Вы находитесь на странице: 1из 6

SIEMENS

COMPACT 155 MBIT/S


ADD-DROP MULTIPLEXER

Surpass hiT - 1/4e

Installation and User Guide

Issue : April 2005

Installation and User Guide - N56717020107 Rel. 3.01


No reproduction or communication without the written consent of Siemens AG

Page A0-1

SIEMENS

PORTS SECURITY LEVEL


Port safety level for the SURPASS hiT - 1/4e subrack access
Connectors
on the front panels
Motherboard
75 or 120
SYNC
E1 OUTPUT and E1 INPUT
COMM
ETH
LOOPS
PWRA/PWRB
POWER 48V/2A MAXI
Optical Cards
TR and REC
EOW / AUX
ERE Card
TR and REC
EOW and AUX
LAN1 Card
ETH
GFP150 Card
ETH
E3DS3 Card
TR and REC
21E120, 21E1R8 Cards
E1 OUTPUT and E1 INPUT
21E75 Card
E1 INPUT and E1 OUTPUT

Function

G.703 2 Mbit/s synchronization ports


G.703 75 or 120 2 Mbit/s traffic ports
Access to local management via a VT100 console or a
PC
Access to remote management via Ethernet network
Loops and remote signaling
Power supply
Power supply
G.957 Optical Ports STM-1 S1.1-2G, IC1.1-2G, IC1.2-2G,
STM-4 S4.1, L4.1, L4.2
Engineering Order Wire

Security
level

SELV
SELV
SELV

SELV
SELV
SELV
SELV
Laser class 1
No Danger
SELV

G703 STM-1 electrical ports


Engineering Order Wire

SELV
SELV

Ethernet Port

SELV

Ethernet Port

SELV

G703 34 or 45 Mbit/s traffic ports

SELV

G.703 120 2 Mbit/s traffic ports

SELV

G.703 75 2 Mbit/s traffic Ports

SELV

The 19" subrack must be mounted only in racks with a bottom part that is
closed or fitted with a class V1 or HF1 or better air filter, or that stand on a
non-flammable floor.

Safe earth requirement


This equipment must be installed only by skilled personnel. For compliance, the protective
earth terminal must be connected to a safe earth with an impedance Z of less than 5 Ohms.

Handling precaution: For any work to be carried out inside the equipment, an
antistatic wrist strap must be worn.

Safety Extra Low Voltage Circuit

Installation and User Guide - N56717020107 Rel. 3.01


No reproduction or communication without the written consent of Siemens AG

Page A0-2

SIEMENS

ENVIRONMENT

Preservation of the environment as part of a sustainable development logic is an essential concern of


Siemens AG. The desire of Siemens AG is to operate systems observing the environment and
consequently it has decided to integrate environmental performances in the life cycle of its products,
from manufacturing to commissioning, use and elimination.

PACKAGING

PACKAGING
The presence of the logo (green dot) means that a contribution is paid to an approved
national organisation to improve packaging recovery and recycling infrastructures.
To facilitate recycling, please respect the sorting rules set up locally for this kind of waste.

BATTERIES

BATTERIES
If your product contains batteries, they must be disposed of at appropriate collection points.

THE PRODUCT

THE PRODUCT
The crossed-out waste bin stuck on the product means that the product belongs to the
family of electrical and electronic equipment.
In this respect, the European regulations ask you to dispose of it selectively:

At sales points in the event of the purchase of similar equipment.

At the collection points made available to you locally (drop-off centre, selective
collection, etc.).

In this way you can participate in the re-use and upgrading of Electrical and Electronic Equipment
Waste, which can have an effect on the environment and human health.

Installation and User Guide - N56717020107 Rel. 3.01


No reproduction or communication without the written consent of Siemens AG

Page A0-3

SIEMENS

CONTENTS

CHANGE LIST ........................................................................................................................... 0-2


PORTS SECURITY LEVEL .....................................................................................................A0-2
ENVIRONMENT.......................................................................................................................A0-3
CONTENTS................................................................................................................ A0-4 to A0-6
1.

INSTALLATION AND COMMISSIONING................................................................... A1-1 A A1-34


1.1
- GENERALITIES ........................................................................................................................ 1-1
1.2
- SUBRACK INSTALLATION ......................................................................................................... 1-4
1.2.1
- Generalities .................................................................................................................. 1-4
1.2.2
- Installation of access modules ..................................................................................... 1-5
1.2.3
- Installation of STM-4 modules ...................................................................................... 1-5
1.2.4
- Installation of GFP150 modules ................................................................................... 1-5
1.3
- CONNECTING PORTS............................................................................................................... 1-6
1.3.1
- Connecting on motherboard......................................................................................... 1-7
1.3.2
- Connecting on the Optical cards ............................................................................... 1-13
1.3.3
- Connecting on the ERE card..................................................................................... 1-17
1.3.4
- Connecting on LAN1 and GFP150 cards................................................................... 1-19
1.3.5
- Connecting on E3DS3 card........................................................................................ 1-20
1.3.6
- Connecting on 21E120, 21E75, 21E1R8 cards ......................................................... 1-21
1.4
- COMMISSIONING ................................................................................................................... 1-23
1.4.1
- Communication function description .......................................................................... 1-24
1.4.2
- Description of DCC transparency function ................................................................. 1-25
1.4.3
- Defining parameters for IP address and Ethernet port............................................... 1-26
1.4.4
- Using HTTP navigator ................................................................................................ 1-30

2.

OPERATION ................................................................................................................ A2-1 A A2-30


2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8

- FUNCTIONAL DESCRIPTION ...................................................................................................... 2-1


- GENERALITIES ........................................................................................................................ 2-1
- OPERATIONAL PARAMETERS ................................................................................................... 2-2
- PREDEFINED FUNCTIONS....................................................................................................... 2-16
- ALARMS PROCESSING ........................................................................................................... 2-19
- PERFORMANCE PROCESSING ................................................................................................ 2-27
- PROCEDURE FOR REPLACING SUBASSEMBLIES ....................................................................... 2-28
PREVENTIVE MAINTENANCE .................................................................................................. 2-29

3.

SPARE PARTS AND CABLES ..................................................................................... A3-1 A A3-4

4.

SPECIFICATIONS ......................................................................................................... A4-1 A A4-4

Installation and User Guide - N56717020107 Rel. 3.01


No reproduction or communication without the written consent of Siemens AG

Page A0-4

SIEMENS

5.

STARTUP GUIDE ........................................................................................................ A5-1 A A5-16


5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8

- INSTALLING THE EQUIPMENT.................................................................................................... 5-1


- CONNECTING TO AN SURPASS HIT - 1/4E ................................................................................. 5-2
- CONFIGURING A PPP PORT..................................................................................................... 5-9
- VIEWING THE ROUTING CONFIGURATION................................................................................. 5-10
- BUILDING A POINT-TO-POINT LINK .......................................................................................... 5-11
- BUILDING A BUS LINK ............................................................................................................ 5-12
- BUILDING A RING .................................................................................................................. 5-13
- MANAGING EQUIPMENT THROUGH THE NETWORK OF A DIFFERENT SUPPLIER ............................ 5-14

A. BUILDING A MANAGEMENT NETWORK ..................................................................AA-1 A AA-6


A.1
- PRELIMINARY REMARK ............................................................................................................A-1
A.1.1
- Unique address ............................................................................................................A-1
A.1.2
- Supervision of PPP link ................................................................................................A-1
A.1.3
- Routing protocols..........................................................................................................A-1
A.1.4
- Unnumbered links.........................................................................................................A-1
A.2
- CONSTRUCTION OF AN IP NETWORK ........................................................................................A-1
A.2.1
- Static routes..................................................................................................................A-1
A.2.2
- Dynamic routes.............................................................................................................A-4

Installation and User Guide - N56717020107 Rel. 3.01


No reproduction or communication without the written consent of Siemens AG

Page A0-5

SIEMENS

FIGURES
Figure 1-1 - SURPASS hiT - 1/4e Subrack .......................................................................................... 1-3
Figure 1-2 - Surpass hiT - 1/4e Subrack Installation............................................................................ 1-3
Figure 1-3 - Connecting motherboard .................................................................................................. 1-7
Figure 1-4 - Connecting S4.1, L4.1 and L4.2 Optical cards............................................................ 1-13
Figure 1-5 - Connecting S1.1-2G, IC1.1-2G, IC1.2-2G Optical cards ............................................... 1-13
Figure 1-6 - Connecting ERE card .................................................................................................... 1-17
Figure 1-7 - Connecting LAN1 card ................................................................................................... 1-19
Figure 1-8 - Connecting GFP150 card ............................................................................................... 1-19
Figure 1-9 - Connecting on E3DS3 card ............................................................................................ 1-20
Figure 1-10 - Connecting 21E120, 21E75, 21E1R8 cards................................................................. 1-21
Figure 1-11 - Commissioning procedure for Surpass hiT - 1/4e network .......................................... 1-22
Figure 1-12 - Examples of the communication function configuration ............................................... 1-24
Figure 1-13 - "Shelf View" screen of Web browser ............................................................................ 1-32
Figure 1-14 - Menu structure.............................................................................................................. 1-34
Figure 2-1 - Synchronization from the 2 MHz external sync input (T3) ............................................. 2-17
Figure 2-2 - Synchronization from a 2 Mbit/s port .............................................................................. 2-17
Figure 2-3 - Remote loopback function (registering alarms on central site) ...................................... 2-18

TABLES
Table 2-1 - Functional Blocks of Surpass hiT - 1/4e ............................................................................ 2-1
Tables 2-2 to 2-13 - Configuration parameters .................................................................................... 2-2
Tables 2-14 and 2-15 - Commands ................................................................................................... 2-14
Table 2-16 - Spcific indicator lights of Motherboard......................................................................... 2-19
Table 2-17 - Spcific indicator lights of Surpass hiT LAN1 card........................................................ 2-19
Table 2-18 - Spcific indicator lights of Surpass hiT GFP150 card ................................................... 2-19
Table 2-19 - "STATUS" indicator light ................................................................................................ 2-20
Table 2-20 - Spcific indicator lights of Surpass hiT E3DS3 card ..................................................... 2-20
Table 2-21 - Pushbuttons ................................................................................................................... 2-20
Tables 2-22 to 2-24 - Alarms and severity ......................................................................................... 2-21
Table 3-1 - Surpass hiT - 1/4e Components list................................................................................... 3-1
Tables 3-2 and 3-3 - Available cables list ............................................................................................ 3-2
Tables 4-1 to 4-5 - Surpass hiT - 1/4e technical characteristics.......................................................... 4-1

Installation and User Guide - N56717020107 Rel. 3.01


No reproduction or communication without the written consent of Siemens AG

Page A0-6

Вам также может понравиться