N i c aragua
Project:
Assistance to Petroleum Sector-Phase IV Country facts:
Official Name:
Cooperating institution: Republic of Nicaragua
Instituto Nicaraguense de Energia (INE)
Capital:
INE is the state organization which is responsible for regulations, norms, Managua
control and taxation of the electricity and hydrocarbon sectors. The main
cooperation between the INE and the Norwegian Petroleum Directorate (NPD) Chief of state:
is connected to the Department of Hydrocarbons in INE (Direccion General de President Daniel Ortega
Hidrocarburos, DGH), which is regulating both the upstream and downstream Saavedra (since January 2007).
activities. By 1. March 2007, the hydrocarbons division of INE has been trans- The president is both chief of
ferred to the Ministry of Mines and Energy, and Vice Minister Lorena Lanza is state and head of government.
in charge of the division.
Population:
Goal: 5 570 129 (2006)
to contribute to the economic and social development and poverty reduction
by identifying and developing new fields in the use of the country’s natural Petroleum sector, key figures:
resources, Average oil production: 0
Annual gas production: 0
Objective: to contribute to secure an environmentally sound exploration
and possible exploitation of petroleum resources by creating capacities, Organisation of the sector:
at Nicaragua’s government level. In 2007, the former INE has been
transferred to the Ministry of
Project period: 2005 - 2007 Energy and Mines (CNE), which
is regulating the hydrocarbons
Total Budget: NOK 2.25 mill sector

2 0 0 6 -2 0 07
Norwegian Petroleum Directorate
O i l f o r d e v e l op m e n t

46
6.9
The programme The main specific objective of the phase III of the
Specific objectives are: cooperation was to assist INE in their first licensing
• Updating of the petroleum database round in 2003 and the negotiation of exploration and
• Implementation of the monitoring system production licences in 2004-2005. INE entered into
• Analysis of new seismic data negotiations with 4 companies. In 2005 one license
• Updating and improving of the national contract has been signed with one company, Oklahoma-
contingency plan for emergencies related to the Nicaragua SA (Indoklanicsa), in the onshore Pacific.
exploration and exploitation activities In 2006 further three contracts were signed with the
• Training to INE’s staff through seminars, companies MKJ and Infinity for 4 areas in the Caribbean
work-shops, and courses abroad Margin. The Indoklanicsa onshore concession is now
• New promotional campaign operated by the Canadian company Norwood, which
started a drilling campaign in the end of 2006. An oil
Major risks: and gas discovery was reported in February 2007.
• There is the possibility, but with a low probability, The situation of the concessions in the Caribbean is
of external risks related to political unrest. presently being discussed by the central government
• There is a low probability for institutional risks, and the local authorities of the Caribbean side, and
such as loss of qualified staff assigned to the there has been no exploration activity there.
Programme and affected recurrent costs as a result
of budget limitations after the end of the The current programme is a prolongation until 2007
Grant period. of the institutional cooperation between INE and NPD.
The cooperation continues with technical assistance and
Contact: training. The contract for the cooperation will be signed
CNE: Lic. Lorena Lanza, Vice Minister, Ministry in 2007
of Energy and Mines, lorena.lanza@cne.gob.ni
Ing. Veronica Artiles, Head of Petroleum Activities in 2006
Information Department, vartiles@cne.gob.ni In 2006, there was no NPD activity of significance, since
NPD: Mr. Fridtjof Riis, Project Coordinator, the political situation prior to the elections has not been
fridtjof.riis@npd.no clear. NPD has been in contact with INE and with the
embassy to follow the process of establishing the new
Cooperating Institution phase IV of the programme.
NORAD
Costs 2006
Brief history of the project No costs to be reported.
The institutional cooperation between the INE and the
NPD was initiated in 1989, as a part of support to the Plans 2007
petroleum sector. No petroleum exploration had taken The Nicaragua project is awaiting the signature of the
place in Nicaragua since the 1970’s. In the first phase of contract between CNE and NORAD. It is expected that
the programme (1989-1995), it was prioritized to organ- the project will start up in the end of the second quarter,
ize and enlarge the existing data base and to evaluate and that it will involve training, assistance on updating
the petroleum potential in order to prepare for renewed of the data base systems, assistance in monitoring of the
exploration. The programme has been prolonged in exploration activity and setting up a contingency plan.
order to continue the institutional cooperation during It is expected that the project will need approximately 4
the licensing round, negotiation phase and the following weeks of assistance. A further delay cannot be ruled out.
up of the new licences. The licensing round is based on
the recent Petroleum Act, which was elaborated with the
support of the Inter American Development Bank, and
approved in 1998.