Revision 1
Revision Date:10/05/2008
Revision Date:10/05/2008
d.,T.Bang-muang , A.Muang , Samutprakarn 10270
Revision Date:10/05/2008
Revision Date:10/05/2008
บริษัท อีไออาร์ เอ็นจิเนียร่ิง จำากัด
EIR ENGINEERING CO.,LTD.
228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270
Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com
QUOTATION
Quotation :No.SKT 080923
TOTAL 107,065.00
VAT 7% 7,494.55
FINAL AMOUNT 114,559.55
We hope that our confirmation will meet with your requirement and look forward to receiving your valuable or
Your Faithfully,
SUMMARY OF QUOTATION
1 Direct Cost
A Sub-Panel For New Injection Machine No.12 1 lot 50,500.00 50,500.00
B Wire And Cable For Sub-MDB Panel No.12 1 lot 40,400.00 40,400.00
Subtotal 1 90,900.00
2 Indirect Cost
2.1 Site Staff and Supervisor 1 lot
2.2 Transportation 1 lot 1,200.00
2.3 Tool and consumption 1 lot 1,000.00
2.4 Site Expense 1 lot
1 Temporary Facilities
2 Small Construction Supplies
3 Utility Supply Costs
Subtotal 2 2,200.00
COST Different
Estimation Sheet
Client Sankyu
: - Thai Co.,Ltd. Date : 30 July 2008
Project New :Injection Machine Installation Job Number : SKT 080923
Location Wellgrow
: Industial Estate Revision : 1
Title Of Work
Sub Panel
: For New Injection 12
- ABB BREAKER T1N 32AT 3P MCCB 1 set Supply By Owner Crusher M/C
- ABB BREAKER T1N 32AT 3P MCCB 1 set Supply By Owner Jet Loader M/C
- FLANGE SOCKET SLOPING 63A 3P+E IP671 set Mold Temp M/C
- FLANGE SOCKET SLOPING 32A 3P+E IP671 set Jet Loader M/C
- CONNECTOR 16A 2P+E IP67 1 set Lighting
- NAMEPLATE 1 lot
TOTAL A1 50,500.00
TOTAL A 50,500.00
TOTAL B 40,400.00
30,000.00 ### -
- -
- -
- -
200.00 - -
600.00 - -
Trans