Вы находитесь на странице: 1из 8

(B) 1.

Structural Design and Drawing Steel StructuresRiveted and Welded joints, Tension and compression members, plate girders: connections, IRS Code of Practice for Steel structures, Sketching of connection details. RCC StructuresSlab Single and 2- way reinforced, Beams rectangular, T and doubly reinforced, Bond, Shear reinforcement, Design of columns, footings, IRC code of practice for RCC structures, Sketching of RCC details of simple structures. Construction materials Description, specification properties and uses of buildings materials stones, sand, timber, bricks, cement, lime, building hardware paints, varnishes, glasses, tiles. Foundation and Constructions Engineering Soil mechanics Element of Soil mechanics- Physical properties of soils, compaction, field methods of compaction, stabilization of soils, safe bearing capacity of soils, determination of safe bearing capacity of earth, earth pressure, Plate loading test, specifications and construction of earthwork in embankments and cuttings. Foundation Engineering Function of foundations, different types of foundations, settlement of foundations, methods of reducing differential settlement, pile foundations, well foundations for bridges. Buildings Brick and stone masonry, construction details, roofs, floors, staircases, jounaey, scaffolding. Reinforced and Pre-stressed concrete Bending and placing of reinforcement , fine and coarse aggregates , concrete mixing, laying and compaction, Finishing of surfaces RCC structures, Form work, curing , Testing. Steel structures. Standard rolled section , fabrication- templating straightening, drilling, riveting , bolting and welding, match marking, trial corrections, testing, site erections equipment, methods. Construction Machinery and Equipment Drilling and Ballasting equipment for quarrying, tunneling and excavation in rock, pile hammers and pile driving equipment, pumps, concrete mixers, vibrators, grouting equipment, air compressors, pneumatic tools and different types of cranes. Hydraulics and Hydrology Hydraulics Element of Hydraulics- Open channel flow, slow in pipes fractional loss, empirical formulae.

2.

3.

4. (a)

(b)

(c) (d)

(e)

(f)

5. (a)

(b)

Hydrology Rain fall and run-off, rain fall statistics, rain gauges, run off calculations by empirical methods, flood discharge estimation, measurement of floods discharge- current meter. Hydraulics structures. Design of bridges alignment , number spans, economic spans, water way calculations, scour depths, afflux, clearance, depths of foundation box and Pipe culverts, River training works spurs, groynes, sprone leaves. Public Health Engineers Water supply Quality of water, physical and chemical and bacteriological standards of water, water borne diseases, water demand methods of forecasting, sources of water, Treatment of waterabretion, sedimentation, filtration, slow and rapid sand filters, disinfection, Hardness- methods of removal. Conveyance and Distribution. Pumping equipment, rising main, systems of distribution, residual pressures, different types of pipes and fittings, testing of pipes. Sewarage Sewages, waste water collection and carriage , design and sewers, house connections, storm water- drains , disposal of sewage river pollution and control, sewage treatment, land irrigations, septic tanks, primary clarifiers, sludge and scum removal, trickling filters, activated sludge process, sludge digesting, principles of anaerobic digestion, sludge gas, sludge drying and disposal.

(c)

6. (a) i)

ii)

(b)

1. Railway Survey & Construction. Classification of surveys, Principles governing location, ruling gradients, compensation for curves, vertical curves, hill surveys, catch sidings, tunnels, preparation of drawings, design of large bridges, progress reports on surveys, projects estimates, standards of constructions, junctions arrangements, projects report, preliminary arrangements for constructions of new lines, letting out contracts, programme of works, critical path net works, executions of work & measurements, progress reports, completion of work. 2. Railway Track Description, specification & functions of track structure elements: Rail, sleepers, fastenings, ballast, formation & other sub-structures, points & crossings, geometry & design features, Track lay outs. 3. Maintenance of Permanent Way (a) Duties: Duties of Assistant Engineer, Duties of Permanent Way inspectors, duties of Works inspectors, duties of bridge inspectors, duties of Mates, Keymen & Gangmen. (b) Maintenance of P. Way: Methods of maintenance, Beater packing, Measured shovel packing, Machine packing, Systems of maintenance, Overhauling, Systematic Through packing, Pickings up of slacks, Directed Track Maintenance, Miscellaneous works, lifting and lowering of track, screening of ballast, Maintenance of drains, Lubrication of rail joints, Adjustments of creep, Maintenance of Level crossings, maintenance of points & crossings. (c) Special Maintenance Works : Maintenance of Short welded rails, Long welded & Continuous welded rails, maintenance of track in electrified section, special precautions, maintenance of track circulated sections, special precautions. (d) Maintenance of curved track & realignment of curves, curvature transitions, superelevation of curves, safe speed, cant deficiency, speed on curves with turnouts, Realignment of curves method. (e) Testing of track recorders, the Hallade track recorder, Amsler car, Oscillograph car, Interpretation of Track recording charts, attention to track defects, records of track defects. 4. Maintenance of Bridges Inspections of bridges, Records of inspection, details of bridges inspections, work connected with maintenance of bridges, laying of bridges sleepers, replacing cracked bed blocks, painting of steel work. 5. Inspection and Maintenance of Tunnels Inspection of Tunnels, Records of inspections, equipments for inspection, details of Tunnel inspection, works connected with maintenance of Tunnels. 6. Inspections & maintenance of turntables & weigh bridges pits Condition for satisfactory working of turntables, adjustments & overhauling of turntables, Inspection & maintenance, Erection & dismantling of turntables, weigh bridge pits & approaches, responsibility of Engineering staff, drainage of weigh bridge pits, constructions of new weigh bridges.

7. Inspections & maintenance of Buildings other than Bridges:General instructions, additions & alterations to quarters, transfer of buildings, building registers, scale of accommodation & other facilities, vacant railway buildings, maintenance of buildings, Inspection & repairs, Petty repair books, periodical inspections, detail of Inspections. 8. Maintenance of sanitary & hygienic condition in station yards & Railway colonies, water supply, drainage & sewerage (a) Sanitation: Formation of sanitation committees, inspection by sanitation committee, sanitary arrangements in stations & colonies, drinking water wells-protection, cleaning of wells, disinfection, prevention of infectious diseases, disinfection of quarters. (b)Water supply: Sources of water supply, water sample analysis, Open wells-size, pumping capacity, improving yield, shallow tube wells, deep tube wells, impounding reservoirs, storage capacity, flood discharge, record of water levels in wells, rainfall registers, high level storage tanks, precautions against pollution, pumps types, selection, installation, aqueducts & pipelines-types, selection, laying, estimating requirements of water/layout of distribution systems, water supply from outside, sources, maintenance and operation of water supply installation- responsibilities of Engineering department & Mechanical department. (c)Drainage & sewerage: Drainage systems, waterborne sewerage, sizes of sewers, sewage treatment systems, sewage disposal, sewage purification systems, surface drainage layout, size of drains, disposal of sludge effluent, drainage of latrines, maintenance of sewerage and drainage systems, maintenance of open sullage drains, storm water drains, house connections, conservancy & sanitary arrangements, responsibilities of Engineering staff. 9. Acquisition management & disposal of land. General code, Rules and ownership of Railway land, sanctioning authority for acquisition and relinquishment, principles for acquisition and relinquishment, procedure for acquisition and relinquishment, plans & schedules, taking over and handing over, demarcation of boundaries, land records- demarcation and verification of Railway boundaries, maintenance of rights of way, religious structures, management of Railway land-leasing of licensing lease or license of land merchants and vendors at stations, bulk oil installations, natural, protinees & gazing construction of buildings near railway land, sale of natural products, felling of trees- within railway land, outside railway land, felling of trees near electric or telegraphic wires. Large scale permanent way renewals. Classifications of routes and tracks, Track renewal programme, factors governing permanent way renewals, preparation for relaying, preliminary works, systematic operation for complete relaying, speed restrictions to be observed during relaying, post relaying works, classification & disposal of released materials. Rehabilitation of bridges. Precautions when working on bridges, rebuilding or alterations to bridges design and execution of bridge works, temporary arrangements, false work for erection of girders, assemble and erection of girders, cranes for erection of girders, testing of girders, proposals for strengthening existing girder spans, methods of regirdering major bridges.

10.

11.

12.

Works effecting railway safety & opening new works. General reference to rules-works requiring sanction of the ACRS & notice thereof, application to the ACRS-execution of works & Safety certificates, documents to accompany application, submission of safety certificate, deviations from plans approved by ACRS, application for running of new type of locomotive and/or rolling stock and for increase in speed, notification to railway officials when opening works, works resulting from accidents, opening of new lines infringement to Schedule of Dimension-condition, procedure thereof, movement of ODCstype and procedure for sanction, movement, precautions during movements. Railway operation (a)General reference to G&SR: Types of signals and their significance, rules for working of trains, block working rules, types, introduction of temporary single line working. (b)Engineering restrictions & indicators: General definitions, Responsibility of the inspector -in-charge, works of short duration, protection of line in block section and procedure for passing trains, works of long duration, temporary engineering fixed signals, arrangements prior to commencement of work, protection in block section for speed restrictions, procedure for blocking lines for engineering purposes, works at times of poor visibility, temporary signals in emergency, permanent speed restrictions indicators-General. (c) Level Crossing General classification, standard specification, normal position of gates, level crossings equipments, traffic and engineering gates, siding gate lodges, appointment of gateman, duties of gatemen, maintenance of level crossings, examination of gate equipment & gatemen in rules, level crossings register, road traffic census, manning/demanning of level crossings. (d) Working of trollies: General instructions- rules for working, distinction between trollies, lorries and motor trollies, certificate of competency, officials permitted to use trollies and lorries, responsibility for safe working at night or in bad weather, working on track circuited sections, conveyance of non railway officials, trolley permit for private sidings, trolly refuges, protection, equipments on trollies & lorries, working of trollies and lorries in block sections, in station limit. (e) Ballast & material trains;- General rules for working, restrictions in running, ordering of ballast trains, issue of fit to run certificate, equipment, testing of track, power, working in block sections, running on Ghat section, loading and unloading from hopper wagons, planning of ballast and material train movements, training out materials & daily reports of ballast train, charges for ballast trains, register of Engineering vehicles.

13

14.

Accidents: General observance of rules: Intimation of accidents by station master, duties & responsibility of the engineering officials in the event of accident impairing through traffic, action at site, action in the case of derailments, examination of site & preparations of sketches, recording track & rolling stock measurements, accidents procedure, use of recorded data, restoration of through running, procurement & arrangement of labour & equipments, temporary arrangements at site of accidents, transshipment, funds required during emergencies, attended of police at site of accident, drivers report on defects in track, action on receipt of report of defective track, abnormal occurrence attributable to ceillation of locomotive, accidents not impairing through traffic, records of accidents, Rivers & floods, pre-monsoon precautionary measures & patrolling of railway lines.

(a)Rivers & Floods: General behavior of rivers, watchmen at important bridges, pitching stone & boulder reserves, vigilance ******, flood records, survey of the course of river, protection work types, design, repair & maintenance, records rivers & flood. (b)Pre-monsoon precautionary measures:- Vulnerable sections, materials for anticipated emergencies, monsoon emergency rakes, equipments, tools, rail clusters, temporary bridge spans, protective works, railway affective tanks, inspections & vigilance over railway affective tanks, pre-monsoon, during monsoon. (c) Monsoon & emergency patrol:- Kinds of patrolling, keymens daily patrol, gang patrol during abnormal rain, systematic night patrolling during monsoon, stationary watchmen at vulnerable points, review of patrolling system and vulnerable locations, security patrolling, disorders, protection of line in emergency, duties of patrolmen & their equipment, reporting damage & obstruction on track to Station Masters, check over patrolling, inspection of equipment, surprise checking at night. 16. Preparation of plans and estimates Preparation of plans, General procedure, plan for other departments, sixes of drawings, titles and numbering of drawing, scale of drawings, details on drawings, symbols and colours of drawing, Railway Board drawings, plan issued by the Chief Engineers office, plans is Divisional/Asstt. Engineers/Inspectors offices, completion drawing, care and filling of tracings, preparation of estimates code rules , technical details, rates and quantities, schedule f rates and price listing of stores, report and justification, rent statement for staff quarters, special features of estimates, remodeling of station yards, track renewal works, deposit works, Urgency Certificate, supplementary estimates. Contract and Execution of works (a) Contracts, General-Code reference

17.

1234-

fgUnh fnol dc vkSj D;ks euk;k tkrk gS \ fgUnh esa izoh.krk izkIr deZpkjh ls D;k vfHkizk; gS \ fgUnh es dk;Zlk/kd dk Kku izkIr deZpkfj;ks ls D;k vfHkik; gS \ fgUnh lIrkg D;ks euk;k tkrk gS \ jktHkkkk cf/kfule dh /kkjk 3(3) ds varxZr vkus okys fofHkUUk izdkj ds dkxtkrks ds uke fy[ks A ;g Hkh mYys[k djs fd fu;ekuqlkj mDr dkxtkr dks vfuok;Zr% fdl Hkkkk es tkjh fd;k tkrk gS \

1. Describe in detail, the procedure for imposing a major penalty on a Group D railway employee, under D & A Rules, for long unauthorized absence. 2. Describe the duties of open line ADEN point wise in brief. What are the main items for inspections & what are the main schedule of inspections of open lines ADEN \ 3. How detailed inspections of major/important railway bridges is done by ADEN\ Brief describe each items starting from foundation to track on bridges & its approaches. 4. Write short notes 1. 2. 3. 4. 5. 6. 7. 8. Cant deficiency & cant excess Switch Expansion joints & buffer rails Safety precautions to be taken for maintenance of LWR/CWR during extreme hot whether & extreme cold whether. USFD testing of rails & welds Pre temping attention, Attention during tamping & pods & post tamping attention Describe the working of T-28 (points & Xings renewals) machine with example of a renewal of one points in single line electrified sections. What are main difference between (i) Ballast cleaning machines (ii) shoulder Ballast cleaning machine & (iii) P&C Ballast cleaning machine. Describe working of track machines in track circuited & in electrified sections.

Вам также может понравиться