
" r
v
CID 0 w v 0) (n COv Lo
" M IV IC Ln Ln W
= 0 0 Z M :3
d C, 0 ci
o o 6 ci C5 6 o a ci 6 -: (I
CD .0
>. 0 = = 0 'E'a u M -
Ma
0.
US
04 0 - -
CD 0
C',
0 -
C:) 0 C4 M
0 V
" m C) Ln
Lo Ln
C>
0 Ln
C)
C)
0 z c E 11 zo 30: .0 -G -r-C E 0 U- 4) 4) U)
Ma (D
>
CD
r-'o C
o
3: 40
M MCL x CE uj <
20
.TcMCo
coco',t
N-0
000
000
Lo 0 N M Lo M
C>00
C)0 C> Lo (D
ac
in t0 0
to M cli
0 N I-T CY) c\j cq
M
La
04
CO r0
c\j C.) m
V) CO
1t Ln
Lo
cn
M c\j
N c\l c\j
PI
0) 2 co rcn
'-T
Ln
U.
cn
LU m , (D M M M M M w 0 (o N to
CL 0 uj 0
cl
z em
c\j m m
v U)
En
M
m U 0 0
0-0, Z 0 U
r- co 04 m
r m IT
M
U') C\j
c\j m co kn co c\j Itr Lo
m &nIt M "cr LO
N,
Q
m m 0 c\j
'T
LL
m co IT
uj
ci
cj
CO OD M CMc\l M
0 0 0
04 (D (C CD 0)
C) C>
CD 0) M CD " P-
c\l CV
CIJM C) ; CDM
m lq
r- U) 'q CD to N
Lo
W t
rl a) ;-- Lo CD
00)
M N CD 0)
6 ci 6
ci o o
o o C) C)
U L) ;Z: Z
r- 0) -
- c\j 6 o
CO CD LO c\j m 1-t 6 ci C)
CO '-T a) I-T Ln U) ci 6 ci
M OD-* co CDrc; 0 o
E
X
c\j 0
COLDI-T
04--
C\ICI)V
p 000 LnoLn
C\ICI)M
Coc)o C)oo
-TU')(D
00 Lno
N
(0,14rcM
-00
000
000
lcni CO Lo
in 0
U.)
N
CD
0
U')
c\j c\l
CV Go CY CM Co c\l -J
LL I.cli
Ln M
Lu L4 Co ui
0
cn
C.,
4c
cm C
(D a Z
0 0
0 U
cla
C4 c\j c\l
cm cm o -r Co Co Zv
CM C.) "cr
cn 't C.)
Lr)
Mn
s
ui
(1)
C.) z z
>Z
00
cj M V)
CD if)
0 -E
0
N CY cn 'ITLn
-0e
W:z
ro
-0 Lo
E o
uj m
Co Ln Zo CM v cn
04 t'IT Lo
0 0 CY E
CD
.0
CD E :5 T 75 Ox UU
Z
d o C)
o 0 o
o o
10
CD 000Cl IT
t- 0 cp 9
cq N
r, Cl
2
0 U) 0 aE
Co'5 ccC 0 0 E V , w
cc Go
E 0 U 0
>0
Co
000
-Ln
0
LOOLO 0
CD CM 'V
CM cn 1w CIA M U)rl-
-3
22
(Dl.T0j
-C)o
oco
Ln N
000
Ln 0 Lp MLo N
0
0 0
04
Lo
m (V
cn
C\j
CY)N CM CV)
Lo 1c\lM
(D
LL
N u) ul
cm m It
c\j fl-
CD
w m
z 0 L)
0 m 0
cn
:) 0 z 0 cm 5z C4 CM C\j
N CMM IT
CDcn c\l C.)M Q Lo
Lo
r M
Lo CD Ul
z 0
z 0
Q Ln
cc
m 0 LA. LU
U')
M2E
d
r.,
U)
C?
,j C)M
m Im 'IT CO c\l (D
CM
CM N
a 6 ci ci o
CD I- CD V) 114'
Lo CD CY) 00 co Lo t-
le P'4
07: 0 Z
Co m
ci ci C5
ci 6 ci
c; 6 ci 0
f- a CM fco 0 CYM
E 0 U
-T CN
cm
00 --
COI-* N
U')
Lo 0 M Ln
in
r,
23
CO (D'.0, N
a
Lo
0 V) O cn Ln I,- O V)
00(0,q
cq-O
000
000
to cm
ao
Lo 0 M Ln
U) a fl- 0
to
cn
cm w cn ;D cn
Ln
N co cm
cm Mto cm co
LU U.
CD
m m b;o cm "
It
CD w
cli "
Lo
cn
cm m cn N w
al
U) 0 w
0
w cm w
co
F.-
V) cq m 1%,
-T
Zo I,,
Ln
a Z CL LU 0 0
cc 5
z 0 C.) N 19t 'M 'cr "tr -It L0
Ln
C (1)
C.)
ui U3
c\j c\j
(D 0 M
c\j cn m
6 Zn
m
-01 V)
C, U) U) CC.) 4 Z
U T A? m :3 0 z 5 0
C4 m
CM V) m IT Lo cn n 'T ko Lf)
;D ;D CD
cn r, CY - Zn b
cQ 04 cn v It Ln
w
tr) I
cm Mo C:
0
0:) :r M I-T
U')
C m
Ln
x
cc
CD c\j 0
z (D jB =
cn
2E
c\l IM CM 04 C-4 -tr 0 c\1 (M CD CV
cw 1,-: Cq
co cn
C7) to CIR 'j
Lo
CM M
V M
U) 0 Lo 114: Lq LO
CM-it M
C'j P' S) CD f- OD
r- 0)
cq cm m Q C14LO
04 Ln
U)
(,2 ci ci 6
0 O0
C, 0 C) 0 0
Lo 0 U) C4 Cl Cl
a a C) CD 6 a
>
d 6 ci
c c
'd' U')
CD (D 0 IT 1 CO 00 0) CDC.) CD 0 0 v to 0 CMV 0 OD
OX
>
1='= IC 0) MZ
0 0 -0 C
MM
Z co OE
0
6 b
Ln U) m o). 9
O-
Cl U?
co IT
LLI x P- cm tV CO W
a 6 ci c; ci ci 6 6 S
M.r
0
to CO (o CM
mu 'too E ZU LA q) Lo E Z.r M
0
V
CV M
U C\j
-)U.) 0
M
tn 0
:0
kg
Ln
in
co(DT
a C\,-;::
a 0 0 Oa 0 a A4 U')U"C" In i4t CY V) Ln r-
E
co
24
CO "T W
C) C) C)
& C;
CD 0
Ln cm
U)C) 0 CD 0 V)0 Lo r- 0
CO
aocoT
N-a
000
000
'n Lo 0 cm M Ln
00
Lo 0 r-
w
..Z co
0 C\l
0 to
cn co
co a
C co 0 p04 M Cl)
C 0 M 0
U) cq 0 04 U)
4CM C.) M U)
U3 N
Z vi
Wc\J 0) CM
M - 0
V
r
0
M
en
'T
CM co V) co c\l
m CM c\j 0-* 0 CMco Ul cm
-It C) r
C) 0
C) -T r-
Lo
LU
5 a z 0
T N N F- cm W Ln,.Cr N cn M Iq Ln
04
Q Co w m r- M 0) CM c\j CM CM V) lw Itt
& C) N CD CMM
m co a M rlCM N V) m m
Kr 0) cn
cq CM m
0) D Lo
0)
Ln
&
U
0 z Z
ir
cm
cm
cn rl co
Lo
V) m
IT Ul
CD '-T cm " cn
CL
rl- M
Ln
0) P,
co
Lo Ln
+
0
0) tn CD
N co r
Lo
LU uj
C cc 0
LLJ -i 4 C m uj,<m & U 4 U) t M lll a 0 Cl 0) Lc? (P cJ -T CD 00 CV 0 CM U) 00 L0 Lr) 0 U') M CO CD 0) 0 CV _j -J V 0) CD U)
O 9
r", 9
CM
ci (3 lp
CM CM M
U
> 4 LU
aq G
CD C.) V V a) CD V: V r,
CL CO) a0 LL
I-T U')
CD 00 M 0 Cl c\j
0) CO (C! CD
co CD O r-
a) c.0 cD
T -T cl)
cm
cm -T -T
-r v
cDcoco
Vqm
N--
CM.0, IT
-T CT
:0
o 9) CD W IT Cl C) C) a N M IT C) Cl 0 Ln Ln 0 C\l M in 0 Q Lo C) tC) 'o , 000 000 Lcnm Lmo 00
Cv
Q, 4
Lf-l) C-,
25
N-0
000 LO
000
Ln 0 Ln
0
0
C\A-a
000
Ln
000
0
0 Ln
q N cn in r, 5
N M Ln rl-
to
a 0
114,
'T C\l
CD N
CO
cv
LO
N N M
co U)
cq N M
f,
Ln
;T IT
cv U, cq cm
co 0 ;T cm M 't
;n tn
10 c
40
W z 0
lot
N cn co - Ln ;n kn N N N M co 'IT Ln
M 0 U) &
0
cn
cm cm t, M Ln ;n rcm cu cm cn I-T In
CD
'n Ln Go o Ln N 04 N M M
tr) W Iq VI
ui
M U c a
M cm 04 N
co ai & co ;a -0 wr
qc 0 LU z
-i 0
U) f04
0) to Zb ;, rCV M CO) V LO M
CO)
v- CO M
IT
v o Ln W
CM
0 E
Lu LU
W
C-4
;D Zv Zn Lo M 0) v I-T Ln
Ln Ln Ln
4 r,
oe
4u
r 0 X 10 Ln coo
In LO tn
-v a, C
CY 'a 3: 0 E 10'ra -5 0 c
CD
CZ
.0 3
M
co
c 0
0
Ul
< ci
U.E
fr Im C 'ro-
CD
6 6 C5 6 6 6
Ci
ci ci 0 6
c"i c
'COD li
0 U 0 - z V
>0
cn .8
00
C5 6 6 o
CD CV CD 0)
CO W 0) 0
V M
U) (A 0
(L
0 Z 20 .G co E E
6 U) 3::" E
bg
N
z
000 - 4
CV
E L n
CM
0 0 U') c)
M
Lon Ln r-
0 -
5t?20 coo tn 0 tn Ln 0 0 CM t N M to r-
E M
26
_ao
aoo
Lo r-
Lo 0 M
a0a
0
cm
Lo I,- 0
Lo 0
000
000
lcov
'-T 0 QD N co m
cv W o f" ;n
N " m cn Itt
Ln
Ln 0 ;o mm
to
0-
-wo CmNcn
Lo Zo zq cn I-T W
" co m
;o m
;n m I-T Ln
U.
W rl ;D ;O rcm m cn -It Ln
;T
IRr Ln
cn -q
-a tn
W z
C.)
z 0
Cl C\j C\l
'-T
CD
cm
cn
(3) r 0
cn
* (D
0) clJ C.) OD
N M cv) M
r-
1-cr
U)
L0
zy):-- o
Iq Lf) to
M LUz 0 W LU W M
cn r 0 C,) CM cn cn 1r 4 Ln V)
;D ;-- Zq b) 4 M V IV 'T V)
V) "T
to -4 co Ln U')
U-)r Lc)tc) Ln
m
.4z yo cn C
u)
o 0 q
cm
q
f q
cm
'o,
r-
Lo
"t
CM
t-
a-
Co
F-
co C;) '-T
C" a W N CM W
Ln rlmmm -
loc
(A E CM CM N
IT W W v
Lo 0 m M N
Ln Ln
cn
cl
-
(P r, '0
-
POR
CM CO
0 -: Iq OR .7 lp
cn V
Ox CO C L) V)
Z
'7 -7 7 - - -
0)
7 C? C! '11(p OR 0 - - - - - - -
L0
CD 0
CD
(D
CD CM
V Cl
-T CO 0) q V Ln
cn C\] C)
OR el cy 0
(D
(p CD 00
Cb -
U)
C\i
C\i C\i
cm
cm V Ln Ln 0 In 0 cm C.) r- U)
20
CM
4U)LO
00 CDOO 000 CY W) r, M
r.200 a C, W U) 0 Lo 0 V N M in r, -
o EL CD C E E
97
E 0
CM-0
C)oo
- - Ln Ln 0 Ln a CM Cj Cn Ln r- a 'le
000
M-0
000
QD
CO
cm Lo 0 " cn
cm cl m
cn Itt
0
V v m co cn CD v m W 04 CJ Q M rco V) -T U,) Le)
ci
LU V) cm C
Z 0
C) 0
x
c,
N Lf CM CM
0 Co r MMV
co Ln
Q 0 CM CIJ 04 CIJ
fM
(D fl V Ln
.0 V 0
(D U
o
a)
Lu
C)
'-T (o
M
00
CD CY
U,)
cli 0 IT
r-
CM CM CM
C.) cv) IV
Ul U,)
z C,, cis CL
tu
v
04 V)
co 0)
V Ln Ln Lo (D
E.
U
C) x -0 U) Oa 3: -g
too 0 W=
r0 :3 C 0 -- ,O
Us
ul
04
CM flLn Ln
Z; -,ia cm 0 13 0 4) 0 01
x 4) LU
CL 0 U.
-i 4 C co W;5 W U)
CO CD 0 - 0) 0 9
- CMCM cn M N
(D C-4 CY M Vj 0) M M CD CD 0) N 104 U c
V
Ln P,
"W OD C!
em Lg; Ln 0 Ln CO CD CD in r- 0) U U? OR q 'R
CM c\l V) V) V V in I- 00 CM
W r, CM co U') IV 0 v r-- OR V P
I?
-- Wcn cm r
z
qm N
CM v
11 Q CD 0
=rJ
P
E m
C) CD 0 CY
0 0 -
in W. C4
CD 0 CD CD 0 U) U) 8 CM cr)
0 Ln f-
28
"-o 000 00 00 to to
C CO
Ln r- 0
Lo 0
cq V cQ V) a) r- 0
V) Ln
000 000 4 Ln in 0 Ln 0
m Lo rl- a
Co cq cm m
Pcq V) cn
cn CO - cog cv cv m m 'T
t- cq cm V)
0 V
PIT
cm cm
Ln f." CM
r- Lo 'T cn V tn
"Vo Co m
IT
Lnv) l4t Ln
VO m V
QCD Lo to
V w r" cli cm 04
" m
V m
Q m
Co tV tn
0 V
C-i 0 VW)
rW)
-"R 0 ui m
M Ln tn 01 01 CY
cm 0 le Lf)
0 V) C.) M
IT 0)
0 It
04 0) IV V
OD Ln
0 cr) Lo Lo
0 E
MS a -
t=
z 0 p a cm cj in CM w V
Ln
0)
cn V Ict Ln Ln
cJ V
Ln
1= z
30. 0
LU I Z IL C4 ul CL
+ 05. 0
CO)
a V) M V "cr
r- CD qtr Lo
c\l (D CD W) Lo W)
C4
M 0
UJ C
cm
LU 0
LU m uj
ci
C
.2 f's C
cu
0 r- Co V w 0) .* 0 Lo
M--
CL 0 U. z
cn c6 6 44 ui,6 r,: ai
r.. cm V-U)
cn V 0 w m "t w w in
cn Co 0) cn
w in a V 0 (D cv V Ln r.. 0) 40
OD- M C) M C4
vi 4 4 6,66 PZoi 6
't Co N CD Cq OD
C
ON
-9 6 c6 r- ai ci C-,i
W"W - Cm0) 0 a) f-
V .1 m cm;:: in N W. (R 2 clJ V
=,v mcm z 0
Ln
o0a
000
o 0 o
coo
40
"
Lg-) 0
0) U) II- -
Ln
C4
C\,
-Lnu) IV cm V)
Soo r,
114 tn U-) C4 v cm 0)
L(
2P
(DNtN -!20
000
000
LOOLO
0
0
CQ-
oocD
__
000
_tnul)
000
otno
C'i to 't m
cm
M Lo r-
c"J cO "4' m cv
Ln
r-. o
cm
N
N cm N
to
w N
cm m
IT - 0 cm cn m
I-* cn cm m
0 .4,
- Lo cq N
0 COO m m .0,
CM CM cr) 19t (a w
0 Lf)
0 cm I'll w N CM CM CM cm cv)
co co cv) IT
Z V
06
J!
CO)
cv 14,
C) CM cn CD CO 04 CM CIJ NCM
cn CO V),Rt
CD ct
uiWE ED
5 z 0 'c
z 0
c4)
CM
'Itt 00 04 04 CY 0 CO r,Cl) Cl) Cr) Lf) 0 q:r Lf) (7) IV 0 CY cv) cl) co V It
C4
00
U) co
0u 0 c 4D 0 =
0 0
x 'n q
w E
CD
W W m
CM
3:
U)
e 0 o CM t; E 3 2
E m co .2
r
W ;i m
P.
> Id 0 r- cl) cri r,e Lr) Cl) 0 CD Cr) 0) cr) 04 CM 0 00 cl) N LQ CD LO 0 C14rV 0 a aD 0) Ln 0 CD r, P- (D 0) (D cr) N GO 0) (D 0 OV 0 CO cl) V 00 U,),qt (D o(o
d)0
ro-
tM (M:2 r- S 'ro 0 0 ,D c 0 03
"o
Qd M cl) qt V Ln Ln t, CO 00 U) 00 c; 6 ci 6 ci c; c; 6 6
a 0 z 0 -. 9, CO Cl) qT CY)in (P IP P.: 000 (.0 mt I'CO 04 CD r': OR OR 000
c
tQ IR
C66 66c;
0 CLOO 9LO G 0 0 0 z
Cc
COr- 0 LO (D (7 q 9 0
CD LO Cl) U) CD 0) C4 'le:
30
CIJ
CD 0 0
-Z;5c.J
C) 0 C) 0 Cl
in
cm U. w N z 0
VOLO co
C> cm csi
-. coin 4cm
c> to co co co
cn
11 to co
cn to CD Ico m cn m v
0
0 z 0
CO)
U VW ui cc x
C4
04
c w
IX 2E ot
0 0.
>
In
(D Cj
000 Q CY Cl) V
C) 0 0 U0 Ln 0 01 Cr) Lf)
0 0 Ul 0 r-
31
-aa
000
to"'t cm c')
coc
U,)OLO Cn In I.-
CD
o
CM-
000
C'J C'3
000
Lotn cm M
coo
OLno In F- a
cm
04 cm
_j U.
CO CM 04
04 cm
W CY cm cn It
CM (D U,) CM 03 cr)
CM It
0 CM ICY CM CM CM M ql'
Q)
'qt If)
I
CO) r- (7) cm N cm cl) (D q1t V) cr)
c
z U3 4) IL) r-
0 iu
-i z m 0
t
0
E
co z cm 0. +
0
z IL)
cv)
430 0 CM Cr)
co qt
W 01 Q
04
CM U) 0 CM CM M
CM (D 0) 00 M V) Co) V
CO (D
0 U,)
.5 E LU Lu -T. .0 g .2 Ir m 0 4) uj
04
$ 0 0
c 0
E 0:2 0 S 0 E 0 0 Co :5 r- o E Q
03 -6 =- IOD E. 0 0)
-J4
MUJ-
r&
M V U)
> r co , V,
0
cr) sLIL,
'cr o 0) LO N OD
CM to 00
V) In
c\i c c 6 4L6 6
U) U.) f,-
2 e
Cc
0 cr) (0 0 04
c c c vi vi -j wi c6 c6
0) cm cm Cl) In CIJ U) V)
qr
N 0) r-
qt 04
0
0
10
0,
r- 'ro- q li
U) -'s 0 0 0.0
0 --
0 J! CDCD,.t z V)
cq
's
*-C,)Cm
"
% . z
'"' It >
14t
cl) CM
O!R a 000
c\I It "it
co
Q U CD E < 20 CD
0 0
0 a 0
5 E
>
"'t c\I in w 00 oao U,) tn 0 In CM Cl) IRT CM M LO
co
r-
a CT
he
In v- 04
ooc cl)
c q In U) ,it 04 cl)
o0o 0 In ID
r-
32
E u
04
C)
0 0 to 0 r-- 6
(D
Ln CM c\j cm co
0 Ln CD CM 04 cl LL 3 lo.. a
w (D m le
0 z z 0
ll le ui
v LU Lo CM C\l 04
CM CD CD
M V) It
E
0 z
r- m
Cm Lo CY) - O M CO Cr) IT LO
Lu -j ZI! mom = M
F z co
04 CL
t Z) 0 Z 0
't CO 0)
Cl)'-d'CV)
CJ r- C4
Mt l4t Lo
C\j
04 L0
+12
LU
ui 0 cc
U) to m
0.
UA
LU'&
c 0
a (mcr)-a co O co co C\Jqt
la
", lp ()
7 ',I: CR 9 (3 CR " N
000 co 04 V
co in
aoc:l 000 00 LO O 0 LO 0
C\l Cr)'RT CM Cr) LO r v-
33
E 0
N-0
000
oc>o
OLOO In
CICDO
000
r- 0
C\j
LnLo
Otno cm C) U.) o f,
000
to
In
U. ci Pi 10 cm z 0 V
m
UA
U) CD U C U) -Z z 0 z
C*
cm N m cn It
r-CD
cq cmmm 'Ict
cri
C\l
OD V) 0
0)
cr) 0 C\l N N m v In
cr) I,- 0) CD cm U,)
13)
cn
C m E gg
C\I CD = 0
w m
co v
c4i CO v
AL E :)-a e
LU
m 2i
C 0 r LO V OD t- CO CO U) CD CO 04 CO 04 CIJ 0 OD 0 tn CO t- 4M 0 04 T Cb -q
C)
CD C.) CD
cm ,:2 C
r = Ir w M Cs 2 a
-53 E E co P
U)
OX U Z - = E
C; C; 6
Cs C; 6
A ci C; C; ci
04
"qr Cl V) cJ CD
V,
'00
In C\I CO
CY) M
-'.4,
U) aD 0) In 04 M In r-
z 6 6 6
> Y. to QQ !Roo In 000 In 000 v- C\l v- C\J e 04 M U) t-
clJoc
-
000
C:)Oc)
coo
-- CM 4
oc)cD
LoLoc) CM CO Lo
00
Lo a
rl_ 0
CDCDQ cQ Itt
000 00 Ln 0 0 Lo N CV) Lo r
co co
C\l C14
CM
U)0
CM CO
CM - co V)
CM CM CO cv)
in
- to CO 0 CM CMco 110,
-,.t ""m
C)
co cv) m 114t
M PLL
CM "
cq cq C)
m Nt Lo
- Lo CO 0
N CM "MM
r-
co
co I- CM Lo CD to
CM " co co co V.
'-t to -
V)OD r-
CM 0 IT "cr
cv) m v v
CM c\j V) CO V) 'IT
I
M
PV)
co
qt V) V)
M 0
M v
CMCY)
v Irt
C,4,qt
V, tr)
LU 0
z
0 z 0
V)
CC) CO (D
CMCO CO
Lo 0
V Lf)
V-
CM uj LU
C-4 C LLI 2i r- CM CMI-00 P 0) - OD 04 CO (3) - Ln C V r Z CQ G) 0 M CO ID M LO (30 0 CC) CO Cr) Co 4. -! 00 M t-- c,) r, C,) z Co Lf) CY) CD co co codLn to
fa CP cx log C 0 0 0
c It wcvw c c
to 0 0 co co co (n -I-w C\i c a?
to CO V CO CO 0 V M V C\ C\i c C6
0
w m co co m w cv - " co 't Lo r- M . . . . . . . . - - - - - z CMw rm to lo. a M M -* Lo W f- 0 . . . . . . . . CM
It cV (D M Ln V) 0 q 9 7 C\! M 0 - - - -
r-, w -,t CD 00 - -
u to
00 cm , Cm
anooo R - - CQ Iq
CC)o Lr) 0
U)
M)-
,is
C\l c) c
CM
o o a a o o
IO to CM V) C) U) 0 LON O
C\,
-1.01.0
"t N m
01.00
US F- o
Lo
to
CM 04
c\j cq
IN M
CM
CM cv) M
t= LI a
1)L za 0 M X
0 '-cr
iu
N CD to CM cm
CM CM CM M M
IN CM M It
(3
C,
C>mo M CO In
U) 0 CM N m
P- w M CT
cm
Ea
C3
cf)
cr)
CM (f) cv) In CM
C) U) M
CD c'J
CY)
c\I c\j CO M CO
00 0 M
CO
CM a)
00
woe
V coo
mz!
I
2
C 5 ZU) C-A
to
to
z 0
CO)
04 CMM cn 'At
CM M CM
N CL
10
to CO N CC) ',CT It
+ La
C)
o C 0 LI < E p N
CO Lr)
co 1-41 IO
C:
C\, 2 E o
LU rLU0
cr 0
uj 1A -i
0
co ui
<
cn co 2 'IO''It 0 r- 0 6 JR 0
m cn CM 6
f0 P4
-uow
0
C) E E Q m C 0
.8 z
co A.
0
!2 0 u
Q
'IT M clJ
000 - CM14'
coo %t'-T -T
000
C E E
IIu C 0 12 CIS CD
z >
V- cn CY
cm,.*
'4'
It
U)
00
000 CM V IN M
000 to r- -
C\j
00 C\l
000 V, c\j M
000 U) r- -
36
Noo 00a
-c'J
Lo Ul qcjc,)
oc:)C>
0 to Lof--o
CD
000
-
- 04 'tt
000
Loino cq CV) V)
C>o
Lno 0
aoo
--CJ"t
000
LoLoo Cmc,)LO
00
Loo F-0
to
co c\j c\j
c\j
CD 04 CO
c\l N V) cr)
M Ln
c\j c\j M
r-
It
c\j 01 cq m m It
CqLn-
00 U)
cm C\l cm CM M At V)
c\l CD
0)
c\J 00
U')
N CMCD
cm cr) cv)
r-
CD CD M
CM 04 Cr)
CD
Cr)"'
r"O'
g x a
CMt- 0 Lo CM V) It m
CO CM - m V) c\j m vt
0)
CD
CM Lo CO cr) hit
U') It Lo
E O!R
cc Luo 4)
U50 EC=
z C-A CL
CM U)
v N
cm Ul
03 + I0 04
wC w0
co m w 4 -i uj co It U 4 ci
C
v N v m 0 Lo ILo a) Cm IRt 1-t (30 Lf)
C
C-) p co
r- 0) cr) 00 -
to CY) 0
INt cr) M 0
in
N r--
co,-t
00 Ln CY)
c M Pcr) C>
r CD C) CO 00 t'0
LO CM 0 - V cl CM CD r- V U) 00 0 (D
M cj0
4cm c c\i ri 6 4 ci
ui .6 c6
CO 6 6
4 ui 6
r, c6
4 4 Lei 6 c6
r-- oi 6
LL
04 V
4.9
> > E co in 00 000 000 in 000 000 00 U= v- 04 C\l -q In Lo C Lo C) CM - CMV Lo U) aLn Ln 0 IL 04 M Ln N CMM r-
> 0 !R -0 Co 0 0 0 0 , U') tn 0 Ul 0
1 cli V 01 M Ln N
-27
INSTALLATION (CONT.) E. MECHANICAL FIT OF CABLE IN RACEWAY Five parameters influence a cable's mechanical fit in a raceway: its configuration, weight, clearance, jam ratio and coefficient of friction. 1. Configuration The configuration of the cable in the raceway is measured by the ratio of the inner diameter of the conduit to the overall diameter of one of the cables within the conduit (Did). Acradled configuration occurs when cables with a ratio of 2.5 or greater are pulled in parallel from individual reels. A triangular configuration occurs when cables with a ratio of less than 2.5 are pulled in parallel from individual reels or when cables are assembled.
Single Cable
Cradled
Triplexed
Configuration directly affects drag which is computed as Weight Correction Factor (w) in thefoliowing section. 2. Weight When making installation calculations, use the total weight per unit length of the cables being pulled. Cabled assemblies will weigh more than paralleled cables unless the cables were specially ordered to have several paralleled cable wound on a reel. Weight Correction Factor (w): Due to its geometric configuration, a cable is subjected to uneven force when it is pulled into a conduit. This imbalance results in additional frictional drag which must be calculated and allowed for if your installation is to be successful. No. Conductors Configuration Factor (w)
dY-d-) Cradled
3 Triplexed The following graph illustrates the Weight Correction Factor (w):
GA
.(5d J2 D- Y
38
I I I
~~W
1.55-
~~~~~~1.45
~~~~~1.40.
1.35-
1.30
I~~~~~~~~~IM I~~~~~~~~~~~~~~~I I I K II
~~~~~1.156
1.10~~~~~~~~~~~~~11
12.2.3.0K35
4
I
.5
5.
E mI
I/ 13.680.1
TI = rip d
=1
3.37, II
1.1
CRI
rde
I~~~~~~~~~~~~~~~~~~~-R
INSTALLATION (CONT.)
MECHANICAL FIT IN RACEWAY (CONT.) When computing Weight Correction Factor, ensure all cable diameters are equal. When in doubt, use the cradled configuration formula. The cables may be in either a single or multiple conductor construction. But, when only one cable (whether single conductor or multiple conductor under common jacket) is being pulled, no weight correction factor is needed. 3. Clearance Clearance refers to the distance between the uppermost cable in the conduit and the inner top of the conduit. Clearance should be 1/4 inch at minimum and up to one inch for large cable installations or installations involving numerous bends. It is calculated as follows: Of Conductors/Cables Configuration Formula
D-d
1.366d +
DA 2
_d _d
TRIPLEXED
6-d _
d2
D-cl
CRADLED When calculating clearance, ensure all cable diameters are equal. Use the triplexed configuration formula if you are in doubt. Again, the cables may be of single or multiple conductor construction. 4. Jam Ratio Jamming is the wedging of three cables lying side by side in a conduit. This usually occurs when cables are being pulled around bends or when cables twist. Jam Ratio is calculated by slightly modifying the ratio used to measure configuration (D/d). A value of 1.05D is used for the inner diameter of the conduit because bending a cylinder creates an oval cross-section in the bend (1.05D/d). * If 1.05D/d is larger than 3.0, jamming is impossible. * If 1.05D/d is between 2.8 and 3.0, serious jamming is probable. * If 1.05D/d is less than 2.5 jamming is impossible but clearance should be checked. Since there are manufacturing tolerances on cable, the actual overall diameter should be measured prior to computing jam ratio. 40
INSTALLATION (CONT.)
MECHANICAL FIT IN RACEWAY (CONT.) 5. Coefficient of Dynamic Friction The coefficient of dynamic friction is a measure of the friction between the cable and the conduit or roller, and can vary from 0.03 to 0.8, even with lubrication. Typical values are shown in Table below: TYPICAL COEFFICIENTS OF DYNAMIC OF FRICTION (f) WITH ADEQUATE CABLE LUBRICATION AT TIME OF PULL TYPE OF CONDUIT CABLE EXTERIOR PVC - Polyvinyl Chloride PE - Low Density HMW Polyethylene CPE - Chlorinated Polyethylene HypalonO -CSPE (Chlorosulfonated PE) NeopreneO - N (Chloroprene) FREP - Flame Retardant EP XLPE - Cross Linked PE LEAD M .4 .35 .35 .5 .5 .4 .35 .5 PVC .35 .35 .35 .5 .5 .4 .35 .5 FIB .5 .5 .5 .7 .7 .5 .5 .5 ASB .5 .5 .5 .6 .6 .5 .5 .5
M = Metallic, Steel or Aluminum PVC Polyvinyl Chloride, Thinwall or Heavy Schedule 40 FIB Fiber Conduit - Orangeburg or Nocrete ASB Asbestos Cement - Transite or Korduct The coefficient of friction of a duct or conduit varies with the type of cable covering, condition of duct or conduit internal surface, type and amount of pulling lubricant used and ambient installation temperature. High ambient temperatures (8010F and over) can increase the coefficient of dynamic friction for cable having a nonmetallic jacket. Pulling lubricants must be compatible with the cable's components and be applied while the cable is being pulled. Note: These values may be conservative and lubricant manufacturer should be consulted for recommended coefficients of friction.
41
INSTALLATION (CONT.)
F. Physical Limitations of Cables 1. Overview The fifth and final consideration in any cable installation is the physical limitations of a cable as it is being pulled into position. Pulling subjects cable to extreme stress and, if done improperly. can displace a cable's components. Thus, it is important that the followin g guidelines be observed: Calculate and stay within the cable's maximum pulling tension, maximum sidewall load and minimum bending radii. Ensure that the raceway joints are aligned and that the wiring space is sufficient. Train the cable to avoid dragging on the edge of the raceway. It using a basket grip, secure it to the cable with steel strapping and cut well behind the area it covers once the cable is in place. Ensure that the pull rope's elongation minimizes jerking. Pull NO FASTER than 40 feet per minute. Pull with a capstan, if possible. Do not stop a pull unless absolutely necessary. NEVER pull the middle of the cable. Seal the cable ends with high voltage putty or silicon caulking and overwrap with tape. 2. Maximum Pulling Tensions a. Overview Excessive pulling tension can cause delamination and displacement of a cable's components. This can cause voids which become the focal, points for corona deterioration. Pulling Tension should NOT EXCEED the SMALLER of these values: * Allowable Tension on Pulling Device. * Allowable Tension on Conductor. * Allowable Sidewall Load. 1. Allowable Tension on Pulling Device. Do not exceed the working load stated by the manufacturer of the pulling devices (pulling eyes, ropes, an'chors, basket grips, etc.). If catalog information is not available, work at 10% of the rated braking tensile strength. Basket Grip - The allowable tension with a basket grip must not exceed the lbs/cmil value (as shown in the Table on page 47) or 1000 lbs, whichever is smaller. Exceptions to this rule are the following Cablec products, for which the upper limit is 1250 lbs. Single Conductor - Durasheath EPR, Durasheath XLPE, Unicon FREP Multiple Conductor - Flame-Guard Durasheath EPR.
42
INSTALLATION (CONT.)
PHYSICAL LIMITATIONS OF CABLES 2. Allowable Tension on Conductor The metallic phase conductors are the tensile members of the cables and should bear all pulling forces. Shielding drain wires or braids should never be used for pulling. Conductor pulling tension should not exceed: Material Copper Aluminum Aluminum Aluminum Aluminum All Cable Type All Power Power Power URD (solid) Thermocouple Temper Soft Hard 3/4 Hard 'AWM' Soft (112 hard) lb/cmil 0.008 0.008 0.006 0.005 0.003 0.008
Three-quarter hard aluminum is allowed for power cable. AWM is required for UL labeled 600V aluminum solid wire 8 AWG and smaller, it may be used in larger sizes. Soft is sometimes used for large solid aluminum. AWM is a UL designated aluminum.
Reduce the maximum pulling tension by 20% to 40% if several conductors are being pulled simultaneously since the tension is not always evenly distributed among the conductors. While BIGC Cables does not recommend the practice, we recognize that some users pull a combination of conductor sizes simultaneously, observing the maximum pulling tension of the largest conductors. During such a pull, the smaller cables may get crushed at bends or may have the pulling forces transf rred to them momentarily (which greatly exceeds their tensile strength). Maximum pulling tension is calculated as follows: TENSION MAXIMUM, single conductors, pulled in parallel:
n < = 3: TM = TI/c n TM = TI/c n 0.8 t = sheath thickness n > 3:
TENSION MAXIMUM: multiple conductors: For cables 8 AWG and larger, and over 3 conductors: TM = 0.8 ETI/c For cables smaller than 8 AWG, and having no twisted subassemblies, and over 6 conductors: TM = 0.8 ET1/c For cables having twisted subassemblies: TM= 0.6 ET1/c The following charts provide the data necessary for calculating allowable tensions:
43
Ln 0
to
c4v
co wmrLn W Omw
COO
0 a 066coo
000
D000
C14 Ln -T
000
000
coo
00-
co 0
r,
000
000
co
CD
co V
C 6
(D
L)
m
008 0 0 000
CD V 0 _
8 0 0 000 U,
r., Cn
Ln V
Ln 0 C4 CDCN Ln
8 000
CDCN Vm V as N Lo 0 00 -
C14 M 0 0 000
a) Ln (D IT rl 00
CD V
CNI
co a Oa
CL
im
0 8 'No 0
m
C)
coo
-8 CY r- Ln VI 0) V CO(m- (n V C) OM w C, C400 Ln o -covy 0 00 U'l 0 co m C.)qr CD Ln CN Ln .00 0;;C14 ZCd CN M W Ocio doo 000 000 r, CD Ln co v r, cD to 4M C.) 4m C14 cn
Cld C-i mmlw
C) 000 000
cn m ;z w 0- Ln V co m cn CY) cc r-j m v cm Ln cc M CN W OD Ln C
00C14(N C'yM 0 0
fft
co to
-a kn co
coo
c,4 0
0 -
Ln C,
N ff)
a
0
0 0 co 0
W M dOo
ch
r- c-J r- 0
cr
0
C
E im 0 E
ci cioo
Lnw (n Iq It? . 0 00
C) Ici
00
to 0 cd
a K 0) C
w 0
0
WIM C) IT m m Tq Ln 0 0 000
0 Ln o
C14
CD b
co o
0 r- CM .0 r 5
0
U W wmvq wow v CN 0N m C-) aj 0 co mv srF CN .2. C .! ? m wmm,cn 0 a 0 N C14of m n Ln acoo Ocia, 000 OOO 000
C 0
Ln 0 cn 00 Ln M V co V N Ln CD r-j Co Ln Cn W CD W Co Co M CD coo OOd Ocio E Z 0 C 0 0 E CMCoSi h: 12 r- > 4) 4) to U) r4 o 0) 4)
CLU 0
CM
CL
E 0
0 C,) 17 u) 0 M VfD M M Lo r1l a V OD M IT 0) r- M V vLn 0 cli V)CO N 000 0 tO 8 0 0 N ry C14 m C%, OOO OOO OOO 000 Oco
CO W 8 CD m lq ID v 000
E 0
000 C14000 M 000 V8 OD:: CO L; 0 C) 0000 0) 00 000 CD =1080 080 CD V IT C'j (D 0 CO (0 V). Ln M 0 _ -N r, 9D co w E McLq OulCD 0 cn CD C,4 -M CDM to (D:; C14 PI Q 04 M V
CIA Ln EDCO Lo; x
800 08
WoLn
0 U)
0 co C co u U)
VI
PI r-
0) 0 -
E coo Ch U C 0
(3
44
FE
uE
N C
a6 - tn m Ln -
ui r-: c
r w 0
Ln
ucn
zN
-j
CC
V r- CM W COCM r- N WA W M Ln N m cmm
mmo
cm v;w 4 0 wN 0 a cm m v V) , 0, EN
. . . . . . . . . CM 00 0 0 002 N kg) 00 cb
04 CY cl V)
M cao 0
Wwsv
c .4 r-:
mmo
N C6 cj N
co in 0
cV CY 1-t 0)
04
Ln le in c 00 CO V)
It
'D N
10H
. .
C!
.5 i
CD
In
E
z
Z lao
-W m
r.- a N W) 0 w r.. w ci 6 oi
cq to r. 6 4 ui
co cd vi rco
M.2 0 ro
0
RN
o w
C4 C
E cc' m E
(I u? cR N co m 0 -
to cm
0 04
4)
.0 E o C im3
C4 w
w 04 00 en
in o;z 4m cn
r- 4m 0 W Cc (D
C;
CIAm PI -W -a -W
"i 4
4 uid
z .6
(D a, t i ci ".: ci - -
0 C) V) W) r, W Z 6 : 'd C5 :
- - -
P. W)m co Q -4 wi f.
C.)
0 G E CD
#A
CL
- cl CY N 0A Cm Cm r0
tm.2 in
> Wu >
E 0
0
cV CM 0 Lo 0 C4 M ID Im 0 C4 c
0 MM in in r. -4 W M CM CQ ci 4 ui ui (a r--:cd ci 6
CY
f,
Ecl u OR o o
CM CO M CM 40 N CM
cj q v) c4 'P cl N c4 r: 'P "Q: 'TEo r.: Ln to co v) & w c-) cq w? N oli Cj en v m Co CD0 Ln CD P, N Cl CO -T It 0 (D N Cyt, 0 V) #- 0 W)CD 0 0 0 CY CY M V) V3 V W Cli
C4 0 00 W.WC4 ochco wqrr) C4-0
ui ei X
-
Co
co
.2 -Z g 0 E E cis 2 0
E = P
Oil
IV Ln Ln to g r
C)0 ul 0
CD 0
U)
Ar,
INSTALLATION (CONT.) PHYSICAL LIMITATIONS CONDUCTORS INPARALLEL OR AS ASSEMBLIES SOFT DRAWN COPPER OR HARD DRAWN ALUMINUM The following maximum tensions are for direct attachment to the conductor. However, the pulling force must not exceed the smallest value of 1) conductor tension, or 2) pulling device tension, or 3) sidewall load. #CDR 2 3 4' 5 6
AWG/kcrnil 20 18 16 14 12 11 10 9 8 6 4 3 2 1 1/0 2/0 3/0 4/0 250 300 350 400 -450 500 600 700 750 800 900 1000 8 13 21 33 52 66 83 100 130 210 330 420 530 670 840 1060 1340 1690 2000 2400 2800 3200 3600 4000 4800 5000 5000 5000 5000 5000 MAXIMUM ALLOWABLE CONDUCTOR TENSION (LBS) 16 26 41 66 100 130 160 200 260 420 660 840 1060 1330 1690 2130 2680 3380 4000 4800 5600 6400 6500 6500 6500 6500 6500 6500 6500 6500 24 39 62 99 150 190 240 310 390 630 1000 1260 1590 2000 2530 3190 4020 5070 6000 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 26 41 66 100 160 210 260 330 420 670 1060 1340 1690 2140 2700 3400 4290 5410 6400 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 33 52 83 .130 200 260 330 410 520 840 1330 1680 2120 2670 3370 4250 5370 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 39 62 99 150 250 310 390 500 630 1000 1600 2020 2540 3210 4050 5110 6440 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 AWG/kcmil 20 18 16 14 12 11 10 9 8 6 4 3 2 1 1/0 2/0 3/0 4/0 250 300 350 400 450 500 600 700 750 800 900 1000
CHARTS
T = 0.008 x CM x N, if N < = 3. T = 0.008 x CM x, N x 0.8, if N > 3. This chart may also be used for hard temperature aluminum conductors. However, use 1/2 of these chart values for all other UL labeled cables having aluminum conductors.
46
I I I I
~INSTALLATION (CONT.) PHYSICAL LIMITATIONS OF CABLES ~CHARTS HAVING EOUAL SIZED CONDUCTORS; WITHOUT SUBASSEMBLIES SOFT DRAWN COPPER
MULTICONDUCTOR CABLES
The following maximumn tensions are for direct attachment to the cable jacket. However, the pulling force
must not exceed the smallest value of 1) conductor tension, or 2) pulling device tension or 3) sidewall load. AWG-= 20 is 16 14 12 11 10 9
~
2
~~CDR
16
CDR
2
4 5 7 8
~~3 24
33 41 478 49 52
39
52 65 78 83
62
83 100 1090 120 130
99
150
190
240
310
410 520 606 620 670 7509 830 920 1000 1000
3
4 5
9 10 11 12 13
~~~
65 72 78 85
100
~~~ 93
110 120 130
8 10 11 12 13
I I~ I
~~~~14
15 16 17 19 20 22 24 26 28
91
98 100 110
140
150 160
230
240 260
360
390 420 440 500 520 570 630 680 730
580
620 660 710
730
790 840
930
990 1000
1000
1000 1000 1000 1000 1000 1000 1000 1000 1000
14
15 16
~~~1
170 190
7 8 40 70 8010 00 1
280 8940 1000 310 330 360 390 420 460 790 830 910 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000
17 19 20 22 24 26 28
~
32 34 36 38 40 42 44 46 48 50
~~30 190
200 220 230 240 260 270 280 300 310 320
310
3330 350 370 390 410 430 450 470 490 510
490
520 560 590 620 660 690 720 760 790 820
780
840 890 940 1000 1000 1000 1000 1000 1000 1000
1000
1000 1000 1000 1000 1000 1000 1000 1000 1000 1000
1000
1000 1000 1000 1000 1000 1000 1000 1000 1000 1000
1000
1000 1000 1000 1000 1000 1000 1000 1000 1000 1000
1000
1000 1000 1000 1000 1000 1000 1000 1000 1000 1000
30
32 34 36 38 40 42 44 46 48 50
T =0.O8 x CM xN,ifN<=6.
~
T
= 0.008 ~~~T
=
x CM x N x 0.8, if N>6.
~~~~~~~~~~~~~~47
1f2 wf
VC
vuCu
OD
T0 ~ T eWfO.
iiWRv
-coso)]I
[2.vif sine (O
_2 2(
.
f) AleDCD - cosO)I (e
~TineklfO~-
+WR
VC
41- 2
si'Z
8H
o- 360
2R
S 2R cos R
K'
-----
tan~'2-
48
CALCULATION DISCUSSON
PULLING AROUND BENDS The preceding formulae for vertical bends assumes that the cable is sliding on the INSIDE SURFACE of the bend. This would not occur on concave up bends when the sidewall loading is less than the weight of the cable. -Cable --- Duct
Typical installation having cable dragging the bottom of the duct are river crossings or up and downhill pulls of long lengths. BENDS MULTIPLY INCOMING TENSION. STRAIGHT RUNS ADD TENSION. The difference: where: Mt = 1.1 W = 2 f 0.5 Tn = 500 lb wfWL + T.n = 61 0 lb
pull around 90' ell: T out Tn e 12001b (See page 59) Thus for the given conditions, one 90' bend increased the tension almost double that of 1 00 ft of straight duct! Because of this multiplying effect, it is better to feed into the duct end having the greater number of bends. But calculate the tensions for pulling either direction to determine which will be easier. CALCULATIONS CORRELATION Even though the foregoing parameters and formulae give exact answers, because of variances in installation techniques, these answers may not correspond to facts. THESE CALCULATIONS MUST BE USED ONLY AS GUIDELINES TO PREDICT "NORMAL" OR "DIFFICULT" CABLE PULLS. The stated parameters and formulae do not consider forces required to bend the cables, and the coefficient of friction is arbitrarily selected - in fact it may change during the pull it the lubricant is not spread evenly. Seldom are the bends located exactly as shown on the designer's drawing, nor are the exact bends' angle or radius known. Nevertheless, one major engineeringcontracting firm states that for 90% of the pulls at a given project, the actual was within 10% of the predicted pulling tension. CAUTION The formulae do not take into account: 1) Weight Correction Factor when there are more than 6 cables (use w = 1.4); 2) Sidewall Loading when there are more than 3 cables; 3) Bending forces in short pulls of large cables through several bends. To better correlate tensions: 1) read just before the pulling head starts into a bend, 2) read just after the head exits a bend, 3) read just after the cable exits the raceway, 4) the meters should have range switches so that the readings are made at half to full scale of the meter, 5) the main reading is the last when the pulling head and rope have minimum influence, 6) record the relative position of the pulling head for any unusual surges.
49
Wfe
1800 BEND MULTIPLIER
e
90,
7 This isthe multiplier used incomputing ten - - - sions around bends. 6 I1Jq I 70' - -
19
0
-I0440 7 -
1xi I 01
40,
3-
- - - - -
I 1XI I A IZI I - - - 00 0,100,I -. -.411 1, I I Lo, I so, 1L4 i1o,I I 14ol 100' I - - - Yi I v yo, 1.100 70 -Pq -45' /I v Yl 000 .0 '01 ly LOO 00.1
ol
010
00
11?,
LK 41 1 1 --- LLo.
40
IL 30-
o, oo ooo
oo
e I .22.5' 20' I
OOV, 00
01 / 010 0,0n ol S
140
ol
00
:a 4
-t7T
o-
IT[Lu Ii iI
1.0 1.2 1.4
I01
-'4 0.2
examol
0.4
0.6
0.8
50
INSTALLATION (CONT.)
F. PHYSICAL LIMITATIONS OF CABLE (CONT.) 3. Sidewall Loading (Sidewall Bearing Pressure) a. Overview Sidewall load is the radial force exerted on a cable being pulled around a conduit bend or sheave. Excessive sidewall loading can crush a cable and is, therefore, one of the most restrictive factors in installations having bends or high tensions.
TENSION
LOAD
Sidewall loading is reduced by increasing the radius of bends. To illustrate, a 15 kv 350 kcmil cable installation dropping six feet vertically underground, traveling horizontally, then rising to a motor should have bends at least six feet in radius to maximize the horizontal distance and still be within the sidewall limit of 500 lbs./ft. Sidewall loading is calculated as follows: SIDEWALL LOADING Where T is tension out of a bend, in pounds and R is radius of a bend, in feet 1 /C per conduit: 3-1 /C cradled: 3-1 /C triangular: SW SW SW
T R 3w-2 ] 3 T R T
Laboratory tests conducted on standard BICC cables after they had been subjected to conduit ,pull tests through 900 elbows of appropriate radii, indicate no significant change in the cabi 's electrical parameters at the following sidewall loads:
Cable type 600V nonshielded control 600V & 1 kV nonshielded EP power 5-35 kV Unishield & Uniblend, 5 kV Durasheath EP Interlocked & Philsheath armored cable (All Voltage Classes)
INSTALLATION (CONT.)
4. Training and Bending a. Overview Training is the positioning of cable which is not under tension. Bending is the positioning of cable which is under tension. When installing cable, the object is to limit these forces so that the cable's physical and electrical characteristics are maintained for the expected service life. The recommended limits are: b. Tables per National Electric Code (Page 57) c. Tables per ICEAMEMA (Page 58) d. A nonshielded cable can tolerate a sharper bend than a shielded cable can. This is especially true for cables having helical metal tapes which, when bent too sharply, can separate, buckle and cut into the insulation. The problem is compounded by the fact that most tapes are under jackets which conceal such damage. The shielding bedding tapes or extruded polymers have sufficient conductivity and coverage initially to pass acceptance testing, then fail prematurely due to corona at the shield/insulation interface. Remember that offsets are bends.
52
INSTALLATION (CONT.)
4. Training and bending (cont.) b. Applications in accordance with the NATIONAL ELECTRICAL CODE.
Table I
Shielded or Lead-Covered Cable (Non-Armored) Single and Multiple Conductor All Voltages Over 600 Volt Nominal 12 x Overall Diameter
Table 11
Single and Multiple Conductor All Voltages Over 600 Volt Nominal 8 x Overall Diameter
Table III Armored Cable - Type MC Interlocked or Corrugated Sheath Multiple Conductors - Non Shielded 7 x External Diameter of Armor Multiple Conductors - Shielded 12 x Diameter of One Shielded Conductor or 7 x External Diameter of Armor Whichever is Greater
In all cases the minimum bending radius specified refers to the inner surface of the cable and not to axis of the cable.
INSTALLATION (CONT.)
4. Training and Bending (Cont.) c. Applications in Accordance With ICEA/NEMA STIDS. (Non-Code) Table I Non-Shielded, Non-Armored Power & Control Cable Thickness of Conductor Insulation Inches Up to 1.000 Overall Diameter of Cable, Inches 1.001 To 2.000 Over 2.000
4 5 -
5 6 7
6 7 8
Table 11 Metallic Shielded and/or Armored Power & Control Cable Minimum Bending Radius Type of Cable Flat Tape or Wire Armored Armored, Interlocked (Duralox ) or (PhilflexO ) -----As A Multiple of Cable O.D. 12 12 12 12 Table I Above
Armored, Welded Corrugated Sheath (Philsheath *Non-Armored, Tape Shielded UniBlendO *Non-Armored, Wire Shielded or UniShieldO -
'Includes 12 x Single Conductor O.D. in Cabled Assemblies, i.e. Triplexed, Quadruplexed, etc.
The above Tables contain the minimum values for the radii to which insulated cables may be bent for perman nt training during installation. These limits do not apply to conduit bends, sheaves or other curved surfaces around which the cable may be pulled under tension while being installed. Larger radii bends are required for such conditions due to the limitation of sidewall bearing pressure. In all cases the minimum radii specified refers to the inner surface of the cable and not to the axis of the cable.
54
EXAMPLE 1
Maximum length
_____
__
__
__
__
I I I I
Problem: Find the maximum manhole spacing for a feeder. Cable: 3-1IC, 350 kcmil Cu, 15 kV GN, 0.175 " EP - Lead; to be
~~~~~~~~~~~~~installed in parallel.
=1.39
in
-EP-Lead'
~~~~~~~~Clearance
0.5D
1(
=0.5 (4.03)
(1.366) (1.39)
=1.24
in. =0OK
~~~~~~~~~~Tm Tm
Lm find Tm Mf i~ d
2
=6500
m +1 3
((0.5)
6500 40-.9i1000/
-=
995 feet
(3
55
INSTALLATION (CONT.)I
CALCULATION EXAMPLE
EXAMPLE 2 10 ft
I
vertical
7~~~~ 5 6~~~~~
Probem:Insall15 V fede beteen1 ad 8in igi codui 4I 0tt 9
Prole nsal
UniShield weight
=
Cu (gedrounding); cabld
nrgd odi
673 lb/IVFT. d
0.92 in
Class B bare = 128.9 lb/MFT, d = 0.232" area = 0.0423 in2 Per Conductor Tension, Tm = 2530 for 3/C
Conduit Selection:I
Cable Area = 3.irl/4*0.922 + 0.0423 =2.04 in2 For fill < 400/ use 3"1C (see "Conduit Info" - 3"C has 40% area of 2.96 in2) 0.96 ftI Conduit Info 3"C: 0 = 3.068 in, stid R 1 Jam: 1.05D/d
=
1.05 (3.068/0.92)
3.5
=OK
Clearance; check if # 4 fits interstice of phase cdrs.I Interstice factor = 0.483 (see Appendix)
2.155d
3.068- 2.155*0.92
=1.11
inch
0.92* 12
11 inches
=
0.92*2.155(12
23.5 in
2 ft
=2.37
Bending radius: we must use conduit elbow having at least 30-inch radius (R xceed 2 ft training limitation.
56
I I I I I
INSTALLATION (CONT.)
~CALCULATION EXAMPLE ~EXAMPLE 2
See Weight Correction Chart, for Did wf -1.1.0.5 K
=
3.068/0.92_ w -1.1
0.55
W
=
1.20
10.2 19.2.37
52
PM
0.232
~~~~~for0.55. 0 wf =
Pulling from 1 to 8:'
T2= wfWL
=
since T2 >1OWR then T3 ztT 2 e~~0, likewise for T5 &T7 T3 zzT 2 e~f U= 384.1.33 =51 1 lb
~P ~
Iw/2R1 3 =
T3
=0.232-51
119 lb /ft
=
=OK
since 119<-500.
T4 z KL +T 3 P5
=1.20.290+511
859 lb
:~:T 5 ~T = 4 ewt()
=
859*1.33
=
1142 lb
=
[w/2RJT 5
5
=
0.232-1 142
265 lb/ft
OK
3100 lb
=
NO because-.TM
=
P7 = [&/2R]T 7
0.232-31 00
719 lb/ft
NO because >Pm
Thus we cannot pull from 1 to 8 because both maximum tension and sidewall load are exceeded at 7. Pulling Example 2 Pulling from 8 to 1
I I,~ I
:zLKL 5~T
~P = [W/2R]T 4
T3 :z:KL + T 4
=
OK
1.20-290+ 223
=
571 lb
:-,T 2 ~T3 e
P2
=
=751 *1.33=759 lb
1 76 lb/ft =OK
=
[ml/2RJT 2 = 0.232*759
T 1 :~:KL +T 2
65 lb
.P
=736
lb
pulling from
~~~~~~~~~~~~~~~57
INSTALLATION (CONT.) CHECKLIST RACEWAYS E] Bending - Check sidewall loads; the use of long sweeps (over 6 ft) allows longer shielded medium voltage cable pulls. - Avoid bends and offsets at the 'pulling' end of a raceway section. Training - Make sure to meet or exceed the minimum training radius. E] Size - Consider weight correction factor and clearance. El Jam Ratio - Avoid a conduit to cable ratio which may cause jamming; elbows may be out of round. El Conduit Fill - Raceways that are too full create pull-in problems and possible cable damage. E] H at Transfer - Route raceways to avoid high ambient temperatures and high thermal resistivity locations. - Separate cables in raceway seals and fire stops. Abrasion - Use duct end-bells, conduit bushings,'and rack saddles to prevent abrasion. n Grounding - Be sure metallic raceways are grounded. Expansion - Thermal expansion of raceways should be considered in duct layout. Spacing - Heat dissipation improves with greater spacing between raceways. Manhole/Spli6e Box - Allow enough working space for pulling and splicing. - Install anchor bolts and grounding electrode during box fabrication. - Provide cable supports. - Chamfer concrete edges at openings. - Provide drainage holes in bottom of boxes, adequate lips on covers. E] Supports - Support raceway system, during system and cable installation, especially trays. - Provide for gang rollers' insertion to be used during pulling. E] Ties - Allow for radial expansion of cable during electrical loading. DIRECT BURIED C] Backfill - Use screened backfill to keep rocks, and debris from damaging cables. r7 Crossovers - Do not lay one cable on top of another. Cable Slack - Allow for earth movement due to freezing, drying or settlement. D pth - Stay below frost-line, check Code requirements. Protection - Use marker tape, and post warning signs.
58
INSTALLATION (CONT.) CHECKLIST PULLING El Conduit Cleanout - Provide clean, SMOOth COncentric inner duct surface; test with a mandrel for obstructions. R Bending -- Bends during pulling must be larger than those permitted for final training; ESPECIALLY THE LAST BEND, WHICH MAY BE TEMPORARY FOR INSTALLATION! F1 Edges - Install temporary guides, tubes, sheaves, etc., as necessary to prevent cutting of cable on sharp edges, such as at panelboards. E] Maximum Tension - Keep sidewall loads below specified maximum. - Check maximum allowable pulling tension. - Check limitation for type of pulling attachment used. M Lubrication - Use pulling compound liberally. Be sure itis compatible with the particular cable being installed. Prelube just before making a difficult pull. Temperature - Check for minimum allowable installation temperature. Allow for change of the coefficient of friction with temperature. El End Seals - Keep moisture out of cable. R Special Instructions - Check shipping container for special instructions.
59
IV
60
surface: (If
1 = conductor 2 = stress control layer 3 = insulation 4 grounded shield 5 creepage length
O
This gradient may be controlled with a stress cone by altering the relative capacitance and insulation thickness; much as an optical lens retracts light:
1= 2= 3= 4= 5= 6= 7=
conductor stress control layer insulation grounded shi Id creepage length stress cone flared shield
Lik wise, special tapes or paints may be used to alter the relative capacitance
Tape: Half-lap and stretch per manufacturer's recommendations - usually 3/4 original width; over-stretch ends and roll each layer to prevent voids; use fresh tape only; remove separator backing, start and end taping at the middle of the splice or termination. Grounding: Except in unusual installations, ground shields at every opportunity; grounding leads should be copper, solid 6 AWG minimum and insulated outside of splice or termination to resist corrosion; connect outdoor termination grounds directly to lightning arrestor grounds; span splices with grounding lead for fault ampacity. TOOLS/SUPPLIES Diameter Tape Knife & Stone Soldering Iron Crimping Tool Plastic Pipe Cutter Linesmen's Pliers Hacksaw Screwdriver Ruler, Grease Pencil Splicing Separators Scissors Hose Clamp Rat-tail File Concave Roller (tape roller) Wire, solid copper, Nos. 12 & 6 AWG (tie wire, gn bond)
62
CONDUCTOR (ANAPACT)*
UnIShIeId*8
EP- Lead
'Electrically Conducting
I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~A1
(ANAPACTi
CDUTRCONDUCTOR
(ESS)*
I..
(ESS)*
INSULATION INSULATION SHIEILD* (EXTRUDED)
~~INSULATION
SHIELD BEDDING * TAPE OR EXTRUDED)iLlINSULATION
(TAPE)*
WIRE SHIELD*
Wire Shielded
URD
Identify Cable Shield System TAPE SHIELD - UNIBLEND6 - This cable has copper-tape shields and between these tapes and the insulation surface will be a layer of electrically conducting material. This cable has an overall jacket. WIRE SHIELD - UNISHIELDO - This cable shield consists of longitudinally applied corrugated wires embedded in a conducting jacket. This conducting jacket adheres to the cable insulation. WIRE SHIELD-URD - This cable shield consists of wires wrapped around a conducting polymer jacket which adheres to the cable insulation. EP-LEAD insulation. Cabi This cable shield consists of a lead sheath over a conducting polymer which adheres to the cable
Preparation
Be sure the splice/termination is the correct one for your specific cable type Review cable manufacturer's instructions. Review and follow splice/termination manufacturer's instructions. Determine proper dimensions. Train cable into final position Cut off excess cable. Remove overall jacket. Remove single conductor jacket for all except those constructions having drain wires emb dded within the jacket, such as UniShield. METALLIC Component of Shield: Concentric Neutral (URD): bind wires (but not tightly); unwrap and twist into pigtail-, tie back out of way. Drain Wires (or UniShleld): mark pull-out point with two wraps of PVC tape; unwrap wires or pull out UniShield wires and twist into pigtail; tie back odt of way; remove PVC tape. Tapes (Uniblend): tack solder at cut off; apply hose clamp; score; unwrap and tear tape against knife edge. Tube (EP-Lead): apply hose clamp; score.- make one or more longitudinal cuts-, roll back and t ar.
65
SPLICING AND TERMINATING (CONT.) Cable Preparation (continued) Extruded Conducting Layer (EIS)-. Conducting Tapes: apply clamp; score; unwrap and tear against knife edge. The circumferential cut may be made using a plastic pipe cutter, a knife in conjunction with a hose clamp for its guide, or a file - rat-tail or triangular - when a taper is desired. The longitudinal cuts are made in UniShield by pulling out the drain wires. For other cables, use a guarded tip knife - such as Stanley No. 199 - which has had the tip or guard ground to give a tip long enough to just cut 85-95% through the conducting layer. Make longitudinal cuts 0.625-0.75 inch apart. Heat may be applied to soften the conducting layer. Excess heat will be indicated by smoking of the material. Roll or pull the longitudinal strips back to the cut-off point. Penciling (when required) Mark pencil area with two wraps of PVC tape on each side: slice the insulation into a taper using a 4-inch knife; smooth with abrasive cloth (nonconducting); then remove PVC tapes and insulation stub which has served as a handle and guard unless solder connectors are to be used, then part of the stub may be left temporarily as a heat shield. Charrifer insulation edge slightly if penciling is not required (penciling is done also to provide a long bonding area for taping.) Cleaning Wipe the insulation towards the shield with a solvent-dampened cloth to remove conducting particles on the surface. Loosen remaining conducting material with a nylon solvent-dampened scouring pad backed with a cloth. Buff only if absolutely necessary with a 240 grit nonconductive abrasive cloth. Wipe clean with a solvent-dampened lint-free cloth DO NOT POUR SOLVENTS OVER CABLE Protecting Seal and protect insulation with a single layer of PVC tape during a temporary splice/termination stoppage - i.e. for lunch. Rewipe with lint-free solvent-dampened cloth after tape is removed just prior to splicing/terminating. NOTES Minor scratches on the insulation must be buffed. Cuts or gouges into the insulation necessitate removal of insulation to that point and restarting. All conducting material must be removed from the creepage area. Do not loosen remaining shield beyond the cut-off point either by allowing flaring or by solvent flowing under the shield. Make cuts square, trim away raveling or jagged edges Insulation without a conducting layer is lighter in color, its surface resistance is higher. Remember that black rubber has carbon black as a constituent, so it will also discolor a solventdampened cloth. Follow the solvent manufacturer's handling precautions. Use a minimum amount of solvent and buff ing on the "creepage" area. The 1/4 inch of insulation adjoining the shield cut-off need not be perfectly clean, since this area is reshielded during the splice or termination installation.
66
Stress Cone Apply half-lapped tightly-stretched layers of high voltage (HV) insulating tape back and forth to build a tapered stress cone. Keep 1/4 inch away from any shield component Grounding Attachment UniShield: Twist drain wires together; cut to 1 1/2 inch; splice to 6 AWG solid copper grounding bond. Uniblend & EP-LEAD:- Apply a 3/4 inch tack of solder longitudinally to hold the 6 AWG solid copper grounding bond to the metal shield component. Shi Iding For all cable types, apply one half-lapped tightly stretched layer of conducting tape overlapping the cable shield to within 1/8 inch of the stress cone peak. NO VOIDS If it is desired to 'beef-up' the stress cone shield, apply one half-lapped layer of shielding braid 1/8 inch from the edge of the conducting ta0e (near the cone peak) to 1 inch beyond the conducting tape overlapping the cable shield. Jacketing Apply two slightly-stretched half-lapped layers of HV insulating tape over stress cone, overlapping the cable jacket and onto the insulation creepage area by 1/4 inch maximum. Make a good sea[ at the grounding bond exit. Apply two half-lapped layers of PVC tape over this HV tape just applied, overlapping it by 1/4 inch. Connecting - see that prior page. Sealing For outdoor terminations seal the conductor against moisture entry at the lug. It is not necessary, nor desirable, to seal the cable ends in dry locations just against water vapor. However, it may be desirable to seal against other corrosive environments. Fill any indents in the lug with conducting tape strips after burrs have been removed. Apply one half-lapped slightly stretched layer of conducting tape overlapping the lug barrel and just 1/1 6 inch onto the penciled insulation. Apply HV insulating tape in half-lapped slightly stretched layers to fill in the penciled area, then overlapping the lug barrel and insulation. Apply two layers of PVC tape over the sealed end. (Do NOT apply PVC over the insulation between the lug seal and stress cone.) Grounding URD: Wrap neutral back into place to the bottom of the stress cone. With slight tension apply three turns of 6 AWG solid copper around the neutral wires leaving a lead. The solid copper should be coated if the n utral wires are coated. For all: Connect the shield grounding bond to the system ground. UNGROUNDED SHIELDS ARE DANGEROUS. Keep the distance between the termination and its surge protector as short as possible. NOTE: When the circuit designer designates that the shield is not to be grounded, particular attention must be given to keep the shield isolated from ground, which is only practical with Uniblend type cables. Tracking Protection For areas exposed to sunlight or airborne contaminants (i.e. dust) apply two half-lapped layers of trackresistant silicone rubber tape, starting at the highest part of the exposed insulation (usually the lug end) wrapping down over the entire stress cone, then back up to the starting point.
A7
~~~~~~~~~~~~~~GROUN
AKTOVELAD
E~~~~~~~~~~~~~~~~~~~WR
CONDUC N
PVC Y
TP
~~~~~~~~~OVELAPKTOVRA
-
CONDUCTING
OV STRESSSTOESSPCONE
ZIRE~~
CONDUCTIGROUNDIN SHILDNGLVELA STRESS CONE PEASTESSCON UNBRADLSOPINA PLEASHIMELDOS
S ICEDGEG
BEDDING
THICKNESS MATHACE
ETA WIUTHCONF EA
25Kv 0.260
CON~~~~uC
ING CONDPLSTIUINULC T PI
28Kv 0.280 36 2.25 28 5.5 0.6 SOLDER LUG~~SHELDIG OVRLA 35Kv 0.34 2.75N3545T7 0. EPRPE/ Data ndrCOmmNDaTIoNs TArE bRAseP nifraincurnl vial adblee ob reliale. 1CC noguarntee Of NDeUlTsN TAnd able maks asuEs no obIgato orETliabilityEDG whatsoever cnnection in withBtis information
SPLICING AND TERMINATING (CONT.) TAPE SPLICE Pr paration - see that prior page Connecting - see that prior page Stress Control Remove any burrs from the conductor connector Fill any Apply one half-lapped tightly stretched layer of conducting connector indents with conducting tape strips tape across the connector to provide a smooth configuration, overlapping the penciling as shown. Dimension Measure and record the diameter over the taped connector (DOC). Compute what will be the diameter over the high voltage (HV) insulating tape: DOI = DOC + 21 (see drawing for dimension 1). Insulating Do not start or end application of insulating tape at a splice end, ie - stagger the tape endings. tightly-stretched, half-lapped high voltage (HV) insulating tape back and forth between penciling,Apply back and forth across splice to within 1/4 inch then diameter over the connector, with a gradual taper of the shield bedding at each end Build up to proper at both ends as shown Roll each second layer VOIDS CAUSE FAILURE. Shielding Apply onetightly-stretched, half-lapped layer of conducting tape across-the splice, overlapping the existing cable shield at both ends as shown. NO VOIDS. For all but URD cables, apply one halt-lapped layer of braid tape across the splice as shown Fasten the braid by tucking its ends under the last wrap: soldering is not necessary. Grounding Attachment UniShield: Twist the drain wires together; splice to 6 AWG solid copper grounding bond, spanning the splice. Uniblend: span the splice with 6 AWG solid copper grounding bond and tack solder 3/4 inch of the bond longitudinally to the metal shield component at each end. All: bend the grounding bond at a right angle to the cable axis. Apply a spiral wrap of tape to hold the wire in place. Jacketing Apply two half-lapped slightly-stretched layers of HV insulating tape across the splice, overlapping the cable jacket as shown. Make good seal at grounding bond exit. Apply two layers of PVC or jacketing tape as shown Grounding URD: span splice with concentric neutral wires and splice to grounding bond. All: Connect grounding bond to system ground. UNGROUNDED SHIELDS ARE DANGEROUS NOTE: When circuit designer designates that the made to keep the shield insulated from ground, shield is not to be grounded, particular attention must be which is only practical with Uniblend type cables. Protection When a splice must endure a continually wet environment, apply one half-lapped layer of electrical filler tape over the prior tape to span the splice and overlap the cable jacket 2 inches at each end. Apply two layers of PVC tape.
69
Z:1
CL
cl-
0)
OL
C,
13 VD CL
0) Q).c co
.6 .2
CL
-10
cl
X 0
cCL
ZF) -0 w 0 CO 3:
CL
U) o U)
cr
04
N
tr) tn
c cli
LO
C-.4 co co
FE
LLJ EL CL A N
.20 ZE
0 to .x (L
Q)
Q)
a
all
-J
c\l
Ln LO cl) '-T
ZZ if)
b 6
cl) UJ Z -J
zU. z
Z
6 o b rz
(D
t-
CL
LLA
Z < CC -j
1w U
LO Lf)
N 0 cm Lf)
in LO U,)
flc\l flQ)
(n
z
Lij
E,
IC)
A; LU
Z 0
L)
x a
0
z
Z
Li z
oz
ui >
LU
-9 IL uj w cc U
U? U-) C,4
U')
U')
U)
cc
z
z
wo -i Z
m
c O
(4!) D LI) te)
to a) LO
O
CD 4 U
cn U
70
Plymouth Plyshield Plyarc Plyvolt/Plysafe Plyglas Plysil Premium CW Premium Grey (or Black) HD2 Plytuff Plysil
Caution- Some sealing compounds may have detrimental effects on components of power and control cables. These materials at the time of testing were found to be compatible with most conducting cable polymers: 3M Company "Scotchfil", Mac Products "Mac Seal". Data and recommendations are based on information currently available and believed to be reliable. BICC Cables makes no guaranteeof resultsand assumes no obligation or liability whatsoever in connection with this information.
71
EXERCISE CAUTION WHEN USING SOLVENTS. PROVIDE ADEQUATE VENTILATION. AVOID BREATHING VAPORS. AVOID SKIN CONTACT. PROTECT EYES. DO NOT ALLOW SMOKING, OPEN FLAMES, OR HOT METAL IN AREA. Regard all cleaning solvents as hazardous. Most are toxic or will decompose into toxic gases at high temperatures. Some are also flammable. Use minimum quantities. do not permit solvents to contact insulation shielding components. Data and recommendations are based on information currentlyavailable and believed to be reliable. BICC Cab/es makes no guarantee of results and assumes no obligation or liability whatsoever in connection with this information.
72
Cable Spinning Equip. G&W Electric Specialty General Electric Company Greenlee His Business Hotsplicer ITT Blackburn Joslyn Mfg. & Supply, Electrical Apparatus Div. Mac Products 3M Company, Electro-Products Div. Oz/Gedney PLM Products Plymouth Rubber, High Voltage Products Raychem, Elec Pwr Products Richmond Screw Anchor Reliable Electric Richards Mfg. Sherman & Reilly Tel-Eye Industries
New London MN Blue Island IL Schenectady NY: Hickory NC Rockford IL San Diego CA Wauconda IL St. Louis MO Chicago IL Kearny NJ Austin TX Terryville CT Cleveland OH Canton MA Menlo Park CA Ft Worth TX Franklin Park IL Irvington NJ Chattanooga TN Cornith MS
SPLICE/TERMINATION Rating - Record the temperature rating for each device's terminal and of its cable for proper overcurrent protection device coordination. Drawings and instructions - Be sure these are proper for the cable involved. - Follow supplier's instructions. Cable Size, Type, Rating, Dimensions Check these before starting to splice or terminate. F1 Materials - Be sure materials won't harm cable components. Review instructions and have materials on hand before starting to splice or terminate. 'El Tools - R-eview instructions and have proper tools on hand before starting to splice or terminate. E] Shelter - Provide clean, dry and safe work area for splicers n Grounding - Protect personnel from energized circuits. - Be sure termination of a shield is adequate to meet the short circuit capability of the shield. n Circuit Identity - Use permanent tags held with nonmetallic binder.
71
V. TESTING DC HIGH POTENTIAL (HIPOT) TESTING OF MEDIUM VOLTAGE POWER CABLES OVERVIEW This procedure is intended to provide general guidelines for high potential dc testing of power cables. All tests made after cable installation and during the guarantee period shall be made in accordance with applicable specifications. All safety precautions must be observed during testing at high voltage. Read and understand and follow the Operator's Manual for the particular test set being used! TEST EQUIPMENT Dir ct current test equipment is available commercially with a wide range of voltages. Accessory ment is necessary to safely conduct high voltage tests such as safety barriers, rubber gloves and equip. noncon ducting hard hats must be used; consult appropriate safety officer. TEST PROCEDURES See IEEE Standard 400. Acceptable procedures, although varying slightly in technique, have more less b en standardized as either a "withstand test" or a "time-leakage current test". Befor performing any dc overpotential tests: All equipment'must be disconnected from the taps, motors, circuit breakers, surge arrestors, cable circuit, i.e. disconnect transformers, switct etc. This and will prevent test interruptions due to flashovers will preclude damage to such equipmen and/or trip-outs resulting from excessiv( leakage current. Establish adequate clearance between the circuit test ends and any grounded object, and to othe equipment not under test (about 2.5 feet). Ground all circuit conductors not under test with all cable shields including nearby equipment Consult termination manufacturers for maximum test voltage recommendations and time limitations. Th direct current test voltage may be applied either continuously or in predetermined steps to the max imum value in accordance with applicable specifications. Continuous Method - Apply test voltage at an approximate rise rate of 1 kV per second or 75% the rated current output of the equipment, whichever o is less. Some equipment will take longer t( reach the maximum test voltage because of the amount of charging current. Step Method - Apply test voltage slowly in 5 to 7 increments of equal value, to the maximun specified. Allow sufficient time at each step for the leakage current to stabilize.
74
TESTING (CONT.)
HIPOT TESTING PROCEDURE Normally this requires only a few seconds unless cable circuits of high capacitance are involved. Record leakage current at each step. Maintain the test voltage at the prescribed value for the time designated in applicable specifications. The following times are usually considered adequateAt the end of the test period, set the test set voltage control to zero. Allow the residual voltage on the circuit to decay then ground the conductor just tested. Caution - It should be recognized that dc charges on cable can build up to potentially dangerous levels if grounds are removed too quickly. Maintain solid grounds after the test on the cable for at I ast 4 times the duration of the test. On exceptionally long cable lengths it may be necessary to increase the grounding time. It is advantageous to maintain these grounds longer and while reconnecting circuit components. Acceptance Testing - After installation and before the cable is placed in regular service the specified test voltage shall be applied for 15 consecutive minutes. Proof Testing - At any time during the period of guarantee the cable circuit may be removed from service and tested at a reduced voltage (normally 65 percent of the original acceptance value) for 5 consecutive minutes. Record the leakage current, at one minute intervals for the duration of the test time involved. COMMENTS DC overpotential testing of medium voltage power cables is usually performed with negative polarity connected to the conductor. DC overpotential testing is a tool only for determining insulation resistance at higher voltages. Effective resistance of the cable system may be calculated insulation by means of Ohms Law: R = V/1. The relation is: Megohms Kilovolts Microamperes X 1000
Insulation resistance may also be measured with standard instruments which give a direct reading at 500 volts (or higher, depending on the model). IR in general has little or no direct relationship to dielectric or breakdown strength. The significance of conducting dc High Voltage tests on nonshielded, nonmetallic-sheathed dependent upon the environment in which cable is it is installed because the characteristics of the return circuits are unknown. The environment must be carefully considered or test results may not be significant. In fact these tests can result in damage to the cable insulation. Humidity, condensation and actual precipitation on the surface of a cable termination can increase the leakage current by several orders of magnitude. Humidity also increases the corona current, indication is included in the total leakage which current. Wind prevents the accumulation of space charges at all bare energized terminals. This results in an increase of corona. It is most desirable to reduce or eliminate corona current at the bare metal extremities of cable or terminations. This may be accomplished by covering these areas with plastic envelopes, plastic or glass containers, plastic wrap (e.g. 'Saran"k or 'Handiwrap') or suitable electrical putty. Routine periodic dc maintenance testing of cable for the evaluation of the insulation strength is not a com-
75
TESTING (CONT.)
HIPOT TESTING PROCEDURE (Cont.) mon practice. Some power cable users have adopted a program of testing circuits during plann d outages, preferring possible breakdowns during testing rather than experiencing a service outage. It is impossibletorecommendtestvoltagevaluesforthosemaintenancetestswiththehistoryofthecabI nearly cuit. An arbitrary test voltage level could cirbreakdown a cable circuit that would otherwise render long trouble-free service at normal operating ac voltage. The main usefulness of dc high voltage testing is to detect conducting particles left on the creepage surface during splicing or termination. Test equipment should be supplied from a stable, constant voltage source. Do not use the same source which is supplying arc welders or othe'r equipment causing line voltage fluctuations. The output voltage of the test set must be filtered and regulated. Consider using a portable motor driven alternator to energize test set. The gradual decrease or nonincrease of leakage current with respect to time at maximum test voltage is the acceptance criteria for dc hipot testing. TESTING PROBLEMS Extra Leakage CurrentFailure to guard against corona Failure to clean insulation surface Failure to keep cable ends dry Failure to provide adequate clearance to ground Improper shield termination Erratic Readings Fluctuating voltage to test set Improper test leads RESULTS vs CABLE LIFE To date there is no basis for correlation between dc test results and cable life expectancy. PARTIAL LISTING OF EQUIPMENT SUPPLIERS J. G. Biddle Company Associated Research Inc. Blue Bell PA 19422 Chicago IL 60648 Hipotronics Brewster NY 10519 Von Corporation Birmingham AL 35211
Environmental Influences. High Relative Humidity, Dampness, Dew, Fog, Wind, Snow
76
TESTING (CONT.)
MAXIMUM DC TEST VOLTAGES FOR SHIELDED CABLES NATIONAL ELECTRICAL MANUFACTURERS'ASSOCIATION EPR = NEMA WC-8, ICEA S-68-516 XLP = NEMA WC-7. ICEA S-66-524 PE = NEMA WC-5. ICEA S-61-402 ACCEPTANCE Rated Circuit Voltage Phase to Phase Volts 2001-5000 5001-8000 8001-15000 15001-25000 25001-28000 28001-35000 Conductor Size AWG-kcmil 8-1000 6-1000 2-1000 G) 100% (For Grounded I kV 25 35 55 80 85 100 Q Not in IEEE-400 25 35 65 (D
20
1-looo (D
100
IBICC; Cables does not make any recommendations for maintenance testing. ASSOCIATION OF EDISON ILLUMINATING COMPANIES The values listed are for ACCEPTANCE testing before the cable is placed in regular service, a and are derived per AEIC CS5 & CS6-87, Section K.2: 'After installation and high-voltage dc test may be made at 80 percent of the test voltage specified in Table 131 & B2 applied for 15 consecutive minutes." RatedkV Voltage Phas -to-Phase 5 8 15 15 25 28 35 46 69 Conductor Size AWG-kcmil B-1000 6-1000 2-1000 2-1000 1-2000 1-2000 1/0-2000 4/0-2000 500-2000 Insulation Thickness Mils 90 115 175 220 260 280 345 445 650
AEIC factory dc test voltages equal to 1.25 times the acceptance test values listed on this sheet. Two other testing values are given in AEIC CS5 & CS6-87, Section K ''Tests During and After Installation---"K-1 - At any time during installation, a dc voltage specified in Table B1 and B2 applied proof test may be made at a voltage not exceeding 75 percent of the test for 5 consecutive minutes." (Thus take 1.25 x 0.75 x values listed on the above table.) -K-3 - After the cable has been completely during the periodof guaranteeat 65 percent of installed and placed in service, a dc proof test may be made at any time the test voltage specified in Table B 1 &B2 applied for 5 consecutive minutes." (Thus take 1.25 x 0.65 x values listed on the above table.)
77
HIGH VOLTAGE DC TEST REPORT WARNING: TEST VOLTAGES ARE LETHAL CAREFULLY REVIEW "TEST PROCEDURE"
OWNER
______________DATE _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
TEST
CUSTOMER
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
LENGTER MEATHER
MOREL RTIN
V3
MEGOHMty-
TIME~~~~~~~~~~~P APPIHEAD FR 0 DEINOR 3TERMINATDO BYE0 OUTDOOk LERANE3 IIN PSONLStTEQP0 LOCKOLOD 3 0OTOO PTHA MS
F
3INOR
IM
VOLMNTINTA SAETY
LBRRER 0I VLTG TS
RHDUCIORMPOAY
VOLAG TAGPPASLCLOED2
TIME
MEGOHMS MEGOHMS 0 02 -GN MEGOHMS MEGOHMS KV KV
_ ___ _ _ _ _ __
- GN
j_
KV
~~~~~~~~~~KV
-30
NEUT
GN
SEC_____
2 MIN4
REMARKS
3MIN 7s MIN
__
__
__f
MINI
B MIN
TO MIN 9tMIN
13MINI
___________
~~~~~~~~~~~~12MIN
13 MIN is MIN SET CONTROL VOLTAGE TO ZERO REVERSE AMMETER
________________________________________________
~ ~ ~ ~ ~
-I MINI
IKV
Ky
KEV
KV
DISCONINECT TESTlEN
OPERATOR
__
W ITNESS
NONDESTRUCTIVE TESTING
FAULT LOCATING Time Domain Reflectorneter (TDR) units are portable commercially available devices which can be used in the field to locate some types of conductor breaks or shorts Connected to the end of a cable the device functions much like radar, sending out low voltage pulses which travel the length of the cable and echo back when an open, short. or tap is encountered The device can usually locate faults within + 2". of the cable length However. TDRs are only capable of locating breaks or shortshaving an impedance different than that of a cable. for most cables. shorts having a resistance of less than a few ohms and opens having a resistance greater than several hundred ohms Splices. taps etc sometimes distort the echo and can mask the fault. Nevertheless, the method is nondestructive and is used successfully on faults having characteristics within the capabilities of the method Note that the conductor may be in a low voltage or medium voltage cable, shielded or nonshielded, it may even be the shield AC TESTING Several cable users are also including high voltage ac testing to determine RELATIVE CAPACITANCE (SIC) and DISSIPATION FACTOR (insulation power factor) for cables being used in ac circuits HOWEVER. the test voltage levels used and equipment are much different. INSULATION TESTING It the dc voltage applied during an insulation resistance (IR) test on power cables is relatively low, 0.6 to 2.5 kV, the test is nondestructive. One such test instrument is the MEGGEWO which is a portable high-range resistance ohmmeter. These low voltage IR tests are particularly useful in detecting dead shorts and indicating grossly deteriorated insulation The limitation for this low voltage IR test is its interpretation The significance of such testing on nonshi Ided, nonmetallic-sheathed cable is very dependent upon the environment because the characteristics of the return circuits are unknown. Even though the test voltage is lower, the safety precautions stated in the Hipot Testing Procedure, and by the test equipment manufacturer. must be observed Again, low resistance readings may be caused by contaminated or moist cable ends, variable test voltage because of too slow of cranking or variable input voltage to motor driven units, high humidity, etc Failure to clean water based cable pulling lubricants from the cable test ends has caused erroneous rejection of good cable. TESTING F Safety Follow test equipment supplier's instructions. Stay clear of energized ends, operators must know equipment. Be sure shields are grounded! Insulated conductors are capacitors. Check cable and termination manufacturer's guidelines. Keep detailed records and provide copy to owner.
r-1 Voltages -
E]
Records -
79
1. CALCULATION PROCEDURE
Select raceway size considering fill, clearance, jam ratio and code requirements. Remember, NEC is minimal. Select values for bending radii and coefficient of friction'. Determine weight and weight correction factor. For each raceway section, i.e. bend or straight 1) compute the expected tension, 2) compare to limits sidewall, attachment method/device, conductor.
When limit has been exceeded: increase bending radii to reduce sidewall loading, decrease fill, reduce the number of bends, check pulling opposite direction. Even for new installations with optimum conditions, 0.4 seems to be the lower limit for coefficient of friction for cables in conduits.
80
I I U I
~APPENDIX (CONT.)
2. CALCULATION INPUT
~~~Job
_ _ _ _ _ _ _ _ _ _
Date
C per NEC
C parallel
C cabled
C multiconductor kV
_____
~~~Cables
Phase
type_______
__________
size
_______
Neutral (Grounded)
______
~~~~Grounding
Duct C existing size_
__
__
I
Describe bends: ending # V
.
Make single line diagram. not necessarily to-scale, of raceway. Number sections of duct: with a section being a straight portion or a curve. Offsets are two or more curves back-to-back radius: angle: H/VUCD/VUCU/VDCDIVDCU & entrance angle radius, angle, H/VUCD/VUCU/VDCD/VDCU Vertical U
=
I
*
Describe bends
ending z
= =
~where H = Horizontal
le. NOTE
EXAMPLE
Up
Down
Incline
Concave
VUCD
cable being pulled vertically up. with the concave side of the elbow down
iS 'I~~~~~~~~~~~~~~~~~~~~~~~~'
81~~~~~~~~
EXAMPLE
L
5kV UniShieldI
3-350 (1.12")
3-4/0 (0.94")I
L = 48 x 1.1 2=54 inches, minimum Over600 V -Angle Pull See '96 NEC370-71 (b). L = 3 x Largest Cable Bending Multiplier + sum of other cables O.D.'s entering same side.I
3-500 (1.21"
3-/ (09"
.1
600 V - for conduits of 3/4 inch and larger, or having #4 or larger conductors.
Straight Pull
2"0
2"
=8
Angle Pull
L =3 x Largest Cable Bending Multiplier + sum of other cables O.D.'s entering same side.
2"
3"
82
+ 0/2 (3
cos (1/2) =T 1
S.D
(3____________
_____
(degrees)
0 30
2 cos ((3/2)
0.500 0.518
(degrees)
120 125
2 cos (13/2)
1.00 1.08
(degrees)
150 155
2 cos (13/2)
1.93 2.31
~1:
60
I
Example 2:12ic
13.875 inch:
(
4
~~=(4500) (0.577)
-1
=2580
lb
18.9 inch
W =15 lb
1.
.1
I I I
Example: estimated T = 1800 lb W = 15 lb R -(1 800 + 15) [2 cos (45/2) J - 3350 lbs
13=45'
~ ~
APPENDIX (CONT.)I
5. SUSPENDING CABLE I. Suspending By Clamping Around CableO
for 600 V = see '96 NEC 300-19 for 600 + V - use the severest of either the cniteria of NEC 300-1 9, or 70 lb per clamp for single conductor-, wrap single conductor cables with two half-lapped layers of jacketing tape under clamp. 11. Suspending by Conductor (Single Conductor)
0
Reference NEMA WC3; ICEA S-1 9-81, 7.2.2.1 F ATW Where A = conductor area -sq inchI LW ~~T conductor tensile strength-lb/in 2 = W = cable weight - pound/foot
=
=
length -feetI
7. unless otherwise
=OKI
OWhen the suspended cable is laid over an elbow at the top, check sidewall loading.I
84~~~~~~~
APPENDIX (CONT.)
Diameter of Largest Possible Conductor in Outer Interstices of Cables (Keeping within a circumscribing circle.) Diameter of interstice Diameter of main conductor x factor from chart
85
0C
HOSE
1/C CABLE
'THREADED CLAMPS NIPPLE HOSE 'CLAMP ADAPTOR PRESSURE --- ,REGULATOR
CRY NITROGEN
3/C CABLE
87
APPENDIX (CONT.)I
CONSTANTS
e=2.718
.T= 1.414 Vr 1.732 7r/4 0.7854
10,
100I
1021 =i /ioo=o0.0 Io-,, 1/1 000 000
-/000.1
= 0.000
001I
SYMBOLSI Cl
cmil d 0 DOA =clearance
=
circular mu l
mm
n m P R T1 Tm
=
= =
millimeterI
number of conductors
radius of bend, ft
W
w 6) 1/C
7r
/180I
=one conductor
3/C
>
==three conductorI
g~reater than (the large part of arrow to biggest) <= less than or equalI
<
less than
88
0 air 0 raceway . 0 underground 0 no raceway . .- Material 0 indoor 0 outdoor gn lead size mfgr &type
1 -Termination
Lightning or Surge Arrestor - feet of wire from arrestor to cable end mfgr &type.. 2: Termination 0 indoor C outdoor gn lead size-
mfgr &typeLightning or Surge Arrestor - feet of wire from arrestor to cable end mfgr &type SPLICE: 1. 0 straight 0 Y 03 T 0 transition, mfgr &type 2. 0 straight 0 Y 0 T 0 transition, mfgr &type pulling rope - material puller - type lubricant - mfgr & type dynamometer - mfgr TESTING: (attach data sheet): when &who cleaning solvent (brand &type)corona suppression (lugs, etc)SKETCH: .-. -. .range--sizegn lead size gn lead size 0 eyes basket grip 0 serving how many grips cabled 0 parallel type time .time .time
INSTALLATION:
(Put on back or separate sheet] - Include all bends such as offsets, and vertical sections as shown in Pulling Calculation Input, page 46. Indicate where reels were set-up, size of boxes or manholes, location of splices or taps.
CIRCUIT:
Identity Source: Vol t Fault -Hz AMPS 0 circuit breaker type o clearing time (sec) Loadsload factor-power factor 4) kVA
Overcurrent Protection:
gn
type. motor- type, size, how started transformers. capacitors, furnaces, lighting fixtures- size. type, connection all: gn/ungn . wy. 1 /34i,. amps: running, full load
I I
I
I I I I I I I I I I I I I I
I I I I I I I 11 I I I I I I
4Tesseneer brive ~ ~
LU LU
CD C> C)
-
FD CD CD
rn Clq r14 - - -
C> 0
M -
rq r14 - w -
C)
M w -
rq
C) C>
-
cq 41,14 - -
M -
ICN:) F3 r4 r,4 - -
on
0 w U, Lu z CL M (L C2 M :)
r6
W W U)
en
O
CD
M
C)
en
CD
M
C)
L) o
U)
U)
w M0 U)
U) LL.
wo
z
LU
z
U) C) 0
U)
z LU
to
0 0
w 0 LU -A 6)
(L 5;
(L (L
IL LU D
C>
C>
C)
C)
C>
:) Cl)
z ui LUw 0:
0 z
I
rq kn 0 00 r-4 0 kn
C)
00 C) 00
C4 C) tn tn C) 00
0 kn
O
kn 0 00
CD
00 en
M z LU
CZ
CZ
M M cq CD
CN L)
0
ww w D co z z
> 4 W)
> 4 -n
cl,
> 4
> C6 4
rq >.
> 6 4 kn
cl IT
z w
C) LO CD C)
EL
(ON
t2