FLOW OF THE PRESENTATION


Introduction; Meaning; Let us understand the subject in form, spirit and substance; Time for case studies;

Dinesh Agrawal CA, MBA

LOOK BACK
Historically, GOI laid emphasis on industrialization through successive Five Year Plans; Rapid industrial development needed massive investment; Prior to independence, there were no institutional arrangements for term finance. GOI, therefore, established the following financial institutions: Indl. Finance Corporation of India (1948) Indl. Credit & Inv. Corpn. of India (1955) Indl. Development Bank of India (1964) & Indl. Reconstruction Bank of India (1971) Similarly, State Governments also established SFCs in their respective states.

Dinesh Agrawal CA, MBA

LOOK BACK (CONTD.)


For long, commercial banks confined their lending to meet WC requirements only and they did not play any active role in extending term finance; However, with increasing proportion of Term Deposits in their deposit portfolio and the paucity of resources in the country, it was felt that banks could enter the field of term finance, in a role complementary to that of Term Lending Institutions. And therefore with have ICICI Banks, IDBI Banks of the world

Dinesh Agrawal CA, MBA

PROJECT BACKGROUND
The purpose of term assistance is to meet a part of the capital expenditure of a project. A project can be defined as A scheme of things to be done during a specified period in future for deriving expected benefits under certain assumed conditions. A project may be in the nature of setting up a new industrial unit, modernisation, expansion, diversification and promotion of R&D.

Dinesh Agrawal CA, MBA

PROJECT BACKGROUND (CONTD 1)


To set up a project, certain capital expenditure needs to be incurred in acquiring assets such as L&B, P&M and other infrastructural facilities like roads, water supply, railway sidings, etc., in addition to the Preliminary / Pre-Operative Expenses and margin on WC Limits Where promoters of a project are unable to meet the entire capital expenditure out of their own resources, Term Loans are sanctioned to supplement the promoters contribution; Promoters of an industrial project can constitute themselves into any of the following forms of business organisations to implement the project : Sole Proprietorship, JHF, Partnership, Co-operative Society & Joint Stock Company. Our discussion of the subject would revolve around Joint Stock Company as Promoter(s).
6 Dinesh Agrawal CA, MBA

PROJECT BACKGROUND (CONTD 2)


The Promotion Stage is a crucial stage in the entire life cycle of a project. Promotion in relation to a project will comprise broadly the following functions:

Identification of a project

Feasibility investigation

Assembling the proposition

Financing the proposition

Dinesh Agrawal CA, MBA

IDENTIFICATION OF A PROJECT
The first step in the project promotion is the identification of a project. An industrial project originates as an idea in a promoter when he observes the existence of a potential market for a certain product; The promoter, on the basis of his experience, background and ability, then considers the feasibility of manufacturing and marketing the product at a remunerative price; There should be an unsatisfied demand.

Dinesh Agrawal CA, MBA

FEASIBILITY INVESTIGATION
A detailed feasibility study is a costly exercise. It is, therefore, desirable that, before it is undertaken, marketability of the product to be manufactured is firmly established; There are agencies, specialising in market research, which conduct such market studies. Promoters may take advantage of their services; A market study aims at assessing the aggregate demand for a product; The promoter will now undertake the detailed feasibility investigation proper, comprising two feasibility studies: i) The Technical Feasibility Study ii) The Economic Feasibility Study

Dinesh Agrawal CA, MBA

FEASIBILITY INVESTIGATION - TECHNICAL FEASIBILITY


Technical Feasibility Study covers the following aspects: Location of the project Lay-out of the Plant Size of the Plant Factory construction Manufacturing process / Technology Process Design Product Design Scale of Operation Infrastructural facilities
10 Dinesh Agrawal CA, MBA

FEASIBILITY INVESTIGATION - ECONOMIC FEASIBILITY


The prime objective of setting up a project is to derive a fair return on the investment. Economic Feasibility Study, therefore, concerns itself with matching of economic resources with the physical requirements of a project and determining the viability of investment therein.

11

Dinesh Agrawal CA, MBA

ASSEMBLING THE PROPOSITION COP


When a promoter is satisfied about the technical feasibility and economic viability of a project, the next task is to work out the Cost of the Project and the Means of financing it. The Cost of the Project would broadly include: (a) L&B (b) P&M (c) Misc. Fixed Assets (d) Technical Know-how, Engg. & Consultancy fees (e) Preliminary and Pre-operative expenses (f) Provision for contingencies (g) Margin on WC Limits
12 Dinesh Agrawal CA, MBA

FINANCING THE PROPOSITION


Setting up of a project involves acquisition of Fixed Assets which facilitate the process of production; Fixed Assets have a relatively longer life and are generally not meant for resale; They are required to be retained over a period of time to exploit their productive potential; C/A go through the operating cycle of RM, WIP and FG, which when sold bring in cash. This cycle is generally completed in a short period of less than one year.

13

Dinesh Agrawal CA, MBA

FINANCING THE PROPOSITION (CONTD 1)


Thus, investment in C/A is realised over a short term, while investment in Fixed Assets is long term in nature; It is realised through surplus generated in the form of Net Profits, Depreciation and other non-cash write-offs; As it takes a long time for the Fixed Assets to pay for themselves, the Promoter should raise suitable long term funds to finance a project; Keeping the foregoing in view, the Promoter will explore the financial feasibility of the project by examining : a) The possible long term sources of finance; b) The feasible financial leverage; c) The expected return on the investment;
14 Dinesh Agrawal CA, MBA

FINANCING THE PROPOSITION (CONTD 2)


Long Term Sources

Owned Capital

Borrowed Capital

Share Capital

Retained Earnings

Debentures

Long Term Loans

Public Deposits

15

Dinesh Agrawal CA, MBA

FINANCING THE PROPOSITION (LONG TERM SOURCES)


The aggregate amount of finance raised for financing a project is referred to as Capital, comprising two components: (a) Owned Capital and (b) Borrowed Capital. The other sources of long term funds are: (a) Capital Subsidy applicable to projects coming up in certain notified backward areas, and; (b) Interest free sales tax loans offered by State Governments.

16

Dinesh Agrawal CA, MBA

FINANCING THE PROPOSITION (FINANCIAL LEVERAGE)


After considering availability of long terms sources of finance, the Promoter will decide about a suitable financial structure for the Company; It will depend upon the financial leverage envisaged in the combination of sources of finance under the two categories, viz., Owned Capital and Borrowed Capital. Few projects can be financed entirely by equity or debt; The divergent interests of debt and equity are brought into alignment by the concept of Debt / Equity gearing which determines the level of debt that can be supported by a given quantum of equity; For this purpose, Debt means Funded Debt including all term liabilities and equity will include Share Capital and retained earnings, if available; No standard D/E Ratio can be prescribed No never
17 Dinesh Agrawal CA, MBA

FINANCING THE PROPOSITION (RETURN ON INVESTMENT)


The most important and widely used Capital Investment Evaluation techniques are: Pay-back Method Net Terminal Surplus Method Excess Present Value Method Internal Rate of Return Method

18

Dinesh Agrawal CA, MBA

FINANCING THE PROPOSITION (RETURN ON INVESTMENT)


The object of Pay-back Method is to find out the period of time required for recovering the entire amount of investment made in a project. The cash flows (Net Profit + Depreciation + Other non-cash write-offs) are compared with the outlay on the project to determine the pay-back period. Years to pay back would be: Total Investment Cash Flow per annum

19

Dinesh Agrawal CA, MBA

FINANCING THE PROPOSITION (RETURN ON INVESTMENT)


Net Terminal Surplus Method employs the concept of compounding which involves re-investing the simple interest earned each year along with the principal so that the principal grows each year by the amount of interest earned during the previous year and interest being calculated on the increased principal also grows. Future Value = Principal x (1+i)n

20

Dinesh Agrawal CA, MBA

FINANCING THE PROPOSITION (RETURN ON INVESTMENT)


Internal Rate of Return Method It is that rate at which the sum of the discounted cash flows is equal to the investment outlay. In other words, IRR is the rate which makes the Present Value (PV) of benefits equal to the Present Value of costs or reduces the Net Present Value (NPV) to zero. The object of this method is to find the rate of return which a project is likely to earn over its useful life.

21

Dinesh Agrawal CA, MBA

TYPES OF TERM ASSISTANCE


The types of term assistance extended by the Bank can be broadly classified into: I] Term Loans (Incl. Forex Loans) II] Deferred Payment Guarantees III] Bill Discounting Facilities IV] Underwriting of Shares / Debentures

22

Dinesh Agrawal CA, MBA

TYPES OF TERM ASSISTANCE TERM LOAN


A Term Loan is a loan granted for a fixed term of not less than one year, intended normally for financing fixed assets acquired / to be acquired, carrying interest at a specified rate, and scheduled for repayment in installments Depending on the term for which the said terms loans are granted, they could be classified into (a) Short Term Loans (b) Medium Term Loans and (c) Long Term Loans.

23

Dinesh Agrawal CA, MBA

TYPES OF TERM ASSISTANCE DPG


Deferred Payment Guarantee (DPG) is a contract to pay to the supplier the price of machinery, supplied by him on deferred terms, in agreed installments with stipulated interest on the respective due dates in case of default in payment thereof by the buyer; A DPG is, in many respects, a substitute for a Term Loan and, as far as the buyer of P&M is concerned, it serves the same purposes as a Term Loan; Standards of appraisal are the same as TL.

24

Dinesh Agrawal CA, MBA

TYPES OF TERM ASSISTANCE BILLS DISCOUNTING


Under a contract for sale of machinery on deferred payment basis, the balance remaining to be paid after the initial down payment represents the deferred receivables of the seller. Thus, the funds of the seller get blocked for unduly long periods and the seller requires finance against such deferred receivables to replenish his Working Capital; To facilitate availment of finance against the deferred receivables, the seller usually draws a series of usance bills with graded maturities to coincide with the due dates of payment of the relative installments (including applicable interest). The usance bills drawn by the seller will be accepted by the buyer before they are discounted by the sellers banker.

25

Dinesh Agrawal CA, MBA

TYPES OF TERM ASSISTANCE U/W OF SHARES


The necessity for underwriting arrangement arises only in the case of a Public Limited Company resorting to raise through the capital issue market, a part of the Share Capital for part-financing a project; Underwriting is a contract whereby a person agrees, in consideration, to take up a specified number of shares or debentures or amount of debenture stock to be offered to the public, in the event of the public not subscribing for them; Underwriting as a business will come under the scope of Investment Banking as distinct from Commercial Banking; In view of this, therefore, a high degree of selectivity should continue to be exercised in undertaking underwriting business; However, the business stemmed not so much from the point of view of earnings on the investment as from the consideration that no viable project enjoying national priority should suffer for want of underwriting support.
26 Dinesh Agrawal CA, MBA

PROJECT APPRAISAL

The purpose of Project Appraisal is to ascertain whether the project will be sound technically, economically, Financially, and managerially and ultimately viable as a commercial proposition.
27 Dinesh Agrawal CA, MBA

PROJECT APPRAISAL
The appraisal of a project will involve the examination of: a) Technical Feasibility : To determine the suitability of the technology selected and the adequacy of the technical investigation, and design; b) Economic Feasibility : To determine the conduciveness of economic parameters to setting up the project and their impact on the scale of operations. c) Financial Feasibility : To determine the accuracy of cost estimates, suitability of the envisaged pattern of financing and general soundness of the capital structure. d) Commercial Viability : To ascertain the extent of profitability of the project and its sufficiency in relation to the repayment obligations pertaining to term finance. e) Managerial Competency : To ascertain that competent men are behind the project to ensure its successful implementation and efficient management after commencement of commercial production.
28 Dinesh Agrawal CA, MBA

PROJECT APPRAISAL (CONTD 2)


A project should also be examined, wherever appropriate, from the point of view of its value to the national economy in terms of socio-economic benefits like generation of employment opportunities, forex earnings, the quantum of import substitution, etc...; The first step in Project Appraisal is to find out whether the project is prima facie acceptable by examining salient features such as: The background and experience of the applicants, particularly in the proposed line of activity; The potential demand for the product; The availability of the required inputs, utilities and other infrastructural facilities; Whether the project is in keeping with the priorities, if any, laid down by the Government.
29 Dinesh Agrawal CA, MBA

PROJECT APPRAISAL (CONTD 3)


The original application may not contain all the basic data / information; In such cases, it may be necessary to interview the applicants and elicit all the necessary data / information with a view to forming an overall idea about the general feasibility of the project; After satisfying itself about the prima facie acceptability of the project, the Branch may call for from the promoters, an Application, containing the following essential data / information, such as:

30

Dinesh Agrawal CA, MBA

PROJECT APPRAISAL (CONTD 4)


Particulars of the project along with a copy of the Project Report furnishing details of the technology, manufacturing process, availability of construction / production facilities, etc; Estimates of cost of the project detailing the itemized assets acquired / to be acquired, inclusive of Preliminary / Pre-operative Expenses and WC margin requirements; Details of the proposed means of financing indicating the extent of promoters contribution, the quantum of Share Capital to be raised by public issue, the composition of the borrowed capital portion with particulars of Term Loans, DPGs, Foreign Currency Loans, etc. WC requirements at the peak level (i.e., when the level of Gross Current Assets is at the peak) during the first year of operations after the commencement of commercial production and the banking arrangements to be made for financing the WC requirements.

31

Dinesh Agrawal CA, MBA

PROJECT APPRAISAL (CONTD 5)


Project Implementation Schedule. Organisational set up along with a list of Board of Directors and indicating the qualifications, experience and competence of: (i) The key personnel to be in charge of implementation of the project during the construction period and (ii) The executives to be in charge of the functional areas of purchase, production, marketing and finance after commencement of commercial production.

32

Dinesh Agrawal CA, MBA

PROJECT APPRAISAL (CONTD 6)


Demand projection based on the overall market prospects together with a copy of the market survey report; Estimates of sales, CoP and profitability; Projected P&L Account and B/S for the operating years during the currency of the Banks term assistance; Proposed amortisation schedule, i.e., repayment programme; Projected Funds Flow Statement covering both the construction period and the subsequent operating years during the currency of the Term Loan; Details of the nature and value of the securities offered; Consents from the Government / other authorities and any other relevant information.

33

Dinesh Agrawal CA, MBA

PROJECT APPRAISAL (CONTD 7)


In respect of existing concerns, in addition to this information, particulars regarding the history of the concern, its past performance, present financial position, etc., should also be called for; The Application completed in all respects and duly signed by the authorised signatories of the Company will form the basis for the detailed appraisal of the project; An inspection of the project site (or factory in the case of existing units) is a must; Each project has to be examined in proper perspective having due regard to its nature, size and scope; Although the basic techniques employed for appraising the viability of various projects are more or less the same, there could be no standard or uniform approach for appraising all projects.

34

Dinesh Agrawal CA, MBA

PROJECT APPRAISAL (CONTD 8)


The ultimate objective of the appraisal exercise is to ascertain the viability of a project with a view to ensuring the repayment of the borrowers obligations under the Banks term assistance; Therefore, it is not so much the quantum of the proposed term assistance as the prospects of its repayment that should weigh with the Branch while appraising a project. In project appraisal, nothing should be assumed or taken for granted; All the data / information should be checked and, wherever possible, counter-checked through inter-firm and inter-industry comparisons; It should be borne in mind that Healthy scepticism is a cardinal virtue in project appraisal.

35

Dinesh Agrawal CA, MBA

PROJECT APPRAISAL MEMORANDUM


PROJECT APPRAISAL MEMORANDUM
1. PROPOSAL Nature of proposal; Purpose : New project, expansion, modernisation, diversification or for any other approved purpose

2. BRIEF HISTORY Brief account of corporate history; MA & AA; Regd. address; Present organisational set up with BoD; Qualifications, experience and background; Line of activities, Financial position, etc., of Associate Concerns; Overall structure of inter-corporate investments

3. PAST PERFORMANCE Summary of Company's past performance in terms of licensed / installed / operating capacities, sales, operating profit and Net Profit for the past 3 years; Capacity utilisation; Sales & profitability; Dividend policy; Capital expenditure programmes implemented by the Company during the past 3 years and how they were financed; Company's management-labour relations 4. PRESENT FINANCIAL POSITION Company's audited Balance Sheets & P/L Accounts for the past 3 years with analysis; Company's Capital structure; Summarise conclusions of financial analysis; Method of depreciation; Revaluation of F/A; Record of major defaults; Position of Company's tax assessment; Contingent Dinesh Agrawal CA, MBA Liabilities; Pending suits; Qualifications / Adverse remarks by auditors

36

PROJECT APPRAISAL MEMORANDUM


PROJECT APPRAISAL MEMORANDUM
5. PROJECT (a) Description of the project (Modernisation, expansion, diversification or a new venture) ; Standing, experience and reliability of outside agency who prepared the Project Report; (b) Collaboration Arrangement (Technical or Financial); (c) Technical Feasibility covering suitability of technology, size & location of plant, technical arrangements & mfg. process (d) Financial Feasibility covering Cost of Project & Means of Finance 6. PROJECT IMPLEMENTATION SCHEDULE With reference to Bar Chart or PERT / CPM Chart and in the light of actual implementation; Main stages in the project implementation and whether the time schedule for construction, erection / installation of P&M, start-up / trial run, commencement of commercial production is reasonable & acceptable

7. PRODUCTION FACTORS (a) Mfg. Process - Basis of selection & justification; (b) Raw Materials - Imported / Indigenous, Names of main suppliers, Pattern of unit prices & fluctuation; (c) Utilities & Essential Services - Requirements of power, fuel, water, transport, railway siding with comments on adequacy of arrangements, treatment and disposal of effluents; (d) Operating Organisation - Experience and expertise of Managerial / Technical personnel, other staff required 8. WORKING CAPITAL REQUIREMENTS Assessment of total WC requirements at the peak level (GCA) during the first year of operations after commencement of commercial production; sharing of business among member banks; financing of additional WC requirments in case of existing companies

37

Dinesh Agrawal CA, MBA

PROJECT APPRAISAL MEMORANDUM


PROJECT APPRAISAL MEMORANDUM
9. MARKETING (a) Sales prospects and underlying assumptions, demand projections on the basis of past consumption, total supply position, general condition of industry (b) Selling Price - Trend to see whether stable, Govt. price controls, quota systems, etc.; (c) Propsects for exports - Export obligations; (d) Marketing Organisation - Adequacy, Distributors / Selling Agents, Terms of arrangement, remuneration, competence, Asso. Concerns - Siphoning of profits 10. COMMERCIAL VIABILITY - CoP & PROFITABILITY (A) Sales Volume / Value - (a) Volume; (b) No. of working days; (c) Capacity utilisation; (d) Value (B) CoP - (a) Matls. consumed; (b) Utilities (PW&F); (c) Wages & Salaries (d) Factory Overheads; (e) Depreciation - SLM / WDV- Consistency; (f) Selling Exp.; (g) Financial Exp.; (h) Admn. Exp.; (i) Royalty & Know-how; (j) Preliminary / Pre-operative Exp.; (k) Taxation (C) Profitability (CMA Data and ratios) (D) Inter-firm comparison 11. COMMERCIAL VIABILITY - DSCR & REPAYMENT PROGRAMME (a) DSCR (Gross) and (Net) ['Core Test' Ratio], Margin of safety and extent of risk coverage; (b) Break-Even Analysis - For first full year of production and the year of maximum capacity utilisation; (c) Cost-Volume-Price (CVP) or Senstivity Analysis - For the year with operating profit nearest to the average operating profit to determine 'Span of Resiliency' of the project; (d) Repayment Programme based on the above factors and initial moratorium (start-up) period 12. FUNDS FLOW ANALYSIS Funds Flows to be divided into Long Term Funds Flows and Short Term Funds Flows - Dif. would indicate Long Term Surplus or Deficit / Movements in C/A & OCL leading to increase or decrease in WCG; Essential expenditure on F/A, repayment obligations, taxes and dividends are fully provided for; Cash generation would be adequate to meet Dinesh Agrawal CA, MBA all commitments during the entire repayment period.

38

CONCLUSION ..chance favours only the prepared mind - Louis Pasteur