HRS stands for Hot Roll Slitting. In this process hot rolled carbon steel coils are cut down into a number of smaller coils of narrower measure to get customer specified widths. For sheet metal, two cylindrical rolls with matching ribs and grooves are used to cut a large roll into multiple narrower rolls. Slitting is considered a practical alternative to other methods due to its high productivity and the versatility of materials it can manage. This continuous production process is very economical yet precise; usually more precise than most other cutting processes.
100 m/min
1.0.4 Line description: a. Coil car: Transfers coils from the coil saddles and places the coils on the pay off reel. There are two coil cars, one at the beginning known as coil loading car and other at end of slitting line known as exit coil car respectively. The Coil Loading Car transfers coils from the crane, to the Uncoiler fast and efficiently. b. Pay off Reel/un-coiler: Pay off Reel is the reel on which the coil to be processed is loaded, once the strap of the roll is cut manually. It feeds the slitting line, decoiled material under controlled back tension. c. Peeler: The Peeler allows back-bending of the lead edge to remove coil set and threads it into the next line operation without manual handling. d. Hold down roll/pinch roll: A pinch roll is provided for smooth feeding of the strip as it is uncoiled from the pay off reel. e. Leveler: The Leveler or Straightener levels the strip, and corrects shape, at close tolerances.
f. Shear: The Crop Shear squares off the leading and tail ends of the coil, and is also used for breaking down coils. g. Slitter: Slitter with Pinch Rolls, threads the strip into the cutters used with a Guide Table to center the strip. Thickness in mm 1.6 1.7 2.0 2.2 2.5 2.6 2.8 3.0 3.2 3.5 4.0 4.5 5.0 6.0 0.16 0.18 0.20 0.22 0.25 0.26 0.28 0.30 0.32 0.35 0.40 0.45 0.50 0.60 h. Side guide: It guides edges trimmed from the slitter to the scrap winder. i. Scrap winders: The Scrap Winder winds edge trim from the slitter into easily handled scrap bundles j. Tension station: The Tension Station is a unit that automatically keeps strip tension constant off unwinds as the coil builds down. Unwind tension is adjustable by initial out diameter of coil, thickness of material and coil width input knobs mounted on the operator's control board. k. Recoiler: The Recoiler with Over-arm Separator is the workhorse of the slitting line and sets line speed and coil tension. Crap setting in mm
can be attributed to poor metal quality; however, it is much more common for the problems to be caused by other variables and factors during the slitting process. 1. Edge Burrs: Burr is an edge defect that can arise during slitting. The primary cause of burr is a horizontal knife clearance that is too tight or too loose. An incorrect clearance automatically causes a poor-quality edge. In fact, one of the characteristics of a poorquality edge is burr. 2. Edge Wave: Although edge wave can be caused by stresses in the metal, most edge wave is "slit-in." Too much vertical clearance, or overlap, causes edge wave. Other contributing factors are poor stripper ring practice. If the rings are too big, the metal will become stretched at the edges. If they are out of parallel, this also will contribute to edge wave. 3. Camber: The deviation from a straight slitting line is hereby defined as "camber. It can result from stresses in the master coil. If the camber is always in one direction, a good way to check if the camber is caused by material defects is to slit the master coil upside down. If the camber is in the opposite direction, the camber has been caused by stresses in the master coil. If not, the camber is not from the virgin metal; it has been slit in. Slitin camber happens when narrow strips are slit and the horizontal clearance is different from one edge to the other. The edges of a slit-in cambered strip are different from side to side. For example, one edge might be good but the other too tight. 4. Crossbow: Crossbow is a shape defect where the strip exhibits a curvature across its width. Like camber, crossbow might be caused by a defect in the master coil or from the slitting process. Usually crossbow is caused by too much overlap (vertical clearance) or by stripper rings that are the wrong size. If the male rings are too big or the female rings are too small, crossbow may result. 5. Knife Marks: Knife marks on the strip almost always are caused by poor stripper ring practices. Proper stripper ring practices include utilizing male and female rings in different sizes, colors, and hardness. 6. Slit Width out of specification: Some variables that cause slit width to be out of specification are improper knife clearance, incorrect or worn tooling, a machine that is not maintained, and poor stripper ring practices. If the horizontal clearance is not right, the width will change. If the stripper rings are not being used correctly, the width will
2.0.3 Line description: Coil car: Transfers coils from the coil saddles and places the coils on the pay off reel. Pay off Reel/un-coiler: Pay off Reel is the reel on which the coil to be processed is loaded, once the strap of the roll is cut manually. It feeds the slitting line, de-coiled material under controlled back tension. Peeler: The Peeler allows back-bending of the lead edge to remove coil set and threads it into the next line operation without manual handling. Hold down roll/pinch roll: A pinch roll is provided for smooth feeding of the strip as it is uncoiled from the pay off reel. Flattener rolls: The flattener levels the strip, and corrects shape, at close tolerances. Shear: The Crop Shear squares off the leading and tail ends of the coil, and is also used for breaking down coils. There are two shears in pickling line. Acid tank: It consists of hydrochloric or sulfuric acid. The acid dissolute the oxide scales from the strip surface. 4
Squeeze tank: It consists of squeezing rolls which produces improved squeezing effect to remove acid without the use of pressure which would damage the treated strip. Rinse tank: In this tank, rinsing and passivation1 of the strip takes place. At this stage the acid residuals are washed for 5 minutes by soft water from the strip. Passivation film is formed on the strip surface providing corrosion protection. Dryer: It evapourates moisture content leftover after rinsing. The minimum temperature of dryer is 110o C. Tension roll: The Tension roll automatically keeps strip tension constant off unwinds as the coil builds down. Recoiler: The re-coiler recoils the steel strip as well as maintains line speed and coil tension.
Passivation is the process of making a material "passive" in relation to another material prior to using the materials together.
3.0.2 Dimensional specification: Maximum thickness at entry: Minimum thickness at exit: Maximum width of sheet metal: Minimum width of sheet metal: 6 mm 0.12 mm 1700 mm 700 mm
Universal Crown Mill X- Ray Gauge Level II automation2 1200 m/min 16 T max.
The level II of automation is when the operator manually loads the machine, the machine automatically cycles, and the operator manually removes the part and takes it to the next station.
3.1.2 Line description: Work rolls: These are in contact with metal sheet and with each pass the sheet metal becomes thinner and thinner. Intermediate rolls: These are intended to provide rigid support required by the working rolls to prevent bending under the rolling load. Backup rolls: These provide rolling force. Rolling balance system: The system ensures that the upper work, intermediate and back up rolls are maintain in proper position relative to lower rolls. Roll changing devices: It uses an overhead crane and a unit designed to attach to the neck of the roll to be removed from or inserted into the mill. Mill protection devices: It ensures that forces applied to the backup roll chocks are not of such a magnitude to fracture the roll necks or damage the mill housing. Roll cooling and lubrication systems: Roll coolant emulsion parameters 450C-650C 4.0-6.5 600 maximum 150 maximum O.5-0.85 1.2-3.5 Maximum 25% of total oil 160 minimum 21 maximum 2 PPM maximum 100% oil + tramp oil %
Temperature pH value Conductivity Chloride (PPM) ESI Oil concentration (%) Tramp oil (%) Sap value Acid content Fe content DM water
Pinions: Provides gears to divide power between the two spindles, rotating them at the same speed but in different directions. Gearing: It establishes desired rolling speed. Drive motors: It provides thousands of horsepower for rolling. Electrical controls: Gives constant and variable voltages applied to the motors. Un-coiler and re-coiler: These unroll and roll up coils of metal. Coil car: It transfers coils from the coil saddles and places the coils on the pay off reel.
3.4 Advantages:
1. In the absence of cooling and oxidation, tighter tolerances and better surface finish can be obtained. 2. The final properties of the work piece can be closely controlled and, if desired, the high strength obtained during cold rolling can be retained or, if high ductility is needed, grain size can be controlled before annealing. 3. Lubrication is, in general, easier.
3.5 Defects:
In hot rolling, if the temperature of the work piece is not uniform the flow of the material will occur more in the warmer parts and less in the cooler. If the temperature difference is great enough cracking and tearing can occur. There are six types of surface defects: 1. Lap: This type of defect occurs when a flap of is folded over and rolled but not welded into the metal. They appear as seams across the surface of the metal. 2. Mill shearing: These defects occur as a feather like lap. 3. Rolled-in scale: This occurs when mill scale is rolled into metal. 4. Scabs: These are long patches of loose metal that have been rolled into the surface of the metal. 5. Seams: They are open, broken lines that run along the length of the metal and caused by the presence of scale. 6. Slivers: Prominent surface ruptures.
CHAPTER-4
4.0 ECL
ECL stands for Electrolytic Cleaning Line. For material rolled with high percentage of oil while reduction in mills goes for annealing in furnace. Oil free base material in annealing is essential for production of bright and corrosion resistance steel sheet metal. Sodium Ortho Silicate (Na2SiO4) is used as cleaning agent. Tension is given according to thickness based on customer requirement. 4.0.1 Material specification: Raw material: Reduced coil from rolling mills having high percentage of oil
4.0.3 Line specification: 4.0.4 Maximum speed: 4.0.5 Maximum Un-coiler tension: 4.0.6 Maximum Re-coiler tension: 300 m/min 2400 Kg 4770 Kg
4.1
Line description:
Coil car: Transfers coils from the coil saddles and places the coils on the pay off reel. Pay off Reel/un-coiler: Pay off Reel is the reel on which the coil to be processed is loaded, once the strap of the roll is cut manually. It feeds the slitting line, de-coiled material under controlled back tension. Strip welder: It seam welds the different coil strips for continuous running of the line. Cleaning tank: It consists of electrodes and utilizes alkaline detergent solution i.e. Sodium Ortho Silicate to clean steel strips.
Rinse tank: In this tank, rinsing of the strip takes place. At this stage the Sodium Ortho Silicate residuals are washed by hot water dip from the strip. Dryer: It evapourates moisture content leftover after rinsing by blowing hot air. Pinch roll: A pinch roll is provided for smooth feeding of the strip as it is uncoiled from the pay off reel. Wringer roller system: The system is to wring or remove moisture from strips of material. Tension roll: The Tension roll automatically keeps strip tension constant off unwinds as the coil builds down. Recoiler: The re-coiler recoils the steel strip as well as maintains line speed and coil tension.
10
Recovery is a process by which deformed grains can reduce their stored energy by the removal or rearrangement of defects in their crystal structure. 2 Recrystallization is a process by which deformed grains are replaced by a new set of undeformed grains that nucleate and grow until the original grains have been entirely consumed. 3 Grain growth refers to the increase in size of grains (crystallites) in a material at high temperature.
11
A study of the microstructure of all steels usually starts with the metastable iron-carbon (Fe-C) binary phase diagram (above figure). It provides an invaluable foundation on which to build knowledge of both carbon steels and alloy steels, as well as a number of various heat treatments they are usually subjected to (hardening, annealing, etc). The process of annealing of cold rolled coil is carried out to obtain the desired properties in the finished coils. For this, the material is heated to predetermined temperature in a protective atmosphere and soaked for a specified time before it is put to room temperature. Optimum condition with annealing atmosphere, annealing cycle, sealing and purging have to be maintained to obtain a finished product with bright surface, desired micro structure and uniform properties throughout the coil. 5.0.1 Material specification: Raw material: DDQ, medium silicon plate T1 to T3 (or/and grade HSLA steel ferritic stainless steel and martensitic chrome steel. 5.0.2 Dimensional specification: Minimum Width: Thickness: Charge weight: height: 700 mm 0.15 mm 90 MT 5450 mm Maximum 1710 mm 4.10 mm Low carbon non-alloy steel CQ, DQ, EDDQ, SEDDQ. Medium carbon low and steel, tin mill black T4 toT5)
5.1
Types:
Following are the types of annealing process carried out in the plant: Bright Anneal: In this method a protective atmosphere to prevent the steel surface from oxidation is used. Process Anneal: This procedure is done at a temperature close to the lower critical line on the iron carbon diagram. It is used when considerable cold working is to follow.
12
Recrystallization Anneal: It is used after cold working to produce a specific grain structure. Sub-Critical Anneal: This method is used on cold-worked steel coils and is carried out below the lower critical line on the iron carbon equilibrium diagram.
5.2
Annealing furnace:
Type: Control system: Operating temperature: Average output: Bell Annealing Furnace Electric Control System About 1200 oC Varies from 10 to 15 tons / day
5.3
Line description:
Coil car cum tilter: Transfers coils from the coil saddles and tilts it to be lifted by overhead crane using coil lifter. Coil lifter: An accessory for lifting coil. Base: A base upon which coils lifted are vertically stacked, edge to edge. It has a recirculating fan. Convector plates: Convector plates separate coils from each other and forms stack of coils. Plate lifter: An accessory for lifting convector plates. Load cover: A cylindrical removable steel load cover (Inner cover) dissipates and transfers heat rapidly, confines the controlled atmosphere during heating and preserves the controlled atmosphere during cooling until the temperature of the charge is sufficiently low to prevent scaling when exposed to ambient air. Gas burners: These are positioned in two rows and fired tangentially to promote a uniform heating of the inner cover. Each burner has its own custom built recuperate to provide preheated air to improve the thermal efficiency. Furnace: Furnace is heating bell (outer cover) is a refractory lined cover which serves as a thermal barrier during heating and permits a controlled cooling cycle. Outer cover has burners for heating.
13
Re-circulating fan: The base assembly normally includes a fan (optional) to provide a source of convection heating to enhance the heat transfer to the charge. It draws furnace atmosphere from inner cover into base and pumps furnace atmosphere back into inner cover.
5.4
Annealing cycle:
1. Coil transfer: Loading of coil onto a given furnace base by crane operator. 2. Charging: After loading the coil the convector plates are loaded onto the base. Load cover (Inner cover) encloses the charge, and an outer refractory lined cover is lowered over the assembly. 3. Leak test: For proper annealing, a conventional gas atmosphere of nitrogen/hydrogen mixture, or pure hydrogen or the like is supplied. In order to maintain this type of gas atmosphere against the intrusion of the ambient atmosphere, some type of seal means is desirable between the inner cover and the base on which the inner cover rests. In to ensure sealing leak test is conducted. 4. Safe purge I (Pre purge): Nitrogen is used for purging out the air at the beginning of the cycle before introducing hydrogen in the furnace. 5. Heating: Heating includes a gas fired burner for heating containment wall whereby furnace atmosphere is heated prior to being admitted to inner cover for providing more uniform heating between the top most edge portions of the top coil with the bottom most edge portions of the bottom coil. Heat transfer from the cover to the coils takes place by radiation. Additionally, a gas atmosphere is circulated within the inner cover by a re-circulating fan to achieve a more rapid and uniform heat transfer by convection. 6. Soaking: At the end of the soak period, the furnace is removed and the bell allowed cool below 400 C (750 F), assisted by a water spray. 7. Warm leak test 8. Cooling: After annealing, cooling is performed by removing the heating bell but leaving the inner cover in place to maintain the protective atmosphere. If a bright finish is desired, the metal must be cooled to near ambient temperature before opening the workload to air. A gas to water heat exchanger or forced-cooler system is often used to shorten the cooling times, especially at low temperatures. The forced-cooler replaces the heating bell at the end of the heating cycle and circulates air or sprays a fine water mist to accelerate the cooling of the outside of the inner cover. 9. Safe purge II (Post purge): When the coil temperature reaches 100 C (212 F), hydrogen is purged out with nitrogen, and the bell was removed to unload the work. 14
10. Unloading: After post purge convector plates and coil stack is unloaded from the by crane operator. 11. Storage and transfer: Coil is then stored for sometime for further cooling to room temperature and is being transferred to other processing lines.
base
Give improved machining characteristics. Ensure a homogenous structure. Reduces residual stresses from cold rolled coils. Help to give a more even response to the steel when cold working. Produce a desired micro structure or to obtain desired mechanical, physical, or other properties.
15
16
CHAPTER-6
6.0.2 Dimensional specification: Minimum Width: Thickness: Coil weight: Coil outer diameter: Coil inner diameter: 800 mm 0.15 mm 30 MT 2000 mm 610 mm Maximum 1705 mm .50 mm
6.0.3 Line specification: Maximum load: Maximum speed: Maximum mill tension Maximum un-coiler tension: Maximum re-coiler tension: Maximum elongation: Maximum threading speed: 100 MT 600 m/min 1000 Kg 3000 Kg 4500 Kg 7.10 mm 50 m/min
17
6.0.4
Further reduction of the strip thickness. Improvement of the surface finish: a. Mirror: Superior luster mirror finish is produced by rolling between fine polished rolls. Mirror finish strips are used mainly for electroplating. b. Bright: Bright finish is produced by rolling between polished rolls. It is the common surface finish condition of cold rolled strip. c. Matt: Matt (dull) surface finish is produced by rolling between roughened rolls. Matt surface is suitable for enameling4 and painting. Matt finish strips are also used in deep drawing due to the ability of the rough surface to hold lubricant providing low friction between the strip and the drawing tools (punch, blank holder and die).
Improvement of the surface flatness; Achievement of a required level of work hardening. For suppressing the yield point phenomenon which can cause stretch strains on formed component.
Enameling is the fusion of a special powdered glass to metals. The glass can be applied using different techniques, but all methods use heat to melt the powder.
18
CHAPTER-7
7.1
CRS:
7.1.1 Line description: a. Coil car: Transfers coils from the coil saddles and places the coils on the pay off reel. There are two coil cars, one at the beginning known as coil loading car and other at end of slitting line known as exit coil car respectively. The Coil Loading Car transfers coils from the crane, to the Uncoiler fast and efficiently. b. Pay off Reel/un-coiler: Pay off Reel is the reel on which the coil to be processed is loaded, once the strap of the roll is cut manually. It feeds the slitting line, decoiled material under controlled back tension. c. Peeler: The Peeler allows back-bending of the lead edge to remove coil set and threads it into the next line operation without manual handling. d. Hold down roll/pinch roll: A pinch roll is provided for smooth feeding of the strip as it is uncoiled from the pay off reel. e. Leveler: The Leveler or Straightener levels the strip, and corrects shape, at close tolerances. f. Shear: The Crop Shear squares off the leading and tail ends of the coil, and is also used for breaking down coils. g. Slitter: Slitter with Pinch Rolls, threads the strip into the cutters used with a Guide Table to center the strip. h. Side guide: It guides edges trimmed from the slitter to the scrap winder.
19
i. Scrap winders: The Scrap Winder winds edge trim from the slitter into easily handled scrap bundles. j. Tension station: The Tension Station is a unit that automatically keeps strip tension constant off unwinds as the coil builds down. Unwind tension is adjustable by initial out diameter of coil, thickness of material and coil width input knobs mounted on the operator's control board. k. Recoiler: The Recoiler with Over-arm Separator is the workhorse of the slitting line and sets line speed and coil tension.
7.2
CTL:
7.2.1Line description: a. Storage Turnstile: The Storage Turnstile provides extra coil storage at the point of operation and reduces process downtime. b. Coil Car: The floor-type Coil Loading Car transfers coils from the Turnstile to the uncoiler fast and efficiently. c. Uncoiler: Uncoiler mandrel feeds the slitting line under controlled back tension. d. Hold down roll: Hold down roll prevents outer wraps from unwinding, and assists in feed-up to the Leveler. e. Peeler: The Peeler allows back-bending of the lead edge of the coil, to remove coil set. f. Leveler: The Leveler or Straightener levels the strip, and corrects shape, at close tolerances. g. Control station: An Auxiliary Control Station provides the operator with push-button control at the entry end for feeding and threading operations. h. Looping pit: The looping pit provides for continuous coil strip feed while the strip is stopped and cut to proper length. i. Master control station: The master control station gives the operator push-button control of the entire Cut-To-Length line, including speed and tension. j. The Stacker accepts cut sheets from the Shear for automatic stacking, incorporating side and end tamping for uniformity. k. Automatic Pack Receiving Table receives the individual sheets from the Stacker with drop-arms at a uniform position as the pack builds down.
20
l. Stacker Run-Out Conveyor accepts stacked sheets ready for a crane or further conveying to warehousing location.
PROCESS INPUT
Skin passed roll Production plan Production consumables
PROCESS OUTPUT
Slit CR coil Production report Record of process parameters Data for analysis of department objectives
PROCESS FLOW
LOADING OF COIL FEEDING OF COIL SLITTING OF COIL RECOILING OF COIL PACKING OF COIL (IF REQ.) STORAGE & TRANPOTATION
(Electricity, air) Man power Work environment & infrastructure Control plan PFMEA Work instruction
CONTINUAL IMPROVEMENT
Continual improvement projects for integrated management system
(Operational & safety instruction, process control method, parameters, reaction plan)
CONTROL
Roles & responsibilities Reaction plan & contingency plan Customer specification (if required) Control on product Feedback of customer complaints/return Department objectives
21
22
8.4 ADVANTAGE:
Precise control gives improved consistency - Ra tolerance of just 4% Texture reproducible from roll to roll, due to total process control Higher peak counts possible than with Shot Blasting Peak count can be varied for a specific Ra
23
CHAPTER-9
9.0 GALVANIZATION
The applications of zinc coated products are increasing day by day. The cold rolled steel sheet users are switching over to zinc coated steel sheets for the purpose of aesthetic look as well as overall life of the product particularly in roofing, automobile, and appliances industries. The quality requirements particularly surface finish in all these sectors is similar to CR and electro galvanized sheets. In view of this, the coating industry is also developing new products and processes to meet the specific needs of the end users. The most significant features in the present market demand are the mechanical properties of the base material, formability and drawability of the coated product and the surface finish. The surface finish plays an important role for the characteristics like paintability, weld ability, etc. Coating properties depends on the surface preparation and heat treatment and the parameters like bath temperature, alloying elements (aluminium, antimony, and lead) in the zinc bath, use of spangle minimizer, and skin pass parameters if the material is skin pass. In surface cleaning, the important change is the introduction of a chemical cleaning section before the furnace. The main purpose of this chemical cleaning section is to eliminate iron fines and excess oil from the strip in order to avoid surface defects on coated strip. 9.0.1 Material specification: Input material: Output material:
Annealed-Cold rolled carbon steel coils free from edge cut and saw edges
45 HRB to 100 HRB 0.20 mm to 2.2 mm (GP size) 500 mm to 1280 mm 0.2 MT (min.) & 18 MT (max.)
Entry section: Hardness: Thickness: Width: 45 to 100 HRB 0.17 mm to 2.20 mm 500 mm to 1280 mm 24
Centre section: Hardness: Thickness: Width: Weight: Inner diameter of coil: 45 to 100 HRB 0.17 mm to 2.20 mm 500 mm to 1280 mm 0.5 MT (min.) to 22 MT (max.) 500 mm, 600 mm
a. Entry section:
Speed: Tension: i. ii. Pay off reel: Accumulator pressure: 56 Kg to 560 Kg 105 Kg/cm2 to 1050 Kg/cm2 15 m/min to 120 m/min
Position:
i. ii. Accumulator: Pay off reel initial diameter: 1% to 90% filled 500 mm to 600 mm
b. Center section: Speed: Tension: i. ii. iii. Process: Pay off reel: Re-coiler: 120 Kg to 1000 Kg 56 Kg to 560 Kg 2225 Kg to 2280 Kg 12 m/min to 108 m/min
c. Exit section:
Speed: 15 m/min to 120 m/min 25
Tension: i. ii. Recoiler: Accumulator pressure: 225 Kg to 2280 Kg 25 Kg/cm2 to 100 Kg/cm2
Position:
i. ii. Accumulator: Pay off reel initial diameter: 9% to 90% filled 500 mm
zone goes up to 8000C for deep drawing qualities. Soaking zone has a horizontal furnace, installed in line to achieve the desired properties in the material so as to be suitable for bending, forming and drawing operations. 9.1.1.4 Jet cooling section: It has controlled jet cooling zone in which the substrate steel sheet is cooled to a temperature suitable for the plating. 9.1.1.5 Hot bridle: Hot bridle contains rolls, positioned between the last cooling section and the molten zinc bath, which are independently driven by motor. It is the speed of the rolls which determines the tension of the strip in the galvanizing line. Hot bridle is adapted to keep the strip from drifting to one side or the other of the bridle rolls. This is an important control, since excessive drifting could result in contact between the strip edges and the stationary furnace structure of the line, which could result in serious damage to the strip. 9.1.1.6 Snout: Snout for metallic coating line extends from the strip preparation furnace to the coating metal bath, having a gas impermeable flexible joint permitting movement of the snout from a position with one end immersed in the coating bath to a position there above, permitting a change in coating metal bath or coating metal bath and container without degassing the strip preparation furnace. 9.1.1.7 Zinc pot: Its a molten zinc tank which holds molten zinc and which conducts on coreless induction heating means for heating the molten zinc. It has a sink roll which is immersed in the molten zinc and around which a steel strip is wound. Hot-dip galvanizing is performed on a continuously fed sheet metal in the molten zinc tank. It comprises a cover which substantially covers the lower surface of the steel strip being immersed in the molten zinc in the molten zinc tank until the steel strip reaches the vessel. It vessel has a curved face at joints of the side plates and the bottom plate. It has a discharge opening at the bottom thereof to discharge the molten zinc, through which discharge opening the molten zinc is forcefully discharged into the molten zinc tank.
9.2 Process:
Uncoiling Cleaning: This operation commonly combines alkaline cleaning (degreasing) and mechanical cleaning by rotating cylindrical brushes. Oil and other contaminants are removed from the steel surface. Pickling: Degreased and rinsed strip enters a pickling bath where oxides and rust are dissolved by hydrochloric acid and removed according to the reactions:
27
Iron oxide reaction: Fe2O3 + 6HCl = 2FeCl3 + 3H2O Rust reaction: Fe2O3*nH2O + 6HCl = 2FeCl3 + (n+3)H2O Cooling: The coated strip is cooled by air and water. Zinc coating (hot galvanizing): Clean strip passes through a bath with molten zinc (Zn). Wiping excessive zinc by air knives. Leveling: Leveler produces smooth and flat strip surface. Recoiling
b. GP 2
01.) Pay-off reel 1 and 2 02.) Strip gauge measurement 03.) Welding machine 04.) Alkaline/electrolytic cleaning section 05.) Entry loop accumulator 06.) Pickling section 07.) Redundant annealing temperature measurement 08.) Annealing furnace 09.) Induction furnace 10.) Zinc pot 11.) Air-knives 12.) Zinc coating thickness control 13.) Coil cooling 14.) Coating gauge measurement 15.) Intermediate looper 16.) Skin pass mill stand 17.) Roughness measurement 18.) Tension leveler 19.) Non-destructive testing (technical properties) 20.) Surface inspection system 21.) Chemical after treatment 22.) Exit loop accumulator 23.) Double head side-trimmer 24.) Strip width measurement 25.) Surface inspection both sides (vertical/horizontal) 26.) Electrostatic oiler 27.) Oiling gauge 28.) Rotary shear 29.) Tension reel
Mill specification: Speed: Maximum load: Maximum reduction: Maximum elongation: 12 m/min to 108 m/min 180 MT 2% 2%
29
ii.
b.
c.
d.
e.
f.
annealing furnace should be made correct material with proper cooling arrangements. Use of vertical type furnace which facilitates the speed matching between the strip and the hearth roll, can also eliminate this defect. Aggregated iron particles: These are loosely connected aggregate or iron particles embedded in the coating. These particles do not indent the steel substrate. Possible root cause is the iron fines pick-up by the rolls in the annealing furnace eventually breaks loose after attaining a certain thickness and adheres to the strip bottom causing the pick up. This can be eliminated by controlling the iron fines on the strip from cold rolling. Bare spots: This is a coating defect which appears as an uncoated spot on the galvanized sheet. This appears essentially due to poor surface preparation i.e. improper reduction of the oxide scale on the sheet surface and poor wet ability of the steel surface by molten zinc. This defect can be controlled by maintaining proper oxidizing reducing conditions in the annealing furnace, strip entry temperature into the zinc bath and bath composition. Adhesion Failure: Adhesion failure of hot dip galvanized coatings during forming often occurs when operating conditions in galvanizing facilities are not stable. Coating adhesion is affected by surface contaminants on the steel strip, strip temperature, atmospheric gas composition in the furnace, bath composition especially with respect to coating thickness and formation of the alloy layer during steel and molten zinc reaction. The cause of adhesion failure can also be carbon deposition and oxide film formation due to leakage in furnace or disturbance in furnace atmosphere. Carbon deposition on the strip takes place due to insufficient removal of rolling oil, caused by increasing line speed and lower strip temperature or by excessive CO+H2 content in the direct fired furnace i.e. low air-fuel ratio. This failure can be reduced either by sufficient alkaline cleaning before entry into the annealing furnace or by increasing air-fuel ratio in the furnace or by maintaining the strip temperature. The oil can be controlled at the time of cold rolling also for best results. Dross pimples: Dross is an intermetallic compound such as FeZn 7 generated from the reaction between iron and zinc which is eluted from the steel strip in a plating tank holding a zinc-base molten metal, and the dross has spherical equivalent diameters of from 5 to 300 microns. In a stagnant state of the molten metal in the plating tank, the dross deposits on the bottom of the plating tank. Galvanizing lines adopt a specific method to minimize top dross formation on the galvanizing bath surface by covering the bath with a seal box so as to reduce oxygen concentration in the box or by nitrogen wiping also. However, the dross pick-up does not appear to be a major source of surface defects, provided skimming operations are performed frequently during galvanizing. Edge Buildup: Other important defect is edge buildup which finally results into edge waviness. The main reason of this is the dross pick-up which mostly takes place from the top dross just after galvanizing. The dross pick-up is more near the coated strip edge where dross pick-up is generally not wiped off efficiently. When such dross particles are picked up by the coating, they can not be seen visually and will not be noticeable after skin rolling. There are many methods to prevent iron build up in the zinc bath. Some of the important methods are, strict control of bath temperature, cleaning of non-adherent iron and dust from the strip, continuous filtering of zinc bath, molten zinc circulation/filtering using a bath/strip cooler and using a ceramic pot which eliminates the source of iron and sufficiently stirs zinc for a dross less galvanizing pot.
31
CHAPTER-10
10.0 CORRUGATION
Corrugated galvanized iron commonly abbreviated (CGI) is a building material composed of sheets of hot-dip galvanized mild steel, cold-rolled to produce a linear corrugated pattern in them. The corrugations increase the bending strength of the sheet in the direction perpendicular to the corrugations, but not across them. Normally each sheet is manufactured longest in its strong direction. The corrugations are described in terms of pitch (the distance between two crests) and depth (the height from the top of a crest to the bottom of a trough). It is important for the pitch and depth to be quite uniform, in order for the sheets to be easily stackable for transport, and to overlap neatly when making a join. 10.0.1 Material specification: Raw material: Galvanized sheets Galvalume5 sheets
corrugating machine has a top reel and a bottom reel, each with roller bars that intermesh with each other so that sheet metal that is passed there between can be corrugated in a uniform manner. The roller bars deform the sheet stock into the corrugations, but prevent marring of the pre-coated finish on the sheet metal. A corrugating machine comprises: A first reel mounted for rotation about a first axis has a pair of ganged sections axially aligned. Each pair of ganged sections having a common center support wheel with spoke-like projections extending radially wherefrom each spoke-like projections of a section supports a different roller bar for independent rotation with respect to the other
Galvalume is Zinc 55% Aluminium 1.5% Silicon alloy coating on steel. It gives excellent corrosion resistance in many environments and suitable for heat resistant applications. Its use in roofing and cladding is increasing day by day in the country due to its unique appearance and enhanced corrosion free life.
32
roller bars of the section. Each roller bar extending axially substantially across a respective ganged section and each spoke-like projection both are being shaped at an outer radial end thereof so as not to protrude in a path of sheet stock to be corrugated. bar of second reel extends axially substantially across a respective ganged section and each spoke-like projection both are being shaped at an outer radial end thereof so as not to protrude in a path of sheet stock to be corrugated. A frame for rotatable mounting of first reel with respect to second reel so that the roller bars of first reel intermesh with respective roller bars of said second reel. An engagement between the roller bars is the only driving force exerted on first reel with respect to second reel. A drive mechanism attached to second reel for rotatable driving of second reel which thereby drives first reel.
33
CHAPTER-11
Who is the customer? What do they want? Are we maintaining the equipment? What is the risk? Is there another sale? Who are we and what is our mission? To understand alignment and balance of plant. To avoid poor base, foundation designs and structures
Measurement, analysis and improvement
a. General b. Planning c. Monitoring and measurement d. Control of non-conforming product e. Analysis of data f. Improvement Due to the latest and advanced testing facilities installed at the companys R&D centre, the detailed testing of the various imported steel samples brought from different Automobile Industries is possible for analyzing & the auto grade specifications required for the outer body panels has been very well established.
The R&D CENTRE has a testing lab consisting of following testing machines:
1. Emission Spectrometer (four alloy base). 34
2. Fully computerized Universal Testing Machine. for measurement of a. Yield strength. b. Ultimate tensile strength c. Percentage elongation d. Yield point elongation r value, n value, u.e. 3. Fully computerized surface roughness tester for roughness profiles and waviness component 4. Metallurgical microscope having magnification up to 500X. 5. Rapid drawability tester, R module. 6. Fully computerized micro hardness tester.
The R&D CENTRE has full fledged chemical laboratory equipped with:
Digital pH conductivity meters Drop point testers Cleveland flash & fire point testers Viscosity bath for carrying out incoming online of oils, greases, RP oils, mill coolants and other chemicals used in the processing centers.
11.1 Achievements:
Rolling up-to 1700 mm width has been achieved. Non Scalloping material with equi-axed grain structure for the bearing case industry has been established. New grades required for the automotive sector other than the EDD quality sheet have been produced, supplied and performing well at the various automobile manufacturers. Indignation of the car body sheet panel has been achieved up-to 95% at the major car industry. Ultra low carbon steel (ULC-IF steel) and Dent resistant high tensile material has been well developed and established for the outer body panels.
35
CHAPTER-12
Set direction and meet customers expectations Improve process control Reduce wastage Lower costs Increase market share Facilitate training Involve staff Raise morale The customers requirements confidence in the ability of the organization to deliver the desired product and service consistently meeting their needs and expectations. The organizations requirements both internally and externally, and at an optimum cost with efficient use of the available resources materials, human, technology and information. To conduct online quality inspection up to dispatch. Considering the factors of equipment
Maintaining reliability because of following importance: Customer Satisfaction Lower cost of maintenance Longer equipment life cycles Less risk of collateral damage
36
Less risk of customer downtime Less maintenance related labor costs Less risk of E,H,&S exposure Future sales success stories It has a payback!!!!
R&D
Operations
HR
Finance Administration
People Management
Servicing Products/Customers
37
13.1RO plant: RO refers to Reverse Osmosis having cleaning membranes such as used in
sea and brackish water desalination technology, for municipal and industrial water production, in particular to cleaning by direct osmosis. Raw water is used as a source for desalination by reverse osmosis, besides dissolved solids (salts), includes suspended particles, organic and mineral, collectively called as suspended solids. Standard desalination technology includes a filtration system called pretreatment system which is designated to remove the suspended solids. Pretreatment systems remove a significant part of the suspended solids, but are not able to remove them absolutely. Some of the suspended solids pass the pretreatment system, reach the RO membrane and stick to its feed surface as foulants. The process of reverse osmosis (RO) desalination of raw water includes basically the following: Providing a semi-permeable membrane (RO membrane) which allows passing of the solvent (water) molecules and rejects dissolved salts, and disposing the RO membrane in a suitable vessel; Feeding the raw water to one side of the RO membrane (feed side) under gauge pressure higher than the osmotic pressure of the raw water; Collecting permeated desalinated water from the other side of the membrane (permeate side); and Removing concentrated saline water (brine) from the feed side (also called feedbrine side).
13.2Compressor: An air compressor is a device that converts electrical power or gas into
kinetic energy by pressurizing and compressing air, which is then released in quick bursts. An air compressor consists: a. A compressor unit. 38
b. A drive unit for driving the compressor unit. c. A sound insulating box having an air inlet and an outlet and encasing the compressor and drive units. A fan which is eccentrically mounted in a cylindrical sound insulating box with the duct located in a position where the outer periphery of the fan most approaches the inner peripheral wall of the sound insulating box, thereby causing the air currents gushing from the fan to form vortex of cooling air within the sound insulating box and taking in the cooling air with a duct at a point where the velocity of cooling air becomes highest for supply to a part or parts to be cooled.
d.
e. A duct mounted in the sound insulating box. The duct has at one end opened toward the discharge side of the fan and the other end opened into at least one of the compressor and drive units where cooling is needed. 13.2.1 OBJECTIVES: i. Arranged air compressor of low noise should have provision for effectively cooling the component parts of the compressor. To provide a duct for conducting cooling air currents from a fan directly into at least either a compressor unit or a drive unit for effectively cooling the interior of same. To provide to take in large quantity of air from a fan and to supply cooling air currents in high velocity to a place in need of the cooling air without causing pressure drops or temperature increases to the air on the way. To provide cooling air currents directly to a rotor and a coil portion of a stator of the drive unit, or a bearing and cylinder portion of the compressor unit which generate high heat, preventing early exudation of grease in the bearing and deterioration of the seal ring to prolong the service lives of the drive unit and the compressor unit.
ii.
iii.
iv.
13.3Boiler: A boiler or steam generator is a device used to create steam by applying heat
energy to water. The utility plant has LPG fired boilers that are available with all-welded construction, of 3 pass, wet back type, with plain cylindrical furnace / furnaces, attached to a fully immersed radiation chamber in the 1st pass and the 2nd & 3rd pass consisting of tube nests. 13.3.1Boiler specification: a. Shell and tube type constructed b. Gas fired c. Generous heating surface to ensure long life of the boiler 39
d. Low exit gas temperature e. The fuel to steam ratio is proportionate to give high efficiency, which means economy in fuel consumption. f. Burner matched with boiler for high efficiency and low operational costs. g. Shell insulated with fibre glass wool mattresses reducing loss by radiation. h. Compact and easy installation. i. Boiler is made cost-effective and the shell and tube design gives you, your investment's worth in terms of an efficient and sturdy design. 13.3.2Features:
It attains maximum heat transfer and minimal frictional losses through tubes. Large heating surfaces and low heat flux to ensure longevity of heating surface area. Boilers' wet back design is best suited for oil firing, resulting in eliminating refractory construction. The front end of boiler is designed to eliminate refractoriness totally. The automatic firing equipment of boiler is designed to match the boiler resulting in low flue gas temperature and high efficiency.
13.4Cooling tower: Cooling towers is the place in which tubular heat exchangers are
arranged whereby fluid flowing through the tubes is indirectly cooled by air flow through the tower. Each heat exchanger includes a tubular heat transfer surface with the heat exchangers being inwardly spaced from the tower wall and circumferentially positioned to form at least one heat exchanger ring, with the heat transfer surfaces thereof forming ring walls. The heat exchangers are preferably arranged to provide at least two radially spaced rings. The heat exchangers of each ring are preferably arranged whereby the heat transfer surfaces thereof form concentric cylindrical heat transfer walls. The spacing between the rings and/or the height of the exchangers are coordinated to provide the required ratio of heat transfer surface to air flow area and sufficient area for airflow to the heat transfer surface.
13.5 PUMP HOUSE: A pump housing, in particular a vane cell pump housing, having a
suction connection point, from which a suction channel emerges which opens with a suctionchannel opening into a receiving chamber in the pump housing, and having a pressure connection point, from which a pressure channel emerges which opens at a pressure-channel opening into the receiving chamber. A pump house is distinguished by the fact that the suction connection point, the pressure connection point, the suction-channel opening and/or the pressure40
channel opening are/is arranged in such a way that a minimum level of a conveying fluid which is present in the receiving chamber is not undershot in different installation situations. A pump housing, comprising: 1. A suction connection point. 2. 3. 4. A suction channel arranged proceeding from the suction connection point. A suction channel opening arranged in the suction channel. A receiving chamber arranged in the pump housing, the receiving chamber coupled to the suction channel by the suction channel opening.
5. A pressure channel opening. 6. A pressure channel leading from the receiving chamber, the pressure channel coupled to the receiving via the pressure channel opening
7. A pressure connection point from which the pressure channel proceeds; wherein at least one of the suction connection point, the pressure connection point, the suction channel opening, and the pressure channel opening is arranged so that an amount of pumped fluid present in the receiving chamber is maintained at a minimum level, regardless of the installation orientation.
13.6 AC PLANT: An air conditioning plant for an industrial plant site basically contains
one conduit for admitting air to the building and a further conduit for evacuating air there from.
13.7 ETP: ETP stands for Effluent Treatment Plant is a process for the treatment of waste
water produced in a plant. The process includes the steps of admixing partially-treated waste water containing precipitated impurities with a flocculating agent in a flocculation basin, directing the admixed waste water to an elongated sedimentation basin, allowing flocculated solids in the waste water to settle to the bottom of the sedimentation basin, removing the settled solids from the bottom of the sedimentation basin and directing the treated water from the sedimentation basin. The treatment of industrial water according to the present processes allows removal of impurities such that the water is suitable for internal re-use in an operating phosphoric acid facility or release. Additionally, the process is able to treat acidic industrial waste water by the removal of impurities as a preliminary treatment stage leading to discharge of the final treated water to natural water bodies; treated water may be processed by reverse osmosis to remove residual impurities.
41
The utility department in todays scenario is at centre stage in efforts to address climate change and minimize harmful environmental impacts. Like a broader front, utility department faces significant environmental protection, remediation and health and safety responsibilities. To identify opportunities for process automation and synergies, encourage consistency of data and identify areas for control enhancements. Ensuring the continuous supply of energy throughout the plant is a key challenge for utility department.
42
8. Opportunity: Whenever a production scheduling plan or a equipment is not in use then maintenance performed by mechanical department is said to be opportunity. Objectives of the department: i. ii. iii. iv. v. vi. Maintain Efficiency and Reduce Energy Use Enable Failure Analysis When it fails Dont just replace it, Ask why it failed! Maintenance & repairs can be scheduled in advance of failure Reducing down time, overtime, shipping cost Reducing the chance of failure of equipment by eliminating failure modes of the components. Equipment components can last many times longer than manufactured life expectancy by understanding these failure modes. Equipment reliability insures that equipment will last many life cycles longer and this in turn reduces the cost of ownership and the life cycle costs of maintenance.
vii.
viii.
44
CHAPTER-15
45
ii.
iii.
The attached information sheet, Safety Guidelines for the Stacking and Storage of Steel Coils gives basic instructions for safely storing and chocking coils. These recommendations include: a. Chocking each coil individually with wedge-shaped blocks. b.Arranging the bottom coils so there is no space between them. c. Never stacking larger, heavier coils on top of smaller coils. Following are the instructions given by the safety department to the crane operators: i. ii. Instruction for crane operator is that not to carry coil over the pavement. To use bell for better communication with the floor workers.
Following are the instructions given by the safety department to the other departments: a. To replace machine parts only in switch off mode. b. Direct handling of coil should be done by wearing gloves. c. Electrical panels should be repaired by specialized electrician and this implies to other department also that risky components should be handled by specialist. 46