Вы находитесь на странице: 1из 80

DETAIL PROJECT REPORT

GOVT. POLYTECHNIC @ AFZALPUR

ABSTRACT OF PROPOSED CONSTRUCTION OF ADMINISTRATIVE BUILDING AT AFZALPUR DIST: GULBARGA


SL NO. GROUND FLOOR DESCRIPTION OF ITEMS Earth work excavation for foundation ANTI-TERMITE PCC BED FOOTING CONCRETE CENTEIRNG FOR FOOTINGS PLINTH BEAM

QTY #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 78.80 6.07 3.21 32.09 100.00 1.75 10.00 6.00 50.00 50.00

UNIT cum Sqm cum cum Sqm cum sqm cum sqm sqm sqm sqm cum cum cum cum cum cum cum cum cum Sqm cum sqm cum sqm sqm

RATE 152.00 103.00 2876.00 4231.00 140.00 4231.00 151.00 4231.00 211.00 231.00 555.00 575.00 1660.00 2756.00 #REF! 68.36 2876.00 3141.00 3166.00 2996.00 2996.00 530.00 3776.00 441.00 4231.00 151.00 336.00

AMOUNT #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 247495.23 19223.95 9618.06 96126.66 52997.69 6614.78 4410.00 25395.65 7550.60 16800.72

1 2 3 4 5 6 7 8 9

Centering to plinth beams


COLUMNS CENTERING FOR COLUMNS. upto First Floor lintel level CENTERING FOR circularCOLUMNS. For additional Ht UCRS MASONRY CRS MASONRY FOR RAMP EARTH FILLING FLOOR BED BRICK MASONRY Rising of wall up to F.F lintel level STEPS PARAPET WALL Partition wall SILL & COPING Centering to SILL & COPING LINTEL BEAMS CENTERING FOR LINTELS CHAJJA

10 a. 11 12 13 14 15 16

16.a 17 18 19 20 21

KRUTHI
ARCHITECTURAL CONSULTANTS GULBARGA

DETAIL PROJECT REPORT

GOVT. POLYTECHNIC @ AFZALPUR

22 23

Centering to Chajja
ROOF BEAM

75.00 20.49 13.25 136.65 117.82 133.67 357.79 17.40 19.80 54.28 #REF! #REF! #REF! 13.00 100.00 300.00 4656.07 1056.66 1.44 11.00 #REF! #REF! #REF! #REF! #REF!

sqm cum cum sqm sqm cum sqm sqm sqm M M cum sqm M M sqm sqm sqm cum No.s sqm sqm kg M sqm

160.00 4231.00 4281.00 151.00 154.00 4231.00 207.00 865.00 15151.52 123.00 1112.00 4231.00 305.00 4020.00 30.60 108.00 107.00 107.00 54343.00 655.00 2414.00 563.00 30.60 205.00 2000.00

11999.44 86713.50 56741.66 20633.81 18143.66 565536.62 74061.50 15051.00 300000.10 6676.44 #REF! #REF! #REF! 52260.00 3060.00 32400.13 498199.18 113063.04 78457.71 7205.00 #REF! #REF! #REF! #REF! #REF!

24

CENTERING FOR ROOF BEAMS

25 26 27 27.a
28 29

ROOF SLAB

Centering to Roof slab


G.I.SHEET Dome Portion with Polycorbonate sheets Expansion joint Treatment to Expansion joint MAIN STAIRCASE Centering to staircase HAND RAILS

30 31 32 32.a 33 34 35 36 36.a 37 38 39 40 41
42

fixing plaster mesh


CEILING PLASTER PLASTERING INSIDE PLASTERING OUTSIDE WOODEN FRAMES

Fixing of door frame


DOOR SHUTTER

Fixing plain rolled glass Ventilators


SOLID PVC DOOR FRAME SOLID PANEL PRELAM PVC DOOR SHUTTER Fixtures for door

Brass hinges Handles Al drops Tower bolts

Front Back

#REF! #REF! #REF! #REF! #REF!


KRUTHI
ARCHITECTURAL CONSULTANTS GULBARGA

each each each each each

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF!

DETAIL PROJECT REPORT

GOVT. POLYTECHNIC @ AFZALPUR

Tower bolts for toilet Latches Rubber bush & wooden door stopper.
For Sliding door

#REF! #REF! #REF! #REF! #REF!

each each each each sqm

#REF! #REF! #REF! #REF! 2769.00

#REF! #REF! #REF! #REF! #REF!

43

Anodized aluminium windows and ventilators.

44

Cement concrete. For toilet ventilators adding 20% for louver V2


FLOORING CERAMIC TILES GLAZED TILES COLAPSIBLE GATE SKIRTING GRILL WORK POLISH TO WOOD PAINTING TO steel

#REF! #REF! #REF! #REF! #REF! #REF! #REF! 703.08 #REF! #REF! #REF! 4656.07 #REF! 1056.66 #REF! #REF! 199.70 19.97

sqm sqm sqm sqm sqm sqm M Kg sqm sqm sqm sqm sqm sqm sqm qtl sqm cum

2546.00 3055.20 830.00 583.00 667.00 2874.00 641.00 64.30 76.84 74.41 40.00 60.00 #REF! 50.00 833.00 4691.00 3.08 2876.00

#REF! #REF! #REF! #REF! #REF! #REF! #REF! 45208.04 #REF! #REF! #REF! 279364.03 #REF! 52833.20 #REF! #REF! 615.08 57433.72

45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60

Wall Putti plastic emulsion paint


plastic emulsion paint on Ceiling WATER PROOFING CEMENT PAINT

Shelves H.Y.S.D. Steel


COMPACTION Flagging area

Cement concrete of mix 1:4:8 using 40mm.

61 62

Shahabad /cudappa stone FLOORING


H.D.P.E. rain down water pipes Outlet for Open to sky Providing & fixing nahni trap with inspection chamber for open to sky

199.70 35.35 16.38 2.00

sqm SQM SQM SQM

478.00 421.00 421.00 8365.00

95456.60 14882.35 6895.98 16730.00

63

waterproofing treatment

891.10

SQM

518.00

461589.80

#REF!
KRUTHI
ARCHITECTURAL CONSULTANTS GULBARGA

DETAIL PROJECT REPORT

GOVT. POLYTECHNIC @ AFZALPUR

KRUTHI
ARCHITECTURAL CONSULTANTS GULBARGA

PROPOSED CONSTRUCTION OF ADMINISTRATIVE BUILDING AT AFZALPUR DIST: GULBARGA GROUND FLOOR SL.NO 1 DESCRIPTION OF ITEM Earth work excavation for foundation KSRB 2-2.2 : Earthwork excavation for foundation of buildings, water supply,sanitary lines and electrical conduits either inpits or in trenches 1.5m and above in width, in hard soil not exceeding 1.5m. in depthincluding dressing the bottom and sides ofpitsand trenches, stacking the excavated soilclear from deges of excavation with lead upto50 m. after breaking of clods complete as per specifications. specifications. No. KBS 2.(a) /2.3.5 Page No 6 Item No.2.4 574.04 CUM 2 ANTI-TERMITE KSRB -3.2 : Providing and injecting chemical emulsion for Pre-constructional AntiTermite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surroundig of pipes and conduits, with chloropyriphos emulsifiable concentrates of 20% concentration, including cost of chemical, diluting in water to one percent concentration, labour, HOM of equipments, complete as per specifications. (Plinth area of the building at ground floor only shall be measured). Specification No. KBS : 3.2.6 / 3.2.7 Page No.9 Item No.3.2 Area = 809.2 P.C.C BED :KSRB 4-1.3 : Providing and laying in position plain cement concrete of mix 1:4:8 using 40mm and down size graded granite metal machine mixed, concrete laid in layers not exceeding 15 cms. Thick, well compacted, in foundation and plinth, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Page No. 12 Item No.4.3 72.94 CUM 4 FOOTING CONCRETE KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of mix 1:1.5:3 with 20mm and down size graded granite metal, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation plinth and ground floor level for retaining walls, return walls, walls (any thickness) including attached plasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window cills, fillets etc., including cost of all materials, labour, HOM of machinery, curing, complete as per specifications.Page No. 12 Item No.4.11 203.07 cum 5 CENTEIRNG FOR FOOTINGS: KSRB 4-6.1 : Providing and removing centering, shuttering, strutting, propping etx., and removal of form work for foundations, footings, bases of columns for mass concrete including cost of all materials, labour complete as per specifications.Page No. 14 Item No.4.28 493.56 Sqm 6 PLINTH BEAM 140.00 4231.00 2876.00 152.00 Qty UNIT RATE

809.20 Sqm

103.00

EMPLOYER

BIDDER

SL.NO

DESCRIPTION OF ITEM KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of mix 1:1.5:3 with 20mm and down size graded granite metal, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation plinth and ground floor level for retaining walls, return walls, walls (any thickness) including attached plasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window cills, fillets etc., including cost of all materials, labour, HOM of machinery, curing, complete as per specifications.Page No. 12 Item No.4.11

Qty

UNIT

RATE

54.31 cum 7 Centering to plinth beams:KSRB 4-6.7 : Providing and removing centering, shuttering, strutting, propping etx., and removal of form work for sides and soffits of beams, beam haunchings, cantilever girders, bressumers and lintels not exceeding 1 m in depth including cost of all materials, labour complete as per specifications.Page No. 15 Item No.4.34 348.64 sqm 8 COLUMNS:KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of mix 1:1.5:3 with 20mm and down size graded granite metal, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation plinth and ground floor level for retaining walls, return walls, walls (any thickness) including attached plasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window cills, fillets etc., including cost of all materials, labour, HOM of machinery, curing, complete as per specifications.Page No. 15 Item No.4.11 69.40 cum 9 CENTERING FOR COLUMNS.:KSRB 4-6.5 : Providing and removing centering, shuttering, strutting, propping etc., for columns, pillars, piers, abutments, post and struts, square / rectanglurs / polygon in plan including cost of all materials, labour complete as per specification.Page No. 15 Item No.4.32 upto First Floor lintel level 10 KSRB 4-6.6 : Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for columns, pillars, piers, post and struts, circular or curved in plan including cost of all materials, labour complete as per specification.Page No. 15 Item No.4.33 upto First Floor lintel level 11 UCRS MASONRY KSRB 5-1.2 : Providing and constructing granite / trap / basalt rubble stone masonry in foundation with cement mortar 1.8 (uncoursed), bond stones at two m. apart in each course including cost of materials, labour, curing complete as per specifications. KBS 5.1.12 Page No.21 Item No.5.2 108.33 cum 12 CRS MASONRY KSRB 5-3.2 : Providing and constructing granite / trap / basalt size stone masonry in basement with cement mortar 1:6 edges of stones chistle dressed in courses not less than 15 cms high, bond stones at two m. apart in each course including cost of materials, labour, curing complete as per specifications. KBN 5.1.13 Page No.21 Item No.5.8 41.56 cum 147.47 Sqm 30.54 Sqm 482.04 Sqm 17.28 Sqm

4231.00

151.00

4231.00

211.00 231.00

555.00 575.00

1660.00

2756.00

EMPLOYER

BIDDER

SL.NO DESCRIPTION OF ITEM 13 FOR RAMP KSRB 4-1.1 : Providing and laying in position plain cement concrete of mix 1:2:4 using 40mm and down size graded granite metal machine mixed, concrete laid in layers not exceeding 15 cms. Thick, well compacted, in foundation and plinth, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Page No. 12 Item No.4.1 14 EARTH FILLING KSRB 2.3 : Filling available excavated earth(excluding rock) in sides of foundations upto plinth in layers not exceeding 20 cms. in depth, compacting each deposited layer by ramming after watering with lead upto 50 m. and lift upto 1.5m. including cost of of all labour complete as per specifications. Page No 6 Item No2.10 (From sump & septic tank) for columns & wall fillings (50% of excavation) 15 FLOOR BED KSRB 4-1.3 : Providing and laying in position plain cement concrete of mix 1:4:8 using 40mm and down size graded granite metal machine mixed, concrete laid in layers not exceeding 15 cms. Thick, well compacted, in foundation and plinth, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Page No. 12 Item No.4.3 For Rooms (Qty as per earth filling) BRICK MASONRY KSRB 6-1.3 : Providing and cosntructing burnt brick masonry for basement and superstructure with approved quality of non modular bricks of standard size of class designation 35 with cement mortar 1:6 including cost of materials, labour charges, scaffolding, curing complete as per specifications. Page No.26 Item No.6.3 Rising of wall up to F.F lintel level Steps Parapet 16.a Partition wall 2996+145+25 = 3166

Qty

UNIT

RATE

18.96 cum

3683.00

683.82 55.48

CUM CUM

68.36 68.36

85.48 cum

2876.00

16

157.59 6.07 3.21 32.09

cum cum cum cum

3141.00 3166.00 2996.00 2996.00

KSRB 6-7.3 : Construction of partition wall 11.2 cms thick with non modular ground moulded burnt bricks of class designation 35 with cement mortar 1:4 including cost of materials, labour charges, scaffolding, curing complete as per specifications. Page No.31 Item No.6.2 Page No. 27 item No. 6.25
Net Qty 17 SILL & COPING KSRB 4-1.6 : Providing and laying in position plain cement concrete of mix 1:2:4 using 20mm and down size graded granite metal machine mixed, concrete laid in layers not exceeding 15 cms. Thick, well compacted, in foundation and plinth, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Page No. 12 Item No.4.6 4.75 cum 18 Centering for Sill & coping KSRB 4-6.9 : Providing and removing centering, shuttering, strutting, propping etc., for edges of slabs and breaks in floor, cills, plinth including cost of all materials, labour complete as per specification.Page No. 15 Item No.4.36 3776.00

187.55 Sqm

530.00

EMPLOYER

BIDDER

SL.NO

DESCRIPTION OF ITEM

Qty UNIT 20.66 sqm

RATE 441.00

19

LINTEL BEAMS:KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of mix 1:1.5:3 with 20mm and down size graded granite metal, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation plinth and ground floor level for retaining walls, return walls, walls (any thickness) including attached plasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window cills, fillets etc., including cost of all materials, labour, HOM of machinery, curing, complete as per specifications.Page No. 12 Item No.4.11 12.08 cum 4231.00

20

CENTERING FOR LINTELS KSRB 4-6.7 : Providing and removing centering, shuttering, strutting, propping etx., and removal of form work for sides and soffits of beams, beam haunchings, cantilever girders, bressumers and lintels not exceeding 1 m in depth including cost of all materials, labour complete as per specifications.Page No. 15 Item No.4.34 112.76 Sqm 151.00

21

CHAJJA:KSRB 4.2.10 : Providing and laying in position reinforced cement concrete of mix 1:1.5:3 (M20) with 12 mm and down size graded granite metal, machine mixed, well compacted for plain chajja of 7.5 cms. Average thickness, upto ground floor level, including cost of all materials, labour, HOM of machinery, finishing, curing, complete as per specifications.Page No. 13 Item No.4.19 99.02 Sqm 336.00

22

Centering to Chajja:KSRB 4-6.10 : Providing and removing centering, shuttering, strutting, propping etc., for chajjas, corbels etc., including edges including cost of all materials, labour complete as per specification.Page No. 15 Item No.4.37 150.41 Sqm 160.00

23

ROOF BEAM:KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of mix 1:1.5:3 with 20mm and down size graded granite metal, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation plinth and ground floor level for retaining walls, return walls, walls (any thickness) including attached plasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window cills, fillets etc., including cost of all materials, labour, HOM of machinery, curing, complete as per specifications.Page No. 12 Item No.4.11 50.50 cum 13.25 cum 4231.00 4281

24

CENTERING FOR ROOF BEAMS KSRB 4-6.7 : Providing and removing centering, shuttering, strutting, propping etx., and removal of form work for sides and soffits of beams, beam haunchings, cantilever girders, bressumers and lintels not exceeding 1 m in depth including cost of all materials, labour complete as per specifications.Page No. 15 Item No.4.34 255.28 Sqm 117.82 Sqm 151.00 154.00

EMPLOYER

BIDDER

SL.NO DESCRIPTION OF ITEM 25 ROOF SLAB :KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of mix 1:1.5:3 with 20mm and down size graded granite metal, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation plinth and ground floor level for retaining walls, return walls, walls (any thickness) including attached plasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window cills, fillets etc., including cost of all materials, labour, HOM of machinery, curing, complete as per specifications.Page No. 12 Item No.4.11

Qty

UNIT

RATE

133.67 cum 26 Centering to Roof slab KSRB 4-6.2 : Providing and removing centering, shuttering, strutting, propping etx., and removal of form work for flat surface such as suspended floors, roofs, landings, balconies ad likes, thickness upto 200 mm including cost of all materials, labour complete as per specifications.Page No. 14 Item No.4.29 891.10 Sqm 27 G.I.SHEET Roof covered by high tensile steel 550 Mps yield stress [ASTM A 446 grade-E) with hot dip metallic 14th coating of A2-Zn alloy (150 GMS/sqm total of both sides) A-Z 150 ( as per ASTM or AS 1397) bare galvallum sheet with hot dip metallic coating, including loading, unloading & transportation charges including lapping wastages, self drilling screw with EPOM rubber washer labour charges lifting fixing bare galvallum sheet for roofing and hammer drilling. Providing silicon setalent temporary electrical supply & required scaffolding. For Staircase 27.a For Dome Portion with Polycorbonate sheets with fabrication.including rising of columns & ring beam 28 Expansion joint KSRRB 2600-2-2:Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per drawing and technical specification including cost of materials, labour, complete as specification Specification No KRBS 2100 MOST Specification No 2100 (Item No 31.3 page No 212 54.28 29 Treatment to Expansion joint KSRRB -2600-1 : Providing & laying a burried expansion joint expansion gap being 20 mm covered with 12 mm thick 200 mm galvanised weldable structural steel plate as per IS 262 placed simillarical to central line of joint resting freely over top surface of deck concrete welding of 8mm dia 100 mm long galvanised nails placed 30 degree c/c along the centre line of place all as specified cluse 2600-4 item no. 31.1 page no.212. For beams at slabs Staircase:KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of mix 1:1.5:3 with 20mm and down size graded granite metal, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation plinth and ground floor level for retaining walls, return walls, walls (any thickness) including attached plasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window cills, fillets etc., including cost of all materials, labour, HOM of machinery, curing, complete as per specifications.Page No. 12 Item No.4.11 6.98 cum M 17.40 Sqm 19.80 Sqm

4231.00

207.00

865.00 15151.52

123.00

37.80

1112.00

30

4231.00

EMPLOYER

BIDDER

SL.NO DESCRIPTION OF ITEM 31 Centering to staircase KSRB 4-6.11 : Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for stairs (excluding landing) except spiral staircase including cost of all materials, labour complete as per specification.Page No. 15 Item No.4.38

Qty

UNIT

RATE

33.26 sqm 32 HAND RAILS Providing and fixing stainless steel hand rails for a height of 900 mm using 62.50mm dia of 16 gauge for top measure and verticals at 1.50m C/c and 50mm dia of gauge stainless steel pipes of 4 rows below top measure at equal intervels including fixing with 50mm dia G.I pipe including cutting, welding,bending wherever necessary with suitable caps at top and bottom etc.,complete finishing with mat/shining finishing etc.,complete as per technical specification and as directed by the Engineer-incharge of work. 13.00 M 33 KSRB 15-18.2 : Providing and fixing plaster mesh 150mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120gms per sqm width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour, for fixing complete as per specifications. (length of mesh only be measured for payment) (Item No 15.35) page No 98 307.54 34 CEILING PLASTER:KSRB 15.3.13 : Providing 12mm thick cement plaster in single coat with cement mortar 1:3, to ceiling including rounding off corners wherever required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications.(Item No 15.21) page No 97 678.72 Sqm 35 PLASTERING INSIDE:KSRB 15.3.9 : Providing 18mm thick cement plaster in single coat with cement mortar 1:6, to brick masonry including rounding off corners wherever required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications.(Item No 15.17) page No 109 Net Qty 5089.55 Sqm M

305.00

4020.00

30.60

108.00

107.00

36

Plastering outside:-KSRB 15.3.9 : Providing 18mm thick cement plaster in single coat with cement mortar 1:6, to brick masonry including rounding off corners wherever required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications.(Item No 15.17) page No 109 Net Qty Parapet WOODEN FRAMES:KSRB 9.4-3 : Providing Matti / Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, HOM of machineries complete as per specifications. Page No. 44 Item No.9.12

753.21 sqm 279.00 sqm

107.00 107.00

37

1.44 Cum

54343.00

EMPLOYER

BIDDER

SL.NO 37.a

DESCRIPTION OF ITEM

Qty

UNIT

RATE

KSRB 9-27.2 : Fixing of door frame in an existing opening including embeeding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debries with lead upto 50 m including cost of materials, labour charges, complete as per specifications.Page No. 58 Item No.9.81
11.00 No.s 655.00

38

DOOR SHUTTER KSRB 9-8.2 : Providing and fixing in position fully panelled Honne wood shutters for doors, styles and rails of 30mm. thick with bottom and lock rails 180 mm wide top rail and styles 100mm wide as per drawing and panels of 20 mm thick including cost of materials, labour, HOM of machineries complete as per specifications. (excluding cost of fixtures ) Page No. 45 Item No.9.24 39.66 SQM 2414.00

39

Providing and fixing 4mm thick glass panels to steel windows including T.W beading of 10mm thick and 2 coats of approved paints. (Item No 37.16 page No 232 DSR.2009-10 D D1

0.90 2.88 3.78 SQM

563.00

40

Providing and fixing M.S bars to ventilators including cutting making holes in frame work with two coats of approved paints. (Item No 37.19 page No 232 Density of 10mm steel = 0.62 SOLID PVC DOOR FRAME Providing & fixing factory made PVC Door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet metered cut at corners & jointed 2 No.s of 150mm long brackets of 15x15mm M.S Square tube, the entire door frame to be reinforced with 19x19mm M.S Square tube of 19gauge. the door frame to be fixed to the wall using M.S. Screws of 65/80mm size complete as per manufacturers specification & direction of Engineer-in-charge. Page No. 51 Item No.9.84

15.62 Kg

30.60

41

57.00 42 SOLID PANEL PRELAM PVC DOOR SHUTTER Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from M.S. tube of 19x19mm, 19 gauge for styles and 15x15mm for top & bottom rails, covered with heat moulded Prelaminated PVC 'C' Channels of 5mm thick sheet & 30x50mm wide to form styles & 5mm thick & 75mm wide Prelaminated PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet Prelaminated on either side fitted in the M.S. frame, Sealed to the styles & rails with PVC Designer beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-incharge fixed to frames with 3 nos of 75mm. aluminium hinges. Page No. 51 Item No.9.85 D2

205.00

21.60 sqm

2000.00

EMPLOYER

BIDDER

SL.NO DESCRIPTION OF ITEM 43 Fixtures for door Providing & Fixing below said DOOR Fittings for existing doors including cost of materials etc. Brass hinges Handles

Qty

UNIT

RATE

Front Handles Back

All drops Tower bolts Tower bolts for toilet Latches Rubber bush & wooden door stopper. For Sliding door 44 WINDOWS:KSRB 7.11 : Providing and fixing in position anodized aluminium windows and ventilators as per approved drawings with sliding shutters using three track window frame of size 92x31.75mm bottom section 1.3 mm, thick, weight 1.07kg/m; sides and top sections 1.3mm, thick, weight 0.933 kg/m. shutter frame section comprising top and bottom section of size 40mmx18mm, wallthickness 1.25mm. weight 0.417 kg./m. shutter side outer 40mmx18mm. wall thickness 1.25mm. weight 0.417 kg/m, shutter interlock section 40mmx26.7mm wall thickness 1.1 mm. thick, weight 0.469 kg/m, the shutters mounted on nylon rollers with approved quality of fixtures such as aluminium handles tower bolts etc.; providing and fixing 5.5mm. thick plain glass for shutters fitted with rubber beading all aluminium sections anodised 12 to 15 microns thick including cutting to required length, joints mitred subdividing the frame tenonned and rivetted, in the assembled frame, stiffened with end clips for corners, angles etc., and fixed to the walls, lintels, floor beams/cills as the case may be, with necessary steel screws, raul plugs or teak wood gatties including cutting masonry or concrete and making good the original surface using cement mortar, aluminium pretreated for removal of any rust and protection of further rust formation and coated with the greasy materials for non-adhesion of mortar and any other sticky materials, (this coating should be cleaned after installation) including coast of all materials, fixtures, labour and HOM of machiery complete as per specification. Page No.31 Item No.7.11

60.00 44.00 44.00 22.00 60.00 10.00 10.00

each each each each each each each

150.00 90.00 450.00 80.00 75.00 75.00 50.00 50.00 1000.00

22.00 each 2.00 each

47.70 sqm

2769.00

45

46

KSRB 7.7 : Providing and fixing in position in cement concrete 1:3:6 steel glazed ventilators side hung/top hung fully openable as per approved drawings using Z angles of 25x33x3mm, weighing 1.419Kg/m both for outer and inner frames and central mullion section of size 25x46x3mm. weighing 0.839kg/m for glazing of windows not more than 34 cms. c to c including providing and fixing 4mm. thick reeded glass with teakwood beading of required size, all steel sections should confirm to I.S 7452:1990, 4 nos. of holdfasts of approved size, section should be cut to lenght welded and electrically grinded subdividing frames of unit shall be tenonned and revetted into the frames electrically. all the steel surface shall be throughly cleaned free of rust and painted with one coat of anti-corosive paint and finishing with two coats of ready mix paint of approved colour and make including cost of materials, fixtures, labour and HOM of machinery complete as per specifications.Page No.30 Item No.7.7. V1 For toilet ventilators adding 20% for louver V FLOORING

9.00 sqm 2.88 sqm

2546.00 3055.20

EMPLOYER

BIDDER

SL.NO

DESCRIPTION OF ITEM

Qty

UNIT

RATE

ProvidingVitrified glazed tiles

flooring with 60 cms x 60 cms of approved

make, shade & size for flooring laed on bed of 12mm thick cement mortor 1:3 mix , flush pointing with white cement using colour pigment,including cost of materials,labour curing as per specification (Item No 14.45) page No 93
832.14 sqm 47 KSRB 14.14-5 : Providing Ceramic tiles of approved make, shade and size for flooring, treads of steps and landings laid on a bed of 12 mm thick, cemetn mortar 1:3 mix, flush pointing with white cement using colour pigment, including cost of materials, laobur, curing, complete as per specifications. For Ceramic Tiles of size 15x15cms(Item No 14.36 ) page No 92 43.33 sqm 48 GLAZED TILES KSRB 14.14-2 : Providing colour glazed tiles of size 15 cms x 15 cms 10mm thick for flooring, treads of steps and landings, laid on a bed of 12mm thick, cement mortar 1:3 mix, finished with flush pointing using white cement, including cost of mateirals, labour, curing, complete as per specifications.(Item No 14.33 ) page No 92 79.20 sqm 49 COLAPSIBLE GATE : KSRB 7.1 : Providing and fixing in position collapsible steel shutters with single or double leaf with vertical channel 20mmx10mmx2mm braced with flat iron diagonals 20mmx5mm size, with top and bottom rails of T iron sections of 40x40x6 mm with 38mm dia steel pulleys complete with bolt and nuts, locking arrangements, stoppers, handles on both sides with 7.5cms openings at 10 cms. c to c applying a priming coat of red lead paint. cost of materials, labour, HOM of machinery complete as per specifications. Page No.29 Item No.7.1 50 "Providing and fixing skirting of 300 mm high using prepolished water cut/gang saw of 19mm thick grey granite 0.5mm wide chamfered width and depth and fixing in CM 1:4 of 20mm thick after chipping the walls etc., complete.".(Item No 14.50) page No 94 293.18 51 GRILL WORK:KSRB 7.9 : Providing and fixing M.S. grill work for windows and ventilators weighing 21kg/sqm using M.S. flats, or M.S. square rods, or combinatioon of M.S. flats and square as per approved design, drawing including cutting steel sections and welding the same to required pattern with a coat of red lead primer, cost of materials, fixtures, labour and HOM of machinery complete as per specifications. Page No.30 Item No.7.9 1341.90 Kg 52 KSRB 15-17.12 : Providing and applying polishing with french polish on new wood surface and / or wood based surface to give an even surface after cleaning the surface of all dirt, dust and foreign matter, sand papered smooth, including cost of wood filler and materials, labour complete as per specifications. (Item No 15.64) page No 103 169.10 sqm 53 PAINTING TO steel 76.84 64.30 M 641.00 3.36 sqm 2874.00 667.00 583.00 830.00

EMPLOYER

BIDDER

SL.NO

DESCRIPTION OF ITEM KSRB 15-18.2 : Providing and applying enamel metal paint two coats (excluding priming coat) over new steel or other metal surface brushing to give an even shade after cleaning oil, grease, dirt and other foreign matter, including cost of materials, labour, complete as per specifications.(Item No 15.74) page No 104

Qty

UNIT

RATE

63.30 sqm 54 wall Putti Providing wall putti for plastering to wall and ceiling, including cost of materials, labour, curing complete as per specifications.as per Market rate. 5768.27 sqm 55 KSRB 15-15.1 : Providing and applying painting in two coats with plastic emulsion paint of approved brand with primer on wall surface to give an even approved shade after throughly brushing the surface, free from mortar drops and other foreign matter including preparing the surface even and sand paper smooth, cost of materials labour complete as per specifications.(Item No 15.51) page No 100 QTY AS PER PLASTERING INSIDE 56 CeilingKSRB 15-15.1 : Providing and applying painting in two coats with plastic emulsion paint of approved brand with primer on wall surface to give an even approved shade after throughly brushing the surface, free from mortar drops and other foreign matter including preparing the surface even and sand paper smooth, cost of materials labour complete as per specifications.(Item No 15.51) page No 100 5089.55 sqm

74.41

40.00

60.00

60.00

KSRB 15-15.2 : Extra over item 15-15.1 for painting two coats with plastic emulsion paint of approved brand and shade on ceiling and / or sloping roof as per specifications.(Item No 15.51.2) page No 113
QTY AS PER Ceiling PLASTERING 57 WATER PROOFING CEMENT PAINT KSRB 15-16.1 : Providing and finishing external walls in two coats with waterproof cement paint of approved brand and shade with primer to give an even shade after throughly brooming the surface to remove all dirt and loose powdered material, free from mortar drops and other foreign matter cost of matrerials, labour, complete as per specifications.(Item No 15.53) page No 101 Qty as per Plastering outside 58 Shelves KSRB 14.10-3 : Flooring with 25mm to 40mm thick polished Cadapa slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, including cost of materials, labour, curing, polishing complete as per specifications.(Item No 14.17 ) page No 89. 31.76 sqm 59 H.Y.S.D. steel:KSRB 4.9.2 : Providing H.Y.S.D. steel (Cold, Twisted ) reinforcement for R.C.C. work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per specifications.Page No. 16 Item No.4.46 1.14% 550.68 cum 492.81 Qtl 1032.21 sqm 678.72 Sqm

1.71 61.71

50.00

833.00

4691.00

EMPLOYER

BIDDER

SL.NO 60

DESCRIPTION OF ITEM COMPACTION Flagging area :KSRRB 300-7.3 : Compaction of original ground with maximum of 6 passes of 8 to 10 tonnes power roller including filling in depression occuring during rolling including cost of all labour, HOM of machinery complete as per specifications. Specification No. KRBS 300-1, 300.5 MORT & H Specification No. 301 to 305 (Item No 19.64) page No 133 Area = 199.7sqm

Qty

UNIT

RATE

199.70 sqm

3.08

61

KSRB 4-1.3 : Providing and laying in position plain cement concrete of mix 1:4:8 using 40mm and down size graded granite metal machine mixed, concrete laid in layers not exceeding 15 cms. Thick, well compacted, in foundation and plinth, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Page No. 12 Item No.4.3 Providing shahabad /cudappa stone FLOORING 40 mm thick set in CM 1:8 with cement pointing 1:3 proportion etc.., complete (Item No 37.80 page No 237 DSR.2009-10 . KSRB 8.6-5 : Providing and fixing on wall surface 4.0kg/sq.cm H.D.P.E. rain down water pipes 110 mm outer dia approved make and brand with necessary specials like shoes, bends and offsets fixed with iron clamps, wall plugs, screws, including cost of materials, labour, curing complete as per specifications.Page No.41 Item No.8.19 Outlet for Open to sky Providing & fixing nahni trap with inspection chamber for open to sky

19.97 sqm

2876.00

62

199.70 sqm

478.00

63

35.35 RMt 16.38 RMt 2.00 each

421.00 421.00 8365.00

64

KSRB 10-3 : Providing and laying integral cement based waterproofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc., consisting of following application. (a) Applying and grouting a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with proprietary water proofing compound conforming to IS:2645 over the RCC slab after cleaning the surface before treatment. (b) Laying cement concrete using broken brick bats 25mm to 100mm size with 50% of cement mortar 1:5 admixed with proprietary water proofing compound conforming IS:2645 over 20mm thick layer of cement mortar 1:5 admixed with proprietary water proofing compound to required slope and treating similary water proofing compound to required slope and treating similarly the adjoining walls upto 300mm height including rounding off junctions of walls and slabs. (c) After two days of proper curing, applying a second coat of cement slurry admixed with proprietary water proofing compound (d) Finishing the surface wit h20mm thick jointless cement mortar of mix 1:4 admixed with proprietary water proofing compound and finally finishing the surface with trowel and neat cement slurry and making of 300x300mm sqare. (e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test including cost of materials, labour complete as per specifications. Page No. 56 Item No.10.30 891.10 sqm 518.00

EMPLOYER

BIDDER

DETAILED ESTIMATE OF PROPOSED CONSTRUCTION OF ADMINISTRATIVE BUILDING AT AFZALPUR DIST: GULBARGA GROUND FLOOR
SL.No

DESCRIPTION OF ITEM

NO

Qty

UNIT

RATE

16

BRICK MASONRY KSRB 6-1.3 : Providing and cosntructing burnt brick masonry for basement and superstructure with approved quality of non modular bricks of standard size of class designation 35 with cement mortar 1:6 including cost of materials, labour charges, scaffolding, curing complete as per specifications. Page No.26 Item No.6.3 For Outer walls For Intermediate walls 1 1 2 100.00 20.70 2.00 0.23 0.23 0.23 3.50 3.425 0.45 80.50 16.31 0.41 97.22 1.93 0.77 1.66 1.99 0.50 0.36 2.17 4.66 1.66 0.66 2.07 18.42 78.80 6.07 0.57 0.56 0.54 0.53 0.51 0.50 3.21 32.09

Deduction MD CG D D1 D2 SD W W1 GW V V1

1 1 2 3 1 1 3 9 2 8 10

3.50 1.40 1.50 1.20 0.90 1.00 2.10 1.50 2.00 0.60 1.50

0.23 0.23 0.23 0.23 0.23 0.15 0.23 0.23 0.23 0.23 0.23

2.40 2.40 2.40 2.40 2.40 2.40 1.50 1.50 1.80 0.60 0.60

cum cum

3141.00 3166.00

Rising of wall up to F.F lintel level 3166 Steps

2996+145+25 = 1 1 1 1 1 1 1 1 11.00 12.68 12.37 12.07 11.77 11.40 11.05 155.00 0.23 0.30 0.30 0.30 0.30 0.30 0.30 0.23 2.40 0.15 0.15 0.15 0.15 0.15 0.15 0.90

Parapet 16.a Partition wall:KSRB 6-7.3 : Construction of partition wall 11.2 cms thick with non modular ground moulded burnt bricks of class designation 35 with cement mortar 1:4 including cost of materials, labour charges, scaffolding, curing complete as per specifications. Page No.31 Item No.6.2 Page No. 27 item No. 6.25 Deduction D1 D2 SD Net Qty

cum cum

2996.00 2996.00

1 2 4 1

29.95 1.20 0.90 1.00

3.90 2.40 2.40 2.40

116.80 5.76 8.64 2.40 16.80 100.00 Sqm

530.00

SL.No

17

DESCRIPTION OF ITEM SILL & COPING:KSRB 4-1.6 : Providing and laying in position plain cement concrete of mix 1:2:4 using 20mm and down size graded granite metal machine mixed, concrete laid in layers not exceeding 15 cms. Thick, well compacted, in foundation and plinth, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Page No. 12 Item No.4.6 W W1 V V1 Parapet wall

NO

Qty

UNIT

RATE

3 17 8 10 1

2.10 1.50 0.60 1.50 24.57

0.23 0.23 0.23 0.23 0.23

0.10 0.10 0.10 0.10 0.10

0.14 0.59 0.11 0.35 0.56 1.75

cum

3776.00

18

Centering for Sill & coping KSRB 4-6.9 : Providing and removing centering, shuttering, strutting, propping etc., for edges of slabs and breaks in floor, cills, plinth including cost of all materials, labour complete as per specification.Page No. 15 Item No.4.36 W W1 V V1 Parapet wall

3 17 8 10 1

2.10 1.50 0.60 1.50 48.40

0.10 0.10 0.10 0.10 0.10

0.63 2.55 0.48 1.50 4.84 10.00 sqm

441.00

19

LINTEL BEAMS: KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of mix 1:1.5:3 with 20mm and down size graded granite metal, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation plinth and ground floor level for retaining walls, return walls, walls (any thickness) including attached plasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window cills, fillets etc., including cost of all materials, labour, HOM of machinery, curing, complete as per specifications.Page No. 12 Item No.4.11 For Outer walls For Intermediate walls 1 1 1 100.00 20.70 15.01 0.23 0.23 0.15 0.20 0.20 0.20 4.60 0.95 0.45 6.00

cum

4231.00

20

CENTERING FOR LINTELS KSRB 4-6.7 : Providing

and

removing

centering,

shuttering, strutting, propping etx., and removal of form work for sides and soffits of beams, beam haunchings, cantilever girders, bressumers and lintels not exceeding 1 m in depth including cost of all materials, labour complete as per specifications.Page No. 15 Item No.4.34 For Outer walls For Intermediate walls 2 2 2 100.00 15.01 10.00 0.20 0.20 0.20 40.00 6.00 4.00 50.00 Sqm

151.00

SL.No

DESCRIPTION OF ITEM CHAJJA: KSRB 4.2.10 : Providing and laying in position reinforced cement concrete of mix 1:1.5:3 (M20) with 12 mm and down size graded granite metal, machine mixed, well compacted for plain chajja of 7.5 cms. Average thickness, upto ground floor level, including cost of all materials, labour, HOM of machinery, finishing, curing, complete as per specifications.Page No. 13 Item No.4.19 W W1 GW V V V1 Drop from slab

NO

Qty

UNIT

RATE

21

3 8 2 7 1 5 1

2.40 1.80 2.30 0.90 0.90 1.80 48.59

0.67 0.67 0.67 0.67 0.37 0.67 0.45

4.82 9.65 3.08 4.22 0.33 6.03 21.86 50.00 Sqm

336.00

22

Centering to Chajja:

KSRB 4-6.10 : Providing and

removing centering, shuttering, strutting, propping etc., for chajjas, corbels etc., including edges including cost of all materials, labour complete as per specification.Page No. 15 Item No.4.37 W W1 GW V V V1 Drop from slab 3 9 2 7 1 8 2 2.40 1.80 2.30 0.90 0.90 1.80 46.71 0.67 0.67 0.67 0.67 0.37 0.67 0.45 4.82 10.85 3.08 4.22 0.33 9.65 42.03 75.00 Sqm

160.00

23

ROOF BEAM:KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of mix 1:1.5:3 with 20mm and down size graded granite metal, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation plinth and ground floor level for retaining walls, return walls, walls (any thickness) including attached plasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window cills, fillets etc., including cost of all materials, labour, HOM of machinery, curing, complete as per specifications.Page No. 12 Item No.4.11 FB1 FB2 FB3 FB4 FB6 FRB FSB RIB beam 1 1 2 3 3 1 1 1 15 1 33.58 40.00 7.83 6.33 9.37 30.00 25.30 35.20 1.24 19.08 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.3 0.30 0.30 0.30 0.45 0.45 0.45 0.60 0.45 0.45 0.45 0.45 3.02 3.60 2.11 2.56 3.79 5.40 20.49 cum 3.42 4.75 2.511 2.5758 13.25 cum

4231.00

4281

24

CENTERING FOR ROOF BEAMS

SL.No

KSRB

4-6.7

DESCRIPTION OF ITEM Providing and removing

NO centering,

Qty

UNIT

RATE

shuttering, strutting, propping etx., and removal of form work for sides and soffits of beams, beam haunchings, cantilever girders, bressumers and lintels not exceeding 1 m in depth including cost of all materials, labour complete as per specifications.Page No. 15 Item No.4.34 FB1 FB2 FB3 FB4 FB6 FRB FSB RIB beam 2 2 8 6 14 2 2 1 2 1 30 15 2 1 60.78 39.87 3.13 2.53 3.75 28.78 25.30 25.3 35.20 35.20 1.24 1.24 19.08 19.08 0.30 0.30 0.45 0.45 0.45 0.60 0.45 0.30 0.45 0.30 0.45 0.3 0.45 0.30 36.47 23.92 11.28 6.84 23.61 34.54 136.65 Sqm 22.77 7.59 31.68 10.56 16.74 5.58 17.17 5.72 117.82 Sqm

151.00

154.00

25

ROOF SLAB :KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of mix 1:1.5:3 with 20mm and down size graded granite metal, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation plinth and ground floor level for retaining walls, return walls, walls (any thickness) including attached plasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window cills, fillets etc., including cost of all materials, labour, HOM of machinery, curing, complete as per specifications.Page No. 12 Item No.4.11 Deduction O.T.S For Dome Staircase 1 -2 -1 -1 953.50 12.60 19.80 17.40 0.15 0.15 0.15 0.15 143.03 -3.78 -2.97 -2.61 133.67

cum

4231.00

26

Centering to Roof slab KSRB 4-6.2 : Providing

and

removing

centering,

shuttering, strutting, propping etx., and removal of form work for flat surface such as suspended floors, roofs, landings, balconies ad likes, thickness upto 200 mm including cost of all materials, labour complete as per specifications.Page No. 14 Item No.4.29 Deduction O.T.S Staircase 1 400.39 -2 -1 12.60 17.40 400.39 -25.20 -17.40 357.79 Sqm

207.00

SL.No

DESCRIPTION OF ITEM G.I.SHEET Roof covered by high tensile steel 550 Mps yield stress [ASTM A 446 grade-E) with hot dip metallic 14th coating of A2-Zn alloy (150 GMS/sqm total of both sides) A-Z 150 ( as per ASTM or AS 1397) bare galvallum sheet with hot dip metallic coating, including loading, unloading & transportation charges including lapping wastages, self drilling screw with EPOM rubber washer labour charges lifting fixing bare galvallum sheet for roofing and hammer drilling. Providing silicon setalent temporary electrical supply & required scaffolding.

NO

Qty

UNIT

RATE

27

For Staircase 27.a For Dome Portion with Polycorbonate sheets with fabrication.including rising of columns & ring beam 28 Expansion joint KSRRB 2600-2-2:Providing

17.40

17.40 Sqm

865.00

19.80

19.80 Sqm

15151.52

and

fixing

20mm

thick

compressible fibre board in expansion joint complete as per drawing and technical specification including cost of materials, labour, complete as specification Specification No KRBS 2100 MOST Specification No 2100 (Item No 31.3 page No 212 For beams at slabs For columns 32 HAND RAILS Providing and fixing stainless steel hand rails for a height of 900 mm using 62.50mm dia of 16 gauge for top measure and verticals at 1.50m C/c and 50mm dia of gauge stainless steel pipes of 4 rows below top measure at equal intervels including fixing with 50mm dia G.I pipe including cutting, welding,bending wherever necessary with suitable caps at top and bottom etc.,complete finishing with mat/shining finishing etc.,complete as per technical specification and as directed by the Engineer-incharge of work. HAND RAILS Connecting rods 2 4 4.50 1.00 9.00 4.00 13.00 M 4 8 5.57 4.00 22.28 32.00 54.28

123.00

4020.00

32.a KSRB 15-18.2 : Providing and fixing plaster mesh 150mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120gms per sqm width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour, for fixing complete as per specifications. (length of mesh only be measured for payment) (Item No 15.35) page No 98 ESTATE OFFICE STORE ROOM ANTI CHAMBER TOILET 1.50 1 1 1 1 7.00 3.53 3.12 2.32 7.00 3.53 3.12 2.32

SL.No

DESCRIPTION OF ITEM PA. CHAMBER PRI. CHAMBER PASSAGE STORE ROOM Confi. Room CONFE. ROOM PANTRY TOILET W.C TOILET PASSAGE TOILET TOILET MAIN OFFICE & Record room area

NO 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

L 3.60 7.09 2.02 2.76 3.41 5.30 11.56 4.47 2.37 1.85 3.09 2.73 4.77 4.28 24.71

Qty UNIT 3.60 7.09 2.02 2.76 3.41 5.30 11.56 4.47 2.37 1.85 3.09 2.73 4.77 4.28 24.71 100.00 M

RATE

30.60

33

CEILING PLASTER:KSRB 15.3.13 : Providing 12mm thick cement plaster in single coat with cement mortar 1:3, to ceiling including rounding off corners wherever required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications.(Item No 15.21) page No 97 ESTATE OFFICE STORE ROOM ANTI CHAMBER TOILET PA. CHAMBER PRI. CHAMBER PASSAGE STORE ROOM Confi. Room CONFE. ROOM PANTRY TOILET W.C TOILET PASSAGE TOILET TOILET MAIN OFFICE & Record room area AREA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2.46 1.49 0.91 0.91 1.68 2.21 0.53 0.53 1.39 1.13 4.76 1.94 0.88 0.53 1.37 0.73 1.46 1.13 98.22 99.18 5.20 2.07 2.73 1.50 1.74 5.90 1.90 3.05 2.10 5.59 7.00 2.48 1.65 1.65 1.65 2.55 4.03 4.03 12.80 3.07 2.50 1.37 2.92 13.04 1.01 1.62 2.92 6.33 33.32 4.82 1.46 0.88 2.26 1.86 5.88 4.54 98.22 99.18 300.00 Sqm

108.00

34

PLASTERING INSIDE:KSRB 15.3.9 : Providing 18mm thick cement plaster in single coat with cement mortar 1:6, to brick masonry including rounding off corners wherever required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications.(Item No 15.17) page No 109 ESTATE OFFICE STORE ROOM ANTI CHAMBER TOILET PA. CHAMBER PRI. CHAMBER PASSAGE 2 2 2 2 2 2 2 2 7.66 3.56 3.64 2.41 3.42 8.11 2.43 3.58 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 59.00 27.37 28.07 18.60 26.33 62.45 18.71 27.57

SL.No

DESCRIPTION OF ITEM STORE ROOM Confi. Room CONFE. ROOM PANTRY TOILET W.C TOILET PASSAGE STAIRCASE TOILET TOILET MAIN OFFICE & Record room area Beam sides FB1 FB2 FB3 FB4 FB6 FRB FSB RIB beam

NO 2 2 2 2 2 2 2 2 4 2 2 2 2 2 2 8 6 14 2 2 1 2 1 30 15 2 1 38 6

L 3.49 6.72 11.76 4.42 2.53 2.18 3.02 3.28 6.40 5.49 5.16 222.21 224.38 151.94 99.67 7.83 6.33 9.37 67.80 25.30 25.30 35.20 35.20 1.24 1.24 19.08 19.08 0.90 0.72

D 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85 0.30 0.30 0.45 0.45 0.45 0.60 0.45 0.30 0.45 0.30 0.45 0.30 0.45 0.30 4.00 4.00

Qty UNIT 26.89 51.76 90.56 34.07 19.51 16.79 23.26 25.25 98.56 42.26 39.71 1711.02 1727.73 91.16 59.80 28.19 17.09 59.03 81.36 22.77 7.59 31.68 10.56 16.74 5.58 17.17 5.72 136.80 17.34 4784.05 8.40 3.36 7.20 23.04 21.60 4.80 9.45 38.25 2.88 9.00 127.98 4656.07 Sqm

RATE

Columns

Deduction MD CG D D1 D2 SD W W1 V V1 Net Qty

1 1 2 8 10 2 3 17 8 10

3.50 1.40 1.50 1.20 0.90 1.00 2.10 1.50 0.60 1.50

2.40 2.40 2.40 2.40 2.40 2.40 1.50 1.50 0.60 0.60

107.00

35

Plastering outside:-KSRB 15.3.9 : Providing 18mm thick cement plaster in single coat with cement mortar 1:6, to brick masonry including rounding off corners wherever required smooth rendering, Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications.(Item No 15.17) page No 109 1 2 9 9 4 163.05 11.00 1.41 1.41 1.80 4.15 2.40 4.00 2.40 2.40 676.66 52.80 50.90 30.46 17.28 828.09 8.40

Col

Dedution MD

3.50

2.40

SL.No

DESCRIPTION OF ITEM CG D D1 D2 W W1 V V1 50% of deduction Net Qty Parapet

NO 1 2 4 5 3 17 8 10

L 1.40 1.50 1.20 0.90 2.10 1.50 0.60 1.50 0.50

D 2.40 2.40 2.40 2.40 1.50 1.50 0.60 0.60

100.86 0.90

155.00

Qty UNIT 3.36 7.20 11.52 10.80 9.45 38.25 2.88 9.00 100.86 50.43 777.66 sqm 279.00 sqm

RATE

107.00 107.00

36

WOODEN FRAMES:KSRB 9.4-3 : Providing Matti / Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, HOM of machineries complete as per specifications. Page No. 44 Item No.9.12 MD 1 x 2 = 2 1x2=2 D2x2=4 2 X 2 =4 D1 8 x 2 =16 8X 2 =16 D2 10 x 2 = 20 10 x 2 = 20 2 2 4 4 2 16 16 8 20 20 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 0.125 2.40 3.50 2.40 1.50 0.30 2.40 1.20 0.30 2.40 0.90 0.05 0.07 0.09 0.06 0.01 0.36 0.18 0.02 0.45 0.17 1.44 Cum

54343.00

36.a KSRB 9-27.2 : Fixing of door frame in an existing opening including embeeding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debries with lead upto 50 m including cost of materials, labour charges, complete as per specifications.Page No. 58 Item No.9.81 11 11.00 No.s 655.00

50

GRILL WORK:KSRB 7.9 : Providing and fixing M.S. grill work for windows and ventilators weighing 21kg/sqm using M.S. flats, or M.S. square rods, or combinatioon of M.S. flats and square as per approved design, drawing including cutting steel sections and welding the same to required pattern with a coat of red lead primer, cost of materials, fixtures, labour and HOM of machinery complete as per specifications. Page No.30 Item No.7.9 W W1 GW V 2 8 1 3 2.10 1.50 2.00 0.60 1.50 1.50 1.80 0.60 6.30 18.00 3.60 1.08

SL.No

DESCRIPTION OF ITEM V1

NO 5

L 1.50

D 0.60 33.48

21.00

Qty UNIT 4.50 33.48 sqm 703.08 Kg

RATE

64.30

58

H.Y.S.D. steel:KSRB 4.9.2 : Providing H.Y.S.D. steel (Cold, Twisted ) reinforcement for R.C.C. work including straightening, cutting, bending, hooking, placing in

position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per specifications.Page No. 16 Item No.4.46 Footing Plinth beam Column Lintel beams Chajja Roof beam Roof slab Staircase 1.15% 59 COMPACTION Flagging area :KSRRB 300-7.3 : Compaction of original ground with maximum of 6 passes of 8 to 10 tonnes power roller including filling in depression occuring during rolling including cost of all labour, HOM of machinery complete as per specifications. Specification No. KRBS 300-1, 300.5 MORT & H Specification No. 301 to 305 (Item No 19.64) page No 133 Area = 199.7sqm KSRB 4-1.3 : Providing and laying in position plain cement concrete of mix 1:4:8 using 40mm and down size graded granite metal machine mixed, concrete laid in layers not exceeding 15 cms. Thick, well compacted, in foundation and plinth, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Page No. 12 Item No.4.3 61 Providing shahabad /cudappa stone FLOORING 40 mm thick set in CM 1:8 with cement pointing 1:3 proportion etc.., complete (Item No 37.80 page No 237 DSR.200910 . 62 KSRB 8.6-5 : Providing and fixing on wall surface 4.0kg/sq.cm H.D.P.E. rain down water pipes 110 mm outer dia approved make and brand with necessary specials like shoes, bends and offsets fixed with iron clamps, wall plugs, screws, including cost of materials, labour, curing complete as per specifications.Page No.41 Item No.8.19 7 5.05 35.35 RMt 421.00 1 199.70 199.70 sqm 478.00 1 199.70 0.10 19.97 sqm 2876.00 #REF! #REF! #REF! 6.00 4.00 33.75 133.67 #REF! #REF! cum #REF! Qtl

50.00

0.080

#REF!

0.0115

78.50

4691.00

199.70

199.70 sqm

3.08

60

SL.No

DESCRIPTION OF ITEM Outlet for Open to sky Providing & fixing nahni trap with inspection chamber for open to sky

NO 2 2

L 8.19

Qty

UNIT

RATE 421.00 8365.00

16.38 RMt 2.00 each

63

KSRB 10-3 : Providing and laying integral cement based waterproofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc., consisting of following application. (a) Applying and grouting a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with proprietary water proofing compound conforming to IS:2645 over the RCC slab after cleaning the surface before treatment. (b) Laying cement concrete using broken brick bats 25mm to 100mm size with 50% of cement mortar 1:5 admixed with proprietary water proofing compound conforming IS:2645 over 20mm thick layer of cement mortar 1:5 admixed with proprietary water proofing compound to required slope and treating similary water proofing compound to required slope and treating similarly the adjoining walls upto 300mm height including rounding off junctions of walls and slabs. (c) After two days of proper curing, applying a second coat of cement slurry admixed with proprietary water proofing compound (d) Finishing the surface wit h20mm thick jointless cement mortar of mix 1:4 admixed with proprietary water proofing compound and finally finishing the surface with trowel and neat cement slurry and making of 300x300mm sqare. (e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test including cost of materials, labour complete as per specifications. Page No. 56 Item No.10.30 Deduction O.T.S Dome portion Staircase 1 -2 -1 -1 953.50 12.60 19.80 17.40 953.50 -25.20 -19.80 -17.40 891.10 sqm

518.00

DIST: GULBARGA

AMOUNT

247495.23 19223.95

9618.06 96126.66

52997.69

AMOUNT

6614.78

4410.00

25395.65

7550.60

AMOUNT

16800.72

11999.44

86713.50

56741.66

AMOUNT

20633.81

18143.66

565536.62

74061.50

AMOUNT

15051.00

300000.10

6676.44

52260.00

AMOUNT

3060.00

32400.13

AMOUNT

498199.18

AMOUNT

83210.04 29853.00

78457.71

7205.00

AMOUNT

45208.04

#REF!

615.08

57433.72

95456.60

14882.35

AMOUNT 6895.98 16730.00

461589.80 #REF!

PROVIDING ELECTRIFICATION TO ADMINISTRATIVE BUILDING FOR PROPOSED CONSTRUCTION OF GOVT. POLYTECHNIC COLLEGE AT AFZALPUR IN GULBARGA DIST. SL. No. Particulars of item Unit 1 Concealed system: Supplying 20mm dia 2mm thick 2.5mm thick heavy guage PVC conduit pipe with suitable size bends, metal/ PVC junction boxes adhesive paste etc, & running before concrete the slab. The conduit shall be tied to the reinforcement rods by using binding wires & unused ways of junction boxes and pipe ends should be covered using PVC and enclosures run with 18 SWG GI fish wire wherever necessary. DSR item No. 2(a) Page No.2a & 2b 19/20mm dia 2mm thick rate as per D.S.R =27 & 5% for A.Wt total rate = 28.35 b 25mm dia 2mm thick rate as per D.S.R =35 & 5% for A.Wt total rate = 36.75 a 2 Qty Rate Amount

Rmt

640.00

28.35

18144.00

Rmt

520.00

36.75

19110.00

Groove cutting : supplying dia 200/2.5mm thick heavy gauge PVC conduit pipe with bends metal junction boxes adhesive paste etc and bracing U or J hooks and ceent plastering up to the surface of the brick level and run with 18 SWG GI fish wire run through out the conduit whever necessary DSR item No. 3(a) Page No.2 a) 19/20mm dia 2mm thick a rate as per D.S.R =35 & 5% for A.Wt total rate = 36.75 Rmt b 25mm dia 2mm thick rate as per D.S.R =46 & 5% for A.Wt total rate = 48.3 Rmt 3 Supplying and flush mounting teak wooden box without front plank made of not less than 12mm thick wood after due groove cutting necessary masonry patch work complete . DSR item No. 6 Page No.3 12x9x3 (300x228x76mm) rate as per D.S.R =70 & 5% for A.Wt total rate = 73.50

210.00

36.75

7717.50

120.00

48.30

5796.00

No

18.00

73.50

1323.00

b 10x7x3 (254x178x76mm) rate as per D.S.R =60 & 5% for A.Wt total rate = 63 c rate as per D.S.R =48 & 5% for A.Wt total rate = 50.40

No No

10.00 8.00

63.00 50.40

630.00 403.20

point wiring using class A Materials:

8. point

wiring using copper wire without switch Supplying and fixing adopting loop system in exisng PVC Conduit / casing caing using copper PVC insulated multi strand 2x1.5Sqmm copper wire with a6Amps flush typ DSR item No. 8 Page No.4 II. point wiring using class A Materials a I a) short point upto 3Mtr from tapping to out let via switch rate as per D.S.R =155 & 5% for A.Wt total rate = 162.75 b medium point above 3Mtr upto 6Mtr from tapping point to out let via switch box rate as per D.S.R =240 & 5% for A.Wt total rate = 252 c Long pint above 6Mtr upto 10Mtr from tapping point to out let via rate as per D.S.R =355 & 5% for A.Wt total rate = 367 5 Supplying 6A flush/projected type socket and a 6 amps flush/ projected type SP switch either surface/flush mounting in a existing gang box or in a 4mm thick plasti sheet and fixing over a flush mounted wooden box and wiring using necessary capacity wires as required .SR item no. 12 (b) page no. 6 4 Module rate as per D.S.R =90 & 5% for A.Wt total rate = 94.50

No

40.00

162.75

6510.00

No

50.00

252.00

12600.00

No

54.00

367.00

19818.00

No

38.00

94.50

3591.00

Supplying &fixing backlite DP socket/switch with/Without neion indiator over eisting of wood or flush mounting in plastic plate/niteches 16 amps flush type universal sket II.a) 32Amps Flush/projecte type DP switch SR item no. 14 (II) a page no. 6 Using Group A material 32Amps Flush/projecte type DP switch a rate as per D.S.R =120 & 5% for A.Wt total rate = 126.00 b rate as per D.S.R =95 & 5% for A.Wt total rate = 99.75 6 7 Wiring for lighting/power circuit using oe of PVC insulated 1100v grade mltis and Copper conductor single core cable in open or consealed system of wiring . II e) 6 sqmm SR item no. 20 (I) page no. 9 Group A materials a 2.5sqmm rate as per D.S.R =21 & 5% for A.Wt total rate = 22.05 b 4 sqmm rate as per D.S.R =30 & 5% for A.Wt total rate = 31.50

No No

17.00 17.00

126.00 99.75

2142.00 1695.75

Rmt

3200.00

22.05

70560.00

Rmt

2100.00

31.50

66150.00

6 sqmm rate as per D.S.R =50 & 5% for A.Wt total rate = 52.50 Supplying 4mm thick plastic sheet with necessary nitches for fixing switches regulators etc and fixing on existing wooden or metal box using NF screws.SR item no. 22 page no. 10 rate as per D.S.R =0.2 & 5% for A.Wt total rate = 0.21

Rmt

240.00

52.50

12600.00

No

24950.00

0.21

5239.50

Supplying and fixing PBBC bakelite straight or slant batten holder and wiring within 60w/230 volts lamps . b) Group A SR item no. 2 (b) page no. 13 Group A rate as per D.S.R =55 & 5% for A.Wt total rate = 57.75

No

26.00

57.75

1501.50

10 Supplying surface mounted type mirror optic luminaries for single/ Twin 36/40watts fluorescent lamps cross rising of stove enameled deep coloured MS low profile housing complete with all accessories and high purity anodized aluminum reflector assembling along with cross louvers including necessary fluorescent tubues with low loss open construction copper wound ferromagnetic ballast starters etc complete set . DSR item No. 5 II (b) Page No. 17 b) Group A rate as per D.S.R =3300 & 5% for A.Wt total rate = 3465.00 11 Supply of Spcial type lamps .18 Watts CFL DSR item No. 21 Page No. 43 rate as per D.S.R =280 & 5% for A.Wt total rate = 294 12 No

No

29.00

3465.00

100485.00

No

26.00

294.00

7644.00

Supplying capacitor type ceiling Fan complete with down rod blades shackle caopies etc for operation on 230volts 50 cycles Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system . DSR item No. 23 (II) Page No. 23 rate as per D.S.R =1850 & 5% for A.Wt total rate = 1942.50

No

36.00

1942.50

69930.00

13 22). Supplying of 144orpm heavy duty exhust fan with bracket blades suitable for opeate on 230V 50Hz AC supply compete . I. Group A DSR item No. 22 Page No. 22 rate as per D.S.R =2550 & 5% for A.Wt total rate = 2677.50

No

8.00

2677.50

21420.00

14 Supplying High pressure sodium vapour street light fitting die cast aluminium canopy with aluminum housing for control gear finished stove enamel gray glassy white canopy interior with a pair of anodized aluminum reflectors clear acrylic bowl gasket lining for drip inseat resistance duly with porcelain holder copper choke igniter and HPF condenser including sodium vapour lamp . DSR item No.12 (II) a Page No. 19 rate as per D.S.R =6450 & 5% for A.Wt total rate = 6772.50

no

1.00

6772.50

6772.50

15 Supplying decorative horizontal type street light fluorescent fitting weather and water proof complete with low loss open construction copper wound ferromagnetic ballast starter locking type brass contact holders with 1 no of 4 feet 40 watts fluorescnt tube completely wired for use on 230/250 volts 50 cycles AC Supply with opal reeded Perspex cover at bottom complete fitting .DSR item No. 6 (II)Page No.17 Group B rate as per D.S.R =1850 & 5% for A.Wt total rate = 1942.50 16 supplying all types & all capacities fluorescent false ceiling/spot light/CFL fittings indoor on the wall/ceiling/rafters/girders using 23/ 0.0076 twin twisted PVC insulated wires, required nos of round blocks and clamps (if required). DSR item No. 7 a Page No.27 On wall/ ceiling Rafter/Girders. rate as per D.S.R =85 & 5% for A.Wt total rate = 89.25

no

3.00

1942.50

5827.50

No

52.00

89.25

4641.00

17 8).Fixing a ceiling fan/Wall mounting fan of all capacities and all types to the existing Shook together with supplying and fixing a 5 ampers ceiling rose ncessary length of 23/0.0076 inch PVC insulated twin twisted copper wire and wiring completely . DSR item No. 8 Page No. 27 rate as per D.S.R =95 & 5% for A.Wt total rate = 99.75 18 12). Fixing one exhaust fan in the nitch already left in the wall with bolts and nuts and 5 amps ciling rose with sufficient length of 23/ 0.0076 inch PVC insulated twin core wire of approved make .DSR item No.12 Page No.27 rate as per D.S.R =280 & 5% for A.Wt total rate = 294 No 8.00 294.00 2352.00

No

36.00

99.75

3591.00

19 Supplying and fixing mm dia class A GI pipe brackets upto 2.7meters long for fixing MV/SV/MH/FTL street light fitting of all capacities on rail/RCC/wall/tubular pole suitable clamps bolts and nuts and wiring using suitable capacity wires etc complete. b DSR item no 2 b. Page no 26. rate as per D.S.R =850 & 5% for A.Wt total rate = 892.50 20 1 ). Supplying & fixing mm dia class A GI pipe bracket up to 2 mtrs long bent at suitable angle and fixing to this bracket 1x40/2x40 watts fluorescent tube street light fitting of all capacities to GI or CI or rail or RCC pole / wall using suitable clam DSR item No.1 Page No. 26 Using 25mm dia GI pipe rate as per D.S.R =550 & 5% for A.Wt total rate = 577.50 21 14) Supplying and fixing regular MCB distribution boards on wall/ woodboard / flush mounting using required clamps bolts bolts nuts ect.. with provision for fixing suitable type capacity MCB,s single phase /3 phase/ single door with powder coated paint DSR item No.14 Page No.36 II-Double Door 12Way SP & N rate as per D.S.R =1450 & 5% for A.Wt total rate = 1522.50 I- Single Door 12Way SP & N rate as per D.S.R =1050 & 5% for A.Wt total rate = 1102.50 22 Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and wiring complete as required.DSR item No.13.C Page No. 34 5-32Amps SP Group A rate as per D.S.R = 200 & 5% for A.Wt total rate =210 5-32Amps DP Group A rate as per D.S.R =540 & 5% for A.Wt total rate = 567 5-32Amps TPN Group A rate as per D.S.R =1075 & 5% for A.Wt total rate = 1128.75

No

1.00

892.50

892.50

No

3.00

577.50

1732.50

No

4.00

1522.50

6090.00

No

2.00

1102.50

2205.00

No

29.00

210.00

6090.00

No

8.00

567.00

4536.00

No

4.00

1128.75

4515.00

23 Supplying Fixing palished wood bond market Rate 2800.00/ sqmt. Market rate 2800 Sqm 24 Supplying of Switch disconnector fuse unit (TPN) HRC type (but without HRC fuses). DSR item No.4 Page No. 31

1.20

2800.00

3360.00

250 amps Group A rate as per D.S.R =6875 & 5% for A.Wt total rate = 7218.75 125 amps Group A rate as per D.S.R =4375 & 5% for A.Wt total rate = 4593.75 25 Supplying of on load change over switches 4 poles 415V 50Hz AC Supply. DSR item No.7 Page No. 32 250 amps Group A rate as per D.S.R =15950 & 5% for A.Wt total rate = 16747.50 26 Supplying and fixing of LED type panel board indicating lamp with requird colour suitable for 220v AC 50 Hz 12/24v DC. DSR item No. 35 Page No. 38 rate as per D.S.R =425 & 5% for A.Wt total rate = 446.25

No

2.00

7218.75

14437.50

No

2.00

4593.75

9187.50

No

1.00

16747.50

16747.50

No

1.00

446.25

446.25

27 Supplying and fixing angle iron frame work fabricated out of M.S angle iron and M.S flat .. with bolts washhe etc and painted with 2 coats of red oxide and then two coats of approved paint . DSR item No.38 Page No.39 a) 40x40x6 mm rate as per D.S.R =210 & 5% for A.Wt total rate = 220.50 Rmt 28 Fixing of Amps TPST/ change over switch/ Contactor along wth neutral link with screws bolts nuts and wiring using required capacity wires and circuit labeling . DSR item No.16 Page No.28 a) 100A to 250A TPST rate as per D.S.R =490 & 5% for A.Wt total rate = 514.5 29 Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts bolts and wshers ect .. complete .DSR item No.3 Page No.30 200Amps rate as per D.S.R =825 & 5% for A.Wt total rate = 866.25

4.40

220.50

970.20

No

4.00

514.50

2058.00

No

6.00

866.25

5197.50

30 Supplying of LT UG cable having aluminium conductor PC insulated sheathed galvanized steel wire/steel tap aroured cable with PVC outer sheathing 1,1 KV class. DSR item No. 10(II) Page No. 68 f) 3.5 core 35 sqmm ,, rate as per D.S.R =250 & 5% for A.Wt total rate = 262.50 Rmt

120.00

262.50

31500.00

31 Supplying and fixing L.T cast lron pot heads suitable for 1.1 KV calss UG cable filled with necessary bitumen/nsulating compound complete with terminals clamps bolts nuts and washers ect item No. 16(e) Page No. 69 50Sqmm rate as per D.S.R =500 & 5% for A.Wt total rate = 525 DSR

No

1.00

525.00

525.00

32 11. Ladour charges for laying of 1.1KV class UG cable when supplied agency in existing trench GI pipe/ stoneware pip[e / on wall/on pole as required. DSR item No. 11 I Page No. 68 b. 25 sqmm to 75 sqmm rate as per D.S.R =8 & 5% for A.Wt total rate =8.40 Rmt 33 11. Digging of trench of 0.6m deepx 0.50 mtr wide refilling the trench to the required ground level and consolidating ect complete (As per Civil SR KSRB I-2, P7) b) In soil (hard) rate as per D.S.R =50 & 5% for A.Wt total rate = 52.5 Rmt 34 Supplying and fixing of class A (medium duty) GI pipe of wall thich ness not less than 3.25mm on pole/wall/drain crossing with necessary clamping arrangements for UG cable of 1.1 KV class . DSR item No. 15 Page No. 69 (a) e. 100mm rate as per D.S.R =660 & 5% for A.Wt total rate = 693 Rmt 35 25. Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the following sizes . DSR item No. 26 Page No. 72 25 sqmm Alluminium or copper wire rate as per D.S.R =22 & 5% for A.Wt total rate =23.10 36 Supplying fixing wiring earth electrode for grounding of lifts transformer DG sets etc,usiong 40mm dia 2,5 mm thick 2.5 mtr long GI pipe with GI funnel with esh & suitable size reducer fixed on the top of the earth electrode.The funnel should be enclosed in CC chamber of 400x400-x400mm with a cast iron cover.The earth electrode shall have straggered holes of 12mm dia & the electrode should be covered 150mm alround with alterate layers of salt & chrcoal from the bottom of the CC chamber.The conection from the electrode is to be established through GI strips using GI bolt & nuts. DSR item No. 8 Page No. 66 No

120.00

8.40

1008.00

60.00

52.50

3150.00

20.00

693.00

13860.00

12.00

23.10

277.20

rate as per D.S.R =2200 & 5% for A.Wt total rate =2310 37 Supplying and fixing of class A (medium duty) GI pipe of wall thich ness not less than 3.25mm on pole/wall/drain crossing with necessary clamping arrangements for UG cable of 1.1 KV class . DSR item No. 15 Page No. 69 b. 50mm rate as per D.S.R =260 & 5% for A.Wt total rate =273.00

No

2.00

2310.00

4620.00

No

20.00

273.00

5460.00

38 Supplying fixing wiring earth electrode for grounding conduits I.C cutouts and other equipments on the meter board using 40mm dia 2.90 thick GI pipe 2.5 mtr long buried in a pit.. The pit should be filled with eual proportion of salt and charcoal 150mm alround the pipe to complete depth. The connection from the pipe to the conduit etc is to be established through GI wire of size as oer ISI specification 7.3.3 of IS 732 using 12mm dia bolts nuts washers and checknuts etc the pipe shall have 16 through holes of 122 mm dia DSR item No. 7 Page No. 66 rate as per D.S.R =1500 & 5% for A.Wt total rate =1575 Rmt Supplying and running of GI/Copper strips for 39 1. grounding connections using necessary fixing materials as required DSR item No. 9 Page No. 67 25x6mm rate as per D.S.R =140 & 5% for A.Wt total rate =147 Mtr 40 Supplying fire extinguisher with connectected accessories complete . Dry chemical powder type DSR item No. 5 Va Page No. 62 rate as per D.S.R =2400 & 5% for A.Wt Each total rate =2520 41 Supplying Electrical rubber mat tested to 22 KV with grooved ISI mark DSR item No. 3 (a) Page No.62 { 6 x 3 x } 1.82 x 0.91 x 0.021m rate as per D.S.R =2000 & 5% for A.Wt total rate =2100

2.00

1575.00

3150.00

8.00

147.00

1176.00

1.00

2520.00

2520.00

Each

1.00

2100.00

2100.00

TOTAL

631487.10

18144

19110

0.00 0.00 0.00 0.00 0.00

7717.5

5796

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1323

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

630.000 403.2

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

6510

12600

19818

3591

0.00 0.00 0.00 0.00 0.00

2142.000 1695.750

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

70560.0

66150.000

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

12600

0.00 0.00 0.00 0.00

5239.5

0.00 0.00 0.00 0.00 0.00

1501.500

0.00 0.00 0.00 0.00 0.00

100485.000

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

7644

69930

0.00 0.00 0.00 0.00

21420

0.00 0.00 0.00 0.00

6772.5

0.00 0.00 0.00 0.00 0.00

5827.5

0.00 0.00 0.00 0.00 0.00

4641

0.00 0.00 0.00 0.00 0.00 0.00

3591

0.00 0.00 0.00 0.00

2352

0.00 0.00 0.00 0.00

892.5

0.00 0.00 0.00 0.00

1732.5

0.00 0.00 0.00 0.00 0.00

6090

2205

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

6090

4536

4515

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3360

0.00

14437.5

9187.5

0.00 0.00 0.00 0.00 0.00 0.00 0.00

16747.5

0.00 0.00 0.00 0.00 0.00

446.25

0.00 0.00 0.00 0.00

970.2

0.00 0.00 0.00 0.00 0.00

2058

0.00 0.00 0.00 0.00 0.00

5197.5

0.00 0.00 0.00 0.00 0.00

31500

0.00 0.00 0.00 0.00 0.00

525

0.00 0.00 0.00 0.00 0.00

1008

0.00 0.00 0.00 0.00 0.00

3150

0.00 0.00 0.00 0.00 0.00

13860

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 277.2 0.00 0.00

0.00

4620

0.00 0.00 0.00

5460

0.00 0.00 0.00 0.00

3150

0.00 0.00 0.00 0.00

1176

0.00 0.00 0.00 0.00 0.00 0.00 0.00 -40215.00 0.00 0.00

42735

2100

0.00 0.00 0.00 0.00

668741.10 668741.10

PROVIDING ELECTRIFICATION TO ADMINISTRATIVE BUILDING FOR PROPSED CONSTRUCTION OF GOVT. POLYTECHNIC COLLEGE AT AFZALPUR IN GULBARGA DIST.
SL.No. Particulars of item Unit Concealed system: Supplying 20mm dia 2mm thick 2.5mm thick heavy guage 1 PVC conduit pipe with suitable size bends, metal/ PVC junction bxes adhesive paste etc, & running before concrete the slab. The conduit shall b tied to the reinforcement rods by using binding wires & unused ways of junction boxes and pipe ends should be covered using PVC and enclosures run with 18 SWG GI fish wre wherever necessary. DSR item No. 2(a) Page No.2a & 2b 19/20mm dia 2mm thick a rate as per D.S.R =27 & 5% for A.Wt total rate = 28.35 Rmt 25mm dia 2mm thick b rate as per D.S.R =35 & 5% for A.Wt total rate = 36.75 Rmt Qty

640.00

520.00

a b

2) Groove cutting : supplying dia 200/2.5mm thick heavy gauge PVC conduit pipe with bends metal junction boxes adhesive paste etc and bracing U or J hooks and ceent plastering up to the surface of the brick level and run with 18 SWG GI fish wire run through out the conduit whever necessary DSR item No. 3(a) Page No.2 a) 19/20mm dia 2mm thick rate as per D.S.R =35 & 5% for A.Wt total rate = 36.75 Rmt 25mm dia 2mm thick rate as per D.S.R =46 & 5% for A.Wt total rate = 48.3 Rmt

210.00

120.00

2) supplying and flush mounting teak wooden box without front plank made of not less than 12mm thick wood after due groove cutting necessary masonry patch work complete . DSR item No. 6 Page No.3 12x9x3 (300x228x76mm) rate as per D.S.R =70 & 5% for A.Wt total rate = 73.50 No 18.00

10x7x3 (254x178x76mm) rate as per D.S.R =60 & 5% for A.Wt total rate = 63 No No 10.00 8.00

rate as per D.S.R =48 & 5% for A.Wt total rate = 50.40

point wiring using class A Materials:

8. point wiring using copper wire

without switch Supplying and fixing adopting loop system in exisng PVC Conduit / casing caing using copper PVC insulated multi strand 2x1.5Sqmm copper wire with a6Amps flush typ DSR item No. 8 Page No.4 II. point wiring using class A Materials I a) short point upto 3Mtr from tapping to out let via switch rate as per D.S.R =155 & 5% for A.Wt total rate = 162.75 medium point above 3Mtr upto 6Mtr from tapping point to out let via switch box rate as per D.S.R =240 & 5% for A.Wt total rate = 252 Long pint above 6Mtr upto 10Mtr from tapping point to out let via rate as per D.S.R =355 & 5% for A.Wt total rate = 367 4 Supplying 6A flush/projected type socket and a 6 amps flush/ projected type SP switch either surface/flush mounting in a existing gang box or in a 4mm thick plasti sheet and fixing over a flush mounted wooden box and wiring a using necessary capacity wires as required .SR item no. 12 (b) page no. 6 4 Module rate as per D.S.R =90 & 5% for A.Wt total rate = 94.50 5 Supplying &fixing backlite DP socket/switch with/Without neion indiator over eisting of wood or flush mounting in plastic plate/niteches 16 amps flush type universal sket II.a) 32Amps Flush/projecte type DP switch SR item no. 14 (II) a page no. 6 Using Group B material 32Amps Flush/projecte type DP switch rate as per D.S.R =110 & 5% for A.Wt total rate = 115.5 rate as per D.S.R =90 & 5% for A.Wt total rate = 94.5 No 38.00

No

40.00

No

50.00

No

54.00

a b

No No

17.00 17.00

Wiring for lighting/power circuit using oe of PVC insulated 1100v grade mltis and Copper conductor single core cable in open or consealed system of wiring . II e) 6 sqmm SR item no. 20 (II) c page no. 9 Group B materials 2.5sqmm rate as per D.S.R =18 & 5% for A.Wt total rate = 18.90 Rmt 4 sqmm rate as per D.S.R =25 & 5% for A.Wt total rate = 26.25 Rmt

3200.00

2100.00

6 sqmm rate as per D.S.R =40 & 5% for A.Wt total rate = 42

Rmt

240.00

Supplying 4mm thick plastic sheet with necessary nitches for fixing switches regulators etc and fixing on existing wooden or metal box using NF screws.SR item no. 22 page no. 10 rate as per D.S.R =0.2 & 5% for A.Wt total rate = 0.21 Supplying and fixing PBBC bakelite straight or slant batten holder and wiring within 60w/230 volts lamps . b) Group B. SR item no. 2 (b) page no. 13 Group B rate as per D.S.R =50 & 5% for A.Wt total rate = 52.5

No

24950.00

No

26.00

Supplying surface mounted type mirror optic luminaries for single/ Twin 36/40watts fluorescent lamps cross rising of stove enameled deep coloured MS low profile housing complete with all accessories and high purity anodized aluminum reflector assembling along with cross louvers including necessary fluorescent tubues with low loss open construction copper wound ferromagnetic ballast starters etc complete set . DSR item No. 5 II (b) Page No. 17 b) Group B rate as per D.S.R =2550 & 5% for A.Wt total rate = 2677.5 Supply of Spcial type lamps .18 Watts CFL No No. 43 rate as per D.S.R =280 & 5% for A.Wt total rate = 294 DSR item No. 21 Page

No

29.00

10

No

26.00

11

Supplying capacitor type ceiling Fan complete with down rod blades shackle caopies etc for operation on 230volts 50 cycles Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system . DSR item No. 23 (II) Page No. 23 rate as per D.S.R =1850 & 5% for A.Wt total rate = 1942.50 No 36.00

12

22). Supplying of 144orpm heavy duty exhust fan with bracket blades suitable for opeate on 230V 50Hz AC supply compete . I. b) Group B DSR item No. 22 Page No. 22 rate as per D.S.R =2450 & 5% for A.Wt total rate = 2572.50 Supplying High pressure sodium vapour street light fitting die cast aluminium canopy with aluminum housing for control gear finished stove enamel gray glassy white canopy interior with a pair of anodized aluminum reflectors clear acrylic bowl gasket lining for drip inseat resistance duly with porcelain holder copper choke igniter and HPF condenser including sodium vapour lamp . DSR item No.12 Page No. 19

No

8.00

13

rate as per D.S.R =5600 & 5% for A.Wt total rate = 5880 no 1.00

14

Supplying decorative horizontal type street light fluorescent fitting weather and water proof complete with low loss open construction copper wound ferromagnetic ballast starter locking type brass contact holders with 1 no of 4 feet 40 watts fluorescnt tube completely wired for use on 230/250 volts 50 cycles AC Supply with opal reeded Perspex cover at bottom complete fitting .DSR item No. 6 (II)Page No.17 Group B rate as per D.S.R =1600 & 5% for A.Wt total rate = 1680 supplying all types & all capacities fluorescent false ceiling/spot light/CFL fittings indoor on the wall/ceiling/rafters/girders using 23/ 0.0076 twin twisted PVC insulated wires, required nos of round blocks and clamps (if required). DSR item No. 7(II) Page No.27 On wall/ ceiling Rafter/Girders. rate as per D.S.R =85 & 5% for A.Wt total rate = 89.25

no

3.00

15

No

52.00

16

8).Fixing a ceiling fan/Wall mounting fan of all capacities and all types to the existing Shook together with supplying and fixing a 5 ampers ceiling rose ncessary length of 23/0.0076 inch PVC insulated twin twisted copper wire and wiring completely . DSR item No. 8 Page No. 27 rate as per D.S.R =95 & 5% for A.Wt total rate = 99.75 No 36.00

17

12). Fixing one exhaust fan in the nitch already left in the wall with bolts and nuts and 5 amps ciling rose with sufficient length of 23/ 0.0076 inch PVC insulated twin core wire of approved make .DSR item No.12 Page No.77 rate as per D.S.R =280 & 5% for A.Wt total rate = 294 No 8.00

18

Supplying and fixing mm dia class A GI pipe brackets upto 2.7meters long for fixing MV/SV/MH/FTL street light fitting of all capacities on rail/RCC/wall/tubular pole suitable clamps bolts and nuts and wiring using suitable capacity wires etc complete. b rate as per D.S.R =850 & 5% for A.Wt total rate = 892.50 No 1.00

19

1 ). Supplying & fixing mm dia class A GI pipe bracket up to 2 mtrs long bent at suitable angle and fixing to this bracket 1x40/2x40 watts fluorescent tube street light fitting of all capacities to GI or CI or rail or RCC pole / wall using suitable clam DSR item No.1 Page No. 26 Using 25mm dia GI pipe

rate as per D.S.R =550 & 5% for A.Wt total rate = 577.50 20 14) Supplying and fixing regular MCB distribution boards on wall/ No 3.00

woodboard / flush mounting using required clamps bolts bolts nuts ect.. with provision for fixing suitable type capacity MCB,s single phase /3 phase/ single door with powder coated paint DSR item No.14 Page No.36 II-Double Door 12Way SP & N rate as per D.S.R =1350 & 5% for A.Wt total rate = 1417.50 I- Single Door 12Way SP & N rate as per D.S.R =925 & 5% for A.Wt total rate = 971.25 21 Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and wiring complete as required. 5-32Amps SP Group B rate as per D.S.R =150 & 5% for A.Wt total rate = 157.50 5-32Amps DP Group B rate as per D.S.R =470 & 5% for A.Wt total rate = 493.50 5-32Amps TPN Group B rate as per D.S.R =925 & 5% for A.Wt total rate = 971.25 22 Supplying Fixing palished wood bond market Rate 2800.00/ sqmt. Market rate 2800 23 Supplying of Switch disconnector fuse unit (TPN) HRC type (but without HRC fuses). DSR item No.4 Page No. 31 250 amps Group B rate as per D.S.R =5550 & 5% for A.Wt total rate = 5827.50 125 amps Group B rate as per D.S.R =925 & 5% for A.Wt total rate = 971.25 24 Supplying of on load change over switches 4 poles 415V 50Hz AC Supply. DSR item No.7 Page No. 32 250 amps Group B rate as per D.S.R =13350 & 5% for A.Wt total rate = 14017 No 2.00 Sqm 1.20 No 4.00 No 29.00 No 2.00

No

4.00

No

8.00

No

2.00

No

1.00

25

Supplying and fixing of LED type panel board indicating lamp with requird colour suitable for 220v AC 50 Hz 12/24v DC. DSR item No. 35 Page No. 38 rate as per D.S.R =350 & 5% for A.Wt total rate = 367.50

No

1.00

26

Supplying and fixing angle iron frame work fabricated out of M.S angle iron and M.S flat .. with bolts washhe etc and painted with 2 coats of red oxide and then two coats of approved paint . DSR item No.38 Page No.39 a) 40x40x6 mm rate as per D.S.R =210 & 5% for A.Wt total rate = 220.50

Rmt

4.40

27

Fixing of Amps TPST/ change over switch/ Contactor along wth neutral link with screws bolts nuts and wiring using required capacity wires and circuit labeling . DSR item No.16 Page No.28 a) 100A to 250A TPST rate as per D.S.R =490 & 5% for A.Wt total rate = 514.5

No

4.00

28

Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts bolts and wshers ect .. complete .DSR item No.16 Page No.30 200Amps rate as per D.S.R =825 & 5% for A.Wt total rate = 866.25

No

6.00

29

Supplying of LT UG cable having aluminium conductor PC insulated sheathed galvanized steel wire/steel tap aroured cable with PVC outer sheathing 1,1 KV class. DSR item No. 10(II) Page No. 68 f) 3.5 core 35 sqmm ,, rate as per D.S.R =210 & 5% for A.Wt total rate = 220.50 Rmt Supplying and fixing L.T cast lron pot heads suitable for 1.1 KV calss UG cable filled with necessary bitumen/nsulating compound complete with terminals clamps bolts nuts and washers ect DSR item No. 16(e) Page No. 69 50Sqmm rate as per D.S.R =500 & 5% for A.Wt total rate = 525

120.00

30

No

1.00

31

11. Ladour charges for laying of 1.1KV class UG cable when supplied agency in existing trench GI pipe/ stoneware pip[e / on wall/on pole as required. DSR item No. 11 I Page No. 68 b. 25 sqmm to 75 sqmm rate as per D.S.R =8 & 5% for A.Wt total rate =8.40 Rmt

120.00

32

11. Digging of trench of 0.6m deepx 0.50 mtr wide refilling the trench to the required ground level and consolidating ect complete (As per Civil SR KSRB I2, P-7) b) In soil (hard) rate as per D.S.R =50 & 5% for A.Wt total rate = 52.5 Rmt Supplying and fixing of class A (medium duty) GI pipe of wall thich ness not less than 3.25mm on pole/wall/drain crossing with necessary clamping arrangements for UG cable of 1.1 KV class . DSR item No. 15 Page No. 69 e. 100mm rate as per D.S.R =660 & 5% for A.Wt total rate = 693 Rmt 25. Supplying tinned copper lugs and crimping and wiring to terminal point for wire of the following sizes . DSR item No. 26 Page No. 72 g) 35 sqmm Alluminium or copper wire rate as per D.S.R =22 & 5% for A.Wt total rate =23.10 No

60.00

33

(a)

20.00

34

12.00

35

Supplying fixing wiring earth electrode for grounding of lifts transformer DG sets etc,usiong 40mm dia 2,5 mm thick 2.5 mtr long GI pipe with GI funnel with esh & suitable size reducer fixed on the top of the earth electrode.The funnel should be enclosed in CC chamber of 400x400-x400mm with a cast iron cover.The earth electrode shall have straggered holes of 12mm dia & the electrode should be covered 150mm alround with alterate layers of salt & chrcoal from the bottom of the CC chamber.The conection from the electrode is to be established through GI strips using GI bolt & nuts. DSR item No. 8 Page No. 66 rate as per D.S.R =2200 & 5% for A.Wt total rate =2310 Supplying and fixing of class A (medium duty) GI pipe of wall thich ness not less than 3.25mm on pole/wall/drain crossing with necessary clamping arrangements for UG cable of 1.1 KV class . DSR item No. 15 Page No. 69 rate as per D.S.R =260 & 5% for A.Wt total rate =273.00

No

2.00

36

No

20.00

37

Supplying fixing wiring earth electrode for grounding conduits I.C cutouts and other equipments on the meter board using 40mm dia 2.90 thick GI pipe 2.5 mtr long buried in a pit.. The pit should be filled with eual proportion of salt and charcoal 150mm alround the pipe to complete depth. The connection from the pipe to the conduit etc is to be established through GI wire of size as oer ISI specification 7.3.3 of IS 732 using 12mm dia bolts nuts washers and checknuts etc the pipe shall have 16 through holes of 122 mm dia DSR item No. 7 Page No. 66

rate as per D.S.R =1500 & 5% for A.Wt total rate =1575 38 1. Supplying and running of GI/Copper strips for grounding connections Rmt 2.00

using necessary fixing materials as required DSR item No. 9 Page No. 67 25x6mm rate as per D.S.R =140 & 5% for A.Wt total rate =147 39 Supplying fire extinguisher with connected accessories complete. 5 WG Dry chemical powder type DSR item No. 3 Page No. 62 rate as per D.S.R =2400 & 5% for A.Wt total rate =2520 Mtr 8.00

Each

1.00

40

Supplying Electrical rubber mat tested to 22 KV with grooved ISI mark DSR item No. 3 (a) Page No.62 { 6 x 3 x } 1.82 x 0.91 x 0.021m rate as per D.S.R =2000 & 5% for A.Wt total rate =2100 Each

1.00

OR PROPSED GULBARGA DIST.


Rate

28.35

36.75

36.75

48.30

73.50

63.00 50.40

162.75

252.00

367.00

94.50

115.50 94.50

18.90

26.25

42.00

0.21

52.50

2677.50

294.00

1942.50

2572.50

5880.00

1680.00

89.25

99.75

294.00

892.50

577.50

1417.50

971.25

157.50

493.50

971.25

2800.00

5827.50

3543.75

14017.50

367.50

220.50

514.50

866.25

220.50

525.00

8.40

52.50

693.00

23.10

2310.00

273.00

1575.00

147.00

2520.00

2100.00

ABSTRACT OF PROPOSED WATER SUPPLY AND SANITARY WORKS FOR ADMINISTRATIVE BUILDING AT GOVT. POLYTECHNIC IN AFZALPUR DIST: GULBARGA
SL NO. DESCRIPTION OF ITEMS Earth work excavation for foundation SAND & RUBBLE FILLING. P.C.C glazed stoneware pipes grade A Brick work Plastering inside: water closet European type water closet Orissa pattern wash basin Mirror Nahani trap Refilling available earth sand cast iron white vitreous china clay indian pattern C.I. manhole cover Gas pipe with cowl

QTY 30.13 2.01


2.01 50.00 3.30 14.83 4.00 3.00 7.00 7.00 13.00 24.43 13.00 5.00 3.00 L/s

UNIT cum cum


cum M cum Sqm Each Each Each Each Each cum Each Each Each

RATE 152.00 1020.00


2876.00 568.00 3678.00 122.00 3740.00 3132.00 1813.00 578.00 270.00 41.02 416.00 920.00 1900.00

AMOUNT 4579.32 2050.53 5781.68 28400.00 12136.06 1808.77 14960.00 9396.00 12691.00 4046.00 3510.00 1002.26 5408.00 4600.00 5700.00 10000.00

1
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

126069.61
Unforseen items 10%

12606.96

138676.57
Rounding off

-3676.57

135000.00

WATER SUPPLY polyethylene pipes 40mm dia 32mm dia 20mm dia stop cock bib cock brass gate valve 15mm nominal bore Over head tank (1000 ltr capacity 1 no.) Reverse Osmosise water Purifier 25mm nominal bore gun metal

78.41 78.41 54.60 19.00 8.00 6.00 4.00 1.00 1.00 8.00

M M M Each Each Each Each Each Each No.s

158.00 134.00 60.50 128.00 173.00 2225.00 785 10000.00 50000.00 441.00

12388.78 10506.94 3303.30 2432.00 1384.00 13350.00 3140.00 10000.00 50000.00 3528.00

2 3 4 5 6 7 8

110033.02
30% for fixtures 33009.906

143042.93
Rounding off

1957.07

145000.00
1 2 SANITARY WORKS WATER SUPPLY TOTAL

135000.00 145000.00

280000.00

DETAILED ESTIMATE OF WATER SUPPLY AND SANITARY WORKS FOR ADMINISTRATIVE BUILDING AT AFZALPUR DIST: GULBARGA
SL. NO DESCRIPTION OF ITEM NO 1 KSRB 2-2.1 : Earthwork excavation for foundation of buildings, culverts, water supply, sanitary lines and electrical conduits either in pits or in trenches 1.5m and above in width, in hard soil not exceeding 1.5m. in depth including dressing the bottom and sides of pits and trenches, stacking the excavated soil clear from deges of excavation with lead upto 50 m. after breaking of clods complete as per specifications. specifications. No. KBS 2.(a) / 2.3.5 Page No. 5 Item No.2.4 Drainage line 1 For chambers 10 For inspection chambers (Area) 3

Qty

UNIT

RATE

AMOUNT

50.00 0.90 1.77

0.60 0.90

0.63 0.75 1.00

18.75 6.08 5.30 30.13 cum

152.00

4579.00

2 SAND & RUBBLE FILLING. KSRB 2.8 : Filling in foundation with granite / trap broken metal 100mm. And down size, with approved sand including hand packing, ramming, watering, including cost of all materials and labour with lead upto 50m. And lift of 1.5m complete as per specifications. Page No 6 Item No.2.15 For chambers 10 For inspection chambers 3 3 P.C.C:KSRB 4-1.3 : Providing and laying in position plain cement concrete of mix 1:4:8 using 40mm and down size graded granite metal machine mixed, concrete laid in layers not exceeding 15 cms. Thick, well compacted, in foundation and plinth, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Page No. 12 Item No.4.3 For chambers 10 For inspection chambers 3

0.90 1.77

0.90

0.15 0.15

1.22 0.80 2.01 cum

1020.00

2051.00

0.90 1.77

0.90

0.15 0.15

1.22 0.80 2.01 cum

2876.00

5782.00

4 KSRB 12-1.7 : Providing and laying in position to required level or slope 450mm internal diameter salt glazed stoneware pipes grade A and jointing with stiff mixture of cement mortar in proportion of 1:1, testing of pipes and joints, including cost of materials, labour charges complete as per specifications. Page No. 59 Item No.11.9 Ground floor

50.00

50.00

720.00

36000.00

6-2.2 : Providing and 5 KSRB constructing burnt brick masonry with approved quality of non modular bricks of standard size of class desingation 50 (table moulded) with cement mortar 1:6 for basement and superstructure including cost of materials, labour charges, scaffolding, curing complete as per specificatons. Specification No KBS 6.2 Page No.25 Sec.chambers 10 For inspection chambers 3 5 KSRB 12-5.1 : Constructing brick masonry circular type manhole 0.91 m internal dia at bottom 0.91m deep and 0.56m dia at top with table moulded non-modular bricks of 50 class designation 50 in cement mortar 1:4, inside cement plastered 12mm thick with cement mortar 1:3, finished with a floating coat of neat cement, foundation concrete 1:3:6 mix using 40mm and downsize granite metal and making necessary channel in cement concrete 1:2:4 mix with 20mm and downsize granite metal finished with a floating coat of neat cement, with S.F.R.C. cover and frame (heavy duty, HD-20 grade designation) 560mm internal diametre confirming IS:12592, total weight cover and frame to be not less than 182kg, fixed in cement concrete 1:2:4, 20mm and downsize broken granite metal, providing and removing centering, shuttering including cost of materials, labour charges, HOM of mechineries complete as per specifications. (Excavation, footrests and 12mm thick cement plaster on the external surface shall be paid seperately) Page No. 60 Item No.11.37 5 KSRB 15.3.1 : Providing 12mm

0.90 1.06

0.20

0.60 0.70

1.08 2.22 3.30 cum

3678.00

12136.00

5.00 No.s

8189.00

40945.00

thick cement plaster in single coat with cement mortar 1:3, to brick masonry including rounding off corners wherever required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications.(Item No 15.21) page No 97

0.83

0.45

1.87 Sqm

108.00

202.00

6 Plastering inside:KSRB 15.3.5 : Providing 18mm thick cement plaster in single coat with cement mortar 1:4, to brick masonry including rounding off corners wherever required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications.(Item No 15.16 page No Sec.chambers 10 For inspection chambers 3

0.90 3.14

0.60

5.40 9.43 14.83 sqm

122.00

1809.00

7 KSRB 11-5 : Providing and fixing white vitreous china clay, water closet European type ( Pedestal type ) with black solid plastic seat and lid, C.P brass hinges, rubber bufers. 10 litre low level, P.V.C flushing cistern ( all are approved make ) with fittings, C.I / M.S brackets, 40mm diameter flush bend with fittings and clamps, overflow arrangements with special and 25mm mosquito proof coupling of approved design, painting of fittings and brackets, cutting and making good the wall and floor wherever required, including cost of materials, labour complete as per specifications. Page Ground floor

4.00 each

3740.00

14960.00

8 KSRB 11-2 : Providing and fixing white vitreours china clay, water closet Orissa pattern of size 580 x 440mm with integral type footrests, 100mm S or P trap, 10 litre low level, P.V.C. flushing cistern ( all are approved make ) with fiitings, C.I /M.S brackets, 32mm diameter flush pipe fittings and clamps, overflow arrangements wht specials and 25mm mosqito proof coupling of approved design, painting of fittings and brackets, cutting and making good the wall and floor wherever required, including cost of materials, labour complete as per specifications.Page No. 66 Item No.12.2 3 9 KSRB 11-11.2 : Providing and fixing white vitreous china clay, flat back wash basin size 630x450mm with a single of 15mm C.P brass pillar tap with C.I/M.S brackets, 32mm C.P brass waste of standard pattern, paintting of fittings and brackets, cutting and making good the wall and floor wherever required, including cost of materials, labour complete as per specifications.Page No. 68 Item No.12.24 Ground floor 3.00 each 3132.00 9396.00

7.00 each

1813.00

12691.00

10 KSRB 11-15.2 : Providing and fixing 450mm dia circular shape mirror with plastic moulded frame of approved make and shade with 6mm thick hard board backing including cost of materials, labour complete as per spcifications. Page No. 70 Item No.12.40 Ground floor

7.00 each

578.00

4046.00

11 providing and fixing CI Nahani trap of approved make conforming to ISI specifications and construction of cistern in CC 1:2:4 as per directions (Rate is inclusive of cost of materials anf fixtures and conveyance of materials to work spot)..Page no.76 item No.12.113.2 13 Ground floor 12 KSRB 2-4 : Refilling available earth around pipe lines, cables in layers not exceeding 20 cms. in depth. Compacting each deposited layer by ramming after watering with lead upto 50m. and lift upto 1.5m. including cost of all labor complete as per specifications allow 60% of rate considered under item KSRB 2.3 Page No.6 Item No.2.11 Drainage line 1 For chambers 10 For inspection chambers 3

13.00 each

270.00

3510.00

50.00 0.90 1.06

0.60 0.15

0.68 0.75 1.00

20.25 1.01 3.17 24.43 cum

41.02

1002.00

13 KSRB 11-18-2.1 : Providing and fixing sand cast iron soil waste bends 100mm dia with access door, insertion of rubber washers 3mm thick bolts and nut, with wpun yarn soaked in cement slurry and cement mortar 1:2 including cost of materials, labour, testing complete as per specifications. 10 Page No. 70 Item No.12.50 3

10.00 3.00 13.00 each

416.00

5408.00

14 Providing white vitreous china clay indian pattern squatting urinals with white glazed foot rests of approved quality and make conforming to ISI specifications and fixing in position with CC 1:2:4 as directed of size 50.8cmsX 38cmsX10.16cms -A grade (Rate includes cost of all materials and conveyance to work spot .(Item No 12.11 page No 57) 5 15 C.I. manhole cover with frames 610x455mm size (38 Kgs).Sl.No. 443 Page No.XVI .Code no 0067 3 3.00 each 1900.00 5700.00 5.00 each 920.00 4600.00

16 Gas pipe with cowl 19 KSRB 11-17.2 : Providing and

10000.00

fixing C.P. brass towel rail 60mm length, 20mm dia with C.P brackets, fixed to wooden cleats with C.P brass screws including cost of materials, labour complete as per specifications. Page No. v0 Item No.12.46
17 Urinal Partitions Pre polished black granite 20mm thick with fixing & finishing as per Engineerin-Charge. 20 Over flow pipes

1.00 each

657.00

657.00

8 1

0.60 2.50

1.50

7.20 Sqm 2.50 M

1722.22 96.00

12400.00 240.00

17 Unforseen items 10% TOTAL

188114.00 18811.40

206925.40

WATER SUPPLY 1 KSRB 13-1.1 : Providing and fixing

to wall, ceiling and floor galvanised/mild steel tube (20,32,40)mm dia nominal bore with fittings (medium grade weight 1.27kg/mtr) B class including cost of all materials, labour charges, HOM of equipments and testing complete as pre specificatios. ( item No. 13.2, 13.4, 13.5.) page No. 78
a. 40mm dia From over head tank to main line b. 32mm dia From main line to sec. line c. 20mm dia From main line to w.c 2 1 2 1 13 22.64 33.13 22.64 33.13 4.20 45.28 33.13 45.28 33.13 54.60 M M M M M 299.00 299.00 227.00 227.00 150.00 13539.00 9906.00 10279.00 7521.00 8190.00

2 KSRB 13-6.2-1 : Providng and fixing in position brass stop cock of approved quality 20mm nominal bore including cost of all materials, labour and HOM of equipments with all leads complete as per specifications. Specification No.KBS 13.2.2/13.3. ( item no 13.28 ) 19 page no 79.

19.00 each

128.00

2432.00

3 KSRB 13-6.1-2 : Providng and fixing in position brass bib cock of approved quality 20mm nominal bore including cost of all materials, labour and HOM of equipments with all leads complete as per specifications. Specification No.KBS 13.2.2 / 13.3. ( item no 13.24 ) page no 79. 4 KSRB 13-6. 3-8: Providing and fixing in position brass gate valve with C.I wheel of approved quality (screwed end) 80mm nominal bore including cost of all materials, labour and HOM of equipments with all leads complete as per specifications. Specification No.KBS 13.2.6 /13.3 . ( item no 13.39 ) page no 80. 5 KSRB 13-6.3-1 :Providng and fixing in position brass gate valve with C.I wheel of approved quality (screwed end) 15mm nominal bore including cost of all materials labour and HOM of equipments with all leads complete as per specifications. Specification No.KBS 13.2.2/13.3. . ( item no 13.35 ) page no 80. For 32mm 6 Over head tank PVC double layer syntex tank (1000 ltr capacity 1 no.)per market rate. 6 KSRB 13-11.1 : Providing and

8.00 each

173.00

1384.00

6.00 each

2225.00

13350.00

4.00 each

785.00

3140.00

1.00 each 10000.00

10000.00

placing on terrace, polyethylene water storage tanks with manhole lid and suitable locking arrangements, making holes of suitable diameter for inlet, outlet and over flow pipes, including cost of all materials, labour, transport charges, HOM of equipments and testing complete as per specifications. (For 1000 litre capacity) ( Item no 13.78 ) page no 93.
7 Reverse Osmosise water Purifier 8 KSRB 13-7 1-1 : Providing and fixing in position 25mm nominal bore gun metal non-return valve horizontal type of approved make including cost of all materials, labour and HOM of equipments with all leads complete as per specifications.Specification No KBS13.2.10 / 13.13 ( Item no 13.52 ) page no 81.

1.00 each

6048.00 L/S

6048.00 50000.00

8.00 No.s

441.00

3528.00 139317.00

9 Unforseen and fixtures 30% TOTAL

41795.10 181112.10

1 SANITARY 2 WATER SUPPLY GRAND TOTAL RS.

206925.40 181112.10 388037.50

SL.NO 8

DESCRIPTION OF ITEM COLUMNS:KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of mix 1:1.5:3 with 20mm and down size graded granite metal, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation plinth and ground floor level for retaining walls, return walls, walls (any thickness) including attached plasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window cills, fillets etc., including cost of all materials, labour, HOM of machinery, curing, complete as per specifications.Page No. 15 Item No.4.11

NO

Qty

6 10 KSRB 4-6.6 : Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for columns, pillars, piers, post and struts, circular or curved in plan including cost of all materials, labour complete as per specification.Page No. 15 Item No.4.33 circular columns ROOF BEAM:KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of mix 1:1.5:3 with 20mm and down size graded granite metal, machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation plinth and ground floor level for retaining walls, return walls, walls (any thickness) including attached plasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window cills, fillets etc., including cost of all materials, labour, HOM of machinery, curing, complete as per specifications.Page No. 12 Item No.4.11

0.16

2.400

2.29

2.4

1.41

2.400

20.36

23

Ring beam
24 CENTERING FOR ROOF BEAMS KSRB 4-6.7 : Providing and removing centering, shuttering, strutting, propping etx., and removal of form work for sides and soffits of beams, beam haunchings, cantilever girders, bressumers and lintels not exceeding 1 m in depth including cost of all materials, labour complete as per specifications.Page No. 15 Item No.4.34

18.1

0.3

0.3

1.629

Ring beam

2 1

18.1 18.1

0.3 0.3

10.86 5.43 16.29

35

Plastering outside:-KSRB 15.3.9 : Providing 18mm thick cement plaster in single coat with cement mortar 1:6, to brick masonry including rounding off corners wherever required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications.(Item No 15.17) page No 109

1.4

2.4

20.16

56

WATER PROOFING CEMENT PAINT KSRB 15-16.1 : Providing and finishing external walls in two coats with waterproof cement paint of approved brand and shade with primer to give an even shade after throughly brooming the surface to remove all dirt and loose powdered material, free from mortar drops and other foreign matter cost of matrerials, labour, complete as per specifications.(Item No 15.53) page No 101 H.Y.S.D. steel:KSRB 4.9.2 : Providing H.Y.S.D. steel (Cold, Twisted ) reinforcement for R.C.C. work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per specifications.Page No. 16 Item No.4.46

20.16

58

Column Ring beam 1.14 0.0114 78.5

2.29 1.629 3.92 3.92 3.507577

UNIT

RATE

AMOUNT

cum

4281.00

9805.71

Sqm

575.00

11707.09

cum

4281

6973.75

sqm

154

2508.66

sqm

110.00

2217.60

sqm

50.00

1008.00

4691 25.38

Qtl

4716.38

16543.06

50763.87