Sl no./ BOQ Description of Qty upto this Qty executed Qty executed Rate Rate Amount since
Unit BOQ Qty. Amount upto this bill Amount upto last bill Amount since last bill
MB no. Item Item bill upto last bill since last bill (in Rs.) (in Rs.) last bill
E/W in
1 1.1 m3
Excavation
487 Qazigund 1373.126 1294.076 79.050 93.55 93.55 7395.13
547 Sadura 1001.080 1001.080 0.000 93.55 93.55 0.00
468 Anantanag 5033.359 4882.930 150.429 93.55 93.55 14072.63
497 Bijbehera 2519.577 2440.377 79.200 93.55 93.55 7409.16
541 Awantipura 956.001 956.001 0.000 93.55 93.55 0.00
Total: 10,188 10883.143 10574.464 308.679 93.55 1,018,118.07 989,241.14 28,876.92 28876.92
Filling with
2 1.2 available m3
excaveted earth.
487 Qazigund 720.000 720.000 0.000 30.25 30.25 0.00
547 Sadura 0.000 0.000 0.000 30.25 30.25 0.00
468 Anantanag 3388.046 3255.287 132.759 30.25 30.25 4015.96
497 Bijbehera 0.000 0.000 0.000 30.25 30.25 0.00
541 Awantipura 0.000 0.000 0.000 30.25 30.25 0.00
Total: 8,164 4108.046 3975.287 132.759 30.25 124,268.39 120,252.43 4,015.96 4015.96
Page 1 of 17
Filling with fine
3 1.3 m3
sand.
Page 2 of 17
P/L M20
6 3.1.1 m3
concrete.
Centering and
7 3.2.1 m2
Shuttering.
Page 3 of 17
Brick work in 1:6
9 4.1 m3
mortar.
487 Qazigund 3906.982 3810.814 96.168 1,384.50 1,384.50 133144.60
547 Sadura 838.025 813.025 25.000 1,384.50 1,384.50 34612.50
468 Anantanag 4232.7729 4232.7729 0.0000 1,384.50 1,384.50 0.00
497 Bijbehera 1817.776 1808.762 9.014 1,384.50 1,384.50 12479.88
541 Awantipura 2436.130 2436.130 0.000 1,384.50 1,384.50 0.00
Total: 13231.686 13101.504 130.1820
125% of BOQ 8,583 10728.75 10728.75 0.000 1,384.50 14,853,954.38 14,853,954.38 0.00 180236.98
Page 4 of 17
Hardcret 62mm
12 6.5 m2
thk
P/f 75 mm PVC
14 8.3 m
Pipe
487 Qazigund 593.560 593.560 0.000 56.35 56.35 0.00
547 Sadura 386.950 386.950 0.000 56.35 56.35 0.00
468 Anantanag 1212.680 1212.680 0.000 56.35 56.35 0.00
497 Bijbehera 457.240 457.240 0.000 56.35 56.35 0.00
541 Awantipura 321.560 321.560 0.000 56.35 56.35 0.00
Total: 3,118.00 2971.990 2971.990 0.000 56.35 167,471.64 167,471.64 0.00 0.00
Page 5 of 17
Supply..Boulder
15 10.1 m3
filling.
487 Qazigund 873.460 873.460 0.000 374.65 374.65 0.00
547 Sadura 155.425 155.425 0.000 374.65 374.65 0.00
468 Anantanag 1283.1195 1283.1195 0.000 374.65 374.65 0.00
497 Bijbehera 163.419 163.419 0.000 374.65 374.65 0.00
541 Awantipura 560.071 560.071 0.000 374.65 374.65 0.00
Total: 2,586 3035.495 3035.495 0.000 374.65 1,137,248.01 1,137,248.01 0.00 0.00
Schedule "A" 22,409,267.92 21,493,667.26 915,600.66
18.00% above (quoted rate) 4,033,668.23 3,868,860.11 164,808.12
Total of Schedule "A" 26,442,936.14 25,362,527.37 1,080,408.77
16 "B" 2 Railing m
Page 6 of 17
Providing,
18 "C" 1 Kg
cutting,TMT bar.
487 Qazigund 0.000 0.000 0.000 38.00 0.00
547 Sadura 900.000 0.000 900.000 38.00 34200.00
468 Anantanag 12428.040 10424.830 2003.2100 38.00 76121.98
497 Bijbehera 2590.4380 1667.183 923.255 38.00 35083.69
541 Awantipura 813.192 813.192 0.000 38.00 0.00
Total: 182,602 16731.670 12905.205 3826.465 38.00 635,803.46 490,397.79 145,405.67 145405.67
RRM in 1:6
19 NS-1
morter
468 Anantnag m3 668.874 668.874 0.000 1,911.88 0
541 Awantipura m3 29.301 29.301 0.000 1,911.88 0
Total: m3 1,000 698.175 698.175 0.000 1,911.88 1,334,826.82 1,334,826.82 0.00
20 NS-2 40mm GI pipe mtr
487 Qazigund 0.000 0.000 0.000
547 Sadura 0.000 0.000 0.000
468 Anantanag 983.400 282.000 701.400
497 Bijbehera 145.000 45.000 100.000
541 Awantipura 0.000 0.000 0.000
Total: 2750 1128.400 327.000 801.400 292.00 329,492.80 95,484.00 234,008.80
Bill of Quantity above 125% of BOQ
Brick work in 1:6
21 4.1 m3 3,531.25 2502.936 2372.754 130.182 3,097.00 7,751,592.33 7,348,418.67 403,173.65
mortar.
Supply and filling
22 "B" 1 m3 62,200 55289.073 55289.073 0.000 113.280 6,263,146.14 6,263,146.14 0.00
earth.
Page 7 of 17
Most of the thing is on
formula, kindly do not
mishandle the sheet //
Update in Upto date quantity only.
Page 8 of 17
Page 9 of 17
Page 10 of 17
Page 11 of 17
Page 12 of 17
Qazigund 196641.11
Sadura 91936.36
Anantanag 422008.98
Bijbehera 265996.72
Awantipura 0
Total 976583.17
Qazigund 0
Sadura 0
Anantanag 159838.5
Bijbehera 0
Awantipura 0
Qazigund 0
Sadura 0
Anantanag 0
Bijbehera 0
Awantipura 0
Page 13 of 17
6384.96
Page 14 of 17
Station Name of Amount for the
no Station Month
1 Qazigund 196,641.11
2 Sadura 126,136.36
3 Anantanag 657,969.46
4 Bijbehera 301,080.41
5 Awantipura 0.00
Grand Total: 1,281,827.34
Say: 2,022,835.00
Everything is on
formula, do not
disturb the sheet
OK
Certified that the forgoing claim is correct. The necessary measurement were taken and recorded as follows
Measurement
Sl no. Name of Engineer Date of measurement: MB no Page
No
1 Sri OP Chouhan, AM/ Civil 31-03-2008 - 487 -
2 Sri Anil Barma, AM/ Civil 31-03-2008 - 547 -
3 Sri Surajit Ghosh, AM/ Civil 31-03-2008 - 468 -
4 Sri Tanbir Hussain DM/ Civil 31-03-2008 - 497 -
5 Sri Sarvash Kumar, DM/Civil - 541 -
Certified that,
Measurements Recorded in MB as above and 469(Abs.) are fully accepted by me and I do not have any other claim against
1
this bill.
2 The labour employed by me have been paid minimum wages as fixed in similar type of work in the area.
All taxes including Royalty charges. Cess, etc. due to the govt. on the materials used for this work have been fully paid and no
3
payment is due to them.
4 All the insurance polices as per previous of the contract has been taken by me and are valid as on date.
I have extended the provident fund benefits to the staff engaged by me and requisites amount of providend fund has been
5
remitted to the providend fund commissioner.
Date: Contractor
Certified that,
1 The quantity billed is not more than the quantity actually executed at site.
No material has been issued to the contractor, for which the cost was to be recovered except such as specially provided in the
2
agreement/ work order.
No departmental tools & plants have been issued to the contractor other than those for which hire charges have been
3
recovered in this bill.
4 In case of lump sum payment, approximate quantity billed is not more than the quantity actually at site.
5 The work has been executed as per approved drawing and specifications and the method of measurement is correct.
6 That the statury formalities and guidelines has been complied with.
AM / civil
Chargeble to ........................................................................ and to be included in the account for the month of ...................
To be paid at …………................... in presence of ............................................................. by Cheque on or before................
Certified that the forgoing claim is correct. The necessary measurement were taken and recorded as follows
Measurement
Sl no. Name of Engineer Date of measurement: MB no Page
No
1 Sri Ben Bahadur Soni, AM/ Civil 31/08/206 5th 487 17 to 21
2 - 547 -
3 Sri Surajit Ghosh, AM/ Civil 31/08/208 5th 468 13 to 16
4 - 497 -
5 Sri Debendra Sohai AM/ Civil 31/08/210 3rd 541 6 to 8
Date: Mgr/ Civil
Certified that,
Measurements Recorded in MB 487, 468,541, 469(Abs.) are fully accepted by me and I do not have any other claim against
1
this bill.
2 The labour employed by me have been paid minimum wages as fixed in similar type of work in the area.
All taxes including Royalty charges. Cess, etc. due to the govt. on the materials used for this work have been fully paid and no
3
payment is due to them.
4 All the insurance polices as per previous of the contract has been taken by me and are valid as on date.
I have extended the provident fund benefits to the staff engaged by me and requisites amount of providend fund has been
5
remitted to the providend fund commissioner.
6 The statury formalities and guidelines has been complied with.
The measurementmade for well steining upto this bill, the Tilt & Shift of well are within permissible limit, as per specification
7
and contract agreement.
Date: Contractor
Certified that,
1 The quantity billed is not more than the quantity actually executed at site.
No material has been issued to the contractor, for which the cost was to be recovered except such as specially provided in the
2
agreement/ work order.
No departmental tools & plants have been issued to the contractor other than those for which hire charges have been
3
recovered in this bill.
4 In case of lump sum payment, approximate quantity billed is not more than the quantity actually at site.
5 The work has been executed as per approved drawing and specifications and the method of measurement is correct.
6 That the statury formalities and guidelines has been complied with.
B.B.Soni AM / civil
Chargeble to ........................................................................ and to be included in the account for the month of ...................
To be paid at …………................... in presence of ............................................................. by Cheque on or before................