COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 01 :

CARRIAGE

Item Code
01-01-a

Description Unit
Carriage of 100 cft / 5 tonne of all materials by truck or other means : 1st 50 meter

Rate (British System) Labour


0.00

Rate (Metric System) Unit


50 m

Composite
58.84

Labour
0.00

Composite
58.84

Spec. No

Remarks
a) Cement carried in containers other than bags will be paid according to this item b) Word, pipes and specials, covers GI , CI , AC, RCC,PCC, PVC and steel pipes and specials. c) Reduce the rate in case of carriage of 1000 NO. Tiles by:33% for 12"x6"x1" size 25% for 12"x6"x1.5" size 20% for 12"x6"x1.25" size

50 Meter

01-01-b

Carriage of 100 cft / 5 tonne of all materials by truck or other means : 2nd 50 meter

50 Meter

0.00

9.29

50 m

0.00

9.29

01-01-c

Carriage of 100 cft / 5 tonne of all materials by truck or other means : 3rd to 5th 50 meter Carriage of 100 cft / 5 tonne of all materials by truck or other means : 250 to 1000 meter Carriage of 100 cft / 5 tonne of all materials by truck or other means : 1st kilometer Carriage of 100 cft / 5 tonne of all materials by truck or other means : 2nd - 5th kilometer Carriage of 100 cft / 5 tonne of all materials by truck or other means : 6th to 10th kilometer Carriage of 100 cft / 5 tonne of all materials by truck or other means : 11th & subsequent kilometer Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 1st 50 meter Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 2nd 50 meter Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 3rd to 5th 50 meter Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 250 - 1000 meter Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 1st kilometer Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 2nd - 5th kilometer Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 6th - 10th kilometer Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 11th & subsequent kilometer Carriage of cement(bag), bitumen/lubricants (drum) by truck or other means : 1st 50 meter Carriage of cement (bag) bitumen/lubricant (drum) by truck or other means : 2nd 50 meter

50 Meter

0.00

6.20

50 m

0.00

6.20

01-01-d 01-01-e 01-01-f 01-01-g 01-01-h 01-02-a

250 Meter 1 KM 1 KM 1 KM 1 KM 50 Meter

0.00 0.00 0.00 0.00 0.00 0.00

28.91 103.24 24.02 20.23 16.63 37.07

250 m km km km km 50 m

0.00 0.00 0.00 0.00 0.00 0.00

28.91 103.24 24.02 20.23 16.63 37.07

Reduce the rate by 33% for our tile size 9"x4.5"x1.5"

01-02-b 01-02-c 01-02-d 01-02-e 01-02-f 01-02-g 01-02-h 01-03-a 01-03-b

50 Meter 50 Meter 50 Meter 1 KM 1 KM 1 KM 1 KM Tonne/50 Meter Tonne/50 Meter

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5.85 3.90 18.21 65.04 15.13 12.75 10.47 11.77 1.86

50 m 50 m 250 m km km km km tonne/50m tonne/50m

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5.85 3.90 18.21 65.04 15.13 12.75 10.47 11.77 1.86

NWFP CSR 2008 - Approved 25-Aug-2008

Page 1 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 01 :

CARRIAGE

Item Code
01-03-c 01-03-d 01-03-e 01-03-f 01-03-g 01-03-h 01-04-a 01-04-b 01-04-c 01-04-d 01-04-e 01-04-f 01-04-g 01-04-h 01-05-a

Description Unit
Carriage of cement (bag), bitumen/lubricant (drum) by truck or other means : 3rd to 5th 50 meter Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 250 to 1000 meter Carriage of cement(bags), bitumen/lubricant (drum) by truck or other means : 1st kilometer Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 2nd - 5th kilometer Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 6th - 10th kilometer Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 11th & subsequent km Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 1st 50 meter Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 2nd 50 meter Carriage of 100cft of sarkanda, pichi, frash etc by road or boat : 3rd to 5th kilometer Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 250 to 1000 meter Carriage of 100cft of sarkanda, pichi, frash etc by road or boat : 1st kilometer Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 2nd - 5th kilometer Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 6th - 10th kilometer Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 11th & subsequent kilometer Carriage of small consignments upto 250kg 1st 50 meter

Rate (British System) Labour


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Rate (Metric System) Unit


tonne/50m t/250m tonne/km tonne/km tonne/km tonne/km 50 m 50 m 50 m 250 m km km km km 50 m

Composite
1.24 5.78 20.65 4.80 4.05 3.33 35.31 5.58 3.72 17.34 61.94 14.41 12.14 9.98 2.94

Labour
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Composite
1.24 5.78 20.65 4.80 4.05 3.33 35.31 5.58 3.72 17.34 61.94 14.41 12.14 9.98 2.94

Spec. No

Remarks

Tonne/50 Meter Tonne/25 0 Meter Tonne/1 Km Tonne/1 Km Tonne/1 Km Tonne/1 Km 50 Meter 50 Meter 50 Meter 250 Meter 1 KM 1 KM 1 KM 1 KM 50 Meter

For consignment weighing over 250 kg, the rate shall be increased on pro-rate basis.

01-05-b 01-05-c 01-05-d 01-05-e 01-05-f

Carriage of small consigmnments upto 250 kg 2nd 50 meter Carriage of small consignments upto 250 kg 3rd to 5th 50 meters Carriage of small consignments upto 250 kg 250 - 1000 meter Carriage of small consignments upto 250 kg 1st kilometer Carriage of small consignments upto 250 kg 2nd to 5th kilometer

50 Meter 50 Meter 250 Meter 1 KM 1 KM

0.00 0.00 0.00 0.00 0.00

0.46 0.31 1.45 5.16 1.20

50 m 50 m 250 m km km

0.00 0.00 0.00 0.00 0.00

0.46 0.31 1.45 5.16 1.20

NWFP CSR 2008 - Approved 25-Aug-2008

Page 2 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 01 :

CARRIAGE

Item Code
01-05-g 01-05-h 01-06-a 01-06-b 01-06-c 01-06-d 01-07-a

Description Unit
Carriage of small consignments upto 250 kg 6th to 10th kilometer Carriage of small consignments upto 250 kg 11th & subsequent kilometer Carriage of consignments (odd job) Coolie load Carriage of consignments (odd job) Donkey load Carriage of consignments (odd job) Cart Load Carriage of consignments (odd job) Camel load Hire Charges of Truck 1 KM 1 KM 1 KM 1 KM 1 KM 1 KM Day

Rate (British System) Labour


0.00 0.00 27.90 0.00 0.00 0.00 0.00

Rate (Metric System) Unit


km km km km km km Day

Composite
1.01 0.83 27.90 18.15 13.61 18.15 5,526.67

Labour
0.00 0.00 27.90 0.00 0.00 0.00 0.00

Composite
1.01 0.83 27.90 18.15 13.61 18.15 5,526.67

Spec. No

Remarks

a) This item shall be allowed with prior concurrence of Superintending Engineer b) The rate includes pay of driver and cleaner only. The cost of repairs shall be borne by the owner and the cost of POL, loading/unloading shall be paid by the borrower .

01-07-b 01-07-c 01-08-a 01-08-b 01-08-c 01-08-d 01-09-a 01-09-b 01-09-c 01-09-d

Hire charges of Tractor with trolley Hire charges of Tractor without trolley Hand shunting loaded railway wagons Upto 500 meter Hand shunting loaded railway wagons Upto 1 kilometer Hand shunting loaded railway wagons Upto 2 kilometer Hand shunting loaded railway wagons 3rd & subsequent kilometer Hand shunting empty railway wagons Upto 500 meter Hand shunting empty railway wagons Upto 1 kilometer Hand shunting empty railway wagons Upto 2 kilometer Hand shunting empty railway wagons 3rd & subsequent kilometer

Day Day Each Each Each Each Each Each Each Each

0.00 0.00 418.50 627.75 767.25 348.75 209.25 313.88 383.63 174.38

4,964.73 4,005.24 418.50 627.75 767.25 348.75 209.25 313.88 383.63 174.38

Day Day Each Each Each Each Each Each Each Each

0.00 0.00 418.50 627.75 767.25 348.75 209.25 313.88 383.63 174.38

4,964.73 4,005.24 418.50 627.75 767.25 348.75 209.25 313.88 383.63 174.38

NWFP CSR 2008 - Approved 25-Aug-2008

Page 3 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 02 :

LOADING, UNLOADING AND STACKING

Item Code
02-01 02-02-a 02-02-b 02-03 02-04 02-05 02-06 02-07 02-08 02-09-a 02-09-b 02-10 02-11 02-12 02-13 02-14 02-15-a

Description Unit
Load into or unload from railway wagons within 50m shingle, sand, ballast, tiles, etc, laid & stacked Load into or unload from railway wagons within 50m laid & stacked : Bricks 10" size Load into or unload from railway wagons within 50m laid & stacked : Bricks 9" or smaller size Load into or unload from railway wagons, cement in bags and stacking within 50m. Load into or unload from railway wagons, empty cement bags and stacking Load into or unload from railway wagons and stacking white lime in bags Load into or unload from railway wagons structural steel, RS joists, rails, rail fastenings etc Load into or unload from 45 gallon drums full, into or from railway wagons,lead upto 50m Loading or unloading packages of all sorts upto 50 kg. Load or unload sleepers other than wooden, incl stacking, lead upto 50 m : Broad gauge Load or unload sleepers other than wooden, including stacking, lead upto 50 m : Metre gauge & Load or unload timber logs or shuttering into or from railway wagons, including stacking within 50m Loading or unloading bhoosa in railway wagons lead upto 50 m. Load or unload timber scrap or wooden plugs into or from railway wagons & stacking within 50m Load or unload pitching stone/spawl from railway wagons of any guage including clearing 1.5m away Loading or unloading building stone including clearing away 1.5m from rails Unloading oil,bitumen or tar etc : Crude Oil (to be pumped from tank wagon into tank) Unloading oil,bitumen or tar etc Crude oil (drained by gravity) Unloading oil,bitumen or tar etc Crude oil materials from railway wagons Unloading oil, bitumen or tar etc : Fuel Oil from tank into empty drums including stacking within 50 m Unloading oil,bitumen or tar etc Petrol (2 gallon tin) 100 cft

Rate (British System) Labour


279.00 348.75 279.00 348.75 312.48 69.75 167.40 22.32 19.53 697.50 348.75 92.07 209.25 139.50 103.23 133.92 83.70

Rate (Metric System) Unit


m3 1000 No. 1000 No. 100 No. 1000 No. tonne tonne Each Each 100 No. 100 No. tonne tonne tonne m3 m3 1000 ltr

Composite
279.00 348.75 279.00 348.75 312.48 69.75 167.40 22.32 19.53 697.50 348.75 92.07 209.25 139.50 103.23 133.92 83.70

Labour
98.53 348.75 279.00 348.75 312.48 69.75 167.40 22.32 19.53 697.50 348.75 92.07 209.25 139.50 36.46 47.29 83.70

Composite
98.53 348.75 279.00 348.75 312.48 69.75 167.40 22.32 19.53 697.50 348.75 92.07 209.25 139.50 36.46 47.29 83.70

Spec. No

Remarks

1000 No. 1000 No. 100 No. 1000 No. tonne tonne Each Each 100 No. 100 No. tonne tonne tonne 100 cft 100 cft 1000 ltr

Except cement in Jute or paper bags

The rate include checking and weighing the tins

02-15-b 02-15-c 02-15-d 02-15-e

1000 ltr Ton tonne 100 No.

83.70 15.90 139.50 175.77

83.70 15.90 139.50 175.77

1000 ltr Ton tonne 100 No.

83.70 15.90 139.50 175.77

83.70 15.90 139.50 175.77


Page 4 of 144

NWFP CSR 2008 - Approved 25-Aug-2008

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 02 :

LOADING, UNLOADING AND STACKING

Item Code
02-15-f 02-15-g 02-16-a 02-16-b 02-16-c 02-16-d 02-16-e 02-16-f 02-17 02-18 02-19 02-20 02-21 02-22 02-23 02-24 02-25

Description Unit
Unloading oil, bitumen or tar etc Kerosine oil (4 gallon tin) Unloading oil,bitumen or tar etc Tar & Bitumen in drums with carriage upto 1 km Removing and stacking within 50m. lead Stone, spawl, brick bats, shingle, sand, lime etc Removing and stacking within 50m. lead Bricks Removing and stacking within 50m. lead Broad gauge wooden sleepers Removing and stacking within 50m. lead Metre gauge or narrow guage wooden sleepers Removing and stacking within 50m. lead Rails, girders, pipes, cement etc. Removing and stacking within 50m. lead Bridge and crossing timbers, etc. Load into wagons girders, rails, MS bars, pipes etc. including 50m lead & stacking inside wagons Unload from wagons girders, rails, MS bars, girder etc. including 50m lead but excluding stacking Load into wagons wooden baord guage sleepers including 50m lead & stacking Unload wooden broad gauge sleepers from wagons including 50m lead and stacking Loading metre gauge or narrow guage wooden sleepers including 50m lead & stack inside wagons Unloading metre gauge or narrow guage wooden sleepers including 50m lead but excluding stacking Loading bridge and crossing timber including 50m lead & stacking Unloading bridge and crossing timbers including 50m lead but excluding stacking Load or unload bitumen, asphalt, tar in drums, into or from railway wagons, lead upto 50m 100 No. 100 No. 100 cft

Rate (British System) Labour


348.75 0.00 139.50 404.55 223.20 127.50 64.17 744.93 178.56 69.75 558.00 279.00 306.90 147.87 279.00 139.50 139.50

Rate (Metric System) Unit


100 No. 100 No. m3 1000 No. 100 No. 100 No. tonne 100 No. tonne tonne 100 No. 100 No. 100 No. 100 No. 100 No. 100 No. tonne

Composite
348.75 90.75 139.50 404.55 223.20 127.50 64.17 744.93 178.56 69.75 558.00 279.00 306.90 147.87 279.00 139.50 139.50

Labour
348.75 0.00 49.26 404.55 223.20 127.50 64.17 744.93 178.56 69.75 558.00 279.00 306.90 147.87 279.00 139.50 139.50

Composite
348.75 90.75 49.26 404.55 223.20 127.50 64.17 744.93 178.56 69.75 558.00 279.00 306.90 147.87 279.00 139.50 139.50

Spec. No

Remarks

1000 No. 100 No. 100 No. tonne 100 No. tonne tonne 100 No. 100 No. 100 No. 100 No. 100 No. 100 No. tonne

NWFP CSR 2008 - Approved 25-Aug-2008

Page 5 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 03 :

EARTHWORK (EXCAVATION AND EMBANKMENT)

Item Code
03-01-a

Description Unit
Earth excavation undressed upto single throw of kassi phaorah or shovel etc : in ashes, sand, soft soil or silt clearance Earth excavation undressed upto single throw of kassi phaorah or shove etc : in ordinary soil, Earth excavation in ashes, sand & soft soil or silt clearance, undressed lead upto 25m. Bed clearance and dressing slopes of drains including removing of weeds and roots etc. Excavated material undressed within 25m

Rate (British System) Labour


1,046.25

Rate (Metric System) Unit


m3

Composite
1,046.25

Labour
36.95

Composite
36.95

Spec. No

Remarks

1000 Cft

03-01-b 03-02 03-03-a

1000 Cft 1000 Cft 1000 Cft

1,255.50 1,534.50 1,953.00

1,255.50 1,534.50 1,953.00

m3 m3 m3

44.34 54.19 68.97

44.34 54.19 68.97


The rate is aplicable where the earth of the bed tobe removed is of the type of ordinary soil. When it is silt or soft soil, it will be paid per item No 03-01-a, 03-01-b or 03-02 above, whichever is applicable. The XEN will specify drains of each category

03-03-b

03-04-a 03-04-b 03-04-c 03-05-a

Bed clearance and dressing slopes of drains including removing of weeds and roots etc. Excavated material dressed within 25m lead Borrowpit excavation undressed lead upto 50m in Ordinary soil Borrowpit excavation undressed lead upto 50m in Hard soil Borrowpit excavation undressed lead upto 50m in shingle/gravel formation Embankment formation in ordinary soil & compaction by mechanical means at optimum moistures content to 95% to 100% max. modified. AASHTO dry density (borrow area)

1000 Cft

2,159.46

2,159.46

m3

76.26

76.26

1000 Cft 1000 Cft 1000 Cft 1000 Cft

1,953.00 2,399.40 4,743.00 551.18

1,953.00 2,399.40 4,743.00 7,039.72

m3 m3 m3 m3

68.97 84.73 167.50 19.46

68.97 84.73 167.50 248.61


The rate includes hire charges of machinery, cost of fuel, lubricants, pay of driver and cleaner. The rate also include clearing and grubbing where necessary.

03-05-b

03-05-c

03-06-a

Embankment formation in ordinary soil & compaction by mechanical means at optimum moistures content to 90% max. modified AASHTO dry density (borrow area) Embankment formation in ordinary soil & compaction by mechanical means at optimum moistures content to 85% max. modified AASHTO dry density (borrow area) Earth fill in lawns including dressing & compaction with earth available from cutting/excavation

1000 Cft

545.60

6,917.98

m3

19.27

244.31

1000 Cft

540.02

6,796.24

m3

19.07

240.01

1000 Cft

1,426.00

1,426.00

m3

50.36

50.36

NWFP CSR 2008 - Approved 25-Aug-2008

Page 6 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 03 :

EARTHWORK (EXCAVATION AND EMBANKMENT)

Item Code
03-06-b 03-07-a 03-07-b 03-07-c 03-07-d 03-08-a 03-08-b 03-08-c 03-08-d 03-09-a 03-09-b 03-09-c 03-10-a 03-10-b 03-10-c 03-10-d 03-11-a

Description Unit
Earth fill in lawns including dressing & compaction with suitable earth borrowed. Earth excavation in open cut upto 1.5m depth for drains etc & disposal : in Ordinary Soil Earth excavation in open cut upto 1.5m depth for drains etc & disposal : in Hard Soil Earth excavation in open cut upto 1.5m depth for drains etc & disposal : in Very hard Soil Earth excavation in open cut upto 1.5m depth for drains etc & disposal : in Gravel & shingle Earth excavation in open cut 1.5m - 3m depth for S.W.Drains etc & disposal : in Ordinary Soil Earth excavation in open cut 1.5m - 3m depth for S.W.Drains etc & disposal : in Hard Soil Earth excavation in open cut 1.5m - 3m depth for S.W.Drains etc & disposal : in Very Hard Soil Earth excavation in open cut 1.5m - 3m depth for drains etc & disposal : in Gravel & shingle Excavation in shingle or gravel formation & rock not requiring blast, undressed, 50m lead : Dry Excavation in shingle or gravel formation & rock not requiring blast, undressed, 50m lead : Wet Excavation in shingle or gravel formation & rock not req. blast, undressed, 50m lead : in Flowing Water Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in Ordinary Soil Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in Hard Soil Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in Very Hard Soil Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in Shingle/Gravel Rock Excavation, dressing & disposal up to 50m Soft Rock, slate, shale, schist or lateriate Rock Excavation, dressing & disposal up to 50m Medium hard rock, requiring occasional blasting Excavation in hard rock requiring blasting and disposal upto 25m & dressing : Grade I

Rate (British System) Labour


2,650.50 2,015.00 2,518.75 2,619.50 2,921.75 2,790.00 3,152.70 3,627.00 6,249.60 5,301.00 6,138.00 7,812.00 2,263.00 2,709.40 3,183.70 5,921.00 7,564.00

Rate (Metric System) Unit


m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

Composite
2,650.50 2,015.00 2,518.75 2,619.50 2,921.75 2,790.00 3,152.70 3,627.00 6,249.60 5,301.00 6,138.00 7,812.00 2,263.00 2,709.40 3,183.70 5,921.00 7,564.00

Labour
93.60 71.16 88.95 92.51 103.18 98.53 111.34 128.09 220.70 187.20 216.76 275.88 79.92 95.68 112.43 209.10 267.12

Composite
93.60 71.16 88.95 92.51 103.18 98.53 111.34 128.09 220.70 187.20 216.76 275.88 79.92 95.68 112.43 209.10 267.12

Spec. No

Remarks

1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft

Tools and plants shall be the liability of the contractor.

03-11-b 03-12-a

1000 Cft 1000 Cft

8,586.07 5,409.50

9,675.07 6,498.50

m3 m3

303.21 191.03

341.67 229.49
a) Tools and plants required shall be the liabilities of the contractor.

NWFP CSR 2008 - Approved 25-Aug-2008

Page 7 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 03 :

EARTHWORK (EXCAVATION AND EMBANKMENT)

Item Code
03-12-b

Description Unit
Excavation in hard rock requiring blasting and disposal upto 25m & dressing : Grade II

Rate (British System) Labour


5,936.50

Rate (Metric System) Unit


m3

Composite
7,751.50

Labour
209.65

Composite
273.74

Spec. No

Remarks
b) Reduce the rate by 8 % if the excavated section is not dressed or levelled to design section.

1000 Cft

03-12-c 03-12-d 03-12-e 03-12-f 03-13-a

Excavation in hard rock requiring blasting and disposal upto 25m & dressing : Grade III Excavation in hard rock requiring blasting and disposal upto 25m & dressing : Grade IV Excavation in hard rock requiring blasting and disposal upto 25m & dressing : Grade V Excavation in hard rock requiring blasting and disposal upto 25m & dressing : Grade VI Excavation in hard rock requiring blasting but blasting prohibited, dispose & dress within 25 m : Grade I

1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft

7,137.75 7,959.25 8,788.50 9,455.00 10,819.00

9,315.75 10,500.25 11,692.50 12,722.00 10,819.00

m3 m3 m3 m3 m3

252.07 281.08 310.36 333.90 382.07

328.98 370.81 412.92 449.27 382.07


a) Tools and plants required shall be the liabilities of the contractor. b) Reduce the rate by 8 % if the excavated section is not dressed or levelled to design section.

03-13-b

Excavation in hard rock requiring blasting where blasting prohibited, dispose & dress within 25 m : Grade II

1000 Cft

11,873.00

11,873.00

m3

419.29

419.29

03-13-c 03-13-d 03-13-e 03-13-f 03-14-a 03-14-b 03-15 03-16-a 03-16-b

Excavation in hard rock requiring blasting where blasting prohibited, dispose & dress within 25 m: Grade III Excavation in hard rock requiring blasting where blasting prohibited, dispose & dress within 25 m: Grade IV Excavation in hard rock requiring blasting where blasting prohibited, dispose & dress within 25 m: Grade V Excavation in hard rock requiring blasting where blasting prohibited, dispose & dress within 25 m: Grade VI Rehandling of earthwork Lead upto a single throw of kassi, shovel, phaorah Rehandling of earthwork upto a lead of 25 m. Rehandling of gravel work or excavated rock, lead upto 25m. Filling, watering and ramming earth under floor with surplus earth from foundation, etc Filling, watering and ramming earth under floor with earth excavated from outside lead upto 50m

1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft

14,275.50 15,918.50 17,577.00 18,910.00 697.50 976.50 2,790.00 1,426.00 2,960.50

14,275.50 15,918.50 17,577.00 18,910.00 697.50 976.50 2,790.00 1,426.00 2,960.50

m3 m3 m3 m3 m3 m3 m3 m3 m3

504.14 562.16 620.73 667.80 24.63 34.48 98.53 50.36 104.55

504.14 562.16 620.73 667.80 24.63 34.48 98.53 50.36 104.55

NWFP CSR 2008 - Approved 25-Aug-2008

Page 8 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 03 :

EARTHWORK (EXCAVATION AND EMBANKMENT)

Item Code
03-17-a

Description Unit
Extra for every 25 m extra lead or part thereof for earthwork soft, ordinary, hard & very hard

Rate (British System) Labour


83.70

Rate (Metric System) Unit


m3

Composite
83.70

Labour
2.96

Composite
2.96

Spec. No

Remarks
This rate shall be aplicable upto 250m total distance, including the lead covered in the item of earth work.

1000 Cft

03-17-b 03-18-a

Extra for every 25 m extra lead or part thereof for gravel, shingle or rock. Transportation of earth all types beyond 250 m and upto 500 m.

1000 Cft 1000 Cft

111.60 1,980.90

111.60 1,980.90

m3 m3

3.94 69.95

3.94 69.95
This rate will be paid in addition to the rate of earth work, without deducting the lead covered in the item of earth work

03-18-b 03-18-c 03-18-d 03-19-a 03-19-b 03-19-c 03-20

Transportation of earth all types for every 100m extra lead beyond 500m upto 1.5 km. Transportation of earth all types for every 500m extra lead beyond 1.5 km. upto 8 km. Transportation of earth all types for every 1 km extra lead or part thereof beyond 8 km. Dressing & levelling earth to designed sections Ashes, sand, silt or soft soil upto cut or fill 6 inches Dressing & levelling earth to designed sections Ordinary or hard soil upto cut or fill 6 inches Dressing & levelling earth to designed section Gravel work or soft rock not requiring blasting upto cut or fill 6 inches Dowel dressing

1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1 Chain

306.90 279.00 195.30 95.48 188.48 449.50 105.40

306.90 279.00 195.30 95.48 188.48 449.50 105.40

m3 m3 m3 m3 m3 m3 m

10.84 9.85 6.90 3.37 6.66 15.87 3.46

10.84 9.85 6.90 3.37 6.66 15.87 3.46


This rate is in addition to pavement for dressed earth work a) To be paid only when exclusively dressing is done and no earh work is carried out in embankment or cutting. b) The surface area dressed is to be taken for measurement (ii) The item is aplicable where the dressing is done by the contractor other than the one who executed the work Page 9 of 144

03-21

Dressing slopes of banks or ground surface

1000 Sft

387.50

387.50

m2

4.17

4.17

03-22

Dressing of earthwork (done by machinery or otherwise & left undressed) to designed section

1000 Sft

418.50

418.50

m2

4.50

4.50

NWFP CSR 2008 - Approved 25-Aug-2008

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 03 :

EARTHWORK (EXCAVATION AND EMBANKMENT)

Item Code
03-23-a 03-23-b 03-23-c 03-23-d 03-24

Description Unit
Excavation in foundation of building, bridges etc complete : in sand, ashes or loose soil Excavation in foundation of building, bridges etc complete : in ordinary soil Excavation in foundation of building, bridges etc complete : in hard soil or soft murum Excavation in foundation of building, bridges etc complete : in shingle/gravel Cutting hard rock such as granite, ballast, hard lime etc with chisels/hammers for small foundation

Rate (British System) Labour


2,542.00 2,976.00 3,332.50 3,782.00 19,096.00

Rate (Metric System) Unit


m3 m3 m3 m3 m3

Composite
2,542.00 2,976.00 3,332.50 3,782.00 29,226.89

Labour
89.77 105.10 117.69 133.56 674.37

Composite
89.77 105.10 117.69 133.56 1,032.14

Spec. No

Remarks

1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft

Tools and plants required shall be the liability of the contractors. Composite rate includes material, i.e plank, etc The rate does not include hire charges of the Roller to be supplied by the Department or through other agencies.

03-25

Extra for excavaton requiring shoring

1000 Cft

426.25

619.85

m3

15.05

21.89

03-26-a

Mixing & moistening of earthwork to OMC in layers for compaction etc complete

1000 Cft

273.42

273.42

m3

9.66

9.66

03-26-b-01 03-26-b-02 03-26-b-03 03-26-b-04 03-26-c 03-26-d 03-27-a

Compaction by rolling with animal driven roller or hand rammed : Soft or sandy soil Compaction by rolling with animal driven roller or hand rammed : Ordinary soil Compaction by rolling with animal driven roller or hand rammed : Hard soil Compaction by rolling with animal driven roller or hand rammed : Admixture of shingle Ramming earthwork (all types of soil) Ramming earthwork behind retaining wall Compaction of earth with power road roller 95% to 100% max. mod. AASHTO dry density

1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft

759.50 914.50 1,275.03 2,251.53 418.50 558.00 154.07

759.50 914.50 1,275.03 2,251.53 418.50 558.00 5,129.59

m3 m3 m3 m3 m3 m3 m3

26.82 32.30 45.03 79.51 14.78 19.71 5.44

26.82 32.30 45.03 79.51 14.78 19.71 181.15

The rate alslo inlcude hire charges of machinery, cost of fuel, lubricant, pay of driver and cleaner etc

03-27-b 03-27-c 03-28

Compaction of earth with power road roller 90% max. mod. AASHTO dry density Compaction of earth with power road roller 85% max. mod. AASHTO dry density Extra for wet earthwork

1000 Cft 1000 Cft 1000 Cft

154.07 154.07 976.50

5,129.59 5,129.59 976.50

m3 m3 m3

5.44 5.44 34.48

181.15 181.15 34.48


That will support a man's weight.

NWFP CSR 2008 - Approved 25-Aug-2008

Page 10 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 03 :

EARTHWORK (EXCAVATION AND EMBANKMENT)

Item Code
03-29 03-30 03-31 03-32 03-33

Description Unit
Extra for slush or daldal including dewatering Extra for puddling. Earthwork on small rain water drains, along canal banks, roads, drains, etc complete Filling and Compacting Soil, Earth and Boulders behind retaining walls Dag belling 75 mm deep.

Rate (British System) Labour


2,232.00 1,743.75 2.79 2,511.00 434.00

Rate (Metric System) Unit


m3 m3 m m3 km

Composite
2,837.00 1,743.75 2.79 2,511.00 434.00

Labour
78.82 61.58 9.15 88.68 568.54

Composite
100.19 61.58 9.15 88.68 568.54

Spec. No

Remarks
That will not support a man's weight

1000 Cft 1000 Cft 1 Rft 1000 Cft 2500 Rft

Dag belling for layout of borrow pit, to be done by contractor at their own cost.

03-34 03-35-a 03-35-b 03-36-a 03-36-b 03-36-c 03-37-a 03-37-b 03-38-a-01 03-38-a-02 03-38-b-01 03-38-b-02 03-39-a 03-39-b 03-39-c 03-39-d 03-40

Turfing slopes of banks or lawns with grass sods including ploughing, laying, setting & watering Berm cutting : Lead upto single throw of phaorah or shovel, without dressing Berm cutting : Upto 25 m lead (including dressing) Berm trimming both sides of channels Upto 1 m depth Berm trimming both sides of channels Over 1m to 1.5m depth Berm trimming both sides of channels Over 1.5m to 2.5m depth Ploughing and levelling borrow pits Upto 1m depth Ploughing and levelling borrow pits Exceeding 1m depth Making boundary or service roads complete in unploughed land : From 3 m to 6 m wide Making boundary or service roads complete in unploughed land : Over 6 m to 12 m wide Making boundary or service roads complete in ploughed land : From 3 m to 6m wide Making boundary or service roads complete in ploughed land : Over 6 m to 12 m wide Earthwork by boats, Digging and loading into boats, upto 25m lead Earthwork by boats, including hire of boats Carriage by boats upto 250m. Earthwork by boats, including hiring of boats Extra for every additional 50m beyond 250m Earthwork by boats, Unloading earth from boats Unloading earth from BG trucks and clearing 1.5m from rail

1000 Sft 1000 Cft 1000 Cft Mile Mile Mile Acre Acre Chain Chain Chain Chain 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft

1,116.00 1,255.50 1,953.00 3,968.00 5,254.50 8,354.50 1,798.00 2,659.80 434.00 589.00 504.99 724.78 2,092.50 1,674.00 111.60 976.50 837.00

1,116.00 1,255.50 1,953.00 3,968.00 5,254.50 8,354.50 1,798.00 2,659.80 434.00 589.00 504.99 724.78 2,092.50 1,674.00 111.60 976.50 837.00

m2 m3 m3 km km km ha ha 50 m 50 m 50 m 50 m m3 m3 m3 m3 m3

12.01 44.34 68.97 2,465.72 3,265.15 5,191.49 4,442.86 6,572.37 711.76 965.96 828.18 1,188.64 73.90 59.12 3.94 34.48 29.56

12.01 44.34 68.97 2,465.72 3,265.15 5,191.49 4,442.86 6,572.37 711.76 965.96 828.18 1,188.64 73.90 59.12 3.94 34.48 29.56
For ordinary soil Area ploughed bo be measured

NWFP CSR 2008 - Approved 25-Aug-2008

Page 11 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 03 :

EARTHWORK (EXCAVATION AND EMBANKMENT)

Item Code
03-41 03-42 03-43

Description Unit
Earthwork by tramway, digging and loading in trucks, upto 25m lead Unloading earth from BG trucks and spreading upto 5m from rail Supplying clean and screened river or pit sand within 150m including removal of loose earth or overburden.

Rate (British System) Labour


1,953.00 1,255.50 11,780.00

Rate (Metric System) Unit


m3 m3 m3

Composite
1,953.00 1,255.50 11,780.00

Labour
68.97 44.34 416.01

Composite
68.97 44.34 416.01

Spec. No

Remarks

1000 Cft 1000 Cft 1000 Cft

The rate include a) Removal of top crust of earth overburden. b) Royalty to the government or cost to the private owner a) The rate does not include back filling after laying of sewer, which is payable seperately b) If the timbering and shuttering is not actually done at site, the composite rate may be reduced by 5 %

03-44-a

Excavation in open cut for sewers & manhole except shingle, gravel & rock : Upto 2m

1000 Cft

2,511.00

2,511.00

m3

88.68

88.68

03-44-b 03-44-c 03-45-a

Excavation in open cut for sewers & manholes except shingle, gravel & rock : 2m to 5m Excavation in open cut for sewers & manholes except shingle, gravel & rock : Below 5m depth Trench Excavation in open cutting below water level for sewers & manholes : Upto 1.25m depth

1000 Cft 1000 Cft 1000 Cft

3,348.00 4,464.00 3,828.50

3,348.00 4,464.00 6,963.61

m3 m3 m3

118.23 157.64 135.20

118.23 157.64 245.92


The rate does not include back filling after laying of sewer, which is payable seperately.

03-45-b 03-45-c 03-46

Trench Excavation in open cutting below water level for sewers & manholes : 1.25m to 2.5m depth Trench Excavation in open cutting below water level for sewers & manholes : Exceeding 2.5m depth Excavation of trench in all kinds of soils except cutting in rock for pilelines upto 1.5m depth

1000 Cft 1000 Cft 1000 Cft

4,696.50 6,773.50 2,042.90

9,164.42 15,104.35 2,042.90

m3 m3 m3

165.86 239.20 72.14

323.64 533.41 72.14


The rate does not include back filling after laying of pipe line, which is payable separately.

03-48-a 03-48-b 03-48-c

Uprooting stump and removing within 50 m upto 2 m girth Uprooting stump and removing within 50 m above 2 m girth Uprooting stump and removing within 50 m upto 2 m girth including sand filling and trinches

Each Each Each

697.50 976.50 697.50

697.50 1,114.69 1,164.71

Each Each Each

697.50 976.50 697.50

697.50 1,114.69 1,164.71

NWFP CSR 2008 - Approved 25-Aug-2008

Page 12 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 03 :

EARTHWORK (EXCAVATION AND EMBANKMENT)

Item Code
03-48-d 03-49-a 03-49-b 03-50 03-51 03-52 03-53 03-54 03-55-a 03-55-b 03-56 03-57-a 03-57-b 03-57-c 03-58 03-59-a 03-59-b 03-59-c 03-60-a 03-60-b 03-60-c 03-60-d 03-61-a 03-61-b

Description Unit
Uprooting stump and removing within 50 m above 2 m girth including sand filling and trinches Jungle clearance and removing within 50m Light Jungle Jungle clearance and removing within 50m Thick Jungle Uprooting sarkanda growth & disposal within 50m Ploughing 3 times Levelling, dressing and making lawns Turfing of lawn with Dacca Grass Clearance of shingle, gravel including sand, soft soil and silt deposits in channel bed upto 25m Clearance of choked up syphon including dewatering Upto 1.25m dia Clearance of choked up syphon including dewatering Exceeding 1.25m dia Clearing & Grubbing Removal of Tree : Girth 150mm - 300mm including removal of stump & backfilling with sand Removal of Tree : Girth 300mm - 600mm including removal of stump & backfilling with sand Removal of Tree : Girth over 600mm including removal of stump & backfilling with sand Compaction of Natural Ground Roadway Excavation in Surplus / Unsuitable Common Material Roadway Excavation in Surplus / Unsuitable Rock (Hard) Material requiring blasting. Roadway Excavation in Surplus / Unsuitable Rock (Medium) Material requiring blasting Structural Excavation in Common Material Structural Excavation in Rock Material requiring blasting Structural backfill using Common Material available at site. Structural Backfill using Granular Material brought from outside Formation of Embankment from Roadway Excavation in Common Material including compaction by power roller. Formation of Embankment from Roadway Excavation in Rock Material requiring blasting and compaction of embankment by power roller. Formation of Embankment from Borrow Excavation in Common Material including compaction by power roller. Each Decare Decare 1000 Sft

Rate (British System) Labour


976.50 1,501.02 3,002.04 362.70 5,359.90 2,945.00 2,945.00 1,422.90 13,950.00 25,110.00 241.06 18.69 37.39 112.16 215.11 157.91 2,106.76 1,223.26 2,606.98 10,533.71 3,950.08 987.66 157.91 2,106.76

Rate (Metric System) Unit


Each Decare Decare m2 ha m2 m2 m3 m m m2 No No No m2 m3 m3 m3 m3 m3 m3 m3 m3 m3

Composite
1,819.85 1,501.02 3,002.04 362.70 5,359.90 2,945.00 9,600.00 1,422.90 13,950.00 25,110.00 1,328.17 259.67 519.35 1,276.14 1,132.54 5,572.00 11,737.61 9,765.11 4,880.60 24,289.44 21,773.58 30,608.66 6,298.37 13,817.39

Labour
976.50 1,501.02 3,002.04 3.90 5,359.90 31.69 31.69 50.25 457.68 823.82 2.59 18.69 37.39 112.16 2.31 5.58 74.40 43.20 92.06 371.99 139.50 34.88 5.58 74.40

Composite
1,819.85 1,501.02 3,002.04 3.90 5,359.90 31.69 103.30 50.25 457.68 823.82 14.29 259.67 519.35 1,276.14 12.19 196.77 414.51 344.85 172.36 857.77 768.93 1,080.94 222.42 487.96

Spec. No

Remarks

ha 1000 Sft 1000 Sft 1000 Cft 100 Ft 100 Ft 1000 Sft No No No 1000 Sft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft 1000 Cft

03-61-c

1000 Cft

158.19

12,200.79

m3

5.59

430.87

NWFP CSR 2008 - Approved 25-Aug-2008

Page 13 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 03 :

EARTHWORK (EXCAVATION AND EMBANKMENT)

Item Code
03-61-d 03-62-a 03-62-b 03-62-c 03-63-a

Description Unit
Formation of Embankment from Roadway Excavation in granular Material including compaction by power roller. Subgrade Preparation in Earth Cut Subgrade Preparation in Rock Cut Subgrade Preparation on Existing Road Earthwork by mechanical means in drains and irrigation channels in DRY soil dressed to designed section, grades profile/with excavated material, disposed off within 50 feet (15.2 m) lead and dressed as directed. Earthwork by mechanical means in drains and irrigation channels in DRY & WET soil dressed to designed section, grades profile/with excavated material, disposed off within 50 feet (15.2 m) lead and dressed as directed. Earthwork by mechanical means in drains and irrigation channels in WET & SLUSH soil dressed to designed section, grades profile/with excavated material, disposed off within 50 feet (15.2 m) lead and dressed as directed. Earthwork by mechanical means in drains and irrigation channels in SLUSH soil dressed to designed section, grades profile/with excavated material, disposed off within 50 feet (15.2 m) lead and dressed as directed. Earthwork by mechanical means in drains and irrigation channels in DRY & WET to that of SLUSH (1:2) soil dressed to designed section, grades profile/with excavated material, disposed off within 50 feet (15.2 m) lead and dressed as directed. Earthwork by mechanical means in drains and irrigation channels in BORROW AREA soil dressed to designed section, grades profile/with excavated material, disposed off within 50 feet (15.2 m) lead and dressed as directed. Earthwork by mechanical means in drains and irrigation channels in UNDER WATER soil dressed to designed section, grades profile/with excavated material, disposed off within 50 feet (15.2 m) lead and dressed as directed.

Rate (British System) Labour


279.00 215.11 645.61 430.22 69.75

Rate (Metric System) Unit


m3 m2 m2 m2 m3

Composite
6,419.45 2,107.01 5,156.16 3,010.30 1,347.51

Labour
9.85 2.31 6.95 4.63 2.46

Composite
226.70 22.67 55.48 32.39 47.59

Spec. No

Remarks

1000 Cft 1000 Sft 1000 Sft 1000 Sft 1000 Cft

03-63-b

1000 Cft

69.75

1,443.34

m3

2.46

50.97

03-63-c

1000 Cft

103.23

1,708.95

m3

3.65

60.35

03-63-d

1000 Cft

103.23

1,949.79

m3

3.65

68.86

03-63-e

1000 Cft

139.50

1,865.64

m3

4.93

65.88

03-63-f

1000 Cft

69.75

1,559.31

m3

2.46

55.07

03-63-g

1000 Cft

279.00

2,608.01

m3

9.85

92.10

NWFP CSR 2008 - Approved 25-Aug-2008

Page 14 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 04 :

DISMANTLING (DEMOLITION)

Item Code
04-01 04-02 04-03

Description Unit
Dismantling dry stone masonry Dismantling stone masonry in mud mortar Dismantling stone masonry in lime or cement mortar 100 Cft 100 Cft 100 Cft

Rate (British System) Labour


237.15 348.75 837.00

Rate (Metric System) Unit


m3 m3 m3

Composite
237.15 348.75 837.00

Labour
83.75 123.16 295.58

Composite
83.75 123.16 295.58

Spec. No

Remarks

Add extra 13%, 32% and 51% on labour rates only for 2nd, 3rd, 4th and subsequent floors respectively.

04-04-a 04-04-b 04-05 04-06 04-07-a 04-07-b 04-08 04-09 04-10 04-11 04-12

Dismantling dry stone or spawl pitching Dismantling stone or spawl pitching (mud grouted) Dismantling stone or spawl pitching and apron in silted condition Dismantling stone pitching, cement or lime grouted Dismantling stone in Wooden crates Dismantling stone in Wire crates Dismantling stone ware drain including base concrete Dismantling mud/pise walling Dismantling sun dried brick masonry Dismantling dry brick masonry Dismantling brick work in mud mortar

100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft

418.50 558.00 697.50 837.00 558.00 697.50 465.00 139.50 348.75 237.15 488.25

418.50 558.00 697.50 837.00 558.00 697.50 465.00 139.50 348.75 237.15 488.25

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

147.79 197.06 246.32 295.58 197.06 246.32 164.21 49.26 123.16 83.75 172.42

147.79 197.06 246.32 295.58 197.06 246.32 164.21 49.26 123.16 83.75 172.42

Add extra 13%, 32% and 51% on labour rates only for 2nd, 3rd, 4th and subsequent floors respectively against item No 04-12, 04-13, 04-14 and 04-15

04-13 04-14 04-15 04-16 04-17

Dismantling brick work in lime or cement mortar Dismantling cement block masonry Dismantling Dhajji walling Dismantling mud concrete Dismantling lime concrete

100 Cft 100 Cft 100 Cft 100 Cft 100 Cft

1,185.75 1,046.25 279.00 558.00 767.25

1,185.75 1,046.25 279.00 558.00 767.25

m3 m3 m3 m3 m3

418.74 369.48 98.53 197.06 270.95

418.74 369.48 98.53 197.06 270.95

Add extra 13%, 32% and 51% on labour rates only for 2nd, 3rd, 4th and subsequent floors respectively against item No 04-17, 04-19, and 04-20

04-18 04-19-a 04-19-b

Dismantling lime or cement concrete, under water Dismantling : Plain Cement Concrete 1:4:8 Dismantling : Plain Cement Concrete 1:3:6

100 Cft 100 Cft 100 Cft

2,929.50 1,534.50 2,511.00

2,929.50 1,534.50 2,511.00

m3 m3 m3

1,034.54 541.90 886.75

1,034.54 541.90 886.75


Page 15 of 144

NWFP CSR 2008 - Approved 25-Aug-2008

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 04 :

DISMANTLING (DEMOLITION)

Item Code
04-19-c 04-19-d 04-19-e 04-20 04-21 04-22-a

Description Unit
Dismantling : Plain Cement Concrete 1:2:4 Dismantling : Cement Concrete with brick aggregate Dismantling : DPC of cement concrete 1.5" thick and clearing the site Dismantling RCC, separating reinforcement, cleaning & straightening the same Dismantling sirki sarkanda or thached roofing supported on battens or ballies Dismantling 1st class tile roofing 100 Cft 100 Cft 100 Sft 100 Cft 100 Sft 100 Sft

Rate (British System) Labour


3,069.00 837.00 379.16 5,022.00 167.40 418.50

Rate (Metric System) Unit


m3 m3 m2 m3 m2 m2

Composite
3,069.00 837.00 379.16 5,022.00 167.40 418.50

Labour
1,083.81 295.58 40.80 1,773.50 18.01 45.03

Composite
1,083.81 295.58 40.80 1,773.50 18.01 45.03

Spec. No

Remarks

Add extra 13%, 32% and 51% on labour rates only for 2nd, 3rd, 4th and subsequent floors respectively against item No 04-22-a, 04-22-b, 04-26, 04-27 and 04-30

04-22-b 04-23 04-24 04-25 04-26 04-27 04-28-a 04-28-b 04-29 04-30 04-31

Dismantling 2nd class tile roofing Dismantling from any height, asbestos sheets & ridge coping Dismantling roof of wooden planks & battens from any height Dismantling wooden ceiling above 20' height in difficult position including lifting along live wire Dismantling jack arch roofing, including removing joists Dismantling RB roof complete with mud and mud plaster including reinforcement complete Stripping and stacking: Slate or tiles from the truss roofing Stripping and stacking: GI sheet roofing Extra for dismantling CI sheet roof above 20 ft. in dificult position including lifting along live wire Dismantling slates or tiles including battens, purlins and planking Dismantling brick or flagged flooring without concrete foundation

100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft

344.84 263.50 229.40 851.14 558.00 697.50 259.16 338.52 658.75 558.00 237.15

344.84 263.50 229.40 851.14 558.00 697.50 259.16 338.52 658.75 558.00 237.15

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

37.11 28.35 24.68 91.58 60.04 75.05 27.89 36.42 70.88 60.04 25.52

37.11 28.35 24.68 91.58 60.04 75.05 27.89 36.42 70.88 60.04 25.52
Add extra 13%, 32% and 51% on labour rates only for 2nd, 3rd, 4th and subsequent floors respectively against item No 04-31 and 04-32

04-32

Dismantling plank or wooden block flooring etc

100 Sft

348.75

348.75

m2

37.53

37.53

NWFP CSR 2008 - Approved 25-Aug-2008

Page 16 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 04 :

DISMANTLING (DEMOLITION)

Item Code
04-33-a

Description Unit
Disjointing RCC pipes inside trench & removing pipes & stacking outside : 6" to 12" diameter 100 Rft

Rate (British System) Labour


3,487.50

Rate (Metric System) Unit


m

Composite
3,487.50

Labour
114.42

Composite
114.42

Spec. No

Remarks
a) The rate does not include the cost of excavation and refilling of trench, or the demoliation of any masonry or brick work. b) Bends, elbows, sluice valves, etc should not be paid for extra if fixed in the length of pipe line that is being dismantled.

04-33-b

Disjointing RCC pipes inside trench & removing pipes & stacking outside : 13" to 24" diameter

100 Rft

4,882.50

4,882.50

160.19

160.19

04-33-c 04-33-d 04-34

Disjointing RCC pipes inside trench & removing pipes & stacking outside : 25" to 36" diameter Disjointing RCC pipes inside trench & removing pipes & stacking outside : Over 36" diameter Removing door with chowkat

100 Rft 100 Rft Each

6,277.50 8,370.00 159.65

6,277.50 8,370.00 159.65

m m Each

205.95 274.61 159.65

205.95 274.61 159.65


Add extra 13%, 32% and 51% on labour rates only for 2nd, 3rd, 4th and subsequent floors respectively against item No 04-34 to 04-37

04-35 04-36 04-37-a 04-37-b 04-37-c 04-37-d 04-37-e 04-38

Removing windows and sky lights with chowkat Removing ventilators and wooden sunshades Dismantling: Woden beams up to 12' in length Dismantling: Wooden beams from 12.1' to 23' length Dismantling: Wooden partiton Jaffry Work etc Dismantling: Wooden trusses Dismantling: Wooden palisade fencing Dismantling iron work of trusses, sheds, water tanks, etc excluding cutting of rivets

Each Each Each Each 600 Sft 5 Cwt 50 Rft 5 Cwt

116.25 58.13 69.75 139.50 1,102.11 1,263.25 868.00 1,426.00

116.25 58.13 69.75 139.50 1,102.11 1,263.25 868.00 1,426.00

Each Each Each Each m2 100 kg m 100 kg

116.25 58.13 69.75 139.50 19.76 492.67 56.96 556.14

116.25 58.13 69.75 139.50 19.76 492.67 56.96 556.14

Add extra 13%, 32% and 51% on labour rates only for 2nd, 3rd, 4th and subsequent floors respectively against item No 04-38 and 04-39

04-39 04-40 04-41

Dismantling rolled steel beams or iron rails etc. Dismantling iron latrine Dismantling tees, bends or sluice valves upto 12" i/d

12 Cwt Each Each/25m mD

1,395.00 527.00 7.75

1,395.00 527.00 7.75

100 kg Each Ea/25mm D

228.78 527.00 7.75

228.78 527.00 7.75

NWFP CSR 2008 - Approved 25-Aug-2008

Page 17 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 04 :

DISMANTLING (DEMOLITION)

Item Code
04-42-a 04-42-b 04-43 04-44 04-45 04-46 04-47 04-48-a

Description Unit
Dismantling water column : BG Dismantling water column : MG or NG Dismantling all type of wire fencing, including rolling wire into bundles and collecting material Dismantling wire netting of tennis courts and frame work Dismantling cloth ceiling and supporting timber Dismantling and removing road metalling Dismantling & removing road pavement etc including screening & stacking of by-products upto 50m. Removing from walls: Mud plaster Each Each 230 Rft 100 Sft 100 Sft 100 Cft 100 Sft 500 Sft

Rate (British System) Labour


3,968.00 2,697.00 558.00 111.60 209.25 558.00 3,660.48 279.00

Rate (Metric System) Unit


Each Each m m2 m2 m3 m2 m2

Composite
3,968.00 2,697.00 558.00 111.60 209.25 558.00 3,660.48 279.00

Labour
3,968.00 2,697.00 7.96 12.01 22.52 197.06 393.87 6.00

Composite
3,968.00 2,697.00 7.96 12.01 22.52 197.06 393.87 6.00

Spec. No

Remarks

Add extra 13%, 32% and 51% on labour rates only for 2nd, 3rd, 4th and subsequent floors respectively against item No 04-46 to 04-49

04-48-b 04-49-a 04-49-b 04-50 04-51 04-52 04-53 04-54 04-55-a 04-55-b

Removing from walls: Cement or lime plaster Scraping : White wash or colour wash Scraping : Ordinary distemper, oil bound distemper or paint off wall Dismantling glazed or accoustics tiles etc Scraping boulders. Cleaning mortar of old stones to be used in masonry Dismantling light, fan and call bell point including casing, capping/strip open type complete Dismantling plug point & making good damaged surface (building portion) Dismantle GI/MS conduit/GI flexible/PVC pipes or conduit wiring of all sizes : On surface Dismantle GI/MS conduit/GI flexible/PVC pipes or conduit wiring of all sizes : Recessed in wall

250 Sft 100 Sft 100 Sft 100 Sft 100 Cft 100 Cft Point Point 1 Rft 1 Rft

279.00 69.75 209.25 868.00 948.32 976.50 30.69 25.73 5.97 9.64

279.00 69.75 209.25 868.00 948.32 976.50 30.69 25.73 5.97 9.64

m2 m2 m2 m2 m3 m3 Point Point m m

12.01 7.51 22.52 93.40 334.90 344.85 30.69 25.73 19.60 31.63

12.01 7.51 22.52 93.40 334.90 344.85 30.69 25.73 19.60 31.63

NWFP CSR 2008 - Approved 25-Aug-2008

Page 18 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 05 :

MORTAR

Item Code
05-01 05-02 05-03 05-04 05-05 05-06 05-07 05-09 05-10 05-11 05-12 05-13 05-14 05-15 05-16 05-17 05-18 05-19 05-20 05-21 05-22 05-23 05-24 05-25 05-26 05-27 05-28 05-29 05-30

Description Unit
Lime Sand Mortar 1 : 2 (one Lime: 2 Sand) Lime Sand Mortar 1 : 3 (one Lime: 3 Sand) Lime Surkhi Mortar 1 : 1-1/2 (one Lime: 1-1/2 Surkhi) Lime Surkhi Mortar 1 : 2 (one Lime: 2 Surkhi) Lime Surkhi Mortar 1 : 3 (one Lime: 3 Surkhi) Lime Sand And Surkhi Mortar 1 : 1 : 1 (one Lime: 1 Sand And : 1 Surkhi) Lime Sand And Surkhi Mortar 1 : 2 : 1 (one Lime: 2 Sand And : 1 Surkhi) Lime, Cement And Sand Mortar 1 : 1 : 3 (one Lime: One Cement And : 3 Sand) Lime, Cement And Sand Mortar 1 : 1 : 4 (one Lime: One Cement And : 4 Sand) Lime, Cement And Sand Mortar 1 : 1 : 5 (one Lime: One Cement And : 5 Sand) Lime, Cement And Sand Mortar 1 : 1 : 6 (one Lime: One Cement And : 6 Sand) Lime, Cement And Sand Mortar 1 : 1 : 7 (one Lime: One Cement And : 7sand) Lime, Cement And Sand Mortar 1 : 1 : 8 (one Lime: One Cement And : 8 Sand) Lime, Cement And Sand Mortar 1 : 1 : 9 (one Lime: One Cement And : 9 Sand) Lime, Cement And Sand Mortar 1 : 1 : 10 (one Lime: One Cement And : 10 Sand) Cement, Lime And Sand Mortar 1 : 2 : 6 (one Cement: 2 Lime And : 6 Sand) Cement, Lime And Sand Mortar 1 : 2 : 9 (one Cement: 2 Lime And : 9 Sand) Cement Sand Mortar 1 : 1 (one Cement: One Sand) Cement Sand Mortar 1 : 1-1/2 (one Cement: 1-1/2 Sand) Cement Sand Mortar 1 : 2 (one Cement: 2 Sand) Cement Sand Mortar 1 : 2-1/2 (one Cement: 2-1/2 Sand) Cement Sand Mortar 1 : 3 (one Cement: 3 Sand) Cement Sand Mortar 1 : 4 (one Cement: 4 Sand) Cement Sand Mortar 1 : 5 (one Cement: 5 Sand) Cement Sand Mortar 1 : 6 (one Cement: 6 Sand) Cement Sand Mortar 1 : 7 (one Cement: 7 Sand) Cement Sand Mortar 1 : 8 (one Cement: 8 Sand) Clay Mortar. Clay Mortar Mixed With Chipped Bhoosa Or Straw. 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft

Rate (British System) Labour


1,046.25 1,046.25 1,046.25 1,046.25 1,046.25 1,046.25 1,046.25 1,046.25 1,046.25 1,046.25 1,046.25 1,046.25 1,046.25 1,046.25 1,046.25 1,046.25 1,046.25 837.00 837.00 837.00 837.00 837.00 837.00 837.00 837.00 837.00 837.00 1,464.75 1,464.75

Rate (Metric System) Unit


m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

Composite
6,973.08 5,979.45 6,297.47 5,566.76 4,645.70 5,785.15 4,981.94 15,025.53 12,998.36 11,559.54 10,484.42 9,695.38 8,853.13 8,440.58 8,019.10 9,908.16 8,803.66 27,152.81 22,536.10 19,574.08 17,046.04 14,988.09 12,400.31 10,928.58 9,639.57 8,804.18 8,091.13 1,500.30 2,861.55

Labour
369.48 369.48 369.48 369.48 369.48 369.48 369.48 369.48 369.48 369.48 369.48 369.48 369.48 369.48 369.48 369.48 369.48 295.58 295.58 295.58 295.58 295.58 295.58 295.58 295.58 295.58 295.58 517.27 517.27

Composite
2,462.52 2,111.63 2,223.93 1,965.88 1,640.62 2,043.01 1,759.36 5,306.22 4,590.33 4,082.22 3,702.54 3,423.90 3,126.46 2,980.77 2,831.92 3,499.04 3,108.99 9,588.93 7,958.56 6,912.53 6,019.76 5,293.00 4,379.13 3,859.40 3,404.18 3,109.17 2,857.36 529.83 1,010.55

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 19 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 05 :

MORTAR

Item Code
05-31 05-32 05-33

Description Unit
Clay Mortar Mixed With Cow-dung 1 : 1 (1 Clay: 1 Cow Dung). White Cement And Sand Mortar1 : 3 (1 White Cement 3 Sand) Coloured Cement Mortar Made By Mixing White Cement And Pigment Of Approved Shade (1 White Cement Mixed With Pigment Of Approved Shade: 2 Sand) White Cement And Sand Mortar1 : 2 (1 White Cement 2 Sand) Coloured Cement Mortar Made By Mixing Grey Cement And Pigment Of Approved Shade (1 Grey Cement Mixed With Pigment Of Approved Shade: 2 Sand) 200 Cft 100 Cft 100 Cft

Rate (British System) Labour


1,534.50 837.00 837.00

Rate (Metric System) Unit


m3 m3 m3

Composite
5,351.30 18,155.99 73,087.27

Labour
270.95 295.58 295.58

Composite
944.90 6,411.73 25,810.55

Spec. No

Remarks

05-34 05-35

100 Cft 100 Cft

837.00 837.00

23,919.19 73,087.27

m3 m3

295.58 295.58

8,446.99 25,810.55

NWFP CSR 2008 - Approved 25-Aug-2008

Page 20 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 06 :

CONCRETE

Item Code
06-01

Description Unit
Mud concrete in foundation using brick ballast or stone ballast 1.5" gauge to 2" guage 100 Cft

Rate (British System) Labour


1,262.32

Rate (Metric System) Unit


m3

Composite
3,016.82

Labour
445.78

Composite
1,065.38

Spec. No

Remarks
The stone ballast, crushed bajri, round shingle from nallah, or brick ballast may be used according to their comparative cheaper rates in various areas of the province. ditto

06-02 06-03-a

06-03-b

06-03-c

06-03-d

06-03-e

06-03-f

06-04-a

Dry rammed shingle brick ballast or stone ballast 1.5" to 2" guage Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth (Ratio 1:3:6) Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth (Ratio 1:4:8) Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth (Ratio 1:5:10) Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth (Ratio 1:6:12) Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth (Ratio 1:6:18) Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth (Ratio 1:7:20) Extra on Item 3 above, for sedimentation tank or filter beds in PHE works (in bed)

100 Cft 100 Cft

837.00 1,681.75

2,301.10 9,181.33

m3 m3

295.58 593.90

812.63 3,242.36

100 Cft

1,681.75

7,518.79

m3

593.90

2,655.24

100 Cft

1,681.75

7,022.69

m3

593.90

2,480.04

100 Cft

1,681.75

6,513.28

m3

593.90

2,300.15

100 Cft

1,681.75

5,842.94

m3

593.90

2,063.42

100 Cft

1,681.75

5,638.45

m3

593.90

1,991.20

100 Cft

837.00

837.00

m3

295.58

295.58

The stone ballast, crushed bajri, round shingle from nallah, or brick ballast may be used according to their comparative cheaper rates in various areas of the province.

06-04-b 06-05-a 06-05-b

Extra on Item 3 above, for sedimentation tank or filter beds in PHE works (On slope) Plain Cement Conrete including placing, compacting, finishing & curing (Ratio 1:1:2) Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:1.5:1.5)

100 Cft 100 Cft 100 Cft

1,255.50 1,562.09 1,562.09

1,255.50 17,800.29 17,738.58

m3 m3 m3

443.38 551.65 551.65

443.38 6,286.12 6,264.33

NWFP CSR 2008 - Approved 25-Aug-2008

Page 21 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 06 :

CONCRETE

Item Code
06-05-c 06-05-d 06-05-e 06-05-f 06-05-g 06-05-h 06-05-i 06-06-a-01

Description Unit
Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:1.5:3) Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:2:3) Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:3:3) Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:2:4) Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:2:6) Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:3:6) Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:4:8) RCC in roof slab, beam, column & other structural members, insitu or precast. Type A (1:1:2) 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft

Rate (British System) Labour


1,562.09 1,562.09 1,562.09 1,562.09 1,562.09 1,562.09 1,562.09 3,158.90

Rate (Metric System) Unit


m3 m3 m3 m3 m3 m3 m3 m3

Composite
14,014.20 13,399.52 11,916.06 11,969.30 10,357.58 10,055.08 8,402.22 20,251.36

Labour
551.65 551.65 551.65 551.65 551.65 551.65 551.65 1,115.56

Composite
4,949.07 4,732.00 4,208.12 4,226.92 3,657.75 3,550.92 2,967.22 7,151.71

Spec. No

Remarks

1) The rate include rendering floor surface smooth, and the plustering done for making up all surfaces after removing centering. 2) Plustering done after soffit of R.C.C roof slab meant for human habitaion buildings shall be paid extra 3) This item shall not be aplicable to factory made units.

06-06-a-02

RCC in roof slab, beam, column & other structural members, insitu or precast. Type B (1:1.5:3)

100 Cft

3,158.90

17,171.91

m3

1,115.56

6,064.21

06-06-a-03

RCC in roof slab, beam, column & other structural members, insitu or precast. Type C (1:2:4) RCC in raft foundation slab, base slab of column & ret. wall etc, not including in 06-06. Type A (1:1:2) RCC in raft foundation slab, base slab of column & ret. wall etc, not including in 06-06 Type B (1:1.5:3) RCC in raft foundation slab, base slab of column & ret. wall etc, not including in 06-06. Type C(1:2:4) RCC including Precast/Prestressed in slab, beam, column, lintel, girder, etc. Type A (1:1:2) RCC including Precast/Prestressed in slab, beam. column, lintels, girder, etc. Type B (1:1.5:3) RCC including Precast/Prestressed slab, column, beam, lintel, girder etc. Type C (1:2:4). Add extra labour for RCC in 2nd & subsequent storeys

100 Cft

3,158.90

15,127.01

m3

1,115.56

5,342.06

06-06-b-01 06-06-b-02 06-06-b-03 06-06-c-01 06-06-c-02 06-06-c-03 06-06-e

100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft

3,100.00 3,100.00 3,100.00 3,689.00 3,689.00 3,689.00 1,185.75

19,252.29 16,258.75 13,508.42 23,004.84 19,925.38 17,173.85 1,185.75

m3 m3 m3 m3 m3 m3 m3

1,094.76 1,094.76 1,094.76 1,302.76 1,302.76 1,302.76 418.74

6,798.89 5,741.73 4,770.46 8,124.09 7,036.59 6,064.89 418.74


Page 22 of 144

NWFP CSR 2008 - Approved 25-Aug-2008

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 06 :

CONCRETE

Item Code
06-07-a

Description Unit
Supply & fabricate M.S. reinforcement for cement concrete (Plain bars) Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 60) Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 40) Supplying & fixing high tensile steel wire in prestressing cables in precast girders Cwt

Rate (British System) Labour


217.00

Rate (Metric System) Unit


Tonne

Composite
5,178.12

Labour
4,271.47

Composite
101,927.17

Spec. No

Remarks
The rate includes wastage, overlap and chairs, etc

06-07-b 06-07-c 06-08

Cwt Cwt Cwt

217.00 217.00 434.00

5,957.36 5,347.52 10,273.84

Tonne Tonne Tonne

4,271.47 4,271.47 8,542.94

117,265.89 105,261.67 202,232.33


The rate includes wastage & allowance for stressing of cables.

06-09 06-10 06-11 06-12-a 06-12-b 06-13 06-14 06-15 06-16 06-17-a 06-17-b 06-18-a 06-18-b 06-18-c 06-19 06-20 06-21-a 06-21-b

Precast cement concrete solid or face blocks 1:2:4, including cost of templates. Precast cem. concrete hollow blocks 1:2:4, including cost of templates & constructing wall thereof Provide & fix ornamental cement jali 1:2:4 2" thick without steel. Extra labour for laying concrete (plain or reinforced) From 20' upto 40' height Extra labour for laying concrete (plain or reinforced) For every extra10' height Extra labour for work of weirs, rails or bridges, syphons & concreting in superstructure RCC spout, 2.5'x6"x5", including fixing in position Making holes upto 3" dia, 18" depth in cement concrete or stone masonry walls and repairing Extra labour for skipping concrete in wells Nicking cement concrete surface. Nicking lime concrete surface. Prepare, water and ramming surface for laying concrete (for Headworks only) Horizontal floor Prepare, water and ramming surface for laying concrete (for Headworks only) Glacis and crest Prepare, water and ramming surface for laying concrete (for Headworks only) inverted filters Providing and fixing 6" wide GI sheet 18 SWG. stopper to expansion joint. Fill expansion joints with bitumen, sand & saw dust in Ratio 1:2:2 Filling expansion joints with bitumen Laying Asphaltic Mixture in Expansion Joints

100 Cft 100 Cft 100 Sft 100 Cft 100 Cft 100 Cft Each Each 100 Cft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 1 RFT 1 RFT 1 RFT 1 RFT

2,588.50 5,595.50 2,309.50 1,116.00 558.00 279.00 217.00 607.60 4,076.50 294.50 97.18 217.00 364.25 108.50 4.52 2.79 27.90 27.90

12,615.17 11,299.44 4,054.93 1,116.00 558.00 279.00 581.15 607.60 4,076.50 294.50 97.18 217.00 364.25 108.50 51.11 11.85 40.38 27.90

m3 m3 m2 m3 m3 m3 Each Each m3 m2 m2 m2 m2 m2 m m m m

914.12 1,976.03 248.50 394.11 197.06 98.53 217.00 607.60 1,439.60 31.69 10.46 23.35 39.19 11.67 14.83 9.15 91.54 91.54

4,455.01 3,990.36 436.31 394.11 197.06 98.53 581.15 607.60 1,439.60 31.69 10.46 23.35 39.19 11.67 167.67 38.87 132.49 91.54

NWFP CSR 2008 - Approved 25-Aug-2008

Page 23 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 06 :

CONCRETE

Item Code
06-22-a-01 06-22-a-02 06-22-a-03 06-22-b-01 06-22-b-02 06-22-b-03 06-23-a-01 06-23-a-02 06-23-a-03 06-23-a-04 06-23-a-05 06-23-a-06 06-23-b-01 06-23-b-02 06-23-b-03 06-23-b-04 06-23-b-05 06-23-b-06 06-24-a-01 06-24-a-02 06-24-a-03

Description Unit
Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1 layer polythene & 1 coat bitumen (1.5" thick) Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1 layer polythene & 1 coat bitumen (2" thick) Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1 layer polythene & 1 coat bitumen (3" thick) Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1 layer polythene & 2 coats bitumen (1.5" thick) Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1 layer polythene & 2 coats bitumen (2" thick) Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1 layer polythene & 2 coats bitumen (3" thick) Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen Ratio 1:4 (0.5" thick) Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen Ratio 1:4 (0.75" thick) Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen Ratio 1:3 (0.5" thick) Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen Ratio 1:3 (0.75" thick) Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen Ratio 1:2 (0.5" thick) Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen Ratio 1:2 (0.75" thick) Damp proof course in c/s plaster, 1 layer polythene, 2 coats bitumen Ratio 1:4 (0.5" thick) Damp proof course in c/s plaster, 1 layer polythene, 2 coats bitumen Ratio 1:4 (0.75" thick) Damp proof course in c/s plaster, 1 layer polythene, 2 coats bitumen Ratio 1:3 (0.5" thick) Damp proof course in c/s plaster, 1 layer polythene, 2 coats bitumen Ratio 1:3 (0.75" thick) Damp proof course in c/s plaster, 1 layer polythene, 2 coats bitumen Ratio 1:2 (0.5" thick) Damp proof course in c/s plaster, 1 layer polythene, 2 coats bitumen Ratio 1:2 (0.75" thick) V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio 1:4 (0.5" thick) V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio 1:4 (0.75" thick) V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio 1:3 (0.5" thick) 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft

Rate (British System) Labour


1,010.60 1,010.60 1,069.50 804.45 1,010.60 1,004.71 922.25 922.25 922.25 922.25 922.25 922.25 922.25 922.25 922.25 922.25 922.25 922.25 922.25 922.25 922.25

Rate (Metric System) Unit


m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

Composite
2,755.24 3,140.99 4,040.47 2,798.77 3,390.67 4,225.37 1,810.45 1,992.92 1,887.89 2,108.23 2,003.20 2,301.95 2,061.47 2,242.60 2,137.57 2,357.92 2,252.89 2,551.64 1,820.49 1,992.92 1,900.96

Labour
108.74 108.74 115.08 86.56 108.74 108.11 99.23 99.23 99.23 99.23 99.23 99.23 99.23 99.23 99.23 99.23 99.23 99.23 99.23 99.23 99.23

Composite
296.46 337.97 434.75 301.15 364.84 454.65 194.80 214.44 203.14 226.85 215.54 247.69 221.81 241.30 230.00 253.71 242.41 274.56 195.89 214.44 204.54

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 24 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 06 :

CONCRETE

Item Code
06-24-a-04 06-24-a-05 06-24-a-06 06-24-b-01 06-24-b-02 06-24-b-03 06-24-b-04 06-24-b-05 06-24-b-06 06-25 06-26 06-27 06-28 06-29-a 06-29-b 06-29-c 06-29-d 06-30 06-31

Description Unit
V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio 1:3 (0.75" thick) V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio 1:2 (0.5" thick) V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio 1:2 (0.75" thick) V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio 1:4 (0.5" thick) V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio 1:4 (0.75" thick) V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio 1:3 (0.5" thick) V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio 1:3 (0.75" thick) V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio 1:2 (0.5" thick) V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio 1:2 (0.75" thick) Grouting concrete between the grooves of gates including shuttering Chisel dressing concrete surface on sides of grooves Laying and ramming dry ballast or kankar Hoisting & placing in position RCC shelves Breaking brick ballast, screening & stacking 2" ring Breaking brick ballast, screening & stacking 1.5" ring Breaking brick ballast, screening & stacking 1" ring Breaking brick ballast, screening & stacking. Jhama ballast 3/4" ring Supply & fix broken glasses on court yard walls, including 1:3:6 cement concrete coping Crushing stone ballast by machine 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Cft 1000 Sft 100 Sft 100 No 100 Cft 100 Cft 100 Cft 100 Cft 100 Rft 100 Cft

Rate (British System) Labour


922.25 922.25 922.25 922.25 922.25 922.25 922.25 922.25 922.25 3,720.00 1,472.50 3,373.11 4,466.17 837.00 976.50 1,116.00 1,255.50 890.51 789.57

Rate (Metric System) Unit


m2 m2 m2 m2 m2 m2 m2 m2 m2 m3 m2 m2 No m3 m3 m3 m3 m m3

Composite
2,108.23 2,003.20 2,301.95 2,070.18 2,242.60 2,155.00 2,357.92 2,252.89 2,551.64 3,720.00 1,472.50 3,373.11 4,466.17 837.00 976.50 1,116.00 1,255.50 5,730.51 789.57

Labour
99.23 99.23 99.23 99.23 99.23 99.23 99.23 99.23 99.23 1,313.71 15.84 362.95 44.66 295.58 344.85 394.11 443.38 29.22 278.83

Composite
226.85 215.54 247.69 222.75 241.30 231.88 253.71 242.41 274.56 1,313.71 15.84 362.95 44.66 295.58 344.85 394.11 443.38 188.01 278.83

Spec. No

Remarks

This does not include the chages for working of crushers , but manual labour for charges of stone to crusher within 100 m and also stacking the product after crushing within 100 m.

06-32-a 06-32-b 06-32-c

Breaking stone ballast screened & stacked 2" ring Breaking stone ballast screened & stacked 1.5" ring Breaking stone ballast screened & stacked 1" ring

100 Cft 100 Cft 100 Cft

976.50 1,116.00 1,255.50

976.50 1,116.00 1,255.50

m3 m3 m3

344.85 394.11 443.38

344.85 394.11 443.38


Page 25 of 144

NWFP CSR 2008 - Approved 25-Aug-2008

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 06 :

CONCRETE

Item Code
06-32-d 06-32-e 06-33 06-34 06-35 06-36-a 06-36-b 06-36-c 06-37-a 06-37-b 06-37-c 06-38-a 06-38-b 06-39-a 06-39-b 06-40-a

Description Unit
Breaking stone ballast screened & stacked 0.5" ring Breaking stone ballast screened & stacked 1/8" to 1/4" ring Screening and stacking stone ballast, shingle or bajri etc Washing ballast, bajri or shingle Erecting and carting sun shades of precast RCC (upto 5"x 2.5") PCC 1:3:6 in mass concrete less formwork using 50% boulders PCC 1:3:6 in mass concrete less formwork using 40% boulders PCC 1:3:6 in mass concrete less formwork using 30% boulders PCC 1:4:8 in mass concrete less formwork using 50% boulders PCC 1:4:8 in mass concrete less formwork using 40% boulders PCC 1:4:8 in mass concrete less formwork using 30% boulders Errecting & removing formwork to concrete in any shape / position (Horizontal) Errecting & removing formwork to concrete in any shape / position (Vertical) Errection and removal of steel Form work for RCC or Plain Concrete horizontal Errection and removal of steel Form work for RCC or Plain Concrete vertical Class A1 concrete in reinforcement/non reinforcement concrete structure with minimum cylinder compressive strength 3000 psi on 28 days other than concrete in water and piles with consistency range in slump 25-75 mm with water cement ratio 0.58 Class A2 cement concrete for concrete place under water with minimum cylinder compressive strength 3500 psi on 28 days with consistency range in slump 100-150 mm with water cement ratio 0.58 Class A3 cement concrete for concrete in pile with minimum cylinder compressive strenght 4000 psi on 28 days other than concrete in water and piles with consistency range in slump 100-150 mm with water cement ratio 0.58 100 Cft 100 Cft 100 Cft 100 Cft Each 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Sft 100 Sft 100 Sft 100 Sft 100 Cft

Rate (British System) Labour


1,674.00 2,790.00 279.00 279.00 198.40 1,765.76 1,762.97 1,762.97 1,762.97 1,762.97 1,762.97 2,325.00 2,604.00 286.75 232.50 2,402.50

Rate (Metric System) Unit


m3 m3 m3 m3 Each m3 m3 m3 m3 m3 m3 m2 m2 m2 m2 m3

Composite
1,674.00 2,790.00 279.00 279.00 198.40 6,375.84 7,049.67 7,735.63 5,447.42 5,942.31 6,437.20 2,539.47 2,849.33 6,367.00 6,276.45 12,549.56

Labour
591.17 985.28 98.53 98.53 198.40 623.57 622.59 622.59 622.59 622.59 622.59 250.17 280.19 30.85 25.02 848.44

Composite
591.17 985.28 98.53 98.53 198.40 2,251.61 2,489.57 2,731.81 1,923.74 2,098.51 2,273.28 273.25 306.59 685.09 675.35 4,431.84

Spec. No

Remarks

06-40-b

100 Cft

2,402.50

13,469.16

m3

848.44

4,756.59

06-40-c

100 Cft

2,402.50

15,073.62

m3

848.44

5,323.20

NWFP CSR 2008 - Approved 25-Aug-2008

Page 26 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 06 :

CONCRETE

Item Code
06-40-d

Description Unit
Class B concrete for concrete in pile specified works only with minimum cylinder compressive strenght 2418 psi on 28 days and consistency range in slump 25-75 mm with water cement ratio 0.65 Class C concrete for concrete for cribbing or otherwise specified in special provision with minimum cylinder compressive strength 3000 psi on 28 days and consistency range in slump 25-75 mm with water cement ratio 0.58 Class D1 concrete for concrete in pre-stressed & post tensioned with minimum cylinder compressive strength 4978.12 psi on 28 days and consistency range in slump 50-100 mm with water cement ratio 0.40 Class D2 concrete for concrete in pre-stressed & post tensioned with minimum cylinder compressive strength 6045 psi on 28 days and consistency range in slump 50-100 mm with water cement ratio 0.40 Class D3 concrete for concrete in pre-stressed & post tensioned with minimum cylinder compressive strength 7112 psi on 28 days and consistency range in slump 50-100 mm with water cement ratio 0.40 Class Y concrete for concrete use as filler in steel grid, Bridge floor, in then reinforced section etc with minimum cylinder compressive strength 2575 psi on 28 days and consistency range in slump 50-100 mm with water cement ratio 0.58 Lean concrete for use as thin layer under neath footings with cylinder compressive strength of 1423 psi on 28 days. 100 Cft

Rate (British System) Labour


2,402.50

Rate (Metric System) Unit


m3

Composite
11,332.30

Labour
848.44

Composite
4,001.97

Spec. No

Remarks

06-40-e

100 Cft

2,402.50

12,158.73

m3

848.44

4,293.82

06-40-f

100 Cft

2,402.50

15,900.05

m3

848.44

5,615.06

06-40-g

100 Cft

2,402.50

17,162.08

m3

848.44

6,060.74

06-40-h

100 Cft

2,402.50

18,398.14

m3

848.44

6,497.25

06-40-i

100 Cft

2,402.50

14,731.19

m3

848.44

5,202.28

06-40-j

100 Cft

2,402.50

9,157.93

m3

848.44

3,234.10

NWFP CSR 2008 - Approved 25-Aug-2008

Page 27 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 07 :

BRICK MASONRY

Item Code
07-01-a 07-01-b 07-02-a 07-02-b 07-02-c 07-02-d 07-03-a 07-03-b 07-04-a-01 07-04-a-02 07-04-a-03 07-04-a-04 07-04-a-05 07-04-a-06 07-04-a-07 07-04-b-01 07-04-b-02 07-04-b-03 07-04-b-04 07-04-b-05 07-04-c

Description Unit
Pacca brickwork in mud mortar in buildings in foundation and plinth Pacca brickwork in mud mortar in buildings in ground floor Add extra labour on Item 07-01 for brickwork in First floor Add extra labour on Item 07-01 for brickwork in Second floor Add extra labour on Item 07-01 for brickwork in Third floor Add extra labour on Item 07-01 for brickwork in Fourth & subsequent floors. Pacca brick work in mud mortar other than building Upto 20 ft. height Pacca brick work in mud mortar other than building Extra labour for each 5 ft. addl. height or part Pacca brick work in foundation and plinth in Cement, sand mortar 1:2 Pacca brick work in foundation and plinth in Cement, sand mortar 1:3 Pacca brick work in foundation and plinth in Cement, sand mortar 1:4 Pacca brick work in foundation and plinth in Cement, sand mortar 1:5 Pacca brick work in foundation and plinth in Cement, sand mortar 1:6 Pacca brick work in foundation and plinth in Cement, sand mortar 1:7 Pacca brick work in foundation and plinth in Cement, sand mortar 1:8 Pacca brick work in foundation and plinth in Lime, cement, sand mortar 1:1:6 Pacca brick work in foundation and plinth in Lime, cement, sand mortar 1:1:7 Pacca brick work in foundation and plinth in Lime, cement, sand mortar 1:1:8 Pacca brick work in foundation and plinth in Lime, cement, sand mortar 1:1:9 Pacca brick work in foundation and plinth in Lime, cement, sand mortar 1:1:10 Pacca brick work in foundation and plinth in Lime, sand mortar 1:2 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft

Rate (British System) Labour


1,751.19 2,327.48 426.25 999.75 1,573.25 2,146.75 2,433.50 426.25 2,316.32 2,316.32 2,316.32 2,316.32 2,316.32 2,316.32 2,316.32 2,316.32 2,316.32 3,029.32 2,316.32 2,316.32 2,316.32

Rate (Metric System) Unit


m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

Composite
7,764.89 8,437.98 523.05 1,096.55 1,670.05 2,243.55 8,447.20 426.25 11,784.57 10,946.64 10,443.89 10,082.10 9,874.10 9,693.08 9,547.24 10,134.13 9,947.96 10,512.20 9,673.60 9,579.54 9,474.23

Labour
618.43 821.94 150.53 353.06 555.59 758.12 859.38 150.53 818.00 818.00 818.00 818.00 818.00 818.00 818.00 818.00 818.00 1,069.80 818.00 818.00 818.00

Composite
2,742.15 2,979.85 184.71 387.24 589.77 792.30 2,983.10 150.53 4,161.69 3,865.77 3,688.23 3,560.46 3,487.01 3,423.08 3,371.58 3,578.84 3,513.09 3,712.35 3,416.20 3,382.99 3,345.80

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 28 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 07 :

BRICK MASONRY

Item Code
07-04-c-01 07-04-c-02 07-04-c-03 07-04-c-04 07-04-c-05 07-05-a-01 07-05-a-02 07-05-a-03 07-05-a-04 07-05-a-05 07-05-a-06 07-05-a-07 07-05-b-01 07-05-b-02 07-05-b-03 07-05-b-04 07-05-b-05 07-05-c 07-05-c-01 07-05-c-02 07-05-c-03 07-05-c-04 07-05-c-05 07-06-a 07-06-b 07-06-c

Description Unit
Pacca brick work in foundation and plinth in lime, sand, surkhi 1:1:1 Pacca brick work in foundation and plinth in lime, coarse cinder. Pacca brick work in foundation and plinth in lime, surkhi mortar 2:3 Pacca brick work in foundation and plinth in lime, surkhi mortar 1:2 Pacca brick work in foundation and plinth in lime, surkhi mortar 1:3 Pacca brick work in ground floor Cement, sand mortar 1:2 Pacca brick work in ground floor Cement, sand mortar 1:3 Pacca brick work in ground floor Cement, sand mortar 1:4 Pacca brick work in ground floor Cement, sand mortar 1:5 Pacca brick work in ground floor Cement, sand mortar 1:6 Pacca brick work in ground floor Cement, sand mortar 1:7 Pacca brick work in ground floor Cement, sand mortar 1:8 Pacca brick work in ground floor Lime, cement, sand mortar 1:1:6 Pacca brick work in ground floor Lime, cement, sand mortar 1:1:7 Pacca brick work in ground floor Lime, cement, sand mortar 1:1:8 Pacca brick work in ground floor Lime, cement, sand mortar 1:1:9 Pacca brick work in ground floor Lime, cement, sand mortar 1:1:10 Pacca brick work in ground floor Lime, sand mortar 1:2 Pacca brick work in foundation and plinth in lime, sand, surkhi 1:1:1. Pacca brick work in Ground floor lime, coarse cinder. Pacca brick work in Ground floor lime, surkhi mortar 2:3 Pacca brick work in Ground floor lime, surkhi mortar 1:2 Pacca brick work in Ground floor lime, surkhi mortar 1:3 Add extra labour on item No.07-05 for brick work in First floor Add extra labour on item No.07-05 for brick work in in Second floor Add extra labour on item No.07-05 for brick work in Third floor 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft

Rate (British System) Labour


2,316.32 2,316.32 2,316.32 2,316.32 2,316.32 2,970.42 2,970.42 2,970.42 2,970.42 2,970.42 2,970.42 2,970.42 3,029.32 3,029.32 3,029.32 3,029.32 3,029.32 3,029.32 3,029.32 3,029.32 3,029.32 3,029.32 3,029.32 426.25 999.75 1,573.25

Rate (Metric System) Unit


m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

Composite
9,309.72 9,775.97 9,515.82 9,304.86 9,039.38 12,535.47 11,697.54 11,194.79 10,859.62 10,625.00 10,443.99 10,298.14 10,952.64 10,757.76 10,609.00 10,483.40 10,389.34 10,284.03 10,022.72 10,488.97 10,228.82 10,017.86 9,752.38 523.05 1,096.55 1,670.05

Labour
818.00 818.00 818.00 818.00 818.00 1,048.99 1,048.99 1,048.99 1,048.99 1,048.99 1,048.99 1,048.99 1,069.80 1,069.80 1,069.80 1,069.80 1,069.80 1,069.80 1,069.80 1,069.80 1,069.80 1,069.80 1,069.80 150.53 353.06 555.59

Composite
3,287.70 3,452.35 3,360.48 3,285.98 3,192.23 4,426.86 4,130.95 3,953.41 3,835.04 3,752.19 3,688.26 3,636.76 3,867.89 3,799.07 3,746.54 3,702.18 3,668.96 3,631.77 3,539.49 3,704.15 3,612.28 3,537.78 3,444.02 184.71 387.24 589.77

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 29 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 07 :

BRICK MASONRY

Item Code
07-06-d 07-07-a-01 07-07-a-02 07-07-a-03 07-07-a-04 07-07-a-05 07-07-a-06 07-07-a-07 07-07-b-01 07-07-b-02 07-07-b-03 07-07-b-04 07-07-b-05 07-07-c 07-07-c-01 07-07-c-02 07-07-c-03 07-07-c-04 07-07-c-05 07-08 07-09

Description Unit
Add extra labour on item No.07-05 for brick work in in Fourth & subsequent floors. Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:2 Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:3 Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:4 Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:5 Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:6 Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:7 Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:8 Pacca brick work other than building upto 10 ft. height : Lime, cement, sand mortar 1:1:6 Pacca brick work other than building upto 10 ft. height : Lime, cement, sand mortar 1:1:7 Pacca brick work other than building upto 10 ft. height : Lime, cement, sand mortar 1:1:8 Pacca brick work other than building upto 10 ft. height : Lime, cement, sand mortar 1:1:9 Pacca brick work other than building upto 10 ft. height : Lime, cement, sand mortar 1:1:10 Pacca brick work other than building upto 10 ft. height : Lime, sand mortar 1:2 Pacca brick work in other than building upto 10 ft height in lime, sand, surkhi 1:1:1 Pacca brick work in other than building upto 10 ft height in lime, coarse cinder 1:1 Pacca brick work in other than building upto 10 ft height in lime, surkhi mortar 2:3 Pacca brick work in other than building upto 10 ft height in lime, surkhi mortar 1:2 Pacca brick work in other than building upto 10 ft height in lime, surkhi mortar 1:3 Add extra labour on item No. 07-07 for every 10 ft. additional height, or part thereof Extra labour for arch work in brick masonry, including labour for centring and decentring 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft

Rate (British System) Labour


2,580.75 2,728.00 2,867.50 2,728.00 2,728.00 2,728.00 2,728.00 2,728.00 2,728.00 2,728.00 2,728.00 2,728.00 2,728.00 2,728.00 3,983.50 2,728.00 2,728.00 2,309.50 3,029.32 426.25 1,147.00

Rate (Metric System) Unit


m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

Composite
2,677.55 12,293.05 11,594.63 10,952.37 10,617.20 10,382.58 10,201.57 10,055.72 10,642.61 10,456.97 10,307.68 10,182.08 10,088.02 9,982.71 11,073.76 10,284.45 10,024.30 9,394.84 9,849.18 445.61 1,195.40

Labour
911.38 963.39 1,012.65 963.39 963.39 963.39 963.39 963.39 963.39 963.39 963.39 963.39 963.39 963.39 1,406.76 963.39 963.39 815.59 1,069.80 150.53 405.06

Composite
945.57 4,341.25 4,094.61 3,867.80 3,749.43 3,666.58 3,602.65 3,551.15 3,758.41 3,692.85 3,640.13 3,595.77 3,562.55 3,525.36 3,910.67 3,631.92 3,540.05 3,317.76 3,478.21 157.37 422.15

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 30 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 07 :

BRICK MASONRY

Item Code
07-10 07-11 07-12-a 07-12-b 07-13

Description Unit
Extra for pacca brick work in steining of wells or any other circular masonry. Extra labour for profile & flared walls Extra labour for pacca brick work in pier/abutment From 10 ft.to 20 ft. height. Extra labour for pacca brick work in pier/abutment Exceeding 20 ft height. Extra for face work (half brick thick) using special bricks instead of first class bricks. 100 Cft 100 Cft 100 Cft 100 Cft 100 Sft

Rate (British System) Labour


736.25 868.00 573.50 1,007.50 573.50

Rate (Metric System) Unit


m3 m3 m3 m3 m2

Composite
1,032.70 868.00 573.50 1,007.50 573.50

Labour
260.00 306.53 202.53 355.80 61.71

Composite
364.69 306.53 202.53 355.80 61.71

Spec. No

Remarks

This item is to be executed only on the written orders of Superintending Engineer.

07-14 07-15-a 07-15-b 07-16-a 07-16-b-01 07-16-b-02 07-16-b-03 07-16-b-04 07-16-b-05 07-16-b-06 07-16-b-07 07-16-c-01 07-16-c-02 07-16-c-03 07-16-c-04

Reinforced brick work in lintel of openings, laid in 1:3 cement mortar complete Extra for dressing or chamfering bricks for Special architectural bricks Extra for dressing or chamfering bricks for all other purposes. Perf. pacca brick wall 1/2 brick thick in ground floor : Mud mortar Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:2 Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:3 Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:4 Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:5 Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:6 Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:7 Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:8 Perf. pacca brick wall 1/2 brick thick in ground floor : Lime, cement, sand mortar 1:1:6 Perf. pacca brick wall 1/2 brick thick in ground floor : Lime, cement, sand mortar 1:1:7 Perf. pacca brick wall 1/2 brick thick in ground floor : Lime, cement, sand mortar 1:1:8 Perf. pacca brick wall 1/2 brick thick in ground floor : Lime, cement, sand mortar 1:1:9

100 Cft 100 No 100 No 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft

7,453.02 1,906.50 1,317.50 1,163.74 1,517.45 1,517.45 1,517.45 1,517.45 1,517.45 1,517.45 1,517.73 1,517.45 1,517.45 1,517.45 1,517.45

17,535.59 1,906.50 1,317.50 2,791.98 4,106.12 3,896.31 3,770.95 3,687.16 3,628.17 3,583.59 3,549.28 3,570.82 3,528.51 3,489.51 3,455.02

m3 100 No 100 No m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

2,632.01 1,906.50 1,317.50 125.22 163.28 163.28 163.28 163.28 163.28 163.28 163.31 163.28 163.28 163.28 163.28

6,192.64 1,906.50 1,317.50 300.42 441.82 419.24 405.75 396.74 390.39 385.59 381.90 384.22 379.67 375.47 371.76

NWFP CSR 2008 - Approved 25-Aug-2008

Page 31 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 07 :

BRICK MASONRY

Item Code
07-16-c-05 07-16-d 07-17-a 07-17-b 07-17-c 07-17-d 07-18-a 07-18-b-01 07-18-b-02 07-18-b-03 07-18-b-04 07-18-b-05 07-18-b-06 07-18-b-07 07-18-c-01 07-18-c-02 07-18-c-03 07-18-c-04 07-18-c-05 07-18-d 07-19-a

Description Unit
Perf. pacca brick wall 1/2 brick thick in ground floor : Lime, cement, sand mortar 1:1:10 Perf. pacca brick wall 1/2 brick thick in ground floor : Lime, sand mortar 1:2 Add extra labour on item No. 07-16 for pacca brick work in First floor Add extra labour on item No. 07-16 for pacca brick work in Second floor Add extra labour on item No. 07-16 for pacca brick work in Third floor Add extra labour on item No. 07-16 for pacca brick work in Fourth & subsequent floors. Perf. pacca brick wall 1 brick thick in ground floor : Mud mortar Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand mortar 1:2 Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand mortar 1:3 Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand mortar 1:4 Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand mortar 1:5 Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand mortar 1:6 Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand mortar 1:7 Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand mortar 1:8 Perf. pacca brick wall 1 brick thick in ground floor : Lime, cement, sand mortar 1:1:6 Perf. pacca brick wall 1 brick thick in ground floor : Lime, cement, sand mortar 1:1:7 Perf. pacca brick wall 1 brick thick in ground floor : Lime, cement, sand mortar 1:1:8 Perf. pacca brick wall 1 brick thick in ground floor : Lime, cement, sand mortar 1:1:9 Perf. pacca brick wall 1 brick thick in ground floor : Lime, cement, sand mortar 1:1:10 Perf. pacca brick wall 1 brick thick in ground floor : Lime, sand mortar 1:2 Add extra labour on item No. 07-18 for perf. pacca brick work in First floor 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft

Rate (British System) Labour


1,517.45 1,517.45 213.13 499.88 786.63 1,290.38 1,745.61 2,240.06 2,240.06 2,240.06 2,240.06 2,240.06 2,240.06 2,240.06 2,240.06 2,240.06 2,240.06 2,240.06 2,240.06 2,240.06 321.16

Rate (Metric System) Unit


m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

Composite
3,435.02 3,403.09 232.49 519.23 810.83 1,324.26 4,849.26 7,070.98 6,652.02 6,400.65 6,233.06 6,115.08 6,023.65 5,952.39 6,245.77 6,150.77 6,084.41 6,015.50 5,969.68 5,890.47 321.16

Labour
163.28 163.28 22.93 53.79 84.64 138.84 187.83 241.03 241.03 241.03 241.03 241.03 241.03 241.03 241.03 241.03 241.03 241.03 241.03 241.03 34.56

Composite
369.61 366.17 25.02 55.87 87.24 142.49 521.78 760.84 715.76 688.71 670.68 657.98 648.14 640.48 672.04 661.82 654.68 647.27 642.34 633.81 34.56

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 32 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 07 :

BRICK MASONRY

Item Code
07-19-b 07-19-c 07-19-d 07-20-a 07-20-b 07-21-a 07-21-b 07-21-c 07-21-d 07-22 07-23 07-24 07-25 07-26-a 07-26-b 07-26-c 07-27-a 07-27-b 07-27-c 07-27-d 07-28 07-29 07-30 07-31

Description Unit
Add extra labour on item No. 07-18 for perf. pacca brick work in Second floor Add extra labour on item No. 07-18 for perf. pacca brick work in Third floor Add extra labour on item No. 07-18 for perf. pacca brck work in Fourth & subsequent floors Fire brick masonry in fire-clay mortar Upto 20 ft. height including all charges Fire brick masonry in fire-clay mortar. Extra for every 5 ft. additional height, or part thereof 1st class brick wall laid in 1:3 c/s mortar reinfd 4.5" thick wall with hoop iron bonding 6" apart 1st class brick wall laid in 1:3 c/s mortar reinfd 4.5" thick wall with hoop iron bonding 12" apart 1st class brick wall laid in 1:3 c/s mortar reinfd 3" thick wall with hoop iron bonding 6" apart 1st class brick wall laid in 1:3 c/s mortar reinfd 3" thick wall with hoop iron banding 12" apart Ghilafi work (1.5 brick thick wall) Dry brick pitching Sun dried bricks in mud mortar Pise wall (mud walling) Eave brick moulded in 1:3 c/s mortar 3" thick drip course cornice Eave brick moulded in 1:3 c/s mortar 4.5" thick drip course cornice Eave brick moulded in 1:3 c/s mortar 4.5" thick eave brick with back brick Laying dressed or moulded brick cornices in c/s mortar, plaster or paint (1 brick) Laying dressed or moulded brick cornices c/s mortar, plaster or paint (2 brick) Laying dressed or moulded brick cornices c/s mortar, plaster or paint (3 brick) Laying dressed or moulded brick cornices c/s mortar, plaster or paint (4 brick) Cleaning bricks dismantled from kacha pacca masonry Scraping bricks dismantled from pacca masonry Supplying and filling sand under floor or plugging in wells Provide & lay 2" thick & 15" projected tile band, laid in 1:2 c/s mortar 100 Sft 100 Sft 100 Sft 100 Cft 100 Cft 100 Sft 100 Sft 100 Sft 100 Sft 100 Cft 100 Cft 100 Cft 100 Cft 100 Rft 100 Rft 100 Rft 100 Rft 100 Rft 100 Rft 100 Rft

Rate (British System) Labour


999.75 1,790.25 2,580.75 3,022.50 426.25 1,046.96 1,046.96 816.01 835.45 3,286.00 1,147.00 1,929.75 868.00 1,588.75 1,805.75 1,526.75 1,805.75 2,673.75 3,564.07 4,479.50 279.00 589.00 88.13 4,371.00

Rate (Metric System) Unit


m2 m2 m2 m3 m3 m2 m2 m2 m2 m3 m3 m3 m3 m m m m m m m 1000 No. 1000 No. m3 m

Composite
999.75 1,790.25 2,580.75 14,336.00 474.65 4,467.48 4,460.23 3,183.34 3,195.54 8,005.60 7,130.45 5,329.85 1,969.10 3,494.50 4,426.61 4,181.73 2,900.20 6,044.21 9,327.30 12,512.69 279.00 589.00 1,552.23 5,153.87

Labour
107.57 192.63 277.69 1,067.39 150.53 112.65 112.65 87.80 89.89 1,160.44 405.06 681.49 306.53 52.12 59.24 50.09 59.24 87.72 116.93 146.97 279.00 589.00 31.12 143.41

Composite
107.57 192.63 277.69 5,062.72 167.62 480.70 479.92 342.53 343.84 2,827.16 2,518.10 1,882.22 695.38 114.65 145.23 137.20 95.15 198.30 306.01 410.52 279.00 589.00 548.17 169.09

Spec. No

Remarks

1000 No. 1000 No. 100 Cft 100 Rft

NWFP CSR 2008 - Approved 25-Aug-2008

Page 33 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 07 :

BRICK MASONRY

Item Code
07-32-a

Description Unit
First class brick tiles clad by laying tiles in stretcher course, in cement sand mortar 1:3 100 Sft

Rate (British System) Labour


1,176.45

Rate (Metric System) Unit


m2

Composite
3,844.50

Labour
126.59

Composite
413.67

Spec. No

Remarks
This item is to be executed only on the written orders of Superintending Engineer.

07-32-b 07-33 07-34 07-35 07-36 07-37 07-38-a 07-38-b 07-38-c 07-39 07-40 07-41-a

First class brick tiles clad by laying tiles in stretcher course, in cement sand mortar 1:4 Chamfering sides of head regulators and masonry walls to increase width Replacing kallar eaten bricks Repairing corners of bridges & other hydraulic masonry works Extra labour for drains of bath rooms etc Maroo corners Masonry with Facing/Machine/Special Bricks in cement sand mortar 1:2 upto 10 ft. height Masonry using Facing/Machine/Special bricks in cement sand mortar 1:3 upto 10 ft. height Masonry using Facing/Machine/Special bricks in cement sand mortar 1:4 upto 10 ft. height Add extra labour on Item 07-38 for every 10 ft additional height or part thereof Masonry with Machine/Special Bricks in 1:3 c/s mortar in circular core wall of Overhead Reservoir Hollow Block Masonry in walls upto 20 feet height in 1:2 cement sand mortar using Hollow Block 16"x8"x8" factory manufactured with 1.5" wall thickness and strenght of 1900 psi. Hollow Block Masonry in walls upto 20 feet height in 1:3 cement sand mortar using Hollow Block 16"x8"x8" factory manufactured with 1.5" wall thickness and strenght of 1900 psi. Hollow Block Masonry in walls upto 20 feet height in 1:4 cement sand mortar using Hollow Block 16"x8"x8" factory manufactured with 1.5" wall thickness and strenght of 1900 psi. Hollow Block Masonry in walls upto 20 feet height in 1:5 cement sand mortar using Hollow Block 16"x8"x8" factory manufactured with 1.5" wall thickness and strenght of 1900 psi.

100 Sft 100 Sft Each Each 100 Rft Each 100Cft 100Cft 100Cft 100Cft 100Cft 100Cft

1,176.45 3,468.53 17.36 217.00 2,592.72 112.84 3,099.07 3,029.32 3,029.32 152.05 5,333.55 1,581.00

3,691.52 3,468.53 21.59 217.00 2,592.72 112.84 15,277.82 14,370.18 13,867.29 158.35 17,880.16 10,656.00

m2 m2 Each Each m Each m3 m3 m3 m3 m3 m3

126.59 373.21 17.36 217.00 85.06 112.84 1,094.43 1,069.80 1,069.80 53.70 1,883.53 558.33

397.21 373.21 21.59 217.00 85.06 112.84 5,395.32 5,074.79 4,897.19 55.92 6,314.32 3,763.13
Payable in addition to brickwork Payable in addition to brickwork

07-41-b

100Cft

1,581.00

10,240.37

m3

558.33

3,616.36

07-41-c

100Cft

1,581.00

9,985.66

m3

558.33

3,526.41

07-41-d

100Cft

1,581.00

9,818.08

m3

558.33

3,467.22

NWFP CSR 2008 - Approved 25-Aug-2008

Page 34 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 07 :

BRICK MASONRY

Item Code
07-41-e

Description Unit
Hollow Block Masonry in walls upto 20 feet height in 1:6 cement sand mortar using Hollow Block 16"x8"x8" factory manufactured with 1.5" wall thickness and strenght of 1900 psi. Hollow Block Masonry in walls upto 20 feet height in 1:7 cement sand mortar using Hollow Block 16"x8"x8" factory manufactured with 1.5" wall thickness and strenght of 1900 psi. Hollow Block Masonry in walls upto 20 feet height in 1:8 cement sand mortar using Hollow Block 16"x8"x8" factory manufactured with 1.5" wall thickness and strenght of 1900 psi. Hollow Block Masonry in walls upto 20 feet height in 1:2 cement sand mortar using Hollow Block 16"x8"x6" factory manufactured with 1.5" wall thickness and strenght of 1900 psi. Hollow Block Masonry in walls upto 20 feet height in 1:3 cement sand mortar using Hollow Block 16"x8"x6" factory manufactured with 1.5" wall thickness and strenght of 1900 psi. Hollow Block Masonry in walls upto 20 feet height in 1:4 cement sand mortar using Hollow Block 16"x8"x6" factory manufactured with 1.5" wall thickness and strenght of 1900 psi. Hollow Block Masonry in walls upto 20 feet height in 1:5 cement sand mortar using Hollow Block 16"x8"x6" factory manufactured with 1.5" wall thickness and strenght of 1900 psi. Hollow Block Masonry in walls upto 20 feet height in 1:6 cement sand mortar using Hollow Block 16"x8"x6" factory manufactured with 1.5" wall thickness and strenght of 1900 psi. Hollow Block Masonry in walls upto 20 feet height in 1:7 cement sand mortar using Hollow Block 16"x8"x6" factory manufactured with 1.5" wall thickness and strenght of 1900 psi. Hollow Block Masonry in walls upto 20 feet height in 1:8 cement sand mortar using Hollow Block 16"x8"x6" factory manufactured with 1.5" wall thickness and strenght of 1900 psi. 100Cft

Rate (British System) Labour


1,581.00

Rate (Metric System) Unit


m3

Composite
9,714.50

Labour
558.33

Composite
3,430.65

Spec. No

Remarks

07-41-f

100Cft

1,581.00

9,610.92

m3

558.33

3,394.07

07-41-g

100Cft

1,581.00

9,536.87

m3

558.33

3,367.92

07-42-a

100Cft

1,829.31

12,519.66

m3

646.02

4,421.28

07-42-b

100Cft

1,829.31

12,016.91

m3

646.02

4,243.74

07-42-c

100Cft

1,829.31

11,715.25

m3

646.02

4,137.21

07-42-d

100Cft

1,829.31

11,514.15

m3

646.02

4,066.19

07-42-e

100Cft

1,829.31

11,371.37

m3

646.02

4,015.77

07-42-f

100Cft

1,829.31

11,264.77

m3

646.02

3,978.12

07-42-g

100Cft

1,829.31

11,178.98

m3

646.02

3,947.82

NWFP CSR 2008 - Approved 25-Aug-2008

Page 35 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 07 :

BRICK MASONRY

Item Code
07-43-a

Description Unit
Hollow Block Masonry in walls upto 20 feet height in 1:2 cement sand mortar using Hollow Block 16"x8"x4" factory manufactured with 1.25" wall thickness and strenght of 1900 psi. Hollow Block Masonry in walls upto 20 feet height in 1:3 cement sand mortar using Hollow Block 16"x8"x4" factory manufactured with 1.25" wall thickness and strenght of 1900 psi. Hollow Block Masonry in walls upto 20 feet height in 1:4 cement sand mortar using Hollow Block 16"x8"x4" factory manufactured with 1.25" wall thickness and strenght of 1900 psi. Hollow Block Masonry in walls upto 20 feet height in 1:5 cement sand mortar using Hollow Block 16"x8"x4" factory manufactured with 1.25" wall thickness and strenght of 1900 psi. Hollow Block Masonry in walls upto 20 feet height in 1:6 cement sand mortar using Hollow Block 16"x8"x4" factory manufactured with 1.25" wall thickness and strenght of 1900 psi. Hollow Block Masonry in walls upto 20 feet height in 1:7 cement sand mortar using Hollow Block 16"x8"x4" factory manufactured with 1.25" wall thickness and strenght of 1900 psi. Hollow Block Masonry in walls upto 20 feet height in 1:8 cement sand mortar using Hollow Block 16"x8"x4" factory manufactured with 1.25" wall thickness and strenght of 1900 psi. Solid Block Masonry in walls upto 20 feet height in 1:2 cement sand mortar using 16"x8"x8" factory manufactured solid blocks with strength of 2100 psi. Solid Block Masonry in walls upto 20 feet height in 1:3 cement sand mortar using 16"x8"x8" factory manufactured solid blocks with strength of 2100 psi. Solid Block Masonry in walls upto 20 feet height in 1:4 cement sand mortar using 16"x8"x8" factory manufactured solid blocks with strength of 2100 psi. Solid Block Masonry in walls upto 20 feet height in 1:5 cement sand mortar using 16"x8"x8" factory manufactured solid blocks with strength of 2100 psi. Solid Block Masonry in walls upto 20 feet height in 1:6 cement sand mortar using 16"x8"x8" factory manufactured solid blocks with strength of 2100 psi. 100Cft

Rate (British System) Labour


2,113.27

Rate (Metric System) Unit


m3

Composite
15,226.04

Labour
746.29

Composite
5,377.03

Spec. No

Remarks

07-43-b

100Cft

2,113.27

14,640.16

m3

746.29

5,170.13

07-43-c

100Cft

2,113.27

14,287.56

m3

746.29

5,045.61

07-43-d

100Cft

2,113.27

14,052.95

m3

746.29

4,962.76

07-43-e

100Cft

2,113.27

13,889.72

m3

746.29

4,905.11

07-43-f

100Cft

2,113.27

13,762.67

m3

746.29

4,860.25

07-43-g

100Cft

2,113.27

13,659.45

m3

746.29

4,823.79

07-44-a

100Cft

1,581.00

11,067.40

m3

558.33

3,908.42

07-44-b

100Cft

1,581.00

10,651.76

m3

558.33

3,761.64

07-44-c

100Cft

1,581.00

10,397.06

m3

558.33

3,671.69

07-44-d

100Cft

1,581.00

10,229.47

m3

558.33

3,612.51

07-44-e

100Cft

1,581.00

10,125.90

m3

558.33

3,575.93

NWFP CSR 2008 - Approved 25-Aug-2008

Page 36 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 07 :

BRICK MASONRY

Item Code
07-44-f

Description Unit
Solid Block Masonry in walls upto 20 feet height in 1:7 cement sand mortar using 16"x8"x8" factory manufactured solid blocks with strength of 2100 psi. Solid Block Masonry in walls upto 20 feet height in 1:8 cement sand mortar using 16"x8"x8" factory manufactured solid blocks with strength of 2100 psi. Solid Block Masonry in walls upto 20 feet height in 1:2 cement sand mortar using 16"x8"x6" factory manufactured solid blocks with strength of 1900 psi. Solid Block Masonry in walls upto 20 feet height in 1:3 cement sand mortar using 16"x8"x6" factory manufactured solid blocks with strength of 1900 psi. Solid Block Masonry in walls upto 20 feet height in 1:4 cement sand mortar using 16"x8"x6" factory manufactured solid blocks with strength of 1900 psi. Solid Block Masonry in walls upto 20 feet height in 1:5 cement sand mortar using 16"x8"x6" factory manufactured solid blocks with strength of 1900 psi. Solid Block Masonry in walls upto 20 feet height in 1:6 cement sand mortar using 16"x8"x6" factory manufactured solid blocks with strength of 1900 psi. Solid Block Masonry in walls upto 20 feet height in 1:7 cement sand mortar using 16"x8"x6" factory manufactured solid blocks with strength of 1900 psi. Solid Block Masonry in walls upto 20 feet height in 1:8 cement sand mortar using 16"x8"x6" factory manufactured solid blocks with strength of 1900 psi. Solid Block Masonry in walls upto 20 feet height in 1:2 cement sand mortar using 16"x8"x4" factory manufactured solid blocks with strength of 1800 psi. Solid Block Masonry in walls upto 20 feet height in 1:3 cement sand mortar using 16"x8"x4" factory manufactured solid blocks with strength of 1800 psi. Solid Block Masonry in walls upto 20 feet height in 1:4 cement sand mortar using 16"x8"x4" factory manufactured solid blocks with strength of 1800 psi. Solid Block Masonry in walls upto 20 feet height in 1:5 cement sand mortar using 16"x8"x4" factory manufactured solid blocks with strength of 1800 psi. Solid Block Masonry in walls upto 20 feet height in 1:6 cement sand mortar using 16"x8"x4" factory manufactured solid blocks with strength of 1800 psi. 100Cft

Rate (British System) Labour


1,581.00

Rate (Metric System) Unit


m3

Composite
10,022.32

Labour
558.33

Composite
3,539.35

Spec. No

Remarks

07-44-g

100Cft

1,581.00

9,948.27

m3

558.33

3,513.20

07-45-a

100Cft

1,829.31

13,064.16

m3

646.02

4,613.57

07-45-b

100Cft

1,829.31

12,561.41

m3

646.02

4,436.02

07-45-c

100Cft

1,829.31

12,259.75

m3

646.02

4,329.49

07-45-d

100Cft

1,829.31

12,058.65

m3

646.02

4,258.48

07-45-e

100Cft

1,829.31

11,915.87

m3

646.02

4,208.05

07-45-f

100Cft

1,829.31

11,809.27

m3

646.02

4,170.41

07-45-g

100Cft

1,829.31

11,723.48

m3

646.02

4,140.11

07-46-a

100Cft

2,113.27

16,002.86

m3

746.29

5,651.36

07-46-b

100Cft

2,113.27

15,416.98

m3

746.29

5,444.46

07-46-c

100Cft

2,113.27

15,064.38

m3

746.29

5,319.94

07-46-d

100Cft

2,113.27

14,829.76

m3

746.29

5,237.09

07-46-e

100Cft

2,113.27

14,666.54

m3

746.29

5,179.44

NWFP CSR 2008 - Approved 25-Aug-2008

Page 37 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 07 :

BRICK MASONRY

Item Code
07-46-f

Description Unit
Solid Block Masonry in walls upto 20 feet height in 1:7 cement sand mortar using 16"x8"x4" factory manufactured solid blocks with strength of 1800 psi. Solid Block Masonry in walls upto 20 feet height in 1:8 cement sand mortar using 16"x8"x4" factory manufactured solid blocks with strength of 1800 psi. 100Cft

Rate (British System) Labour


2,113.27

Rate (Metric System) Unit


m3

Composite
14,539.49

Labour
746.29

Composite
5,134.58

Spec. No

Remarks

07-46-g

100Cft

2,113.27

14,436.27

m3

746.29

5,098.13

NWFP CSR 2008 - Approved 25-Aug-2008

Page 38 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 08 :

STONE MASONRY

Item Code
08-01-a 08-01-b 08-01-c-01 08-01-c-02 08-01-c-03 08-01-d-01 08-01-d-02 08-01-d-03 08-01-d-04 08-02-a 08-02-b 08-02-c-01 08-02-c-02 08-02-c-03 08-02-d-01 08-02-d-02 08-02-d-03 08-02-d-04 08-03-a 08-03-b 08-03-c-01 08-03-c-02 08-03-c-03 08-03-d-01

Description Unit
Random rubble masonry in foundn. & plinth Dry masonry. Random rubble masonry in foundn. & plinth in mud mortar Random rubble masonry (Un coursed) in foundn. & plinth in lime, sand mortar 1:2 Random rubble masonry (Un coursed) in foundn. & plinth in lime, sand mortar, Surkhi Ratio 1:1:1 Random rubble masonry (Un coursed) in foundn. & plinth in lime, Surkhi Ratio 1:2 Random rubble masonry in foundn. & plinth in cement, sand mortar : Ratio 1:3 Random rubble masonry in foundn. & plinth in cement, sand mortar : Ratio 1:4 Random rubble masonry in foundn. & plinth in cement, sand mortar : Ratio 1:6 Random rubble masonry in foundn. & plinth in cement, sand mortar : Ratio 1:8 Coursed rubble masonry in foundn. & plinth dry masonry. Coursed rubble masonry in foundn. & plinth in mud mortar Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in lime, sand mortar 1:2 Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in lime, sand mortar, Surkhi Ratio 1:1:1 Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in lime, Surkhi Ratio 1:2 Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in cement,sand mortar : Ratio 1:3 Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in cement,sand mortar : Ratio 1:4 Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in cement,sand mortar : Ratio 1:6 Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in cement,sand mortar : Ratio 1:8 Random rubble masonry in ground floor Dry masonry. Random rubble masonry in ground floor in mud mortar Random rubble masonry in ground floor in lime, sand mortar 1:2 Random rubble masonry in ground floor in lime, sand mortar, Surkhi Ratio 1:1:1 Random rubble masonry in ground floor in lime, Surkhi Ratio 1:2 Random rubble masonry in ground floor in cement,sand mortar : Ratio 1:3 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft

Rate (British System) Labour


2,015.00 2,518.75 3,890.50 3,890.50 3,890.50 3,890.50 3,890.50 3,890.50 3,890.50 2,604.00 3,611.50 4,402.00 4,402.00 4,402.00 4,402.00 4,402.00 4,402.00 4,402.00 2,309.50 3,022.50 4,254.75 4,254.75 4,254.75 4,254.75

Rate (Metric System) Unit


m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

Composite
4,519.70 5,404.60 8,246.50 8,137.60 8,028.70 10,764.81 10,010.68 9,147.55 8,670.00 5,108.70 6,497.35 8,551.54 8,699.65 8,602.94 11,035.83 10,365.49 9,594.96 9,176.30 4,814.20 5,908.35 8,610.75 8,501.85 8,392.95 11,129.06

Labour
711.59 889.49 1,373.92 1,373.92 1,373.92 1,373.92 1,373.92 1,373.92 1,373.92 919.59 1,275.39 1,554.55 1,554.55 1,554.55 1,554.55 1,554.55 1,554.55 1,554.55 815.59 1,067.39 1,502.55 1,502.55 1,502.55 1,502.55

Composite
1,596.12 1,908.62 2,912.23 2,873.77 2,835.31 3,801.56 3,535.24 3,230.43 3,061.78 1,804.12 2,294.52 3,019.95 3,072.26 3,038.10 3,897.27 3,660.54 3,388.43 3,240.58 1,700.12 2,086.52 3,040.86 3,002.40 2,963.95 3,930.19

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 39 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 08 :

STONE MASONRY

Item Code
08-03-d-02 08-03-d-03 08-03-d-04 08-04-a 08-04-b 08-04-c-01 08-04-c-02 08-04-c-03 08-04-d-01 08-04-d-02 08-04-d-03 08-04-d-04 08-05-a-01 08-05-a-02 08-05-a-03 08-05-b-01 08-05-b-02 08-05-b-03 08-06-a-01 08-06-a-02 08-06-a-03 08-06-b-01

Description Unit
Random rubble masonry in ground floor in cement,sand mortar : Ratio 1:4 Random rubble masonry in ground floor in cement,sand mortar : Ratio 1:6 Random rubble masonry in ground floor in cement,sand mortar : Ratio 1:8 Coursed rubble masonry in ground floor Dry masonry. Coursed rubble masonry in ground floor in mud mortar Coursed rubble masonry in ground floor in lime, sand mortar 1:2 Coursed rubble masonry in ground floor in lime, sand mortar, Surkhi Ratio 1:1:1 Coursed rubble masonry in ground floor in lime, Surkhi Ratio 1:2 Coursed rubble masonry in ground floor in cement,sand mortar : Ratio 1:3 Coursed rubble masonry in ground floor in cement,sand mortar : Ratio 1:4 Coursed rubble masonry in ground floor in cement,sand mortar : Ratio 1:6 Coursed rubble masonry in ground floor in cement,sand mortar : Ratio 1:8 Ashlar block masonry in ground floor in lime, sand mortar 1:2 Ashlar block masonry in ground floor in lime, sand mortar, Surkhi Ratio 1:1:1 Ashlar block masonry in ground floor in lime, Surkhi Ratio 1:2 Ashlar block masonry in ground floor in cement,sand mortar : Ratio 1:3 Ashlar block masonry in ground floor in cement,sand mortar : Ratio 1:4 Ashlar block masonry in ground floor in cement,sand mortar : Ratio 1:6 Ashlar fine masonry in ground floor in lime, sand mortar 1:2 Ashlar fine masonry in ground floor in lime, sand mortar, Surkhi Ratio 1:1:1 Ashlar fine masonry in ground floor in lime, Surkhi Ratio 1:2 Ashlar fine masonry in ground floor in cement,sand mortar : Ratio 1:3 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft

Rate (British System) Labour


4,254.75 4,254.75 4,254.75 3,038.00 4,774.00 4,983.25 4,983.25 4,983.25 4,983.25 4,983.25 4,983.25 4,983.25 13,950.00 13,950.00 13,950.00 13,950.00 13,950.00 13,950.00 27,373.00 27,373.00 27,373.00 27,373.00

Rate (Metric System) Unit


m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

Composite
10,374.93 9,511.80 9,034.25 5,542.70 7,659.85 9,131.46 9,280.90 9,183.58 11,617.08 10,946.74 10,178.87 9,770.86 20,195.73 20,123.13 20,050.53 21,874.61 21,371.85 20,802.06 34,625.51 34,589.21 34,552.91 35,464.95

Labour
1,502.55 1,502.55 1,502.55 1,072.86 1,685.92 1,759.82 1,759.82 1,759.82 1,759.82 1,759.82 1,759.82 1,759.82 4,926.40 4,926.40 4,926.40 4,926.40 4,926.40 4,926.40 9,666.69 9,666.69 9,666.69 9,666.69

Composite
3,663.88 3,359.06 3,190.42 1,957.39 2,705.05 3,224.75 3,277.52 3,243.16 4,102.54 3,865.81 3,594.64 3,450.55 7,132.06 7,106.42 7,080.78 7,724.95 7,547.40 7,346.19 12,227.89 12,215.08 12,202.26 12,524.34

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 40 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 08 :

STONE MASONRY

Item Code
08-06-b-02 08-06-b-03 08-07-a 08-07-b 08-07-c 08-07-d 08-08 08-09 08-10-a 08-10-b 08-11-a

Description Unit
Ashlar fine masonry in ground floor in cement,sand mortar : Ratio 1:4 Ashlar fine masonry in ground floor in cement,sand mortar : Ratio 1:6 Extra labour on items 08-03-a-01 to 08-06-b-03 for work in First floor Extra labour on items 08-03-a-01 to 08-06-b-03 for work in Second floor Extra labour on items 08-03-a-01 to 08-06-b-03 for work in Third floor Extra labour on items 08-03-a-01 to 08-06-b-03 for work in Fourth & subsequent floors Extra labour on items 08-03-a-01 to 08-06-b-03 for every 5' additional height, other than building Extra labour for arch work in stone masonry including centring & decentring etc. Extra labour for coping & caps etc Extra labour for cornice & string course Dressing stones : Hammer dressed 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Sft

Rate (British System) Labour


27,373.00 27,373.00 612.25 1,432.20 2,266.10 3,623.90 573.50 2,294.00 11,780.00 11,780.00 3,642.50

Rate (Metric System) Unit


m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m2

Composite
35,213.57 34,932.90 612.25 1,432.20 2,266.10 3,623.90 573.50 2,294.00 11,780.00 11,780.00 3,642.50

Labour
9,666.69 9,666.69 216.21 505.78 800.27 1,279.77 202.53 810.12 4,160.07 4,160.07 391.93

Composite
12,435.57 12,336.45 216.21 505.78 800.27 1,279.77 202.53 810.12 4,160.07 4,160.07 391.93

Spec. No

Remarks

a) This rate of dressing shall be paid only when supply of undressed stone is made b) In case of masonry, dressing is already included and this rate shall not be added thereto c) Only dressed surface of stone shall be measured

08-11-b

Dressing stones : Rough tooled dressed

100 Sft

7,006.00

7,006.00

m2

753.85

753.85

08-11-c

Dressing stones : Chisel dressed

100 Sft

8,463.00

8,463.00

m2

910.62

910.62

08-11-d 08-12 08-13 08-14 08-15

Dressing stones : Fine dressed Dhajji walling 5"x5" thick deodar framing with stone laid in 1:6 c/s mortar & 1:4 c/s plaster Provide & fix stone blocks from 2 cft. to 6 cft. each, including lift upto 20 ft. Providing and fixing stone blocks, under 2 cft. each, including lift upto 20 ft. Provide & lay stone/boulder dry hand packed as filling behind retaining walls or in pitching

100 Sft 100 Sft 100 Cft 100 Cft 100 Cft

18,476.00 5,468.40 19,251.00 9,517.00 589.00

18,476.00 11,663.75 21,864.60 12,130.60 3,529.30

m2 m2 m3 m3 m3

1,988.02 588.40 6,798.43 3,360.90 208.00

1,988.02 1,255.02 7,721.42 4,283.88 1,246.36

NWFP CSR 2008 - Approved 25-Aug-2008

Page 41 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 09 :

ROOFING

Item Code
09-01

Description Unit
First class tile roofing including earth, mud plaster, gobri leeping, cement plaster etc complete 100 Sft

Rate (British System) Labour


4,172.60

Rate (Metric System) Unit


m2

Composite
9,201.08

Labour
448.97

Composite
990.04

Spec. No

Remarks
Add extra 13%, 32% and 51% on labour rates only are 6%, 15% and 23% on composite rates for 2nd, 3rd, 4th and subsequent floors respectively. ditto ditto ditto

09-02 09-03 09-04-a 09-04-b 09-04-c 09-05

Second class tile roofing consisting of 4" earth and 1" mud plaster with gobri leeping etc Covering mud roof with coal tar and fine sand Filling spaces in between wooden battens over beams, filled with deodar wood pieces Filling spaces in between RCC battens, filled with PCC block 1:3:6 Filling spaces in between spacers filled with bricks Single layer of tiles 10"x5"x1.25" laid over 4" earth and 1" mud plaster on top of RC roof slab

100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft

3,146.50 140.43 434.00 609.77 175.46 1,294.25

6,993.54 567.83 2,017.29 895.33 466.46 5,091.50

m2 m2 m2 m2 m2 m2

338.56 15.11 46.70 65.61 18.88 139.26

752.50 61.10 217.06 96.34 50.19 547.85

Add extra 13%, 32% and 51% on labour rates only are 6%, 15% and 23% on composite rates for 2nd, 3rd, 4th and subsequent floors respectively. a) For steel part and its erection etc. Item No 25-10 and 25-14 be reffered b) Add extra 13%, 32% and 51% on labour rates only are 6%, 15% and 23% on composite rates for 2nd, 3rd, 4th and subsequent floors respectively.

09-06-a

Jack arch roof 4.5" thick laid in 1:5 c/s mortar a) cement concrete in haunches 1:6:12

100 Sft

4,588.00

11,416.48

m2

493.67

1,228.41

09-06-b

Jack arch roof 4.5" thick laid in 1:5 c/s mortar b) cement concrete in haunches 1:3:6

100 Sft

4,588.00

12,415.70

m2

493.67

1,335.93

NWFP CSR 2008 - Approved 25-Aug-2008

Page 42 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 09 :

ROOFING

Item Code
09-07-a

Description Unit
Jack arch roofing 4.5"thick laid in 1:5 c/s mortar complete. Cement concrete in haunches 1:6:12 100 Sft

Rate (British System) Labour


3,727.75

Rate (Metric System) Unit


m2

Composite
10,246.29

Labour
401.11

Composite
1,102.50

Spec. No

Remarks
a) For steel part and its erection etc. Item No 25-10 and 25-14 be reffered b) Add extra 13%, 32% and 51% on labour rates only are 6%, 15% and 23% on composite rates for 2nd, 3rd, 4th and subsequent floors respectively.

09-07-b 09-08 09-09 09-10-a

Jack arch roofing 4.5"thick laid in 1:5 cement mortar, including complete. Cement concrete in haunches 1:3:6 Extra for vaulted jack arch roofing Jack arch roofing of shingle & cement concrete 1:3:6, 4.5" at crown & 1/2" cem. plaster complete Earth filling over roof including watering, ramming etc 3" thick earth filling and 1" mud plaster

100 Sft 100 Sft 100 Sft 100 Sft

3,727.75 1,178.00 3,673.50 383.16

11,149.43 1,178.00 7,348.03 984.23

m2 m2 m2 m2

401.11 126.75 395.27 41.23

1,199.68 126.75 790.65 105.90


ditto

Add extra 13%, 32% and 51% on labour rates only are 6%, 15% and 23% on composite rates for 2nd, 3rd, 4th and subsequent floors respectively.

09-10-b 09-11 09-12 09-13-a

Earth filling over roof including watering, ramming etc 4" thick earth filling and 1" mud plaster 1/8" thick gobri leeping on roofs or floors 2 coats of bitumen laid hot using 34 lbs. for %sft over roof & blinded with sand at 1 cft per % sft Supply & fix corrugated GI sheet with GI bolts, nuts, limpet etc. complete : 20 BWG

100 Sft 100 Sft 100 Sft 100 Sft

399.90 87.42 279.00 868.00

1,085.67 111.92 1,095.78 10,450.23

m2 m2 m2 m2

43.03 9.41 30.02 93.40

116.82 12.04 117.91 1,124.44


ditto

Add extra 13%, 32% and 51% on labour rates only are 6%, 15% and 23% on composite rates for 2nd, 3rd, 4th and subsequent floors respectively.

09-13-b 09-13-c 09-14 09-15

Supply & fix corrugated GI sheet with GI bolts, nuts, limpet etc. complete : 22 BWG Supply & fix corrugated GI sheet with GI bolts, nuts, limpet etc. complete : 24 BWG Khassi parnalas in c/s mortar 1:2, 12" outside width finished smooth with a floating coat Khuras on roof 2'x2'x6"

100 Sft 100 Sft 1 Rft Each

868.00 868.00 50.56 187.55

9,172.47 7,734.99 70.18 363.00

m2 m2 m Each

93.40 93.40 165.87 187.55

986.96 832.29 230.24 363.00


ditto ditto

NWFP CSR 2008 - Approved 25-Aug-2008

Page 43 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 09 :

ROOFING

Item Code
09-16 09-17-a 09-17-b 09-18 09-19-a 09-19-b 09-20 09-21 09-22 09-23 09-24-a 09-24-b 09-25 09-26 09-27 09-28-a 09-28-b 09-28-c 09-29 09-30 09-31 09-32 09-33 09-34-a

Description Unit
Bottom khuras of brick masonry in c/s mortar 1:6,4'x2'x4.5" over 3" cem. concrete 1:4:8 Plain GI sheets 22 SWG rain water down pipe a) 4" diameter down pipe Plain GI sheets 22 SWG rain water down pipe b) 5" diameter down pipe Plain galvanized iron sheet flashing, 22 guage Cast iron rain water down pipe fixed in position excluding heads & shoes : 4" dia Cast iron rain water down pipe fixed in position excluding heads & shoes : 3" dia Heads for cast iron rain water down pipe fixed in place including cost of clamp holdfast and painting Shoes, bends or offsets for cast iron ran water down pipe, including fixing & painting Plain GI sheet spouts fixed in position, including paint Laying 1/2" thick deodar ceiling complete, including sawing, planing & fixing Flat sheet roof with GI plain sheets, including batten rolls, screws, clips etc : 22 BWG Flat sheet roof with GI plain sheets, including batten rolls, screws, clips etc : 24 BWG Asbestos cement corrugated sheet roofing including overlaps, GI hooks, bolts, nuts etc Extra labour for erection of GI sheets, flat sheet or asbestos sheet roofing above 20' height Fixing asbestos cement sheet ridges and valleys 1/4" thick Plain GI sheet ridging including fixture complete 6" lap & 18" overall of 22 gauge GI sheet ridging Plain GI sheet ridging including fixture complete 9" lap & 24" overall, of 24 gauge GI sheet ridging Plain GI sheet ridging including fixture complete 12" lap & 30 overall, of 22 gauge GI sheet ridging Plain 22 gauge GI sheet gutter semi circular 8" diameter Fixing water spouse or parnala. Making masonry ventilators in c/s mortar 1:4 Making drip course 2"x1/2" under RCC slab edges in outer opening, in c/s mortar 1:2 Supply and laying of twin GI sheet 20 SWG painted with bitumen & polythene fim complete Provide & lay roof insulation complete with Thermopore sheet 1/2" thick Each 1 RFT 1 RFT 100 Sft 1 RFT 1 RFT Each Each Each 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft

Rate (British System) Labour


187.55 41.59 41.59 5,537.36 29.42 29.42 122.76 68.20 145.70 3,193.00 2,235.88 2,235.88 1,147.00 189.10 1,441.50 52.93 52.93 52.93 26.46 217.00 868.00 6.26 1,745.30 13.22

Rate (Metric System) Unit


Each m m m2 m m Each Each Each m2 m2 m2 m2 m2 m m m m m Each Each m m2 m2

Composite
579.83 118.01 132.38 9,496.63 290.05 231.60 500.35 445.79 287.54 15,498.70 10,506.83 9,602.68 13,996.59 189.10 7,595.56 358.72 351.19 391.12 170.03 217.00 1,174.08 7.27 14,027.29 64.58

Labour
187.55 136.43 136.43 595.82 96.53 96.53 122.76 68.20 145.70 343.57 240.58 240.58 123.42 20.35 47.29 173.64 173.64 173.64 86.82 217.00 868.00 20.53 187.79 142.29

Composite
579.83 387.19 434.32 1,021.84 951.62 759.84 500.35 445.79 287.54 1,667.66 1,130.53 1,033.25 1,506.03 20.35 249.20 1,176.89 1,152.20 1,283.21 557.83 217.00 1,174.08 23.84 1,509.34 694.84

Spec. No

Remarks
ditto ditto

ditto ditto

ditto ditto ditto ditto

100 RFT 1 RFT 1 RFT 1 RFT 1 RFT Each Each 1 RFT 100 Sft 1 Sft

NWFP CSR 2008 - Approved 25-Aug-2008

Page 44 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 09 :

ROOFING

Item Code
09-34-b 09-34-c 09-35 09-36-a

Description Unit
Provide & lay roof insulation complete with Thermopore sheet 3/4" thick Provide & lay roof insulation complete with Thermopore sheet 1" thick Providing and fixing AC rain water down pipe 4" dia, with shoe, tee, bend & clamp etc Making jharries in existing brick masonry For slabs upto 6" thick 1 Sft 1 Sft 1 RFT 1 RFT

Rate (British System) Labour


13.22 13.22 28.67 15.57

Rate (Metric System) Unit


m2 m2 m m

Composite
77.22 89.32 210.10 37.09

Labour
142.29 142.29 94.08 51.07

Composite
830.91 961.11 689.31 121.68

Spec. No

Remarks

Rate shall be increase by 1.5 times for stone masonry or PCC and 2 times for RCC

09-36-b 09-37-a 09-37-b 09-38 09-39 09-40-a 09-40-b 09-40-c 09-40-d 09-40-e 09-41-a

Making jharries in existing brick masonry For slabs exceeding 6" to 12" thick Making recess in existing brick masonry a) upto 1.0' height of girder or beam Making recess in existing brick masonry b) for every 6" additional height or part thereof Hoisting RS Beams & wooden beams and placing in position Hoisting and placing in position sahl ballies, over roof Hoist precast RCC/pre-stressed conc. battens a) From 5' to 6' long Hoist precast RCC/pre-stressed conc. battens b) Over 6' to 7' long Hoist precast RCC/pre-stressed conc. battens c) Over 7' to 8' long Hoist precast RCC/pre-stressed conc. battens d) Over 8' to 9' long Hoist precast RCC/pre-stressed conc. battens e) Exceeding 9' length Hoisting and placing in position RCC troughs Upto 10' in length

1 RFT Each Each Each Each Each Each Each Each Each Each

42.14 161.20 65.88 168.33 28.64 23.96 35.65 47.34 57.04 71.30 71.30

45.08 183.25 78.10 168.33 28.64 23.96 35.65 47.34 57.04 71.30 71.30

m Each Each Each Each Each Each Each Each Each Each

138.25 161.20 65.88 168.33 28.64 23.96 35.65 47.34 57.04 71.30 71.30

147.90 183.25 78.10 168.33 28.64 23.96 35.65 47.34 57.04 71.30 71.30
Applicable only ot roof troughs (inverted tees and trough) for heights of first storey only ditto

09-41-b 09-41-c 09-41-d 09-41-e

Hoisting and placing in position RCC troughs Upto 11' in length Hoisting and placing in position RCC troughs Upto 12' in length Hoisting and placing in position RCC troughs Upto 13' in length Hoisting and placing in position RCC troughs Upto 14' in length

Each Each Each Each

95.26 118.64 128.90 142.60

95.26 118.64 128.90 142.60

Each Each Each Each

95.26 118.64 128.90 142.60

95.26 118.64 128.90 142.60

NWFP CSR 2008 - Approved 25-Aug-2008

Page 45 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 09 :

ROOFING

Item Code
09-41-f 09-41-g 09-41-h 09-41-i 09-41-j 09-41-k 09-42-a 09-42-b 09-42-c 09-42-d 09-42-e 09-42-f 09-42-g 09-42-h 09-43 09-44 09-45

Description Unit
Hoisting and placing in position RCC troughs Upto 15' in length Hoisting and placing in position RCC troughs Upto 16' in length Hoisting and placing in position RCC troughs Upto 17' in length Hoisting and placing in position RCC troughs Upto 18' in length Hoisting and placing in position RCC troughs Upto 19' in length Hoisting and placing in position RCC troughs Upto 20' in length Hoist & place in position RCC inverted battens Upto 10' span Hoist & place in position RCC inverted battens Upto 12' span Hoist & place in position RCC inverted battens Upto 13' span Hoist & place in position RCC inverted battens Upto 14' span Hoist & place in position RCC inverted battens Upto 15' span Hoist & place in position RCC inverted battens Upto 16' span Hoist & place in position RCC inverted battens Upto 18' span Hoist & place in position RCC inverted battens Upto 20' span RCC spout including fixing in position, with top and bottom khuras P/F Burnt Brick Tile Roofing over Tee Iron and Steel Girder, in 1:6 c/s mortar (12' max span) Providing and Laying Prestressed Roof of Slab/Girder, 2" thick PCC 1:2:4 with chicken mesh, polythene, mud, tar Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each 100 Sft 1 Sft

Rate (British System) Labour


156.86 178.25 203.05 237.86 285.20 356.50 56.54 113.09 141.79 170.50 187.55 213.13 284.73 426.25 303.80 2,781.37 24.49

Rate (Metric System) Unit


Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each m2 m2

Composite
156.86 178.25 203.05 237.86 285.20 356.50 56.54 113.09 141.79 170.50 187.55 213.13 284.73 426.25 492.26 27,309.69 159.54

Labour
156.86 178.25 203.05 237.86 285.20 356.50 56.54 113.09 141.79 170.50 187.55 213.13 284.73 426.25 303.80 299.27 263.50

Composite
156.86 178.25 203.05 237.86 285.20 356.50 56.54 113.09 141.79 170.50 187.55 213.13 284.73 426.25 492.26 2,938.52 1,716.69

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 46 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 10 :

FLOORING

Item Code
10-01 10-02 10-03-a 10-03-b 10-04 10-05 10-06 10-07 10-08 10-09 10-10 10-11 10-12 10-13-a 10-13-b 10-13-c 10-14 10-15-a

Description Unit
Laying murum flooring complete as per specs Earth flooring 6" thick consolidated layer of moistened earth, including ramming Provide, lay, water & ram clean coarse sand under floor / brick paving, complete Provide, lay, water & ram brick ballast 1.5" to 2" guage mixed with 25% sand for floor foundations Mud floor of 6" thick consolidated layer of moist earth & finished off with 1" mud plaster Dry brick paving laid flat,sand grouted, including prep. of bed, by 1/2" thick mud plaster Dry brick on edge paving, sand grouted, including prep. of bed, by 1/2" thick mud plaster Grouting 4.5" dry brick work with cement sand mortar 1:5 Flat brick flooring laid in 1:6 c/s mortar over a bed of 3/4" thick cement mortar 1:6 Brick on edge flooring, laid in 1:6 c/s mortar, over a bed of 3/4" thick cement mortar 1:6 Brick tiles (12"x6"x2") laid in 1:6 c/s mortar, over a bed of 3/4" thick c/s mortar 1:6 Brick tiles (9"x4.5"x1.5") laid flat in 1:3 c/s mortar over a bed of 3/4" thick cement mortar 1:6 Cement tiles (8"x8"x3/4") laid flat in 1:2 c/s mortar, over 3/4" thick bed of c/s mortar 1:2 Cement concrete tiles laid in 1:2 c/s mortar over 3/4" thick bed of c/s mortar 1:2 : 12" x 12" x 1" Cement concrete tiles laid in 1:2 c/s mortar over 3/4" thick bed of c/s mortar 1:2 : 9" x 9" x 3/4" Cement concrete tiles laid in 1:2 c/s mortar over 3/4" thick bed of c/s mortar 1:2 : 6" x 6" x 3/4" Coloured cement tile (8"x8"x3/4") of dark shade laid flat in 1:2 c/s mortar over 3/4" mortar bed Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in panels : 1" thick 100 Sft 100 Sft 100 Cft 100 Cft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft

Rate (British System) Labour


1,271.00 422.38 1,665.85 3,333.09 806.00 587.45 829.56 573.50 999.75 1,286.50 999.75 1,147.00 1,533.57 1,533.57 1,533.57 1,533.57 1,533.57 903.65

Rate (Metric System) Unit


m2 m2 m3 m3 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

Composite
4,659.00 1,015.28 2,136.36 6,344.60 1,720.46 2,187.07 3,183.61 942.67 3,190.09 4,410.36 2,940.83 3,619.27 14,392.72 7,858.72 6,827.80 6,842.32 7,132.72 1,912.91

Labour
136.76 45.45 588.29 1,177.07 86.73 63.21 89.26 61.71 107.57 138.43 107.57 123.42 165.01 165.01 165.01 165.01 165.01 97.23

Composite
501.31 109.24 754.45 2,240.58 185.12 235.33 342.56 101.43 343.25 474.55 316.43 389.43 1,548.66 845.60 734.67 736.23 767.48 205.83

Spec. No

Remarks

If glass strips are used for paneling, it shall be paid extra as per item No. 10-43

10-15-b 10-15-c 10-15-d

Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in panels: 1.5" thick Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in panels: 1.5" thick Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in panels : 1.75" thick

100 Sft 100 Sft 100 Sft

1,057.10 1,057.10 1,057.10

2,379.02 2,551.33 2,909.00

m2 m2 m2

113.74 113.74 113.74

255.98 274.52 313.01

NWFP CSR 2008 - Approved 25-Aug-2008

Page 47 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 10 :

FLOORING

Item Code
10-15-e 10-15-f 10-15-g 10-15-h 10-15-i 10-16-a

Description Unit
Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in panels : 2" thick Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in panels: 2.25" thick Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in panels: 2.5" thick Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in panels: 2.75" thick Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in panels : 3" thick Provide & laying conglomerate floor (two coat work) with top layer of 1/2" thick wearing surface of one part of cement 2 parts of stone chips passing 3/16" sieve over bottom layer of cement concrete (1:3:6) including surface finishing & dividing in panels: 1.5" thick Provide & laying conglomerate floor (two coat work) with top layer of 1/2" thick wearing surface of one part of cement 2 parts of stone chips passing 3/16" sieve over bottom layer of cement concrete (1:3:6) including surface finishing & dividing in panels: 1.75" thick Provide & laying conglomerate floor (two coat work) with top layer of 1/2" thick wearing surface of one part of cement 2 parts of stone chips passing 3/16" sieve over bottom layer of cement concrete (1:3:6) including surface finishing & dividing in panels : 2" thick Add extra in cement concrete floor topping if finished with pigment and polishing Extra labour for each storey above ground for mosaic, conglomerate, tiles, stone & wood floor 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft

Rate (British System) Labour


1,196.60 1,736.00 1,805.75 2,170.00 2,022.75 1,906.50

Rate (Metric System) Unit


m2 m2 m2 m2 m2 m2

Composite
3,217.91 4,049.52 4,327.26 4,899.76 5,006.85 3,229.95

Labour
128.75 186.79 194.30 233.49 217.65 205.14

Composite
346.25 435.73 465.61 527.21 538.74 347.54

Spec. No

Remarks

ditto

10-16-b

100 Sft

1,317.50

2,760.30

m2

141.76

297.01

10-16-c

100 Sft

1,457.00

3,022.29

m2

156.77

325.20

10-17 10-18

100 Sft 100 Sft

434.00 209.25

849.76 209.25

m2 m2

46.70 22.52

91.43 22.52
Applicable to item No 10-08 to 10-16, 10-19 to 10-25 and 10-30 to 10-35

10-19-a 10-19-b 10-20-a 10-20-b 10-20-c

Flag stone flooring in lime mortar 1:2, over 3/4" bedding : 2" thick Flag stone flooring in lime mortar 1:2, over 3/4" bedding : 3" thick Asphalt floor, including base preparation, remelting, setting out & finish : 1" thick topping Asphalt floor, including base preparation, remelting, setting out & finish : 1/2" thick topping Asphalt floor, including base preparation, remelting, setting out & finish : 1/4" thick topping

100 Sft 100 Sft 100 Sft 100 Sft 100 Sft

2,605.55 2,429.78 852.50 742.45 520.49

3,910.17 3,960.37 7,318.92 3,975.66 2,139.59

m2 m2 m2 m2 m2

280.36 261.44 91.73 79.89 56.00

420.73 426.14 787.52 427.78 230.22

NWFP CSR 2008 - Approved 25-Aug-2008

Page 48 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 10 :

FLOORING

Item Code
10-21-a

Description Unit
1.375" thick mosaic flooring, including rubbing and polishing complete : Using grey cement 100 Sft

Rate (British System) Labour


3,410.00

Rate (Metric System) Unit


m2

Composite
5,946.40

Labour
366.92

Composite
639.83

Spec. No

Remarks
If glass strips are used for paneling, it shall be paid extra as per item No. 10-43

10-21-b 10-22-a 10-22-b 10-23 10-24 10-25 10-26-a

10-26-b

10-26-c

10-26-d 10-26-e

10-26-f 10-26-g 10-26-h 10-27

1.375" thick mosaic flooring, including rubbing and polishing complete : Using white cement 1.5" thick mosaic flooring, including rubbing & polishing complete : Using grey cement 1.5" thick mosaic flooring, including rubbing & polishing complete : Using white cement Laying floor of mosaic marble chips tiles of approved shade including finishing complete Lay floor of white glazed tile 1/4" thick in white cement 1:2 over 3/4" thick cement mortar 1:2 Lay floor of approved coloured glazed tiles 1/4" thick laid in white cement & pigment complete Provide & lay marble fine dressed stone flooring on surface in white cement complete: 3/4" thick (Badel, Silky black, Sunny white, Sunny Grey or eq) Provide & lay marble fine dressed stone flooring on surface in white cement complete: 1" thick (Badel, Silky black, Sunny white, Sunny Grey or eq) Provide & lay marble fine dressed stone flooring on surface in white cement complete: 1/2" thick (Badel, Silky black, Sunny white, Sunny Grey or eq) Providing and Laying marble fine dressed stone 4-5 feet and 12" wide 1" thick for stairs steps. Providing and Laying marble fine dressed stone 7x1.5 feet and 1" thick for stairs steps. Providing and fixing glazed tile colour printed border 2" wide Providing and fixing glazed tile colour printed border 3" wide Providing and fixing glazed tile colour printed border 4" wide Rubbing and polishing old grit/mosaic floor, including repairing voids, uneven surface, complete

100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft

3,410.00 3,493.70 3,493.70 1,917.35 2,433.50 2,433.50 4,898.00

5,664.35 5,793.79 5,978.92 5,393.92 7,072.88 7,095.15 10,733.10

m2 m2 m2 m2 m2 m2 m2

366.92 375.92 375.92 206.31 261.84 261.84 527.02

609.48 623.41 643.33 580.39 761.04 763.44 1,154.88


ditto

100 Sft

4,898.00

13,909.35

m2

527.02

1,496.65

100 Sft

4,898.00

9,589.65

m2

527.02

1,031.85

100 Sft 100 Sft

4,898.00 4,898.00

13,222.80 13,222.80

m2 m2

527.02 527.02

1,422.77 1,422.77

100 Rft 100 Rft 100 Rft 100 Sft

454.15 454.15 454.15 2,433.50

3,902.04 3,902.04 3,902.04 2,475.85

m m m m2

14.90 14.90 14.90 261.84

128.02 128.02 128.02 266.40


Reduce the rate by 35 % and 40 % for labour and composite rate respectively if polishing is not done.

NWFP CSR 2008 - Approved 25-Aug-2008

Page 49 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 10 :

FLOORING

Item Code
10-28

Description Unit
Rubbing & polishing grit floor, including repairing voids, uneen surface, complete 100 Sft

Rate (British System) Labour


850.95

Rate (Metric System) Unit


m2

Composite
997.36

Labour
91.56

Composite
107.32

Spec. No

Remarks
Reduce the rate by 35 % and 40 % for labour and composite rate respectively if polishing is not done.

10-29 10-30 10-31 10-32 10-33 10-34 10-35-a 10-35-b 10-36-a 10-36-b 10-37-a 10-37-b 10-37-c 10-38-a 10-38-b 10-38-c 10-39 10-40-a-01 10-40-a-02

Cleaning and washing mosaic or marble floor with caustic soda mixture Shisham wood boarding or strip flooring 3/4" thick including 2 coats of bitumen laid hot complete Deodar wood boarding or strip flooring 3/4" thick including 2 coats of bitumen laid hot complete Teak wood boarding or strip flooring 1/2" thick including 2 coats of bitumen laid hot complete Shisham wood block flooring 1" thick out to required size, fixed on a layer of bitumen base Teak wood block 1" thick cut to required size, fixed on a layer of asphalt bitumen laid on base Laying wooden paving of hard wood on edge in coal tar & asphalt : Shisham wood Laying wooden paving of hard wood on edge in coal tar & asphalt : Kikar wood Tile skirting laid in 1:2 c/s mortar over 3/4" thick cement mortar 1:2 complete : Cement tiles Tile skirting laid in 1:2 c/s mortar over 3/4" thick cement mortar 1:2 complete : Mosaic tiles Provide grey cement skirting 3/8" thick complete 1:2 cement, sand mortar Provide grey cement skirting 3/8" thick complete 1:3 cement, sand mortar Provide grey cement skirting 3/8" thick complete Extra if skirting or dado is finished with pigment Glazed tile 1/4" thick dado jointed in white cement complete : White Plain tiles Glazed tile 1/4" thick dado jointed in white cement complete : Coloured Plain tiles Glazed tile 1/4" thick dado jointed in white cement complete : Printed tiles Glazed tile dado 1/4" thick in pigment over 1:2 c/s mortar 3/4" thick including finishing complete Mosaic dado or skirting complete as per specs Using grey cement : 3/8" thick Mosaic dado or skirting complete as per specs Using grey cement : 1/2" thick

100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft

104.78 7,285.00 5,208.00 7,285.00 5,208.00 7,285.00 2,015.00 2,015.00 1,673.07 1,945.25 1,983.07 1,983.07 155.00 2,712.50 2,712.50 2,712.50 2,712.50 3,472.00 3,472.00

232.56 28,503.04 38,336.09 39,106.29 24,480.02 58,802.31 13,958.29 9,873.93 8,185.77 10,897.31 2,576.21 2,473.97 821.23 7,351.88 7,264.76 7,351.88 7,472.88 5,128.37 5,513.88

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

11.27 783.87 560.38 783.87 560.38 783.87 216.81 216.81 180.02 209.31 213.38 213.38 16.68 291.86 291.86 291.86 291.86 373.59 373.59

25.02 3,066.93 4,124.96 4,207.84 2,634.05 6,327.13 1,501.91 1,062.43 880.79 1,172.55 277.20 266.20 88.36 791.06 781.69 791.06 804.08 551.81 593.29
Page 50 of 144

NWFP CSR 2008 - Approved 25-Aug-2008

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 10 :

FLOORING

Item Code
10-40-b-01 10-40-b-02 10-41-a

Description Unit
Mosaic dado or skirting complete as per specs Using white cement : 3/8" thick including grinding and polishing Mosaic dado or skirting complete as per specs Using white cement : 1/2" thick including grinding and polishing Provide & lay marble fine dressed and polished stone dado or skirting in white cement complete : 3/8" thick (Badel, Silky black, Sunny white, Sunny Grey or eq) Provide & lay marble fine dressed and polished stone dado or skirting in white cement complete : 1/2" thick (Badel, Silky black, Sunny white, Sunny Grey or eq) Rubber flooring, consisting of 12"x12"x1/8" rubber tiles laid on firm foundation 100 Sft 100 Sft 100 Sft

Rate (British System) Labour


3,472.00 3,472.00 1,581.00

Rate (Metric System) Unit


m2 m2 m2

Composite
5,110.34 5,572.56 4,601.77

Labour
373.59 373.59 170.12

Composite
549.87 599.61 495.15

Spec. No

Remarks

10-41-b

100 Sft

1,581.00

5,691.98

m2

170.12

612.46

10-42

100 Sft

1,144.06

12,744.33

m2

123.10

1,371.29

The cost of base for rubber floor is not included in the rate and is payable separately

10-43-a 10-43-b 10-43-c 10-43-d 10-44 10-45 10-46-a 10-46-b 10-47 10-48-a 10-48-b 10-48-c 10-48-d

Provide & fix glass strip 1.5" wide for dividing the floors into panels : 5mm thick Provide & fix glass strip 1.5" wide for dividing the floors into panels : 3mm thick Providing and Fixing marble strip 1.5 inch wide 3/8 inch thick for dividing the floor into panels Providing and Fixing marble strip 2" wide and 3/8" thick for dividing the floor into panels P/F Vinyl Tiles or Vinyl Sheet flooring over firm foundation P/F Precast Concrete 7000 psi TUFF Tiles over bed of 2" thick sand & 4" thick brick ballast comp P/F Ceramic Floor Tiles (Emco, National or eq) Size : 12" x 12" P/F Ceramic Floor Tiles (Emco, National or eq) Size 20" x 20" Burnt brick (1st class) pavement on edge grouted with sand including preparation of bed Porceline tile floor 1/4" thick laid cement 1:2 or 3/4" thick cement mortar 1:2 (Local Master Tiles) Porceline tile floor 1/4" thick laid cement 1:2 over 3/4" thick cement mortar 1:2 (Imported Tiles) Granitto tile floor 1/4" thick laid cement 1:2 or 3/4" thick cement mortar 1:2 (Imported Tiles UAE) 24"x24" Granitto tile floor 1/4" thick laid cement 1:2 or 3/4" thick cement mortar 1:2 (Imported Tiles UAE) 16"x16"

100 Rft 100 Rft 100 Rft 100 Rft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft

37.76 37.76 37.76 37.76 1,193.50 1,116.00 2,325.00 2,325.00 1,286.50 2,433.50 2,433.50 2,433.50 2,433.50

418.91 418.91 291.86 482.43 13,741.20 5,669.11 11,396.01 17,446.01 3,733.73 8,276.83 10,454.83 20,013.83 17,334.89

m m m m m2 m2 m2 m2 m2 m2 m2 m2 m2

1.24 1.24 1.24 1.24 128.42 120.08 250.17 250.17 138.43 261.84 261.84 261.84 261.84

13.74 13.74 9.58 15.83 1,478.55 610.00 1,226.21 1,877.19 401.75 890.59 1,124.94 2,153.49 1,865.23

NWFP CSR 2008 - Approved 25-Aug-2008

Page 51 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 10 :

FLOORING

Item Code
10-49-a

Description Unit
Providing and Laying marble fine dressed stone flooring on surface in white cement complete using indian green marble 12"x12"x3/4" thick Providing and Laying marble fine dressed stone flooring on surface in white cement complete using Trevera marble 12"x12"x3/4" thick Providing and Laying marble fine dressed stone flooring on surface in white cement complete using Botocina marble 12"x12"x3/4" thick Providing and Laying marble fine dressed stone flooring on surface in white cement complete using Veroona/Lasbela marble 12"x12"x3/4" thick Chemical polishing of marble floor/Dado Replaced coloured glass panes of sizes upto 4 mm thickness with iron, nails and putty including removing broken ones if required in all floors. 100 Sft

Rate (British System) Labour


2,852.00

Rate (Metric System) Unit


m2

Composite
28,440.35

Labour
306.88

Composite
3,060.18

Spec. No

Remarks

10-49-b

100 Sft

2,852.00

10,048.35

m2

306.88

1,081.20

10-49-c

100 Sft

2,852.00

12,105.35

m2

306.88

1,302.54

10-49-d

100 Sft

2,852.00

11,500.35

m2

306.88

1,237.44

10-50 10-51

100 Sft 1 Sft

558.00 21.70

1,616.75 106.40

m2 m2

60.04 233.49

173.96 1,144.86

NWFP CSR 2008 - Approved 25-Aug-2008

Page 52 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 11 :

SURFACE RENDERING

Item Code
11-01-a 11-01-b 11-02-a

Description Unit
Mud plaster on walls (excluding gobri leeping) upto 20' height : 1/2" thick Mud plaster on walls (excluding gobri leeping) upto 20' height : 1" thick Mud plaster on floor / roof (excluding gobri leeping) upto 20' height : 1/2" thick 100 Sft 100 Sft 100 Sft

Rate (British System) Labour


253.58 346.58 227.85

Rate (Metric System) Unit


m2 m2 m2

Composite
396.36 632.14 370.63

Labour
27.29 37.29 24.52

Composite
42.65 68.02 39.88

Spec. No

Remarks

Add extra 13%, 32% and 51% above the labour rates only or 6%, 15% and 23% on composite rates for 2nd, 3rd, 4th and subsequent floors respectively.

11-02-b 11-03-a 11-03-b 11-04-a 11-04-b 11-05 11-06-a 11-06-b 11-06-c 11-07-a

Mud plaster on floor / roof (excluding gobri leeping) upto 20' height : 1" thick Cement lime plaster 1:7:12 (c/l/s) upto 20' height 1/4" thick Cement lime plaster 1:7:12 (c/l/s) upto 20' height 1/2" thick Cement Neru plaster 1:2 (c/s) upto 20' height 1/4" thick Cement Neru plaster 1:2 (c/s) upto 20' height 1/2" thick 2" stucco cement plaster 1:2:4 (c/s/shingle) upto 20' height Provide/lay machine sprayed plaster 1/2" thick using cement & zero guage chips : Ratio 1:1 Provide/lay machine sprayed plaster 1/2" thick using cement & zero guage chips : Ratio 1:1.5 Provide/lay machine sprayed plaster 1/2" thick using cement & zero guage chips : Ratio 1:2 Cement plaster 1:2, upto 20' height 3/8" thick

100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft

429.04 790.50 790.50 790.50 790.50 1,788.70 581.87 587.45 599.54 790.50

714.60 929.41 1,068.56 1,212.23 1,512.00 3,436.96 1,761.14 1,681.14 1,649.94 1,250.66

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

46.16 85.06 85.06 85.06 85.06 192.46 62.61 63.21 64.51 85.06

76.89 100.00 114.98 130.44 162.69 369.82 189.50 180.89 177.53 134.57
The rate be allowed only on written orders of Superintending Engineer

11-07-b 11-07-c 11-08-a 11-08-b 11-08-c 11-09-a 11-09-b 11-09-c

Cement plaster 1:2, upto 20' height 1/2" thick Cement plaster 1:2, upto 20' height 3/4" thick Cement plaster 1:3 upto 20' height 3/8" thick Cement plaster 1:3 upto 20' height 1/2" thick Cement plaster 1:3 upto 20' height 3/4" thick Cement plaster 1:4 upto 20' height 3/8" thick Cement plaster 1:4 upto 20' height 1/2" thick Cement plaster 1:4 upto 20' height 3/4" thick

100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft

790.50 1,007.50 790.50 790.50 1,007.50 790.50 790.50 1,007.50

1,383.64 1,923.47 1,116.29 1,223.44 1,659.09 1,083.08 1,160.76 1,586.00

m2 m2 m2 m2 m2 m2 m2 m2

85.06 108.41 85.06 85.06 108.41 85.06 85.06 108.41

148.88 206.97 120.11 131.64 178.52 116.54 124.90 170.65

ditto

NWFP CSR 2008 - Approved 25-Aug-2008

Page 53 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 11 :

SURFACE RENDERING

Item Code
11-10-a

Description Unit
Cement plaster 3/8" thick under soffit of RCC roof slabs only upto 20' height : (1:2) 100 Sft

Rate (British System) Labour


1,007.50

Rate (Metric System) Unit


m2

Composite
1,360.82

Labour
108.41

Composite
146.42

Spec. No

Remarks
i) This item shall be applicable to building meant for human habitation only, such as building like residence, offices, educational institutions and hospitals etc. It shall no admissible on godowns, bins, agricultural, poultry etc. ii) The thickness of the plaster will not be more than 3/8" thick.

11-10-b

Cement plaster 3/8" thick under soffit of RCC roof slabs only upto 20' height : (1:3) Cement plaster 3/8" thick under soffit of RCC roof slabs only upto 20' height : (1:4) Cement plaster 1:5, upto 20' height 3/8" thick Cement plaster 1:5, upto 20' height 1/2" thick Cement Plaster 1:5, upto 20' height 3/4" thick Cement plaster 1:6, upto 20' height 3/8" thick Cement plaster 1:6, upto 20' height 1/2" thick Cement plaster 1:6, upto 20' height 3/4" thick Applying floating coat of cement 1/32" thick Lime pointing flush upto 20' height, including racking joints in lime sand mortar 1:2 Lime pointing struck joints on walls, upto 20' height including racking joints, in lime sand mortar 1:2 Cement pointing flush, upto 20' height Ratio 1:2 Cement pointing flush, upto 20' height Ratio 1:3 Cement pointing 1:2 flush, on floor Cement pointing struck joints, on walls, upto 20' height : Ratio 1:2 Cement pointing struck joints, on walls, upto 20' height : Ratio 1:3 Pointing flush on stone work, upto 20' height in lime sand mortar 1:2 (lime, sand) Pointing flush on stone work, upto 20' height in cement sand mortar 1:3 Pointing flush on stone work, upto 20' height On stone work raised : in lime sand mortar 1:2

100 Sft

1,007.50

1,353.91

m2

108.41

145.68

11-10-c 11-11-a 11-11-b 11-11-c 11-12-a 11-12-b 11-12-c 11-13 11-14 11-15 11-16-a 11-16-b 11-17-a 11-18-a 11-18-b 11-19-a 11-19-b 11-19-c-01

100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft

1,007.50 790.50 790.50 1,007.50 790.50 790.50 1,007.50 539.40 573.50 937.75 790.50 790.50 573.50 937.75 937.75 798.25 798.25 1,526.75

1,239.82 1,052.59 1,135.59 1,531.67 1,009.03 1,078.96 1,440.20 718.00 679.74 1,043.99 1,132.45 1,056.70 915.45 1,279.70 1,203.95 933.77 1,064.45 1,662.27

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

108.41 85.06 85.06 108.41 85.06 85.06 108.41 58.04 61.71 100.90 85.06 85.06 61.71 100.90 100.90 85.89 85.89 164.28

133.40 113.26 122.19 164.81 108.57 116.10 154.97 77.26 73.14 112.33 121.85 113.70 98.50 137.70 129.55 100.47 114.53 178.86

NWFP CSR 2008 - Approved 25-Aug-2008

Page 54 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 11 :

SURFACE RENDERING

Item Code
11-19-c-02 11-20 11-21 11-22 11-23-a-01 11-23-a-02 11-23-a-03 11-23-b-01 11-23-b-02 11-24-a-01 11-24-a-02 11-24-b-01 11-24-b-02 11-25-a-01 11-25-a-02 11-25-a-03 11-25-b-01 11-25-b-02 11-26-a 11-26-b 11-27

Description Unit
Pointing flush on stone work, upto 20' height On stone work raised : in c/s mortar 1:3 Racking and washing joints of stone masonry (old work) Racking and washing joints of brick masonry (old work) Priming coat of chalk under distemper Distempering New surface : One coat Distempering New surface : Two coats Distempering New surface : Three coats Distempering Old surface : One coat Distempering Old surface : Two coats Colour washing: New surface : One coat Colour washing: New surface : Two coats Colour washing: Old surface : One coat Colour washing: Old surface : Two coats White washing: New surface : One coat White washing: New surface : Two coats White washing: New surface : Three coats White washing: Old surface : One coat White washing: Old surface : Two coats Gobri leeping: On walls Gobri leeping: Over roofs Striking joints of burnt brick in lime or cement mortar 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft

Rate (British System) Labour


1,526.75 348.75 209.25 86.80 217.00 217.00 217.00 60.76 86.80 46.50 119.35 52.70 91.76 43.40 121.83 155.93 52.70 91.76 87.42 87.42 206.15

Rate (Metric System) Unit


m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

Composite
1,792.95 348.75 209.25 125.34 342.53 371.18 390.71 141.96 190.80 75.54 166.90 74.96 127.94 53.56 137.08 179.89 71.16 104.59 95.59 105.39 206.15

Labour
164.28 37.53 22.52 9.34 23.35 23.35 23.35 6.54 9.34 5.00 12.84 5.67 9.87 4.67 13.11 16.78 5.67 9.87 9.41 9.41 22.18

Composite
192.92 37.53 22.52 13.49 36.86 39.94 42.04 15.27 20.53 8.13 17.96 8.07 13.77 5.76 14.75 19.36 7.66 11.25 10.29 11.34 22.18

Spec. No

Remarks

Payable with fresh masonry when the face of the work is not to be plastered/pointed.

11-28 11-29 11-30 11-31 11-32-a 11-32-b 11-32-c

Extra for lime, mud or cement plaster & pointing from 20' & above for each additional 10' height Caulking joints of sleeper wall, with sand and coaltar Caulking joints of sleepers, with mud and chopped straw Extra cost of labour & material for red oxide pigment in cement pointing to match bricks Provide grooved c/s plaster 1:3 over existing plastered & roughened surface 3/8" thick Provide grooved c/s plaster 1:3 over existing plastered & roughened surface 1/2" thick Providing ornamental plaster 3/4" thick with (1:3) cement sand mortar on walls, columns chajja and slabs finished smooth including all charges for Labour and Material.

100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft

140.43 294.50 294.50 46.50 705.25 705.25 5,246.75

140.43 588.26 375.57 221.95 1,050.10 1,137.46 6,382.92

m2 m2 m2 m2 m2 m2 m2

15.11 31.69 31.69 5.00 75.88 75.88 564.55

15.11 63.30 40.41 23.88 112.99 122.39 686.80

NWFP CSR 2008 - Approved 25-Aug-2008

Page 55 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 11 :

SURFACE RENDERING

Item Code
11-32-d

Description Unit
Providing ornamental moulding of approved design in column with base/top and nosing and shade of lintle or pediments in cement mortar(1:3) 1-1/8" thick(1 feet under coat x 1/8" finish layer) including all charges for curing/finishing complete Provide & fit expanded metal edge bead for corners, with nails on both sides of edges Petty repairs to Fire Place Petty repairs to Verandah Petty repairs to Room upto 100 sft area Petty repairs to Room exceeding 100 sft area Extra labour for white washing, priming etc. from 20' height & above for every extra 10' height 100 Sft

Rate (British System) Labour


4,732.15

Rate (Metric System) Unit


m2

Composite
6,688.56

Labour
509.18

Composite
719.69

Spec. No

Remarks

11-33 11-34-a 11-34-b 11-34-c 11-34-d 11-35

1 RFT Each Each Each Each m3 / coat

4.23 136.40 195.30 136.40 224.75 0.93

18.81 317.90 401.00 438.90 648.25 0.93

m Each Each Each Each m3 / coat

13.89 136.40 195.30 136.40 224.75 0.93

61.70 317.90 401.00 438.90 648.25 0.93

The will be taken from the floor, roof or ground underneath as the case may be, on the side towards which the work is to be done

11-36 11-37

Providing and fixing of clad stones over 1/2" c/s mortar 1:1 incl curing etc. Supply & apply acrylic wall coating 10 to 12mm thick of approved quality over plastered surface

100 Sft 100 Sft

2,015.00 1,216.75

8,016.65 11,461.87

m2 m2

216.81 130.92

862.59 1,233.30
The rate of plastering over walls is not included in this rate and is to be paid separately.

11-38 11-39-a 11-39-b

P/F Ceramic Exterior Finish Tiles over 1/2" cement sand mortar 1:1 including curing complete Providing and fixing Chakwal tiles red colour in 1:3 cement mortar complete. Providing and fixing Chakwal tiles white colour in 1:3 cement mortar complete.

100 Sft 100 Sft 100 Sft

2,534.25 2,030.50 2,030.50

12,078.37 5,606.05 6,090.05

m2 m2 m2

272.69 218.48 218.48

1,299.63 603.21 655.29

NWFP CSR 2008 - Approved 25-Aug-2008

Page 56 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 12 :

WOOD WORK, WOODEN/ALUMINIUM JOINERY

Item Code
12-01-a 12-01-b 12-02-a 12-02-b 12-03-a 12-03-b 12-03-c 12-04-a-01

Description Unit
Plain wood work sawn, wrought, planed & fixed in position, including nails & screws : Deodar wood Plain wood work sawn, wrought, planed & fixed in position, including nails & screws : Shisham wood Plain woodwork for regulation karries or needles etc. complete as per specs : Deodar wood Plain woodwork for regulation karries or needles etc. complete as per specs : Shisham wood 1st class teak wood wrought joinery in doors & windows, panelled or glazed complete : 2" thick 1st class teak wood wrought joinery in doors & windows, panelled or glazed complete : 1.75" thick 1st class teak wood wrought joinery in doors & windows, panelled or glazed complete : 1.5" thick 1st class teak wood wrought joinery Teak wood frame 1.75" thick w/o spring/hinge Cft Cft Cft Cft 1 Sft 1 Sft 1 Sft 1 Sft

Rate (British System) Labour


364.25 511.50 264.12 423.15 136.18 136.18 136.18 84.55

Rate (Metric System) Unit


m3 m3 m3 m3 m2 m2 m2 m2

Composite
3,172.66 1,771.11 3,047.12 1,657.35 1,145.97 1,070.34 994.71 601.51

Labour
12,863.38 18,063.47 9,327.32 14,943.42 1,465.28 1,465.28 1,465.28 909.71

Composite
112,041.54 62,546.22 107,608.13 58,528.82 12,330.62 11,516.89 10,703.10 6,472.28

Spec. No

Remarks

a) This also includes the cost of woods required for extra thickness of chowkats.

12-04-a-02 12-04-b-01 12-04-b-02 12-04-c 12-04-d 12-05 12-06 12-07-a 12-07-b 12-07-c 12-08-a 12-08-b

1st class teak wood wrought joinery Teak wood frame 1.75" thick w/o spring/hinge 1st Class Teak Wood Wrought Joinery : Teak Wood framing 1.5" thick w/ wire guaze w/o springs 1st Class Teak Wood wrought joinery : Teak Wood framing 1.5" thick w/ wire guaze w/ springs 1st class teak wood wrought joinery GI wire guaze 22 SWG, fixed to chowkat 1st class teak wood wrought joinery GI wire guaze 22 SWG, fixed on teak wood frame Provide & fix exp. metal 1/2"-3/4" mesh, 16 guage fixed to chowkat, with 1" teak wood cover strips Provide & fix expanded metal 1/2" to 3/4", 16 guage fixed to chowkat with 1" cover moulding First class deodar wood wrought joinery in doors and windows etc. complete : 2" thick First class deodar wood wrought joinery in doors and windows etc. complete : 1-3/4" thick First class deodar wood wrought joinery in doors and windows etc. complete : 1.5" thick Deodar wood framed, braced & battened doors & windows : 2.25" thick, 1.25" battens & 1" planks Deodar wood framed, braced & battened doors & windows : 1.75" thick, 1" battens & 3/4" planks

1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft

84.55 84.55 84.55 30.35 45.53 30.35 30.35 83.59 83.59 67.81 97.31 74.72

613.51 522.78 536.51 189.79 445.04 189.79 189.79 724.33 637.91 601.39 733.84 600.24

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

909.71 909.71 909.71 326.61 489.92 326.61 326.61 899.42 899.42 729.66 1,047.01 803.97

6,601.40 5,625.09 5,772.88 2,042.16 4,788.66 2,042.16 2,042.16 7,793.83 6,863.86 6,470.91 7,896.15 6,458.58
Page 57 of 144

NWFP CSR 2008 - Approved 25-Aug-2008

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 12 :

WOOD WORK, WOODEN/ALUMINIUM JOINERY

Item Code
12-09 12-10 12-11-a 12-11-b 12-12-a 12-12-b 12-13-a-01 12-13-a-02 12-13-b-01 12-13-b-02 12-13-c 12-13-d 12-14 12-15-a 12-15-b 12-16 12-17-a 12-17-b 12-18-a-01 12-18-a-02 12-18-b-01 12-18-b-02

Description Unit
1" thick battened doors & windows fitted in position, complete with iron fittings Deodar wood battened ledged & braced doors & windows 2.25" thick complete Deodar wood doors framed with braces & 22 SWG GI sheet facing on one side complete Deodar wood doors framed with braces & 22 SWG GI sheet facing on both sides complete Partal wood doors framed with braces & 22 SWG GI sheet facing on one side complete Partal wood doors framed with braces & 22 SWG GI sheet facing on both sides complete First class deodar wood wrought joinery work Deodar wood frame 1-3/4" thick w/o springs First class deodar wood wrought joinery work Deodar wood frame 13/4" thick with springs First class deodar wood wrought joinery work Deodar wood frame 1.5" thick w/o springs First class deodar wood wrought joinery work Deodar wood frame 1" thick with springs First class deodar wood wrought joinery work GI wire guaze fixed to chowkat with 3/4" strip First class deodar wood wrought joinery work GI wire guaze fixed to chowkat with 1/2" strip Making and fixing trellis doors & windows of deodar wood complete. Provide & fix MS chowkat of doors, windows etc MS angle iron 1.5"x1.5"x1/4" welded with MS flat Provide & fix MS chowkat of doors, windows etc MS tee iron 1.5"x 1.5"x 1/4" welded with MS flat Extra for providing & fixing iron double spring hinges with brass fittings including finger plate etc P/F brass spring hinges to wire gauzed door. P/F hydraulic Door Closer (Best Quality) Providing and fixing sliding bolt to doors Iron sliding bolts : 10" long Providing and fixing sliding bolt to doors Iron sliding bolts : 12" long Providing and fixing sliding bolt to doors CP sliding bolts : 10" long Providing and fixing sliding bolt to doors CP sliding bolts : 12" long 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft Each Each Each Each Each Each

Rate (British System) Labour


56.04 83.40 38.75 38.75 27.37 38.75 71.62 71.62 71.62 71.62 30.35 30.35 64.58 20.65 20.76 20.67 43.40 89.90 43.71 43.71 361.77 43.71

Rate (Metric System) Unit


m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 Each Each Each Each Each Each

Composite
445.69 733.32 315.91 320.54 204.13 155.38 373.71 387.56 337.72 351.58 131.04 114.90 391.72 100.54 107.31 61.65 219.82 755.40 140.27 194.72 791.08 533.52

Labour
602.97 897.44 416.95 416.95 294.47 416.95 770.66 770.66 770.66 770.66 326.61 326.61 694.92 222.21 223.39 222.37 43.40 89.90 43.71 43.71 361.77 43.71

Composite
4,795.62 7,890.51 3,399.15 3,449.02 2,196.43 1,671.89 4,021.08 4,170.16 3,633.88 3,782.95 1,409.95 1,236.36 4,214.89 1,081.79 1,154.60 663.30 219.82 755.40 140.27 194.72 791.08 533.52

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 58 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 12 :

WOOD WORK, WOODEN/ALUMINIUM JOINERY

Item Code
12-18-c-01 12-18-c-02 12-19-a 12-19-b 12-20-a-01 12-20-a-02 12-20-b-01 12-20-b-02 12-21-a 12-21-b 12-22-a 12-22-b 12-23-a 12-23-b 12-24-a 12-24-b 12-24-c 12-25-a 12-25-b 12-25-c 12-26-a 12-26-b

Description Unit
Providing and fixing sliding bolt to doors Brass sliding bolts : 10" long Providing and fixing sliding bolt to doors Brass sliding bolts : 12" long Extra for brass fittings to doors & windows Deodar panelled, panelled+glazed or fully glazed Extra for brass fittings to doors & windows Deodar wood wire guazed shutters Extra for providing/fixing approved quality Rim locks : Imported Extra for providing/fixing approved quality Rim locks : Local Extra for providing/fixing approved quality Rim locks : Imported Extra for providing/fixing approved quality Rim locks : Local Provide & fix exp. metal 1/2"-3/4"mesh 16 gauge Fixed to chowkat with 1" deodar wood strip etc Provide & fix exp. metal 1/2"-3/4"mesh 16 gauge Fixed with 1" cover mould & screws including frame Provide & fix deodar wood almirah 9"-12" depth including boxing with back, shelves, shutters etc Provide & fix deodar wood almirah 9"-12" depth With shelves, shutters etc w/o boxing & back Provide & fix wooden box type wardrobe 22" deep Partal wood boxing & deodar wood shelves etc Provide & fix wooden box type wardrobe 22" deep Deodar wood boxing & deodar shelves etc Provide & fix chowkat for doors, windows & CS windows, including holdfast etc : Teak wood Provide & fix chowkat for doors, windows & CS windows, including holdfast etc : Shisham wood Provide & fix chowkat for doors, windows & CS windows, including holdfast etc : Deodar wood Make & fix deodar planking in eave boards etc planed on both sides complete : 1" thick Make & fix deodar planking in eave boards etc planed on both sides complete : 3/4" thick Make & fix deodar planking in eave boards etc planed on both sides complete : 1/2" thick Make & fix deodar wood shelves, incl brackets 1" thick Make & fix deodar wood shelves, incl brackets 1.5" thick Each Each 1 Sft 1 Sft Each Each Each Each 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft

Rate (British System) Labour


43.71 43.71 0.97 1.05 187.55 187.55 132.65 132.65 15.18 12.40 136.45 97.17 145.99 145.99 26.02 20.76 13.01 2,635.00 2,635.00 2,635.00 2,635.00 2,635.00

Rate (Metric System) Unit


Each Each m2 m2 Each Each Each Each m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

Composite
594.02 654.52 8.66 8.31 913.55 611.05 737.65 495.65 183.92 282.26 954.76 539.58 608.06 687.93 297.09 102.44 183.61 26,475.85 20,716.21 14,980.81 26,366.91 37,872.98

Labour
43.71 43.71 10.42 11.28 187.55 187.55 132.65 132.65 163.31 133.42 1,468.20 1,045.53 1,570.80 1,570.80 279.95 223.37 139.98 283.53 283.53 283.53 283.53 283.53

Composite
594.02 654.52 93.18 89.45 913.55 611.05 737.65 495.65 1,979.02 3,037.12 10,273.21 5,805.91 6,542.75 7,402.09 3,196.69 1,102.30 1,975.62 2,848.80 2,229.06 1,611.94 2,837.08 4,075.13

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 59 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 12 :

WOOD WORK, WOODEN/ALUMINIUM JOINERY

Item Code
12-26-c 12-27-a 12-27-b 12-27-c 12-27-d 12-28-a 12-28-b 12-29 12-30-a 12-30-b 12-31-a 12-31-b 12-32 12-33 12-34 12-35 12-36 12-37-a-01 12-37-a-02 12-37-a-03 12-37-b-01 12-37-b-02 12-37-b-03 12-38-a 12-38-b

Description Unit
Make & fix deodar wood shelves, incl brackets 2" thick Make & fix cleats for doors & windows including hinges and screws. Make & fix cleats with brass hooks for roof ventilators Make & fix Door stops of 1.5" dia rubber block Make & fix GI hook with clamps for doors Teak wood railing of any shape & design including bends, corners, polishing etc complete Shisham wood railing of any shape & design including bends, corners, polishing etc complete Deodar wood dado or picture rail 3"x1.5" as per approved design, including moulding etc. complete Sawing wood by hand : Soft wood (deodar, kail or chir) Sawing wood by hand : Hard wood (shisham, kikar, teak or sahl) Sawing wood by machine : Soft Wood Sawing wood by machine : Hard Wood Making and fixing sun-shade of deodar wood including fixing brackets Making and fixing 1" thick kail or chir wooden notice board with frame Making deodar punkha pole 10'x6"x6" Dismantling and refixing eave boards Wooden stair-cases complete 2'-3' wide frame 1.5" thick planks of deodar wood including hand rails Providing and fixing partition including framework : Sheet on one side of frame : Hard board Providing and fixing partition including framework : Sheet on one side of frame : Ply wood 1/4" thick Providing and fixing partition including framework : Sheet on one side of frame : Masonite Providing and fixing partition including framework : Sheets on both sides of frame : Hard board Providing and fixing partition including framework : Sheets on both sides of frame : Ply wood 1/4" Providing and fixing partition including framework : Sheets on both sides of frame : Masonite Providing and fixing ceiling, including frame work : Hard board Providing and fixing ceiling, including frame work : Chip Board 100 Sft 1 No 1 No Each Each 1 RFT 1 RFT 1 RFT 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 1 SFT Each 1 RFT 1 RFT 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft

Rate (British System) Labour


2,635.00 36.42 36.42 21.70 26.04 124.81 124.81 51.06 837.00 1,674.00 452.14 488.28 3,363.50 40.47 307.61 14.47 145.70 868.00 868.00 868.00 1,596.50 1,596.50 1,596.50 2,294.00 2,294.00

Rate (Metric System) Unit


m2 each no Each Each m m m m2 m2 m2 m2 m2 m2 Each m m m2 m2 m2 m2 m2 m2 m2 m2

Composite
49,379.05 85.09 83.25 100.35 56.29 898.83 412.16 242.60 837.00 1,674.00 452.14 488.28 32,138.51 112.73 6,339.46 14.47 1,862.59 5,897.36 6,230.11 8,745.10 7,431.72 8,056.08 12,668.00 7,323.36 9,747.60

Labour
283.53 36.42 36.42 21.70 26.04 409.47 409.47 167.51 90.06 180.12 48.65 52.54 361.91 435.48 307.61 47.46 478.02 93.40 93.40 93.40 171.78 171.78 171.78 246.83 246.83

Composite
5,313.19 85.09 83.25 100.35 56.29 2,948.93 1,352.23 795.93 90.06 180.12 48.65 52.54 3,458.10 1,212.99 6,339.46 47.46 6,110.85 634.56 670.36 940.97 799.65 866.83 1,363.08 787.99 1,048.84

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 60 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 12 :

WOOD WORK, WOODEN/ALUMINIUM JOINERY

Item Code
12-38-c 12-38-d 12-39-a-01 12-39-a-02 12-39-b-01 12-39-b-02 12-40 12-41-a 12-41-b 12-42-a 12-42-b 12-42-c 12-43-a 12-43-b 12-44-a 12-44-b 12-45-a 12-45-b 12-46-a 12-46-b 12-47 12-48 12-49

Description Unit
Providing and fixing ceiling, including frame work : Ply wood 1/4" thick Providing and fixing ceiling, including frame work : Masonite Provide & fix, thermorpore false ceiling complete Deodar wood frame panelling : 3/4" thick Provide & fix, thermorpore false ceiling complete Deodar wood frame panelling : 1" thick Provide & fix, thermorpore false ceiling complete Partal wood frame panelling : 3/4" thick Provide & fix, thermorpore false ceiling complete Partal wood frame panelling : 1" thick Supply and Fixing accoustic miller fibre tile ceiling fixed with aluminium tee hung by GI wire fixed in roof Fixing Door including chowkats Fixing Windows including chowkats Glazing with panes (16-18 oz) including cost of putty Glazing with panes (16-18 oz) using deodar wooden fillets & putty Glazing with panes (24-26 oz) using putty & deodar wooden fillets Cutting to required size & fixing glass panes with putty. Cutting to required size & fixing glass panes Using deodar wood fillets & putty Glazing with plate glass 6 mm thick including cost of deodar wood fillet & putty : Upto 0.75 m2 Glazing with plate glass 6 mm thick including cost of deodar wood fillet & putty : 0.75m2 to 2.25 m2 1.5" thick deodar doors & windows, chowkat of MS angle iron 1.5"x1.5"x1/4" welded with MS flat 1.5" thick deodar doors & windows, chowkat of MS tee iron 1.5"x 1.5"x 1/4" welded with MS flat 1.5" thick hollow flush door/window, chowkat of MS angle iron 1.5"x1.5"x1/4" welded with MS flat 1.5" thick hollow flush door/window, chowkat of MS tee iron 1.5"x 1.5"x 1/4" welded with MS flat Panelled door of MS sheet with forged door leaves of MS sheet 22 SWG etc complete 24 SWG aluminium kick plate 4" high, on bottom rail of flush doors of commercial ply Curtain railing to doors & windows comprising TOSO-elite Japanese railing or equiv. including paint 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft Each Each 1 Sft 1 Sft 1 Sft 100 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 RFT 1 RFT

Rate (British System) Labour


2,294.00 2,294.00 1,736.00 1,736.00 1,736.00 1,736.00 1,444.60 364.25 182.13 13.84 19.38 19.38 193.75 3.75 23.41 23.41 104.08 114.59 88.53 87.53 146.20 23.01 22.87

Rate (Metric System) Unit


m2 m2 m2 m2 m2 m2 m2 Each Each m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m m

Composite
7,621.63 10,715.60 12,390.05 14,350.25 8,572.50 9,398.33 29,660.59 364.25 182.13 40.97 62.07 62.07 390.38 15.64 102.77 101.87 609.05 590.47 471.92 432.50 445.52 34.97 100.52

Labour
246.83 246.83 186.79 186.79 186.79 186.79 155.44 364.25 182.13 148.91 208.48 208.48 20.85 40.30 251.93 251.92 1,119.88 1,232.95 952.63 941.78 1,573.06 75.50 75.02

Composite
820.09 1,153.00 1,333.17 1,544.09 922.40 1,011.26 3,191.48 364.25 182.13 440.85 667.82 667.82 42.00 168.30 1,105.85 1,096.08 6,553.34 6,353.49 5,077.81 4,653.75 4,793.83 114.72 329.80

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 61 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 12 :

WOOD WORK, WOODEN/ALUMINIUM JOINERY

Item Code
12-50 12-51 12-52-a 12-52-b 12-52-c 12-52-d 12-53-a-01 12-53-a-02 12-53-a-03 12-53-a-04 12-53-b-01 12-53-b-02 12-53-b-03 12-53-b-04 12-53-b-05 12-53-b-06 12-53-b-07 12-53-b-08 12-53-b-09 12-53-b-10 12-53-c-01

Description Unit
MS flat 1/2"x1/8" grill in windows of approved design including painting 3 coats, complete Provide & fix GI wire gauze 22 SWG, 12x12 mesh per sq. in, fixed to steel window complete Hollow flush door 1.5"-2" thick including iron mongery excluding chowkat & lock : Teak veneered Hollow flush door 1.5"-2" thick including iron mongery excluding chowkat & lock : Shisham veneered Hollow flush door 1.5"-2" thick including iron mongery excluding chowkat & lock : Deodar veneered Hollow flush door 1.5"-2" thick including iron mongery excluding chowkat & lock : Commercial veneered Supply and Fixing aluminium door/window, Economy model Sliding window Supply and Fixing aluminium door/window, Economy model Hinges window Supply and Fixing aluminium door/window, Economy model Fixed louver in door frame Supply and Fixing aluminium door/window, Economy model Fixed louver in 2" frame Supply and Fixing aluminium door/window, Deluxe 3" sect. Sliding window Supply and Fixing aluminium door/window, Deluxe 3" sect. Hinges window Supply and Fixing aluminium door/window, Deluxe 3" sect. Fixed glazing Supply and Fixing aluminium door/window, Deluxe 3" sect. Fixed arch Supply and Fixing aluminium door/window, Deluxe 3" sect. Fixed louvers Supply and Fixing aluminium door/window, Deluxe 3" sect. Sliding door Supply and Fixing aluminium door/window, Deluxe 3" sect. Swing door single action (short handle) Supply and Fixing aluminium door/window, Deluxe 3" sect. Swing door single action (long handle) Supply and Fixing aluminium door/window, Deluxe 3" sect. Swing door double action (short handle) Supply and Fixing aluminium door/window, Deluxe 3" sect. Swing door double action (short handle) Supply and Fixing aluminium door/window, Deluxe 3.5" sect. Sliding window 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft

Rate (British System) Labour


23.12 32.12 17.52 17.52 17.50 17.52 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33

Rate (Metric System) Unit


m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

Composite
166.45 140.67 416.17 384.71 404.04 367.76 283.43 416.53 470.87 356.03 416.53 416.53 356.03 356.03 410.37 443.70 423.67 434.47 423.67 396.49 416.53

Labour
248.79 345.65 188.52 188.52 188.32 188.53 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58

Composite
1,790.98 1,513.62 4,478.04 4,139.53 4,347.43 3,957.06 3,049.70 4,481.85 5,066.56 3,830.87 4,481.85 4,481.85 3,830.87 3,830.87 4,415.63 4,774.23 4,558.65 4,674.85 4,558.65 4,266.27 4,481.85

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 62 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 12 :

WOOD WORK, WOODEN/ALUMINIUM JOINERY

Item Code
12-53-c-02 12-53-c-03 12-53-c-04 12-53-c-05 12-53-c-06 12-53-c-07 12-53-d-01 12-53-d-02 12-53-d-03 12-53-d-04 12-53-d-05 12-53-d-06 12-53-d-07 12-53-d-08 12-53-d-09 12-53-e-01 12-53-e-02 12-53-e-03 12-54-a-01 12-54-a-02 12-54-a-03

Description Unit
Supply and Fixing aluminium door/window, Deluxe 3.5" sect. Hinges window Supply and Fixing aluminium door/window, Deluxe 3.5" sect. Fixed glazing Supply and Fixing aluminium door/window, Deluxe 3.5" sect. Fixed arch Supply and Fixing aluminium door/window, Deluxe 3.5" sect. Sliding door Supply and Fixing aluminium door/window, Deluxe 3.5" sect. Swing door single action (short handle) Supply and Fixing aluminium door/window, Deluxe 3.5" sect. Swing door single action (long handle) Supply and Fixing aluminium door/window, Premium 4" sect. Sliding window Supply and Fixing aluminium door/window, Premium 4" sect. Hinges window Supply and Fixing aluminium door/window, Premium 4" sect. Fixed glazing Supply and Fixing aluminium door/window, Premium 4" sect. Fixed arch Supply and Fixing aluminium door/window, Premium 4" sect. Sliding door Supply and Fixing aluminium door/window, Premium 4" sect. Swing door single action (short handle) Supply and Fixing aluminium door/window, Premium 4" sect. Swing door single action (long handle) Supply and Fixing aluminium door/window, Premium 4" sect. Swing door double action (short handle) Supply and Fixing aluminium door/window, Premium 4" sect. Swing door double action (long handle) Supply and Fixing aluminium door/window. Other items : Fly screen shutter for Deluxe model Supply and Fixing aluminium door/window. Other items : Fly screen shutter for Premium model Supply and Fixing aluminium door/window. Other items : Fly screen shutter with separate outer frame Supply and Fixing aluminium bronze/black. Economy model Sliding window Supply and Fixing aluminium bronze/black. Economy model Hinges window Supply and Fixing aluminium bronze/black. Economy model Fixed louver in door frame 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft

Rate (British System) Labour


29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 6.20 6.20 6.20 29.33 29.33 29.33

Rate (Metric System) Unit


m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

Composite
416.53 416.53 356.03 443.68 410.37 423.58 474.56 467.47 416.53 391.12 485.20 410.37 423.67 580.82 594.41 308.70 272.40 369.20 416.53 416.53 505.46

Labour
315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 66.71 66.71 66.71 315.58 315.58 315.58

Composite
4,481.85 4,481.85 3,830.87 4,774.01 4,415.63 4,557.69 5,106.21 5,029.98 4,481.85 4,208.45 5,220.72 4,415.63 4,558.65 6,249.66 6,395.87 3,321.61 2,931.02 3,972.59 4,481.85 4,481.85 5,438.73

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 63 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 12 :

WOOD WORK, WOODEN/ALUMINIUM JOINERY

Item Code
12-54-a-04 12-54-b-01 12-54-b-02 12-54-b-03 12-54-b-04 12-54-b-05 12-54-b-06 12-54-b-07 12-54-b-08 12-54-b-09 12-54-b-10 12-54-c-01 12-54-c-02 12-54-c-03 12-54-c-04 12-54-c-05 12-54-c-06 12-54-c-07 12-54-d-01 12-54-d-02 12-54-d-03

Description Unit
Supply and Fixing aluminium bronze/black. Economy model Fixed louver in 2" frame Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Sliding window Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Hinges window Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Fixed glazing Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Fixed arch Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Fixed louvers Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Sliding door Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Swing door single action (short handle) Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Swing door single action (long handle) Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Swing door double action (short handle) Supply and Fixing aluminium bronze/black. Deluxe 3" sect. Swing door double action (long handle) Supply and Fixing aluminium bronze/black. Deluxe 3.5" sect. Sliding window Supply and Fixing aluminium bronze/black. Deluxe 3.5" sect. Hinges window Supply and Fixing aluminium bronze/black. Deluxe 3.5" sect. Fixed glazing Supply and Fixing aluminium bronze/black. Deluxe 3.5" sect. Fixed arch Supply and Fixing aluminium bronze/black. Deluxe 3.5" sect. Sliding door Supply and Fixing aluminium bronze/black. Deluxe 3.5" sect. Swing door single action (short handle) Supply and Fixing aluminium bronze/black. Deluxe 3.5" sect. Swing door single action (long handle) Supply and Fixing aluminium bronze/black. Premium 4" sect. Sliding window Supply and Fixing aluminium bronze/black. Premium 4" sect. Hinges window Supply and Fixing aluminium bronze/black. Premium 4" sect. Fixed glazing 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft

Rate (British System) Labour


29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33 29.33

Rate (Metric System) Unit


m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

Composite
505.46 416.53 416.53 356.03 356.03 505.46 478.29 444.96 396.49 620.50 581.76 416.53 416.53 356.03 356.03 478.29 444.96 423.67 416.53 416.53 356.03

Labour
315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58 315.58

Composite
5,438.73 4,481.85 4,481.85 3,830.87 3,830.87 5,438.73 5,146.35 4,787.75 4,266.27 6,676.60 6,259.78 4,481.85 4,481.85 3,830.87 3,830.87 5,146.35 4,787.75 4,558.65 4,481.85 4,481.85 3,830.87

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 64 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 12 :

WOOD WORK, WOODEN/ALUMINIUM JOINERY

Item Code
12-54-d-04 12-54-d-05 12-54-d-06 12-54-d-07 12-54-d-08 12-54-d-09 12-54-e-01 12-54-e-02 12-54-e-03 12-55-a 12-55-b 12-55-c 12-56-a

Description Unit
Supply and Fixing aluminium bronze/black. Premium 4" sect. Fixed arch Supply and Fixing aluminium bronze/black. Premium 4" sect. Sliding door Supply and Fixing aluminium bronze/black. Premium 4" sect. Swing door single action (short handle) Supply and Fixing aluminium bronze/black. Premium 4" sect. Swing door single action (long handle) Supply and Fixing aluminium bronze/black. Premium 4" sect. Swing door double action (short handle) Supply and Fixing aluminium bronze/black. Premium 4" sect. Swing door double action (long handle) Supply and Fixing aluminium bronze/black. Other items : Fly screen shutter for Deluxe model Supply and Fixing aluminium bronze/black. Other items : Fly screen shutter for Premium model Supply and Fixing aluminium bronze/black. Other items : Fly screen shutter with separate outer frame Wall Panelling over 0.5" thick chipboard & wood frame (2"x0.75") 2'x2' grid : Sheesham Ply Wall Panelling over 0.5" thick chipboard & wood frame (2"x0.75") 2'x2'grid : Lamination Sheet Wall Panelling over 0.5" thick chipboard & wood frame (2"x0.75") 2'x2' grid : Commercial Ply Supply and Fixing MS Sheet 16 guage(10x20 feet) box type chowkats including fixing in position with all charges for Hold fast, Hinges and Painting etc Wood plastic composite door patio door leap delux (laker coated) Wood plastic composite door patio door leap premium grade ( UV coated ) Wood plastic composite door patio door with frame and beading deluxe grade (laker coated) Wood plastic composite patio door with frame and beading premium grade(UV coated) Wood plastic composite door bukhara flush door steppe type Wood plastic composite door rock type single side door Wood plastic composite door rock type double side door Wood plastic composite door image type single side door Wood plastic composite door carving type single side door Composite windows deluxe grade (laker coated) 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 RFT

Rate (British System) Labour


29.33 29.33 29.33 29.33 29.33 29.33 6.20 6.20 6.20 46.52 34.86 46.51 30.95

Rate (Metric System) Unit


m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m

Composite
356.03 478.29 444.96 423.67 615.41 594.12 308.70 272.40 248.20 105.72 135.87 96.69 161.18

Labour
315.58 315.58 315.58 315.58 315.58 315.58 66.71 66.71 66.71 500.54 375.06 500.42 101.53

Composite
3,830.87 5,146.35 4,787.75 4,558.65 6,621.78 6,392.68 3,321.61 2,931.02 2,670.63 1,137.60 1,461.94 1,040.33 528.82

Spec. No

Remarks

12-56-b 12-56-c 12-56-d 12-56-e 12-57-a 12-57-b 12-57-c 12-58-a 12-59-a 12-60-a

1 RFT 1 RFT 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft

41.33 41.33 35.74 35.74 35.74 35.74 35.74 35.74 35.74 15.68

319.81 341.13 710.63 710.63 551.94 829.90 934.63 934.63 934.63 681.02

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

444.75 444.75 384.59 384.59 384.59 384.59 384.59 384.59 384.59 168.71

3,441.11 3,670.51 7,646.33 7,646.33 5,941.10 8,933.00 10,056.62 10,056.62 10,056.62 7,327.74
Page 65 of 144

NWFP CSR 2008 - Approved 25-Aug-2008

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 12 :

WOOD WORK, WOODEN/ALUMINIUM JOINERY

Item Code
12-60-b 12-61-a 12-61-b 12-62-a 12-62-b 12-62-c

Description Unit
Composite windows premium grade (UV coated) Wood Plastic Fly Screen Delux Grade Wood Plastic Screen Premium Grade Kitchen Floor Cabinet as per MES Design/Specification.. Kitchen Wall Cabinet as per MES Design/Specification. Providing and Fixing Sink Cabinet as per MES Design/Specification. 1 Sft 1 Sft 1 Sft 1 Sft 1 Sft Each

Rate (British System) Labour


15.62 18.58 18.58 108.50 86.80 1,302.00

Rate (Metric System) Unit


m2 m2 m2 m2 m2 each

Composite
734.46 276.95 276.95 642.87 518.16 5,735.14

Labour
168.11 200.00 200.00 1,167.46 933.97 1,302.00

Composite
7,902.00 2,980.00 2,980.00 6,917.24 5,575.46 5,735.14

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 66 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 13 :

PAINTING AND VARNISHING

Item Code
13-01 13-02 13-03 13-04 13-05-a-01 13-05-a-02 13-05-b-01 13-05-b-02 13-05-c-01 13-05-c-02 13-05-d-01 13-05-d-02 13-05-e-01 13-05-e-02 13-05-f-01 13-05-f-02 13-05-g-01 13-05-g-02 13-06-a-01 13-06-a-02 13-06-b-01 13-06-b-02 13-06-c-01

Description Unit
Cleaning painted woodwork with oil & water Oiling woodwork with boiled linseed oil Brushing & scraping blisters of old paints from woodwork Scraping, brushing and removing old paint, from metal surface Painting old corrugated surfaces, pent roofing etc. with oil paint : First coat Painting old corrugated surfaces, pent roofing etc. with oil paint : Each subsequent coat Painting old surfaces : Sashes, fanlights, doors or windows : First coat Painting old surfaces : Sashes, fanlights, doors or windows : Each subsequent coat Painting old surfaces : Doors / windows any type First coat Painting old surfaces : Doors / windows any type Each subsequent coat Painting old surfaces : Guard bars, gratings, railing & similar open work : First coat Painting old surfaces : Guard bars, gratings, railing & similar work : Each subsequent coat Painting old surfaces : Fillets, framing, skirting pipes, etc. less than 6" girth : First coat Painting old surfaces : Fillets, framing, skirting pipes, etc. less than 6" girth : Each subseq. coat Painting old surfaces : Small detached articles Not exceeding 1 sft : First coat Painting old surfaces : Small detached articles Not exceeding 1 sft : Each subsequent coat Painting old surfaces : Small detached articles 1sft-3sft area : First coat Painting old surfaces : Small detached articles 1sft-3sft area : Each subsequent coat Prepare & Paint new corrugated surface, pent roofing etc : Priming coat Prepare & Paint new corrugated surface, pent roofing etc : Each subsequent coat of paint Prepare & Paint new surface, sashes, doors & windows etc : Priming coat Prepare & Paint new surface, sashes, doors & windows etc : Each subsequent coat of paint Prepare & Paint new surface, doors & windows Priming coat 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Rft 100 Rft 100 No. 100 No. 100 No. 100 No. 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft

Rate (British System) Labour


62.00 62.00 139.50 558.00 286.44 217.00 173.60 147.56 286.44 217.00 173.60 147.56 147.56 104.16 658.75 511.50 1,317.50 728.50 327.98 169.57 194.68 104.16 327.98

Rate (Metric System) Unit


m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m m 100 No. 100 No. 100 No. 100 No. m2 m2 m2 m2 m2

Composite
116.45 119.47 139.50 558.00 561.11 437.10 336.65 283.32 561.11 437.10 336.65 283.32 285.92 215.24 1,156.67 840.74 2,267.96 1,306.88 714.27 501.29 442.06 311.86 714.27

Labour
6.67 6.67 15.01 60.04 30.82 23.35 18.68 15.88 30.82 23.35 18.68 15.88 4.84 3.42 658.75 511.50 1,317.50 728.50 35.29 18.25 20.95 11.21 35.29

Composite
12.53 12.86 15.01 60.04 60.38 47.03 36.22 30.49 60.38 47.03 36.22 30.49 9.38 7.06 1,156.67 840.74 2,267.96 1,306.88 76.86 53.94 47.57 33.56 76.86

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 67 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 13 :

PAINTING AND VARNISHING

Item Code
13-06-c-02 13-06-d-01 13-06-d-02 13-06-e-01 13-06-e-02 13-06-f-01 13-06-f-02 13-06-g-01 13-06-g-02 13-06-h 13-06-i

Description Unit
Prepare & Paint new surface, doors & windows Each subsequent coat of paint Prepare & Paint new surfaces of guard bars, railing & similar open work : Priming coat Prepare & Paint new surfaces of guard bars, railing & similar work : Each subsequent coat Prepare & Paint new surface of fillets, framing, skirtings etc : Priming coat Prepare & Paint new surface of fillets, framing, skirtings etc : Each subsequent coat of paint Prepare & Paint new surface of small detached articles upto 1 sft : Priming coat Prepare & Paint new surface of small detached articles upto 1 sft : Each subsequent coat Prepare & paint surf. of small detached articles 1sft - 3sft area : Priming coat Prepare & paint surf. of small detached articles 1sft - 3sft area : Subsequent coat of paint Extra for knotting & stopping to prime coat on new surface of wood Providing and applying 3 coats of approved type of Plastic emulsion paint to Plastic surface as per manufucture specification. Khanki mixture, applied hot to barrage gates First coat Khanki mixture, applied hot to barrage gates Second coat French polishing complete: On new work French polishing complete: On old work Varnishing wood work, including cleaning & preparing surface : First coat Varnishing wood work, including cleaning & preparing surface : Second coat Varnishing wood work, including cleaning & preparing surface : Third coat Bitumen coating to plastered / cement concrete surface : 20 Ibs. per 100 sft. Bitumen coating to plastered / cement concrete surface : 14 Ibs. per 100 sft. Bitumen coating to plastered / cement concrete surface : 10 Ibs. per 100 sft. Writing letters or figures Coaltar paint applied hot: First coat Coaltar paint applied hot: Second coat 100 Sft 100 Sft 100 Sft 100 Rft 100 Rft 100 No. 100 No. 100 No. 100 No. 100 Sft 100 Sft

Rate (British System) Labour


169.57 194.68 104.16 147.56 69.44 651.00 327.67 1,309.75 581.25 35.34 868.00

Rate (Metric System) Unit


m2 m2 m2 m m 100 No. 100 No. 100 No. 100 No. m2 m2

Composite
501.29 411.21 281.00 328.52 218.15 1,366.11 906.35 2,700.65 1,624.88 114.60 2,575.50

Labour
18.25 20.95 11.21 4.84 2.28 651.00 327.67 1,309.75 581.25 3.80 93.40

Composite
53.94 44.25 30.24 10.78 7.16 1,366.11 906.35 2,700.65 1,624.88 12.33 277.12

Spec. No

Remarks

13-07-a 13-07-b 13-08-a 13-08-b 13-09-a 13-09-b 13-09-c 13-10-a 13-10-b 13-10-c 13-11 13-12-a 13-12-b

2000 Sft 2000 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft Each 100 Sft 100 Sft

4,340.00 3,279.80 2,790.00 1,395.00 173.60 86.80 86.80 86.80 520.80 347.20 5.15 102.30 62.00

8,641.00 6,471.59 3,872.10 1,950.74 482.62 323.79 282.09 661.40 947.60 675.39 6.16 703.48 400.94

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 Each m2 m2

23.35 17.65 300.20 150.10 18.68 9.34 9.34 9.34 56.04 37.36 5.15 11.01 6.67

46.49 34.82 416.64 209.90 51.93 34.84 30.35 71.17 101.96 72.67 6.16 75.69 43.14
Page 68 of 144

NWFP CSR 2008 - Approved 25-Aug-2008

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 13 :

PAINTING AND VARNISHING

Item Code
13-13-a 13-13-b 13-14-a 13-14-b 13-15 13-16 13-17 13-18 13-19 13-20 13-21-a

Description Unit
Solignum paint applied hot: First coat Solignum paint applied hot: Second coat Creosote paint applied hot: First coat Creosote paint applied hot: Second coat Burning off or rubbing down with pumice stone, old paint from wood work Removing with caustic soda,old paint from wood work Painting distance marks with white ground and black letterin on both faces Painting two feet wide gauges, reading to 1/10th of a foot. Painting sounding rods and other guages, reading to 1/10th of a foot Painting levelling staves Painting & lettering (2 coats) on both sides with syn. enamel paint : Mile/km posts 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft Each

Rate (British System) Labour


194.37 100.13 194.37 100.13 356.50 139.50 26.50 5,821.95 2,910.98 8,704.57 217.00

Rate (Metric System) Unit


m2 m2 m2 m2 m2 m2 Each m m m Each

Composite
626.95 799.51 471.58 285.93 561.09 187.90 65.13 6,873.51 3,310.64 9,230.92 317.13

Labour
20.91 10.77 20.91 10.77 38.36 15.01 26.50 191.01 95.50 285.58 217.00

Composite
67.46 86.03 50.74 30.77 60.37 20.22 65.13 225.51 108.62 302.85 317.13

Spec. No

Remarks

100 RFT 100 RFT 100 RFT Each

The ratio in the rate of 1st coat to 2nd coat is 60 % to 40 % in the labour as well as composite rate

13-21-b 13-21-c 13-22 13-23-a 13-23-b 13-24 13-25 13-26 13-27 13-28 13-29 13-30-a 13-30-b 13-31 13-33

Painting & lettering (2 coats) on both sides with syn. enamel paint : Furlong or 1/10 km posts Painting & lettering (2 coats) on both sides with syn. enamel paint : Sign posts Removing paint or varnish from wall Scraing of Khanki paint from barrage gates Scraping of Aluminium paint from barrage headworks Painting letters with shade Scraping rust from old rails or girders Chiselling old paint from brick work Cleaning glasses with chalk and spirit etc Cleaning and oiling rafter or rolled steel beams Cleaning and painting punkha poles, including fixing hooks Preparing surface and painting with emulsion paint : First coat Preparing surface and painting with emulsion paint : 2nd & each subsequent coat. Pavement Marking using Reflective Chlorinated Rubber Paint with Glass Beads as per specification Repainting of ceiling fan (all sizes & types) incl painting of blades, canopy etc with syn. enamel

Each Each 100 Sft 100 Sft 100 Sft letter 100 Sft 100 Sft 100 Sft 100 Sft Each 100 Sft 100 Sft 100 Sft Job

27.17 286.44 279.00 3.49 69.75 13.89 418.50 558.00 279.00 139.50 279.00 347.20 173.60 573.50 41.23

39.72 386.57 279.00 76.09 142.35 18.95 491.10 630.60 351.60 146.84 300.27 793.33 336.83 3,431.76 129.87

Each Each m2 m2 m2 letter m2 m2 m2 m2 Each m2 m2 m2 Job

27.17 286.44 30.02 0.38 7.51 13.89 45.03 60.04 30.02 15.01 279.00 37.36 18.68 61.71 41.23

39.72 386.57 30.02 8.19 15.32 18.95 52.84 67.85 37.83 15.80 300.27 85.36 36.24 369.26 129.87

NWFP CSR 2008 - Approved 25-Aug-2008

Page 69 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 13 :

PAINTING AND VARNISHING

Item Code
13-34 13-35-a 13-35-b 13-35-c 13-36 13-37

Description Unit
Repainting of iron poles with cross arms, with bitumen or other approved paint Repainting of pipes and specials of GI, MS or PVC conduit etc : Upto 1.5" i/d Repainting of pipes and specials of GI, MS or PVC conduit etc : From 1.5" to 2" i/d Repainting of pipes and specials of GI, MS or PVC conduit etc : From 2" to 4" i/d Repainting main switches & branch distribution boards of all sizes & types with approved paint Extra labour for painting, varnishing etc from 20' height & above, for every additional 10' Job

Rate (British System) Labour


286.75 179.57 269.36 359.15 44.17 50.22

Rate (Metric System) Unit


Job m m m Job m2

Composite
348.25 370.47 631.35 777.41 88.04 50.22

Labour
286.75 5.89 8.84 11.78 44.17 5.40

Composite
348.25 12.15 20.71 25.51 88.04 5.40

Spec. No

Remarks

100 RFT 100 RFT 100 RFT Job 100/coat

The height will be taken from the floor, road or ground underneath, as the case may be, on side towards which the work is to be done.

13-38-a 13-38-b

Preparing surface & painting with snowcem / weathershield paint : First coat Preparing surface & painting with snowcem / weathershield paint : 2nd & subsequent coats

100/coat 100/coat

434.00 217.00

811.04 422.10

m2 m2

46.70 23.35

87.27 45.42

NWFP CSR 2008 - Approved 25-Aug-2008

Page 70 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 14 :

PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS

Item Code
14-01-a 14-01-b 14-02-a 14-02-b 14-03-a 14-03-b 14-04 14-05-a-01 14-05-a-02 14-05-a-03 14-05-a-04 14-05-b-01 14-05-b-02 14-05-b-03 14-05-b-04 14-06-a 14-06-b 14-06-c 14-06-d 14-06-e 14-07 14-08-a

Description Unit
Providing and Fixing glazed earthen ware WC European type excluding cost of seat & cover : White Providing and Fixing glazed earthen ware WC European type excluding cost of seat & cover : Coloured Providing and Fixing double seat & cover only : Bakelite Providing and Fixing double seat & cover only : Plastic Providing and Fixing glazed earthen ware WC squatting type with built-in foot rests : White Providing and Fixing glazed earthen ware WC squatting type with built-in foot rests : Coloured Providing and Fixing white glazed earthernware WC squatting type with separate foot rests Providing and Fixing glazed earthen ware WHB complete Size 22"x16" : White with pedestal Providing and Fixing glazed earthen ware WHB complete Size 22"x16" : Coloured with pedestal Providing and Fixing glazed earthen ware WHB complete Size 22"x16" : White without pedestal Providing and Fixing glazed earthen ware WHB complete Size 22"x16' : Coloured without pedestal Providing and Fixing glazed earthen ware WHB complete Size 25"x18" : White with pedestal Providing and Fixing glazed earthen ware WHB complete Size 25"x18" : Coloured with pedestal Providing and Fixing glazed earthen ware WHB complete Size 25"x18" : White without pedestal Providing and Fixing glazed earthen ware WHB complete Size 25"x18" : Coloured without pedestal Providing and Fixing stainless steel sink with drain board size 48"x24", including set of brackets, waste pipe etc Providing and fixing stainless steel sink with drain board size 18"x36" including set of brackets, waste pipe etc Providing and fixing stainless steel sink with drain board size 18"x48" including set of brackets, waste pipe etc Providing and fixing stainless steel sink with drain board size 20"x60" including set of brackets, waste pipe etc Providing and fixing stainless steel sink with drain board size 20"x72" including set of brackets, waste pipe etc Providing and Fixing terrazzo concrete sink 25"x18", with drain board of mosaic, including set of brackets etc Providing and Fixing glazed earthen ware sink including set of brackets, waste pipe etc : 25"x18" Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

Rate (British System) Labour


265.98 265.98 4.96 4.96 241.80 241.80 241.80 322.40 322.40 241.80 241.80 322.40 322.40 241.80 241.80 322.40 322.40 322.40 322.40 322.40 372.00 322.40

Rate (Metric System) Unit


Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each each each each each Each Each

Composite
1,682.89 1,842.61 367.96 307.46 1,288.45 1,669.60 943.60 1,611.05 1,792.55 992.00 1,052.50 2,161.60 2,241.46 1,113.00 1,173.50 2,524.60 2,161.60 4,146.00 5,219.27 8,514.10 1,545.70 1,133.10

Labour
265.98 265.98 4.96 4.96 241.80 241.80 241.80 322.40 322.40 241.80 241.80 322.40 322.40 241.80 241.80 322.40 322.40 322.40 322.40 322.40 372.00 322.40

Composite
1,682.89 1,842.61 367.96 307.46 1,288.45 1,669.60 943.60 1,611.05 1,792.55 992.00 1,052.50 2,161.60 2,241.46 1,113.00 1,173.50 2,524.60 2,161.60 4,146.00 5,219.27 8,514.10 1,545.70 1,133.10

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 71 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 14 :

PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS

Item Code
14-08-b 14-09 14-10-a 14-10-b 14-11

Description Unit
Providing and Fixing glazed earthen ware sink including set of brackets, waste pipe etc : 25"x18" Providing and Fixing white glazed earthernware flat back urinal Providing and Fixing glazed earthen ware low down flushing cistern 3 gallons capacity : White Providing and Fixing glazed earthen ware low down flushing cistern 3 gallons capacity : Coloured Providing and Fixing white enamelled CI low down flushing cistern (3 gallons capacity) including CP water connection Providing and Fixing cast iron high level flushing cistern, including high level flushing cistern including CP : 3 gallons Providing and Fixing cast iron high level flushing cistern, including high level flushing cistern including CP : 1 gallon Providing and Fixing CP soap dish. Providing and Fixing glazed earthen ware soap dish White Providing and Fixing glazed earthen ware soap dish Coloured Providing and Fixing CP toilet paper holder Providing and Fixing CP towel rail : 24" long, 3/4" dia Providing and Fixing CP towel rail : 20" long, 1/2" dia Providing and Fixing best quality 5mm mirror 22"x16" size Providing and Fixing best quality 5mm glass shelf 24"x5" With chromium plated brackets & railing Providing and Fixing best quality 5mm glass shelf 24"x5" Glass shelf only, w/o chromium plated brackets Providing and Fixing glazed earthen ware shelf 24"x5" with CP brackets & railing of : 24" length, 3/4" dia Providing and Fixing glazed earthen ware shelf 24"x5" with CP brackets & railing of : 20" length, 1/2" dia Providing and Fixing Plastic soap dish. Providing and Fixing Plastic toilet paper holder. Providing and Fixing Plastic towel rail. Providing and Fixing Plastic shelf 24"x5" with Providing and Fixing CP pillar-cock, heavy type : 3/4" Providing and Fixing CP pillar-cock, heavy type : 1/2" Providing and Fixing CP stop-cock, heavy type : 3/4" Providing and Fixing CP stop-cock, heavy type : 1/2" Each Each Each Each Each

Rate (British System) Labour


322.40 322.40 322.40 322.40 322.40

Rate (Metric System) Unit


Each Each Each Each Each

Composite
951.60 866.90 1,484.00 1,544.50 2,306.80

Labour
322.40 322.40 322.40 322.40 322.40

Composite
951.60 866.90 1,484.00 1,544.50 2,306.80

Spec. No

Remarks

14-12-a

Each

322.40

2,185.80

Each

322.40

2,185.80

14-12-b

Each

322.40

975.80

Each

322.40

975.80

14-13 14-14-a 14-14-b 14-15 14-16-a 14-16-b 14-17 14-18-a 14-18-b 14-19-a 14-19-b 14-20-a 14-20-b 14-20-c 14-20-d 14-21-a 14-21-b 14-22-a 14-22-b

Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

34.72 34.72 34.72 34.72 34.72 34.72 100.75 39.68 14.88 39.68 39.68 34.72 34.72 34.72 34.72 34.72 34.72 34.72 34.72

337.22 185.97 216.22 204.12 240.42 216.22 645.25 463.18 317.38 342.18 402.68 119.42 137.57 119.42 131.52 579.22 417.08 579.22 325.12

Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

34.72 34.72 34.72 34.72 34.72 34.72 100.75 39.68 14.88 39.68 39.68 34.72 34.72 34.72 34.72 34.72 34.72 34.72 34.72

337.22 185.97 216.22 204.12 240.42 216.22 645.25 463.18 317.38 342.18 402.68 119.42 137.57 119.42 131.52 579.22 417.08 579.22 325.12
Page 72 of 144

NWFP CSR 2008 - Approved 25-Aug-2008

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 14 :

PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS

Item Code
14-23 14-24-a 14-24-b 14-25 14-26-a 14-26-b 14-27 14-28-a

Description Unit
Providing and Fixing underground stop-cock 1/2" with CP cover Providing and Fixing CP bib-cock, heavy type : 3/4" Providing and Fixing CP bib-cock, heavy type : 1/2" Providing and Fixing 1/2" CP tee stop cock Providing and Fixing CP shower rose : 1/2"x4" Providing and Fixing CP shower rose : 3/4"x6" Providing and Fixing CP mixing valve for WHB, sink or shower Providing and Fixing gun metal peet / gate valve (screwed) 1" dia Each Each Each Each Each Each Each Each

Rate (British System) Labour


39.68 34.72 34.72 34.72 34.72 34.72 34.72 39.68

Rate (Metric System) Unit


Each Each Each Each Each Each Each Each

Composite
359.12 325.12 325.12 325.12 325.12 373.52 2,696.72 644.68

Labour
39.68 34.72 34.72 34.72 34.72 34.72 34.72 39.68

Composite
359.12 325.12 325.12 325.12 325.12 373.52 2,696.72 644.68

Spec. No

Remarks

Reduce the composite rate by 10 % incase brase peet / gate valve are used.

14-28-b 14-28-c 14-28-d 14-28-e 14-29-a 14-29-b 14-29-c 14-30-a 14-30-b 14-31-a 14-31-b 14-32-a 14-32-b 14-33 14-34-a-01

Providing and Fixing gun metal peet / gate valve (screwed) 1" dia Providing and Fixing gun metal peet / gate valve (screwed) 2" dia Providing and Fixing gun metal peet / gate valve (screwed) 2" dia Providing and Fixing gun metal peet / gate valve (screwed) 3" dia Providing and Fixing CP or brass oxidized swan-neck cock 1/2" dia : Single way Providing and Fixing CP or brass oxidized swan-neck cock 1/2" dia : Double way Providing and Fixing CP or brass oxidized swan-neck cock 1/2" dia : Three way Providing and Fixing brass union 1/2" dia Providing and Fixing brass union 3/4" dia Providing and Fixing CI floor trap including CI grating & concrete chamber all round : 4"x2" Providing and Fixing CI floor trap including CI grating & concrete chamber all round : 4"x3" Providing and Fixing 'P' trap including GI grating & PCC chamber 4" of cast iron Providing and Fixing 'P' trap including GI grating & PCC chamber 4" glazed Providing and Fixing 4" gully trap with PCC, including masonry chamber 1'x1' and PVC grating 6"x6" Providing and fitting CI soil pipe with : Lead & yarn caulked joint : 4" dia.

Each Each Each Each Each Each Each Each Each Each Each Each Each Each 1 RFT

39.68 39.68 39.68 39.68 34.72 39.68 49.60 34.72 34.72 77.50 77.50 69.75 69.75 116.25 23.63

765.68 886.68 2,399.18 3,064.68 579.22 947.18 1,259.60 234.37 288.82 222.70 501.00 747.35 124.20 418.75 451.55

Each Each Each Each Each Each Each Each Each Each Each Each Each Each m

39.68 39.68 39.68 39.68 34.72 39.68 49.60 34.72 34.72 77.50 77.50 69.75 69.75 116.25 77.52

765.68 886.68 2,399.18 3,064.68 579.22 947.18 1,259.60 234.37 288.82 222.70 501.00 747.35 124.20 418.75 1,481.48

NWFP CSR 2008 - Approved 25-Aug-2008

Page 73 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 14 :

PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS

Item Code
14-34-a-02 14-34-b-01 14-34-b-02 14-35-a 14-35-b 14-35-c 14-35-d 14-36-a

Description Unit
Providing and fitting CI soil pipe with : Lead & yarn caulked joint : 2" dia. Providing and fitting CI soil pipe with : Cement caulked joint : 4" dia Providing and fitting CI soil pipe with : Cement caulked joint : 2" dia Providing and Fixing AC soil pipe with cement caulked joint including all specials : 1" i/d Providing and Fixing AC soil pipe with cement caulked joint including all specials : 3" i/d Providing and Fixing AC soil pipe with cement caulked joint including all specials : 4" i/d Providing and Fixing AC soil pipe with cement caulked joint including all specials : 6" i/d Providing and Fixing CI specials, such as tees, bends etc Lead caulked joint 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT Each

Rate (British System) Labour


11.81 23.63 11.81 5.91 7.09 11.81 18.90 96.88

Rate (Metric System) Unit


m m m m m m m Each

Composite
301.40 436.80 286.64 75.63 92.38 126.44 180.66 363.07

Labour
38.76 77.52 38.76 19.38 23.26 38.76 62.02 96.88

Composite
988.85 1,433.06 940.44 248.13 303.10 414.83 592.71 363.08

Spec. No

Remarks

Increase the composite rate by 3 %, in case of plug type.

14-36-b 14-37-a 14-37-b 14-37-c 14-37-d 14-38 14-39-a 14-39-b 14-40 14-41-a 14-41-b 14-42-a 14-42-b 14-43-a 14-43-b 14-44-a 14-44-b

Providing and Fixing CI specials, such as tees, bends etc Cement caulked joint Supply and Fixing CI manhole cover with frame etc complete 12" dia Supply and Fixing CI manhole cover with frame etc complete 18" dia Supply and Fixing CI manhole cover with frame etc complete 24" dia Providing & Fixing Steel manhole cover with frame 18"x18" full heavy duty Providing and Fixing RCC pipe 4" dia, including laying & jointing in trenches Providing and Fixing brass stop/bib cock : 1/2" dia Providing and Fixing brass stop/bib cock : 3/4" dia Hoisting & Placing in position precast RC latrine seat Providing and Fixing CP waste coupling : 1.25" Providing and Fixing CP waste coupling : 1.5" Providing and Fixing rubber plug with chain : 1.25" Providing and Fixing rubber plug with chain : 1.5" Providing and Fixing waste pipe of PVC : 1.25" Providing and Fixing waste pipe of PVC : 1.5" Providing and Fixing flushing bend of PVC : 1.25" Providing and Fixing flushing bend of PVC : 1.5"

Each Each Each Each Each 1 RFT Each Each Each Each Each Each Each Each Each Each Each

96.88 50.06 50.06 50.06 217.00 69.18 34.72 34.72 209.25 39.68 39.68 1.49 1.49 34.72 34.72 24.80 24.80

314.67 1,260.06 1,713.81 2,712.06 2,122.75 142.81 252.52 349.32 209.25 221.18 245.38 74.09 86.19 83.12 119.42 67.15 97.40

Each Each Each Each each m Each Each Each Each Each Each Each Each Each Each Each

96.88 50.06 50.06 50.06 217.00 226.98 34.72 34.72 209.25 39.68 39.68 1.49 1.49 34.72 34.72 24.80 24.80

314.67 1,260.06 1,713.81 2,712.06 2,122.75 468.55 252.52 349.32 209.25 221.18 245.38 74.09 86.19 83.12 119.42 67.15 97.40
Page 74 of 144

NWFP CSR 2008 - Approved 25-Aug-2008

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 14 :

PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS

Item Code
14-45-a 14-45-b 14-46-a 14-46-b 14-47-a 14-47-b 14-47-c 14-48-a 14-48-b 14-48-c 14-48-d 14-48-e 14-48-f 14-49-a 14-49-b 14-50-a 14-50-b 14-50-c 14-51-a 14-51-b 14-51-c 14-52-a 14-52-b 14-52-c 14-53 14-54-a 14-54-b 14-55-a

Description Unit
Providing and Fixing CP bottle trough with waste pipe : 1.25" i/d Providing and Fixing CP bottle trough with waste pipe : 1.5" i/d Providing and Fixing angle iron brackets for : WHB and cistern Providing and Fixing angle iron brackets for : Sink Providing and Fixing 1/2" dia connection including check nuts etc Plastic rubber connection Providing and Fixing 1/2" dia connection including check nuts etc Copper connection Providing and Fixing 1/2" dia connection including check nuts etc CP connection Providing and Fixing brass ball float valve 1/2" dia Providing and Fixing brass ball float valve 3/4" dia Providing and Fixing brass ball float valve 1" dia Providing and Fixing brass ball float valve 1.25" dia Providing and Fixing brass ball float valve 1.5" dia Providing and Fixing brass ball float valve 2" dia Providing and Fixing 4" dia MS high pressure seamwelded pipe & specials complete : 2" dia Providing and Fixing 4" dia MS high pressure seamwelded pipe & specials complete : 1" dia Providing and Fixing Audco type valve : 4" dia Providing and Fixing Audco type valve : 2" dia Providing and Fixing Audco type valve : 1" dia Providing and Fixing pressure regulator : No. 103 Providing and Fixing pressure regulator : No. 043 Providing and Fixing pressure regulator : People type Providing and Fixing high pressure flange type valve : 4" dia Providing and Fixing high pressure flange type valve : 2" dia Providing and Fixing high pressure flange type valve : 1" dia Providing and Fixing nipple or bush 1/4" to 3/8" i/d Providing and Fixing eclipse cock : 1" dia Providing and Fixing eclipse cock : 3/4" dia Providing and Fixing GI pipe(light) & including specials complete 2" dia Each Each Each Each Each Each Each Each Each Each Each Each Each 1 RFT 1 RFT Each Each Each Each Each Each Each Each Each Each Each Each 1 RFT

Rate (British System) Labour


39.68 39.68 39.68 39.68 14.88 14.88 14.88 34.72 34.72 34.72 34.72 34.72 34.72 96.90 77.52 387.50 155.00 116.25 124.00 124.00 124.00 387.50 155.00 77.50 14.88 77.50 77.50 30.94

Rate (Metric System) Unit


Each Each Each Each Each Each Each Each Each Each Each Each Each m m Each Each Each Each Each Each Each Each Each Each Each Each m

Composite
947.18 1,249.68 112.28 124.38 45.13 54.81 147.98 179.92 198.07 337.22 415.87 700.22 942.22 318.21 261.93 10,067.50 5,600.00 1,931.25 1,309.80 1,092.00 704.80 10,672.50 4,874.00 1,892.50 24.56 803.50 779.30 188.34

Labour
39.68 39.68 39.68 39.68 14.88 14.88 14.88 34.72 34.72 34.72 34.72 34.72 34.72 317.92 254.34 387.50 155.00 116.25 124.00 124.00 124.00 387.50 155.00 77.50 14.88 77.50 77.50 101.52

Composite
947.18 1,249.68 112.28 124.38 45.13 54.81 147.98 179.92 198.07 337.22 415.87 700.22 942.22 1,044.00 859.34 10,067.50 5,600.00 1,931.25 1,309.80 1,092.00 704.80 10,672.50 4,874.00 1,892.50 24.56 803.50 779.30 617.91

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 75 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 14 :

PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS

Item Code
14-55-b 14-55-c 14-55-d 14-55-e 14-55-f 14-56-a 14-56-b 14-56-c 14-57-a 14-57-b 14-58-a 14-58-b 14-58-c 14-59-a 14-59-b 14-60-a 14-60-b 14-61-a 14-61-b 14-61-c 14-61-d 14-61-e 14-62-a

Description Unit
Providing and Fixing GI pipe(light) & including specials complete 1.5" dia Providing and Fixing GI pipe(light) & including specials complete 1.25" dia Providing and Fixing GI pipe(light) & including specials complete 1" dia Providing and Fixing GI pipe(light) & including specials complete 3/4" dia Providing and Fixing GI pipe(light) & including specials complete 1/2" dia Providing and Fixing oxidized gas cock : 1" dia. Providing and Fixing oxidized gas cock : 3/4" dia. Providing and Fixing oxidized gas cock : 1/2" dia. Providing and Fixing brass gas cock : 1/2" dia Providing and Fixing brass gas cock : 3/4" dia Providing and Fixing 1/4" CP or oxidized gas cock Single way Providing and Fixing 1/4" CP or oxidized gas cock Two way Providing and Fixing 1/4" CP or oxidized gas cock Three way Providing and Fixing approved best quality light burners Single Providing and Fixing approved best quality light burners Double Providing and Fixing approved best quality gas room heaters Single pannel Providing and Fixing approved best quality gas room heaters Double pannel Providing and Fixing approved best quality cooking range with 2 burners & oven Providing and Fixing approved best quality cooking range with 2 burners, oven & rostary Providing and Fixing approved best quality cooking range with 3 burners, oven & hot case Providing and Fixing approved best quality cooking range with 3 burners, oven, hot case & roastary Providing and Fixing approved best quality cooking range with 5 burners, oven, hot case & roastary Providing and Fixing approved best quality gas water heaters 20 gallons capacity 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

Rate (British System) Labour


30.94 30.94 17.98 17.89 15.47 12.40 12.40 12.40 2.48 2.48 14.88 24.80 39.68 496.00 496.00 496.00 496.00 496.00 496.00 496.00 496.00 496.00 496.00

Rate (Metric System) Unit


m m m m m Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

Composite
156.06 129.80 95.05 72.67 53.83 206.00 133.40 109.20 117.43 196.08 93.53 115.55 148.58 1,101.00 2,129.50 3,521.00 4,126.00 5,699.00 6,667.00 9,208.00 13,806.00 19,009.00 9,692.00

Labour
101.52 101.52 58.98 58.70 50.76 12.40 12.40 12.40 2.48 2.48 14.88 24.80 39.68 496.00 496.00 496.00 496.00 496.00 496.00 496.00 496.00 496.00 496.00

Composite
512.00 425.85 311.85 238.41 176.60 206.00 133.40 109.20 117.43 196.08 93.53 115.55 148.58 1,101.00 2,129.50 3,521.00 4,126.00 5,699.00 6,667.00 9,208.00 13,806.00 19,009.00 9,692.00

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 76 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 14 :

PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS

Item Code
14-62-b 14-62-c 14-63-a 14-63-b 14-63-c 14-64-a 14-64-b 14-64-c 14-64-d 14-65 14-66 14-67 14-68-a 14-68-b 14-68-c 14-69-a-01 14-69-a-02 14-69-b-01 14-69-b-02 14-69-b-03 14-69-b-04 14-69-b-05 14-70-a 14-70-b

Description Unit
Providing and Fixing approved best quality gas water heaters 30 gallons capacity Providing and Fixing approved best quality gas water heaters 50 gallons capacity Providing and Fixing gas cross burners : 6" Size Providing and Fixing gas cross burners : 9" Size Providing and Fixing gas cross burners : 12" Size Providing and Fixing gas nozzle star burner with injector 12" nozzle Providing and Fixing gas nozzle star burner with injector 18" nozzle Providing and Fixing gas nozzle star burner with injector 24" nozzle Providing and Fixing gas nozzle star burner with injector 32" nozzle Providing and Fixing flue pipe for gas room heater any type/make Providing and Fixing gas twin burners with stand complete Imperial make Providing and Fixing angle iron frame wall type brackets for gas room heater Providing and Fixing gas tandoor complete : 24" nozzle Providing and Fixing gas tandoor complete : 32" nozzle Providing and Fixing gas tandoor complete : 48" nozzle P/F Fibre Glass Water Tank (Shalimar/Spectrum) 300 gallons P/F Fibre Glass Water Tank (Sepctrum/Shalimar) 400 gallons P/F Polyethylene Water Tank (Super Tuff) 200 gallons (Horizontal) Supplying and Fixing Polyethylene Water Tank (Super Tuff) 400 gallons (Vertical) P/F Polyethylene Water Tank (Super Tuff) 500 gallons (Vertical) P/F Polyethylene Water Tank (Super Tuff) 1000 gallons (Vertical) P/F Polyethylene Water Tank (Super Tuff) 1500 gallons (Vertical) Providing and Fixing of pipe type B nikasi system including testing in all respect 110 mm (using dadex, or eq) Providing and Fixing of pipe type B nikasi system including testing in all respect 75 mm (using dadex, or eq) Each Each Each Each Each Each Each Each Each Each Each Pair Each Each Each Each Each Each Each Each Each Each 1 RFT 1 RFT

Rate (British System) Labour


496.00 496.00 62.00 62.00 62.00 148.80 148.80 148.80 148.80 49.60 148.80 62.00 387.50 581.25 581.25 775.00 775.00 775.00 1,581.00 1,581.00 2,108.00 3,162.00 23.63 23.63

Rate (Metric System) Unit


Each Each Each Each Each Each Each Each Each Each Each Pair Each Each Each Each Each Each Each Each Each Each m m

Composite
11,386.00 13,806.00 340.30 400.80 485.50 572.30 729.60 790.10 1,177.30 158.50 4,383.80 304.00 1,028.80 1,609.75 2,384.15 11,115.00 13,948.04 8,574.00 15,426.34 18,454.06 35,095.69 50,207.31 339.30 188.36

Labour
496.00 496.00 62.00 62.00 62.00 148.80 148.80 148.80 148.80 49.60 148.80 62.00 387.50 581.25 581.25 775.00 775.00 775.00 1,581.00 1,581.00 2,108.00 3,162.00 77.52 77.52

Composite
11,386.00 13,806.00 340.30 400.80 485.50 572.30 729.60 790.10 1,177.30 158.50 4,383.80 304.00 1,028.80 1,609.75 2,384.15 11,115.00 13,948.04 8,574.00 15,426.34 18,454.06 35,095.69 50,207.31 1,113.19 617.99

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 77 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 14 :

PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS

Item Code
14-71-a

Description Unit
Providing and Fixing of poly dex high pressure PPR(green including testing ect complete 25 mm(including all special ect) Providing and Fixing of poly dex high pressure PPR(green including testing ect complete 20 mm(including all special ect) Providing of plumbing tape insulation on G.I pipe complete 1/2" dia Providing of plumbing tape insulation on G.I pipe complete 3/4" dia Providing of plumbing tape insulation on G.I pipe complete 1" dia Providing of plumbing tape insulation on G.I pipe complete 1.5" dia Providing of plumbing tape insulation on G.I pipe complete 2" dia Providing of plumbing tape insulation on G.I pipe complete 2.5" dia Providing of thermal insulation of high density (64kg/m3) fiber glass pipe insulation faced with aluminium foil for chilled/hot water piping complete 1/2" dia Providing of thermal insulation of high density (64kg/m3) fiber glass pipe insulation faced with aluminium foil for chilled/hot water piping complete 3/4" dia Providing of thermal insulation of high density (64kg/m3) fiber glass pipe insulation faced with aluminium foil for chilled/hot water piping complete 1" dia Providing of thermal insulation of high density (64kg/m3) fiber glass pipe insulation faced with aluminium foil for chilled/hot water piping complete 1.5" dia Providing of thermal insulation of high density (64kg/m3) fiber glass pipe insulation faced with aluminium foil for chilled/hot water piping complete 2" dia Providing of thermal insulation of high density (64kg/m3) fiber glass pipe insulation faced with aluminium foil for chilled/hot water piping complete 2.5" dia Providing of thermal insulation of high density (64kg/m3) fiber glass pipe insulation faced with aluminium foil for chilled/hot water piping complete 3" dia Providing and Fixing Gas water Geyser "Singer" 30 gallons SG 35 DLX with imported (American) Thermostat 1 RFT

Rate (British System) Labour


15.47

Rate (Metric System) Unit


m

Composite
81.02

Labour
50.76

Composite
265.83

Spec. No

Remarks

14-71-b

1 RFT

15.47

73.96

50.76

242.64

14-72-a 14-72-b 14-72-c 14-72-d 14-72-e 14-72-f 14-73-a

20 Rft 20 Rft 20 Rft 20 Rft 20 Rft 20 Rft 20 Rft

11.81 11.81 11.81 11.81 11.81 11.81 31.00

25.83 32.84 39.85 46.86 53.87 60.88 636.00

m m m m m m m

1.94 1.94 1.94 1.94 1.94 1.94 5.09

4.24 5.39 6.54 7.69 8.84 9.99 104.33

14-73-b

20 Rft

31.00

678.35

5.09

111.28

14-73-c

20 Rft

31.00

817.50

5.09

134.10

14-73-d

20 Rft

31.00

896.15

5.09

147.01

14-73-e

20 Rft

31.00

926.40

5.09

151.97

14-73-f

20 Rft

31.00

1,071.60

5.09

175.79

14-73-g

20 Rft

31.00

1,228.90

5.09

201.59

14-74-a

Each

496.00

13,624.50

each

496.00

13,624.50

NWFP CSR 2008 - Approved 25-Aug-2008

Page 78 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 14 :

PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS

Item Code
14-74-b 14-75-a 14-75-b 14-76 14-77 14-78 14-79-a

Description Unit
Providing and Fixing Gas water Geyser "Singer" 35 gallons SG 35 DLX with imported (American) Thermostat Providing & Fixing "Singer" Cooking Range Model 307 (3 Burners Black), Bigger size Providing & Fixing "Singer" Cooking Range Model 308 (3 Burners Black), Smaller size Providing & Fixing "Singer" Cooking Range Model 310 (3 Burners White) Providing & Fixing "Singer" Cooking Range Model 312 (5 Burners), (Automatic) Supply and Fixing low level plastic flushing cistern. Supply and fixing of 0.5 HP Monoblock water pump 1.25"x1" single phase upto 72 ft head (Deen Pump Type SE) i/c all accessories. Supply and fixing of 1.0 HP Monoblock water pump 1.25"x1" single phase upto 90 ft head (Deen Pump Type SE) i/c all accessories. Supply and fixing of 1.0 HP Monoblock water pump 1.25"x1" single phase upto 88 ft head (Deen Pump Type DE-S2) i/c all accessories. Supply and fixing of 1.5 HP Monoblock water pump 1.25"x1" single phase upto 130 ft head (Deen Pump Type DE-S2) i/c all accessories. Supply and fixing of 2.0 HP Monoblock water pump 1.5"x1.25" 3 stage model DE-S3 (DEENS' PUMPS) single phase for 150 ft head with all accessories. Supply and fixing of 2.0 HP Monoblock water pump 1.5"x1.5" 4 stage model DE-S4 (DEENS' PUMPS) single phase for 190 ft head with all accessories. Supply and fixing of 2.0 HP Monoblock water pump 2"x2" size 1 stage SE model (DEENS' PUMPS) single phase for 65 ft head with all accessories and fittings. Supply and fixing of 3.0 HP Monoblock water pump 1.5"x1.5" size 5 stage DE-S5 model (DEENS' PUMPS) single phase for 220 ft head with all accessories Supply and fixing of 3.0 HP Monoblock water pump 1.5"x1.25" size 6 stage DE-S6 model (DEENS' PUMPS) single phase for 260 ft head with all accessories Supply and fixing of 4.0 HP Monoblock water pump 1.5"x1.25" size 7 stage DN-S7 model (DEENS' PUMPS) single phase for 300 ft head with all accessories Each Each Each Each Each Each Each

Rate (British System) Labour


496.00 124.00 124.00 124.00 124.00 77.50 306.90

Rate (Metric System) Unit


each each each each each each each

Composite
14,713.50 14,347.55 12,792.70 16,241.20 18,032.00 809.55 6,831.22

Labour
496.00 124.00 124.00 124.00 124.00 77.50 306.90

Composite
14,713.50 14,347.55 12,792.70 16,241.20 18,032.00 809.55 6,831.22

Spec. No

Remarks

14-79-b

Each

306.90

8,380.02

each

306.90

8,380.02

14-79-c

Each

306.90

9,316.56

each

306.90

9,316.56

14-79-d

Each

306.90

9,671.09

each

306.90

9,671.09

14-80-a

Each

306.90

13,597.54

each

306.90

13,597.54

14-80-b

Each

306.90

14,551.02

each

306.90

14,551.02

14-80-c

Each

306.90

14,964.84

each

306.90

14,964.84

14-81-a

Each

306.90

16,641.90

each

306.90

16,641.90

14-81-b

Each

306.90

20,345.71

each

306.90

20,345.71

14-81-c

Each

306.90

21,402.04

each

306.90

21,402.04

NWFP CSR 2008 - Approved 25-Aug-2008

Page 79 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 14 :

PLUMBING, SANITARY INSTALLATION AND GAS FITTINGS

Item Code
14-81-d

Description Unit
Supply and fixing of 3.0 HP Monoblock water pump 2.5"x2" size 2 stage DE-S2 model (DEENS' PUMPS) single phase for 100 ft head with all accessories Supply and fixing of 4.0 HP Monoblock water pump 1.5"x2" size 3 stage DN-S3 model (DEENS' PUMPS) single phase for 130 ft head with all accessories Supply and fixing of 4.0 HP Monoblock water pump 1.5"x2" size 4 stage DN-S4 model (DEENS' PUMPS) single phase for 160 ft head with all accessories Supply and fixing of 3.0 HP Monoblock water pump 3"x3" size 1 stage P.P model (DEENS' PUMPS) single phase for 60 ft head with all accessories Supply and fixing of 4.0 HP Monoblock water pump 3"x2.5" size 1stage P.P model (DEENS' PUMPS) single phase for 60 ft head with all accessories Supply and fixing of 1.0 HP Deep well water pump 1"x1" size 1stage Jet S-1 model (DEENS' PUMPS) single phase for 60 ft suction and upto 60 ft head with all accessories Supply and fixing of 2.0 HP Deep well water pump 1"x1" size 2 stage Jet S-2 model (DEENS' PUMPS) single phase for 80 ft suction and upto 80 ft head with all accessories Supply and fixing of 3.0 HP Deep well water pump 1"x1" size 3 stage Jet S-3 model (DEENS' PUMPS) single phase for 120 ft suction and upto 120 ft head with all accessories Supply and fixing of 4.0 HP Deep well water pump 1"x1" size 4 stage Jet S-4 model (DEENS' PUMPS) single phase for 160 ft suction and upto 160 ft head with all accessories Providing & Fixing Solar Geysers 35 gallons capacity (a product of Enercon, National Energy Conservation Centre Islamabad) Each

Rate (British System) Labour


542.50

Rate (Metric System) Unit


each

Composite
21,372.83

Labour
542.50

Composite
21,372.83

Spec. No

Remarks

14-81-e

Each

306.90

20,513.66

each

306.90

20,513.66

14-81-f

Each

542.50

21,716.05

each

542.50

21,716.05

14-81-g

Each

306.90

20,585.17

each

306.90

20,585.17

14-81-h

Each

306.90

23,284.68

each

306.90

23,284.68

14-82-a

Each

1,100.50

9,334.55

each

1,100.50

9,334.55

14-82-b

Each

1,100.50

12,593.08

each

1,100.50

12,593.08

14-82-c

Each

1,100.50

15,255.08

each

1,100.50

15,255.08

14-82-d

Each

1,100.50

17,999.36

each

1,100.50

17,999.36

14-83

Each

806.00

27,426.00

each

806.00

27,426.00

NWFP CSR 2008 - Approved 25-Aug-2008

Page 80 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 15 :

ELECTRIC INSTALLATIONS

Item Code
15-01-a-01 15-01-a-02 15-01-a-03 15-01-a-04 15-01-a-05 15-01-a-06 15-01-b-01 15-01-b-02 15-01-b-03 15-01-b-04 15-01-b-05 15-01-b-06 15-02-a-01 15-02-a-02 15-02-a-03 15-02-a-04 15-02-a-05 15-02-a-06 15-02-a-07 15-02-a-08 15-02-b-01

Description Unit
Supply and Erection MS conduit pipe for wiring purpose comp. On surface including clamps etc: 1/2" i/d Supply and Erection MS conduit pipe for wiring purpose comp. On surface including clamps etc: 3/4" i/d Supply and Erection MS conduit pipe for wiring purpose comp. On surface including clamps etc: 1" i/d Supply and Erection MS conduit pipe for wiring purpose comp. On surface including clamps etc: 1.25" i/d Supply and Erection MS conduit pipe for wiring purpose comp. On surface including clamps etc: 1.5" i/d Supply and Erection MS conduit pipe for wiring purpose comp. On surface including clamps etc: 2" i/d Supply and Erection MS conduit pipe for wiring purpose comp. Recessed in walls including chase etc : 1/2" i/d Supply and Erection MS conduit pipe for wiring purpose comp. Recessed in walls including chase etc : 3/4" i/d Supply and Erection MS conduit pipe for wiring purpose comp. Recessed in walls including chase etc : 1" i/d Supply and Erection MS conduit pipe for wiring purpose comp. Recessed in walls including chase etc : 1.25" i/d Supply and Erection MS conduit pipe for wiring purpose comp. Recessed in walls including chase etc : 1.5" i/d Supply and Erection MS conduit pipe for wiring purpose comp. Recessed in walls including chase etc : 2" i/d Supply and Erection PVC pipe for wiring purpose complete On surface including clamps etc: 1/2" i/d Supply and Erection PVC pipe for wiring purpose complete On surface including clamps etc: 3/4" i/d Supply and Erection PVC pipe for wiring purpose complete On surface including clamps etc: 1" i/d Supply and Erection PVC pipe for wiring purpose complete On surface including clamps etc: 1.25" i/d Supply and Erection PVC pipe for wiring purpose complete On surface including clamps etc: 1.5" i/d Supply and Erection PVC pipe for wiring purpose complete On surface including clamps etc: 2" i/d Supply and Erection PVC pipe for wiring purpose complete On surface including clamps etc: 3" i/d Supply and Erection PVC pipe for wiring purpose complete On surface including clamps etc: 4" i/d Supply and Erection PVC pipe for wiring purpose complete Recessed in walls including chase etc : 1/2" i/d 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT

Rate (British System) Labour


7.18 7.18 7.18 7.18 7.18 7.18 17.96 17.96 17.96 17.96 17.96 17.96 3.59 3.59 3.59 5.30 7.18 4.58 5.48 7.07 10.77

Rate (Metric System) Unit


m m m m m m m m m m m m m m m m m m m m m

Composite
26.37 32.64 40.05 45.73 51.27 68.81 46.36 52.63 60.05 65.73 71.26 85.47 18.23 9.70 22.92 36.29 34.74 30.62 53.25 63.33 25.41

Labour
23.57 23.57 23.57 23.57 23.57 23.57 58.92 58.92 58.92 58.92 58.92 58.92 11.78 11.78 11.78 17.39 23.57 15.02 17.97 23.19 35.35

Composite
86.50 107.08 131.40 150.04 168.20 225.75 152.11 172.68 197.01 215.65 233.80 280.40 59.81 31.81 75.20 119.06 113.98 100.47 174.70 207.76 83.38

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 81 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 15 :

ELECTRIC INSTALLATIONS

Item Code
15-02-b-02 15-02-b-03 15-02-b-04 15-02-b-05 15-02-b-06 15-02-b-07 15-02-b-08 15-03-a 15-03-b 15-03-c 15-03-d 15-03-e 15-03-f 15-03-g 15-04-a

Description Unit
Supply and Erection PVC pipe for wiring purpose complete Recessed in walls including chase etc : 3/4" i/d Supply and Erection PVC pipe for wiring purpose complete Recessed in walls including chase etc : 1" i/d Supply and Erection PVC pipe for wiring purpose complete Recessed in walls including chase etc : 1.25" i/d Supply and Erection PVC pipe for wiring purpose complete Recessed in walls including chase etc : 1.5" i/d Supply and Erection PVC pipe for wiring purpose complete Recessed in walls including chase etc : 2" i/d Supply and Erection PVC pipe for wiring purpose complete Recessed in walls including chase etc : 3" i/d Supply and Erection PVC pipe for wiring purpose complete Recessed in walls including chase etc : 4" i/d Supply and Erection GI flexible pipe for wiring purpose complete 1/2" i/d Supply and Erection GI flexible pipe for wiring purpose complete 3/4" i/d Supply and Erection GI flexible pipe for wiring purpose complete 1" i/d Supply and Erection GI flexible pipe for wiring purpose complete 1.25" i/d Supply and Erection GI flexible pipe for wiring purpose complete 1.5" i/d Supply and Erection GI flexible pipe for wiring purpose complete 2" i/d Supply and Erection GI flexible pipe for wiring purpose complete 3" i/d Supply and Erection Sahl wood strip batten for wiring complete 1/2" i/d 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT

Rate (British System) Labour


10.77 10.77 10.77 14.37 17.96 21.55 26.94 4.15 6.00 7.01 7.59 7.59 12.44 12.83 1.85

Rate (Metric System) Unit


m m m m m m m m m m m m m m m

Composite
35.40 39.84 53.76 51.85 54.48 78.54 93.52 32.92 48.06 67.51 87.28 102.03 128.27 202.80 5.39

Labour
35.35 35.35 35.35 47.13 58.92 70.70 88.37 13.61 19.70 22.99 24.92 24.92 40.81 42.11 6.09

Composite
116.13 130.72 176.36 170.10 178.74 257.69 306.83 108.02 157.67 221.48 286.34 334.76 420.84 665.37 17.67

Spec. No

Remarks

Additional width required to accommodate wire will be provided by erection of additional strips.

15-04-b 15-04-c 15-05-a 15-05-b

Supply and Erection Sahl wood strip batten for wiring complete 3/4" i/d Supply and Erection Sahl wood strip batten for wiring complete 1" i/d Supply and Erection single core PVC insulated copper conductor 250/440 V grade cable : 3/0.029" Supply and Erection single core PVC insulated copper conductor 250/440 V grade cable : 3/0.036"

1 RFT 1 RFT 1 RFT 1 RFT

1.85 1.85 2.50 2.51

8.41 4.09 7.32 9.54

m m m m

6.09 6.09 8.21 8.25

27.59 13.43 24.01 31.31

NWFP CSR 2008 - Approved 25-Aug-2008

Page 82 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 15 :

ELECTRIC INSTALLATIONS

Item Code
15-05-c 15-05-d 15-05-e 15-05-f 15-05-g 15-06-a 15-06-b 15-06-c 15-06-d 15-06-e 15-06-f 15-07-a 15-07-b 15-07-c 15-07-d 15-07-e 15-07-f 15-07-g 15-08-a 15-08-b 15-08-c

Description Unit
Supply and Erection single core PVC insulated copper conductor 250/440 V grade cable : 7/0.029" Supply and Erection single core PVC insulated copper conductor 250/440 V grade cable : 7/0.036" Supply and Erection single core PVC insulated copper conductor 250/440 V grade cable : 7/0.044" Supply and Erection single core PVC insulated copper conductor 250/440 V grade cable : 7/0.064" Supply and Erection single core PVC insulated copper conductor 250/440 V grade cable : 19/0.064" Supply and Erection single core PVC insulated+sheathed copper conductor 250/440 V grade cable : 3/0.029" Supply and Erection single core PVC insulated+sheathed copper conductor 250/440 V grade cable : 3/0.036" Supply and Erection single core PVC insulated+sheathed copper conductor 250/440 V grade cable : 7/0.029" Supply and Erection single core PVC insulated+sheathed copper conductor 250/440 V grade cable : 7/0.036" Supply and Erection single core PVC insulated+sheathed copper conductor 250/440 V grade cable : 7/0.044" Supply and Erection single core PVC insulated+sheathed copper conductor 250/440 V grade cable : 7/0.064" Supply and Erection single core PVC insulated & sheathed copper conductor, 660/1100V cable : 7/0.064" Supply and Erection single core PVC insulated & sheathed copper conductor, 660/1100V cable : 19/0.052" Supply and Erection single core PVC insulated & sheathed copper conductor, 660/1100V cable : 19/0.064" Supply and Erection single core PVC insulated & sheathed copper conductor, 660/1100V cable : 19/0.083" Supply and Erection single core PVC insulated & sheathed copper conductor, 660/1100V cable : 37/0.072" Supply and Erection single core PVC insulated & sheathed copper conductor, 660/1100V cable : 37/0.083" Supply and Erection single core PVC insulated & sheathed copper conductor, 660/1100V cable : 37/0.103" Supply and Erection twin core PVC insulated & sheathed copper conductor 250/440 V grade cable : 3/0.029" Supply and Erection twin core PVC insulated & sheathed copper conductor 250/440 V grade cable : 3/0.036" Supply and Erection twin core PVC insulated & sheathed copper conductor 250/440 V grade cable : 7/0.029" 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT

Rate (British System) Labour


2.36 2.36 5.89 8.84 14.73 4.12 4.12 4.71 4.71 7.66 11.78 11.78 20.03 20.03 29.46 73.65 73.65 73.65 2.94 2.94 4.12

Rate (Metric System) Unit


m m m m m m m m m m m m m m m m m m m m m

Composite
12.76 14.89 25.81 50.14 118.01 8.91 11.13 14.67 31.27 29.41 57.90 70.81 62.45 108.56 203.44 311.96 372.82 534.03 12.17 17.33 24.78

Labour
7.73 7.73 19.33 28.99 48.32 13.53 13.53 15.46 15.46 25.12 38.66 38.66 65.70 65.70 96.65 241.63 241.63 241.63 9.66 9.66 13.53

Composite
41.87 48.86 84.67 164.52 387.19 29.25 36.51 48.13 102.60 96.50 189.95 232.31 204.89 356.17 667.47 1,023.48 1,223.17 1,752.06 39.91 56.86 81.29

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 83 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 15 :

ELECTRIC INSTALLATIONS

Item Code
15-08-d 15-08-e 15-08-f 15-09-a 15-09-b 15-09-c 15-09-d 15-09-e 15-09-f 15-10-a 15-10-b 15-10-c 15-10-d 15-10-e 15-10-f 15-11-a-01

Description Unit
Supply and Erection twin core PVC insulated & sheathed copper conductor 250/440 V grade cable : 7/0.036" Supply and Erection twin core PVC insulated & sheathed copper conductor 250/440 V grade cable : 7/0.044" Supply and Erection twin core PVC insulated & sheathed copper conductor 250/440 V grade cable : 7/0.064" Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick bakelite sheet top etc. complete : 4"x4" Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick bakelite sheet top etc. complete : 7"x4" Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick bakelite sheet top etc. complete : 9"x4" Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick bakelite sheet top etc. complete : 8"x10" Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick bakelite sheet top etc. complete : 10"x12" Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick bakelite sheet top etc. complete : 12"x14" Supply and Erection Sahl wood board, 1.75" deep : 3" dia Supply and Erection Sahl wood board, 1.75" deep : 4"x4" Supply and Erection Sahl wood board, 1.75" deep : 7"x4" Supply and Erection Sahl wood board, 1.75" deep : 8"x10" Supply and Erection Sahl wood board, 1.75" deep : 10"x12" Supply and Erection Sahl wood board, 1.75" deep : 12"x14" Supply and Erection of iron/aluminium clad, 500V main switch Double pole : 15/20 Amp. 1 RFT 1 RFT 1 RFT Each Each Each Each Each Each Each Each Each Each Each Each Each

Rate (British System) Labour


4.12 4.12 4.12 44.17 58.90 73.63 88.35 106.02 123.69 8.84 26.50 26.50 26.50 29.45 29.45 265.05

Rate (Metric System) Unit


m m m Each Each Each Each Each Each Each Each Each Each Each Each Each

Composite
40.31 50.24 89.33 86.53 125.45 152.27 233.55 311.72 395.94 14.89 33.76 68.86 84.58 102.05 114.15 870.05

Labour
13.53 13.53 13.53 44.17 58.90 73.63 88.35 106.02 123.69 8.84 26.50 26.50 26.50 29.45 29.45 265.05

Composite
132.26 164.82 293.08 86.53 125.45 152.27 233.55 311.72 395.94 14.89 33.76 68.86 84.58 102.05 114.15 870.05

Spec. No

Remarks

Reduce the labour and composite rates by 20 % in case, base frame is already installed.

15-11-a-02 15-11-a-03 15-11-a-04 15-11-b-01 15-11-b-02

Supply and Erection of iron/aluminium clad, 500V main switch Double pole : 30/35 Amp. Supply and Erection iron/aluminium clad 500 volts main switch Double Pole : 60/65 Amp Supply and Erection iron/aluminium clad 500 volts main switch Double Pole : 100 Amp Supply and Erection of iron/aluminium clad, 500V main switch Triple pole with neutral link : 15/20 Amp. Supply and Erection of iron/aluminium clad, 500V main switch Triple pole with neutral link : 30/35 Amp.

Each Each Each Each Each

265.05 265.05 265.05 265.05 265.05

991.05 3,290.05 4,500.05 991.05 1,233.05

Each Each Each Each Each

265.05 265.05 265.05 265.05 265.05

991.05 3,290.05 4,500.05 991.05 1,233.05

NWFP CSR 2008 - Approved 25-Aug-2008

Page 84 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 15 :

ELECTRIC INSTALLATIONS

Item Code
15-11-b-03 15-11-b-04 15-12-a

Description Unit
Supply and Erection of iron/aluminium clad, 500V main switch Triple pole with neutral link : 60/65 Amp. Supply and Erection of iron/aluminium clad, 500V main switch Triple pole with neutral link : 100 Amp. Supply and Erection or iron/aluminium clad, 500V main switch with triple pole, complete : 60 Amp. Each Each Each

Rate (British System) Labour


353.40 441.75 147.25

Rate (Metric System) Unit


Each Each Each

Composite
1,805.40 2,388.64 3,777.25

Labour
353.40 441.75 147.25

Composite
1,805.40 2,388.64 3,777.25

Spec. No

Remarks

Reduce the labour and composite rates by 20 % in case, base frame is already installed.

15-12-b 15-12-c 15-12-d 15-12-e 15-13

Supply and Erection or iron/aluminium clad, 500V main switch with triple pole, complete : 100 Amp. Supply and Erection or iron/aluminium clad, 500V main switch with triple pole, complete : 200 Amp. Supply and Erection or iron/aluminium clad, 500V main switch with triple pole, complete : 300 Amp. Supply and Erection or iron/aluminium clad, 500V main switch with triple pole, complete : 500 Amp. Supply and Erection plain pendent lamp holder, complete with bakelite lamp holder & flexible twin wire of 2m

Each Each Each Each Each

147.25 235.60 235.60 235.60 5.89

4,382.25 5,075.60 6,043.60 8,463.60 189.62

Each Each Each Each Each

147.25 235.60 235.60 235.60 5.89

4,382.25 5,075.60 6,043.60 8,463.60 189.62


Reduce the labour and composite rates by 20 % in case, base frame is already installed.

15-14 15-15 15-16 15-17 15-18-a 15-18-b 15-19-a 15-19-b 15-20-a 15-20-b 15-21

Supply and Erection 9" long swan neck plain brass/steel/brass oxidised bracket lamp holder, complete Supply and Erection wall/pole type bracket with double cover water tight reflector, flexible wire & brass holder Supply and Erection call bell 220/250V, fixed on Sahl wood board 7"x4" Supply and Erection bell push or bed switch, with 5m. twin flexible wire 23/0.0076" Supply and Erection switches 10/15 Amp : Open type Supply and Erection switches 10/15 Amp : Recessed type Supply and Erection 3 pin 10/15 Amp. wall socket : Open type Supply and Erection 3 pin 10/15 Amp. wall socket : Recessed Supply and Erection 3 pin switch & plug combined recessed type : 5 Amp Supply and Erection 3 pin switch & plug combined recessed type : 10/15 Amp Supply and Erection 3 pin 10/15 Amp. wall socket with shoe open type

Each Each Each Each Each Each Each Each Each Each Each

11.04 23.56 14.73 4.42 8.84 8.84 14.73 14.73 14.73 14.73 14.73

53.39 53.81 81.28 58.38 26.99 26.99 38.92 38.92 159.93 196.23 57.08

Each Each Each Each Each Each Each Each Each Each Each

11.04 23.56 14.73 4.42 8.84 8.84 14.73 14.73 14.73 14.73 14.73

53.39 53.81 81.28 58.38 26.99 26.99 38.92 38.92 159.93 196.23 57.08

NWFP CSR 2008 - Approved 25-Aug-2008

Page 85 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 15 :

ELECTRIC INSTALLATIONS

Item Code
15-22-a 15-22-b 15-23-a 15-23-b 15-23-c 15-23-d 15-23-e 15-24-a 15-24-b 15-24-c

Description Unit
Supply and Erection button holder/angle holder Bakelite large size Supply and Erection button holder/angle holder Brass Supply and Erection porcelain fuses (china made) with plastic sheet base on angle iron board : 10/15 Amp. Supply and Erection porcelain fuses (china made) with plastic sheet base on angle iron board : 30 Amp. Supply and Erection porcelain fuses (china made) with plastic sheet base on angle iron board : 60 Amp. Supply and Erection porcelain fuses (china made) with plastic sheet base on angle iron baord : 100 Amp. Supply and Erection porcelain fuses (china made) with plastic sheet base on angle iron board : 200 Amp. Supply and Erection tube light, including rod, choke etc complete Double rod (80 watts) with 2 chokes & 2 starters Supply and Erection tube light, including rod, choke etc complete Single rod (40 watts) with 1 choke & 1 starter Supply and Erection tube light, including rod, choke etc complete Round tube (10 watt) 1 choke + 1 starter w/o cover Supply and Erection girder clamp hook, 5/8" dia.for hanging ceiling fans Supply and Erection circuit breaker (imported) on sahl wood board complete : 2/5/15 Amp. Supply and Erection circuit breaker (imported) on sahl wood board complete : 20/25/30 Amp. Supply and Erection stay for house service pipe, erected with straining screws and 7/14 SWG stay wire Supply and Erection of house service pipe Henley or pole, type 2" dia. erected to install insulated wire etc Supply and Erection shackle/pin insulator, medium size Supply and Erection bare copper conductor wire, No. 2 to 16 SWG, including binding wire No. 16 SWG Supply and Erection GI wire of sizes, including binding wire No. 16 SWG for support of rubber wire, pole to pole Wiring overhead line in 2 single core, PVC insulated cable with GI wire #8 SWG : 3/0.029" Wiring overhead line in 2 single core, PVC insulated cable with GI wire #8 SWG : 7/0.029" Wiring overhead line in 2 single core, PVC insulated cable with GI wire #8 SWG : 7/0.036" Each Each Each Each Each Each Each Set Set Each

Rate (British System) Labour


7.36 7.36 14.73 14.73 14.73 14.73 14.73 58.90 44.17 32.40

Rate (Metric System) Unit


Each Each Each Each Each Each Each Set Set Each

Composite
31.56 43.66 44.97 51.03 87.32 147.82 256.73 875.65 477.36 165.49

Labour
7.36 7.36 14.73 14.73 14.73 14.73 14.73 58.90 44.17 32.40

Composite
31.56 43.66 44.97 51.03 87.32 147.82 256.73 875.65 477.36 165.49

Spec. No

Remarks

15-25 15-26-a 15-26-b 15-27 15-28 15-29 15-30 15-31 15-32-a 15-32-b 15-32-c

Each Each Each 1 RFT 1 RFT Each kg kg 1 RFT 1 RFT 1 RFT

14.73 44.17 44.17 5.30 7.07 14.73 7.36 7.36 4.12 4.12 4.12

63.13 304.32 322.48 57.63 223.09 535.03 777.73 104.16 40.32 51.50 55.76

Each Each Each m m Each kg kg m m m

14.73 44.17 44.17 17.39 23.19 14.73 7.36 7.36 13.53 13.53 13.53

63.13 304.33 322.48 189.07 731.93 535.03 777.73 104.16 132.27 168.95 182.92

NWFP CSR 2008 - Approved 25-Aug-2008

Page 86 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 15 :

ELECTRIC INSTALLATIONS

Item Code
15-32-d 15-33 15-34 15-35-a 15-35-b 15-36-a 15-36-b 15-36-c 15-37 15-38 15-39

Description Unit
Wiring overhead line in 2 single core, PVC insulated cable with GI wire #8 SWG : 7/0.044" Supply and Erection street light pole bracket 1.25" GI pipe 2m. long, complete with 2 pole clamps Supply and Fixing dust & weather proof street light fitting with reflector, 400W mercury vapour lamp etc comp. Supply and Erection pole mounted street light complete for fitting 125/250 W mercury lamp : GEC make Supply and Erection pole mounted street light complete for fitting 125/250 W mercury lamp : Philips make Supply and Fixing 125 W mercury vapour lamp with choke Supply and Fixing 250 W mercury vapour lamp with choke Supply and Fixing 400 W mercury vapour lamp with choke Supply and Fixing mercury sodium lamp 360 Sunlux 400 W complete with choke Supply and Fixing mercury blended lamp 160 W Supply and Erection MS angle lattice structure pole 36' long 14"sq at base & 8"sq. at top for elec. distribution 1 RFT Each Each Each Each Each Each Each Each Each Each

Rate (British System) Labour


7.07 132.52 235.60 235.60 235.60 58.90 58.90 58.90 58.90 58.90 3,534.00

Rate (Metric System) Unit


m Each Each Each Each Each Each Each Each Each Each

Composite
73.46 605.64 6,285.60 1,506.10 3,018.60 542.90 936.15 2,781.40 1,571.40 482.40 15,634.00

Labour
23.19 132.52 235.60 235.60 235.60 58.90 58.90 58.90 58.90 58.90 3,534.00

Composite
241.02 605.64 6,285.60 1,506.10 3,018.60 542.90 936.15 2,781.40 1,571.40 482.40 15,634.00

Spec. No

Remarks

a) Increase/Reduce composite rate of addition/reduction in height of pole above ground level b) The item does not cover cost of excavation, which is payable separately. The item does not cover cost of excavation, which is payable separately.

15-40-a-01

Supply and Fixing GI tubular street light pole, 8' of 5" dia, 7' 4" dia, 5' of 3" dia, Single arm of 5' of 1.5" dia

Each

883.50

17,158.00

Each

883.50

17,158.00

15-40-a-02 15-40-b-01 15-40-b-02 15-40-b-03 15-41

Supply and Fixing GI tubular street light pole, 8' of 5" dia, 7' 4" dia, 5' of 3" dia, Double arm of 5' of 1.5" dia Supply and Fixing GI tubular street light pole, 8' of 4" dia, 7' 3" dia, 5' of 2" dia, Single arm of 5' of 1.5" dia Supply and Fixing GI tubular street light pole, 8' of 4" dia, 7' 3" dia, 5' of 2" dia, Double arm of 5' of 1.5" dia Providing street light poles of 40 ft height without arms including fixing complete. Earthing of iron clad/aluminium switches etc with GI wire #8 SWG in GI pipe 0.5" dia

Each Each Each Each Job

883.50 883.50 883.50 136.40 1,178.00

17,763.00 14,133.00 14,738.00 22,361.65 3,874.33

Each Each Each each Job

883.50 883.50 883.50 136.40 1,178.00

17,763.00 14,133.00 14,738.00 22,361.65 3,874.33


The item does not cover cost of excavation, which is payable separately.

15-42

Supply and Erection 2'x2'x1/8" copper plate including rivetting to copper tape & placing in mixture of salt etc

Each

294.50

2,956.50

Each

294.50

2,956.50

NWFP CSR 2008 - Approved 25-Aug-2008

Page 87 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 15 :

ELECTRIC INSTALLATIONS

Item Code
15-43-a 15-43-b 15-44 15-45 15-46 15-47-a 15-47-b 15-47-c 15-47-d 15-48-a 15-48-b 15-48-c 15-48-d 15-49 15-50 15-51 15-52 15-53 15-54 15-55-a 15-55-b

Description Unit
Supply and Erection copper tape, including copper stapple & copper nails etc : Size 1.5"x1/8" Supply and Erection copper tape, including copper stapple & copper nails etc : Size 2"x1/8" Supply and Erection 1" dia & 1m long lightening conductor copper rod with 5 spikes ball & base etc. Wiring of light/fan/call-bell point in 3/0.029 PVC insulated & sheathed cable on sahl wood strip Wiring of 2/3-pin 5-Amp plug point in 3/0.029 PVC insulated & sheathed cable on sahl wood Wiring of main & sub-main in 2 single core PVC insulated & sheathed cable : 3/0.029 Wiring of main & sub-main in 2 single core PVC insulated & sheathed cable : 7/0.029 Wiring of main & sub-main in 2 single core PVC insulated & sheathed cable : 7/0.044 Wiring of main & sub-main in 2 single core PVC insulated & sheathed cable : 7/0.064 Wiring of sub main/earthing in 1 single core PVC insulated & sheathed cable : 3/0.029 Wiring of sub main/earthing in 1 single core PVC insulated & sheathed cable : 7/0.029 Wiring of sub main/earthing in 1 single core PVC insulated & sheathed cable : 7/0.044 Wiring of sub main/earthing in 1 single core PVC insulated & sheathed cable : 7/0.064 Wiring of light point in 3/0.029 PVC insulated sheathed cable on sahl wood strip batten Wiring of light/fan/call-bell point in 3/0.029 PVC insulated bare cable in PVC pipe recessed Wiring of 2/3-pin 5-Amp. plug point in 3/0.029 PVC insulated bare cable in PVC pipe recessed Wiring of light point in 3/0.029 PVC insulated bare cable in PVC pipe recessed in wall comp. Special earthing of iron/metal clad switches etc with copper wire No. 8 SWG in GI pipe 1/2" dia Supply and Erection enclosed switch of bakelite DP (China) 15/30 Amp. fixed on wooden board complete Supply and erection of fancy wall type bracket with brass holder & fancy shade : Single Supply and erection of fancy wall type bracket with brass holder & fancy shade : Double 1 RFT 1 RFT Job Each Each 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT Each Each Each Each Each Each Each Each

Rate (British System) Labour


4.12 4.12 736.25 17.67 17.67 3.68 3.68 5.89 10.60 2.50 2.36 2.36 4.12 28.27 26.50 12.96 40.05 471.20 29.45 23.56 23.56

Rate (Metric System) Unit


m m Job Each Each m m m m m m m m Each Each Each Each Each Each Each Each

Composite
119.98 156.59 2,309.25 553.55 391.14 25.44 48.31 104.39 187.29 11.01 16.45 28.54 51.70 934.39 783.50 415.34 1,409.15 6,441.45 233.34 326.06 519.66

Labour
13.53 13.53 736.25 17.67 17.67 12.08 12.08 19.32 34.78 8.21 7.73 7.73 13.53 28.27 26.50 12.96 40.05 471.20 29.45 23.56 23.56

Composite
393.62 513.75 2,309.25 553.55 391.14 83.48 158.51 342.48 614.47 36.12 53.97 93.65 169.63 934.39 783.50 415.34 1,409.15 6,441.45 233.34 326.06 519.66

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 88 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 15 :

ELECTRIC INSTALLATIONS

Item Code
15-56-a 15-56-b 15-56-c 15-57-a 15-57-b 15-57-c 15-58 15-59 15-60 15-61-a 15-61-b 15-62 15-63-a 15-63-b 15-63-c 15-64-a

Description Unit
Supply and Erection white round globe with holder, gallery & 100 Watt bulb complete : 6" dia. Supply and Erection white round globe with holder, gallery & 100 Watt bulb complete : 8" dia. Supply and Erection white round globe with holder, gallery & 100 Watt bulb complete : 10" dia. Supply and Erection white flat globe with holder, gallery & 100 W bulb complete : 8" dia Supply and Erection white flat globe with holder, gallery & 100 W bulb complete : 10" dia Supply and Erection white flat globe with holder, gallery & 100 W bulb complete : 12" dia Supply and Erection white round globe 6" dia with angle type bakelite gallery, holder & 60-W bulb complete Supply and Erection 1' long strip light fitting comp. with cover of opalescent perspex in plain finish 10-Watt Supply and Erection double fluorescent tube light fitting 2 No. 4' long, 40-W with 2 chokes & starters complete Supply and Erection fluorescent tube light fitting including 4' rod, choke, starter, flexible wire etc : Single Supply and Erection fluorescent tube light fitting including 4' rod, choke, starter, flexible wire etc : Double Supply and Erection porch-light fitting round/square type with gallery, holder & 40 W bulb Supply and Erection gate-light fitting complete with holder & 160-Watt mercury blended lamp: Small Supply and Erection gate-light fitting complete with holder & 160-Watt mercury blended lamp: Medium Supply and Erection gate-light fitting complete with holder & 160-Watt mercury blended lamp: Large Supply and Erection garden-light fitting with holder and 160 W mercury blended lamp & choke : 18" dia Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

Rate (British System) Labour


29.45 29.45 29.45 29.45 29.45 29.45 29.45 58.90 73.63 58.90 58.90 44.17 58.90 58.90 58.90 147.25

Rate (Metric System) Unit


Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

Composite
164.97 225.47 346.47 225.47 346.47 527.97 634.45 319.05 860.13 494.50 845.40 467.67 724.40 845.40 966.40 1,296.75

Labour
29.45 29.45 29.45 29.45 29.45 29.45 29.45 58.90 73.63 58.90 58.90 44.17 58.90 58.90 58.90 147.25

Composite
164.97 225.47 346.47 225.47 346.47 527.97 634.45 319.05 860.13 494.50 845.40 467.67 724.40 845.40 966.40 1,296.75

Spec. No

Remarks

The rate does not include cost of GI pipe and excavation and are to be paid separatively

15-64-b 15-64-c

Supply and Erection garden-light fitting with holder and 160 W mercury blended lamp & choke : 19" dia Supply and Erection garden-light fitting with holder and 160 W mercury blended lamp & choke : 22" dia

Each Each

147.25 147.25

1,478.25 1,962.25

Each Each

147.25 147.25

1,478.25 1,962.25

NWFP CSR 2008 - Approved 25-Aug-2008

Page 89 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 15 :

ELECTRIC INSTALLATIONS

Item Code
15-65-a

Description Unit
Supply and Erection garden-light fitting with porcelain holder 125 W mercury vapour lamp & choke : 18" dia Each

Rate (British System) Labour


147.25

Rate (Metric System) Unit


Each

Composite
1,690.00

Labour
147.25

Composite
1,690.00

Spec. No

Remarks
The rate does not include cost of GI pipe and excavation and are to be paid separatively

15-65-b 15-65-c 15-66-a 15-66-b 15-67 15-68-a

Supply and Erection garden-light fitting with porcelain holder 125 W mercury vapour lamp & choke : 19" dia Supply and Erection garden-light fitting with porcelain holder 125 W mercury vapour lamp & choke : 22" dia Supply and Erection flood-light fitting with holder, complete 14" dia with 500-W lamp Supply and Erection flood-light fitting with holder, complete 19" dia with 1000-W lamp Making hole in wall with necessary masonry work for exhaust fan any size complete Supply and Erection best quality AC ceiling fan complete with GI rod, canopy, blades & regulator : 36" sweep

Each Each Each Each Each Each

147.25 147.25 147.25 147.25 88.35 73.63

1,871.50 2,355.50 1,962.25 3,232.75 142.80 1,525.63

Each Each Each Each Each Each

147.25 147.25 147.25 147.25 88.35 73.63

1,871.50 2,355.50 1,962.25 3,232.75 142.80 1,525.63


Asia, Breeze, Climax, Millat, National & Pak fans are the approved makes.

15-68-b 15-68-c 15-69-a

Supply and Erection best quality AC ceiling fan complete with GI rod, canopy, blades & regulator : 48" sweep Supply and Erection best quality AC ceiling fan complete with GI rod, canopy, blades & regulator : 56" sweep Supply and Erection best quality exhaust fan complete with shutter & regulator : 12"sweep

Each Each Each

73.63 73.63 58.90

2,009.63 2,433.13 1,329.40

Each Each Each

73.63 73.63 58.90

2,009.63 2,433.13 1,329.40


Asia, Breeze, Climax, Millat, National & Pak fans are the approved makes.

15-69-b 15-69-c 15-70-a 15-70-b 15-70-c 15-71-a 15-71-b 15-71-c

Supply and Erection best quality exhaust fan complete with shutter & regulator : 16"sweep Supply and Erection best quality exhaust fan complete with shutter & regulator : 18"sweep Supply and Erection transpower auto circuit breaker 3-phase, 400V fungus moisture proofing : 30 Amp. Supply and Erection transpower auto circuit breaker 3-phase, 400V fungus moisture proofing : 60 Amp. Supply and Erection transpower auto circuit breaker 3-phase, 400V fungus moisture proofing : 100 Amp. Supply and Erection single phase imported auto circuit breaker 6 Amp. Supply and Erection single phase imported auto circuit breaker 15 Amp. Supply and Erection single phase imported auto circuit breaker 20 Amp.

Each Each Each Each Each Each Each Each

58.90 58.90 235.60 235.60 279.77 44.17 44.17 44.17

1,571.40 1,825.50 2,716.10 3,260.60 5,724.77 370.88 467.67 588.67

Each Each Each Each Each Each Each Each

58.90 58.90 235.60 235.60 279.77 44.17 44.17 44.17

1,571.40 1,825.50 2,716.10 3,260.60 5,724.77 370.88 467.67 588.67

NWFP CSR 2008 - Approved 25-Aug-2008

Page 90 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 15 :

ELECTRIC INSTALLATIONS

Item Code
15-71-d 15-72-a 15-72-b

Description Unit
Supply and Erection single phase imported auto circuit breaker 30 Amp. Supply and Erection of bus bars for 500 volts 3 phase AC S/W 4 copper bars 40 Amp with bar size 1 1/2" X 1/8" Supply and Erection of bus bars 500 volts 3 phase AC supply with 4 copper bars - 100 Amp with bar size1 1 1/2" X 1/8" Supply and Erection of bus bars 500 volts 3 phase AC supply with 4 copper bars - 200 Amp with bar size 2"X 1/8" Supply and Erection of bus bars 500 volts 3 phase AC supply with 4 copper bars - 300 Amp with bar zise 2" X 3/16" Supply and Erection of bus bars 500 volts 3 phase AC supply with 4 copper bars - 500 Amp with zise 2" X 1/4" Supply and Erection of bracket of channel 3" X 1 1/2" X 1/4" section 2' long for 2 lines Supply and Erection of bracket of MS channel 3" X 1 1/2" X 1/4" Section:- 4' long for 4 lines Supply and Erection of anchor rod honley type for poles i/e clamps & 7/13 SWG stay wire straning screws PCC 1:3:6 Supply and Erection cubical type factory fabricated floor/wall mounting steel main board comp. : On surface Supply and Erection cubical type factory fabricated floor/wall mounting steel main board comp. : Recessed Flouresent tube lights fitting 2.5x2.5 feet square type suitable for fixing in recess or direct on complete with 4 Nos 2 ft 20 watts tubes, chokes, starters, holders complete in all respect in steel body. Supply and Fixing of fluoresent tube fitting rectanglular box types housing made of 22 SWG stave enamelled steel sheet having spring load inner frame attachement with acrylic or polythene complete with 2 No 4 ft 40 watts Supply and Fixing electric AC exhuast/fresh air circulation(double way) 220/230 single phase plastic frame body and blade complete 8"x8" Supply and Fixing electric AC exhuast/fresh air circulation(double way) 220/230 single phase plastic frame body and blade complete 10"x10" Supply and fixing electric AC exhaust/fresh air circulation(Double way) 220/230 single phase plastic frame body and blade complete 12"x12" Each Each Each

Rate (British System) Labour


44.17 511.50 511.50

Rate (Metric System) Unit


Each Each Each

Composite
600.78 4,365.35 4,380.48

Labour
44.17 511.50 511.50

Composite
600.78 4,365.35 4,380.48

Spec. No

Remarks

15-72-c

Each

899.00

5,218.70

Each

899.00

5,218.70

15-72-d

Each

1,092.75

5,427.58

Each

1,092.75

5,427.58

15-72-e 15-73-a 15-73-b 15-74

Each Each Each 1 RFT

1,271.00 111.91 141.36 4.35

8,040.95 338.42 553.00 48.34

Each Each Each m

1,271.00 111.91 141.36 14.26

8,040.95 338.42 553.00 158.59

15-75-a 15-75-b 15-76-a

Each Each Each

1,472.50 1,708.10 124.00

9,821.50 10,057.10 1,939.00

Each Each each

1,472.50 1,708.10 124.00

9,821.50 10,057.10 1,939.00

15-76-b

each

124.00

1,576.00

each

124.00

1,576.00

15-77-a

each

196.85

1,523.36

each

196.85

1,523.36

15-77-b

each

196.85

1,666.41

each

196.85

1,666.41

15-77-c

each

73.78

4,998.18

each

73.78

4,998.18

NWFP CSR 2008 - Approved 25-Aug-2008

Page 91 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 15 :

ELECTRIC INSTALLATIONS

Item Code
15-78 15-79-a 15-79-b 15-79-c 15-79-d 15-80 15-81 15-82 15-83 15-84 15-85 15-86 15-87 15-88 15-89 15-90 15-91 15-92 15-93 15-94 15-95-a 15-95-b 15-95-c 15-95-d

Description Unit
Supply and Fixing bracket fan pak made complete Supply and Fixing PVC conduit for surface wiring (dura duct) 1/2" including all charges for nail screws etc PVC conduit for surface wiring (dura duct) 1" including all charges for nail screws etc complete PVC conduit for surface wiring (dura duct) 1.5" including all charges for nail screws etc complete PVC conduit for surface wiring (dura duct) 2" including all charges for nail screws etc complete Supply and Fixing dimmer switch complete Supply and Fixing 20 Amp power plug Supply and Fixing Asia porcelin power plug 30 Amp Supply and fixing light plug 10 Amp Supply and fitting of capacitor 2.2 uf for ceiling fans Supply and fitting of ball bearing of size 6201, 6202 or 6203 for ceiling fans Supply and erection of cut out, bakelite open type Supply and erection of cut out bakelite Recessed type cut out Supply and erection of kit kat 500 volts 15/20 Amp Supply and erection of kit kat 500 volts 30/35 Amp Supply and erection of kit kat 500 volts 60/65 Amp Supply and erection of kit kat 500 volts 100 Amp Supply and erection of kit kat 500 volts 200 Amp Supply and erection of kit kat 500 volts 300 Amp Supply and erection of kit kat 500 volts 400 Amp Providing & Fixing Honda Generator EP 2500ex, 2.2 KVA Petrol driven. Providing & Fixing Honda Generator EP 2500ex, 2.2 KVA Petrol-cum-Gas driven Providing & Fixing Honda Generator EP 2800ex, 3.1 KVA Petrol-cum-Gas driven. Providing & Fixing Honda Generator EP 2800ex, 3.1 KVA Petrol driven. each 1 RFT 1 RFT 1 RFT 1 RFT each each each each each each each each each each each each each each each Each Each Each Each

Rate (British System) Labour


99.20 4.54 4.54 4.54 4.54 49.60 49.60 49.60 49.60 29.45 36.81 6.48 6.48 10.58 11.86 17.00 20.37 23.52 23.52 29.14 449.50 449.50 449.50 449.50

Rate (Metric System) Unit


each m m m m each each each each each each each each each each each each each each each each each each each

Composite
1,853.70 19.48 22.63 24.99 29.70 134.30 152.45 170.60 128.25 65.75 145.71 34.31 40.36 39.62 40.90 60.56 97.81 139.68 288.51 359.47 41,831.26 44,856.26 69,056.26 66,031.26

Labour
99.20 14.88 14.88 14.88 14.88 49.60 49.60 49.60 49.60 29.45 36.81 6.48 6.48 10.58 11.86 17.00 20.37 23.52 23.52 29.14 449.50 449.50 449.50 449.50

Composite
1,853.70 63.91 74.23 81.97 97.46 134.30 152.45 170.60 128.25 65.75 145.71 34.31 40.36 39.62 40.90 60.56 97.81 139.68 288.51 359.47 41,831.26 44,856.26 69,056.26 66,031.26

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 92 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 16 :

ROADS AND BRIDGES

Item Code
16-01

Description Unit
Providing and Laying sub-base course of brick on edge 4.5" thick including compaction to required camber & grade 100 Cft

Rate (British System) Labour


2,222.39

Rate (Metric System) Unit


m3

Composite
8,232.46

Labour
784.83

Composite
2,907.27

Spec. No

Remarks
The nominal thickness of bricks shall be taken for the purpose of measurement and payment. To be used only when brick aggregate is cheaper than stone aggregate. a) The carriage of the whole distance to side of work shall be calculated on the basis of the rates of the actual means of transport used in carriage that is i.e road and rail is the case may be. b) It shall be payable from the nearest approved quarry. c) The quantity of pit run or bed run gravel in crush stone aggregate for payment of carriage shall be taken as per actual volume but not more than 120 Cft.

16-02

Providing and Laying sub-base course of brick aggregate, including compaction to required camber, grade & density

100 Cft

837.00

2,692.68

m3

295.58

950.91

16-03-a

Granular Sub Base Course using Pit Run Gravel

100 Cft

439.58

1,795.34

m3

155.24

634.02

16-03-b

Granular Sub Base Using Crushed Stone Aggregate

100 Cft

265.98

2,363.58

m3

93.93

834.69

16-04-a 16-04-b 16-05 16-06 16-07 16-08-a 16-08-b 16-08-c 16-09-a 16-09-b

Aggregate Base Course Water Bound Macadam Base Course Providing and Laying road edging of 3" wide & 9" deep brick on end, complete Bitumenous Prime Coat Bitumenous Tack Coat Single bitumenous Surface Treatment Double bitumenous Surface Treatment Triple bitumenous Surface Treatment Resurfacing of road complete with per 100sft : 22 Ibs. bitumen, 2.5"cft bajri/crush aggregate Resurfacing of road complete with per 100sft : 20 Ibs. bitumen, 2"cft bajri/crush aggregate

100 Cft 100 Cft 100 Rft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft

265.98 265.98 852.50 7.20 20.16 13.69 20.83 34.44 35.03 49.03

2,730.36 2,763.98 2,546.50 796.27 375.85 1,412.06 2,945.69 3,559.60 910.74 847.17

m3 m3 m m2 m2 m2 m2 m2 m2 m2

93.93 93.93 27.97 0.77 2.17 1.47 2.24 3.71 3.77 5.28

964.22 976.09 83.55 85.68 40.44 151.94 316.96 383.01 98.00 91.16

NWFP CSR 2008 - Approved 25-Aug-2008

Page 93 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 16 :

ROADS AND BRIDGES

Item Code
16-10 16-11-a 16-11-b 16-11-c 16-12-a 16-12-b 16-12-c 16-13

Description Unit
Scarifying/Dismantling old road surface, including removal of debris within one chain (NHA specified) Dense Graded Hot Bitmac (Mobile Asphalt Mixer) 1" Thick, without prime coat or tack coat Dense Graded Hot Bitmac (Mobile Asphalt Mixer) 1.5" Thick Dense Graded Hot Bitmac (Mobile Asphalt Mixer) 2" Thick Asphaltic Base Course (Asphalt Batch Plant Hot Mixed) Asphaltic Wearing Course (Asphalt Batch Plant Hot Mixed) Carriage of asphalt concrete from asphalt batch plant to the site of work by dump trucks. Providing RCC railing on bridges (3 feet high) 100 Sft 100 Sft 100 Sft 100 Sft 100 Cft 100 Cft Mile 100 Rft

Rate (British System) Labour


139.50 149.73 214.52 279.31 324.78 324.78 0.00 8,915.34

Rate (Metric System) Unit


m2 m2 m2 m2 m3 m3 t/km m

Composite
139.50 2,017.78 2,961.46 3,925.46 29,778.15 34,188.40 5.35 42,116.53

Labour
15.01 16.11 23.08 30.05 114.70 114.70 0.00 292.50

Composite
15.01 217.11 318.65 422.38 10,516.06 12,073.53 5.35 1,381.78

Spec. No

Remarks

The rate includes the cost of steel, its fabrication, laying in position and fastening, including cost of binding wire and removal of rust from the bars, etc

16-14 16-15-a

Providing and fixing GI pipe railing (3 feet high) P&E at site : RCC km stone

100 Rft/3rows Each

4,227.94 951.70

62,183.38 2,135.84

m/3rows Each

138.68 951.70

2,039.61 2,135.84
The rate is for complete item of work according to standard design including cement concrete foundation block and painting letters etc.

16-15-b 16-15-c 16-16-a

16-16-b 16-17-a

16-17-b

P&E at site : RCC 1/10th km stone. P&E at site : RCC boundry pillar. Road signs (not exceeding 1 m2) without reflection sheet & lettering : Supply and Fixing at site with PCC 1:3:6 upto max 3' depth Road signs (not exceeding 1 m2) without reflection sheet & lettering : Supply to the C&W store/site of work Road sign (any size) double pedestal 4"x2"x0.25" 11' long without reflection sheet & lettering: Supply and Fixing at site with PCC 1:3:6 max 3' depth Road sign (any size) double pedestal 4"x2"x0.25" 11' long without reflection sheet & lettering: Supply to the C&W store/site of work

Each Each 100 Sft

228.16 140.43 7,689.08

396.58 755.32 72,206.77

Each Each m2

228.16 140.43 827.35

396.58 755.32 7,769.45

The cost of pedestal, PCC and excavation is included in the rate.

100 Sft 100 Sft

6,393.51 8,824.27

66,179.77 58,678.16

m2 m2

687.94 949.49

7,120.94 6,313.77
The cost of pedestal, PCC and excavation is included in the rate.

100 Sft

9,835.06

49,707.84

m2

1,058.25

5,348.56

NWFP CSR 2008 - Approved 25-Aug-2008

Page 94 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 16 :

ROADS AND BRIDGES

Item Code
16-18-a

Description Unit
Supply and Fixing reflective sheet on MS/aluminium road signs etc including lettering : Diamond grade 100 Sft

Rate (British System) Labour


1,036.80

Rate (Metric System) Unit


m2

Composite
49,436.80

Labour
111.56

Composite
5,319.40

Spec. No

Remarks
a) The rate does not include the cost of road signs b) The work with sub-items a and b shall only be carried out on the written permission of the SE.

16-18-b 16-18-c 16-19-a-01 16-19-a-02 16-19-b-01 16-19-b-02 16-19-c-01 16-19-c-02 16-19-c-03 16-20

Supply and Fixing reflective sheet on MS/aluminium road signs etc including lettering : High intensity grade Supply and Fixing reflective sheet on MS/aluminium road signs etc including lettering : Engineering grade Supply and Fixing aluminium alloy road studs as per specs Large, strip 146x30mm, 171 beads: Uni-direction Supply and Fixing aluminium alloy road studs as per specs Large, strip 146x30mm, 171 beads: Bi-direction Supply and Fixing aluminium alloy road studs as per specs Medium, strip 114x18mm, 74 beads: Uni-direction Supply and Fixing aluminium alloy road studs as per specs Medium, strip 114x18mm, 74 beads: Bi-direction Supply and Fixing aluminium alloy road studs as per specs Small, strip 75x14mm, 43 beads: Uni-directional Supply and Fixing aluminium alloy road studs as per specs Small, strip 75x14mm, 43 beads: Bi-directional Supply & Fixing Cat Eye single as specified Providing and Fixing gantry of structural steel sections as per design / drawings including foundation complete

100 Sft 100 Sft Each Each Each Each Each Each Each Cwt

1,036.80 1,036.80 279.00 279.00 279.00 279.00 279.00 279.00 139.50 1,015.75

27,656.80 7,086.80 521.00 763.00 490.75 702.50 430.25 581.50 502.50 5,791.81

m2 m2 Each Each Each Each Each Each each kg

111.56 111.56 279.00 279.00 279.00 279.00 279.00 279.00 139.50 19.91

2,975.87 762.54 521.00 763.00 490.75 702.50 430.25 581.50 502.50 113.52

The cost of RCC base for the foundation is not included in the rate which is payable separately. The nominal thickness of bricks shall be taken for the purpose of measurement and payment. For different thicknesses, rate is to be calculated on pro-rate basis.

16-21

Providing and Laying dry brick pavement/soling in streets etc including prep, water, compaction & sand cushion

100 Cft

1,147.00

7,554.78

m3

405.06

2,667.95

16-22

Supply & spreading 1"-1.5" guage shingle on road surface including compaction

100 Cft

4.18

1,409.09

m3

1.48

497.62

16-23-a 16-23-b

Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 460mm Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 610mm

100 Rft 100 Rft

8,689.92 10,865.78

43,635.39 62,843.36

m m

285.10 356.49

1,431.61 2,061.79

NWFP CSR 2008 - Approved 25-Aug-2008

Page 95 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 16 :

ROADS AND BRIDGES

Item Code
16-23-c 16-23-d 16-23-e 16-23-f 16-23-g 16-24 16-25-a

Description Unit
Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 760mm Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 910mm Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 1070mm Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 1220mm Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 1520mm Granular Material in Bed to RCC Pipe Culvert Confirmatory Boring including SPT's, samples, lab test bore-hole logs & Report : Alluvial Soils 100 Rft 100 Rft 100 Rft 100 Rft 100 Rft 100 Cft 100 Rft

Rate (British System) Labour


13,039.29 15,210.86 17,384.59 19,561.37 21,731.90 260.70 90,732.04

Rate (Metric System) Unit


m m m m m m3 m

Composite
91,205.55 107,377.73 148,203.11 189,024.64 259,215.36 3,507.28 160,823.70

Labour
427.80 499.04 570.36 641.78 712.99 92.06 2,976.77

Composite
2,992.31 3,522.89 4,862.31 6,201.59 8,504.44 1,238.59 5,276.37

Spec. No

Remarks

a) The bore hole dia shall not be less than 200mm and the method of execution of pre-construction boring shall be done with casing and appropriate to soil encountered. b) Preparation and submission of bore-logs based on soil classification with SPT's values as per BS-1377 is included in the rate. Rates includes all material, equipment, instruments and temporary work required to construct test pile, load test and load settlement readings and preparation of graphs of the test pile.

16-25-b

Confirmatory Boring including SPT's, samples, lab test, bore-hole logs, report : in Gravelly Soil

100 Rft

90,732.04

179,268.95

2,976.77

5,881.53

16-26-a

Pile Load Testing : Max Load up to 240 tonne

Job

0.00

377,898.63

Job

0.00

377,898.59

16-26-b 16-26-c 16-26-d 16-27-a 16-27-b

Pile Load Testing : Max Load 240 - 300 tonne Pile Load Testing : Max Load 300 - 360 tonne Pile Load Testing : Max Load 360 - 600 tonne Boring for Cast-in-place RCC Piles in Alluvial Soils : Dia up to 760mm Boring for Cast-in-place RCC Piles in Alluvial Soils : Dia 760 - 1220 mm

Job Job Job 100 Rft 100 Rft

0.00 0.00 0.00 0.00 0.00

408,148.63 438,398.63 468,648.63 70,091.67 88,536.91

Job Job Job m m

0.00 0.00 0.00 0.00 0.00

408,148.59 438,398.59 468,648.59 2,299.60 2,904.75

NWFP CSR 2008 - Approved 25-Aug-2008

Page 96 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 16 :

ROADS AND BRIDGES

Item Code
16-27-c 16-28-a 16-28-b 16-29 16-30-a 16-30-b 16-34 16-35 16-36 16-37 16-38 16-39 16-40 16-41 16-42 16-43 16-44 16-46

Description Unit
Boring for Cast-in-place RCC Piles in Alluvial Soils : Dia 1220 - 2000 mm Boring for Cast-in-place RCC Piles in Gravelly Soils : Dia up to 660mm Boring for Cast-in-place RCC Piles in Gravelly Soils : Dia 660 - 910 mm Supply fabricate & install welded MS lining in piles of thickness as per specs/drwg Supply and Fixing Neoprene Bearing Pad as per specs & design Supply and Fixing Steel Bearing Pads as per specs & design Supply and Fixing spirally wound sheath of 50mm dia. for pre-stressing of cables in precast conc. girders Supply and Fixing stressing anchorages for high tensile steel wire cables in precast girders Launching girders in place, including lifting & handli any number of time including temporary works comp Stressing Cable of High Tensile Steel Wire Strands Inject Cement Grout in Sheath Pipe after stressing Cut off projecting wire ends of cables & make good anchorage recess with 1:2:4 cem. conc. Supply and place in position MS expansion joint assemblies as specified & as per drawing Supply and place in position galvanised steel 3" dia drain scuppers in deck slab as per specs/drwg Providing and Fixing rain water outlet of AC pipe Supply and Fixing polystrene fill in expansion joints & under diaphragms at transoms. Providing and Laying expansion joint of neoprene strip 4"x1/4" and plastic bitumen Repair to cracks to reinforced or plain cement concrete work by grouting with cement gun in (1:2) cement sand mortar including cutting the chase of required size. Dismantling bitumen carpet of any description from existing roads surface including its removal and disposal within 3 chains lead as desired. Removing the existing worn out bitumanious surface having pot holes and ruts in patches of regular shape brushing and re-carpeting with 1" thick (consolidated) asphalt macadam as per specifications. 100 Cft 100 Rft 100 Rft Cwt Cubic Inch Cwt 100 Rft Set Ft Each 100 Rft Each Cwt Each Each 100 Cft 100 Rft 100 Rft

Rate (British System) Labour


0.00 0.00 0.00 349.99 2.41 834.64 510.23 83.70 221.15 474.30 396.84 83.05 881.89 85.25 43.40 2,169.81 3,118.60 1,216.75

Rate (Metric System) Unit


m m m kg cm3 kg m Set m Each m Each kg Each Each m3 m m

Composite
110,670.23 88,536.91 140,183.34 6,481.65 21.77 6,674.33 3,146.94 688.70 294.90 837.30 1,841.45 142.63 5,657.95 297.30 250.57 2,308.96 12,709.06 1,942.75

Labour
0.00 0.00 0.00 6.86 0.15 16.36 16.74 83.70 725.57 474.30 13.02 83.05 17.29 85.25 43.40 766.26 102.32 39.92

Composite
3,630.91 2,904.75 4,599.19 127.04 1.33 130.82 103.25 688.70 967.53 837.30 60.42 142.63 110.90 297.30 250.57 815.40 416.96 63.74

Spec. No

Remarks

16-47

100 Sft

279.00

279.00

m2

30.02

30.02

16-48

100 Sft

658.72

3,425.23

m2

70.88

368.55

NWFP CSR 2008 - Approved 25-Aug-2008

Page 97 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 16 :

ROADS AND BRIDGES

Item Code
16-49

Description Unit
Providing and Laying 1" thick(consolidated) asphalt macadam with liquid asphalt (cut backs) of any approved grade with premixed sand seal coat, as specified. Removing the existing worn out bitumanious surface pot holes and ruts in patches of regular shape brushing and re-carpeting with 2" thick(consolidated) asphalt macadam as per specificaiton complete Providing and Laying 2" thick (consolidated) asphalt macadam with liquid asphalt(cut backs) of approved grade with precoated bajri seal coat as specified. Removing of existing worn out bitumanious surface pot holes and ruts in patches and re-carpeting with 3" thick(consolidated) asphalt macadam as per specifiedcomplete including disposal of excavated stuff within one chain Providing and Laying 3" thick (consolidated) asphalt macadam with liquid asphalt(cut backs) of approved grade with precoated bajri seal coat as specified. Surface dressing with bituman 80/100 or any other approved grade on a primary coat of liquid asphalt (cut backs) of any approved grade primer at 22lbs&bituman at 35lbs with 5cft of 1/2 standard size bajri per %sft of road surface complete with rolling. Providing and Laying PVC pipe (b) 8" dia in foot path of bridge for utilities. Providing and filling sand behind abutment of bridges, culverts. Formation of shoulder with permeable material less than 7 % from 200 seive and P.I less than 4 as specified by NHA Cold Milling of asphalt concrete 0-70 mm Cold Milling of asphalt concrete 0-50 mm Cold Milling of asphalt concrete 0-30 mm Seal Coat / Pad Coat Providing and Laying Asphalt concrete in pot holes/ deep patching upto 30 cm including ramming completel Grooving in existing BT road of size 4x4 cm @ 2 meter c/c. Leveling dressing and compaction with power roller of existing base coarse layer after asphalt scarification. Providing and fixing kerb stone (12"x18"x6") in cement sand mortar 1:3 in center media or round about as specified. 100 Sft

Rate (British System) Labour


449.47

Rate (Metric System) Unit


m2

Composite
3,215.98

Labour
48.36

Composite
346.04

Spec. No

Remarks

16-50

100 Sft

679.64

4,449.94

m2

73.13

478.81

16-51

100 Sft

470.39

4,240.69

m2

50.61

456.30

16-52

100 Sft

864.62

6,322.03

m2

93.03

680.25

16-53

100 Sft

655.37

6,112.78

m2

70.52

657.73

16-54

100 Sft

18.94

2,054.67

m2

2.04

221.08

16-55 16-56 16-57 16-58-a 16-58-b 16-58-c 16-59 16-60 16-61 16-62 16-63-a

10 Rft 100 Cft 1000 Cft 100 Sft 100 Sft 100 Sft 100 Sft 100 Cft 100 Sft 100 Sft 100 Rft

49.60 653.48 932.48 41.85 27.90 16.74 109.74 1,705.00 170.50 356.50 1,147.00

4,233.78 1,984.48 10,588.24 897.56 622.94 351.10 680.85 15,311.28 170.50 646.88 13,074.94

m m3 m3 m2 m2 m2 m2 m3 m2 m2 m

16.27 230.77 32.93 4.50 3.00 1.80 11.81 602.12 18.35 38.36 37.63

1,389.04 700.81 373.92 96.58 67.03 37.78 73.26 5,407.13 18.35 69.60 428.97

NWFP CSR 2008 - Approved 25-Aug-2008

Page 98 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 16 :

ROADS AND BRIDGES

Item Code
16-63-b

Description Unit
Providing and fixing kerb stone (12"x14"x6") in cement sand mortar 1:3 in center media or round about as specified. Providing and fixing kerb stone (12"x12"x6") in cement sand mortar 1:3 in center media or round about as specified. Bailing out water by Mechanical mean. Pavement marking in reflective thermoplast paint with glass beads for line 15 cm width. Pavement marking in reflective thermoplast paint with glass beads for line 20 cm width. Pavement marking in non-reflective thermoplast paint for line 15 cm width. Pavement marking in non-reflective thermoplast paint for line 20 cm width. Pavement marking in reflective chlorinated rubber paint with glass beads for line 15 cm width. Pavement marking in reflective chlorinated rubber paint with glass beads for line 20 cm width. Pavement marking in reflective chlorinated rubber paint for line 15 cm width. Pavement marking in reflective chlorinated rubber paint for line 20 cm width. Providing & laying stone soling in water logged area including granular filling & compaction complete. Tucking and chipping of road surface before hot surface dressing over existing road. Leveling course on existing surface of road. Jack Anchorage For 20 to 24 Wires 0.5" Strand (Comprising Trumpet, Stressing Block & Wedges Complete) Jack Anchorage For 16 to 19 Wires 0.5" Strand (Comprising Trumpet, Stressing Block & Wedges Complete) Jack Anchorage For 10 to 12 Wires 0.5" Strand (Comprising Trumpet, Stressing Block & Wedges Complete) Jack Anchorage For 13 to 15 Wires 0.5" Strand (Comprising Trumpet, Stressing Block & Wedges Complete) Jack Anchorage For 8 to 9 Wires 0.5" Strand (Comprising Trumpet, Stressing Block & Wedges Complete) 100 Rft

Rate (British System) Labour


1,147.00

Rate (Metric System) Unit


m

Composite
12,469.94

Labour
37.63

Composite
409.12

Spec. No

Remarks

16-63-c

100 Rft

1,147.00

11,864.94

37.63

389.27

16-64 16-65-a 16-65-b 16-66-a 16-66-b 16-67-a 16-67-b 16-68-a 16-68-b 16-69 16-70 16-71 16-72-a

100 Cft 100 Rft 100 Rft 100 Rft 100 Rft 100 Rft 100 Rft 100 Rft 100 Rft 100 Cft 100 Sft 100 Cft Each

5.74 153.45 153.45 153.45 153.45 153.45 153.45 153.45 153.45 565.75 139.50 283.77 83.70

26.91 2,754.95 3,639.46 1,544.95 2,018.06 1,060.95 1,369.50 818.95 1,045.22 3,479.56 139.50 26,926.86 11,578.70

m3 m m m m m m m m m3 m2 m3 each

2.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 5.03 199.79 15.01 100.21 83.70

9.50 90.39 119.40 50.69 66.21 34.81 44.93 26.87 34.29 1,228.80 15.01 9,509.14 11,578.70

16-72-b

Each

83.70

9,279.70

each

83.70

9,279.70

16-72-c

Each

83.70

5,528.70

each

83.70

5,528.70

16-72-d

Each

83.70

7,464.70

each

83.70

7,464.70

16-72-e

Each

83.70

4,318.70

each

83.70

4,318.70

NWFP CSR 2008 - Approved 25-Aug-2008

Page 99 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 16 :

ROADS AND BRIDGES

Item Code
16-72-f 16-72-g 16-73-a 16-73-b 16-73-c 16-73-d 16-73-e 16-73-f 16-73-g 16-73-h 16-73-i 16-73-j 16-74-a

Description Unit
Jack Anchorage For 5 to 7 Wires 0.5" Strand (Comprising Trumpet, Stressing Block & Wedges Complete) Jack Anchorage For upto 4 Wires 0.5" Strand (Comprising Trumpet, Stressing Block & Wedges Complete) Un-galvanized Sheath for 20 to 24 Wires 0.5" Strand Cable Un-galvanized Sheath for 16 to 19 Wires 0.5" Strand Cable Un-galvanized Sheath for 13 to 15 Wires 0.5" Strand Cable Un-galvanized Sheath for 10 to 12 Wires 0.5" Strand Cable Un-galvanized Sheath for 8 to 9 Wires 0.5" Strand Cable Un-galvanized Sheath for 5 to 7 Wires 0.5" Strand Cable Un-galvanized Sheath for upto 4 Wires 0.5" Strand Cable Stressing and Grouting for Cables upto 24/0.5" (Single End Stressing). Stressing and Grouting for Cables ranging from 13/0.5" to 24/.05" (Single End Stressing). Stressing and Grouting for Cable below 13/0.5" (Single End Stressing). Supply of High Tensile Pre-stressed concrete steel wire strand Grade 270K 0.5" dia. Packed in standard reeless/weldless coils of two 2000 kgs approximately binded and wraped in Hessian Cloth. Supply of P.C Steel wire Dia 7 mm and 8 mm. Packed in reeless coils of 600 kgs to 800kgs properly binded. Supply of P.C Steel wire Dia 4 mm and 5 mm. Packed in reeless coils of 600 kgs to 800kgs properly binded. Galvanized Sheath for 20 to 24 Wires 0.5" Strand Cable Galvanized Sheath for 16 to 19 Wires 0.5" Strand Cable Galvanized Sheath for 13 to 15 Wires 0.5" Strand Cable Galvanized Sheath for 10 to 12 Wires 0.5" Strand Cable Galvanized Sheath for 8 to 9 Wires 0.5" Strand Cable Galvanized Sheath for 5 to 7 Wires 0.5" Strand Cable Galvanized Sheath for upto 4 Wires 0.5" Strand Cable Precast Reinfored Concrete Kerb New Jersy Barrier for Median (Double Face) Precast Reinforced Concrete Kerb New Jersy Barrier for Bridge (Single Face) Repair to pot holes including cleaning, brushing, removal of loose material and filling of the same with clean stone of size 0.75" to 1.5" with hot bitumen manual compaction with rammer (water bound 3% biutmen) Each Each 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft Each Each Each Tonne

Rate (British System) Labour


83.70 83.70 5.10 5.10 5.10 5.10 5.10 5.10 5.10 623.10 415.40 297.60 0.00

Rate (Metric System) Unit


each each m m m m m m m each each each ton

Composite
3,471.70 2,261.70 129.73 112.79 97.06 84.96 77.70 70.44 59.55 2,075.10 1,867.40 1,749.60 163,350.00

Labour
83.70 83.70 16.73 16.73 16.73 16.73 16.73 16.73 16.73 623.10 415.40 297.60 0.00

Composite
3,471.70 2,261.70 425.62 370.05 318.44 278.74 254.92 231.10 195.37 2,075.10 1,867.40 1,749.60 165,971.28

Spec. No

Remarks

16-74-b 16-74-c 16-75-a 16-75-b 16-75-c 16-75-d 16-75-e 16-75-f 16-75-g 16-76-a 16-76-b 16-77

Tonne Tonne 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 8 Rft 8 Rft 100 Sft

0.00 0.00 5.10 5.10 5.10 5.10 5.10 5.10 5.10 0.00 0.00 917.91

127,050.00 114,950.00 173.29 150.30 129.73 112.79 103.11 93.43 78.91 12,438.19 8,659.55 3,836.66

ton ton m m m m m m m m m m2

0.00 0.00 16.73 16.73 16.73 16.73 16.73 16.73 16.73 0.00 0.00 98.77

129,088.77 116,794.60 568.54 493.11 425.62 370.05 338.29 306.53 258.89 5,100.96 3,551.32 412.82

NWFP CSR 2008 - Approved 25-Aug-2008

Page 100 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 17 :

LINING OF CANALS

Item Code
17-01-a 17-01-b 17-02 17-03-a 17-03-b 17-04-a 17-04-b 17-05-a 17-05-b 17-06-a

Description Unit
Formation, dressing and preparing sub-grade in bed Formation, dressing and preparing sub-grade On slope Stabilized layer of cement, sand mortar 1:30 2" thick on slope 1/2" thick plaster of cement, sand motar 1:10 in bed 1/2" thick plaster of cement, sand motar 1:10 On slope 1" thick plaster of cement, sand mortar 1:6 in bed 1" thick plaster of cement, sand mortar 1:6 On slope 3/8" thick plaster of cement, sand mortar 1:3 in bed 3/8" thick plaster of cement, sand mortar 1:3 On slope Lining with Brick tiles 12"x6"x2", in c/s mortar 1:6 over a layer of 1/8" thick c/s mortar 1:6 (in bed) 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Cft

Rate (British System) Labour


311.55 434.00 852.50 612.87 782.75 782.75 999.75 612.87 782.75 3,076.75

Rate (Metric System) Unit


m2 m2 m2 m2 m2 m2 m2 m2 m2 m3

Composite
311.55 434.00 1,309.88 816.88 986.76 1,657.22 1,874.22 955.42 1,125.30 12,612.88

Labour
33.52 46.70 91.73 65.94 84.22 84.22 107.57 65.94 84.22 1,086.55

Composite
33.52 46.70 140.94 87.90 106.17 178.32 201.67 102.80 121.08 4,454.20

Spec. No

Remarks

The rates covers laying tiles including mortar item 17.01 to 17.05 are payable separately.

17-06-b 17-07-a 17-07-b 17-08-a 17-08-b 17-09-a 17-09-b 17-10-a-01 17-10-a-02 17-10-a-03 17-10-b-01 17-10-b-02 17-10-b-03

Lining with Brick tiles 12"x6"x2", in c/s mortar 1:6 over a layer of 1/8" thick c/s mortar 1:6 (On slope) Lining with Brick tiles 12"x6"x2", in c/s mortar 1:3 over a layer of 1/8" thick c/s mortar 1:3 (in bed) Lining with Brick tiles 12"x6"x2", in c/s mortar 1:3 over a layer of 1/8" thick c/s mortar 1:3 (On slope) Lining with bricks 9"x4.5"x3" (First Class) in c/s mort. 1:6 ove a layer of 1/8" thick c/s mortar 1:6 (in bed) Lining with bricks 9"x4.5"x3" (First Class), in c/s mort. 1:6 over a layer of 1/8" thick c/s mortar 1:6 (On slope) Lining with bricks 9"x4.5"x3" (First Class), in c/s mort. 1:3 over a layer of 1/8" thick c/s mortar 1:3 (in bed) Lining with bricks 9"x4.5"x3" (First Class), in c/s mort. 1:3 over a layer of 1/8" thick c/s mortar 1:3 (On slope) 4" thick PCC lining, using washed screened & graded stone aggregate : in bed : Ratio 1:2:4 4" thick PCC lining, using washed screened & graded stone aggregate : in bed : Ratio 1:3:6 4" thick PCC lining, using washed screened & graded stone aggregate : in bed : Ratio 1:4:8 4" thick PCC lining, using washed screened & graded stone aggregate : On slope : Ratio 1:2:4 4" thick PCC lining, using washed screened & graded stone aggregate : On slope : Ratio 1:3:6 4" thick PCC lining, using washed screened & graded stone aggregate : On slope : Ratio 1:4:8

100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft

3,503.00 3,076.75 3,503.00 3,076.75 3,503.00 3,076.75 3,503.00 2,402.50 2,402.50 2,402.50 2,828.75 2,828.75 2,828.75

13,039.13 13,685.42 14,111.67 10,634.53 11,060.78 11,707.08 12,133.33 12,047.65 10,124.72 8,471.86 12,473.90 10,550.97 8,898.11

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

1,237.07 1,086.55 1,237.07 1,086.55 1,237.07 1,086.55 1,237.07 848.44 848.44 848.44 998.96 998.96 998.96

4,604.73 4,832.96 4,983.49 3,755.55 3,906.08 4,134.32 4,284.85 4,254.59 3,575.51 2,991.81 4,405.12 3,726.04 3,142.34
ditto ditto ditto

NWFP CSR 2008 - Approved 25-Aug-2008

Page 101 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 17 :

LINING OF CANALS

Item Code
17-11-a 17-11-b 17-11-c 17-11-d 17-11-e 17-11-f

Description Unit
Providing and Laying PCC SEGMENTS in PRECAST Lining (PARABOLA TYPE) TYPE A PROVIDinG AND LAYin PCC SEGMENTS in PRECAST Lining (PARABOLA TYPE) TYPE B Providing and Laying PCC segments in Precast lining (Parabola type) Type C Providing and Laying PCC segments in Precast lining (Parabola type) Type d Providing and Laying PCC segments in Precast lining (Parabola type) Type SPL D Providing and Laying PCC segments in Precast lining (Parabola type) Type e 1Rft 1Rft 1Rft 1Rft 1Rft 1Rft

Rate (British System) Labour


117.64 78.43 63.96 63.96 58.80 58.80

Rate (Metric System) Unit


m m m m m m

Composite
453.32 219.94 161.17 137.43 114.86 104.09

Labour
385.97 257.32 209.85 209.85 192.90 192.90

Composite
1,487.28 721.57 528.76 450.90 376.84 341.51

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 102 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 18 :

SHEET PILING

Item Code
18-01 18-02 18-03-a

Description Unit
Cutting Ransome & Larson piles. Cutting universal piles Driving steel piles to depth of: Upto 15' Each Each 1 RFT

Rate (British System) Labour


147.25 159.03 43.81

Rate (Metric System) Unit


Cut Cut m

Composite
147.25 159.03 43.81

Labour
147.25 159.03 143.72

Composite
147.25 159.03 143.72

Spec. No

Remarks

a) The rates includes laying and removing of track and also carriage way of piles to machine, average distance of 100 ft. b) The rates are for the trackle ganges only supplied by the contractor. Mechincal staff on machine will be supplied by the Govt; c) T-piles and adjustable junction piles will be counted as two piles.

18-03-b

Driving steel piles to depth of: More than 15' to 25'

1 RFT

58.93

58.93

193.33

193.33

18-03-c

Driving steel piles to depth of: More than 25' to 30'

1 RFT

61.48

61.48

201.71

201.71

18-04 18-05 18-06 18-07-a 18-07-b 18-07-c 18-08 18-09

Dolleying piles upto 5' Drilling holes in piles by hand Raising and lowering machine Turning Machine : 90 Turning Machine : 135 Turning Machine : 180 Travelling machine (light) Loading and unloading piles

Each Each Each Job Job Job 50 meter tonne

130.20 17.67 5,020.76 2,883.00 3,596.00 4,619.00 4,501.20 103.23

130.20 17.67 5,020.76 2,883.00 3,596.00 4,619.00 4,501.20 103.23

Each Each Each Job Job Job 50 m tonne

130.20 17.67 5,020.76 2,883.00 3,596.00 4,619.00 4,501.20 103.23

130.20 17.67 5,020.76 2,883.00 3,596.00 4,619.00 4,501.20 103.23

To be done by hand carts or ramps, including cost of ropes.

18-10 18-11 18-12

Carriage of piling machine under different conditions Erecting piling machines Dismantling piling machine

50 meter Each Each

2,317.25 13,726.80 13,726.80

2,317.25 13,726.80 13,726.80

50 m Each Each

2,317.25 13,726.80 13,726.80

2,317.25 13,726.80 13,726.80

NWFP CSR 2008 - Approved 25-Aug-2008

Page 103 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 19 :

PROTECTION AND DIVERSION WORKS

Item Code
19-01 19-02 19-03-a

Description Unit
Cutting pilchi, frash or sarkanda including carriage within 1.5 km. Weaving matresses Supply & fill used synthetic fibre/plastic bags 1.25cft capacity with sand or earth, sewing & stacking : in dry 100 Cft 100 Sft Each

Rate (British System) Labour


530.10 1,004.40 22.60

Rate (Metric System) Unit


m3 m2 Each

Composite
530.10 1,004.40 28.65

Labour
187.20 108.07 22.60

Composite
187.20 108.07 28.65

Spec. No

Remarks

The rate dones not include supply of sand or earth for filling of bags, which shall be paid extra.

19-03-b

19-03-c 19-03-d 19-04-a 19-04-b 19-04-c 19-04-d 19-05-a 19-05-b 19-05-c 19-06-a 19-06-b 19-06-c 19-07-a 19-07-b 19-07-c 19-08

Supply & fill used synthetic fibre/plastic bags 1.25cft capacity with sand or earth, sewing & stacking : Under water Supply & fill used cotton bags 1.25 cft capacity with sand or earth, sewing & stacking : in dry Supply & fill used cotton bags 1.25 cft capacity with sand or earth, sewing & stacking : Under Water Supply & fill new synthetic fibre/plastic bags 4-5cft capacity with sand or earth,sewing, stacking : in dry Supply & fill new synthetic fibre/plastic bags 4-5cft capacity with sand or earth,sewing, stacking : Under water Supply & fill used cotton bags 4-5 cft capacity with sand or earth, sewing & stacking : in dry Supply & fill used cotton bags 4-5 cft capacity with sand or earth, sewing & stacking : Under Water Carriage of synthetic fibre/plastic bags 1.25 cft capacity filled with sand / earth : 1st 50 m Carriage of synthetic fibre/plastic bags 1.25 cft capacity filled with sand / earth : 2nd & 3rd 50 m Carriage of synthetic fibre/plastic bags 1.25 cft capacity filled with sand / earth : 4th and subsequent 50 m Carriage of new synthetic fibre/plastic bags 4-5 cft capacity filled with sand/earth : 1st 50 m Carriage of new synthetic fibre/plastic bags 4-5 cft capacity filled with sand/earth : 2nd & 3rd 50 m Carriage of new synthetic fibre/plastic bags 4-5 cft capacity filled with sand/earth : 4th & subsequent 50 m Rolling matresses to river edge & floating, after unrolling with area : Upto 200 m2 Rolling matresses to river edge & floating, after unrolling with area : Over 200 to 250 m2 Rolling matresses to river edge & floating, after unrolling with area : Over 250 m2 Sewing empty cement bags in sheets

Each

28.18

34.23

Each

28.18

34.23

Each Each Each Each Each Each 100 No. 100No/50 m 100No/50 m 100 No. 100No/50 m 100No/50 m 100 Sft 100 Sft 100 Sft 100 No.

22.60 28.18 90.40 112.72 90.40 112.72 114.39 86.49 9.49 457.56 345.96 37.94 306.90 488.25 583.11 404.55

38.33 43.91 103.71 126.03 117.02 139.34 114.39 86.49 9.49 457.56 345.96 37.94 306.90 488.25 583.11 492.64

each each Each Each each each 100 No. 100No/50m 100No/50m 100 Nos. 100No/50m 100No/50m m2 m2 m2 100 No.

22.60 28.18 90.40 112.72 90.40 112.72 114.39 86.49 9.49 457.56 345.96 37.94 33.02 52.54 62.74 404.55

38.33 43.91 103.71 126.03 117.02 139.34 114.39 86.49 9.49 457.56 345.96 37.94 33.02 52.54 62.74 492.64
Page 104 of 144 ditto

NWFP CSR 2008 - Approved 25-Aug-2008

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 19 :

PROTECTION AND DIVERSION WORKS

Item Code
19-09

Description Unit
Making compact round pilchi, frash or sarkanda round bundles of specified size for the work 100 Cft

Rate (British System) Labour


544.05

Rate (Metric System) Unit


m3

Composite
544.05

Labour
192.13

Composite
192.13

Spec. No

Remarks
Measured in the shape of compact round bundles and of size specified for the work before filling at site.

19-10 19-11-a 19-11-b 19-11-c 19-12 19-13-a-01 19-13-a-02 19-13-a-03 19-13-b-01 19-13-b-02 19-13-b-03 19-13-c-01 19-13-c-02 19-13-c-03 19-14 19-15-a 19-15-b 19-15-c 19-16-a 19-16-b

Launching the bundles mentioned in Item 19-09 above & placing in position Supply within 150m (500 feet) : Boulders 9" and above Supply within 150m (500 feet) : Over size shingle 3" to 9" Supply within 150m (500 feet): Mixed graded shingle Supplying munj or patha trungers (6" mesh to hold 3 cft) stones/boulders Provide & weave GI wire netting for wire crates 6"x9" mesh : 15 SWG wire Provide & weave GI wire netting for wire crates 6"x9" mesh : 10 SWG wire Provide & weave GI wire netting for wire crates 6"x9" mesh : 8 SWG wire Provide & weave GI wire netting for wire crates 6"x6" mesh : 15 SWG wire Provide & weave GI wire netting for wire crates 6"x6" mesh : 10 SWG wire Provide & weave GI wire netting for wire crates 6"x6" mesh : 8 SWG wire Provide & weave GI wire netting for wire crates 4"x6" mesh : 15 SWG wire Provide & weave GI wire netting for wire crates 4"x6" mesh : 10 SWG wire Provide & weave GI wire netting for wire crates 4"x6" mesh : 8 SWG wire Providing and Laying shingle on top of bund, including handling of materials within 100 m. Supply & dump at site, without boat, including handling within 100m : Stone or boulder Supply & dump at site, without boat, including handling within 100m : Shingle or spawls Supply & dump at site, without boat, including handling within 100m : Brick bats Supplying and dumping by boat, including loading within 100m lead : Stone or boulder Supplying and dumping by boat, including loading within 100m lead : Shingle or spawls

100 Cft 100 Cft 100 Cft 100 Cft Each 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft

334.80 1,009.98 675.18 797.94 69.75 807.24 1,449.56 2,126.60 1,085.00 2,100.56 2,821.00 1,371.44 2,577.96 3,463.32 279.00 558.00 558.00 418.50 1,395.00 1,395.00

334.80 1,009.98 675.18 797.94 102.60 2,041.44 4,222.88 7,368.94 2,728.48 5,801.35 9,817.39 3,427.83 7,104.57 11,942.89 1,368.00 1,828.50 1,647.00 2,838.50 2,605.00 2,484.00

m3 m3 m3 m3 Each m2 m2 m2 m2 m2 m2 m2 m2 m2 m3 m3 m3 m3 m3 m3

118.23 356.67 238.44 281.79 69.75 86.86 155.97 228.82 116.75 226.02 303.54 147.57 277.39 372.65 98.53 197.06 197.06 147.79 492.64 492.64

118.23 356.67 238.44 281.79 102.60 219.66 454.38 792.90 293.58 624.22 1,056.35 368.84 764.45 1,285.05 483.11 645.73 581.63 1,002.41 919.95 877.22
Page 105 of 144

NWFP CSR 2008 - Approved 25-Aug-2008

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 19 :

PROTECTION AND DIVERSION WORKS

Item Code
19-16-c 19-17-a 19-17-b 19-18-a 19-18-b 19-19 19-20 19-21 19-22 19-23 19-24-a 19-24-b 19-25 19-26 19-27 19-28-a 19-28-b 19-29-a 19-29-b 19-30-a 19-30-b 19-30-c 19-31-a

Description Unit
Supplying and dumping by boat, including loading within 100m lead : Brick bats Provide & fill brick bats in crates, excluding cost of crates : without hand packing. Provide & fill brick bats in crates, excluding cost of crates : with hand packing. Supply & fill bricks in wire crates including sewing crates, excl cost of crates : Stone or boulder Supply & fill bricks in wire crates including sewing crates, excl cost of crates : Shingle or spawls Extra for anchoring boat for dumping by boats or tipping crates Extra for tipping crates (in addition to achoring boats) Pilchi revetment, including carriage upto 1.5 km Surface protection with pilchi matresses including carriage upto 1.5 km. Pilchi, sarkanda or frash pitching on slopes, incl supply within 1.5 km, pegging & tying with wire P&E groynes, vertical wooden stakes 7"-12" dia Upto 1.5 m high, single row of stakes at 0.3m P&E groynes, vertical wooden stakes 7"-12" dia Upto 3 m high, double row of stakes at 0.6m Providing and Laying stone pithcing/filling, dry hand packed in pitching & aprons Supplying stone and stone filling in GI wire crate and its sewing, excluding cost of crates Providing and Laying stone pitching with hammer dressed stones on surface, laid in courses Providing and Laying stone pitching for top layer only : On slope Providing and Laying stone pitching for top layer only : On level Providing and Laying stone or spawl filling : On slope Providing and Laying stone or spawl filling : On level Providing and Laying grouted stone pitching, in 1:8 c/s mortar Top layer on slope Providing and Laying grouted stone pitching, in 1:8 c/s mortar Top layer on level Providing and Laying grouted stone pitching, in 1:8 c/s mortar Stone pitching/filling on slope or on level Grouting stone pitching or apron etc, in : Cement, sand mortar 1:3 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Sft

Rate (British System) Labour


1,116.00 697.50 837.00 602.64 599.85 55.80 558.00 279.00 0.00 558.00 589.00 1,038.50 868.00 899.00 2,015.00 2,573.00 2,015.00 426.25 356.50 3,146.50 2,573.00 2,146.75 1,209.00

Rate (Metric System) Unit


m3 m3 m3 m3 m3 m3 m3 m2 m2 m2 m2 m2 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m2

Composite
3,536.00 3,117.50 3,257.00 1,812.64 1,688.85 55.80 558.00 1,852.00 36.30 7,181.54 4,097.88 5,031.38 3,046.00 3,077.00 4,628.60 5,186.60 4,628.60 2,822.05 2,752.30 7,310.71 6,737.21 6,310.96 4,122.08

Labour
394.11 246.32 295.58 212.82 211.84 19.71 197.06 30.02 0.00 60.04 63.38 111.74 306.53 317.48 711.59 908.65 711.59 150.53 125.90 1,111.18 908.65 758.12 130.09

Composite
1,248.73 1,100.94 1,150.20 640.13 596.41 19.71 197.06 199.28 3.91 772.73 440.93 541.38 1,075.69 1,086.63 1,634.58 1,831.63 1,634.58 996.60 971.97 2,581.76 2,379.23 2,228.70 443.54

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 106 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 19 :

PROTECTION AND DIVERSION WORKS

Item Code
19-31-b 19-32 19-33 19-34 19-35 19-36 19-37 19-38-a 19-38-b

Description Unit
Grouting stone pitching or apron etc, in : Cement, sand mortar 1:8 Sand grouting in stone apron, with high pressure hose Grouting stone filling or pitching with bajri Remove stone & repitching hand packed, on slopes or level, making good damaged portion Collect & stack boulders from nullah beds or loose shale etc within 100m lead Levelling and dressing stone filling under blocks and grouting with shingle Grouting jharies between blocks with bajri Breaking stone into spawls and stacking Stone pitching with hammer dressed stone on surface laid in courses including carriage of material with in 91.50 (300 feet) meters. Stone pitching hand packed with surface levelled off to the correct section with hammer dressed stone and voids filled in 1:8 cement mortar in floors of bridges and along banks and in aprons etc including 91.50 meter lead. Removing stone and repitching, hand packed on slopes after making good damage slope. Collecting and stacking boulders from nullah beds or loose shale from any other site, within 91.50 (300 feet) meter lead Stone pitching for top layer only on slop Stone pitching for top layer only on Bed Laying stone or spawl filling. a)on level Laying stone or spawl filling. a)on slop Fix floating spurs, with material from canal plantation within 1 km : Upto 2' FS depth Fix floating spurs, with material from canal plantation within 1 km : Over 2' to 3' FS depth Fix floating spurs, with material from canal plantation within 1 km : Over 3' to 4' FS depth Fix floating spurs, with material from canal plantation within 1 km : Exceeding 4' depth Stake & bush from canal plantation etc : Pegs 3.5' long, 3"-6" dia: Unsharpened within 1km 100 Sft 100 Sft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft

Rate (British System) Labour


1,209.00 426.25 348.75 2,046.00 837.00 426.25 713.00 418.50 2,720.25

Rate (Metric System) Unit


m2 m2 m3 m3 m3 m3 m3 m3 m3

Composite
2,722.54 1,007.05 820.65 2,046.00 837.00 752.95 1,184.90 418.50 5,333.85

Labour
130.09 45.86 123.16 722.54 295.58 150.53 251.79 147.79 960.65

Composite
292.95 108.36 289.81 722.54 295.58 265.90 418.44 147.79 1,883.63

Spec. No

Remarks

19-38-c

100 Cft

3,146.50

7,287.60

m3

1,111.18

2,573.60

19-38-d 19-38-e

100 Cft 100 Cft

1,131.50 558.00

1,131.50 558.00

m3 m3

399.59 197.06

399.59 197.06

19-38-f-01 19-38-f-02 19-38-g-01 19-38-g-02 19-39-a 19-39-b 19-39-c 19-39-d 19-40-a-01

100 Cft 100 Cft 100 Cft 100 Cft Each Each Each Each 100 No.

2,573.00 2,015.00 356.50 426.25 14.26 20.24 28.52 57.04 929.07

5,186.60 4,628.60 2,752.30 2,822.05 14.26 20.24 28.52 57.04 1,171.07

m3 m3 m3 m3 Each Each Each Each 100 No.

908.65 711.59 125.90 150.53 14.26 20.24 28.52 57.04 929.07

1,831.63 1,634.58 971.97 996.60 14.26 20.24 28.52 57.04 1,171.07


Royalty to be paid to the forest Department or cost to the private owner, as the case may be, if and when required. Page 107 of 144

NWFP CSR 2008 - Approved 25-Aug-2008

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 19 :

PROTECTION AND DIVERSION WORKS

Item Code
19-40-a-02 19-40-a-03 19-40-a-04 19-40-a-05 19-40-b-01 19-40-b-02 19-40-b-03 19-40-b-04 19-40-b-05 19-40-c-01 19-40-c-02 19-40-c-03 19-40-c-04 19-40-c-05

Description Unit
Stake & bush from canal plantation etc : Pegs 3.5' long, 3"-6" dia: Sharpening one end Stake & bush from canal plantation etc : Pegs 3.5' long, 3"-6" dia: Driving 1' below ground Stake & bush from canal plantation etc : Pegs 3.5' long, 3"-6" dia: Tying with munj, patha ban Stake & bush from canal plantation etc : Pegs 3.5' long, 3"-6" dia: Wattle+intertwine brushwood Stake & bush from canal plantation etc : Pegs 4' long, 3"-6" dia: Unsharpened within 1km Stake & bush from canal plantation etc : Pegs 4' long, 3"-6" dia: Sharpening one end Stake & bush from canal plantation etc : Pegs 4' long, 3"-6" dia: Driving 1.25' below ground Stake & bush from canal plantation etc : Pegs 4' long, 3"-6" dia: Tying with munj, patha ban Stake & bush from canal plantation etc : Pegs 4' long, 3"-6" dia: Wattle+intertwine brushwood Stake & bush from canal plantation etc : Pegs 5' long, 3"-6" dia: Unsharpened within 1km Stake & bush from canal plantation etc : Pegs 5' long, 3"-6" dia: Sharpening one end Stake & bush from canal plantation etc : Pegs 5' long, 3"-6" dia: Driving 1.5' below ground Stake & bush from canal plantation etc : Pegs 5' long, 3"-6" dia: Tying with munj, patha ban Stake & bush from canal plantation etc : Pegs 5' long, 3"-6" dia: Wattle+intertwine brushwood 100 No. 100 No. 100 Rft 100 Rft 100 No. 100 No. 100 No. 100 Rft 100 Rft 100 No. 100 No. 100 No. 100 Rft 100 Rft

Rate (British System) Labour


441.75 348.75 139.50 976.50 1,068.57 441.75 488.25 139.50 1,185.75 1,286.50 471.20 412.30 139.50 1,450.80

Rate (Metric System) Unit


100 No. 100 No. 100 Rft 100 Rft 100 No. 100 No. 100 No. 100 Rft 100 Rft 100 No. 100 No. 100 No. 100 Rft 100 Rft

Composite
441.75 348.75 157.65 1,339.50 1,431.57 441.75 488.25 157.65 1,548.75 1,528.50 471.20 412.30 157.65 1,813.80

Labour
441.75 348.75 139.50 976.50 1,068.57 441.75 488.25 139.50 1,185.75 1,286.50 471.20 412.30 139.50 1,450.80

Composite
441.75 348.75 157.65 1,339.50 1,431.57 441.75 488.25 157.65 1,548.75 1,528.50 471.20 412.30 157.65 1,813.80

Spec. No

Remarks

ditto

Royalty to be paid to the forest Department or cost to the private owner, as the case may be, if and when required.

19-40-d-01 19-40-d-02 19-40-d-03 19-40-d-04 19-40-d-05

Stake & bush from canal plantation etc : Pegs 6' long, 3"-6" dia: Unsharpened within 1km Stake & bush from canal plantation etc : Pegs 6' long, 3"-6" dia: Sharpening one end Stake & bush from canal plantation etc : Pegs 6' long, 3"-6" dia: Driving 1.75' below ground Stake & bush from canal plantation etc : Pegs 6' long, 3"-6" dia: Tying with munj, patha ban Stake & bush from canal plantation etc : Pegs 6' long, 3"-6" dia: Wattle+intertwine brushwood

100 No. 100 No. 100 No. 100 Rft 100 Rft

1,573.25 547.77 485.77 139.50 1,813.50

1,815.25 547.77 485.77 157.65 2,176.50

100 No. 100 No. 100 No. 100 Rft 100 Rft

1,573.25 547.77 485.77 139.50 1,813.50

1,815.25 547.77 485.77 157.65 2,176.50


ditto

NWFP CSR 2008 - Approved 25-Aug-2008

Page 108 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 19 :

PROTECTION AND DIVERSION WORKS

Item Code
19-40-e-01 19-40-e-02 19-40-e-03 19-40-e-04 19-40-e-05 19-41-a-01 19-41-a-02 19-41-a-03 19-41-a-04 19-41-a-05

Description Unit
Stake & bush from canal plantation etc : Pegs 8' long, 4"-8" dia: Unsharpened within 1km Stake & bush from canal plantation etc : Pegs 8' long, 4"-8" dia: Sharpening one end Stake & bush from canal plantation etc : Pegs 8' long, 4"-8" dia: Driving 2' below ground Stake & bush from canal plantation etc : Pegs 8' long, 4"-8" dia: Tying with munj, patha ban Stake & bush from canal plantation etc : Pegs 8' long, 4"-8" dia: Wattle+intertwine brushwood Stake, market bamboo, bush from any source 8'-10' long, 2.5"-5" dia : Supply bamboo Stake, market bamboo, bush from any source 8'-10' long, 2.5"-5" dia : Sharpen one end Stake, market bamboo, bush from any source 8'-10' long, 2.5"-5" dia : Driving bamboo 2.5' Stake, market bamboo, bush from any source 8'-10' long, 2.5"-5" dia : Tying bamboo with wire Stake, market bamboo, bush from any source 8'-10' long, 2.5"-5" dia : Wattle & intertwine 100 No. 100 No. 100 No. 100 Rft 100 Rft 100 No. 100 No. 100 No. 100 Rft 100 Rft

Rate (British System) Labour


3,286.00 689.13 537.23 139.50 2,092.50 0.00 589.00 620.00 279.00 2,650.50

Rate (Metric System) Unit


100 No. 100 No. 100 No. 100 Rft 100 Rft 100 No. 100 No. 100 No. 100 Rft 100 Rft

Composite
3,528.00 689.13 537.23 161.28 2,455.50 18,150.00 589.00 620.00 300.78 3,231.30

Labour
3,286.00 689.13 537.23 139.50 2,092.50 0.00 589.00 620.00 279.00 2,650.50

Composite
3,528.00 689.13 537.23 161.28 2,455.50 18,150.00 589.00 620.00 300.78 3,231.30

Spec. No

Remarks

ditto ditto

Royalty to be paid to the forest Department or cost to the private owner, as the case may be, if and when required.

19-41-b-01 19-41-b-02 19-41-b-03 19-41-b-04 19-41-b-05 19-41-c-01 19-41-c-02 19-41-c-03 19-41-c-04

Stake, market bamboo, bush from any source 10'-12' long, 2.5"-5" dia : Supply bamboo Stake, market bamboo, bush from any source 10'-12' long, 2.5"-5" dia : Sharpen one end Stake, market bamboo, bush from any source 10'-12' long, 2.5"-5" dia : Driving bamboo 2.75' Stake, market bamboo, bush from any source 10'-12' long, 2.5"-5" dia : Tying bamboo with wire Stake, market bamboo, bush from any source 10'-12' long, 2.5"-5" dia : Wattle & intertwine Stake, market bamboo, bush from any source 12'-14' long, 2.5"-5" dia : Supply bamboo Stake, market bamboo, bush from any source 12'-14' long, 2.5"-5" dia : Sharpen one end Stake, market bamboo, bush from any source 12'-14' long, 2.5"-5" dia : Driving bamboo 3.5' Stake, market bamboo, bush from any source 12'-14' long, 2.5"-5" dia : Tying bamboo with wire

100 No. 100 No. 100 No. 100 Rft 100 Rft 100 No. 100 No. 100 No. 100 Rft

0.00 689.13 651.00 139.50 3,292.20 0.00 777.48 723.23 139.50

21,780.00 689.13 651.00 1,582.43 4,018.20 25,410.00 777.48 723.23 1,582.43

100 No. 100 No. 100 No. 100 Rft 100 Rft 100 No. 100 No. 100 No. 100 Rft

0.00 689.13 651.00 139.50 3,292.20 0.00 777.48 723.23 139.50

21,780.00 689.13 651.00 1,582.43 4,018.20 25,410.00 777.48 723.23 1,582.43


ditto

NWFP CSR 2008 - Approved 25-Aug-2008

Page 109 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 19 :

PROTECTION AND DIVERSION WORKS

Item Code
19-41-c-05 19-41-d-01 19-41-d-02 19-41-d-03 19-41-d-04 19-41-d-05

Description Unit
Stake, market bamboo, bush from any source 12'-14' long, 2.5"-5" dia : Wattle & intertwine Stake, market bamboo, bush from any source 14'-16' long, 2.5"-5" dia : Supply bamboo Stake, market bamboo, bush from any source 14'-16' long, 2.5"-5" dia : Sharpen one end Stake, market bamboo, bush from any source 14'-16' long, 2.5"-5" dia : Driving bamboo 4' Stake, market bamboo, bush from any source 14'-16' long, 2.5"-5" dia : Tying bamboo with wire Stake, market bamboo, bush from any source 14'-16' long, 2.5"-5" dia : Wattle & intertwine 100 Rft 100 No. 100 No. 100 No. 100 Rft 100 Rft

Rate (British System) Labour


3,841.83 0.00 883.50 806.00 139.50 3,906.00

Rate (Metric System) Unit


100 Rft 100 No. 100 No. 100 No. 100 Rft 100 Rft

Composite
4,858.23 29,040.00 883.50 806.00 1,582.43 5,067.60

Labour
3,841.83 0.00 883.50 806.00 139.50 3,906.00

Composite
4,858.23 29,040.00 883.50 806.00 1,582.43 5,067.60

Spec. No

Remarks
ditto

Royalty to be paid to the forest Department or cost to the private owner, as the case may be, if and when required.

19-41-e-01 19-41-e-02 19-41-e-03 19-41-e-04 19-41-e-05 19-42 19-43

Stake, market bamboo, bush from any source 16'-20' long, 2.5"-5" dia : Supply bamboo Stake, market bamboo, bush from any source 16'-20' long, 2.5"-5" dia : Sharpen one end Stake, market bamboo, bush from any source 16'-20' long, 2.5"-5" dia : Driving bamboo 4' Stake, market bamboo, bush from any source 16'-20' long, 2.5"-5" dia : Tying bamboo with wire Stake, market bamboo, bush from any source 16'-20' long, 2.5"-5" dia : Wattle & intertwine Cut & supply brushwood from canal plantation or from any other source, within 1.5 km. Filling brush wood only, thoroughly packed

100 No. 100 No. 100 No. 100 Rft 100 Rft 100 Cft 100 Cft

0.00 1,036.64 971.23 139.50 4,185.00 279.04 139.05

36,300.00 1,036.64 971.23 1,582.43 5,491.80 533.40 139.05

100 No. 100 No. 100 No. 100 Rft 100 Rft m3 m3

0.00 1,036.64 971.23 139.50 4,185.00 98.54 49.10

36,300.00 1,036.64 971.23 1,582.43 5,491.80 188.37 49.10


ditto ditto Measured in compacted and packed shape before filling.

19-44 19-45 19-46 19-47

Covering road 10' to 12' wide, with 3" sarkanda or jungle, upto 50m lead Gachi pitching 1' thick Gachi pitching done with silt clearance and berm dressing Filter granular backfill behind retaining wall (stone/boulder filling upto one meter to prevent choking of weep holes).

100 Rft 100 Sft 100 Sft 100 Cft

166.84 1,815.06 1,535.02 589.00

166.84 1,815.06 1,535.02 2,116.63

50 m m2 m2 m3

273.62 195.30 165.17 208.00

273.62 195.30 165.17 747.48

NWFP CSR 2008 - Approved 25-Aug-2008

Page 110 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 20 :

OUTLETS

Item Code
20-01-a

Description Unit
Earthwork for Outlets : Exc/Refill/Ram/Puddle Upto 50 cusecs channel discharge Earthwork for outlets : Exc/Refill/Ram/Puddle 51-100 cusecs channel discharge Earthwork for outlets : Exc/Refill/Ram/Puddle 101-200 cusecs channel discharge Earthwork for outlets : Exc/Refill/Ram/Puddle 201-350 cusecs channel discharge Earthwork for Outlets : Ex/Refill/Ram/Puddle Over 350 cusecs channel discharge Dismantling outlets: Old types such as KGO's orfices, etc Job

Rate (British System) Labour


697.50

Rate (Metric System) Unit


Job

Composite
697.50

Labour
697.50

Composite
697.50

Spec. No

Remarks
Includes consolidation of earth after refilling

20-01-b 20-01-c 20-01-d 20-01-e 20-02-a

Job Job Job Job Each

920.70 1,395.00 1,883.25 2,790.00 697.50

920.70 1,395.00 1,883.25 2,790.00 697.50

Job Job Job Job Each

920.70 1,395.00 1,883.25 2,790.00 697.50

920.70 1,395.00 1,883.25 2,790.00 697.50


The rates are for total dismantlement and remaoval of material. The rates do not include earthwork for which rates are given in item No 20-01 above.

20-02-b 20-02-c 20-02-d 20-02-e 20-02-f 20-02-g 20-03 20-04 20-05 20-06-a 20-06-b 20-07 20-08 20-09-a 20-09-b 20-09-c

Dismantling outlets: APM or OF, 'H' upto 2.0 ft. Dismantling outlets: APM or OF, 'H' from 2.1-3.0ft Dismantling outlets: APM or OF, 'H' above 3.0 ft Dismantling outlets: Tail cluster bifurcation Dismantling outlets: Tail cluster trifurcation Dismantling outlets: Tail cluster quardification Making temporary APM brick block & fixing at site Dismantling walls, taking out temporary APM brick block, fixing iron block & rebuilding walls Dismantling walls & fitting iron block of OF outlet Constructing, watching & removing bund for outlet built in running water : Upto 3' depth Constructing, watching & removing bund for outlet built in running water : Over 3' depth Adjusting "B" of tail cluster by dismantling and rebuilding throat walls Adjusting "Y" of an APM outlet, including dismantling and rebuilding Extra labour in fixing APM and OF outlet blocks Depth exceeding 5.0' Extra labour in fixing APM and OF outlet blocks Depth more than 4.0' to 5.0' Extra labour in fixing APM and OF outlet blocks Depth more than 3.0' to 4.0'

Each Each Each Each Each Each Each Job Each Each Each Each Each Each Each Each

1,046.25 1,395.00 1,743.75 1,046.25 1,395.00 1,743.75 286.44 720.75 720.75 1,395.00 1,883.25 444.85 860.25 868.00 651.00 520.80

1,046.25 1,395.00 1,743.75 1,046.25 1,395.00 1,743.75 493.35 720.75 720.75 1,395.00 1,883.25 729.20 1,316.42 968.43 751.43 621.23

Each Each Each Each Each Each Each Job Each Each Each Each Each Each Each Each

1,046.25 1,395.00 1,743.75 1,046.25 1,395.00 1,743.75 286.44 720.75 720.75 1,395.00 1,883.25 444.85 860.25 868.00 651.00 520.80

1,046.25 1,395.00 1,743.75 1,046.25 1,395.00 1,743.75 493.35 720.75 720.75 1,395.00 1,883.25 729.20 1,316.42 968.43 751.43 621.23
Page 111 of 144

NWFP CSR 2008 - Approved 25-Aug-2008

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 20 :

OUTLETS

Item Code
20-09-d 20-09-e 20-10 20-11 20-12

Description Unit
Extra labour in fixing APM and OF outlet blocks Depth more than 2.0' to 3.0' Extra labour in fixing APM and OF outlet blocks Depth upto 2.0' Repairing damaged reducing collar of hume pipe outlets Laying iron pipes for outlets. Water allowance for constructing outlets or culverts, when canal water not flowing Each Each Each 1 Rft Each

Rate (British System) Labour


434.00 347.20 286.44 23.01 348.75

Rate (Metric System) Unit


Each Each Each m Each

Composite
512.65 404.07 419.54 23.01 348.75

Labour
434.00 347.20 286.44 75.50 348.75

Composite
512.65 404.07 419.54 75.50 348.75

Spec. No

Remarks

At the discretion of the Engineer-in-Charge depending upon the distance and the source of supply.

20-13 20-14-a 20-14-b 20-15-a 20-15-b 20-16-a 20-16-b

Hoisting and placing RC slab or stone in position on outlets or WC culverts Fixing pipe outlet, including backfilling of earth & puddling : Portion under bank Fixing pipe outlet, including backfilling of earth & puddling : Portion under road, beyond bank Removing pipe outlet,refilling earth & puddling Portion under bank Removing pipe outlet,refilling earth & puddling Portion under road, beyond Changing pipe outlets by removing one pipe & replacing : Portion under bank Changing pipe outlets by removing one pipe & replacing : Portion under road, beyond

Each 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft

299.15 58.74 27.31 46.53 17.44 68.06 33.94

299.15 67.14 35.71 46.53 17.44 76.46 42.34

Each m m m m m m

299.15 192.71 89.61 152.65 57.21 223.29 111.35

299.15 220.27 117.17 152.65 57.21 250.85 138.91

NWFP CSR 2008 - Approved 25-Aug-2008

Page 112 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 21 :

SINKING OF WELLS

Item Code
21-01-a-01 21-01-a-02 21-01-a-03 21-01-a-04 21-01-b-01 21-01-b-02 21-01-b-03 21-01-b-04 21-01-c-01 21-01-c-02 21-01-c-03 21-01-c-04 21-02-a-01 21-02-a-02 21-02-a-03 21-02-a-04 21-02-a-05 21-02-a-06 21-02-a-07 21-02-a-08 21-02-b-01

Description Unit
Excavate well in dry & dispose of soil within 50m in ordinary soil or sand : Upto 1.5 m depth Excavate well in dry & dispose of soil within 50m in ordinary soil or sand : 1.5 to 3 m depth Excavate well in dry & dispose of soil within 50m in ordinary soil or sand : 3 to 4.5 m depth Excavate well in dry & dispose of soil within 50m in ordinary soil or sand : 4.5 to 6 m depth Excavate well in dry & dispose of soil within 50m in hard soil : Upto 1.5 m depth Excavate well in dry & dispose of soil within 50m in hard soil : Above 1.5 to 3 m depth Excavate well in dry & dispose of soil within 50m in hard soil : Above 3 to 4.5 m depth Excavate well in dry & dispose of soil within 50m in hard soil : Above 4.5 to 6 m depth Excavate well in dry & dispose of soil within 50m in hard strata like shingle : Upto 1.5 m depth Excavate well in dry & dispose of soil within 50m in hard strata like shingle :1.5 to 3 m depth Excavate well in dry & dispose of soil within 50m in hard strata like shingle : 3 to 4.5 m depth Excavate well in dry & dispose of soil within 50m in hard strata like shingle : 4.5 to 6 m depth Dry sinking of well & disposal of soil within 50m in ordinary soil : 3 to 4.5 m depth Dry sinking of well & disposal of soil within 50m in ordinary soil : 4.5 to 6 m depth Dry sinking of well & disposal of soil within 50m in ordinary soil : 6 to 7.5 m depth Dry sinking of well & disposal of soil within 50m in ordinary soil : 7.5 to 9 m depth Dry sinking of well & disposal of soil within 50m in ordinary soil : 9 to 10.5 m depth Dry sinking of well & disposal of soil within 50m in ordinary soil : 10.5 to 12 m depth Dry sinking of well & disposal of soil within 50m in ordinary soil : 12 to 13.5 m depth Dry sinking of well & disposal of soil within 50m in ordinary soil : Exceeding 13.5 m depth Dry sinking of well & disposal of soil within 50m in hard soil : 3 to 4.5 m depth 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft

Rate (British System) Labour


206.99 216.47 244.12 278.88 252.81 263.87 288.36 324.71 544.34 564.09 587.79 631.24 1,116.33 1,395.21 1,674.09 1,952.98 2,231.86 2,510.74 2,790.42 3,069.30 1,534.26

Rate (Metric System) Unit


m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

Composite
206.99 216.47 244.12 278.88 252.81 263.87 288.36 324.71 544.34 564.09 587.79 631.24 1,116.33 1,395.21 1,674.09 1,952.98 2,231.86 2,510.74 2,790.42 3,069.30 1,534.26

Labour
73.10 76.45 86.21 98.49 89.28 93.19 101.83 114.67 192.23 199.21 207.58 222.92 394.23 492.71 591.20 689.69 788.17 886.66 985.43 1,083.91 541.82

Composite
73.10 76.45 86.21 98.49 89.28 93.19 101.83 114.67 192.23 199.21 207.58 222.92 394.23 492.71 591.20 689.69 788.17 886.66 985.43 1,083.91 541.82

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 113 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 21 :

SINKING OF WELLS

Item Code
21-02-b-02 21-02-b-03 21-02-b-04 21-02-b-05 21-02-b-06 21-02-b-07 21-02-b-08 21-02-c-01 21-02-c-02 21-02-c-03 21-02-c-04 21-02-c-05 21-02-c-06 21-02-c-07 21-02-c-08 21-03-a-01

Description Unit
Dry sinking of well & disposal of soil within 50m in hard soil : 4.5 to 6 m depth Dry sinking of well & disposal of soil within 50m in hard soil : 6 to 7.5 m depth Dry sinking of well & disposal of soil within 50m in hard soil : 7.5 to 9 m depth Dry sinking of well & disposal of soil within 50m in hard soil : 9 to 10.5 m depth Dry sinking of well & disposal of soil within 50m in hard soil : 10.5 to 12 m depth Dry sinking of well & disposal of soil within 50m in hard soil : 12 to 13.5 m depth Dry sinking of well & disposal of soil within 50m in hard soil : Exceeding 13.5 m depth Dry sinking of well & disposal of soil within 50m in hard strata like shingle : 3 to 4.5 m depth Dry sinking of well & disposal of soil within 50m in hard strata like shingle : 4.5 to 6 m depth Dry sinking of well & disposal of soil within 50m in hard strata like shingle : 6 to 7.5 m depth Dry sinking of well & disposal of soil within 50m in hard strata like shingle : 7.5 to 9 m depth Dry sinking of well & disposal of soil within 50m in hard strata like shingle : 9 to 10.5 m depth Dry sinking of well & disposal of soil within 50m in hard strata like shingle : 10.5 to 12 m depth Dry sinking of well & disposal of soil within 50m in hard strata like shingle : 12 to 13.5 m depth Dry sinking of well & disposal of soil within 50m in hard strata like shingle : Over 13.5 m depth Wet sinking of well for depths below spring level Upto 1.5 m depth Wet sinking of well for depths below spring level Above 1.5 to 3 m depth Wet sinking of well for depths below spring level Above 3 to 4.5 m depth Wet sinking of well for depths below spring level Above 4.5 to 6 m depth Wet sinking of well for depths below spring level Above 6 to 7.5 m depth 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft

Rate (British System) Labour


1,813.14 2,092.81 2,371.70 2,650.58 2,929.47 3,208.35 3,487.23 2,092.02 2,371.70 2,650.58 2,929.47 3,208.35 3,487.23 3,766.91 4,045.79 1,325.60

Rate (Metric System) Unit


m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

Composite
1,813.14 2,092.81 2,371.70 2,650.58 2,929.47 3,208.35 3,487.23 2,092.02 2,371.70 2,650.58 2,929.47 3,208.35 3,487.23 3,766.91 4,045.79 1,325.60

Labour
640.30 739.07 837.56 936.05 1,034.53 1,133.02 1,231.51 738.79 837.56 936.05 1,034.53 1,133.02 1,231.51 1,330.27 1,428.76 468.13

Composite
640.30 739.07 837.56 936.05 1,034.53 1,133.02 1,231.51 738.79 837.56 936.05 1,034.53 1,133.02 1,231.51 1,330.27 1,428.76 468.13

Spec. No

Remarks

The outer dimensions of the curb shall from basis of payment.

21-03-a-02 21-03-a-03 21-03-a-04 21-03-a-05

100 Cft 100 Cft 100 Cft 100 Cft

2,665.68 4,102.24 5,553.27 7,322.87

2,665.68 4,102.24 5,553.27 7,322.87

m3 m3 m3 m3

941.38 1,448.69 1,961.12 2,586.05

941.38 1,448.69 1,961.12 2,586.05

NWFP CSR 2008 - Approved 25-Aug-2008

Page 114 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 21 :

SINKING OF WELLS

Item Code
21-03-a-06 21-03-a-07 21-03-a-08 21-03-a-09 21-03-a-10 21-03-b-01 21-03-b-02 21-03-b-03 21-03-b-04 21-03-b-05 21-03-b-06 21-03-b-07 21-03-b-08 21-03-b-09 21-03-b-10 21-03-c-01 21-03-c-02 21-03-c-03 21-03-c-04 21-03-c-05 21-03-c-06

Description Unit
Wet sinking of well for depths below spring level Above 7.5 to 9 m depth Wet sinking of well for depths below spring level Above 9 to 10.5 m depth Wet sinking of well for depths below spring level Above 10.5 to 12 m depth Wet sinking of well for depths below spring level Above 12 to 13.5 m depth Wet sinking of well for depths below spring level Exceeding 13.5 m depth Wet sinking of well for depths below spring level in cohesive soil : Upto 1.5 m depth Wet sinking of well for depths below spring level in cohesive soil : 1.5 to 3 m depth Wet sinking of well for depths below spring level in cohesive soil : Above 3 to 4.5 m depth Wet sinking of well for depths below spring level in cohesive soil : Above 4.5 to 6 m depth Wet sinking of well for depths below spring level in cohesive soil : Above 6 to 7.5 m depth Wet sinking of well for depths below spring level in cohesive soil : Above 7.5 to 9 m depth Wet sinking of well for depths below spring level in cohesive soil : Above 9 to 10.5 m depth Wet sinking of well for depths below spring level in cohesive soil : Above 10.5 to 12 m depth Wet sinking of well for depths below spring level in cohesive soil : Above 12 to 13.5 m depth Wet sinking of well for depths below spring level in cohesive soil : Exceeding 13.5 m depth Wet sinking of well for depths below spring level in shingle/gravel etc : Upto 1.5 m depth Wet sinking of well for depths below spring level in shingle/gravel etc : 1.5 to 3 m depth Wet sinking of well for depths below spring level in shingle/gravel etc : 3 to 4.5 m depth Wet sinking of well for depths below spring level in shingle/gravel etc : 4.5 to 6 m depth Wet sinking of well for depths below spring level in shingle/gravel etc : 6 to 7.5 m depth Wet sinking of well for depths below spring level in shingle/gravel etc : 7.5 to 9 m depth 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft

Rate (British System) Labour


9,354.33 11,345.75 14,029.52 16,659.65 20,044.70 1,705.52 3,333.00 5,030.79 6,665.21 9,192.81 11,591.90 14,218.25 17,775.71 20,825.26 24,913.98 3,372.59 8,030.75 10,950.47 15,163.14 22,788.77 29,484.97

Rate (Metric System) Unit


m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

Composite
9,354.33 11,345.75 14,029.52 16,659.65 20,044.70 1,705.52 3,333.00 5,030.79 6,665.21 9,192.81 11,591.90 14,218.25 17,775.71 20,825.26 24,913.98 3,372.59 8,030.75 10,950.47 15,163.13 22,788.77 29,484.97

Labour
3,303.45 4,006.72 4,954.48 5,883.31 7,078.73 602.30 1,177.04 1,776.61 2,353.80 3,246.41 4,093.64 5,021.13 6,277.44 7,354.38 8,798.30 1,191.02 2,836.03 3,867.13 5,354.82 8,047.79 10,412.53

Composite
3,303.45 4,006.72 4,954.48 5,883.31 7,078.73 602.30 1,177.04 1,776.61 2,353.80 3,246.41 4,093.64 5,021.13 6,277.44 7,354.38 8,798.30 1,191.02 2,836.03 3,867.13 5,354.81 8,047.79 10,412.53

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 115 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 21 :

SINKING OF WELLS

Item Code
21-03-c-07 21-03-c-08 21-03-c-09 21-03-c-10 21-04 21-05 21-06-a

Description Unit
Wet sinking of well for depths below spring level in shingle/gravel etc : 9 to 10.5 m depth Wet sinking of well for depths below spring level in shingle/gravel etc : 10.5 to 12 m depth Wet sinking of well for depths below spring level in shingle/gravel etc : 12 to 13.5 m depth Wet sinking of well for depths below spring level in shingle/gravel etc : Exceeding 13.5 m depth Making & fixing in position, kikar wood well curb Laying well curb in position only Providing & laying RCC well curb in position, using coarse sand : Ratio 1:1.5:3 100 Cft 100 Cft 100 Cft 100 Cft 100 Cft Each 100 Cft

Rate (British System) Labour


36,979.11 47,902.71 60,229.09 76,638.20 94,247.55 565.75 7,703.67

Rate (Metric System) Unit


m3 m3 m3 m3 m3 Each m3

Composite
36,979.11 47,902.71 60,229.09 76,638.20 184,997.55 565.75 21,023.35

Labour
13,059.06 16,916.70 21,269.72 27,064.55 33,283.24 565.75 2,720.53

Composite
13,059.06 16,916.70 21,269.72 27,064.55 65,331.31 565.75 7,424.33

Spec. No

Remarks

a) If concrete mixer is supplied by government, all charges including depreciation will be recoverd from the contractor. b) The rate does not include cost of steel reinforement and its labour for bending/binding, which is payable separately.

21-06-b

Providing & laying RCC well curb in position, using coarse sand : Ratio 1:2:4

100 Cft

7,703.67

22,414.54

m3

2,720.53

7,915.63

21-07

Providing and fixing structural steel for cutting edge

Ton

14,570.00

106,772.00

tonne

14,339.79

105,085.00

NWFP CSR 2008 - Approved 25-Aug-2008

Page 116 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 22 :

SURFACE DRAINAGE

Item Code
22-01-a-01 22-01-a-02 22-01-b-01 22-01-b-02 22-02-a 22-02-b 22-02-c 22-03-a 22-03-b 22-03-c 22-04-a 22-04-b 22-04-c 22-05-a

Description Unit
Tega formed of pacca bricks on end, laid in and over c/s mortar : 3" thick : Ratio 1:3 Tega formed of pacca bricks on end, laid in and over c/s mortar : 3" thick : Ratio 1:5 Tega formed of pacca bricks on end, laid in and over c/s mortar : 4.5" thick : Ratio 1:3 Tega formed of pacca bricks on end, laid in and over c/s mortar : 4.5" thick : Ratio 1:5 Pacca flat brick 3" thick, laid in reimbursement, in c/s mortar, on sides of drains etc : Ratio 1:3 Pacca flat brick 3" thick, laid in reimbursement, in c/s mortar, on sides of drains etc : Ratio 1:5 Pacca flat brick 3" thick, laid in reimbursement, in c/s mortar, on sides of drains etc : Ratio 1:6 Pacca brick on edge, laid in reimbursement, in c/s mortar, on sides of drains etc : Ratio 1:3 Pacca brick on edge, laid in reimbursement, in c/s mortar, on sides of drains etc : Ratio 1:5 Pacca brick on edge, laid in reimbursement, in c/s mortar, on sides of drains etc : Ratio 1:6 Pacca flat brick, Herring bond pitching in c/s mortar laid to line, grade, slope etc : Ratio 1:3 Pacca flat brick, Herring bond pitching in c/s mortar laid to line, grade, slope etc : Ratio 1:5 Pacca flat brick, Herring bond pitching in c/s mortar laid to line, grade, slope etc : Ratio 1:6 Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type I 100 Rft 100 Rft 100 Rft 100 Rft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Sft 100 Rft

Rate (British System) Labour


566.10 566.10 624.82 624.82 790.79 790.79 790.79 882.73 882.73 882.73 740.27 740.27 740.27 723.97

Rate (Metric System) Unit


m m m m m2 m2 m2 m2 m2 m2 m2 m2 m2 m

Composite
1,915.17 1,715.44 2,216.99 2,089.53 2,950.53 2,737.02 2,676.01 4,116.22 3,800.31 3,707.29 3,173.81 2,931.99 2,878.80 4,454.98

Labour
18.57 18.57 20.50 20.50 85.09 85.09 85.09 94.98 94.98 94.98 79.65 79.65 79.65 23.75

Composite
62.83 56.28 72.74 68.55 317.48 294.50 287.94 442.91 408.91 398.90 341.50 315.48 309.76 146.16

Spec. No

Remarks

The rate does not include cost of excavation, which is to be paid separately.

22-05-b 22-05-c 22-05-d 22-05-e 22-05-f 22-05-g

Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type II Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type III Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type IV Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type V Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type VI Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type VII

100 Rft 100 Rft 100 Rft 100 Rft 100 Rft 100 Rft

1,839.76 2,338.98 2,519.67 3,379.28 3,819.70 3,877.91

10,342.43 13,098.26 14,854.77 19,605.57 21,995.97 22,777.19

m m m m m m

60.36 76.74 82.67 110.87 125.32 127.23

339.32 429.73 487.36 643.23 721.65 747.28

NWFP CSR 2008 - Approved 25-Aug-2008

Page 117 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 22 :

SURFACE DRAINAGE

Item Code
22-05-h 22-05-i 22-05-j 22-05-k 22-05-l 22-06-a 22-06-b 22-06-c

Description Unit
Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type VIII Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type IX Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type X Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type XI Construct Punjab standard drains, of cement concrete 1:1.5:3, complete : Type XII Laying RC hume pipes in position including jointing 6" to 12" dia Laying RC hume pipes in position including jointing 12" to 24" dia Laying RC hume pipes in position including jointing 24" to 36" dia 100 Rft 100 Rft 100 Rft 100 Rft 100 Rft 100 Rft 100 Rft 100 Rft

Rate (British System) Labour


5,841.10 6,658.88 7,184.26 7,852.83 8,027.16 4,263.89 6,360.47 8,542.64

Rate (Metric System) Unit


m m m m m m m m

Composite
33,928.57 38,410.41 44,548.93 47,258.26 48,374.84 4,571.15 6,984.96 9,484.27

Labour
191.64 218.47 235.70 257.64 263.36 139.89 208.68 280.27

Composite
1,113.14 1,260.18 1,461.58 1,550.47 1,587.10 149.97 229.17 311.16

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 118 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 23 :

SEWERAGE

Item Code
23-01-a

Description Unit
Providing and Laying RCC pipe, moulded with cement concrete 1:1.5:3, including cost of reinforcement, testing etc : 4" dia: Providing and Laying RCC pipe, moulded with cement concrete 1:1.5:3, including cost of reinforcement, testing etc : 6" dia: Providing and Laying RCC pipe, moulded with cement concrete 1:1.5:3, including cost of reinforcement, testing etc : 9" dia: Providing and Laying non-reinforced concrete pipe, moulded with cement concrete 1:1.5:3 complete : 4" internal diameter Providing and Laying non-reinforced concrete pipe, moulded with cement concrete 1:1.5:3 complete : 6" i/d Providing and Laying non-reinforced concrete pipe, moulded with cement concrete : 9" i/d wall thickness 1". Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 12" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 15" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 18" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 21" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 24" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 27" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 30" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 33" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 36" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 42" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 48" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 54" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 60" i/d, Wall B 1 RFT

Rate (British System) Labour


46.55

Rate (Metric System) Unit


m

Composite
87.12

Labour
152.71

Composite
285.82

Spec. No

Remarks

23-01-b

1 RFT

52.22

98.32

171.32

322.57

23-01-c

1 RFT

59.31

140.46

194.57

460.83

23-02-a

1 RFT

40.17

93.65

131.78

307.25

23-02-b 23-02-c 23-03-a-01 23-03-a-02 23-03-a-03 23-03-a-04 23-03-a-05 23-03-a-06 23-03-a-07 23-03-a-08 23-03-a-09 23-03-a-10 23-03-a-11 23-03-a-12 23-03-a-13

1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT

52.22 76.32 130.54 160.67 195.82 237.57 261.09 351.38 391.63 426.78 466.61 602.52 692.90 903.77 1,245.20

125.99 157.47 296.50 418.90 498.32 624.91 703.77 923.18 1,092.59 1,183.03 1,278.16 1,782.99 2,242.28 2,748.28 3,458.60

m m m m m m m m m m m m m m m

171.32 250.39 428.30 527.13 642.45 779.42 856.59 1,152.83 1,284.89 1,400.20 1,530.87 1,976.76 2,273.28 2,965.13 4,085.30

413.36 516.64 972.76 1,374.33 1,634.90 2,050.24 2,308.95 3,028.80 3,584.61 3,881.34 4,193.43 5,849.71 7,356.56 9,016.68 11,347.12

NWFP CSR 2008 - Approved 25-Aug-2008

Page 119 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 23 :

SEWERAGE

Item Code
23-03-a-14 23-03-a-15 23-03-b-01 23-03-b-02 23-03-b-03 23-03-b-04 23-03-b-05 23-03-b-06 23-03-b-07 23-03-b-08 23-03-b-09 23-03-b-10 23-03-b-11 23-03-b-12 23-03-b-13 23-03-b-14 23-03-b-15 23-03-c-01 23-03-c-02 23-03-c-03 23-03-c-04

Description Unit
Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 66" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class II : 72" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 12" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 15" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 18" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 21" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 24" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 27" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 30" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 33" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 36" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 42" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 48" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 54" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 60" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 66" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class III : 72" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 12" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 15" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 18" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 21" i/d, Wall B 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT

Rate (British System) Labour


1,709.76 2,324.71 130.54 160.67 195.82 237.29 261.09 351.51 391.63 426.78 466.91 602.52 693.20 903.77 1,245.20 1,702.11 2,324.71 130.54 160.67 195.82 237.29

Rate (Metric System) Unit


m m m m m m m m m m m m m m m m m m m m m

Composite
4,402.74 5,275.92 314.99 437.34 535.20 735.30 814.44 941.74 1,147.88 1,533.48 1,721.17 2,004.34 3,275.51 4,408.34 5,303.11 6,313.38 7,489.34 327.17 475.34 712.27 975.08

Labour
5,609.46 7,626.99 428.30 527.13 642.45 778.50 856.59 1,153.23 1,284.89 1,400.20 1,531.85 1,976.76 2,274.28 2,965.13 4,085.30 5,584.34 7,626.99 428.30 527.13 642.45 778.50

Composite
14,444.68 17,309.45 1,033.42 1,434.83 1,755.90 2,412.39 2,672.03 3,089.71 3,766.03 5,031.12 5,646.89 6,575.91 10,746.42 14,463.07 17,398.67 20,713.19 24,571.31 1,073.39 1,559.53 2,336.85 3,199.09

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 120 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 23 :

SEWERAGE

Item Code
23-03-c-05 23-03-c-06 23-03-c-07 23-03-c-08 23-03-c-09 23-03-c-10 23-03-c-11 23-03-c-12 23-03-c-13 23-03-c-14 23-03-c-15 23-04-a

Description Unit
Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 24" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 27" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 30" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 33" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 36" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 42" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 48" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 54" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 60" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 66" i/d, Wall B Providing and Laying RCC pipe sewers complete As per ASTM C-76-79, Class IV : 72" i/d, Wall B Lowering of sub-soil water table by tubewells Upto 1 ft below SSWL 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT

Rate (British System) Labour


261.09 351.35 391.63 426.78 466.40 602.52 693.20 903.77 1,245.20 1,702.11 2,324.71 0.00

Rate (Metric System) Unit


m m m m m m m m m m m m

Composite
1,072.67 1,273.60 1,498.34 1,902.39 2,126.46 2,630.98 3,459.96 4,223.89 5,303.11 6,497.83 8,042.68 147.56

Labour
856.59 1,152.74 1,284.89 1,400.20 1,530.18 1,976.76 2,274.28 2,965.13 4,085.30 5,584.34 7,626.99 0.00

Composite
3,519.27 4,178.49 4,915.80 6,241.44 6,976.57 8,631.83 11,351.58 13,857.91 17,398.67 21,318.35 26,386.75 484.12

Spec. No

Remarks

a) This rate shall be payable, in addition to the item of excavation below SSWL for sewer and manholes under chapter 3 earthwork b) The grant of these rates shall be subject to Superintending Engineer's approval. c) The rate includes cost of providing pumps, POL and all operation charges at the site of work, etc

23-04-b

Lowering of sub-soil water table by tubewells 0 - 2 ft below SSWL

1 RFT

0.00

313.57

0.00

1,028.76

23-04-c

Lowering of sub-soil water table by tubewell 0 - 3 ft below SSWL

1 RFT

0.00

494.33

0.00

1,621.82

23-04-d 23-04-e 23-04-f

Lowering of sub-soil water table by tubewells 0 - 4 ft below SSWL Lowering of sub-soil water table by tubewells 0 - 5 ft below SSWL Lowering of sub-soil water table by tubewells 0 - 6 ft below SSWL

1 RFT 1 RFT 1 RFT

0.00 0.00 0.00

686.16 900.12 1,121.46

m m m

0.00 0.00 0.00

2,251.18 2,953.16 3,679.34


Page 121 of 144

NWFP CSR 2008 - Approved 25-Aug-2008

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 23 :

SEWERAGE

Item Code
23-04-g 23-04-h 23-04-i 23-04-j 23-04-k 23-04-l 23-05-a 23-05-b 23-06 23-07 23-08-a 23-08-b 23-09-a 23-09-b 23-09-c 23-09-d 23-10 23-11

Description Unit
Lowering of sub-soil water table by tubewells 0 - 7 ft below SSWL Lowering of sub-soil water table by tubewells 0 - 8 ft below SSWL Lowering of sub-soil water table by tubewells 0 - 9 ft below SSWL Lowering of sub-soil water table by tubewells 0 - 10 ft below SSWL Lowering of sub-soil water table by tubewells 0 - 11 ft below SSWL Lowering of sub-soil water table by tubewells 0 - 12 ft below SSWL Constructing gully grating chamber complete With CI gully trap,weighing 81 lbs. frame hinged Constructing gully grating chamber complete Concrete gully trap Fixing manhole frame and cover in RCC slab, including carriage to site Providing and Fixing 3" thick RCC manhole cover, 22" dia with tee shaped CI frame of 20" clear i/d complete RCC manhole cover 22" dia with: Tee shaped CI frame, 22" i/d complete RCC manhole cover 22" dia with: 3"x3"x1/4" angle iron frame, 22" i/d complete Providing and Fixing CI ventilating shaft of 9" i/d, painted with bitumenous paint complete : 18 ft. long Providing and Fixing CI ventilating shaft of 9" i/d, painted with bitumenous paint complete : 24 ft. long Providing and Fixing CI ventilating shaft of 9" i/d, painted with bitumenous paint complete : 30 ft. long Providing and Fixing CI ventilating shaft of 9" i/d, painted with bitumenous paint complete : 36 ft. long Septic Tank (int.Size: 7'x2'x5') complete Soakage Pit (6'dia x 15' deep) complete 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT 1 RFT Each Each Set Set Set Set 100 Kg 100 Kg 100 Kg 100 Kg Each Each

Rate (British System) Labour


0.00 0.00 0.00 0.00 0.00 0.00 805.66 805.66 593.65 1,362.18 1,899.31 1,897.76 158.10 210.80 263.50 316.20 1,426.00 1,426.00

Rate (Metric System) Unit


m m m m m m Each Each Set Set Set Set 100 Kg 100 Kg 100 Kg 100 Kg Each Each

Composite
1,328.05 1,519.88 1,726.46 2,036.34 2,154.39 2,360.98 4,111.04 3,037.50 593.65 4,451.69 14,219.40 12,762.35 7,960.18 8,012.88 8,065.58 8,118.28 10,493.30 10,190.56

Labour
0.00 0.00 0.00 0.00 0.00 0.00 805.66 805.66 593.65 1,362.18 1,899.31 1,897.76 158.10 210.80 263.50 316.20 1,426.00 1,426.00

Composite
4,357.12 4,986.48 5,664.25 6,680.91 7,068.21 7,745.98 4,111.04 3,037.50 593.65 4,451.69 14,219.40 12,762.35 7,960.18 8,012.88 8,065.58 8,118.28 10,493.30 10,190.56

Spec. No

Remarks

Pipe connection to be paid separately.

NWFP CSR 2008 - Approved 25-Aug-2008

Page 122 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 24 :

TUBEWELL AND WATER SUPPLY

Item Code
24-01 24-02-a-01 24-02-a-02 24-02-a-03 24-02-a-04 24-02-a-05 24-02-a-06 24-02-a-07 24-02-a-08 24-02-a-09 24-02-b-01 24-02-b-02 24-02-b-03 24-02-b-04 24-02-b-05 24-02-b-06 24-02-b-07 24-02-c-01 24-02-c-02 24-02-c-03 24-02-c-04

Description Unit
Mobilization of plant, equipment and camping arrangements etc & demobilization after completion Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 3" i/d Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 4" i/d Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 5" i/d Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 6" i/d Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 8" i/d Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 10" i/d Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 12" i/d Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 15" i/d Tubewell boring in all soils except shingle/rock From ground upto 100' below ground : 18" i/d Tubewell boring in all soils except shingle/rock From 100' to 200' below ground : 5" i/d Tubewell boring in all soils except shingle/rock From 100' to 200' below ground : 6" i/d Tubewell boring in all soils except shingle/rock From 100' to 200' below ground : 8" i/d Tubewell boring in all soils except shingle/rock From 100' to 200' below ground : 10" i/d Tubewell boring in all soils except shingle/rock From 100' to 200' below ground : 12" i/d Tubewell boring in all soils except shingle/rock From 100' to 200' below ground : 15" i/d Tubewell boring in all soils except shingle/rock From 100' to 200' below ground : 18" i/d Tubewell boring in all soils except shingle/rock From 200' to 300' below ground : 5" i/d Tubewell boring in all soils except shingle/rock From 200' to 300' below ground : 6" i/d Tubewell boring in all soils except shingle/rock From 200' to 300' below ground : 8" i/d Tubewell boring in all soils except shingle/rock From 200' to 300' below ground : 10" i/d Job 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft

Rate (British System) Labour


0.00 48.22 71.82 108.26 162.74 244.11 366.17 457.71 572.15 715.19 184.44 260.39 317.35 344.89 484.84 657.96 822.45 249.04 325.53 311.74 527.28

Rate (Metric System) Unit


Job m m m m m m m m m m m m m m m m m m m m

Composite
19,360.00 96.55 144.31 213.37 309.90 442.77 614.50 755.70 914.84 1,092.15 363.13 592.49 575.61 642.88 827.53 1,052.05 1,255.95 490.27 619.85 634.57 884.87

Labour
0.00 158.20 235.64 355.19 533.92 800.90 1,201.34 1,501.68 1,877.12 2,346.42 605.13 854.29 1,041.17 1,131.53 1,590.69 2,158.66 2,698.32 817.06 1,068.03 1,022.77 1,729.93

Composite
19,360.00 316.75 473.47 700.05 1,016.72 1,452.67 2,016.06 2,479.35 3,001.44 3,583.17 1,191.38 1,943.88 1,888.48 2,109.20 2,715.00 3,451.62 4,120.58 1,608.51 2,033.62 2,081.91 2,903.13

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 123 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 24 :

TUBEWELL AND WATER SUPPLY

Item Code
24-02-c-05 24-02-c-06 24-02-c-07 24-02-d-01 24-02-d-02 24-02-d-03 24-02-d-04 24-02-d-05 24-03-a-01 24-03-a-02 24-03-b-01 24-03-b-02 24-04-a-01

Description Unit
Tubewell boring in all soils except shingle/rock From 200' to 300' below ground : 12" i/d Tubewell boring in all soils except shingle/rock From 200' to 300' below ground : 15" i/d Tubewell boring in all soils except shingle/rock From 200' to 300' below ground : 18" i/d Tubewell boring in all soils except shingle/rock From 300' to 400' below ground : 8" i/d Tubewell boring in all soils except shingle/rock From 300' to 400' below ground : 10" i/d Tubewell boring in all soils except shingle/rock From 300' to 400' below ground : 12" i/d Tubewell boring in all soils except shingle/rock From 300' to 400' below ground : 15" i/d Tubewell boring in all soils except shingle/rock From 300' to 400' below ground : 18" i/d Rotary drilling except in shingle, gravel & rock From ground to 250' below ground : 5"-18" i/d Rotary drilling except in shingle, gravel & rock From ground to 250' below ground : 20"-26" i/d Rotary drilling except in shingle, gravel & rock Exceeding 250' below ground : 5"-18" i/d Rotary drilling except in shingle, gravel & rock Exceeding 250' below ground : 20"-26" i/d Boring for tubewell in shingle, gravel & rock From ground to 200' below ground : 12"-18" i/d 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft

Rate (British System) Labour


631.64 723.75 906.03 476.02 632.74 757.97 868.90 1,085.63 0.00 0.00 0.00 0.00 0.00

Rate (Metric System) Unit


m m m m m m m m m m m m m

Composite
1,042.87 1,157.26 1,382.89 863.41 1,061.85 1,251.44 1,389.10 1,657.86 836.91 1,018.35 1,046.14 1,272.94 2,092.27

Labour
2,072.31 2,374.52 2,972.55 1,561.74 2,075.91 2,486.77 2,850.72 3,561.78 0.00 0.00 0.00 0.00 0.00

Composite
3,421.49 3,796.78 4,537.04 2,832.70 3,483.76 4,105.79 4,557.43 5,439.16 2,745.76 3,341.04 3,432.20 4,176.30 6,864.41

Spec. No

Remarks

Location and depth of shingle, gravel or rock is to be determined from the bore log.

24-04-a-02 24-04-b-01 24-04-b-02 24-05 24-06 24-07-a

Boring for tubewell in shingle, gravel & rock From ground to 200' below ground : 20"-26" i/d Boring for tubewell in shingle, gravel & rock Over 200' depth below ground : 12"-18" i/d Boring for tubewell in shingle, gravel & rock Over 200' depth below ground : 20"-26" i/d Providing strong substantially built box of deodar 4'x2'x9", with compartments & lock Furnishing sample of water from bore hole Providing and installing brass strainer in tubewell bore hole 6" i/d, 3/16" thick Providing and installing brass strainer in tubewell bore hole 8" i/d, 3/16" thick

1 Rft 1 Rft 1 Rft Job Per set 1 Rft

0.00 0.00 0.00 662.63 1,116.00 200.84

2,545.87 2,619.52 3,187.43 6,569.85 1,285.40 1,531.84

m m m Job Per set m

0.00 0.00 0.00 662.63 1,116.00 658.92

8,352.59 8,594.24 10,457.44 6,569.85 1,285.40 5,025.72

Cost/labour of jointing both ends is included in the rate.

24-07-b

1 Rft

291.81

2,711.81

957.37

8,897.00
Page 124 of 144

NWFP CSR 2008 - Approved 25-Aug-2008

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 24 :

TUBEWELL AND WATER SUPPLY

Item Code
24-07-c 24-07-d 24-07-e 24-08-a

Description Unit
Providing and installing hole 10" i/d 3/16" thick Providing and installing hole 10" i/d, 1/4" thick Providing and installing hole 12" i/d, 1/4" thick Providing and installing hole 6" i/d, 2 ft. long brass strainer in tubewell bore brass strainer in tubewell bore brass strainer in tubewell bore MS bail plug in tubewell bore 1 Rft 1 Rft 1 Rft 1 Rft

Rate (British System) Labour


301.26 301.26 321.34 133.07

Rate (Metric System) Unit


m m m m

Composite
2,963.26 3,695.16 3,780.73 1,904.51

Labour
988.38 988.38 1,054.27 436.59

Composite
9,721.98 12,123.23 12,403.97 6,248.40

Spec. No

Remarks

In the case of increase and decreas in the length of bail plug, tie rates will be increased or decreased as per rates given in section No 12 to this diameter.

24-08-b 24-08-c 24-08-d 24-09-a-01 24-09-a-02 24-09-a-03 24-09-a-04 24-09-b-01 24-09-b-02 24-09-b-03 24-09-b-04 24-09-c-01 24-09-c-02 24-09-c-03

Providing and installing MS bail plug in tubewell bore hole 8" i/d, 2 ft. long Providing and installing MS bail plug in tubewell bore hole 10" i/d, 2 ft. long Providing and installing MS bail plug in tubewell bore hole 12" i/d, 2 ft. long Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'B' working pressure : 6" i/d Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'B' working pressure : 8" i/d Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'B' working pressure : 10" i/d Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'B' working pressure : 12" i/d Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'C' working pressure : 6" i/d Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'C' working pressure : 8" i/d Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'C' working pressure : 10" i/d Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'C' working pressure : 12" i/d Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'D' working pressure : 6" i/d Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'D' working pressure : 8" i/d Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'D' working pressure : 10" i/d

1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft

137.04 137.04 146.12 192.80 241.01 257.07 289.21 192.80 241.01 257.07 289.21 192.80 241.01 257.07

2,479.60 3,133.00 3,576.47 469.89 664.51 1,165.78 1,563.34 590.89 854.48 1,592.91 2,170.76 802.64 1,177.55 2,000.93

m m m m m m m m m m m m m m

449.62 449.62 479.38 632.56 790.70 843.42 948.84 632.56 790.70 843.42 948.84 632.56 790.70 843.42

8,135.18 10,278.88 11,733.81 1,541.65 2,180.14 3,824.75 5,129.06 1,938.63 2,803.40 5,226.09 7,121.91 2,633.35 3,863.34 6,564.71

NWFP CSR 2008 - Approved 25-Aug-2008

Page 125 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 24 :

TUBEWELL AND WATER SUPPLY

Item Code
24-09-c-04 24-10-a-01 24-10-a-02 24-10-a-03

Description Unit
Providing and installing PVC strainer, in tubewell borehole comp. BSS Class 'D' working pressure : 12" i/d Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'B' working pressure : 6" i/d : 2' long Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'B' working pressure : 8" i/d : 2' long Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'B' working pressure : 10" i/d : 2' long Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'B' working pressure : 12" i/d : 2' long Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'C' working pressure : 6" i/d : 2' long Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'C' working pressure : 8" i/d : 2' long Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'C' working pressure : 10" i/d : 2' long Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'C' working pressure : 12" i/d : 2' long Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'D' working pressure : 6" i/d : 2' long Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'D' working pressure : 8" i/d : 2' long Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'D' working pressure : 10" i/d : 2' long Providing and installing PVC pipe with wooden bail plug in tubewell BSS Class 'D' working pressure : 12" i/d : 2' long Providing and installing MS blind pipe socket/welded joint MS reducer in tubewell borehole : 6" i/d, 3/16" thick Providing and installing MS blind pipe socket/welded joint MS reducer in tubewell borehole : 8" i/d, 3/16" thick Providing and installing MS blind pipe socket/welded joint MS reducer in tubewell borehole : 10" i/d 3/16" thick Providing and installing MS blind pipe socket/welded joint MS reducer in tubewell borehole : 12" i/d, 1/4" thick Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'B' working pressure : 6" i/d 1 Rft Each Each Each

Rate (British System) Labour


289.21 210.80 263.50 263.50

Rate (Metric System) Unit


m Each Each Each

Composite
2,769.71 746.59 1,086.95 2,043.51

Labour
948.84 210.80 263.50 263.50

Composite
9,086.97 746.59 1,086.95 2,043.51

Spec. No

Remarks

24-10-a-04

Each

316.20

2,816.54

Each

316.20

2,816.54

24-10-b-01 24-10-b-02 24-10-b-03

Each Each Each

210.80 263.50 263.50

984.72 1,461.28 2,882.91

Each Each Each

210.80 263.50 263.50

984.72 1,461.28 2,882.91

24-10-b-04

Each

316.20

4,009.33

Each

316.20

4,009.33

24-10-c-01 24-10-c-02 24-10-c-03

Each Each Each

210.80 263.50 263.50

1,232.37 1,826.81 3,733.74

Each Each Each

210.80 263.50 263.50

1,232.37 1,826.81 3,733.74

24-10-c-04

Each

316.20

5,188.78

Each

316.20

5,188.77

24-11-a 24-11-b 24-11-c 24-11-d 24-12-a-01

1 Rft 1 Rft 1 Rft 1 Rft 1 Rft

361.51 421.76 502.10 578.41 337.41

688.21 899.49 1,082.75 1,249.82 609.66

m m m m m

1,186.05 1,383.73 1,647.30 1,897.69 1,106.98

2,257.90 2,951.08 3,552.33 4,100.45 2,000.19

NWFP CSR 2008 - Approved 25-Aug-2008

Page 126 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 24 :

TUBEWELL AND WATER SUPPLY

Item Code
24-12-a-02 24-12-a-03 24-12-a-04 24-12-b-01 24-12-b-02 24-12-b-03 24-12-b-04 24-12-c-01 24-12-c-02 24-12-c-03 24-12-c-04 24-13-a

Description Unit
Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'B' working pressure : 8" i/d Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'B' working pressure : 10" i/d Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'B' working pressure : 12" i/d Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'C' working pressure : 6" i/d Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'C' working pressure : 8" i/d Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'C' working pressure : 10" i/d Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'C' working pressure : 12" i/d Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'D' working pressure : 6" i/d Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'D' working pressure : 8" i/d Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'D' working pressure : 10" i/d Providing and installing PVC blind pipe in tubewell with strainer BSS Class 'D' working pressure : 12" i/d Test & develop tubewell of size 6" i/d & above continuously : Upto 1.5 cusecs discharge 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft Hour

Rate (British System) Labour


401.68 546.04 542.26 341.43 401.68 441.84 542.26 341.43 401.68 441.84 542.26 0.00

Rate (Metric System) Unit


m m m m m m m m m m m Hour

Composite
820.09 1,450.52 1,812.76 734.68 1,010.31 1,772.84 2,418.85 860.52 1,196.04 2,205.18 3,018.17 423.50

Labour
1,317.84 1,791.48 1,779.08 1,120.16 1,317.84 1,449.62 1,779.08 1,120.16 1,317.84 1,449.62 1,779.08 0.00

Composite
2,690.60 4,758.92 5,947.39 2,410.35 3,314.66 5,816.42 7,935.87 2,823.21 3,924.02 7,234.83 9,902.12 423.50

Spec. No

Remarks

Compressor, accessories along with working staff to be supplied by Govt;

24-13-b 24-14 24-15-a 24-15-b

Test & develop tubewell of size 6" i/d & above continuously : Over 1.5 cusecs discharge with DNT unit Shrouding with graded pack grave 3/8" to 1/8" around tubewell in bore hole Providing and Laying cut, joint, test & disinfect, CI pipeline in trenches, complete : 3" i/d Providing and Laying cut, joint, test & disinfect, CI pipeline in trenches, complete : 4" i/d

Hour 1 Rft 1 Rft 1 Rft

0.00 106.33 30.13 40.17

496.10 129.77 196.13 263.72

Hour m m m

0.00 348.84 98.84 131.78

496.10 425.74 643.48 865.23


The rate includes wastage etc. a) Pipes to be supplied by Govt; b) Providing and installing specials and valves is not included in the rate, which is payable separately.

24-15-c 24-15-d 24-15-e

Providing and Laying cut, joint, test & disinfect, CI pipeline in trenches, complete : 6" i/d Providing and Laying cut, joint, test & disinfect, CI pipeline in trenches. complete : 8" i/d Providing and Laying cut, joint, test & disinfect, CI pipeline in trenches, complete : 10" i/d

1 Rft 1 Rft 1 Rft

60.25 100.42 130.54

503.67 1,350.63 1,716.83

m m m

197.68 329.46 428.30

1,652.47 4,431.20 5,632.63

NWFP CSR 2008 - Approved 25-Aug-2008

Page 127 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 24 :

TUBEWELL AND WATER SUPPLY

Item Code
24-15-f 24-16-a-01 24-16-a-02 24-16-a-03 24-16-b-01 24-16-b-02 24-16-b-03 24-16-c-01

Description Unit
Providing and Laying cut, joint, test & disinfect, CI pipeline in trenches, complete : 12" i/d Providing and Laying cut, joint, test & disinfect GI pipe line Using heavy quality GI Pipe : 4" Dia Providing and Laying cut, joint, test & disinfect GI pipe line Using heavy quality GI Pipe : 6" Dia Providing and Laying cut, joint, test & disinfect GI pipe line Using heavy quality GI Pipe : 8" Dia Providing and Laying cut, joint, test & disinfect GI pipe line Using medium quality GI Pipe : 4" Dia Providing and Laying cut, joint, test & disinfect GI pipe line Using medium quality GI Pipe : 6" Dia Providing and Laying cut, joint, test & disinfect GI pipe line Using medium quality GI Pipe : 8" Dia Providing and Laying cut, joint, test & disinfect GI pipe line Using light quality GI Pipe : 1/2" i/d 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft

Rate (British System) Labour


130.54 38.16 54.23 70.29 38.16 54.23 70.29 10.04

Rate (Metric System) Unit


m m m m m m m m

Composite
2,380.85 552.41 937.53 1,957.89 478.96 699.76 814.20 48.40

Labour
428.30 125.19 177.91 230.62 125.19 177.91 230.62 32.95

Composite
7,811.19 1,812.37 3,075.87 6,423.53 1,571.40 2,295.81 2,671.26 158.79

Spec. No

Remarks

Cost of sockets, tees, elbows, bends, valves, crosses, unions and plugs etc is included in the rates.

24-16-c-02 24-16-c-03 24-16-c-04 24-16-c-05 24-16-c-06 24-16-c-07 24-16-c-08 24-16-c-09 24-17-a-01

Providing and Laying cut, joint, test & disinfect GI pipe line Using light quality GI Pipe : 3/4" i/d Providing and Laying cut, joint, test & disinfect GI pipe line Using light quality GI Pipe : 1" i/d Providing and Laying cut, joint, test & disinfect GI pipe line Using light quality GI Pipe : 1.25" i/d Providing and Laying cut, joint, test & disinfect GI pipe line Using light quality GI Pipe : 1.5" i/d Providing and Laying cut, joint, test & disinfect GI pipe line Using light quality GI Pipe : 2" i/d Providing and Laying cut, joint, test & disinfect GI pipe line Using light quality GI Pipe : 2.5" i/d Providing and Laying cut, joint, test & disinfect GI pipe line Using light quality GI Pipe : 3" i/d Providing and Laying cut, joint, test & disinfect GI pipe line Using light quality GI Pipe : 4" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'B'working pressure : 3" i/d

1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft

12.05 13.11 16.07 18.08 20.12 22.09 30.13 38.16 16.07

66.83 90.19 114.92 143.19 177.52 237.58 282.77 401.52 79.23

m m m m m m m m m

39.54 43.02 52.71 59.30 66.02 72.48 98.84 125.19 52.71

219.25 295.90 377.05 469.78 582.41 779.47 927.74 1,317.33 259.94


Providing and installing specials and valves is not included in the rate, which is payable separately.

24-17-a-02

Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'B'working pressure : 4" i/d

1 Rft

18.08

110.57

59.30

362.76

NWFP CSR 2008 - Approved 25-Aug-2008

Page 128 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 24 :

TUBEWELL AND WATER SUPPLY

Item Code
24-17-a-03 24-17-a-04 24-17-a-05 24-17-a-06 24-17-a-07 24-17-a-08 24-17-a-09 24-17-a-10 24-17-a-11 24-17-b-01 24-17-b-02 24-17-b-03 24-17-b-04 24-17-b-05 24-17-b-06 24-17-b-07 24-17-b-08 24-17-b-09 24-17-b-10 24-17-b-11 24-17-c-01

Description Unit
Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'B'working pressure : 6" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'B'working pressure : 8" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'B'working pressure : 10" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'B'working pressure : 12" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'B'working pressure : 14" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'B'working pressure : 16" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'B'working pressure : 18" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'B'working pressure : 20" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'B'working pressure : 24" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'C'working pressure : 3" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'C'working pressure : 4" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'C'working pressure : 6" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'C'working pressure : 8" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'C'working pressure : 10" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'C'working pressure : 12" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'C'working pressure : 14" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'C'working pressure : 16" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'C'working pressure : 18" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'C'working pressure : 20" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'C'working pressure : 24" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'D'working pressure : 3" i/d 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft

Rate (British System) Labour


26.11 36.15 43.17 60.25 70.29 80.34 92.39 108.45 128.54 16.07 18.08 26.11 36.15 46.19 65.57 70.29 80.34 92.39 108.45 128.54 16.07

Rate (Metric System) Unit


m m m m m m m m m m m m m m m m m m m m m

Composite
165.73 267.37 427.75 590.41 789.24 1,014.37 1,249.94 1,517.30 2,120.39 79.59 115.24 225.38 330.19 550.07 774.94 1,053.01 1,465.65 1,812.85 2,201.70 3,125.65 79.59

Labour
85.66 118.61 141.63 197.68 230.62 263.57 303.10 355.82 421.71 52.71 59.30 85.66 118.61 151.55 215.12 230.62 263.57 303.10 355.82 421.71 52.71

Composite
543.74 877.20 1,403.40 1,937.05 2,589.37 3,327.99 4,100.87 4,978.03 6,956.66 261.13 378.08 739.45 1,083.31 1,804.70 2,542.46 3,454.75 4,808.57 5,947.66 7,223.44 10,254.74 261.13

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 129 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 24 :

TUBEWELL AND WATER SUPPLY

Item Code
24-17-c-02 24-17-c-03 24-17-c-04 24-17-c-05 24-17-c-06 24-17-c-07 24-17-c-08 24-17-c-09 24-17-c-10 24-17-c-11 24-18-a-01

Description Unit
Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'D'working pressure : 4" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'D'working pressure : 6" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'D'working pressure : 8" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'D'working pressure : 10" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'D'working pressure : 12" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'D'working pressure : 14" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'D'working pressure : 16" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'D'working pressure : 18" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'D'working pressure : 20" i/d Providing and Laying cut, joint, test & disinfect AC pipe line BSS Class 'D'working pressure : 24" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'B'working pressure : 3" i/d 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft

Rate (British System) Labour


19.67 28.41 39.34 55.66 65.57 76.50 87.42 100.54 118.02 139.88 17.48

Rate (Metric System) Unit


m m m m m m m m m m m

Composite
145.11 278.66 468.53 816.42 1,162.51 1,479.14 2,127.87 2,649.16 3,356.03 4,278.70 110.29

Labour
64.54 93.22 129.07 182.60 215.12 250.97 286.82 329.85 387.21 458.92 57.36

Composite
476.09 914.25 1,537.16 2,678.54 3,813.99 4,852.82 6,981.20 8,691.47 11,010.60 14,037.71 361.85

Spec. No

Remarks

a) Providing and installing specials and valves is not included in the rate, which is payable separately. b) When sockets are used for jointing of pipes instead of by overlap pipe. Its providing installation will be paid extra.

24-18-a-02

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'B'working pressure : 4" i/d

1 Rft

19.67

159.67

64.54

523.84

24-18-a-03 24-18-a-04 24-18-a-05 24-18-a-06 24-18-b-01 24-18-b-02

Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'B'working pressure : 6" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'B'working pressure : 8" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'B'working pressure : 10" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'B'working pressure : 12" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'C'working pressure : 2.5" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'C'working pressure : 3" i/d

1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft

28.41 39.34 50.27 65.57 17.48 17.48

300.66 457.76 954.74 1,336.07 97.71 129.17

m m m m m m

93.22 129.07 164.92 215.12 57.36 57.36

986.43 1,501.83 3,132.36 4,383.43 320.56 423.78

NWFP CSR 2008 - Approved 25-Aug-2008

Page 130 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 24 :

TUBEWELL AND WATER SUPPLY

Item Code
24-18-b-03 24-18-b-04 24-18-b-05 24-18-b-06 24-18-b-07 24-18-c-01 24-18-c-02 24-18-c-03 24-18-c-04 24-18-c-05 24-18-c-06 24-18-c-07 24-18-c-08 24-18-c-09 24-18-c-10 24-18-d-01 24-18-d-02

Description Unit
Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'C'working pressure : 4" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'C'working pressure : 6" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'C'working pressure : 8" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'C'working pressure : 10" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'C'working pressure : 12" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'D' working pressure : 1.25" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'D' working pressure : 1.5" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'D' working pressure : 2" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'D' working pressure : 2.5" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'D' working pressure : 3" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'D' working pressure : 4" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'D' working pressure : 6" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'D' working pressure : 8" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'D' working pressure : 10" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'D' working pressure : 12" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'E' working pressure : 3/4" i/d Providing and Laying cut, joint, test, disinfect PVC pipe line BSS Class 'E' working pressure : 1" i/d 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft

Rate (British System) Labour


19.67 28.41 39.34 50.27 65.57 13.99 16.28 16.28 17.48 17.48 19.67 28.41 39.34 50.27 65.57 15.07 8.26

Rate (Metric System) Unit


m m m m m m m m m m m m m m m m m

Composite
158.82 421.66 647.97 1,381.27 1,942.16 47.26 60.44 84.04 119.73 127.59 253.93 547.50 833.71 1,813.60 2,541.47 33.94 35.00

Labour
64.54 93.22 129.07 164.92 215.12 45.89 53.40 53.40 57.36 57.36 64.54 93.22 129.07 164.92 215.12 49.43 27.10

Composite
521.06 1,383.41 2,125.89 4,531.72 6,371.91 155.06 198.29 275.71 392.81 418.62 833.09 1,796.27 2,735.26 5,950.14 8,338.16 111.36 114.83

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 131 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 24 :

TUBEWELL AND WATER SUPPLY

Item Code
24-19-a-01

Description Unit
Providing and Fixing CI specials of BSS class 'B', 'C' & 'D' CISS specials, with spigot & socket : 3"-6" i/d kg

Rate (British System) Labour


28.67

Rate (Metric System) Unit


kg

Composite
188.40

Labour
28.67

Composite
188.40

Spec. No

Remarks
a) Labour rates include the cost of jointing material and labour b) The internal dia of the pipe, from which the branch is taken out, will be considered internal dia for the purpose of payment of specials.

24-19-a-02 24-19-b-01 24-19-b-02 24-19-c-01 24-19-c-02 24-20-a

Providing and Fixing CI specials of BSS class 'B', 'C' & 'D' CISS specials, with spigot & socket : 8"-12" i/d Providing and Fixing CI specials of BSS class 'B', 'C' & 'D' CI flanged specials with flanged joint : 3"-6" i/d Providing and Fixing CI specials of BSS class 'B', 'C' & 'D' CI flanged specials with flanged joint : 8"-12" i/ Providing and Fixing CI specials of BSS class 'B', 'C' & 'D' CI specials with tyton joints : 3"-6" i/d Providing and Fixing CI specials of BSS class 'B', 'C' & 'D' CI specials with tyton joints : 8"-12" i/d Providing and Fixing CI specials of BSS Class 'B', 'C' & 'D' working pressure for AC pipe line : 3" to 6" i/d

kg kg kg kg kg kg

34.56 14.34 22.94 6.58 11.98 37.02

194.29 174.06 182.66 166.30 171.70 196.74

kg kg kg kg kg kg

34.56 14.34 22.94 6.58 11.98 37.02

194.29 174.06 182.66 166.30 171.70 196.74


a) Labour rates include the cost of jointing material and labour b) The internal dia of the pipe, from which the branch is taken out, will be considered internal dia for the purpose of payment of specials.

24-20-b 24-21-a

Providing and Fixing CI specials of BSS Class 'B', 'C' & 'D' working pressure for AC pipe line : 8" to 18" i/d Providing and Fixing sluice valve, BSS quality/weight, Class 'B' working pressure for CI & AC pipe line : 3" i/d Providing and Fixing sluice valve, BSS quality/weight, Class 'B' working pressure for CI & AC pipe line : 4" i/d Providing and Fixing sluice valve, BSS quality/weight, Class 'B' working pressure for CI & AC pipe line : 6" i/d Providing and Fixing sluice valve, BSS quality/weight, Class 'B' working pressure for CI & AC pipe line : 8" i/d Providing and Fixing sluice valve, BSS quality/weight, Class 'B' working pressure for CI & AC pipe line : 10" i/d Providing and Fixing sluice valve, BSS quality/weight, Class 'B' working pressure for CI & AC pipe line : 12" i/d

kg Each

57.35 867.22

217.07 2,682.23

kg Each

57.35 867.22

217.07 2,682.23
Labour rates include the cost of jointing material and labour

24-21-b 24-21-c 24-21-d 24-21-e 24-21-f

Each Each Each Each Each

229.40 911.40 911.40 1,147.00 1,720.50

2,649.40 4,783.40 8,776.40 12,642.00 17,450.50

Each Each Each Each Each

229.40 911.40 911.40 1,147.00 1,720.50

2,649.40 4,783.40 8,776.40 12,642.00 17,450.50


Page 132 of 144

NWFP CSR 2008 - Approved 25-Aug-2008

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 24 :

TUBEWELL AND WATER SUPPLY

Item Code
24-22-a 24-22-b 24-22-c 24-22-d 24-22-e 24-22-f 24-23

Description Unit
Providing and Fixing sluice valve of BSS quality weight for GI & PVC pipe line including jointing material : 3" i/d Providing and Fixing sluice valve of BSS quality weight for GI & PVC pipe line including jointing material : 4" i/d Providing and Fixing sluice valve of BSS quality weight for GI & PVC pipe line including jointing material : 6" i/d Providing and Fixing sluice valve of BSS quality weight for GI & PVC pipe line including jointing material : 8" i/d Providing and Fixing sluice valve of BSS quality weight for GI & PVC pipe line including jointing material : 10" i/d Providing and Fixing sluice valve of BSS quality weight for GI & PVC pipe line including jointing material : 12" i/d Providing and Fixing fire hydrants BSS quality and weight of 2.5" dia (including cost of jointing material) Each Each Each Each Each Each Each

Rate (British System) Labour


926.13 926.13 1,147.00 1,433.75 1,867.75 2,294.00 1,720.50

Rate (Metric System) Unit


Each Each Each Each Each Each Each

Composite
2,922.63 3,588.13 5,406.20 10,085.25 14,512.25 19,597.00 5,985.75

Labour
926.13 926.13 1,147.00 1,433.75 1,867.75 2,294.00 1,720.50

Composite
2,922.63 3,588.13 5,406.20 10,085.25 14,512.25 19,597.00 5,985.75

Spec. No

Remarks
ditto

a) Labour rates include cost of jointing material and labour b) Connecting pipes and specials , if used will be paid extra.

24-24-a 24-24-b 24-25-a

24-25-b

24-26-a-01 24-26-a-02 24-26-a-03 24-26-a-04 24-26-a-05 24-26-a-06 24-26-a-07

Providing and Fixing air valve 2" i/d of BSS quality and weight complete with jointing material : Single Providing and Fixing air valve 2" i/d of BSS quality and weight complete with jointing material : Double Providing and Fixing CI flanges 5/8" thick on pipes including turning, facing & fitting etc complete : 3" to 6" i/d Providing and Fixing CI flanges 5/8" thick on pipes including turning, facing & fitting etc complete : 8" to 12" i/d Providing and installing PVC bends BSS Class 'B'working pressure : 2" i/d Providing and installing PVC bends BSS Class 'B'working pressure : 3" i/d Providing and installing PVC bends BSS Class 'B'working pressure : 4" i/d Providing and installing PVC bends BSS Class 'B'working pressure : 6" i/d Providing and installing PVC bends BSS Class 'B'working pressure : 8" i/d Providing and installing PVC bends BSS Class 'B'working pressure : 10" i/d Providing and installing PVC bends BSS Class 'B'working pressure : 12" i/d

Each Each Each

1,147.00 1,720.50 702.92

3,034.60 4,793.90 1,307.93

Each Each Each

1,147.00 1,720.50 702.92

3,034.60 4,793.90 1,307.93

Each

1,033.07

2,073.68

Each

1,033.07

2,073.68

Each Each Each Each Each Each Each

98.19 107.53 143.38 207.89 286.75 329.38 395.25

167.40 245.96 316.40 986.53 3,055.23 4,655.13 5,586.15

Each Each Each Each Each Each Each

98.19 107.53 143.38 207.89 286.75 329.38 395.25

167.40 245.96 316.40 986.53 3,055.23 4,655.13 5,586.15

NWFP CSR 2008 - Approved 25-Aug-2008

Page 133 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 24 :

TUBEWELL AND WATER SUPPLY

Item Code
24-26-b-01 24-26-b-02 24-26-b-03 24-26-b-04 24-26-b-05 24-26-b-06 24-26-b-07 24-26-c-01 24-26-c-02 24-26-c-03 24-26-c-04 24-26-c-05 24-26-c-06 24-26-c-07 24-27-a-01 24-27-a-02 24-27-a-03 24-27-a-04 24-27-a-05 24-27-a-06 24-27-a-07

Description Unit
Providing and installing pressure : 2" i/d Providing and installing pressure : 3" i/d Providing and installing pressure : 4" i/d Providing and installing pressure : 6" i/d Providing and installing pressure : 8" i/d Providing and installing pressure : 10" i/d Providing and installing pressure : 12" i/d Providing and installing pressure : 2" i/d Providing and installing pressure : 3" i/d Providing and installing pressure : 4" i/d Providing and installing pressure : 6" i/d Providing and installing pressure : 8" i/d Providing and installing pressure : 10" i/d Providing and installing pressure : 12" i/d Providing and installing pressure : 2" i/d Providing and installing pressure : 3" i/d Providing and installing pressure : 4" i/d Providing and installing pressure : 6" i/d Providing and installing pressure : 8" i/d Providing and installing pressure : 10" i/d Providing and installing pressure : 12" i/d PVC bends BSS Class 'C'working PVC bends BSS Class 'C'working PVC bends BSS Class 'C'working PVC bends BSS Class 'C'working PVC bends BSS Class 'C'working PVC bends BSS Class 'C'working PVC bends BSS Class 'C'working PVC bends BSS Class 'D'working PVC bends BSS Class 'D'working PVC bends BSS Class 'D'working PVC bends BSS Class 'D'working PVC bends BSS Class 'D'working PVC bends BSS Class 'D'working PVC bends BSS Class 'D'working PVC tees BSS Class 'B'working PVC tees BSS Class 'B'working PVC tees BSS Class 'B'working PVC tees BSS Class 'B'working PVC tees BSS Class 'B'working PVC tees BSS Class 'B'working PVC tees BSS Class 'B'working Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

Rate (British System) Labour


90.29 98.81 131.75 191.04 263.50 329.38 395.25 90.29 98.81 143.38 207.89 286.75 358.44 430.13 143.38 172.05 229.40 315.42 465.97 537.66 645.19

Rate (Metric System) Unit


Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

Composite
176.80 271.84 339.39 1,318.39 3,724.10 5,520.27 6,624.33 194.11 358.36 489.43 1,938.19 5,304.62 6,587.52 7,351.33 247.19 772.33 1,445.93 2,824.36 3,018.83 3,133.11 3,327.15

Labour
90.29 98.81 131.75 191.04 263.50 329.38 395.25 90.29 98.81 143.38 207.89 286.75 358.44 430.13 143.38 172.05 229.40 315.42 465.97 537.66 645.19

Composite
176.80 271.84 339.39 1,318.40 3,724.10 5,520.27 6,624.33 194.11 358.36 489.43 1,938.19 5,304.62 6,587.52 7,351.33 247.19 772.33 1,445.93 2,824.36 3,018.83 3,133.11 3,327.15

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 134 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 24 :

TUBEWELL AND WATER SUPPLY

Item Code
24-27-b-01 24-27-b-02 24-27-b-03 24-27-b-04 24-27-b-05 24-27-b-06 24-27-b-07 24-27-c-01 24-27-c-02 24-27-c-03 24-27-c-04 24-27-c-05 24-27-c-06 24-27-c-07 24-28-a-01 24-28-a-02 24-28-a-03 24-28-a-04 24-28-a-05 24-28-a-06 24-28-a-07

Description Unit
Providing and installing PVC tees BSS Class 'C'working pressure : 2" i/d Providing and installing PVC tees BSS Class 'C'working pressure : 3" i/d Providing and installing PVC tees BSS Class 'C'working pressure : 4" i/d Providing and installing PVC tees BSS Class 'C'working pressure : 6" i/d Providing and installing PVC tees BSS Class 'C'working pressure : 8" i/d Providing and installing PVC tees BSS Class 'C'working pressure : 10" i/d Providing and installing PVC tees BSS Class 'C'working pressure : 12" i/d Providing and installing PVC tees BSS Class 'D'working pressure : 2" i/d Providing and installing PVC tees BSS Class 'D'working pressure : 3" i/d Providing and installing PVC tees BSS Class 'D'working pressure : 4" i/d Providing and installing PVC tees BSS Class 'D'working pressure : 6" i/d Providing and installing PVC tees BSS Class 'D'working pressure : 8" i/d Providing and installing PVC tees BSS Class 'D'working pressure : 10" i/d Providing and installing PVC tees BSS Class 'D'working pressure : 12" i/d Providing and installing PVC sockets BSS Class 'B'working pressure : 2" i/d Providing and installing PVC sockets BSS Class 'B'working pressure : 3" i/d Providing and installing PVC sockets BSS Class 'B'working pressure : 4" i/d Providing and installing PVC sockets BSS Class 'B'working pressure : 6" i/d Providing and installing PVC sockets BSS Class 'B'working pressure : 8" i/d Providing and installing PVC sockets BSS Class 'B'working pressure : 10" i/d Providing and installing PVC sockets BSS Class 'B'working pressure : 12" i/d Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

Rate (British System) Labour


143.38 172.05 229.40 315.42 465.97 534.71 645.19 143.38 172.05 229.40 315.42 465.97 537.66 645.19 48.05 50.18 71.69 564.28 143.38 179.07 215.06

Rate (Metric System) Unit


Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

Composite
264.50 431.60 671.29 1,197.88 6,522.02 7,801.97 9,902.29 406.91 695.13 852.31 2,910.88 4,618.69 5,921.55 6,874.27 108.61 179.95 210.11 823.83 748.98 1,909.37 2,810.51

Labour
143.38 172.05 229.40 315.42 465.97 534.71 645.19 143.38 172.05 229.40 315.42 465.97 537.66 645.19 48.05 50.18 71.69 564.28 143.38 179.07 215.06

Composite
264.50 431.60 671.29 1,197.88 6,522.02 7,801.97 9,902.29 406.91 695.13 852.31 2,910.88 4,618.69 5,921.55 6,874.27 108.61 179.95 210.11 823.83 748.98 1,909.37 2,810.51

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 135 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 24 :

TUBEWELL AND WATER SUPPLY

Item Code
24-28-b-01 24-28-b-02 24-28-b-03 24-28-b-04 24-28-b-05 24-28-b-06 24-28-b-07 24-28-c-01 24-28-c-02 24-28-c-03 24-28-c-04 24-28-c-05 24-28-c-06 24-28-c-07 24-29-a-01 24-29-a-02 24-29-a-03 24-29-a-04 24-29-a-05 24-29-a-06 24-29-a-07

Description Unit
Providing and installing PVC sockets BSS Class 'C'working pressure : 2" i/d Providing and installing PVC sockets BSS Class 'C'working pressure : 3" i/d Providing and installing PVC sockets BSS Class 'C'working pressure : 4" i/d Providing and installing PVC sockets BSS Class 'C'working pressure : 6" i/d Providing and installing PVC sockets BSS Class 'C'working pressure : 8" i/d Providing and installing PVC sockets BSS Class 'C'working pressure : 10" i/d Providing and installing PVC sockets BSS Class 'C'working pressure : 12" i/d Providing and installing PVC sockets BSS Class 'D'working pressure : 2" i/d Providing and installing PVC sockets BSS Class 'D'working pressure : 3" i/d Providing and installing PVC sockets BSS Class 'D'working pressure : 4" i/d Providing and installing PVC sockets BSS Class 'D'working pressure : 6" i/d Providing and installing PVC sockets BSS Class 'D'working pressure : 8" i/d Providing and installing PVC sockets BSS Class 'D'working pressure : 10" i/d Providing and installing PVC sockets BSS Class 'D'working pressure : 12" i/d Providing and installing PVC tappered core BSS Class 'B'working pressure : 2" i/d Providing and installing PVC tappered core BSS Class 'B'working pressure : 3" i/d Providing and installing PVC tappered core BSS Class 'B'working pressure : 4" i/d Providing and installing PVC tappered core BSS Class 'B'working pressure : 6" i/d Providing and installing PVC tappered core BSS Class 'B'working pressure : 8" i/d Providing and installing PVC tappered core BSS Class 'B'working pressure : 10" i/d Providing and installing PVC tappered core BSS Class 'B'working pressure : 12" i/d Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

Rate (British System) Labour


48.05 282.10 71.69 100.36 143.38 179.22 215.06 48.05 50.18 71.69 100.36 143.38 179.22 215.06 98.19 107.53 143.38 207.89 286.75 358.44 424.55

Rate (Metric System) Unit


Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each

Composite
117.26 428.91 244.72 982.82 1,787.16 2,255.58 3,329.60 169.17 400.23 670.64 1,792.60 2,652.31 2,965.00 3,589.15 176.06 202.70 259.31 360.16 546.29 791.01 909.03

Labour
48.05 282.10 71.69 100.36 143.38 179.22 215.06 48.05 50.18 71.69 100.36 143.38 179.22 215.06 98.19 107.53 143.38 207.89 286.75 358.44 424.55

Composite
117.26 428.91 244.72 982.82 1,787.16 2,255.58 3,329.60 169.17 400.23 670.64 1,792.60 2,652.31 2,965.00 3,589.15 176.06 202.70 259.31 360.16 546.29 791.01 909.03

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 136 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 24 :

TUBEWELL AND WATER SUPPLY

Item Code
24-29-b-01 24-29-b-02 24-29-b-03 24-29-b-04 24-29-b-05 24-29-b-06 24-29-b-07 24-29-c-01 24-29-c-02 24-29-c-03 24-29-c-04 24-29-c-05 24-29-c-06 24-29-c-07 24-30-a-01 24-30-a-02

Description Unit
Providing and installing PVC tappered core BSS Class 'C'working pressure : 2" i/d Providing and installing PVC tappered core BSS Class 'C'working pressure : 3" i/d Providing and installing PVC tappered core BSS Class 'C'working pressure : 4" i/d Providing and installing PVC tappered core BSS Class 'C'working pressure : 6" i/d Providing and installing PVC tappered core BSS Class 'C'working pressure : 8" i/d Providing and installing PVC tappered core BSS Class 'C'working pressure : 10" i/d Providing and installing PVC tappered core BSS Class 'C'working pressure : 12" i/d Providing and installing PVC tappered core BSS Class 'D'working pressure : 2" i/d Providing and installing PVC tappered core BSS Class 'D'working pressure : 3" i/d Providing and installing PVC tappered core BSS Class 'D'working pressure : 4" i/d Providing and installing PVC tappered core BSS Class 'D'working pressure : 6" i/d Providing and installing PVC tappered core BSS Class 'D'working pressure : 8" i/d Providing and installing PVC tappered core BSS Class 'D'working pressure : 10" i/d Providing and installing PVC tappered core BSS Class 'D'working pressure : 12" i/d Providing and Laying HDPE pipe Din-/Din-/ISO-4427 incl testing & disinfect complete (20mm dia) Providing and Laying HDPE pipe Din-8074/Din-8075/ISO-4427 including testing & disinfect complete (25mm dia) Providing and Laying HDPE pipe Din-8074/Din-8075/ISO-4427 incl testing & disinfect complete (32mm dia) Providing and Laying HDPE pipe Din-8074/Din-8075/ISO-4427 including testing & disinfect complete (40mm dia) Providing and Laying HDPE pipe Din-8074/Din-8075/ISO-4427 including testing & disinfect complete (50mm dia) Each Each Each Each Each Each Each Each Each Each Each Each Each Each 1 Rft 1 Rft

Rate (British System) Labour


98.19 107.53 143.38 208.19 286.75 358.44 430.96 98.19 107.53 143.38 207.89 286.75 358.44 430.13 13.14 13.14

Rate (Metric System) Unit


Each Each Each Each Each Each Each Each Each Each Each Each Each Each m m

Composite
184.71 211.35 267.96 369.11 554.95 818.70 976.01 167.40 197.51 286.99 424.18 650.11 1,033.25 1,314.31 24.40 27.78

Labour
98.19 107.53 143.38 208.19 286.75 358.44 430.96 98.19 107.53 143.38 207.89 286.75 358.44 430.13 43.10 43.10

Composite
184.71 211.35 267.96 369.11 554.95 818.70 976.01 167.40 197.51 286.99 424.18 650.11 1,033.26 1,314.31 80.06 91.14

Spec. No

Remarks

24-30-a-03

1 Rft

13.14

37.58

43.10

123.29

24-30-a-04

1 Rft

17.48

54.99

57.36

180.43

24-30-a-05

1 Rft

17.48

65.74

57.36

215.68

NWFP CSR 2008 - Approved 25-Aug-2008

Page 137 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 24 :

TUBEWELL AND WATER SUPPLY

Item Code
24-30-a-06

Description Unit
Providing and Laying HDPE pipe Din-8074/Din-8075/ISO-4427 incl testing & disinfect complete (75mm dia) Providing and Laying HDPE pipe Din-8074/Din-8075/ISO-4427 including testing & disinfect complete (110mm dia) Providing and installing HDPE Socket 20mm dia Providing and installing HDPE Socket 25mm dia Providing and installing HDPE Socket 32mm dia Providing and installing HDPE Socket 40mm dia Providing and installing HDPE Socket 50mm dia Providing and installing HDPE Socket 75mm dia Providing and installing HDPE Socket 110mm dia Providing and installing HDPE Tee 20mm dia Providing and installing HDPE Tee 25mm dia Providing and installing HDPE Tee 32mm dia Providing and installing HDPE Tee 40mm dia Providing and installing HDPE Tee 50mm dia Providing and installing HDPE Tee 75mm dia Providing and installing HDPE Tee 110mm dia Providing and installing HDPE bend 20mm dia Providing and installing HDPE bend 25mm dia Providing and installing HDPE bend 32mm dia Providing and installing HDPE bend 40mm dia Providing and installing HDPE bend 50mm dia Providing and installing HDPE bend 75mm dia Providing and installing HDPE bend 110mm dia Providing and installing HDPE adaptor 20mm Providing and installing HDPE adaptor 25mm Providing and installing HDPE adaptor 32mm Providing and installing HDPE adaptor 40mm Providing and installing HDPE adaptor 50mm Providing and installing HDPE adaptor 75mm Providing and installing HDPE adaptor 110mm S/H/J G.I. Flanged Pipe 18" i/d 6.35mm thick S/H/J G.I. Flanged Pipe 16" i/d 6.35mm thick S/H/J G.I. Flanged Pipe 12" i/d 6.35mm thick S/H/J G.I. Flanged Pipe 10" i/d 6.35mm thick S/H/J G.I. Flanged Pipe 8" i/d 5mm thick 1 Rft

Rate (British System) Labour


17.48

Rate (Metric System) Unit


m

Composite
156.19

Labour
57.36

Composite
512.44

Spec. No

Remarks

24-30-a-07

1 Rft

19.67

250.31

64.54

821.22

24-30-b-01 24-30-b-02 24-30-b-03 24-30-b-04 24-30-b-05 24-30-b-06 24-30-b-07 24-30-c-01 24-30-c-02 24-30-c-03 24-30-c-04 24-30-c-05 24-30-c-06 24-30-c-07 24-30-d-01 24-30-d-02 24-30-d-03 24-30-d-04 24-30-d-05 24-30-d-06 24-30-d-07 24-30-e-01 24-30-e-02 24-30-e-03 24-30-e-04 24-30-e-05 24-30-e-06 24-30-e-07 24-31-a 24-31-b 24-31-c 24-31-d 24-31-e

Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft

34.41 34.41 34.41 48.05 255.21 50.18 71.69 114.70 114.70 114.70 143.38 143.38 172.05 229.40 77.65 77.65 77.65 98.19 98.19 107.53 143.38 40.15 40.15 40.15 48.05 48.05 50.18 71.69 629.45 240.06 314.73 262.27 209.82

46.51 47.72 50.14 81.93 285.46 146.98 192.69 135.27 144.95 158.26 215.98 297.05 2,494.04 5,250.90 95.81 101.86 113.96 153.85 170.79 422.13 415.63 100.64 136.95 167.20 314.25 392.90 957.68 1,959.29 3,101.09 3,732.12 2,934.38 2,264.82 1,884.46

Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each Each m m m m m

34.41 34.41 34.41 48.05 255.21 50.18 71.69 114.70 114.70 114.70 143.38 143.38 172.05 229.40 77.65 77.65 77.65 98.19 98.19 107.53 143.38 40.15 40.15 40.15 48.05 48.05 50.18 71.69 2,065.13 787.60 1,032.56 860.47 688.38

46.51 47.72 50.14 81.93 285.46 146.98 192.69 135.27 144.95 158.26 215.98 297.05 2,494.04 5,250.90 95.81 101.86 113.96 153.85 170.79 422.13 415.63 100.64 136.95 167.20 314.25 392.90 957.68 1,959.29 10,174.19 12,244.49 9,627.22 7,430.52 6,182.60
Page 138 of 144

NWFP CSR 2008 - Approved 25-Aug-2008

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 24 :

TUBEWELL AND WATER SUPPLY

Item Code
24-31-f 24-31-g 24-32-a 24-32-b 24-32-c 24-32-d 24-32-e 24-32-f 24-32-g 24-33 24-34 24-35 24-36-a 24-36-b 24-36-c 24-38-a 24-38-b 24-38-c 24-38-d 24-38-e 24-38-f 24-38-g 24-39-a 24-39-b 24-39-c 24-39-d

Description Unit
S/H/J G.I. Flanged Pipe 6" i/d 5mm thick S/H/J G.I. Flanged Pipe 4" i/d 5mm thick S/H/J MS Flanged Pipe 18" i/d 6.35mm thick S/H/J MS Flanged Pipe 16" i/d 6.35mm thick S/H/J MS Flanged Pipe 12" i/d 6.35mm S/H/J MS Flanged Pipe 10" i/d 6.35mm thick S/H/J MS Flanged Pipe 8" i/d 5mm thick S/H/J MS Flanged Pipe 6" i/d 5mm thick S/H/J MS Flanged Pipe 4" i/d 5mm thick Supplying and Fixing MS manhole cover of 0.25" thick sheet & angle iron frame 2"x2"x0.25" with lock complete Supplying and Fixing flat iron (2"x3/8") ladder for OHR, holes @ 15" c/c, steps of MS bars 5/8" i/d & paint compl Supplying and Fixing C.I. vent pipe for storage tanks including jally etc Supplying and Fixing MS cap of 3/16" thick sheet : 10" i/d Supplying and Fixing MS Cap of 3/16" thick sheet : 8" i/d Supplying and Fixing MS Cap of 3/16" thick sheet : 6" i/d Supplying and Fixing Flanged Expansion Joints BSS 2035: 18" i/d Supplying and Fixing Flanged Expansion Joint BS-2035 : 16" i/d Supplying and Fixing Flanged Expansion Joint BS-2035 : 12" i/d Supplying and Fixing Flanged Expansion Joint BSS-2035 : 10" i/d Supplying and Fixing Flanged Expansion Joint BSS 2035 : 8" i/d Supplying and Fixing Flanged Expansion Joints BSS 2035 : 6" i/d Supplying and Fixing Flanged Expansion Joint BSS-2035 : 4" i/d Supplying and Fixing MS Suspension Clamp 3/8" thick for housing pipe : 18" i/d Supplying and Fixing MS Suspension Clamp 3/8" thick for housing pipe : 16" i/d Supplying and Fixing MS Suspension Clamp 3/8" thick for housing pipe : 12" i/d Supplying and Fixing MS Suspension Clamp 3/8" thick for housing pipe : 10" i/d 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Rft 1 Sft 1 Rft 1 Rft Each Each Each Each Each Each Each Each Each Each Each Each Each Each

Rate (British System) Labour


157.36 104.91 524.54 349.70 262.27 209.82 174.85 139.88 87.42 41.20 23.82 1.75 11.78 11.78 11.78 16,058.00 11,470.00 5,059.20 3,670.40 2,982.20 1,605.80 1,376.40 1,376.40 917.60 573.50 344.10

Rate (Metric System) Unit


m m m m m m m m m m2 m m Each Each Each Each Each Each Each Each Each Each Each Each Each Each

Composite
980.16 556.24 3,472.10 2,969.35 2,227.31 1,734.42 1,404.21 902.18 516.97 491.41 520.62 46.02 858.78 798.28 737.78 76,558.00 59,870.00 29,259.20 18,190.40 13,388.20 8,865.80 6,821.40 2,828.40 1,825.10 1,057.50 707.10

Labour
516.28 344.19 1,720.94 1,147.29 860.47 688.38 573.65 458.92 286.82 443.30 78.14 5.74 11.78 11.78 11.78 16,058.00 11,470.00 5,059.20 3,670.40 2,982.20 1,605.80 1,376.40 1,376.40 917.60 573.50 344.10

Composite
3,215.76 1,824.93 11,391.41 9,741.95 7,307.45 5,690.34 4,606.98 2,959.90 1,696.11 5,287.54 1,708.06 150.97 858.78 798.28 737.78 76,558.00 59,870.00 29,259.20 18,190.40 13,388.20 8,865.80 6,821.40 2,828.40 1,825.10 1,057.50 707.10

Spec. No

Remarks

NWFP CSR 2008 - Approved 25-Aug-2008

Page 139 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 24 :

TUBEWELL AND WATER SUPPLY

Item Code
24-39-e 24-39-f 24-39-g 24-40 24-41 24-42 24-43 24-44 24-45-a

Description Unit
Supplying and Fixing MS Suspension Clamp 3/8" thick for housing pipe : 8" i/d Supplying and Fixing MS Suspension Clamp 3/8" thick for housing pipe : 6" i/d Supplying and Fixing MS Suspension Clamp 3/8" thick for housing pipe : 4" i/d Supplying and Fixing PVC Water Stopper 8" wide 3/8" thick Conducting Elec: Resistivity survey of the area and furnishing its reports. Logging of bore hole with electrical equipment and furnishing reports. Providing and lowering pezu meter 1.25" GI pipe including all accessories. P&L Reflux valves (C.I) of BSS quality/weight including jointing material 3" i/d-6" i/d. Laying cut, joint, test & disinfect of 8"i/d of GI pipe line including cost of welding, excavation and filling compaction etc complete. Laying cut, joint, test & disinfect of 6"i/d of GI pipe line including cost of welding, excavation and filling compaction etc complete. Laying cut, joint, test & disinfect of 4"i/d of GI pipe line including cost of welding, excavation and filling compaction etc complete. Laying cut, joint, test & disinfect of 3"i/d of GI pipe line including cost of welding, excavation and filling compaction etc complete. Testing of soil for bearing capacity & chemical contents upto any depth. Each Each Each 1 Rft No Job 1 Rft 1 Rft No

Rate (British System) Labour


229.40 172.05 114.70 6.99 697.50 837.00 38.15 321.34 125.15

Rate (Metric System) Unit


Each Each Each m no job m m joint

Composite
471.40 353.55 296.20 191.45 30,342.50 12,937.00 137.01 1,538.72 996.35

Labour
229.40 172.05 114.70 22.95 697.50 837.00 125.18 1,054.27 125.15

Composite
471.40 353.55 296.20 628.10 30,342.50 12,937.00 449.51 5,048.29 996.35

Spec. No

Remarks

24-45-b

joint

125.15

803.96

joint

125.15

803.96

24-45-c

joint

125.15

611.57

joint

125.15

611.57

24-45-d

Joint

125.15

420.39

joint

125.15

420.39

24-46

1 Rft

340.24

5,504.88

1,116.29

18,060.62

NWFP CSR 2008 - Approved 25-Aug-2008

Page 140 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 25 :

IRON WORK

Item Code
25-01 25-02 25-03 25-04 25-05 25-06 25-07 25-08 25-09 25-10 25-11 25-12 25-13 25-14 25-15 25-16 25-17-a 25-17-b 25-18 25-19 25-20 25-21 25-22 25-23 25-24 25-25 25-26 25-27 25-28

Description Unit
Laying, linking and packing tramway line Dismantling tramway track Laying, linking of BG track, including packing, straightening and levelling Linking points and crossings, complete with fastenings Bending or straightening BG rail with jim crow Fixing street lamp posts Binding ends of sleepers and timbers of all sizes & kinds, including spreading & restacking Opening stacks of sleepers & timber of all kinds and sizes, including spreading for inspection Small iron work, such as gusset plates, knees, bends, stirrups, straps, rings etc excluding erection Fabrication of heavy steel work with angle, tees, sheet iron etc for making trusses, girders etc Erection and fitting in position iron trusses, staging of water tanks, etc Fixing corrugated iron sheet including rivetting, etc Erecting corrugated iron sheet tanks, upto 20' height Erecting rolled steel beams or old rails, in roof etc, erection & fixing in position Erecting rolled steel beams or rails, erection for posts etc (other than in roofs) Making bolts & nuts of iron rods Cutting rails,rolled steel joist & beams, with hacksaw : Upto 6" size Cutting rails,rolled steel joist & beams, with hacksaw : Above 6" size Cutting rails or rolled steel beams of size below 6" with jim Bending rolled steel beams or rails Drilling holes,in plates upto 1/2" thick per inch dia. or part thereof Extra for drilling holes in plates over 1/2" thick per inch dia, or part thereof Rivetting 1/8" dia Cutting out Rivets, all sizes. Fitting and erection of gutters of sheet iron Cutting and fixing iron bars, for barred windows Cutting GI sheets of 2'-8" wide. Notching web or foot of rail posts for housing rail beams Hoop iron netted trellis work fixed with nails 1 RFT 1 RFT 1 RFT Each Each Each Each Each tonne tonne tonne 1 SFT tonne tonne tonne kg Each cut Each cut

Rate (British System) Labour


8.58 2.84 22.95 2,247.50 286.75 837.00 32.40 3.46 27,032.00 17,980.00 4,920.48 6.92 6,125.60 347.20 174.22 61.85 129.16 193.75 64.58 110.72 26.86 12.40 3.88 11.19 19.38 27.38 13.43 299.66 24.98

Rate (Metric System) Unit


m m m Each Each Each Each Each tonne tonne tonne m2 tonne tonne tonne kg Each cut Each cut Each cut Per Bend Each hole Each hole Each Each m Each Each Each cut m2

Composite
8.58 2.84 22.95 2,247.50 286.75 837.00 32.40 3.46 116,572.00 107,520.00 4,920.48 6.92 6,125.60 347.20 174.22 128.10 129.16 193.75 64.58 240.36 26.86 12.40 3.88 11.19 19.38 27.38 13.43 304.71 26.45

Labour
28.15 9.32 75.29 2,247.50 286.75 837.00 32.40 3.46 27,032.00 17,980.00 4,920.48 74.41 6,125.60 347.20 174.22 61.85 129.16 193.75 64.58 110.72 26.86 12.40 3.88 11.19 63.59 27.38 13.43 299.66 268.80

Composite
28.15 9.32 75.29 2,247.50 286.75 837.00 32.40 3.46 116,572.00 107,520.00 4,920.48 74.41 6,125.60 347.20 174.22 128.10 129.16 193.75 64.58 240.36 26.86 12.40 3.88 11.19 63.59 27.38 13.43 304.71 284.62

Spec. No

Remarks

Each cut Per Bend Each hole Each hole Each Each 1 RFT Each Each Each cut 1 SFT

NWFP CSR 2008 - Approved 25-Aug-2008

Page 141 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 25 :

IRON WORK

Item Code
25-29 25-30 25-31 25-32 25-33 25-34 25-35 25-36 25-37

Description Unit
Fixing zinc, iron or GI sheet on table tops Making and fixing steel grated doors, complete with locking arrangements & angle iron frame Making and fixing steel grated door, with 1/16" thick sheeting, including angle iron frame & lock Making and fixing grating in opening, including fixing at site with flat iron 2"x3/8" and 3/4" sq. bars Providing and Fixing terrace railing of 2" i/d conduit pipe 16 SWG welded with 5/8"x5/8" sq bar 2.75' high complete Providing and Fixing collapsible gate made of 2"x2"x1/4" tee iron at top & bottom, lock etc complete Providing and Fixing 24 SWG GI sheet rolling shutter of steel frame of MS channel 2"x1.25"x1/8" complete Providing and Fixing MS angle iron 1"x1"x1/4" edge protector nozing of steps of stairs, complete Providing and Fixing stair railing of 2.5" i/d GI pipe, welded with 5/8"x5/8" MS bars 2'-9" high, fixed in each step Providing and Fixing GI wire gauze 24 SWG, 12x12 meshes per sq.in., fixed to steel windows or doors etc Providing and Fixing steel windows with openable glazed panels Without wire guaze : Glass pane 2mm thick Providing and Fixing steel windows with openable glazed panels Without wire gauze : Glass pane 2.5mm thick Providing and Fixing steel windows with openable glazed panels Without wire gauze : Glass pane 3mm thick Providing and Fixing steel windows with openable glazed panels Without wire gauze : Glass pane 4mm thick Providing and Fixing steel windows with openable glazed panels Without wire gauze : Glass pane 5mm thick Providing and Fixing steel windows with openable glazed panels With 22 SWG wire gauze : Glass pane 2mm Providing and Fixing steel windows with openable glazed panels With 22 SWG wire gauze : Glass pane 2.5mm Providing and Fixing steel windows with openable glazed panels With 22 SWG wire gauze : Glass pane 3mm Providing and Fixing steel windows with openable glazed panels With 22 SWG wire gauze : Glass pane 4mm Providing and Fixing steel windows with openable glazed panels With 22 SWG wire gauze : Glass pane 5mm Supply and Fixing iron grating for fire place 1 SFT 1 SFT 1 SFT 1 SFT 1 SFT 1 SFT 1 SFT 1 RFT 1 RFT

Rate (British System) Labour


11.58 218.96 215.07 58.91 39.65 135.09 16.90 18.84 67.29

Rate (Metric System) Unit


m2 m2 m2 m2 m2 m2 m2 m m

Composite
12.13 429.92 582.74 134.40 224.57 476.62 138.22 164.63 343.45

Labour
124.58 2,356.00 2,314.15 633.82 426.68 1,453.56 181.86 61.80 220.77

Composite
130.48 4,625.90 6,270.26 1,446.19 2,416.38 5,128.39 1,487.19 540.11 1,126.80

Spec. No

Remarks

25-38 25-39-a-01 25-39-a-02 25-39-a-03 25-39-a-04 25-39-a-05 25-39-b-01 25-39-b-02 25-39-b-03 25-39-b-04 25-39-b-05 25-40

1 SFT 1 SFT 1 SFT 1 SFT 1 SFT 1 SFT 1 SFT 1 SFT 1 SFT 1 SFT 1 SFT 1 SFT

46.95 14.58 14.58 14.58 14.58 14.58 16.05 16.05 16.05 16.05 16.05 263.60

124.39 336.65 340.28 334.23 346.33 348.75 401.12 404.75 398.70 410.80 413.22 531.38

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

505.20 156.83 156.83 156.83 156.83 156.83 172.68 172.68 172.68 172.68 172.68 2,836.31

1,338.48 3,622.39 3,661.45 3,596.35 3,726.54 3,752.58 4,316.04 4,355.09 4,290.00 4,420.19 4,446.23 5,717.64

NWFP CSR 2008 - Approved 25-Aug-2008

Page 142 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 25 :

IRON WORK

Item Code
25-41

Description Unit
Providing and Fixing angle iron railing, using 2.5"x2.5"x3/8" angle iron post 4.5'long, 5'to 6" apart, complete Providing and Fixing barbed wire fencing of 1.5"x1.5"x3/16" angle iron post 3.25' long, 5 to 6 ft. centre to centre Providing and Fixing barbed wire fencing on compound wall of 1.5"x1.5"x3/16" angle iron post 3' long, 4' apart Supplying and Fixing 18SWG Steel Almirah, 12" max depth including box shelves, back, shelves, lock, spray paint complete Supplying and Fixing 18 SWG MS Sheet Door with angle iron frame (1.5"x1.5"x1/8"), bolt, hinges, paint etc complete Supplying and Fixing 18 SWG MS Sheet Gate with angle iron frame (2"x2"x3/16") with side window, lock, painting etc 1 RFT

Rate (British System) Labour


153.51

Rate (Metric System) Unit


m

Composite
839.85

Labour
503.65

Composite
2,755.42

Spec. No

Remarks

25-42

1 RFT

29.63

100.26

97.21

328.92

25-43 25-46

1 RFT 1 SFT

31.80 57.64

114.20 531.89

m m2

104.34 620.20

374.66 5,723.09

25-47-a

1 SFT

64.49

354.72

m2

693.90

3,816.81

25-47-b

1 SFT

99.89

499.81

m2

1,074.77

5,378.00

NWFP CSR 2008 - Approved 25-Aug-2008

Page 143 of 144

COMPOSITE SCHEDULE OF RATES 2008 NWFP

Chapter # 26 :

MISCELLANEOUS

Item Code
26-01 26-02 26-03 26-04 26-05 26-06

Description Unit
Supplying bamboo jhandies 10' to 12' with iron shoes and flags 15" square Supplying wooden pegs for levelling 1.5" square 6" long Supplying wooden pegs for alignment, 2" to 3" square, 9" long Fixing enamelled iron gauges flush with masonry including cost of hooks Supply & fix boundry pillars in position, including digging pits Fixing main line type distance mark in position including making 1:3:6 cement concrete base block Boring and fixing 1.5" dia pressure pipe in ordinary soil Boring and fixing 1.5 dia pressure pipe in clay Boring and fixing 1.5" dia pressure pipe in shingle Repairs to hand pump, pulling out & refitting Fixing hand pump (machine only) Washing of Durries / Synthetic Matting Washing of Bed Sheets Washing of Table Cloth / Napkins / Dusters etc Recaning of chairs/stools : With plastic cane. Recaning of chairs/stools : With willow cane. Sweeping chimneys Cleaning of water tanks upto 400 gallons capacity Each 100 No. 100 No. Each Each Each

Rate (British System) Labour


43.40 182.13 658.75 868.00 139.50 83.70

Rate (Metric System) Unit


Each 100 No 100 No Each Each Each

Composite
327.75 654.03 1,590.45 1,013.20 427.07 317.85

Labour
43.40 182.13 658.75 868.00 139.50 83.70

Composite
327.75 654.03 1,590.45 1,013.20 427.07 317.85

Spec. No

Remarks

Composite rate does not include cost of iron distance marks.

26-07-a 26-07-b 26-07-c 26-08 26-09 26-10-a 26-10-b 26-10-c 26-11-a 26-11-b 26-12 26-13

1 RFT 1 RFT 1 RFT 1 RFT Each 100 SFT Each Each kg kg Each Each

44.89 83.17 121.45 32.80 198.40 1,080.56 23.34 11.66 69.75 97.65 69.75 70.31

44.89 83.17 121.45 32.80 198.40 1,080.56 23.34 11.66 287.55 1,307.65 109.44 70.31

m m m m Each m2 Each Each kg kg Each Each

147.29 272.87 398.45 107.60 198.40 116.27 23.34 11.66 69.75 97.65 69.75 70.31

147.29 272.87 398.45 107.60 198.40 116.27 23.34 11.66 287.55 1,307.65 109.44 70.31
Capacity of cart, 20 cubic feet

For capacity other than 400 gallons, the rate shall be work out on proper rate basis. Capacity of cart, 20 cubic feet

26-14 26-15 26-16-a 26-16-b 26-17 26-18

Supplying manure Spraying anti-termite liquid mixed with water in the ratio of 1:40 Providing and Fixing barbed wire fencing with 4 horizontal & 2 cross wires : Without PCC base Providing and Fixing barbed wire fencing with 4 horizontal & 2 cross wires : With PCC 1:4:8 base 12"x12"x21" Making notice board 1/2" thick of c/s mortar 1:3 with 2"x1/2" beading Binding office books/registers.

Cart load 100 Sft/spray 1 RFT 1 RFT 100 SFT Each

111.60 7.75 4.41 4.41 5,016.90 13.95

325.25 122.26 137.56 139.50 5,598.17 31.50

Cart load m2 m m m2 Each

111.60 0.83 14.47 14.47 539.82 13.95

325.25 13.16 451.30 457.67 602.36 31.50

NWFP CSR 2008 - Approved 25-Aug-2008

Page 144 of 144