100%(2)100% нашли этот документ полезным (2 голоса)
7K просмотров14 страниц
From 7-08-88 to 1-12-90, I was made in-charge of the projects being executed in GDK 11A coal mine of singareni collieries, company. I was entrusted with the project involving tunneling work to drive a roadway connecting Coal Handling Plant at the surface with the underground bunkers. The gate roadway, 180 meters long and 3 X 4. Meters in cross-section through hard sandstone dipping at 1 in 4 was to be driven
From 7-08-88 to 1-12-90, I was made in-charge of the projects being executed in GDK 11A coal mine of singareni collieries, company. I was entrusted with the project involving tunneling work to drive a roadway connecting Coal Handling Plant at the surface with the underground bunkers. The gate roadway, 180 meters long and 3 X 4. Meters in cross-section through hard sandstone dipping at 1 in 4 was to be driven
Авторское право:
Attribution Non-Commercial (BY-NC)
Доступные форматы
Скачайте в формате PDF, TXT или читайте онлайн в Scribd
From 7-08-88 to 1-12-90, I was made in-charge of the projects being executed in GDK 11A coal mine of singareni collieries, company. I was entrusted with the project involving tunneling work to drive a roadway connecting Coal Handling Plant at the surface with the underground bunkers. The gate roadway, 180 meters long and 3 X 4. Meters in cross-section through hard sandstone dipping at 1 in 4 was to be driven
Авторское право:
Attribution Non-Commercial (BY-NC)
Доступные форматы
Скачайте в формате PDF, TXT или читайте онлайн в Scribd