2012-2016 Capital Improvement Program

City of Houston

STORM DRAINAGE SYSTEM

Storm Drainage - Summary of Funding Sources


2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)
Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Funding Source 200 83,728 Estimated 2011 56,313 9,400 446 14,500 3,069 2012 58,960 203 57,730 2013 207 60,007 2014 210 58,330 2015 214 60,041 2016 1,034 295,068 2012-2016 1,034 378,796 Total Estimated 2011 9,416 12,247 62,065 2012 2,040 10,090 46,630 Fiscal Year Planned Appropriations 2013 1,017 9,007 47,503 2014 517 7,611 51,672 2015 526 8,969 48,625 2016 535 11,768 47,524 2012-2016 4,635 47,445 241,954 Total 14,051 59,692 304,019

Fiscal Year Planned Appropriations

Fund 4030 - Ser-F Storm Sewer Const. Fund Fund 4505 - Storm Sewer Cons. Const. Fund Fund 4510 - Contribution for Capital Projects Fund Fund 5000 - Community Development Blk Grant Fund 8500 - Water & Sewer Sys Cons. Const. Fund Storm Drainage DDSRF Texas Dept. of Transportation

3,109 55,851

57,730

2,021 57,986

58,330

60,041

5,130 289,938

56,313 9,400 446 14,500 8,199 289,938

Total:

83,728

58,960

57,730

60,007

58,330

60,041

295,068

378,796

Active CIP

Form D

Storm Drainage - Summary of Funds


2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)

CIP No. M-000100

Project

Est. 2011 2012

Fiscal Year Planned Appropriations 2013 2014 2015 2016

2012-2016

Pre-Engineering for Storm Water Drainage Improvements Fund 4030 - Ser-F Storm Sewer 1,300 Storm Drainage DDSRF Project Total: 1,300 2,185 2,185 200 200 1,965 446 4,000 2,411 2,437 1,610 2,437 1,610 994 994 3,158 3,158 595 595 2,497 2,497 605 605 2,541 2,541 615 615 4,419 4,419 10,611 10,611 1,035 14,765 15,800 4,000 4,445 4,445 4,875 4,875 4,960 4,960 5,046 5,046 23,326 23,326 2,690 2,690 203 203 3,092 3,092 207 207 3,629 3,629 210 210 4,184 4,184 214 214 15,780 15,780 1,034 1,034

M-000101

Miscellaneous and Emergency Needs (Acquisition, Engineering, Construction, and Legal) Storm Drainage DDSRF Project Total:

M-000126

Local Drainage Program (LDP) Fund 4030 - Ser-F Storm Sewer Fund 4510 - Contribution for Cap Storm Drainage DDSRF Project Total:

M-000220

Storm Drainage Program Support Fund 4030 - Ser-F Storm Sewer Storm Drainage DDSRF Project Total:

M-000241

Stormwater Pump Station and Flood Warning System Improvements Storm Drainage DDSRF 2,415 Project Total: 2,415 1,035 12,040 13,075 Nottingham and Yorkshire Drainage and Paving Fund 8500 - Water & Sewer Sys Storm Drainage DDSRF Project Total:

M-000247

585 585

2,140 2,140

M-000250

Kirkwood Dr (Briar Forest) Drainage and Paving Fund 4030 - Ser-F Storm Sewer 316 Fund 4505 - Storm Sewer Cons. Fund 8500 - Water & Sewer Sys Project Total: 8,100 860 9,276 2,350
Form C

M-000261

Buffalo Bayou Detention Basin Fund 4030 - Ser-F Storm Sewer

Active CIP

Storm Drainage - Summary of Funds


2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)

CIP No.

Project Storm Drainage DDSRF Project Total:

Est. 2011 2,350 9,131 620 9,751 2012

Fiscal Year Planned Appropriations 2013 6,959 6,959 2014 2015 2016

2012-2016 6,959 6,959

M-000262

Whiteheather Drainage and Paving Fund 4030 - Ser-F Storm Sewer Fund 8500 - Water & Sewer Sys Storm Drainage DDSRF Project Total:

575 8,855 9,430 8,304 8,304

575 8,855 9,430 8,304 8,304

M-000263

Sherwood Forest Drainage and Paving Storm Drainage DDSRF Project Total: Rampart Street Drainage and Paving Fund 4505 - Storm Sewer Cons. Storm Drainage DDSRF Project Total: 600

M-000265

16,514 600 6,700 6,700 1,000 4,701 1,000 220 220 4,795 4,795 600 4,903 4,701 16,514

14,920 14,920

31,434 31,434

M-000267

Shepherd Drive Drainage and Paving Fund 4030 - Ser-F Storm Sewer Project Total:

M-000271

Meyerland and Marilyn Estates Drainage and Paving Fund 4030 - Ser-F Storm Sewer Storm Drainage DDSRF Project Total: 4,701 4,701

M-000273

Glenbrook Valley Drainage and Paving Fund 4030 - Ser-F Storm Sewer Project Total:

M-000276

Astoria (Flushing Meadows to Binghampton) Drainage and Paving Fund 4030 - Ser-F Storm Sewer Project Total:

M-000277

Southpark and Southcrest Drainage and Paving Fund 4030 - Ser-F Storm Sewer Storm Drainage DDSRF 4,903
Form C

Active CIP

Storm Drainage - Summary of Funds


2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)

CIP No.

Project Project Total:

Est. 2011 600 6,186 1,036 7,222 2012

Fiscal Year Planned Appropriations 2013 2014 4,903 2015 2016

2012-2016 4,903

M-000280

Brays Village Drainage and Paving Fund 4030 - Ser-F Storm Sewer Fund 8500 - Water & Sewer Sys Project Total:

M-000281

Braesmont Dr (Braeswood to Lymbar) and S Rice Ave (Braeswood to Contour Place) Drainage and Paving Fund 4030 - Ser-F Storm Sewer 600 Storm Drainage DDSRF Project Total: 600 4,863 553 5,416 8,500 14,887 8,500 600 600 6,728 6,728 14,887 14,887 14,887 7,328 7,328 1,828 1,828 1,828 1,828

M-000283

Bellaire West Drainage and Paving Fund 4030 - Ser-F Storm Sewer Fund 4505 - Storm Sewer Cons. Fund 8500 - Water & Sewer Sys Project Total:

M-000284

Airline Dr. Drainage and Paving Fund 5000 - Community Develop Storm Drainage DDSRF Project Total:

M-000285

Garden Oaks and Shepherd Forest Drainage and Paving Storm Drainage DDSRF Project Total: Pleasantville and Glendale Drainage and Paving Fund 4030 - Ser-F Storm Sewer 750 Storm Drainage DDSRF Project Total: 750

M-000286

554 554 1,499 10,957 12,456

468 468

7,438 7,438

3,716 3,716

12,176 12,176 1,499

M-000287

Wirt Road Drainage and Paving Fund 8500 - Water & Sewer Sys Storm Drainage DDSRF Project Total:

4,355 4,355

15,312 16,811

M-000288
Active CIP

Easthaven Blvd (Bryant to Ledge) Drainage and Paving


Form C

Storm Drainage - Summary of Funds


2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)

CIP No.

Project Fund 4030 - Ser-F Storm Sewer Storm Drainage DDSRF Project Total:

Est. 2011 800 2012

Fiscal Year Planned Appropriations 2013 2014 4,400 800 702 702 4,400 6,049 6,049 2015 2016

2012-2016

4,400 4,400 6,981 6,981

M-000289

Minnetex Place and Almeda Genoa Place Drainage and Paving Storm Drainage DDSRF 230 Project Total: 230 1,100 Montrose Area and Midtown Drainage and Paving Fund 4030 - Ser-F Storm Sewer Fund 8500 - Water & Sewer Sys Storm Drainage DDSRF Project Total: 1,100 600

M-000290

2,021 40 40 11,342 13,363 1,573 1,573

2,021 12,955 14,976

M-000291

Sagemont Drainage and Paving Fund 4030 - Ser-F Storm Sewer Storm Drainage DDSRF Project Total:

1,287 600 1,287 1,452 1,452 1,903 1,903 595 595 10,300 6,000 4,680 16,300 4,680 5,111 5,111 3,490 3,490 4,760 4,760 4,842 4,842 5,660 5,660

1,287 1,287 1,797 1,797 2,248 2,248 6,255 6,255

M-000293

Binglewood, Inwood Forest, and Oak Forest Drainage and Paving Storm Drainage DDSRF 345 Project Total: 345 Cullen Blvd. (Loop 610 to Old Spanish Trail) Drainage and Paving Storm Drainage DDSRF 345 Project Total: 345 Scott Street (Loop 610 to Old Spanish Trail) Drainage and Paving Storm Drainage DDSRF Project Total: Mitigation Program for Capital Improvement Projects Fund 4030 - Ser-F Storm Sewer Fund 5000 - Community Develop Storm Drainage DDSRF Project Total:

M-000294

M-000295

M-000296

22,883 22,883

M-000297
Active CIP

Stormwater Quality Demonstration Projects


Form C

Storm Drainage - Summary of Funds


2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)

CIP No.

Project Fund 4030 - Ser-F Storm Sewer Storm Drainage DDSRF Project Total:

Est. 2011 300 1,610 300 1,610 2012

Fiscal Year Planned Appropriations 2013 2014 2015 2016

2012-2016

1,610 1,610 3,608 3,608 3,871 3,871 2,982 2,982 3,871 3,871 2,982 2,982

M-000582

South Shaver Paving and Drainage: Gulf Freeway to Highway 3 Storm Drainage DDSRF 3,608 Project Total: 3,608 Tanner Road Paving and Drainage: Hempstead to Beltway 8 Storm Drainage DDSRF Project Total:

M-000589

M-000597

Brittmoore: Hammerly to Clay Detention Basin Storm Drainage DDSRF Project Total: Developer Participation Fund 4505 - Storm Sewer Cons. Storm Drainage DDSRF Project Total: 500

M-000800

500 1,000 1,000 1,000 1,000 1,500 1,500 713 713 403 403 200 174 200 83,728 174 58,960 500 500 57,730 500 500 60,007 500 500 58,330 11,100 11,100 60,041 12,774 12,774 295,068 3,805 3,805 1,500 1,500 1,500 1,500 8,244 8,244 6,500 6,500 8,957 8,957 4,208 4,208

M-001010

Wycliffe Drive (Chatterton to Melronome) Drainage and Paving Storm Drainage DDSRF Project Total: Willow Waterhole Drainage and Paving Storm Drainage DDSRF Project Total: Contingencies Fund 4505 - Storm Sewer Cons. Storm Drainage DDSRF Project Total: Total Appropriations:

M-001013

M-NA

Active CIP

Form C

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Pre-Engineering for Storm Water Drainage Improvements
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District V NS
Ord. Date Served: Key Map: WBS # CUIC

CIP No.:
V
Amount

M-000100
Neighborhood: Appr. Amt.

Description:

Justification:

Program supports development of Candidate Projects for programming in future years Capital Improvement Plans. Feasibility Assessments are performed, either using professional engineering services or internal City staff, annually on Candidate Needs to define projects including detailed project scopes, cost estimates and implementation schedules. Developing specific, detailed projects to address the identified highest needs will provide candidate projects with both costs and benefits defined for citywide comparison and ranking for implementation.

Date

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Storm Drainage DDSRF

Estimated 2011 2012

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total

1,150 150

2,185

2,690

3,092

3,629

4,184

16,930 150

1,300

2,185

2,690

3,092

3,629

4,184

17,080

1,300 2,185 2,690 3,092 3,629 4,184

1,300 15,780

Total Funds

1,300

2,185

2,690

3,092

3,629

4,184

17,080

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Miscellaneous and Emergency Needs (Acquisition, Engineering, Construction, and Legal) This project provides for miscellaneous and emergency needs including right-of-way acquisition, design, construction and legal services for future projects or unforeseen projects. This project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as mitigation. Council District
Location: Geographic Ref.: Date Ord. Date

CITY OF HOUSTON - Storm Drainage


CIP No.:
V
CUIC Amount

V NS

Served: Key Map: WBS #

M-000101
Neighborhood: Appr. Amt.

Description:

Justification:

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Storm Drainage DDSRF

Estimated 2011 2012

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total

200 200

203 203

207 207

210 210

214 214

1,034 1,034

200

203

207

210

214

1,034

Total Funds

200

203

207

210

214

1,034

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Local Drainage Program (LDP)
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District V LD
Ord. Date Served: Key Map: WBS # CUIC

CIP No.:
V V
Amount

M-000126
Neighborhood: Appr. Amt.

Description:

Justification:

This program provides professional engineering services and construction to address necessary local storm water drainage system improvements citywide. It also addresses certain large-scale storm water drainage system construction repairs. This program is required to investigate and resolve existing localized storm water drainage problems reported by citizens.

Date

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Fund 4505 - Storm Sewer Cons. Const. Fund Fund 4510 - Contribution for Capital Projects Fund Storm Drainage DDSRF

Estimated 2011 2012

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total

460 1,951

1,000 3,000

1,287 3,158

1,308 3,567

1,331 3,629

1,354 3,692

6,740 18,997

2,411

4,000

4,445

4,875

4,960

5,046

25,737

1,965

1,965

446 2,411 4,000 4,445 4,875 4,960 5,046

446 25,737

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Storm Drainage Program Support
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District V NS
Ord. Date Served: Key Map: WBS # CUIC

CIP No.:
V V
Amount

M-000220
Neighborhood: Appr. Amt.

Description:

Provides project management, planning and technical support, engineering, and construction management to support planning, development, and implementation of the CIP. Technical services are necessary to support the CIP to deliver storm water drainage improvement projects that reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation.

Date

Justification:

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Storm Drainage DDSRF

Estimated 2011 2012

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total

2,437

1,610

994

595

605

615

6,856

2,437

1,610

994

595

605

615

6,856

2,437 1,610 994 595 605 615

2,437 4,419

Total Funds

2,437

1,610

994

595

605

615

6,856

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Stormwater Pump Station and Flood Warning System Improvements
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District V MS
Ord. Date Served: Key Map: CUIC WBS #

CIP No.:
V V
Amount

M-000241
Neighborhood: Appr. Amt.

Description:

Justification:

This program consists of engineering assessment, design, construction of new and rehabilitation of existing City storm water facilities, including: storm water pump stations and flood warning systems at various locations citywide. The program is necessary to identify and prioritize the need for safety enhancements, improved functionality, and advance flood warning system to alert the traveling public.

Date

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Storm Drainage DDSRF

Estimated 2011 2012

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total

690 1,725

702 2,456

713 1,784

726 1,815

2,831 7,780

2,415

3,158

2,497

2,541

10,611

2,415

3,158

2,497

2,541

10,611

Total Funds

2,415

3,158

2,497

2,541

10,611

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Nottingham and Yorkshire Drainage and Paving Sub-Project I: Nottingham area Sub-Project II: Yorkshire area Project provides for the right-of-away acquisition, design and construction of storm drainage improvements, necessary concrete paving, curbs, sidewalks, driveways and underground utilities to serve the Nottingham and Yorkshire areas. CDP outfall W0208, W0209, W0211, W0212, W0224, W0917, and adjacent drainage areas. Buffalo Bayou watershed. Project will be designed and constructed in two subprojects. Project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011 2012 1,000 460 11,615 585 Council District
Location: Geographic Ref.: Date Ord. Date

CITY OF HOUSTON - Storm Drainage


CIP No.:
G 489A,B, E,F
CUIC

G NS

Served: Key Map: WBS #

M-000247
Neighborhood:

Description:

Amount

Appr. Amt.

Justification:

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Fund 8500 - Water & Sewer Sys Cons. Const. Fund Storm Drainage DDSRF Total Funds

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total 1,000 1,045

2,140

13,755

13,075

585

2,140

15,800

1,035 12,040 13,075 585 585 2,140 2,140

1,035 14,765 15,800

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Kirkwood Dr (Briar Forest) Drainage and Paving
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District G NS
Ord. Date Served: Key Map: WBS # CUIC

CIP No.:
G 489N

M-000250
Neighborhood: Amount

18
Appr. Amt.

Description:

Justification:

Project provides for the right-of- away acquisition, design and construction of storm water drainage improvements, necessary concrete paving, curbs, sidewalks, driveways and underground utilities. Project serves an area bound by Buffalo Bayou on the north, Westheimer on the south, Wilcrest on the east, and Dairy Ashford on the west. CDP outfall W0014 and adjacent areas. Buffalo Bayou watershed Project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011 116 200 8,960

Date

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Fund 4505 - Storm Sewer Cons. Const. Fund Fund 8500 - Water & Sewer Sys Cons. Const. Fund Total Funds

Fiscal Year Planned Appropriations 2012 2013 2014 2015 2016

Project Total 116 200 8,960

9,276

9,276

316 8,100 860 9,276

316 8,100 860 9,276

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Buffalo Bayou Detention Basin
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District G MS
Ord. Date Served: Key Map: CUIC WBS #

CIP No.:
G 489
Amount

M-000261
Neighborhood: Appr. Amt.

Description:

Project addresses watershed storm water quantity and quality requirements. It includes design and construction of a detention basin. Project is necessary for mitigation of impacts resulting from combined storm water drainage project improvements in the area.

Date

Justification:

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Storm Drainage DDSRF

Estimated 2011 2012

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total

350 2,000

234 6,725

584 8,725

2,350

6,959

9,309

2,350 6,959

2,350 6,959

Total Funds

2,350

6,959

9,309

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Whiteheather Drainage and Paving Sub-Project I; Sub-Project II; Sub-Project III; Sub-Project IV Project provides for the design and construction of storm drainage improvements in the area, necessary concrete paving, curbs, sidewalks, driveways and underground utilities. Project will serve the Dumbarton Oaks and South Glen area. CDP outfalls C0076, C0078, C0526,C1220 and adjacent areas. Sims Bayou watershed. This project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011 2012 Council District
Location: Geographic Ref.: Date Ord. Date

CITY OF HOUSTON - Storm Drainage


CIP No.:
D 572 JNS
CUIC Amount

D NS

Served: Key Map: WBS #

M-000262
Neighborhood: Appr. Amt.

Description:

Justification:

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Fund 8500 - Water & Sewer Sys Cons. Const. Fund Storm Drainage DDSRF Texas Dept. of Transportation

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total

9,751

9,430

19,181

9,751

9,430

19,181

9,131 620 575 8,855 9,751 9,430

9,131 1,195 8,855 19,181

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Sherwood Forest Drainage and Paving
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District G NS
Served: Key Map: WBS # CUIC

CIP No.:
G 491B,C, F,G

M-000263
Neighborhood: Amount Appr. Amt.

Description:

Justification:

Project provides for the design and construction of storm drainage improvements, necessary concrete paving, curbs, sidewalks, driveways and underground utilities. Project will serve the Sherwood Forest area. CDP outfall W0434, W0507, and adjacent areas. Buffalo Bayou watershed. This project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011

Date

Ord. Date

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Storm Drainage DDSRF

Fiscal Year Planned Appropriations 2012 2013 2014 2015 2016

Project Total

8,304

8,304

8,304

8,304

8,304

8,304

Total Funds

8,304

8,304

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Rampart Street Drainage and Paving Sub-Project I: Rampart/Renwick streets from Beechnut to Jessamine Sub-Project II: Rampart Street from Jessamine to Glenmont Street. Project provides for the design and construction of storm drainage improvements in the area, necessary concrete paving, curbs, sidewalks, driveways and underground utilities. Project will serve the Westmoreland, Sharpstown, Breaburn, and Maplewood area. CDP outfall D0326. Sims Bayou watershed. Project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011 2012 Council District
Location: Geographic Ref.: Date Ord. Date

CITY OF HOUSTON - Storm Drainage


CIP No.:
C,F 531 A-T
CUIC Amount

C,F NS

Served: Key Map:

M-000265
Neighborhood: Appr. Amt.

Description:

WBS #

Justification:

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Fund 4505 - Storm Sewer Cons. Const. Fund Storm Drainage DDSRF Total Funds

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total

600

760 15,754 14,920

1,360 30,674

600

16,514

14,920

32,034

600 16,514 600 16,514 14,920 14,920

600 31,434 32,034

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Shepherd Drive Drainage and Paving
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District C,D,G Served: NS
Key Map: WBS # CUIC

CIP No.:
C,D,G 492LMQ RUV

M-000267
Neighborhood: Amount Appr. Amt.

Description:

Justification:

Project provides for the design and construction of storm drainage improvements, necessary concrete paving, curbs, sidewalks, driveways and underground utilities. Project will serve an area surrounding Shepherd Drive from Westheimer Road to Buffalo Bayou. CDP Outfall W0679 and adjacent areas. Buffalo Bayou watershed. This project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011

Date

Ord. Date

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund

Fiscal Year Planned Appropriations 2012 2013 2014 2015 2016

Project Total

6,700

6,700

6,700

6,700

6,700

6,700

Total Funds

6,700

6,700

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Meyerland and Marilyn Estates Drainage and Paving Project combined with M-000279 Project provides for the right-of- away acquisition, design and construction of storm drainage improvements, necessary concrete paving, curbs, sidewalks, driveways and underground utilities. Project will serve the Myerland and Marilyn Estates areas and will deliver project M-000279. CDP outfall D0192, D0212, D0320, D0219, D0220, D0273 and adjacent areas. Brays Bayou watershed. Project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011 2012 Council District
Location: Geographic Ref.: Date Ord. Date

CITY OF HOUSTON - Storm Drainage


CIP No.:
C 531U
CUIC Amount

C NS

Served: Key Map: WBS #

M-000271
Neighborhood: Appr. Amt.

Description:

Justification:

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Storm Drainage DDSRF

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total

1,000 4,701

1,000 4,701

1,000

4,701

5,701

1,000 4,701

1,000 4,701

Total Funds

1,000

4,701

5,701

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Glenbrook Valley Drainage and Paving
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District I NS
Ord. Date Served: Key Map: WBS # CUIC

CIP No.:
I 535P,T
Amount

M-000273
Neighborhood: Appr. Amt.

Description:

Justification:

Drainage improvements to serve an area bound by Sims Bayou on the north, Bellfort on the south, HCFCD C165-00-00 on the east, and Glen Valley on the west. CDP outfall C0016 and adjacent areas. Project includes construction of drainage swale to alleviate flooding on Glen Dell and Santa Elena. Drainage improvements include required piping, sheet flow modifications, or detention to reduce the risk of structural flooding during 100-year, 1% probability rainfall events. Project areas have multiple reports of structural flooding. Estimated 2011

Date

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund

Fiscal Year Planned Appropriations 2012 2013 2014 2015 2016

Project Total

220

220

220

220

220

220

Total Funds

220

220

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Astoria (Flushing Meadows to Binghampton) Drainage and Paving
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District E NS
Served: Key Map: WBS # CUIC

CIP No.:
E 616DH617A

M-000276
Neighborhood: Amount Appr. Amt.

Description:

Justification:

Drainage improvements along Astoria to serve the Scarsdale area. Project area bound by Sand Hook on the north, Adirondack on the south, Turkey Creek on the east, and Binghampton on the west. CDP outfall A0034 and adjacent areas. Clear Creek watershed. Project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011

Date

Ord. Date

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund

Fiscal Year Planned Appropriations 2012 2013 2014 2015 2016

Project Total

200 4,595

200 4,595

4,795

4,795

4,795

4,795

Total Funds

4,795

4,795

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Southpark and Southcrest Drainage and Paving
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District D NS
Ord. Date Served: Key Map: WBS # CUIC

CIP No.:
D 533;534
Amount

M-000277
Neighborhood: Appr. Amt.

Description:

Justification:

Project provides for the design and construction of storm drainage improvements, necessary concrete paving, curbs, sidewalks, driveways and underground utilities. Project will serve the Southpark and Southcrest areas. CDP outfall D0898 and adjacent areas. Sims Bayou watershed. Project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011

Date

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Storm Drainage DDSRF

Fiscal Year Planned Appropriations 2012 2013 2014 2015 2016

Project Total

600 4,903

600 4,903

600

4,903

5,503

600 4,903

600 4,903

Total Funds

600

4,903

5,503

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Brays Village Drainage and Paving
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District F
Ord. Date Served: Key Map: WBS # CUIC

CIP No.:
F 529B,F
Amount

M-000280
Neighborhood: Appr. Amt.

Description:

Justification:

Drainage improvements along Boone and certain side streets to serve the Brays Village area. Project area bound by Harwin on the north, Brays Bayou on the south, Wildacres on the west, and Dairy Property on the east. CDP outfall D-0687 and adjacent areas. Project involves the constructruction of storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011

Date

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Fund 8500 - Water & Sewer Sys Cons. Const. Fund

Fiscal Year Planned Appropriations 2012 2013 2014 2015 2016

Project Total

7,222

7,222

7,222

7,222

6,186 1,036

6,186 1,036

Total Funds

7,222

7,222

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Braesmont Dr (Braeswood to Lymbar) and S Rice Ave (Braeswood to Contour Place) Drainage and Paving Sub-Project I Sub-Project II Braesmont drainage improvements to serve the Marilyn Estates area. Project area bound by Atwell on the west, Chimney Rock on the east, Brays Bayou on the north, and Lymbar on the south. CDP outfall D0320. Drainage improvements to reduce the risk of structural flooding caused by insufficient storm water drainage system capacity; including modification of street conveyance and addressing storm water flow mitigation as applicable. Estimated 2011 2012 Council District
Location: Geographic Ref.: Date Ord. Date

CITY OF HOUSTON - Storm Drainage


CIP No.:
C 530
CUIC

Served: Key Map: WBS #

M-000281
Neighborhood: Amount Appr. Amt.

Description:

Justification:

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Storm Drainage DDSRF

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total

600 1,828

600 1,828

600

1,828

2,428

600 1,828

600 1,828

Total Funds

600

1,828

2,428

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Bellaire West Drainage and Paving
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District F NS
Ord. Date Served: Key Map: WBS # CUIC

CIP No.:
F 529
Amount

M-000283
Neighborhood: Appr. Amt.

Description:

Justification:

The project consists of storm water drainage improvements to serve the Bellaire West area. CDP outfall D0736 and adjacent drainage areas. Brays Bayou watershed. Project includes construction of drainage swale along Cook Rd to intercept overland sheetflow from the Crown Colony area. Project involves the constructruction of storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011

Date

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Fund 4505 - Storm Sewer Cons. Const. Fund Fund 8500 - Water & Sewer Sys Cons. Const. Fund Total Funds

Fiscal Year Planned Appropriations 2012 2013 2014 2015 2016

Project Total

100 5,316

100 5,316

5,416

5,416

4,863

4,863

553 5,416

553 5,416

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Airline Dr. Drainage and Paving Sub-Project I: Tidwell Street Outfall (FY11) Sub-Project II: Airline Drive and Clark storm systems. Project provides for the design and construction of storm drainage improvements, necessary concrete paving, curbs, sidewalks, driveways and underground utilities. Project will serve the Airline Drive area CDP outfall E0369. White Oak Bayou watershed. Project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011 2012 Council District
Location: Geographic Ref.: Date Ord. Date

CITY OF HOUSTON - Storm Drainage


CIP No.:
H 413, 453
CUIC Amount

H NS

Served: Key Map: WBS #

M-000284
Neighborhood: Appr. Amt.

Description:

Justification:

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Fund 5000 - Community Development Blk Grant Storm Drainage DDSRF Total Funds

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total

8,500

14,887

23,387

8,500

14,887

23,387

8,500 14,887 8,500 14,887

8,500 14,887 23,387

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Garden Oaks and Shepherd Forest Drainage and Paving Sub-Project I Sub-Project II Project provides for the design and construction of storm drainage improvements, necessary concrete paving, curbs, sidewalks, driveways and underground utilities. Project will serve the Garden Oaks, Shepherd Forest, Shepherd Park, Candlelight Plaza, Pinemont, and Oak Grove areas. CDP outfall E0247, E0159, E0189. E0403, E0410, and adjacent areas. White Oak watershed. Project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011 2012 Council District
Location: Geographic Ref.: Date Ord. Date

CITY OF HOUSTON - Storm Drainage


CIP No.:
A,H 452
CUIC Amount

A,H NS

Served: Key Map:

M-000285
Neighborhood: Appr. Amt.

Description:

WBS #

Justification:

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Storm Drainage DDSRF

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total

600 6,728

600 6,728

600

6,728

7,328

600

6,728

7,328

Total Funds

600

6,728

7,328

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Pleasantville and Glendale Drainage and Paving Sub-Project I; Sub-Project II; Sub-Project III Council District
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


CIP No.:
B B NS
Served: Key Map: WBS # CUIC

M-000286

495F,K,L Neighborhood: ,P
Amount Appr. Amt.

Description:

Justification:

Project provides for the design and construction of storm drainage improvements, necessary concrete paving, curbs, sidewalks, driveways and underground utilities. Project will serve the Pleasantville and Glendale areas. CDP outfall H0072 and adjacent areas. Buffalo Bayou and San Jacinto River watersheds. Project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011

Date

Ord. Date

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Storm Drainage DDSRF

Fiscal Year Planned Appropriations 2012 2013 2014 2015 2016

Project Total

750

554

468 7,438 3,716

1,772 11,154

750

554

468

7,438

3,716

12,926

750 554 468 7,438 3,716

750 12,176

Total Funds

750

554

468

7,438

3,716

12,926

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Wirt Road Drainage and Paving Sub-Project I: Coordinates with N-000381 Sub-Project II: Coordinates with N-000397 Project provides for the design and construction of storm drainage improvements, necessary concrete paving, curbs, sidewalks, driveways and underground utilities. Project will serve the Wirt Road area. Wirt Road from I-10 to Hempstead Hwy. CDP outfall W0404 and adjacent areas. Buffalo Bayou watershed. Project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011 2012 Council District
Location: Geographic Ref.: Date Ord. Date

CITY OF HOUSTON - Storm Drainage


CIP No.:
A 451MX491AB
CUIC

A MS

Served: Key Map:

M-000287
Neighborhood: Amount Appr. Amt.

Description:

WBS #

Justification:

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 8500 - Water & Sewer Sys Cons. Const. Fund Storm Drainage DDSRF

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total

518 11,938 4,355

518 16,293

12,456

4,355

16,811

1,499 10,957 4,355

1,499 15,312

Total Funds

12,456

4,355

16,811

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Easthaven Blvd (Bryant to Ledge) Drainage and Paving
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District I NS
Ord. Date Served: Key Map: WBS # CUIC

CIP No.:
I 575, 567
Amount

M-000288
Neighborhood: Appr. Amt.

Description:

Justification:

Project provides for the design and construction of storm drainage improvements, necessary concrete paving, curbs, sidewalks, driveways and underground utilities. Project will be located along Easthaven Blvd and certain side streets to serve the Easthaven and Hales area. CDP outfall C1054 and adjacent areas. Sims Bayou watershed. Project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011

Date

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Storm Drainage DDSRF

Fiscal Year Planned Appropriations 2012 2013 2014 2015 2016

Project Total

800 4,400

800 4,400

800

4,400

5,200

800 4,400

800 4,400

Total Funds

800

4,400

5,200

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Minnetex Place and Almeda Genoa Place Drainage and Paving Sub-Project I Project provides for the design and construction of storm drainage improvements, necessary concrete paving, curbs, sidewalks, driveways and underground utilities. Project will be located along Cullen Blvd and certain side streets to serve the Minnetex Place and Almeda Genoa. CDP outfall C1147 and adjacent areas. Sims Bayou and Clear Creek watersheds. Project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011 2012 Council District
Location: Geographic Ref.: Date Ord. Date

CITY OF HOUSTON - Storm Drainage


CIP No.:
D 573, 574
CUIC Amount

D NS

Served: Key Map: WBS #

M-000289
Neighborhood: Appr. Amt.

Description:

Justification:

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Storm Drainage DDSRF

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total

230

702 6,049

932 6,049

230

702

6,049

6,981

230

702

6,049

6,981

Total Funds

230

702

6,049

6,981

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Montrose Area and Midtown Drainage and Paving Sub-Project I: Project incorporates N-000400 (NSR 467) Sub-Project II: TBD Project provides for the design and construction of storm drainage improvements, necessary concrete paving, curbs, sidewalks, driveways and underground utilities. Project will serve an area bound by Buffalo Bayou on the north, US-59 on the south, Caroline on the east, and Montrose on the west. CDP outfall W0686 and adjacent areas. Buffalo Bayou watershed. Project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011 2012 40 1,100 Council District
Location: Geographic Ref.: Date Ord. Date

CITY OF HOUSTON - Storm Drainage


CIP No.:
C,D,I 493
CUIC Amount

C,D,I NS

Served: Key Map:

M-000290
Neighborhood: Appr. Amt.

Description:

WBS #

Justification:

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Fund 8500 - Water & Sewer Sys Cons. Const. Fund Storm Drainage DDSRF Total Funds

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total 40

1,573 13,363

2,673 13,363

1,100

40

13,363

1,573

16,076

1,100 2,021 40 1,100 40 11,342 13,363 1,573 1,573

1,100 2,021 12,955 16,076

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Sagemont Drainage and Paving
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District E NS
Ord. Date Served: Key Map: WBS # CUIC

CIP No.: M-000291


576, 616
Neighborhood: Amount Appr. Amt.

Description:

Justification:

Project provides for the design and construction of storm drainage improvements, necessary concrete paving, curbs, sidewalks, driveways and underground utilities. Project will serve the Freeway Manor and Sagemont areas. CDP Outfalls C0250, A0061 and A0130 and adjacent areas. Sims Bayou and Clear Creek watersheds. Project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011

Date

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Storm Drainage DDSRF

Fiscal Year Planned Appropriations 2012 2013 2014 2015 2016

Project Total

600 1,287

600 1,287

600

1,287

1,887

600 1,287

600 1,287

Total Funds

600

1,287

1,887

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Binglewood, Inwood Forest, and Oak Forest Drainage and Paving
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District A NS
Ord. Date Served: Key Map: WBS # CUIC

CIP No.:
A 411
Amount

M-000293
Neighborhood: Appr. Amt.

Description:

Justification:

Project provides for the design and construction of storm drainage improvements, necessary concrete paving, curbs, sidewalks, driveways and underground utilities. Project will serve the Binglewood, Inwood Forest, and Oak Forest area. CDP outfall E0758, E0119, and E0918 and adjacent areas. White Oak watershed. Project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011

Date

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Storm Drainage DDSRF

Fiscal Year Planned Appropriations 2012 2013 2014 2015 2016

Project Total

345 1,452

345 1,452

345

1,452

1,797

345

1,452

1,797

Total Funds

345

1,452

1,797

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Cullen Blvd. (Loop 610 to Old Spanish Trail) Drainage and Paving
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District D NS
Served: Key Map: WBS # CUIC

CIP No.:
D 533 M,O,R

M-000294
Neighborhood: Amount Appr. Amt.

Description:

Justification:

Project provides for the design and construction of storm drainage improvements, necessary concrete paving, curbs, sidewalks, driveways and underground utilities. Project will serve the Cullen Blvd Area (Loop 610 to OST). CDP Outfall D0888. Sims Bayou watershed. Project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011

Date

Ord. Date

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Storm Drainage DDSRF

Fiscal Year Planned Appropriations 2012 2013 2014 2015 2016

Project Total

345 1,903

345 1,903

345

1,903

2,248

345

1,903

2,248

Total Funds

345

1,903

2,248

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Scott Street (Loop 610 to Old Spanish Trail) Drainage and Paving
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District D NS
Ord. Date Served: Key Map: WBS # CUIC

CIP No.:
D 533
Amount

M-000295
Neighborhood: Appr. Amt.

Description:

Justification:

Project provides for the design and construction of storm drainage improvements, necessary concrete paving, curbs, sidewalks, driveways and underground utilities. Project will serve the Scott Street Area (Loop 610 to OST). CDP Outfall D0068. Brays Bayou watershed. Project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011

Date

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Storm Drainage DDSRF

Fiscal Year Planned Appropriations 2012 2013 2014 2015 2016

Project Total

595 5,660

595 5,660

595

5,660

6,255

595

5,660

6,255

Total Funds

595

5,660

6,255

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Mitigation Program for Capital Improvement Projects
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District V MS
Ord. Date Served: Key Map: CUIC WBS #

CIP No.:
V V
Amount

M-000296
Neighborhood: Appr. Amt.

Description:

Justification:

This project provides for the right-of-way acquisition, design and construction of detention basins. This includes analyzing the feasibility of providing detention for mitigation of impacts due to City of Houston projects, existing infrastructure limited areas, and potential development. Preliminary engineering for regional detention projects for Halls, Little White Oak, Hunting, Sims and White Oak Bayous. The City constructs many projects that require determination and mitigation of impacts. Designing and contracting on a regional or subregional basis for multiple projects would reduce up-front and long term maintenance costs at multiple sites. Estimated 2011 9,300 1,000 6,000

Date

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Fund 5000 - Community Development Blk Grant Storm Drainage DDSRF Total Funds

Fiscal Year Planned Appropriations 2012 1,000 1,150 2,530 2013 1,017 585 3,509 2014 517 595 2,378 2015 526 605 3,629 2016 535 615 3,692

Project Total 12,895 4,550 21,738

16,300

4,680

5,111

3,490

4,760

4,842

39,183

10,300 6,000 4,680 16,300 4,680 5,111 5,111 3,490 3,490 4,760 4,760 4,842 4,842

10,300 6,000 22,883 39,183

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Stormwater Quality Demonstration Projects
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District V
Ord. Date Served: Key Map: WBS # CUIC

CIP No.:
V
Amount

M-000297
Neighborhood: Appr. Amt.

Description:

Justification:

Implementation of stormwater quality demonstration projects through partnerships with the Texas Commission on Environmental Quality (TCEQ), Environmental Protection Agency and other non-profit organizations. Two grants awarded with 40% local share. Implementation of pilot projects using leveraged partnerships to develop local data for future efforts under the Municipal Separate Storm Sewer System (MS4) Permit and Total Maximum Daily Load (TMDL) limitations. Estimated 2011

Date

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Storm Drainage DDSRF

Fiscal Year Planned Appropriations 2012 2013 2014 2015 2016

Project Total

300 1,610

300 1,610

300

1,610

1,910

300 1,610

300 1,610

Total Funds

300

1,610

1,910

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: South Shaver Paving and Drainage: Gulf Freeway to Highway 3 Funding associated with Street Paving and Drainage Project N000582. Project consists of constructing drainage and detention facilities for Shaver Road at Berry Bayou to facilitate construction of the South Shaver paving project. TxDOT will manage construction. Project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Council District
Location: Geographic Ref.: Date Ord. Date

CITY OF HOUSTON - Storm Drainage


CIP No.:
E
CUIC Amount

E MS

Served: Key Map: WBS #

M-000582
Appr. Amt.

576K,L,P Neighborhood:

Description:

Justification:

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Storm Drainage DDSRF

Estimated 2011 2012

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total

3,608

3,608

3,608

3,608

3,608

3,608

Total Funds

3,608

3,608

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Tanner Road Paving and Drainage: Hempstead to Beltway 8 Funding associated with Street Paving and Drainage Project N000589. Project consists of constructing a 72 inch diameter storm sewer system to serve a drainage area required for the construction of Tanner Road. Project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Council District
Location: Geographic Ref.: Date Ord. Date

CITY OF HOUSTON - Storm Drainage


CIP No.:
A 410,450
CUIC

A MS

Served: Key Map:

M-000589
Neighborhood: Amount Appr. Amt.

Description:

WBS #

Justification:

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Storm Drainage DDSRF

Estimated 2011 2012

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total

3,871

3,871

3,871

3,871

3,871

3,871

Total Funds

3,871

3,871

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Brittmoore: Hammerly to Clay Detention Basin Funding associated with Street Paving and Drainage, CIP # N-000597 Project includes an off site detention basin to facilitate the construction of the Brittmoore: Hammerly to Clay paving improvements. Project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Council District
Location: Geographic Ref.: Date Ord. Date

CITY OF HOUSTON - Storm Drainage


CIP No.:
A 449LQ
CUIC Amount

A MS

Served: Key Map: WBS #

M-000597
Neighborhood: Appr. Amt.

Description:

Justification:

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Storm Drainage DDSRF

Estimated 2011 2012

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total

2,982

2,982

2,982

2,982

2,982

2,982

Total Funds

2,982

2,982

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Developer Participation
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District V NS
Ord. Date Served: Key Map: WBS # CUIC

CIP No.:
V V
Amount

M-000800
Neighborhood: Appr. Amt.

Description:

This project provides for the City's share of the cost of participation in joint property for storm water drainage system improvements sponsored by property owners and developers. This allows additional drainage systems to be constructed using sponsors' funds to match City funding.

Date

Justification:

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Fund 4030 - Ser-F Storm Sewer Const. Fund Fund 4505 - Storm Sewer Cons. Const. Fund Storm Drainage DDSRF Total Funds

Estimated 2011 2012

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total

500

1,000

1,000

1,500

1,500

1,500

7,000

500

1,000

1,000

1,500

1,500

1,500

7,000

500 1,000 500 1,000 1,000 1,000 1,500 1,500 1,500 1,500 1,500 1,500

500 6,500 7,000

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Wycliffe Drive (Chatterton to Melronome) Drainage and Paving
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District A NS
Ord. Date Served: Key Map: WBS # CUIC

CIP No.:
A 449
Amount

M-001010
Neighborhood: Appr. Amt.

Description:

Justification:

Project provides for the design and construction of storm drainage improvements in the area, necessary concrete paving, curbs, sidewalks, driveways and underground utilities. Project will serve the Western Village and Sherwood Estates Area. CDP Outfall W1005 and adjacent areas. Buffalo Bayou watershed. This project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011

Date

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Storm Drainage DDSRF

Fiscal Year Planned Appropriations 2012 2013 2014 2015 2016

Project Total

713 8,244

713 8,244

713

8,244

8,957

713

8,244

8,957

Total Funds

713

8,244

8,957

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Willow Waterhole Drainage and Paving Sub-Project I: Sub-Project II: Project provides for the design and construction of storm drainage improvements in the area, necessary concrete paving, curbs, sidewalks, driveways and underground utilities. Project will serve Westbury, Myerland, Willow Meadows, and Willow Bend areas. CDP Outfalls D0172, D0388, D0241, D0155, D0189, D0180, D5021, and adjacent drainage areas. Brays Bayou watershed. This project will construct storm drainage improvements to address and reduce the risk of structural flooding. Improvements include modification of street conveyance and sheet flow, and provide detention as needed for mitigation. Estimated 2011 2012 Council District
Location: Geographic Ref.: Date Ord. Date

CITY OF HOUSTON - Storm Drainage


CIP No.:
C 531
CUIC Amount

C NS

Served: Key Map: WBS #

M-001013
Neighborhood: Appr. Amt.

Description:

Justification:

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Other Total Allocations Source of Funds Storm Drainage DDSRF

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total

403 3,805

403 3,805

403

3,805

4,208

403

3,805

4,208

Total Funds

403

3,805

4,208

Active CIP

Form A

2012-2016 CAPITAL IMPROVEMENT PLAN ($ Thousands)


Project: Contingencies
Location: Geographic Ref.:

CITY OF HOUSTON - Storm Drainage


Council District W NS
Ord. Date Served: Key Map: WBS # CUIC

CIP No.:
W
Neighborhood: Amount Appr. Amt.

M-NA

Description:

Justification:

This project provides for unforeseen needs for facility right-of-way, site, and easement acquisition; engineering and construction services; and legal services required in conjunction with various projects and activities. Project is required to provide for unforeseen costs.

Date

Total Authorized

0.00

0.00

Project Allocation Acquisition Design Construction Equipment Civic Art Contingencies Total Allocations Source of Funds Fund 4505 - Storm Sewer Cons. Const. Fund Storm Drainage DDSRF

Estimated 2011 2012

Fiscal Year Planned Appropriations 2013 2014 2015 2016

Project Total

500 200 174 500 500

5,000 6,100

5,500 7,474

200

174

500

500

500

11,100

12,974

200 174 500 500 500 11,100

200 12,774

Total Funds

200

174

500

500

500

11,100

12,974

Active CIP

Form A