1 COLD WATER DEMAND.

1) DOMESTIC WATER

PERSON x IGPD x 4.55 L/IG = L/DAY

2) COOLING TOWER MAKE UP WATER

FOR A/C RT x 13 L/MIN x 0.015 x H/D x 60 MIN/H = 0 L/DAY

FOR COMP. RT x 13 L/MIN x 0.015 x H/D x 60 MIN/H = 0 L/DAY


AIR
RT x 13 L/MIN x 0.015 x H/D x 60 MIN/H = 0 L/DAY

3) OTHERS

INDUSTRIAL WATER L/MIN x H/D x 60 MIN/H = 0 L/DAY

------------------------------------------------------------------------------------------------------------------------------------------------------

TOTAL (DOMESTIC AND A/C) 0 L/DAY

M³/DAY

Page 1
2. COLD WATER STORAGE TANK

TYPE HOT DIPPED GALVANISED

STORAGE VOLUME = M³

DIMENSION L x W x H

GROSS VOLUME M³

3. COLD WATER INCOMING PIPE

WATER TANK VOLUME M³

FLOW RATE ( Hrs FILL) L/MIN

TOTAL EQUIVALENT LENGTH OF PIPE M

CITY MAIN PRESS 20 MAQ

STATIC HEAD 10 MAQ

P = MAQ - MAQ - MAQ = MMAQ/M


M

INCOMING PIPE SIZE MMø


4 PNEUMATIC PUMP SELECTION

DOMESTIC WATER = L/MIN


( REFER TO ATTACHED LOADING UNIT & CURVE )

COOLING TOWER MAKE UP WATER


RT x 13 L/MIN x 0.02 = 0 L/MIN

TOTAL = 0 L/MIN

PUMP HEAD

PIPE M x 0.04 MAQ/M = 0 MAQ

STATIC PRESSURE = MAQ

DISCHARGE PRESSURE = 7 MAQ

OTHERS = 5 MAQ

TOTAL = 12 MAQ

PNEUMATIC PUMP CAPACITY

L/MIN x MAQ x KW x 2 NOS

( PARALELL AND ALTERNATIVE OPERATION )

Page 4
5 COLD WATER TRANSFER PUMP ( FROM SUCTION TANK TO HIGH TANK )

STORAGE TANK CAPACITY M³/DAY

OPERATION HOURS 6 HRS

SAFETY FACTOR 1.1

TOTAL CAPACITY M³ x 1000 x 1.1 = 0.0 L/MIN


6H x 60

PUMP HEAD

PIPE M x 0.04 MAQ/M = MAQ

STATIC PRESSURE = MAQ

DISCHARGE PRESSURE = 7 MAQ

OTHERS = 5 MAQ

TOTAL 12 MAQ

PUMP CAPACITY

L/MIN x MAQ x KW x 2 NOS

( 1 DUTY & 1 STANDBY )

Page 5
SHINRYO (MALAYSIA) SDN BHD

LOADING UNIT CALCULATION FOR COLD WATER

PROJECT :
BRANCH / LOCATION :

FIXTURE OCCUPANCY TYPE OF LOADING QTY


CONTROL UNITS

Water closet Public Flush Valve 10


Water closet Public Flush Tank 5
Pedestal urinal Public Flush Valve 10
Stall or wall urinal Public Flush Valve 5
Stall or wall urinal Public Flush Tank 3

Wash Basin Public Faucet 2


Bathtub Public Faucet 4
Shower Head Public Mixing Valve 4
Service sink Office Faucets 3
Kitchen sink Hotel / restaurant Faucet 4
Hand bidet Public Faucet 2
Garden Taps Public Faucet 3

Water closet Private Flush Valve 6


Water closet Private Flush Tank 3
Lavatory Private Faucet 1
Bathtubs Private Faucets 2
Shower head Private Mixing Valve 2
Hand bidet Private Faucet 1
Kitchen sink Private Faucet 2
Laudry trays (1 to 3) Private Faucet 3

Bathroom group Private Flush valve 8


for water closet

Bathroom group Private Flush tank 6


for water closet

Separate shower Private Mixing valve 2

Combination fixture Private Faucet 3

TOTAL LOADING UNITS

Note : Data obtained from HUNTER (1941)

Page 6
SHINRYO (MALAYSIA) SDN BHD

NG UNIT CALCULATION FOR COLD WATER

Date :

TOTAL
LOADING UNITS

Page 7