Hot finishing mills that have installed Mobile Industrial Dispersion Application System (MIDAS) lubrication application equipment for daily operation of lubrication have gained both roll productivity and savings in their operations.
Edger roll cycles increased from 3-4 weeks to 10-12 weeks. Less down time for edger roll changes.
AFTER
Using Quakers chemicals and lubricants adds up to your lowest bottom-line costs.
Monitor
Mixing Cabinets
Our case studies show: Savings of USD $50,000 for each roll pair due to decreased roll wear. Savings of USD $600,000 in Tinning Mill operations.
quakerchem.com 1.800.523.7010