JAMSHORO POWER COMPANY LIMITED
List Of Maintenance Works And Plant Modification, Recently Carried Out By
Jamshoro Power Company Limited.
A) THERMAL POWER STATION, JAMSHORO
ELECTRICAL SECTION
Sr. Name of Work Date of Amount Remarks
# Completion
01. Replacement of 6.6KV Power Cable of December 2005 1188750.00 The reliability of said supply
Intake Pump House sources has increased as
insulation of originally installed
power cables was weak.
02 Installation of CVCF Equipment 9478600.00 The reliability of CVCF system
received on Dt: has increased has the spares
February 2006, of old CVCF Power Supply
installation is in system have become absolute.
process.
BOILER SECTION
Sr. Name of Work Date of Amount Remarks
# Completion
01. Replaced the air preheater side-A May 2004 Rs.1160690 Fault removed and unit made
lower support bearing by new one. reliable
02. Replaced the complete hot reheater Dec.2005 Rs.26600000 Boiler reliability and loading
tubes / coils increased
03. Replaced the heating elements of Air Rs.28000000 Loading of the unit improved
preheater elements both sides Dec.2005
04. About 1369 M² area of Air preheater Dec.2005 Rs.1120000 Flue gas leakages points
hopper and exhaust flue gases duct attended.
was repaired by patch work
including insulation and cladding.
05. All the 38 Nos soot blowers were Dec.2005 Efficiency and reliability
completely overhauled improved.
06. Complete water washing of heating Dec.2005 -do-
tubes
07. Main ceiling ring of isolating device Dec.2005 -do-
for main steam line was replaced
08. Replaced the damaged flexible gear Feb.2005 -do-
coupling and taper roller bearing of
F.D Fan B-side
(TURBINE SECTION)
Sr. Name of Work Date of Amount Remarks
# Completion
1 High pressure water jet cleaning of May 2004 Condenser vacuum improved.
condenser tubes
2 Condensate pump-B diffusers and May 2003 Rs.300000 At 125 MW two CPs were in
impellers manufactured from local operation to maintain the
market level. After said work one CP
is maintaining the level.
3 Seats of min. flow recirculation July 2003 Nil Amperes on electric motor
valves of BFPs repaired in workshop reduced. Aux consumption
saved
2
JAMSHORO POWER COMPANY LIMITED
Unit No.2 (210 MW Gas / Oil Fired).
(INSTRUMENT SECTIOIN)
(ELECTRICAL SECTION)
S.# Name of Maintenance and Date of Amount Remarks
Modification Works Completion
01. Installation of D.C Batteries January 2002 Reliability of DC system after
3400000.00 replacement of 12 years old
batteries.
02. Replacement of 6.6KV Power Cable of December 1981250.00 The reliability of said supply
Demi-Plant & Intake Pump House 2005 sources has increased as
insulation of originally installed
power cables was weak.
3
JAMSHORO POWER COMPANY LIMITED
(BOILER SECTION)
S.# Name of Maintenance and Date of Amount Remarks
Modification Works Completion
01. i)Replaced all 40 No coils of primary
supper heater, 80 Nos coils of
secondary super heater including their
inlet and outlet headers Nov.2003 44.34 Million Boiler loading on gas and
ii) Installation of additional spray reliability improved
injection attemperator for platen super
heater outlet header.
02. Furnace support beam refractory Nov.2003 2.97 Million -
works and masonry work at bottom /
hopper of furnace
03. Replaced the pressure control March 2004 0.149 Million To maintain the lube oil
regulator of boiler I.D.Fan-A by new pressure.
one
(TURBINE SECTIOIN)
4
JAMSHORO POWER COMPANY LIMITED
Unit No.3 (210) MW Gas / Oil Fired).
(INSTRUMENT SECTION)
S.# Name of Maintenance and Date of Amount Remarks
Modification Works Completion
01 Replacement of Temperature Dec. 2005 629,979/- Previously single contact direct
Indicating Switches of Double Contact type temperature including
Type) on Boiler Feed Pump No. 1, 2 & switches were installed on Boiler
3 for sealing water Return Oil Feed Pumps causing frequent
Temperature Bearing No. 5 & 6 and tripping of the pumps without
Drain Oil Temperature of Booster Side indication ultimately effecting the
of Thyoda Japan make. load reduction. After replacing
these switches with double
contact type Thyoda Japan,
these unnecessary tripping has
been avoided resulting plant
efficiency and reliability
improvement.
02 Replacement of ZJM Pneumatic Dec.2005 4085858/- These Regulators shifted to local
Actuator on Secondary Spray A&B, mode frequently due to complete
Gland Sealing & Condenser Level their useful life, ultimately very
Regulator. difficult to control parameters.
After replacing these regulators
are controlled from A.C.C.R even
Gland Sealing and Condenser Level
Regulators are working on Auto.
03 Rehabilitation work on MZ-III Auto Dec. 2005 500,000/- Most of the regulators working
Regulation System including on Auto mode like Feed Water,
replacement of Chinese Components Condenser level, Gland Sealing,
with USA / Japan make Industrial H.P Auxiliary frequently shifted
Standard Components, Exhaust from Auto to “Manual” mode
Cooling Fans etc. due to malfunctioning of the
System’s module because of low
inferior quality components. By
replacing this compound now the
regulators are working more
efficiently on “Auto” mode
improving plant efficiency.
04 Replacement of Instrument Air Line Dec. 2005 5070000/- A complete header of Instrument
Header of Boiler Front. Air line on boiler front of ¾” ∅
and 250 ft. length replaced with
new S.S pipe as the originally
installed M.S air line became
corrosive from inside. From this
header air supply to gas
regulator, G.R fan (A&B),
primary and secondary sprays,
SCAH and H.P Aux. Header
regulators. Moreover the
distribution air lines of ¼” ∅ and
100 ft. length of all these
regulators also replaced with
new S.S pipe.
05 Installation of Motorized Actuator On Dec. 2005 124734/- Originally ZJM4 DBKIY
Load Feed Water. Pneumatic type regulator is
installed for low load feed water.
This regulator is used during
start up of unit. Some time due
to moisture in Instrument Air or
5
JAMSHORO POWER COMPANY LIMITED
due to trouble in any part like
torque motor, pilot valve of
regulator, this actuator not
operate properly causing delay in
the start up of machine. Keeping
in view the importance of this
regulator, a new motorized
actuator typeDKJ-4100 with
position feed back installed in
parallel to old type Pneumatic
actuator. Along with this
motorized actuator a local T.B
and Auto / Manual Station in
C.C.R also installed. This
actuator checked / tested and
took into operation. The
performance of the newly
installed Motorized Actuator is
much more time better than the
Pneumatic Regulator.
06 Work on Control cable damages due October 2003 500000/- All the Controllable repaired &
to fire incident on 19.10.2004. tested for proper alarms,
interlocks / protection.
07 Level switch with thermo state replace Sep. 2004 250000/- LP Bypass Start permission made
at LP Bypass Unit # 3 MRS No. 1849 healthy to avoid any damage.
dated 07.09.2004
08 Stator Cooling Water make-up August, 2004 230000/- To ensure reliable operation of
solenoid valve replaced and modified solenoid valve.
from 220V DC to 220V AC
09 Oil Gun Cylinders, Tilt/Secondary Air December 90,000/- To ensure smooth operation.
Damper piston rods hard chrome 2003
plated and galvanized.
10 Control cable for HPH replaced with Dec. 2005 1,20000/- HPH Protection made healthy.
new one.
11 H2 purity analyzer replaced with new Dec.2005 2,50000/- To ensure efficient monitoring.
one.
(ELECTRICAL SECTION)
S.# Name of Maintenance and Date of Amount Remarks
Modification Works Completion
01. Installation of D.C Batteries April 2003 Reliability of DC system after
3500000.00 replacement of 13 years old
batteries.
02. Replacement of 6.6KV Power Cable of December 1585000.00 The reliability of said supply
Pre-treatment Plant 2005 sources has increased as
insulation of originally installed
power cables was weak due
many joints.
(BOILER SECTION)
S.# Name of Maintenance and Date of Amount Remarks
Modification Works Completion
01. a) Replaced all 40 Nos Coils of primary Nov.2002 44.34 Million Boiler load on gas and reliability
super heater, 80 Nos Coils of 2ndary improved.
super heater including their inlet and
outlet headers.
b) Installation of additional injection
spray attemperator for platen outlet
header.
6
JAMSHORO POWER COMPANY LIMITED
02. a)Complete overhauling of boiler was
carried out I.DFan bearings, F.D.Fan 1.8 Million
bearings. Motorized valves, steam coil
air heater water washing, refractory Dec.2005 Reliability improved.
works, burner compartments, soot
blowers of A.P.H, all kind of pumps.
Expansion joints, Dampers etc.
b) Replaced the cold end elements of 7.8 Million
A.P.H.Both side.
03. 20 Tons boiler self auxiliary steam Feh.2005 Rs.1,35,00/- Leakages of aux.steam stopped.
motorized valve HS-395 (dia 3”) was
replaced.
( TURBINE SECTION)
7
JAMSHORO POWER COMPANY LIMITED
operated at
150 MW, with one CW pump in
operation(in case of emergency).
Practically it was done in March.
2005
c. Frequency of back washing of
heat exchangers are minimized
4 Turbine high pressure Chinese origin Nov. 0.80 a. Turbine heat loss minimized.
drain valves were replaced with 2003 million b. Over loading of condensers
Japanese Okano valves class 2500 restricted.
c. Erosion of turbine flash tank
and drain lines minimized.
5 Chinese chemical dozing pumps April 2.00 a. Equipment down time
replaced with Prominent German 2005 million minimized.
pumps. b. Trouble free operation.
c. Oil consumption minimized.
8
JAMSHORO POWER COMPANY LIMITED
03 Repairing of APH (Air Re-heater) July, 2005 20,000/- APH Control device WY-2
Control Device Wy-2 installed on Boiler Auxiliary Panel
was out of order since 1993. This
device is used for monitoring
support and guide bearings
temperature of APHs and also
control of lube oil motors for the
same. This device was procured
vide tender No. T-988 and the
rates quoted were US $
27,675.00. Now the same has
been repaired at our own during
this major overhauling.
04 Rehabilitation work on MZ-III Auto July, 2003 500,000/- Most of the regulators working
Regulation System including on Auto mode like Feed Water,
replacement of Chinese Components Condenser level, Gland Sealing,
with USA / Japan make Industrial H.P Auxiliary frequently shifted
Standard Components, Exhaust from Auto to “Manual” mode
Cooling Fans etc. due to malfunctioning of the
System’s module because of low
inferior quality components. By
replacing this compound now the
regulators are working more
efficiently on “Auto” mode
improving plant efficiency.
05 Replacement of Instrument Air Line July, 2004 5,70000/- A complete header of Instrument
Header of Boiler Front. Air line on boiler front of ¾” ∅
and 250 ft. length replaced with
new S.S pipe as the originally
installed M.S air line became
corrosive from inside. From this
header air supply to gas
regulator, G.R fan (A&B),
primary and secondary sprays,
SCAH and H.P Aux. Header
regulators. Moreover the
distribution air lines of ¼” ∅ and
100 ft. length of all these
regulators also replaced with
new S.S pipe.
06 3-Way Valves of 2nd Elevation replaced During M.O.H 400,000/- R.O Burners can not be ignited
with new one during Major July, 2003 without these 3-way valves. All
Overhauling (These 3-Way Valves the 16 nos. R.O Burners made
were shifted to Unit # 2). ready.
07 FSSS 32 Pin Pg-Connectors replaced. May, 2004 2,00000/- FSSS caused false tripping due to
Important Scan Power Supply sub- five incidents on unit logic
divided into six portions for ease of cabinet on 06.09.2000. 2A.C. Bs
fault detection and trouble shooting. installed to monitor any
malfunction.
08 Stator Cooling Water make up July,2003 2,30,000/- To ensure safe and reliable
Solenoid Valve modified from 220V DC operation.
to 220V AC.
09 Oil Gun Cylinders, Tilt/ Secondary Air July,2003 90,000/- To ensure proper and smooth
Damper Cylinders hard chrome plated operation
9
JAMSHORO POWER COMPANY LIMITED
(ELECTRICAL SECTION)
S. Name of Maintenance and Date of Amount Remarks
# Modification Works Completion
01. Installation of D.C Batteries December 3400000.00 Reliability of DC system after
2005 replacement of 14 years old
batteries.
02. Installation of UPS March 2005 2273600.00 The reliability of UPS system has
increased as the spares of old
UPS Power Supply system have
been obsolete.
(BOILER SECTION)
S. Name of Maintenance and Date of Amount Remarks
# Modification Works Completion
01. Modification and modernization of Boiler load on gas and reliability
boiler Unfit No.4 improved.
a.Replaced all 40 Nos coils of primary April 2003 44.34 Million
and platen super heaters, 80 Nos coils
of 2ndary super heaters including their
inlet and outlet headers.
b.Installation of additional spray
injection attemprator for platen outlet
header.
02. Repaired the 3D burner (RO) Sept.2005 Rs.23700 Improvement in burner
alongwith their all accessories like, air
compartment, pipes diffuser etc.
03. Furnace bottom hopper supporting Sept.2005 1.42 Million Leakage of flue gases stopped.
beams 02 Nos refractory work
carriedout.
( TURBINE SECTION)
S. Name of Maintenance and Date of Amount Remarks
# Modification Works Completion
01 Major Overhauling Carried out. June-2003 30.00 Over all reliability and safety
increased.
02 Chemical Dosing Pumps replaced with Oct. 2003 2.00 i) Equipment down
Prominent Germany Pumps. time decreased.
ii) Loss of chemical
decrease.
03 L.P Heater Drain Pumps replaced with July 2003 1.4 i) Equipment down
K.S.B Drain Pumps. time decreased.
iii) Reliability of
plant increased.
04 Jet cleaning of Condenser carried out August 2005 - Vacuum improved efficiency of
condenser increased.
05 06 Nos. Main Steam drain valves of August 2005 0.7 Leakages on drain header
drain header replaced with Okano decreased.
Volvo Japan.
10
JAMSHORO POWER COMPANY LIMITED
06 Bearing Cooling Water Pumps taken July 2003 - 1. Reliability of cooling water
into service. These pumps were not increased resulting availability of
taken into service by Chinese. Feed Water Pumps ensured.
2. Frequent Tripping of Feed Water
Pump minimized.
07 Carbon Brushes fixed on the shaft of August 2005 - 1. Frequent Gear damage
motor of Feed Water Pump near decreased.
Bearing No. 4. 2. Equipment down time
decreased.
3. Reliability of Feed Water Pump
increased.
(WORKSHOP)
( COMMON)
11
JAMSHORO POWER COMPANY LIMITED
B) GAS TURBINE POWER STATION KOTRI
15 MW Unit No.1
25 MW Unit No.3
S.No. Name of Maintenance Date of Amount Remarks
& Modification works Completion
1 11 kV Generator Jan.2004 Rs.828,000.00 The Minimum Oil Circuit
Breaker Breaker modified at
Alstom Factory Karachi,by
using Vacuum
Chambers,due to
Non availability of spare
parts and frequent
problems of oil leakage on
the breaker.
2. Generator Control Nov.2004 Rs1,023,303.00 The spare parts of the
Panel. existing system phased-out
Signal Limit Monitor and were no more available
Cards so the modification of the
signal limit monitors cards
carried-out by using TSX
Modicon Micron PLC
System.
3. Inlet Guide Vanes Apr - 2005 Rs.2,953,657.00 Modified type Inlet Guide
Vanes installed on the
machine. The out put
capacity of the unit
increased 1 to1.5 MW
4. Cranking Motor May 2005 Rs.3,087,678.00 The Faulty motor replaced,
with a new motor
12
JAMSHORO POWER COMPANY LIMITED
25 MW Unit No 4
S.No. Name of Maintenance Date of Amount Remarks
& Modification works Completion
1 11 kV Generator Breaker July – 2004 Rs.695,000.00 The Minimum Oil Circuit
Breaker modified at Alstom
Factory Karachi,by using
Vacuum Chambers,due to
Non availability of spare parts
and frequent problems of oil
leakage on the breaker
2. Spare 11 kV Generator July – 2004 Rs.695,000.00 -Do-
Breaker
3. Turbine Components
Modified type Inlet Guide Sep– 2004 Rs.2,953,657.00 Modified type Inlet Guide
Vanes installed Vanes installed on the
machine. The out put capacity
of the unit increased 1 to1.5
MW.
Turbine Bearings No.1 Sep– 2004 Rs65,520.00 Replacement of worn-out
&2 replaced with new bearings during inspection of
ones the unit.
Ist & 2nd Stage Buckets Sep – 2004 Rs.3,506,541.00 Replacement of Buckets
replaced with new ones. during inspection of the unit
carried-out
4 Generator Control Panel. Nov – 2004 Rs1,023,303.00 The spare parts of the existing
Signal Limit Monitor system phased-out and were
Cards no more available so the
modification of the signal
limit monitors cards carried-
out by using TSX Modicon
Micron PLC System.
25 MW Unit No.5
S.No. Name of Maintenance Date of Amount Remarks
and Modification Completion
works
1. Expansion Joints of Sep.2003 Rs.767,820.00 The Damaged Expansion
HRSG Generator Joints replaced with new
ones to prevent hot gases
from the worn-out Expansion
Joints..
2. Inlet Guide Vanes Sep-2003 Rs.2,953,657.00 Modified type Inlet Guide
Vanes installed on the
machine. The out put
capacity of the unit increased
1 to1.5 MW
13
JAMSHORO POWER COMPANY LIMITED
3. Turbine Components Aug-2005 Rs.3,490,412.00 i) 120 Nos. 1st stage moving
blades replaced with
new one.
ii) 05 Nos. 1st stage shroud
replaced with new ones
iii) 10 Nos. Transition
pieces replaced with
new ones.
25 MW Unit No.6
S.No. Name of Maintenance Date of Amount Remarks
and Modification Completion
works
1. Inlet Guide Vanes Jan.2003 Rs.2,953,657.00 Modified type Inlet Guide
Vanes installed on the
machine. The out put
capacity of the unit increased
1 to1.5 MW
15
JAMSHORO POWER COMPANY LIMITED
Installation of New Energy Meters on all Generating Units and 132 kV Outgoing Feeders
16