Item No Description Rate Cost

Unit Qty Remarks


Code (Rs)
SANITARY INSTALLATIONS
19.1 Providing and fixing water vitreous china
water closet squatting pan ( Indian type
W.C. pan ) with 100mm sand cast Iron P or
S trap, 10 litre low level white P.V.C.
flushing cistern(of approved make) with
fittings. C.I.M.S.brackets, 32mm diameter
flush pipe with fittings and clamps, overflow
arrangment with specials and misquito proof
coupling of approved municipal design
including painting of fittings and brackets,
cutting an making good the walls and floors
wherever required.

19.1.1 Long pan pattern W.C. pan of size 580 mm


with flush pipe & overflow arrangement
Details of cost for one pan
Materials-
White glazed vitreous china long pan pattern
Each 1 1953
W.C. pan
10 litre low level P.V.C. flushing cistern with
Each 1 7358
fitting accessories and flush pipe
C.I. Brackets for low level P.V.C flushing
Pair 1 130.8
cistern
32mm M.S. holder bat clamp Each 1 1329
Overflow arrangement and specials for
1 time 24.15 9999
overflow pipe
25mm diameter mosquito proof coupling of
Each 1 1350
the approved municipal design
100mm Sand C.I.'P' or 'S' trap with vent
Each 1 1896
horn
Red lead white lead and gaskit Each 5.2 9999
Cement, sand and grit etc. Each 10.35 9999
Painting of fittings. Each 15 9999
Carriage of materials Each 10.35 9999

Labour:-
Fitter 1st class Each 1.25 116
Mason, 1st class Each 0.50 123
Beldar Each 1.00 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one pan
Say Rs. each

19.1.2 Orissa pattern W.C. pan.of size 580x440mm


with integral type foot rests with flush pipe and
overflow arrangement.
Details of cost for one pan
White vitreous china Orissa pattern W.C.
pan Add for materials, labour and painting each 1 1954
etc. Same as per(A) in item No. 19.1.1
Add for water charges @ 1%
Add for contractor's profit and overheads @
10%
Cost for one pan
Say Rs. each
19.2 Providing and fixing white vitreous china
pedestal type water closet (European type
W.C. pan) with seat and lid,C.P. brass hinges
and rubber buffers. 10 litre low level white
P.V.C. flushing cistern with
fittingsC.I.M.S.brackets, 40mm diameter flush
pipe with fittings and clamps, overflow
arrangement with specials and misquito proof
coupling of approved municipal design
complete including painting of fittings and
brackets, cutting an making good the walls and
floors wherever required.

19.2.2 W.C. pan with white solid plastic seat and lid

Details of cost for one pan


Materials-
White solid plastic seat and lid with C.P.
brass hinges and rubber buffers complete Each 1 1875

White vitreous china pedestal type W.C. pan


Each 1 1955

10 litre low level C.I. flushing cistern with


Each 1 7358
fitting.
accessories and flush pipe Each 1 7358
C.I. Brackets for flushing cisterm pair 1 130.8
Overflow arrangement and specials for
1 time 24.15 9999
overflow pipe
Mosquito proof couplig of approved
Each 1 1350
municipal design
approved municipal design Each 1 1350
100mm Sand C.I.'P' or 'S' trap with vent
Each 1 1896
horn
Red lead white lead and gaskit 1 time 6.20 9999
Cement, sand and grit etc. 1 time 10.35 9999
Spainting of fittings. 1 time 15.00 9999
Carriage of materials 1 time 10.35 9999
Labour:-
Fitter 1st class Each 1.25 116
Mason, 1st class Each 0.50 123
Beldar Each 1.00 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one pan
Say Rs. each
19.2.3 W.C. pan with white solid plastic seat and lid

Details of cost for one pan


Materials-
Black solid plastic seat and lid with C.P.
Each 1 1876
Brass hinges and rubber buffers
White vitreous china pedestal type w.c. pan
other materials, painting and labour Each 1 1955
etc.(Rate as per item "A" in item 19.2.2)
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one pan
Say Rs. each
19.3 Providing and fixing white vireous china
pedestral type water closed (European type)
with seat and lid, with C.P brass hinges and
rubber buffers, 10 litre low level flushing
cistern with fittings and C.I./M.S. brackets
40 mm flushbend overflow arrangement with
specials of standard make and mosquito
proof coupling of approved municipal design
complete including painting of fittings and
brackets, cutting and making good the walls
ad floors wherever required:

19.3.2 W.C. pan with white solid plastic seat and lid
with white vitreous china flushing cistern and
c.p. flush bend
Details of cost for one pan
Materials-
White solid plastic seat and lid with C.P.
Each 1.00 1875
brass hinges and rubber buffers complete
White vitreous china pedestal type W.C. pan
Each 1.00 1955
10 litre low level C.I. flushing cistern with
fitting. And brackets and 40mm white C.P. Each 1.00 7006
flush bend
Overflow arrangement and specials for
1 time 24.15 9999
overflow pipe
Mosquito proof couplig of approved
Each 1.00 1350
municipal design
Plugs screws etc. 1 time 5.20 9999 A
Red lead white lead and gaskit 1 time 6.20 9999
Cement, sand and grit etc. 1 time 10.35 9999
Carriage of materials 1 time 10.35 9999
Labour:-
Fitter 1st class Each 1.00 116
Mason, 1st class Each 1.00 123
Beldar Each 1.00 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one pan
Say Rs. each
19.3.3 W.C. pan with white solid plastic seat and lid
with white vitreous china flushing cistern and
c.p. flush bend
Details of cost for one pan
Materials-
Black solid plastic seat and lid with C.P.
Each 1.00 1876
Brass hinges and rubber buffers
Vitreous china pedestal type W.C. pan Each 1.00 1955
10 litre white vitreous china level flushing
cistern with fittings and brackets and 40 mm Each 1.00 1006
white C.P. flush bend
other materials, painting and labour
etc.(Rate as per item "A" in item 19.3.2)
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one pan
Say Rs. each
19.4 Providing and fixing white vitreous china flat
back or wall corner type lipped front urinal
basin of 430 x 265 mm sizes respectively
with automatic flushing cistern with C.I./>.S.
brackets standard size of G.I. Flush pipe
and C.P. brass spreaders with brass unions
and G.I. clamps complete including painting
of fitting and brackets, cutting and making
good the walls and floors wherever required:

19.4.1 One urinal basin with 5 litre P.V.C.


automatic flushing cistern
Details of cost for one no.
Materials-
Flat back or angular lipped front urinal basin
of 430x260x350xmm and 340x410x265xmm
Each 1.00 1913
sizes respectively of white Vitreous China

5 litre P.V.C. autonatic flushing cistern with


Each 1.00 7359
fitting
C.I. Brackets pair 1.00 1308
Standard size G.I. Flush pipe with brass
unions and clamps including C.P. brass Each 1.00 7375
spreaders
Plugs screws etc. 1 time 5.20 9999
Red lead white lead and gaskit 1 time 6.20 9999
Cement, sand and grit etc. 1 time 10.35 9999
Carriage of materials 1 time 10.35 9999
Labour:-
Fitter 1st class Each 1.00 116
Mason, 1st class Each 1.00 123
Beldar Each 1.00 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.4.2 Range of two urinal basins with 7.5 litre
P.V.C. autonatic flushing cistern.
Details of cost for one no.
Materials-
Flat back or angular lipped front urinal basin
of 430x260x350xmm and 340x410x265xmm
sizes respectively of white Vitreous China Each 2.00 1913

7.5 litre P.V.C. autonatic flushing cistern


Each 1.00 7360
with fitting
C.I. Brackets pair 1.00 1308
Standard size G.I. Flush pipe with brass
unions and clamps including fitting and C.P. Each 1.00 7376 A
brass spreaders
Plugs screws etc. 1 time 7.80 9999
Red lead white lead and gaskit 1 time 7.80 9999
Cement, sand and grit etc. 1 time 7.80 9999
Painting of fittings 1 time 15.00 9999
Labour:-
Fitter 1st class Each 1.50 116
Mason, 1st class Each 1.50 123
Beldar Each 2.00 114
Carriage of materials 1 time 10.35 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.4.3 Range of two urinal basins with 7.5 litre
P.V.C. autonatic flushing cistern.
Details of cost for one no.
Materials-
Materials-
Flat back or angular lipped front urinal basin
of 430x260x350xmm and 340x410x265xmm
Each 3.00 1913
sizes respectively of white Vitreous China

7.5 litre P.V.C. autonatic flushing cistern


Each 1.00 7360
with fitting
C.I. Brackets pair 1.00 1308
Standard size G.I. Flush pipe with brass
unions and clamps including fitting and C.P. Each 1.00 7377
brass spreaders
Plugs screws etc. 1 time 12.95 9999
Red lead, white lead and gaskit 1 time 12.95 9999
Cement, sand and grit etc. 1 time 12.95 9999
Painting of fittings 1 time 15.00 9999
Labour:-
Fitter 1st class Each 2.00 116
Mason, 1st class Each 2.00 123
Beldar Each 3.00 114
Carriage of materials 1 time 15.50 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.4.4 Range of two urinal basins with 10 litre
P.V.C. autonatic flushing cistern.
Details of cost for one no.
Materials- 1913
Flat back or angular lipped front urinal basin
of 430x260x350xmm and 340x410x265xmm
Each 4.00 7361 A
sizes respectively of white Vitreous China

10 litre P.V.C. autonatic flushing cistern with


Each 1.00 1308 A
fitting
C.I. Brackets for flushing cistern pair 1.00 7378
Standard size G.I. Flush pipe with brass
unions and clamps including fitting and C.P. Each 1.00 9999
brass spreaders
Plugs screws etc. 1 time 20.70 9999
Red lead, white lead and gaskit 1 time 20.70 9999
Cement, sand and grit etc. 1 time 20.70 9999
Painting of fittings 1 time 15.00
Labour:-
Fitter 1st class Each 3.00 116
Mason, 1st class Each 3.00 123
Beldar Each 4.00 114
Carriage of materials 1 time 20.70 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.5 Providing and fixing white vitreous china flat
back half stall urinal of 580x 380x350xmm
with automatic flushing cistern (of approved
make )with fittings. C.I. /M.S. brackers
standerd size C.P. brass flush pipe
spreaders with unions and clamps (all in
C.P. brass) with waste fitting as per IS :
2556, C.I. trap with outlet grating and other
couplings in CP brass including painting of
fittings and brackets, cutting and making
good the walls and floors wherever required:

Single half stall urinal with 5 litre P.V.C.


automatic flushing cistern.
Details of cost for one no.
Materials-
White vitreous china half stall urinal with
Each 1.00 7379
waste fittings
5 litre P.V.C. autonatic flushing cistern with
Each 1.00 7359
fittings
Standard size flush pipe with unions
Each 1.00 1532
spreaders and clamps, all in C.P. brass
C.I. bracket/M.S bracket pair 1.00 108
50mm diameter standard urinal C.I. Trap
with vent arm oulet grating and other Each 1.00 1891
couplings in C.P. brass
Red lead, white lead and gaskit 1 time 6.75 9999
Cement, sand and grit etc. 1 time 10.35 9999
Painting of fittings 1 time 10.00 9999
Carriage of materials 1 time 15.55 9999
Labour:-
Fitter 1st class Each 3.00 116
Mason, 1st class Each 3.00 123
Beldar Each 4.00 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.5.2 Range of two half stall urinals with 7.5 litre
P.V.C. autonatic flushing cistern.
Details of cost for one no.
Materials-
Two half stall urinals of white vitreous china
Each 2.00 7379
with waste fittings.
7.5 litre P.V.C. autonatic flushing cistern
Each 1.00 7360
with fitting
C.I. bracket/M.S bracket pair 1.00 1308
Standard size flush pipe with unions,
spreaders and clamps and all in C.P. brass. Each 1.00 1533
50mm diameter standard urinal C.I. Trap
with vent arm oulet grating and other Each 1.00 1891
couplings in C.P. brass
Red lead, white lead and gaskit 1 time 6.75 9999
Cement, sand and grit etc. 1 time 20.70 9999
Painting of fittings 1 time 10.00 9999
Carriage of materials 1 time 20.70 9999
Labour:-
Fitter 1st class Each 2.50 116
Mason, 1st class Each 3.00 123
Beldar Each 6.00 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.5.3 Range of two half stall urinals with 10 litre
P.V.C. autonatic flushing cistern.
Details of cost for one no.
Materials-
Three half stall urinals of white vitreous
Each 3.00 7379
china with waste fittings.
10 litre P.V.C. autonatic flushing cistern with
Each 1.00 7361
fitting
C.I. bracket/M.S bracket pair 1.00 1308
Standard size flush pipe with unions,
spreaders and clamps and all in C.P. brass. Each 1.00 1534

80 mm diameter standard urinal C.I. Trap


with vent arm oulet grating and other Each 1.00 1893
couplings in C.P. brass
Red lead, white lead and gaskit 1 time 6.75 9999
Cement, sand and grit etc. 1 time 31.05 9999
Painting of fittings 1 time 10.00 9999
Carriage of materials 1 time 25.85 9999
Labour:-
Fitter 1st class Each 3.00 116
Mason, 1st class Each 3.50 123
Beldar Each 7.00 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.5.4 Range of two half stall urinals with 10 litre
P.V.C. autonatic flushing cistern.
Details of cost for one no.
Materials-
Four half stall urinals of white vitreous china
Each 4.00 7379
with waste fittings.
10 litre P.V.C. autonatic flushing cistern with
Each 1.00 7361
fitting
C.I. bracket/M.S bracket pair 1.00 1308
Standard size flush pipe with unions,
spreaders and clamps and all in C.P. brass. Each 1.00 1535

80 mm diameter standard urinal C.I. Trap


with vent arm oulet grating and other Each 1.00 1893
couplings in C.P. brass
Red lead, white lead and gaskit 1 time 6.75 9999
Cement, sand and grit etc. 1 time 41.40 9999
Painting of fittings 1 time 15.00 9999
Carriage of materials 1 time 31.05 9999
Labour:-
Fitter 1st class Each 3.50 116
Mason, 1st class Each 4.00 123
Beldar Each 8.00 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.6 Providing and fixing one piece construction
white vitreous china squatting plate with an
integral longitudinal flushing pipe. Automatic
flushing cistern with fitting , C.I/M.S.
brackets, standard size G.I. Flush pipe for
back and front flush with standard spreader
pips with fittings. G.I. clamps and in C.P.
brass coupling complete including painting
of fittings and brackets, cutting and making
good the walls and floors etc. wherever
required:

Single squatting plate with 5 litre P.V.C.


automatic flshing cistern
Details of cost for one no.
Materials-
I) Squatting plate of white glazed vitreous
Each 1.00 1915
china
ii) 5 litre autonatic P.V.C. flushing cistern
Each 1.00 7359
with fittings
iii) M.S. brackets for flushing cistern pair 1.00 1308
iv) G.I. Flush pipe of standard size with
Each 1.00 1540
spreader, fittings
v) Red lead, white lead and gaskit 1 time 6.75 9999
vi) Cement, sand and grit etc. 1 time 10.35 9999
vii) Painting of fittings 1 time 10 9999
viii) Carriage of materials 1 time 10.35 9999
Labour:-
Fitter 1st class Each 1.75 116
Mason, 1st class Each 0.75 123
Beldar Each 3.00 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.6.2 Range of two squatting plates with 7.5 litre
P.V.C. autonatic flushing cistern.
Details of cost for one no.
Materials-
I) Squatting plate of white glazed vitreous
Each 2 1915
china
ii) 7.5 litre autonatic P.V.C. flushing cistern
Each 1 7360
with fittings
iii) M.S. brackets for flushing cistern pair 1 1308
iv) G.I. Flush pipe of standard size with
Each 1 1541
spreader, fittings
v) Red lead, white lead and gaskit 1 time 6.75 9999
vi) Cement, sand and grit etc. 1 time 20.7 9999
vii) Painting of fittings 1 time 10 9999
viii) Carriage of materials 1 time 12.75 9999
Labour:-
Fitter 1st class Each 2.50 116
Mason, 1st class Each 1.00 123
Beldar Each 4.00 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.6.3 Range of two squatting plates with 10 litre
P.V.C. autonatic flushing cistern.
Details of cost for one no.
Materials-
I) Squatting plate of white glazed vitreous
Each 3 1915
china
ii) 10 litre autonatic P.V.C. flushing cistern
Each 1 7361
with fittings
iii) M.S. brackets for flushing cistern pair 1 1308
iv) G.I. Flush pipe of standard size with
Each 1 1542
spreader, fittings
v) Red lead, white lead and gaskit 1 time 6.75 9999
vi) Cement, sand and grit etc. 1 time 31.05 9999
vii) Painting of fittings 1 time 10 9999
viii) Carriage of materials 1 time 16.2 9999
Labour:-
Fitter 1st class Each 3.00 116
Mason, 1st class Each 1.50 123
Beldar Each 5.00 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.6.4 Range of two squatting plates with 15 litre
P.V.C. autonatic flushing cistern.
Details of cost for one no.
Materials-
I) Squatting plate of white glazed vitreous
Each 4 1915
china
ii) 15 litre autonatic P.V.C. flushing cistern
Each 1 7362
with fittings
iii) M.S. brackets for flushing cistern pair 1 1308
iv) G.I. Flush pipe of standard size with
Each 1 1543
spreader, fittings
v) Red lead, white lead and gaskit 1 time 6.75 9999
vi) Cement, sand and grit etc. 1 time 41.4 9999
vii) Painting of fittings 1 time 10 9999
viii) Carriage of materials 1 time 26.55 9999
Labour:-
Fitter 1st class Each 3.50 116
Mason, 1st class Each 1.75 123
Beldar Each 5.50 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.7 Providing and fixng white vitreous china
wash basin with C.I/M.S. brackets, 15 mm
C.P. brass pillar taps, 32 mm C.P. brass
waste of standard pattern, including painting
of fittings and backets, cutting and making
good the walls wherever required:

Details of cost for one no.


Materials-
I) 630x450 mm flat back wash basin of white
Each 1.00 1947
vitreous china
ii) 15 mm C.P. brass pillar taps Each 2.00 1885
iii) 32 mm C.P. brass waste of standard
Each 1.00 1951
pattern,
iv) C.I/M.S. brackets, pair 1.00 1309
v) Red lead, white lead and gaskit 1 time 6.20 9999
vi) Cement, sand and grit etc. 1 time 5.15 9999
vii) Painting of fittings 1 time 10.35 9999
viii) Carriage of materials 1 time 5.20 9999
Labour:-
Fitter 1st class Each 0.33 116
Mason, 1st class Each 0.33 123
Beldar Each 0.67 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.7.2 Flat back wash basin size 630x450 mm with
a single 15 mm C.P. brass pillar tap.
Details of cost for one no.
Materials-
I) 630x450 mm flat back wash basin of white
Each 1.00 1947
vitreous china
ii) 15 mm C.P. brass pillar taps Each 1.00 1885
iii) 32 mm C.P. brass waste of standard
Each 1.00 1951
pattern,
iv) C.I/M.S. brackets, pair 1.00 1309
v) Red lead, white lead and gaskit 1 time 6.20 9999
vi) Cement, sand and grit etc. 1 time 5.15 9999
vii) Painting of fittings 1 time 10.35 9999
viii) Carriage of materials 1 time 5.20 9999
Labour:-
Fitter 1st class Each 0.33 116
Mason, 1st class Each 0.33 123
Beldar Each 0.67 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.7.3 Flat back wash basin size 550x400 mm with
a single 15 mm C.P. brass pillar tap.
Details of cost for one no.
Materials-
I) 550x400 mm flat back wash basin of white
Each 1.00 3229
vitreous china
ii) 15 mm C.P. brass pillar taps Each 2.00 1885
iii) 32 mm C.P. brass waste of standard
Each 1.00 1951
pattern,
iv) C.I/M.S. brackets, pair 1.00 1309
v) Red lead, white lead and gaskit 1 time 6.20 9999
vi) Cement, sand and grit etc. 1 time 5.15 9999
vii) Painting of fittings 1 time 10.35 9999
viii) Carriage of materials 1 time 5.20 9999
Labour:-
Fitter 1st class Each 0.33 116
Mason, 1st class Each 0.33 123
Beldar Each 0.67 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.7.4 Flat back wash basin size 550x400 mm with
a single 15 mm C.P. brass pillar tap.
Details of cost for one no.
Materials-
I) 550x400 mm flat back wash basin of white
Each 1.00 3229
vitreous china
ii) 15 mm C.P. brass pillar taps Each 2.00 1885
iii) 32 mm C.P. brass waste of standard
Each 1.00 1951
pattern,
iv) C.I/M.S. brackets, pair 1.00 1309
v) Red lead, white lead and gaskit 1 time 6.20 9999
vi) Cement, sand and grit etc. 1 time 5.15 9999
vii) Painting of fittings 1 time 10.35 9999
viii) Carriage of materials 1 time 5.20 9999
Labour:-
Fitter 1st class Each 0.30 116
Mason, 1st class Each 0.33 123
Beldar Each 0.63 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.7.5 Angle back wash basin size 600x480 mm
with a pair of 15 mm C.P. brass pillar taps.
Analysis of rate same as for item no. 19.7.1
except the code of angle back wash basin of
white vitreous china of size 600x480 mm will
be 1949 instead of code no. 1947.

19.7.6 Angle back wash basin size 600x480 mm


with a pair of 15 mm C.P. brass pillaar taps.

Analysis of rate same as for item no. 19.7.2


except the code of angle back wash basin of
white vitreous china of size 600x480 mm will
be 1949 instead of code no. 1947.

19.7.7 Angle back wash basin size 400x400 mm


with a pair of 15 mm C.P. brass pillar taps.
Analysis of rate same as for item no. 19.7.1
except the code of angle back wash basin of
white vitreous china of size 400x400 mm will
be 1950 instead of code no. 1947.

19.7.8 Angle back wash basin size 400x400 mm


with a pair of 15 mm C.P. brass pillar taps.
Analysis of rate same as for item no. 19.7.2
except the code of angle back wash basin of
white vitreous china of size 400x400 mm will
be 1950 instead of code no. 1947.
19.7.9 Flat back wash basin size 450x300 mm with
a pair of 15 mm C.P. brass pillar taps.
Analysis of rate same as for item no. 19.7.2
except the code of angle back wash basin of
white vitreous china of size 450x300 mm will
be 7004 instead of code no. 1947.

19.7.10 Surgeon type wash basin size 660x460 mm


with a pair of 15 mm C.P. brass pillar
taps.with elbow operator levers.
Analysis of rate same as for item no. 19.7.1
except the code of angle back wash basin of
white vitreous china of size 600x460 mm will
be 3213 instead of code no. 1947and C.P.
brass pillar tap (elbow operated lever) will be
7363 instead of 1885.

19.7.11 Surgeon type wash basin size 660x460 mm


with a pair of 15 mm C.P. brass pillar
taps.with elbow operator levers.
Analysis of rate same as for item no. 19.7.2
except the code of angle back wash basin of
white vitreous china of size 600x460 mm will
be 3213 instead of code no. 947 and C.P.
brass pillar tap (elbow operated lever) will be
7363 instead of 1885.

19.8 Add for


19.8.1 Plugging the hole of washbasin if a pillar tap
is not provided
Details of cost of one plug
Materials-
Porcelain stopper Each 1.00 1968
Carriage of materials and fixing charges 1 time 1.05 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.8.2 Providing 32 mm dia. C.P. brass trap
Details of cost of one plug
32 mm dia. C.P. brass trap Each 1 1894
Carriage of materials and fixing charges 1 time 2.05 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.8.3 Providing 32 mm dia. C.P. brass union
Details of cost of one plug
32 mm dia. C.P. brass union Each 1 3604
Carriage of materials and fixing charges 1 time 2.05 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.9 Providing and fixing white vitreous china
pedestal for wash basin completely
recessed at the back for the reception of
pipes and fittings.
Details of cost of one pedestal.
Materials-
White vitreous china pedestal Each 1.00 1396
White cement mortar 1 time 15.50 9999
Carriage of materials and fixing charges 1 time 15.55 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.10 Providing and fixing kitchen sink with C.I.
Brackets, C.P. brass chain with rubber plug,
40 mm C.P. brass waste complete, including
painting the fitting and brackets, cutting and
making good the walls wherever required:

19.10.2 White glazed fire clay kitchen sink of size


600x450x250 mm
Details of cost of one no
Materials-
I) White glazed fire clay kitchen sink of size
Each 1.00 1863
600x450x250 mm
ii) C.I. Brackets pair 1.00 1309
iii) C.P. brass chain with 40mm rubber plug.
Each 1.00 1315
iv) 40 mm C.P. brass waste Each 1.00 1952
v) Red lead, white lead and gaskit 1 time 6.20 9999
vi) Cement, sand and grit etc. 1 time 5.15 9999
vii) Painting of fittings 1 time 10.35 9999
viii) Carriage of materials 1 time 5.20 9999
Labour:-
Fitter 1st class Each 0.22 116
Mason, 1st class Each 0.33 123
Beldar Each 0.56 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.10.3 White glazed fire clay kitchen sink of size
750x450x250 mm
Analysis of rate same as for item no.
19.10.2 except the code of White glazed fire
clay kitchen sink of size 750x450x250 mm
wile be 1864 instead of code no. 1863.

19.10A Providing and fixing kitchen sink with C.I.


Brackets, C.P. brass chain with rubber plug,
40 mm C.P. brass waste complete, including
painting the fitting and brackets, cutting and
making good the walls wherever required:

19.10A.1 kitchen sink with drain board


19.10A.1.1 510x1040 bowl depth 178 mm
Details of cost of one no
Materials-
I) Stainless steel kitchen sink with drain
Each 1.00 7098
board 510x1040 bowl depth 178 mm
ii) C.I. Brackets pair 2.00 1309
iii) Cement, sand and grit etc. 1 time 10.40 9999
iv) Painting of fittings 1 time 10.35 9999
v) Carriage of materials 1 time 5.20 9999 A
Labour:-
Fitter 1st class Each 0.22 116
Mason, 1st class Each 0.60 123
Beldar Each 0.82 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each

19.10A.1.2 400x915 bolw depth 160mm


Details of cost of one no
Materials-
I) Stainless steel kitchen sink with drain
Each 1.00 7099
board 400x915 bolw depth 160mm
ii) C.I. Brackets pair 2.00 1309
iii) Cement, sand and grit etc. 1 time 10.40 9999
iv) Painting of fittings 1 time 10.35 9999
v) Carriage of materials 1 time 5.20 9999
Labour:-
Fitter 1st class Each 0.22 116
Mason, 1st class Each 0.60 123
Beldar Each 0.82 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.10A.1.3 500x1000 bolw depth 178 mm
Analysis of rates similar to that of ite no.
19.10A.1.1 except change in code no. for
kitchen sink with drain board will be 7100
instead of 7098
19.10A.2 withour drain board
19.10A.2.1 610x510 bolw depth 200 mm
Details of cost of one no
Materials-
I) Stainless steel kitchen sink with drain
Each 1.00 7101
board 610x510 bolw depth 200 mm
ii) C.I. Brackets pair 2.00 1309
iii) Cement, sand and grit etc. 1 time 5.20 9999
iv) Painting of fittings 1 time 10.35 9999
v) Carriage of materials 1 time 5.20 9999
Labour:-
Fitter 1st class Each 0.22 116
Mason, 1st class Each 0.33 123
Beldar Each 0.56 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.10A.2.2 535x460 bolw depth 178 mm
Analysis of rates similar to that of ite no.
19.10A.2.1 except change in code no. for
kitchen sink with drain board will be 7102
instead of 7101
19.10A.2.3 510x432 bolw depth 172 mm
Analysis of rates similar to that of ite no.
19.10A.2.1 except change in code no. for
kitchen sink with drain board will be 7103
instead of 7101
19.11 Providing and fizing white vitreous china
laboratory sink with CI brackets, CP brass
chain with rubber plug 40 mm CP brass
waste and 40 mm CP brass trap with
necessary CP brass union complete
including painting brackets fittings, cutting
and making good the wall wherever
required:
19.11.1 size 450x300 x150 mm
Details of cost of one no
Materials-
I) White vitreous china laboratory sink of
Each 1.00 1871
size 450x300 x150 mm
ii) C.I. Brackets pair 1.00 1309
iii) C.P. brass chain with 40mm rubber plug.
Each 1.00 1315
iv) 40 mm C.P. brass waste Each 1.00 1952
v) 40 mm C.P. brass trap Each 1.00 1895
vi) 40 mm C.P. brass union Each 1.00 3617
vii) Red lead, white lead and gaskit 1 time 6.20 9999
viii) Cement, sand and grit etc. 1 time 5.15 9999
ix) Painting of fittings 1 time 10.35 9999
x) Carriage of materials 1 time 5.20 9999
Labour:-
Fitter 1st class Each 0.22 116
Mason, 1st class Each 0.33 123
Beldar Each 0.56 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each

19.11.2 size 600x450 x200 mm


Analysis of rate same as for item no.
19.10.2 except the code of White vitreous
china laboratory sink of size 600x450 x200
mm mm wile be 1872 instead of code no.
1871..
19.12 Providing and fixing 2nd class teak wood
draining board with 65 to 75 mm high
skirting and beading,max
polished,supported on a pair of CI brackets
painted to the required limit complete. The
board shall have a fluted surface with
smooth finished complete.
19.12.1 750x450x25 mm drainging board
Details of cost of one no
750x450x25 mm thick teak wood drainging
Each 1 1303
board with skirting and beading
C.I. Brackets pair 1.00 1309
Cement, sand and grit etc. 1 time 2.60 9999
Painting of fittings 1 time 5.20 9999
Carriage of materials 1 time 2.60 9999
Labour:-
Fitter 1st class Each 0.06 116
Mason, 1st class Each 0.17 123
Beldar Each 0.22 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.12.2 600x450x25 mm drainging board
Details of cost of one no
600x450x25 mm thick teak wood drainging
Each 1 1302
board with skirting and beading
C.I. Brackets pair 1.00 1309
Cement, sand and grit etc. 1 time 2.60 9999
Painting of fittings 1 time 5.20 9999
Carriage of materials 1 time 2.60 9999
Labour:-
Fitter 1st class Each 0.06 116
Mason, 1st class Each 0.17 123
Beldar Each 0.22 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.12B Providing and fixing draining board with
CIMS brackets including painting of
brackets. Cutting and making good the walls
wherever required:
White glazed fire clay draining board of size
600x450x25 mm
Details of cost of one no
White glazed fire clay draining board of size
Each 1 7364
600x450x25 mm
C.I./M.S. brackets pair 1 1309
Cement, sand and grit etc. 1 time 5.15 9999
Painting of fittings 1 time 10.00 9999
Carriage of materials 1 time 3.00 9999
Labour:-
Fitter 1st class Each 0.06 116
Mason, 1st class Each 0.17 123
Beldar Each 0.22 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.12B.2 Marble stone draining board of size
600x450x25 mm
Analysis of rate same as for item no.
19.12B.1 except the code no. draining borad
will be 7365 instead of code no. 7364

19.13 Providing and fixing one piece construction


bath tub white vitreous enamelled inside and
painted with enamel paint of desired shade
on outside including integral overflow and
with detachable feet, a pair of 20mm CP
brass pillar taps, 40 mm CP brass chain with
rubber plug, 40mm CP brass trap with union
complete:
19.13.1 Enamelled sheet tub size 1700x730x430
Each 1 3219
mm with detachaable feet
20mm CP brass pillar taps Each 2 1886
40 mm CP brass waste Each 1 1952
40 mm CPn brass ovserflow Each 1 3616
CP brass chain with 40 mm rubber plug Each 1 1315
40 mm dia CP brass trap Each 1 1895
40 mm dia CP brass union Each 1 3617
carriage of materials 1 time 51.75 9999
Labour:-
Fitter 1st class Each 0.50 116
Beldar Each 1.00 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.14 providing and fixing white vitreous china
water closet squatting pan (Indian type)
19.14.1 Long pattern WC pan of size 580 mm
Details of cost of one no
White glazed vitreous china long pan pattern
Each 1 1953
squatting pan size 580 mm
Cement, sand and grit etc. 1 time 5.15 9999
Painting of fittings 1 time 5.2 9999
Labour:- A
mason 1st class Each 0.50 123
Beldar Each 0.50 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.14.2 Orissa pattern WC pan of size 580x440 mm

Details of cost of one no


Materials-
White vitreous china orissa pattern
Each 1 1954
squatting pan size 580x440 mm
Cement, sand and grit etc. 1 time 5.15 9999
Painting of fittings 1 time 5.2 9999
Labour:- A
mason 1st class Each 0.50 123
Beldar Each 0.50 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each

19.14A Extra for using coloured WC pan instead of


white WC pan
19.14A.1 Orissa pattern WC pan of size 580x440 mm

Details of cost of one no


Materials-
Coloured orissa pattern WC pan Each 1.00 7104
Orissa pattern WC pan of size 580x440 mm
Each 1.00 1954 (-)
Difference
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.15 providing and fixing white vitreous china
pedestal type (European type/wash down
type )water closet pan
Details of cost of one no
Materials-
White vitreous china pedestal type WC pan
add for other materials and labour Each 1.00 1955
etc.(Same as per (A) in item no. 19.14.1)
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.15A Extra for using coloured pedestal type WC
pan (European type) with low level cistern of
same color instead of white vitreous china
WC pan and cistern.
Details of cost of one no
Materials-
Coloured (European type ) WC pan Each 1.00 7105
White WC pan (European type) Each 1.00 1955
coloured low level cistern Each 1.00 7106
White vitreous china low level flusing cistern
Each 1.00 7005
10 liter capacity
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each

19.16 Providing and fixing a pair of white vitreous


chain foot rests of shandard pattern for
squatting pan water closet :
250x130x30 mm
Details of cost of one no
Materials-
White vitrocous china foot rests of shandard
pair 1.00 1363
pattern for squatting pan WC
cement sand including carriage of materials 1 time 3.10 9999
Labour:-
mason 1st class Each 0.06 123
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.16.2 250x125x25 mm
Details of cost of one no
Materials-
White glazed china foot rests of shandard
pair 1.00 1970
pattern for squatting pan WC
cement sand including carriage of materials
1 time 3.10 9999
Labour:-
mason 1st class Each 0.06 123
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.17 Providing and fixing 10 litre low level white
vitreous flushin cistern of approved make
with fittings such as lead valve less syphin
etc. and CP brass handle complete
Details of cost of one no
Materials-
10 litre low level white vitreous flushin
each 1.00 7006
cistern of approved make with fittings
Carriage of materials 1 time 5.15 9999
Labour:-
Fitter 1st class Each 0.50 116
Beldar Each 0.50 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.17A Providing and fixing 10 litre low level PVC
cistern of approved make with fittings
complete.
Details of cost of one no
Materials-
PVC flushing cistern 10 litre low level Each 1.00 7358
Carriage of materials 1 time 2.00 9999
Labour:-
Fitter 1st class Each 0.13 116
Beldar Each 0.13 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.18 Providing and fixing 10 litre high level CI
flushing cistern of approved make with
integral fittings such as ball valve GI chain
and pull complete.
Details of cost of one no
Materials-
10 litre CI flushing cistern with fittings and
GI chain and pull Each 1 7007

Carriage of materials 1 time 3.65 9999


Labour:-
Fitter 1st class Each 0.25 116
Beldar Each 0.50 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.19 Providinga and fixing 5 litre C.I. Automatic
flushing cistern with fittings
Details of cost of one no
Materials-
5 litreC.I. Automatic flushing cistern with
Each 1 1325
fittings
Carriage of materials 1 time 2.6 9999
Labour:-
Fitter 1st class Each 0.25 116
Beldar Each 0.50 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.2 Providinga and fixing 10 litre C.I. Automatic
flushing cistern with fittings
Details of cost of one no
Materials-
10 litreC.I. Automatic flushing cistern with
Each 1 1325
fittings
Carriage of materials 1 time 3.65 9999
Labour:-
Fitter 1st class Each 0.25 116
Beldar Each 0.50 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.20A Providing and fixing controlled flush, low
level cistern made of high density
polyethlene/ polypropylene, with all fittings
complete.
10 litre (Full fllush) capacity white
Details of cost of one no
Materials-
Controlled flush cistern with accessories Each 1 7122
Carriage of materials 1 time 2.70 9999 A
Labour:-
(Considering 1 fitter and 1 beldar can fix 8
Each 0.13 116
cistern in one day) Fitter 1st class
Beldar Each 0.13 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.20A.2 10 litre (Full fllush) capacity colour
Details of cost of one no
Materials-
Controlled flush cistern with accessories Each 1 7123
Carriage of materials 1 time 2.70 9999 A
Labour:-
(Considering 1 fitter and 1 beldar can fix 8
Each 0.13 116
cistern in one day) Fitter 1st class
Beldar Each 0.13 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.20A.3 8 litre (Full fllush) capacity white
Details of cost of one no
Materials-
Controlled flush cistern with accessories Each 1 7124
Carriage of materials 1 time 2.70 9999 A
Labour:-
(Considering 1 fitter and 1 beldar can fix 8
Each 0.13 116
cistern in one day) Fitter 1st class
Beldar Each 0.13 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each

19.20A.4 8 litre (Full fllush) capacity colour


Details of cost of one no
Materials-
Controlled flush cistern with accessories Each 1.0 7125
Carriage of materials 1 time 2.70 9999 A
Labour:-
(Considering 1 fitter and 1 beldar can fix 8
Each 0.13 116
cistern in one day) Fitter 1st class
Beldar Each 0.13 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.21 Providing and fixing 15 liter CI automatic
flushing cistern with fittings.
Details of cost of one no
Materials-
15 liter CI automatic flushing cistern with
each 1 1327
fittings.
Carriage of materials 1 time 3.65 9999
Labour:-
Fitter 1st class Each 0.25 116
Beldar Each 0.50 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.21.A providing and fixing controlled flush, low
level cistern made of vitreous china with all
fittings complete
10 litre (Full fllush) capacity white
Details of cost of one no
Materials-
Controlled flush cistern with accessories Each 1.00 7126
Carriage of materials 1 time 5.20 9999
Labour:-
Fitter 1st class Each 0.50 116
Beldar Each 0.50 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each

19.21A.2 10 litre (Full fllush) capacity colour


Analysis of rates similar to that of ite no.
19.21A.1 except change in code no. for
flushing cistern with all accessories will be
7127 instead of 7126
19.23 Providing and fixing solid plastic seat with lid
for pedestal type WC pan with CP brass
hinges, rubber buffers etc. complete.
19.23.1 White solid plastic seat with lid
Details of cost of one no
Materials-
White solid plastic seat with lid CP brass
each 1.00 1875
hinges, rubber buffers
Carriage of materials and fixing charge 1 time 5.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each

19.23.2 Black solid plastic seat with lid


Details of cost of one no
Materials-
Black solid plastic seat with lid CP brass
each 1.00 1876
hinges, rubber buffers
Carriage of materials and fixing charge 1 time 5.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.23A Extra for providing cloloured other than
black solid PVC platic seat and cover in
Eutopean type WC pan instead of white
plastic seat and cover.
Details of cost of one no
Materials-
Coloured P.V.C. plasti seat and lid each 1.0 7107
white P.V.C. plasti seat and lid each 1.0 1875 (-)
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each

19.24 P/F G.I. Chain with G.I. Pull


Details of cost of one no
Materials-
G.I. Inlet connection each 1.00 1313
Carriage of materials and fixing charge 1 time 3.1 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.25 P/F G.I. Inlet connection for flush pipe
connection with W.C. pan
Details of cost of one no
Materials-
G.I. Inlet connection each 1.00 1614
Carriage of materials and fixing charge 1 time 5.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.26 P/Fwhite vitreous china flat back or wall
corner type lipped front urinal basin of
430x260x350 mm and 340x410x265 mm
sizes respectively.
Details of cost of one no
Materials-
Flat back or wall corner type lipped front
urinal basin of 430x260x350 mm and
each 1 1913
340x410x265 mm sizes respectively. Of
white vitreous china
Carriage of materials 1 time 3.65 9999
Labour:-
Fitter 1st class Each 0.38 116
Beldar Each 0.38 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.27 P/F white glazed fire clay stall urinal of
standard size
Details of cost of one no
Materials-
white glazed fire clay single stall urinal Each 1 1914
Cement sand and grit 1 time 4.15 9999
carriage of materials 1 time 5.15 9999
Labour:-
Fitter 1st class Each 0.50 116
Mason 1st class Each 0.50 123
Beldar Each 1.00 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.28 P/F white vitreous china squatting plate
urinal with integral rim longitudinal flush pipe
.
Details of cost of one no
Materials-
squatting plate urinal white vitreous china
with integral rim longitudinal flush pipe . each 1 1915

Cement sand and grit 1 time 4.15 9999


carriage of materials 1 time 5.15 9999
Labour:-
Fitter 1st class Each 0.50 116
Mason 1st class Each 0.50 123
Beldar Each 1.00 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.29 P/F white vitreous china wash basin
including making all connections but
excluding the cost of fittings
19.29.1 Flat back wash basin of size 630x450 mm
Details of cost of one no
Materials-
white vitreous china wash basin 630x450
each 1 1947
mm
Fixing charge 1 time 20.7 9999
carriage of materials 1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.29.2 Flat back wash basin of size 550x400 mm
Details of cost of one no
Materials-
white vitreous china wash basin 550x400
each 1.00 3229
mm
Fixing charge 1 time 20.7 9999
carriage of materials 1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.29.3 Angle back wash basin of size 600x480 mm
Details of cost of one no
Materials-
white vitreous china wash basin 600x480
each 1.00 1949
mm
Fixing charge 1 time 20.7 9999
carriage of materials 1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.29.4 Angle back wash basin of size 400x400 mm
Details of cost of one no
Materials-
white vitreous china wash basin 400x400
each 1.00 1950
mm
Fixing charge 1 time 20.7 9999
carriage of materials 1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.29.5 Flat back wash basin of size 450x300 mm
Details of cost of one no
Materials-
white vitreous china wash basin 450x300
each 1.00 7004
mm
Fixing charge 1 time 20.7 9999
carriage of materials 1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.29.6 Surgeon type wash basin of size 660x460
mm
Details of cost of one no
Materials-
white vitreous china Surgeon type 660x460
each 1.00 3213
mm
Fixing charge 1 time 20.7 9999
carriage of materials 1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.30 P/F kitchen sink including making all
connections excluding cost of fittings.
19.30.2 White glazed fire clay sink of size
600x450x250 mm
Details of cost of one no
Materials-
White glazed fire clay sink of size
600x450x250 mm
White glazed fire clay sink of size
each 1.00 1863
600x450x250 mm
Fixing charge 1 time 15.55 9999
carriage of materials 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.30.3 White glazed fire clay sink of size
750x450x250 mm
Details of cost of one no
Materials-
White glazed fire clay sink of size
each 1 1864
750x450x250 mm
Fixing charge 1 time 15.55 9999
carriage of materials 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.31 P/F white vitreous china laboratory sink
including making all connectons excluding
cost of fittings.
19.31.1 size 450x300x150 mm
Details of cost of one no
Materials-
laboratory sink size of 450x300x150 mm each 1 1871
Fixing charge 1 time 15.55 9999
carriage of materials 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each

19.31.2 Size 600x4500x200 mm


Details of cost of one no
Materials-
laboratory sink size of 600x4500x200 mm each 1.00 1872
Fixing charge 1 time 15.55 9999
carriage of materials 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.32 P/F C.P. brass chain and rubber plug
complete for sink or wash basin:
19.32.1 32 mm dia
Details of cost of one no
Materials-
C.P. brass chain with 32 mm dia rubber
each 1 1314
plug.
Carriage of materials and fixing charge 1 time 3.10 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.32.2 40 mm dia
Analysis of rate same as for item no.
19.32.1 except the code of C.P. brass chain
with 40mm dia rubber plug will be 1315
instead of 1314
19.33 P/F rubber plug for sink or wash basin .
Details of cost of one no
Materials-
Good quality rubber plug each 1 1969
Carriage of materials and fixing charge 1 time 1.60 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.34 P/F C.P. brass waste for sink or wash basin:

19.34.1 32 mm dia
Details of cost of one no
Materials-
CP brass waste 32 mm dia each 1 1951
Carriage of materials and fixing charge 1 time 7.80 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.34.2 40mm dia
Details of cost of one no
Materials-
CP brass waste 40 mm dia each 1 1952
Carriage of materials and fixing charge 1 time 7.80 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.34A P/F P.V.C. waste pipe for sink or wash basin
including PV.C. Waste fittings complete.

19.34A.1 Semi rigid pipe


32 mm dia
Semi rigid PVC waste pipe with waste
each 1.00 7117
fittings
Carriage of materials and fixing charge 1 time 7.80 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.34A.1.2 40 mm dia
Analysis of rates similar to that of item no.
19.34A.1.1 except change in code no. for
PVC waste pipe I.e. 7118 instead of 7117

19.34A.2 Flexible pipe


19.34A.2.1 32 mm dia
Details of cost of one no
Materials-
Flexible pipe (coil type ) with waste fittings each 1 7119
Carriage of materials and fixing charge 1 time 7.80 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.34A.2.2 40 mm dia
Analysis of rates similar to that of item no.
19.34A.2.1 except change in code no. for
PVC waste pipe I.e. 7120 instead of 7119
19.35 P/F fisher union for wash basin
19.35.1 32 mm dia brass union
Details of cost of one no
Materials-
32 mm dia brass fisher union each 1.00 3750
Carriage of materials and fixing charge 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.35.2 40 mm dia brass union
Details of cost of one no
Materials-
40 mm dia brass fisher union each 1.00 3744
Carriage of materials and fixing charge 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.36 P/F C.P. brass trap for wash basins and
sinks
19.36.1 32 mm dia brass union
Details of cost of one no
Materials-
32 mm C.P. brass trap each 1.00 1894
Carriage of materials and fixing charge 1 time 7.80 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each

19.36.2 40 mm dia brass union


Details of cost of one no
Materials-
40 mm C.P. brass trap each 1.00 1895
Carriage of materials and fixing charge 1 time 7.80 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.37 P/F 2nd class teak wood draining board with
65 to 75 mm length skirting and beading,
wax polished complete. The board shall
bave a fluted surface with smooth finished
complete:
19.37.1 750x450x25 mm size
Details of cost of one no
Materials-
750x450x25 mm thick teak wood draining
each 1 1303
board with skirting and beading
Carriage of materials and fixing charge 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.37.2 600x450x25 mm size
Details of cost of one no
Materials-
600x450x25 mm thick teak wood draining
each 1 1302
board with skirting and beading
Carriage of materials and fixing charge 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.38 Providing and fixing 100 mm sand cast iron
grating for gully, floor or nahani trap.
Details of cost of one no
Materials-
100mm FCI grating for gully or nehani trap each 1 1369
Carriage of materials and fixing charge 1 time 1.60 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.38A P/F stainless steel jali (grating ) with or
withour hole for wate pipe for floor/nahani
trap
19.38A.1 75 mm dia weight not less than 70 gms
Details of cost of one no
Materials-
75 mm dia stainless steel grating each 1 7108
Carriage of materials and fixing charge 1 time 1.60 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.38A.2 100 mm dia weight not less than 100 gms
Analysis of rates similar to that of item no.
19.38A.1 except change in code no. for rate
of grating I.e. 7109 instead of 7108
19.38B P/F plastic moulded jalji of required colour
and shade for floor/nahani trap:
19.38B.1 Circular type
Details of cost of one no
Materials-
Plastic moulded jali circular type each 1.00 7110
Carriage of materials and fixing charge 1 time 1.60 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.38B.2 Rectangular with openable circular type lid
Analysis of rates similar to that of item no.
19.38B.1 except change in code no. for jali
i.e. 7111 instead of 7110
19.39 P/F puff pipe complete with brass perforated
cap:
19.39.1 15 mm dia puff pipe
Details of cost of one no
Materials-
P/F 15 mm dia G.I. Pipe (rate vide item no.
metre 1
20.2.1)
Brass perforated cap each 1 1310 (A) rate
I/CS water
Carriage of materials and fixing charge 1 time 1.60 9999 charges,
Add for water charges@ 1% on all except A C.P. and
overheads
Add for contractor's profit and overheads @
10% on all except A
Cost for one no.
Say Rs. each

19.39.2 20 mm dia puff pipe


Details of cost of one no
Materials-
P/F 20 mm dia G.I. Pipe (rate vide item no.
metre 1.00
20.2.2)
Brass perforated cap each 1.00 1311 (A) rate
Carriage of materials and fixing charge 1 time 1.60 9999 I/CS water
Add for water charges@ 1% on all except A charges,
C.P. and
overheads
Add for contractor's profit and overheads @
10% on all except A
Cost for one no.
Say Rs. each

19.39.3 25 mm dia puff pipe


Details of cost of one no
Materials-
P/F 25 mm dia G.I. Pipe (rate vide item no.
metre 1.00
20.2.3)
Brass perforated cap each 1.00 1312 (A) rate
Carriage of materials and fixing charge 1 time 1.60 9999 I/CS water
Add for water charges@ 1% on all except A charges,
C.P. and
overheads
Add for contractor's profit and overheads @
10% on all except A
Cost for one no.
Say Rs. each

19.40 Providing and fixing in position 32 mm


diameter GI flsh pipe for high level flushing
cistern complete including cutting and
making good the walls and floors
Details of cost of one no
Materials-
32 mm diameter galvanised iron telescopic
Each 1.00 1544
pipe with brass union
Cement, sand and grit 1 time 2.60 9999
Carriage of materials 1 time 2.60 9999
Labour:-
Mason 1st class Each 0.12 123
Beldar Each 0.25 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no. Say Rs. each

19.41 P/F in position 25 mm diameter mosquito


proof coupling of approved municipal
design.
Details of cost of one no
Materials-
Mosquito proof coupling of approved design Each 1.00 1350
Carriage of materials and fixing charge 1 time 0.70 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no. Say Rs. each

19.42 P/F 600x 450 mm bevelled edge mirror of


superior glass(of approved quality) complete
wit 6 mm thick hard board ground fixed to
wooden cleats with CP brass screws and
washers complete.
Details of cost of one no (A) rate I/cs
Materials- water
Mirror of superior make glass each 1 1392 charges,
C.P. &
600x450 mm 6 mm thick hard board
sqm 0.27 7116 overheads
wooden cleats
same as item no. 9.51 of sub-head, wood
work) each 4

25 mm C.P. brass screwa, and washers cent 0.04 588


Carriage of materials 1 time 1.6 9999
Sundries 1 time 0.55 9999

Labour:-
Carpenter 2nd class Each 0.12 112
Beldar Each 0.25 114
Add for water charges@ 1% on all except A

Add for contractor's profit and overheads @


10% on all except A
Cost for one no. Say Rs. each

19.42A P/F mirror of required shape and size with


plastic moulded frame of approved make
and shade with 6 mm thick hard board
backing
19.42A.1 Circular shape 450 mm dia.
Details of cost of one no
Materials-
Mirror 450 mm dia with plastic moulded
Each 1.00 7112
frame
Hard board 0.45x0.45 = 0.2025 sqm
Add wastage @ 10% = 0.0203 sqm
sqm 0.22 7116
= 0.2228 sqm
say 0.22 sqm
Rawl plug 40 to 50 mm cent 0.02 7048
C.P. brass screws and washers cent 0.02 588
sundries 1 time 0.55 9999
Carriage of materials 1 time 1.60 9999
Labour:-
Carpenter IInd class Each 0.33 112
Beldar Each 0.33 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no. Say Rs. each

19.42A.2 Ractangular shape 453x357 mm


Details of cost of one no
Materials-
Mirror 453x357 mm with plastic moulded
Each 1.00 7113
frame
Hard board 0.453x0.357 = 0.1617 sqm
Add wastage @ 10% = 0.0162 sqm
sqm 0.18 7116
= 0.1779 sqm
say 0.18 sqm
Rawl plug 40 to 50 mm cent 0.04 7048
C.P. brass screws and washers cent 0.04 588
sundries 1 time 0.55 9999
Carriage of materials 1 time 1.60 9999
Labour:-
Carpenter IInd class Each 0.33 112
Beldar Each 0.33 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no. Say Rs. each

19.42A.3 Oval shape 450x350 mm (Outer


dimensions)
Details of cost of one no
Materials-
Oval shape 450x350 mm (Outer
Each 1.00 7114
dimensions)
Hard board 0.45x0.35 = 0.1575 sqm
Add wastage @ 10% = 0.0158 sqm
= 0.1733 sqm sqm 0.17 7116
say 0.17 sqm
Rawl plug 40 to 50 mm cent 0.04 7048
C.P. brass screws and washers cent 0.04 588
sundries 1 time 0.55 9999
Carriage of materials 1 time 1.60 9999
Labour:-
Carpenter IInd class Each 0.33 112
Beldar Each 0.33 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no. Say Rs. each

19.42A.4 Ractangular shape 1500x450 mm


Details of cost of one no
Materials-
Mirror 1500x450 mm with plastic moulded
Each 1.00 7115
frame
Hard board 1.50x0.45 = 0.675 sqm
Add wastage @ 10% = 0.0675 sqm
sqm 0.74 7116
= 0.7425 sqm
say 0.74 sqm
Rawl plug 40 to 50 mm cent 0.04 7048
C.P. brass screws and washers cent 0.04 588
sundries 1 time 0.55 9999
Carriage of materials 1 time 1.60 9999
Labour:-
Carpenter IInd class Each 0.33 112
Beldar Each 0.33 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no. Say Rs. each

19.43 P/F 600x120x5 mm glass shelf with edges


rounded off supported on anodised
aluminium angle frame with CP brass
brackets and guard rail complete fixed with
40 mm long screws, rawl plugs etc.
complete.
Details of cost of one no
Materials-
600x120x5 mm glass shelf with anodised
aluminium angle frame C.P. brass brackets each 1.00 3228
and guard railof standard size
Rawl plugs each 2.00 7048
40 mm C.P. brass screws cent 0.04 586
Carriage of materials 1 time 1.60 9999
Labour:-
Carpenter IInd class Each 0.25 112
Beldar Each 0.25 114
Add for water charges@ 1% on all except A

Add for contractor's profit and overheads @


10% on all except A
Cost for one no. Say Rs. each

19.44 P/F towel rail complete with brackets fixed to


wooden clears with C.P. brass screws.
19.44.1 C.P. Brass towel rail with two C.P. brass
brackets.
19.44.1.1 750x20 mm size
Details of cost of one no
Materials-
750x20 mm C.P. Brass towel rail together (A) rate I/cs
with a pair of C.P. brass brackets to fit the water
size of towel rail wooden cleats charges,
25 mm C.P. brass screwa, cent C.P. &
Carriage of materials 1 time overheads
Labour:-
Carpenter IInd class Each 0.17 112
Beldar Each 0.17 114
Add for water charges@ 1% on all except A

Add for contractor's profit and overheads @


10% on all except A
Cost for one no. Say Rs. each

19.44.1.2 600x20 mm size


Analysis of rate same as for item no.
19.44.1.1 except the code of White the code
of towel rail 600x30 mm will be 1888 instead
of 1887
19.44.2 Anodised aluminium towel rail with two
anodised aluminium brackets
750x20 mm size
Details of cost of one no
Materials-
750x20 mm anodised aluminium towel rail A
Each 1.00 3224
with two anodised aluminium brackets
wooden plugs(Rate as per item no. 9.51 of
Each 2.00
wood work)
25 mm C.P. brass screwa, cent 0.06 588
Carriage of materials 1 time 1.60 9999
Labour:-
Carpenter IInd class Each 0.17 112
Beldar Each 0.17 114
Add for water charges@ 1% on all except A

Add for contractor's profit and overheads @


10% on all except A
Cost for one no. Say Rs. each

19.44.2.2 600x20 mm size


Analysis of rate same as for item no.
19.44.2.1 except the code of anodised
alumimium rail fluted surface with a pair of
anodised aluminium brackets of size 600x20
mm will be 3225 instead of code no. 3224

19.45 P/F toilet paper holder :


19.45.1 C.P. brass
Materials-
C.P. brass toilet paper holder of standard (A) rate I/cs
Each 1.00 1889
size water
charges,
C.P. &
overheads
(A) rate I/cs
water
wood cleats ((Rate as per item no. 9.51 of charges,
Each 2.00 C.P. &
wood work)
25 mm C.P. brass screwa, cent 0.06 588 overheads
Carriage of materials 1 time 1.65 9999
Labour:-
Carpenter IInd class Each 0.12 112
Beldar Each 0.12 114
Add for water charges@ 1% on all except A

Add for contractor's profit and overheads @


10% on all except A
Cost for one no. Say Rs. each

19.45.2 Vitreous china


Details of cost of one no (A) rate I/cs
Materials- water
Vitreous china toilet paper holder of charges,
Each 1.00 3749 C.P. &
standard size
overheads
wood cleats (Rate as per item no. 9.51 of
Each 2.00
S.H. wood work)
25 mm C.P. brass screwa, cent 0.06 588
Carriage of materials 1 time 1.65 9999
Labour:-
Carpenter IInd class Each 0.12 112
Beldar Each 0.12 114
Add for water charges@ 1% on all except A

Add for contractor's profit and overheads @


10% on all except A
Cost for one no. Say Rs.

19.48 P/F soil, waste and vent pipes:


19.48.1 100 mm dia
19.48.1.1 Sand cast iron S&S pipe
Materials-
100 mm sand cast iron pipe single scoket
each 10.00 1617
(1.80m long)
5% Allowance for wastage Scaffolding 1 time 31.05 9999
Carriage of materials 1 time 20.70 9999
Labour:-
Filtter Ist class each 0.42 116
Bandhani each 0.21 1000
Beldar each 0.83 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for 17.37 metre
Cost per metre
Say Rs. Per metre
19.48.1.2 Centrifugally cast (spun iron S&S pipe
Details of cost for 16.87 m
(1.75mx10)-(9x0.07m) joints = 16.87 m
Materials-
100 mm centrifugally cast (spun iron S&S
each 10.00 3620
pipe
5% Allowance for wastage Scaffolding 1 time 31.05 9999
Carriage of materials 1 time 20.70 9999
Labour:-
Filtter Ist class each 0.42 116
Bandhani each 0.21 1000
Beldar each 0.83 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for 16.87 m
Cost per metre
Say Rs. Per metre
19.48.2 75 mm dia
19.48.2.1 Sand cast iron S&S pipe
Details of cost for 17.42 m
(1.8mx10)-(9x0.065m) joints = 17.415 m
say 17.42 m
Materials-
75 mm sand cast iron S&S pipe single
each 10.00 1616
scoket (1.80m long)
5% Allowance for wastage Scaffolding 1 time 31.05 9999
Carriage of materials 1 time 15.53 9999
Labour:-
Filtter Ist class each 0.35 116
Bandhani each 0.17 1000
Beldar each 0.70 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for 17.42 metre
Cost per metre
Say Rs. Per metre
19.48.2.2 Centrifugally cast (spun) iron S&S pipe
Details of cost for 16.92 m
(1.75mx10)-(9x0.065m) joints = 16.915 m
say 16.92m
Materials-
75 mm Centrifugally cast iron S&S pipe
each 10.00 3621
single scoket (1.75m long)
5% Allowance for wastage Scaffolding 1 time 31.05 9999
Carriage of materials 1 time 15.53 9999
Labour:-
Filtter Ist class each 0.35 116
Bandhani each 0.17 1000
Beldar each 0.70 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for 16.92 metre
Cost per metre
Say Rs. Per metre

19.48.3 50 mm dia
Sand cast iron S&S pipe
Details of cost for 17.46 m
(1.8mx10)-(9x0.06m) joints = 17.46 m

Materials-
50 mm sand cast iron S&S pipe single
each 10.00 1615
scoket (1.80m long)
5% Allowance for wastage Scaffolding 1 time 31.05 9999
Carriage of materials 1 time 15.53 9999
Labour:-
Filtter Ist class each 0.35 116
Bandhani each 0.17 1000
Beldar each 0.70 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for 17.46 metre
Cost per metre
Say Rs. Per metre
19.48.3.2 Centrifugally cast (spun) iron S&S pipe
Details of cost for 16.96 m
(1.75mx10)-(9x0.06m) joints = 16.96 m
Materials-
50 mm Centrifugally cast (spun) iron S&S
each 10.00 3622
pipe (1.75 m long)
5% Allowance for wastage Scaffolding 1 time 31.05 9999
Carriage of materials 1 time 10.35 9999
Labour:-
Filtter Ist class each 0.28 116
Bandhani each 0.14 1000
Beldar each 0.56 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for 16.96 metre
Cost per metre
Say Rs. Per metre

19.48A P/F the joints with spun yarn cement slurry


and cement mortar 1:2 (1 cement :2 fine
sand) in S.C.I./C.I. Pipes
19.48A.1 50 mm dia pipe
Details of cost for 4 joints
Materials-
Cement mortar spun yarn etc. 1 time 1.75 9999
Labour:-
Filtter each 0.20 116
Beldar each 0.20 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for 4 joints
Cost per metre
Say Rs. Per metre
19.48A.2 75 mm dia pipe
Details of cost for 4 joints
Materials-
Cement mortar spun yarn etc. 1 time 2.65 9999
Labour:-
Filtter each 0.28 116
Beldar each 0.28 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for 4 joints
Cost per metre
Say Rs. Per metre

19.48A.3 100 mm dia pipe


Details of cost for 4 joints
Materials-
Cement mortar spun yarn etc. 1 time 3.10 9999
Labour:-
Filtter each 0.33 116
Beldar each 0.33 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for 4 joints
Cost per metre
Say Rs. Per metre

19.49 P/F M.S. holder bat clamps of approved


design to sand Cast iron/cast iron(spun)pipe
embedded in and including cement concrete
blocks 10x10x10 cm of 1:2:4 miz(1
cement:2 coarse sand: 4 graded stone
aggregate 20 mm nominal size) including
cost of cutting holes and making good the
walls etc.
19.49.1 For 100 mm dia . Pipe
(Rate as per item no. 12.71.2 of S.H.
Roofing)
19.49.2 For 75 mm dia . Pipe
(Rate as per item no. 12.71.1 of S.H.
Roofing)
19.49.3 For 50 mm dia . Pipe
Details of cost for 5 clamps (A) rate I/cs
Materials- water
M.S. clamps for 50 mm pipes each 5.00 1333 charges,
C.P. &
C.C. block 5x0.1x0.1x0.1 = 0.005 cum (Rate
overheads
vide item no. 4.6.3. Of S.H. concrete work) cum 0.01

Carriage of bat clamps 1 time 0.95 9999


Labour:-
Filtter (grade I) each 0.13 116
Mason(II nd class) each 0.75 124
Beldar 0.50 114
sundries 2.75 9999
Add for water charges@ 1% on all except A

Add for contractor's profit and overheads @


10% on all except A
Cost for 5 clamps
Cost for 1 clamp
Say Rs. each
19.50 P/F bend of required degree with access
door, insertion rubber washer 3mm thick,
bolts and nuts complete
19.50.1 100 mm
19.50.1.1 Sand cast iron S&S
Details of cost of one no
Materials-
100 mm dia sand cast iron bend with access
door including cost of bolts and nuts each 1.00 1625

Insertion rubber washer 3mm thick each 1.00 1374


Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.50.1.2 Centrifugally cast (spun) iron S&S pipe
Analysis of rate same as for item no.
19.50.1.1 except the code of 100 mm dia
centrifugally cast (spun) iron S&S bend with
access door including cost of bolts & nuts
will be 3624 instead of code no. 1625
19.50.2 75 mm dia
19.50.2.1 Sand cast iron S&S pipe
Details of cost of one no
Materials-
75 mm dia sand cast iron bend with access
each 1.00 1624
door including cost of bolts and nuts
Insertion rubber washer 3mm thick each 1.00 1373
Carriage of materials and fixing charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each

19.50.2.2 Centrifugally cast (spun) iron S&S pipe


Analysis of rate same as for item no.
19.50.2.1 except the code of 75 mm dia
centrifugally cast (spun) iron S&S bend with
access door including cost of bolts & nuts
will be 3625 instead of code no. 1624

19.50.3 50 mm dia
19.50.3.1 Sand cast iron S&S pipe
Details of cost of one no
Materials-
50 mm dia sand cast iron bend with access
each 1.00 1623
door including cost of bolts and nuts
Insertion rubber washer 3mm thick each 1.00 1372
Carriage of materials and fixing charges 1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.50.3.2 Centrifugally cast (spun) iron S&S pipe
Analysis of rate same as for item no.
19.50.3.1 except the code of 50 mm dia
centrifugally cast (spun) iron S&S bend with
access door including cost of bolts & nuts
will be 3626 instead of code no. 1623

19.51 P/F plain bend of required degree


19.51.1 100 mm dia
19.51.1.1 Sand cast iron S&S pipe
Details of cost of one no.
Materials-
100 mm sand cast iron plain bend each 1.00 1621
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each

19.51.1.2 Centrifugally cast (spun) iron S&S pipe


Analysis of rate same as for item no.
19.51.1.1 except the code of 100 mm dia
centrifugally cast (spun) iron S&S bend with
access door including cost of bolts & nuts
will be 3628 instead of code no. 1621
19.51.2 75 mm dia
19.51.2.1 Sand cast iron S&S pipe
Details of cost of one no.
Materials-
75 mm sand cast iron plain bend each 1.00 1620
Carriage of materials and fixing charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each

19.51.2.2 Centrifugally cast (spun) iron S&S pipe


Analysis of rate same as for item no.
19.51.2.1 except the code of 75 mm dia
centrifugally cast (spun) iron S&S bend with
access door including cost of bolts & nuts
will be 3629 instead of code no. 1620

19.51.3 50 mm dia
19.51.3.1 Sand cast iron S&S pipe
Details of cost of one no.
Materials-
50 mm sand cast iron plain bend each 1.00 1619
Carriage of materials and fixing charges 1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each

19.51.3.2 Centrifugally cast (spun) iron S&S pipe


Analysis of rate same as for item no.
19.51.3.1 except the code of 50 mm dia
centrifugally cast (spun) iron S&S bend with
access door including cost of bolts & nuts
will be 3630 instead of code no. 1619

19.52 P/F heel rest sanitary bend


19.52.1 100 mm dia
19.52.1.1 Sand cast iron S&S pipe
Details of cost of one no.
Materials-
100 mm sand cast iron heel rest bend each 1.00 1667
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each
19.52.1.2 Centrifugally cast (spun) iron S&S pipe
Analysis of rate is similar to item no.
19.52.1.1 except the code of 100 mm dia
centrifugally cast (spun) iron S&S heel rest
sanitary bend will be 3634 instead of code
no. 1667
19.52.2 75 mm
19.52.2.1 Sand cast iron S&S pipe
Details of cost of one no.
Materials-
75 mm sand cast iron heel rest bend each 1.00 1666
Carriage of materials and fixing charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each

19.52.2.2 Centrifugally cast (spun) iron S&S pipe


Analysis of rate is similar to item no.
19.52.2.1 except the code of 75mm dia
centrifugally cast (spun) iron S&S heel rest
sanitary bend will be 3635 instead of code
no. 1666
19.52.3 50 mm
19.52.3.1 Sand cast iron S&S pipe
Details of cost of one no.
Materials-
50mm sand cast iron heel rest bend each 1.00 1665
Carriage of materials and fixing charges 1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one no.
Say Rs. each

19.52.3.2 Centrifugally cast (spun) iron S&S pipe


Analysis of rate is similar to item no.
19.52.3.1 except the code of 50 mm dia
centrifugally cast (spun) iron S&S heel rest
sanitary bend will be 3636 instead of code
no. 1665
19.53 P/F double equal junction of required degree
with access door, insertion rubber washer 3
mm thick, bolts and nuts complete

19.53.1 100x100x100x100 mm
Sand cast iron S&S pipe
Details of cost of one no.
Materials-
100x100x100x100 mm sand cast iron
double equal junction with access door each 1.00 1637
including cost of bolts and nuts
Insertion rubber washer 3mm thick each 1.00 1374
Carriage of materials and fixing charges 1 time 5.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each
19.53.1.2 Centrifugally cast (spun) iron S&S pipe
Analysis of rate is similar to item no.
19.53.1.1 except code of 100x100x100x100
mm dia centrifugally cast (spun) iron S&S
double equal junction with access door
including cost of nuts and bolts will be 3654
instead of code no. 1637

19.53.2 75x75x75x75 mm
Sand cast iron S&S pipe
Details of cost of one no.
Materials-
75x75x75x75 mm sand cast iron double
equal junction with access door including each 1.00 1636
cost of bolts and nuts
Insertion rubber washer 3mm thick each 1.00 1373
Carriage of materials and fixing charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each
19.53.2.2 Centrifugally cast (spun) iron S&S pipe
Analysis of rate is similar to item no.
19.53.1.1 except code of 75x75x75x75 mm
dia centrifugally cast (spun) iron S&S double
equal junction with access door including
cost of nuts and bolts will be 3655 instead
of code no. 1636
19.53.3 50x50x50x50 mm
19.53.3.1 Sand cast iron S&S pipe
Details of cost of one no.
Materials-
50x50x50x50 mm sand cast iron double
equal junction with access door including each 1.00 1635
cost of bolts and nuts
Insertion rubber washer 3mm thick each 1.00 1372
Carriage of materials and fixing charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each
19.53.3.2 Centrifugally cast (spun) iron S&S pipe
Analysis of rate is similar to item no.
19.53.3.1 except code of 50x50x50x50 mm
centrifugally cast (spun) iron S&S double
equal junction with access door including
cost of nuts and bolts will be 3656 instead
of code no. 1635
19.54 P/F double equal junction of required degree

19.54.1 100x100x100x100 mm
19.54.1.1 Sand cast iron S&S pipe
Details of cost of one no.
Materials-
100x100x100x100 mm sand cast iron
each 1.00 1634
double equal junction
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each
19.54.1.2 Centrifugally cast (spun) iron S&S pipe
Analysis of rate is similar to item no.
19.54.1.1 except code of 100x100x100x100
mm dia centrifugally cast (spun) iron S&S
double equal plain junction will be 3650
instead of code no. 1634

75x75x75x75 mm
Sand cast iron S&S pipe
Details of cost of one no.
Materials-
75x75x75x75 mm sand cast iron double
each 1.00 1633
equal junction
Carriage of materials and fixing charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each
19.54.2.2 Centrifugally cast (spun) iron S&S pipe
Analysis of rate is similar to item no.
19.54.2.1 except code of 75x75x75x75 mm
centrifugally cast (spun) iron S&S double
equal plain junction will be 3651 instead of
code no. 1633
50x50x50x50 mm
Sand cast iron S&S pipe
Details of cost of one no.
Materials-
50x50x50x50 mm sand cast iron double
each 1.00 1632
equal junction
Carriage of materials and fixing charges 1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each

19.54.3.2 Centrifugally cast (spun) iron S&S pipe


Analysis of rate is similar to item no.
19.54.3.1 except the code of 50x50x50x50
mm centrifugally cast (spun) iron S&S
double equal plain junction will be 3652
instead of code no. 1632
19.55 P/F single equal plain junction of required
degree with access door, insertion rubber
washer 3 mm thick, bolts and nuts complete

19.55.1 100x100x100x100 mm
19.55.1.1 Sand cast iron S&S pipe
Details of cost of one no.
100x100x100 mm single equal junction with
access door including cost of bolts and nuts each 1.00 1631

Insertion rubber washer 3mm thick each 1.00 1374


Carriage of materials and fixing charges 1 time 5.2 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each

19.55.1.2 Centrifugally cast (spun) iron S&S pipe


Analysis of rate is similar to item no.
19.55.1.1 except code of 100x100x100 mm
centrifugally cast (spun) iron S&S single
equal plain junction with access door with
bolts and nuts will be 3644 instead of code
no. 1631
75x75x75 mm
19.55.2.1 Sand cast iron S&S pipe
Details of cost of one no.
Materials-
75x75x75x75 mm sand cast iron singele
equal junction with access door with bolts each 1.00 1630
and nuts
Insertion rubber washer 3mm thick each 1.00 1373
Carriage of materials and fixing charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each
19.55.2.2 Centrifugally cast (spun) iron S&S pipe
Analysis of rate is similar to item no.
19.55.2.1 except code of 75x75x75 mm
centrifugally cast (spun) iron S&S single
equal plain junction with access door with
bolts and nuts will be 3645 instead of code
no. 1630
19.55.3 50x50x50 mm
19.55.3.1 Sand cast iron S&S pipe
Details of cost of one no.
Materials-
50x50x50mm sand cast iron single equal
junction with access door with bolts and nuts each 1.00 1629

Insertion rubber washer 3mm thick each 1.00 1372


Carriage of materials and fixing charges 1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each
19.55.3.2 Centrifugally cast (spun) iron S&S pipe
Analysis of rate is similar to item no.
19.53.3.1 except code of 50x50x50 mm
centrifugally cast (spun) iron S&S single
equal junction with access door including
cost of nuts and bolts will be 3646 instead
of code no. 1629
P/F single equal junction of required degree
100x100x100x100 mm
Sand cast iron S&S pipe
Details of cost of one no.
Materials-
100x100x100 mm sand cast iron single
each 1.00 1628
equal junction
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each
19.56.1.2 Centrifugally cast (spun) iron S&S pipe
Analysis of rate is similar to item no.
19.56.1.1 except code of 100x100x100 mm
centrifugally cast (spun) iron S&S single
equal plain junction will be 3640 instead of
code no. 1628
19.56.2 75x75x75 mm
19.56.2.1 Sand cast iron S&S pipe
Details of cost of one no.
Materials-
75x75x75 mm sand cast iron single equal
each 1.00 1627
junction
Carriage of materials and fixing charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each
19.56.2.2 Centrifugally cast (spun) iron S&S pipe
Analysis of rate is similar to item no.
19.56.2.1 except code of 75x75x75 mm
centrifugally cast (spun) iron S&S single
equal plain junction will be 3641 instead of
code no. 1627
19.56.3 50x50x50 mm
19.56.3.1 Sand cast iron S&S pipe
Details of cost of one no.
Materials-
50x50x50 mm sand cast iron single equal
each 1.00 1626
junction
Carriage of materials and fixing charges 1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each

19.56.3.2 Centrifugally cast (spun) iron S&S pipe


Analysis of rate is similar to item no.
19.56.3.1 except the code of 50x50x50 mm
centrifugally cast (spun) iron S&S single
equal plain junction will be 3642 instead of
code no. 1626
P/F single equal plain junction of required
degree with access door, insertion rubber
washer 3 mm thick, bolts and nuts complete:

19.57.1 100x100x75x75 mm
19.57.1.1 Sand cast iron S&S pipe
Details of cost of one no.
100x100x75x75 mm sand cast iron branch
with access door including cost of bolts and each 1.00 1362
nuts
Insertion rubber washer 3mm thick each 1.00 1374
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each

19.57.1.2 Centrifugally cast (spun) iron S&S pipe


Analysis of rate is similar to item no.
19.57.1.1 except code of
100x100x75x75mm centrifugally cast
(spun) iron S&S double unequal plain
junction with access door with bolts and nuts
will be 3674 instead of code no. 1662

19.57.2 100x100x50x50 mm
19.57.2.1 Sand cast iron S&S pipe
Details of cost of one no.
Materials-
100x100x50x50 mm sand cast iron double
unequal junction with access door with bolts each 1.00 1663
and nuts
Insertion rubber washer 3mm thick each 1.00 1374
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each
19.57.2.2 Centrifugally cast (spun) iron S&S pipe
Analysis of rate is similar to item no.
19.57.2.1 except code of100x100x50x50
mm centrifugally cast (spun) iron S&S
double unequal plain junction with access
door with bolts and nuts will be 3675
instead of code no. 1663
19.57.3 75x75x50x50 mm
19.57.3.1 Sand cast iron S&S pipe
Details of cost of one no.
Materials-
75x75x50x50 mm sand cast iron double
equal junction with access door with bolts each 1.00 1664
and nuts
Insertion rubber washer 3mm thick each 1.00 1373
Carriage of materials and fixing charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each

19.57.3.2 Centrifugally cast (spun) iron S&S


Analysis of rate is similar to item no.
19.57.3.1 except the code of 75x75x50x50
mm centrifugally cast (spun) iron S&S
double unequal plain junction will be 3676
instead of code no. 1664
19.58 P/F double unequa plain junction of required
degree :
19.58.1 100x100x75x75 mm
19.58.1.1 Sand cast iron S&S
Details of cost of one no.
100x100x75x75 mm junction. each 1.00 1659
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each

19.58.1.2 Centrifugally cast (spun) iron S&S


Analysis of rate is similar to item no.
19.58.1.1 except code of
100x100x75x75mm centrifugally cast
(spun) iron S&S double unequal plain
junction will be 3670 instead of code no.
1659
19.58.2 100x100x50x50 mm
19.58.2.1 Sand cast iron S&S pipe
Details of cost of one no.
Materials-
100x100x50x50 mm junction each 1.00 1660
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each
19.58.2.2 Centrifugally cast (spun) iron S&S
Analysis of rate is similar to item no.
19.58.2.1 except code of 100x100x50x50
mm centrifugally cast (spun) iron S&S
double unequal plain junction will be 3671
instead of code no. 1660
19.58.3 75x75x50x50 mm
19.58.3.1 Sand cast iron S&S pipe
Details of cost of one no.
Materials-
75x75x50x50 mm junction each 1.00 1661
Carriage of materials and fixing charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each

19.58.3.2 Centrifugally cast (spun) iron S&S


Analysis of rate is similar to item no.
19.58.3.1 except the code of 75x75x50x50
mm centrifugally cast (spun) iron S&S
double unequal plain junction will be 3672
instead of code no. 1661

19.59 P/F single unequal plain junction of required


degree with access door, insertion rubber
washer 3 mm thick, bolts and nuts complete:

19.59.1 100x100x75 mm
19.59.1.1 Sand cast iron S&S pipe
Details of cost of one no.
100x100x75 mm sand cast iron single
unequal junction with access door including each 1.00 1656
cost of bolts and nuts
Insertion rubber washer 3mm thick each 1.00 1374
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each

19.59.1.2 Centrifugally cast (spun) iron S&S pipe


Analysis of rate is similar to item no.
19.59.1.1 except code of 100x100x75mm
centrifugally cast (spun) iron S&S single
unequal plain junction with access door with
bolts and nuts will be 3664 instead of code
no. 1656
19.59.2 100x50x50 mm
19.59.2.1 Sand cast iron S&S
Details of cost of one no.
Materials-
100x50x50 mm sand cast iron single
unequal junction with access door with bolts each 1.00 1657
and nuts
Insertion rubber washer 3mm thick each 1.00 1374
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each
19.59.2.2 Centrifugally cast (spun) iron S&S
Analysis of rate is similar to item no.
19.59.2.1 except the code of 100x100x50
mm centrifugally cast (spun) iron S&S
single unequal plain junction with access
door with bolts and nuts will be 3665
instead of code no. 1657
19.59.3 75x75x50 mm
19.59.3.1 Sand cast iron S&S pipe
Details of cost of one no.
Materials-
75x75x50 mm S.C.I single unequal junction
with access door including cost of bolts and each 1.00 1658
nuts
Insertion rubber washer 3mm thick each 1.00 1373
Carriage of materials and fixing charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each

19.59.3.2 Centrifugally cast (spun) iron S&S


Analysis of rate is similar to item no.
19.59.3.1 except the code of 75x75x50 mm
centrifugally cast (spun) iron S&S single
unequal plain junction will be 3666 instead
of code no. 1658
19.60 P/F single unequal plain junction of required
degree :
19.60.1 100x100x75 mm
19.60.1.1 Sand cast iron S&S pipe
Details of cost of one no.
100x100x75 mm junction each 1.00 1653
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each

19.60.1.2 Centrifugally cast (spun) iron S&S


Analysis of rate is similar to item no.
19.60.1.1 except code of 100x100x75mm
centrifugally cast (spun) iron S&S single
unequal plain junction will be 3660 instead
of code no. 1653
19.60.2 100x100x50 mm
19.60.2.1 Sand cast iron S&S
Details of cost of one no.
Materials-
100x100x50 mm junction each 1.00 1654
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each
19.60.2.2 Centrifugally cast (spun) iron S&S
Analysis of rate is similar to item no.
19.60.2.1 except code of 100x100x50mm
centrifugally cast (spun) iron S&S single
unequal plain junction will be 3661 instead
of code no. 1654
19.60.3 75x75x50 mm
19.60.3.1 Sand cast iron S&S
Details of cost of one no.
Materials-
75x75x50 mm junction each 1.00 1655
Carriage of materials and fixing charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost for one junction.
Say Rs. each

19.60.3.2 Centrifugally cast (spun) iron S&S


Analysis of rate is similar to item no.
19.60.3.1 except the code of 75x75x50 mm
centrifugally cast (spun) iron S&S single
unequal plain junction will be 3662 instead
of code no. 1655
19.61 P/F double unequal plain invert branch of
required degree :
19.61.1 100x100x100x100 mm
19.61.1.1 Sand cast iron S&S
Details of cost of one no.
100x100x100x100 mm sand cast iron invert
each 1.00 1673
branch
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one invert branch
Say Rs. each

19.61.1.2 Centrifugally cast (spun) iron S&S


Analysis of rate is similar to item no.
19.61.1.1 except code of
100x100x100x100mm centrifugally cast
(spun) iron S&S double equal plain invert
branch will be 3685 instead of code no.
1673
19.61.2 75x75x75x75 mm
19.61.2.1 Sand cast iron S&S
Details of cost of one no.
Materials-
75x75x75x75 mm sand cast iron invert
each 1.00 1672
branch
Carriage of materials and fixing charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one invert branch
Say Rs. each
19.61.2.2 Centrifugally cast (spun) iron S&S
Analysis of rate is similar to item no.
19.61.2.1 except code of 75x75x75x75mm
centrifugally cast (spun) iron S&S double
equal plain invert branch will be 3686
instead of code no. 1672

19.61.3 50x50x50x50 mm
19.61.3.1 Sand cast iron S&S
Details of cost of one no.
Materials-
50x50x50x50 mm sand cast iron invert
each 1.00 1671
branch
Carriage of materials and fixing charges 1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one invert branch
Say Rs. each
19.61.3.2 Centrifugally cast (spun) iron S&S
Analysis of rate is similar to item no.
19.61.3.1 except the code of 50x50x50x50
mm centrifugally cast (spun) iron S&S
double equal plain invert branch will be
3687 instead of code no. 1671
19.62 P/F single equal plain invert branch of
required degree :
19.62.1 100x100x100 mm
19.62.1.1 Sand cast iron S&S
Details of cost of one no.
Materials-
100x100x100 mm sand cast iron invert
each 1.00 1670
branch
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one invert branch
Say Rs. each

19.62.1.2 Centrifugally cast (spun) iron S&S


Analysis of rate is similar to item no.
19.62.1.1 except code of 100x100x100mm
centrifugally cast (spun) iron S&S single
equal plain invert branch will be 3681
instead of code no. 1670
19.62.2 75x75x75 mm
19.62.2.1 Sand cast iron S&S
Details of cost of one no.
Materials-
75x75x75 mm sand cast iron invert branch each 1.00 1669
Carriage of materials and fixing charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one invert branch
Say Rs. each
19.62.2.2 Centrifugally cast (spun) iron S&S
Analysis of rate is similar to item no.
19.62.2.1 except code of 75x75x75mm
centrifugally cast (spun) iron S&S single
equal plain invert branch will be 3682
instead of code no. 1669

19.62.3 50x50x50x50 mm
19.62.3.1 Sand cast iron S&S
Details of cost of one no.
Materials-
50x50x50 mm sand cast iron invert branch each 1.00 1668
Carriage of materials and fixing charges 1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one invert branch
Say Rs. each

19.62.3.2 Centrifugally cast (spun) iron S&S


Analysis of rate is similar to item no.
19.62.3.1 except the code of 50x75x50 mm
centrifugally cast (spun) iron S&S single
unequal plain invert branch will be 3683
instead of code no. 1668
19.63 P/F double unequal plain invert branch of
required degree :
19.63.1 100x100x75x75 mm
19.63.1.1 Sand cast iron S&S
Details of cost of one no.
Materials-
100x100x75x75 mm sand cast iron invert
each 1.00 1677
branch
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one invert branch
Say Rs. each
19.63.1.2 Centrifugally cast (spun) iron S&S
Analysis of rate is similar to item no.
19.63.1.1 except code of
100x100x75x75mm centrifugally cast
(spun) iron S&S double equal plain invert
branch will be 3695 instead of code no.
1677
19.63.2 100x100x50x50 mm
19.63..2.1 Sand cast iron S&S
Details of cost of one no.
Materials-
100x100x50x50 mm sand cast iron invert
each 1.00 1678
branch
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one invert branch
Say Rs. each
19.63.2.2 Centrifugally cast (spun) iron S&S
Analysis of rate is similar to item no.
19.63.2.1 except code of
100x100x50x50mm centrifugally cast
(spun) iron S&S double unequal plain invert
branch will be 3696 instead of code no.
1678
19.63.3 75x75x50x50 mm
19.63.3.1 Sand cast iron S&S
Details of cost of one no.
Materials-
75x75x50x50 mm sand cast iron invert
each 1.00 1679
branch
Carriage of materials and fixing charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one invert branch
Say Rs. each
19.63.3.2 Centrifugally cast (spun) iron S&S
Analysis of rate is similar to item no.
19.63.3.1 except the code of 75x75x50x50
mm centrifugally cast (spun) iron S&S
double unequal plain invert branch will be
3697 instead of code no. 1679

19.64 P/F single unequal plain invert branch of


required degree :
19.64.1 100x100x75 mm
19.64.1.1 Sand cast iron S&S
Details of cost of one no.
Materials-
100x100x75mm sand cast iron invert branch
each 1.00 1674
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one invert branch
Say Rs. each

19.64.1.2 Centrifugally cast (spun) iron S&S


Analysis of rate is similar to item no.
19.64.1.1 except code of 100x100x75mm
centrifugally cast (spun) iron S&S single
unequal plain invert branch will be 3690
instead of code no. 1674
19.64.2 100x100x50 mm
19.64.2.1 Sand cast iron S&S
Details of cost of one no.
Materials-
100x100x50 mm sand cast iron invert
each 1.00 1675
branch
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one invert branch
Say Rs. each
19.64.2.2 Centrifugally cast (spun) iron S&S
Analysis of rate is similar to item no.
19.64.2.1 except code of 100x100x50mm
centrifugally cast (spun) iron S&S single
unequal plain invert branch will be 3691
instead of code no. 1675
19.64.3 75x75x50 mm
19.64.3.1 Sand cast iron S&S
Details of cost of one no.
Materials-
75x75x50 mm sand cast iron invert branch each 1.00 1676
Carriage of materials and fixing charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one invert branch
Say Rs. each

19.64.3.2 Centrifugally cast (spun) iron S&S


Analysis of rate is similar to item no.
19.64.3.1 except code of 75x75x50mm
centrifugally cast (spun) iron S&S single
unequal plain invert branch will be 3692
instead of code no. 1676
19.65 Providing and fixing sand cast iron S&S off
sets:
19.65.1 76 mm off sets
19.65.1.1 with 50mm dia pipe
Details of cost of one no.
Materials-
76 mm sand cast iron S&S offset with 50
each 1.00 3745
mm dia pipe
Carriage of materials and fixing charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each

19.65.1.2 with 75mm dia pipe


Analysis of rate is similar to item no.
19.65.1.1 except code of 76 mm sand cast
iron S&S offeset with 75 mm dia pipe will be
3746 instead of code no. 3745
19.65.1.3 with 100mm dia pipe
Analysis of rate is similar to item no.
19.65.1.1 except code of 76 mm sand cast
iron S&S offeset with 100 mm dia pipe will
be 3747 instead of code no. 3745

19.65.2 114 mm off sets


19.65.2.1 with 50mm dia pipe
Details of cost of one no.
Materials-
114 mm sand cast iron S&S offset with 50
each 1.00 3711
mm dia pipe
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each

19.65.2.2 with 75mm dia pipe


Analysis of rate is similar to item no.
19.65.2.1 except code of114mm sand cast
iron S&S offeset with 75 mm dia pipe will be
3712 instead of code no. 3711
19.65.2.3 with 100mm dia pipe
Analysis of rate is similar to item no.
19.65.2.1 except code of 114mm sand cast
iron S&S offeset with 100 mm dia pipe will
be 3713 instead of code no. 3711

19.65.3 152 mm off sets


with 50mm dia pipe
Details of cost of one no.
Materials-
152 mm sand cast iron S&S offset with 50
each 1.00 3715
mm dia pipe
Carriage of materials and fixing charges 1 time 6.90 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each

19.65.3.2 with 75mm dia. pipe


Analysis of rate is similar to item no.
19.65.3.1 except code of 152mm sand cast
iron S&S offeset with 75 mm dia pipe will be
3716 instead of code no. 3715
19.65.3.3 with 100mm dia pipe
Analysis of rate is similar to item no.
19.65.3.1 except code of 152mm sand cast
iron S&S offeset with 100 mm dia pipe will
be 3717 instead of code no. 3715
19.65A P/F centrifugally cast (spun)iron S&S off
sets.
19.65A.1 75 mm off sets
19.65A.1.1 with 50mm dia pipe
Details of cost of one no.
Materials-
75 mm centrifugally cast iron S&S offset
each 1.00 3698
with 50 mm dia pipe
Carriage of materials and fixing charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each

19.65A.1.2 with 75mm dia pipe


Analysis of rate is similar to item no.
19.65A.1.1 except code of 75mm
centrifugally cast iron S&S offeset with 75
mm dia pipe will be 3699 nstead of code
no. 3698
19.65A.1.3 with 100mm dia pipe
Analysis of rate is similar to item no.
19.65A.1.1 except code of 75mm
centrifugally cast iron S&S offeset with 100
mm dia pipe will be 3700 nstead of code
no. 3698
19.65A.2 115 mm off sets
19.65A.2.1 with 50mm dia pipe
Details of cost of one no.
Materials-
115 mm sand cast iron S&S offset with 50
each 1.00 3702
mm dia pipe
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each

19.65A.2.2 with 75mm dia pipe


Analysis of rate is similar to item no.
19.65A.2.1 except code of 115mm
centrifugally cast iron S&S offeset with 75
mm dia pipe will be 3703 nstead of code
no. 3702
19.65A.2.3 with 100mm dia pipe
Analysis of rate is similar to item no.
19.65A.2.1 except code of 115mm
centrifugally cast iron S&S offeset with 100
mm dia pipe will be 3704 nstead of code
no. 3702
19.65A.3 150 mm off sets
19.65A.3.1 with 50mm dia pipe
Details of cost of one no.
Materials-
150 mm sand cast iron S&S offset with 50
each 1.00 3706
mm dia pipe
Carriage of materials and fixing charges 1 time 6.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each

19.65A.3.2 with 75mm dia pipe


Analysis of rate is similar to item no.
19.65A.3.1 except code of 150mm
centrifugally cast iron S&S offeset with 75
mm dia pipe will be 3707 nstead of code
no. 3706
19.65A.3.3 with 100mm dia pipe
Analysis of rate is similar to item no.
19.65A.3.1 except code of 150mm
centrifugally cast iron S&S offeset with 100
mm dia pipe will be 3708 nstead of code
no. 3706
19.66 P/F door piece, insertion rubber washer 3
mm thick , bolts & nuts complete:
19.66.1 100 mm
19.66.1.1 Sand cast iron S&S
Details of cost of one no.
Materials-
100 mm sand cast iron door piece including
each 1.00 1683
bolts and nuts
Insertion rubber washer each 1.00 1374
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each

19.66.1.2 Centrifugally cast (spun) iron S&S


Analysis of rate is similar to item no.
19.66.1.1 except code of 100mm
centrifugally cast (spun) iron S&S door piece
will be 3728 instead of code no. 1683

19.66.2 75 mm
19.66.2.1 Sand cast iron S&S
Details of cost of one no.
Materials-
75 mm sand cast iron door piece including
each 1.00 1682
bolts and nuts
Insertion rubber washer each 1.00 1373
Carriage of materials and fixing charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each

19.66.2.2 Centrifugally cast (spun) iron S&S


Analysis of rate is similar to item no.
19.66.2.1 except code of 75mm
centrifugally cast (spun) iron S&S door piece
will be 3729 instead of code no. 1682

19.66.3 50 mm
19.66.3.1 Sand cast iron S&S
Details of cost of one no.
Materials-
50mm sand cast iron door piece including
each 1.00 1681
bolts and nuts
Insertion rubber washer each 1.00 1372
Carriage of materials and fixing charges 1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each

19.66.3.2 Centrifugally cast (spun) iron S&S


Analysis of rate is similar to item no.
19.66.3.1 except code of 50mm
centrifugally cast (spun) iron S&S door piece
will be 3730 instead of code no. 1681

19.67 P/F terminal guard:


19.67.1 100 mm
19.67.1.1 Sand cast iron S&S
Details of cost of one no.
Materials-
100mm sand cast iron terminal guard each 1.00 1640
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each

19.67.1.2 Centrifugally cast (spun) iron S&S


Analysis of rate is similar to item no.
19.67.1.1 except code of 100mm
centrifugally cast (spun) iron S&S turminal
guard will be 3733 instead of code no.
1640
19.67.2 75 mm
19.67.2.1 Sand cast iron S&S
Details of cost of one no.
Materials-
75mm sand cast iron terminal guard each 1.00 1639
Carriage of materials and fixing charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each

19.67.2.2 Centrifugally cast (spun) iron S&S


Analysis of rate is similar to item no.
19.67.2.1 except code of 75mm
centrifugally cast (spun) iron S&S turminal
guard will be 3734 instead of code no.
1639
19.67.3 50 mm
19.67.3.1 Sand cast iron S&S
Details of cost of one no.
Materials-
50mm sand cast iron terminal guard each 1.00 1638
Carriage of materials and fixing charges 1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each

19.67.3.2 Centrifugally cast (spun) iron S&S


Analysis of rate is similar to item no.
19.67.3.1 except code of 50mm
centrifugally cast (spun) iron S&S turminal
guard will be 3735 instead of code no.
1638
19.68 Providing and fixing collar:
19.68.1 100 mm
19.68.1.1 Sand cast iron S&S
Details of cost of one no.
Materials-
100mm sand cast iron collar each 1.00 1686
Carriage of materials and fixing charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each

19.68.1.2 Centrifugally cast (spun) iron S&S


Analysis of rate is similar to item no.
19.68.1.1 except code of 100mm
centrifugally cast (spun) iron S&S collar will
be 3738 instead of code no. 1686
19.68.2 75 mm
19.68.2.1 Sand cast iron S&S
Details of cost of one no.
Materials-
75mm sand cast iron collar each 1.00 1685
Carriage of materials and fixing charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each

19.68.2.2 Centrifugally cast (spun) iron S&S


Analysis of rate is similar to item no.
19.68.2.1 except code of 75mm
centrifugally cast (spun) iron S&S collar will
be 3739 instead of code no. 1685
19.68.3 50 mm
19.68.3.1 Sand cast iron S&S
Details of cost of one no.
Materials-
50mm sand cast iron collar each 1.00 1684
Carriage of materials and fixing charges 1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each

19.68.3.2 Centrifugally cast (spun) iron S&S


Analysis of rate is similar to item no.
19.68.3.1 except code of 50mm
centrifugally cast (spun) iron S&S collar will
be 3740 instead of code no. 1684
19.69 Providing and fixing 50mm dia. Pass over
pipe
19.69.1 Sand cast iron S&S
Details of cost of one no.
Materials-
50mm sand cast iron pass over pipe each 1.00 1680
Carriage of materials and fixing charges 1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each

19.69.2 Centrifugally cast (spun) iron S&S


Analysis of rate is similar to item no.
19.69.1 except code of 50mm centrifugally
cast (spun) iron S&S pass over pipe will be
3741 instead of code no. 1680

19.70 Providing lead caulked joints to sand cast


iron/centrifugally cast (spun) iron pipes and
fittings of diameter:
19.70.1 100 mm
Details of cost of one no.
Materials-
Pig lead Kg. 0.98 1397
spun yarn Kg. 0.11 1881
Kerosene oil, fuel and other sundries 1 time 5.20 9999
Carriage of material 1time 0.55 9999
Labour:-
Filtter each 0.06 116
Asstt.Fitter each 0.06 117
Beldar each 0.12 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one joint
Say Rs. each

19.70.2 75mm
Details of cost of one no.
Materials-
Pig lead Kg. 0.88 1397
Spun yarn Kg. 0.09 1881
Kerosene oil, fuel and other sundries 1 time 4.15 9999
Carriage of material 1time 0.55 9999
Labour:-
Filtter each 0.05 116
Asstt.Fitter each 0.05 117
Beldar each 0.09 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one joint
Say Rs. each

19.70.3 50mm
Details of cost of one no.
Materials-
Pig lead Kg. 0.77 1397
Spun yarn Kg. 0.06 1881
Kerosene oil, fuel and other sundries 1 time 2.60 9999
Carriage of material 1time 0.55 9999
Labour:-
Filtter each 0.04 116
Asstt.Fitter each 0.05 117
Beldar each 0.05 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one joint
Say Rs. each

19.71 Providing and fixing M.S. stays and clamps


for sand cast iron/centrifugally cast (spun)
iron pipes and fittings of diameter:
19.71.1 100 mm
Details of cost of one no.
Materials-
M.S. stayes & clamps includingbolts and
each 1.00 1330
nuts for 100m pipe
Carriage of material & fixing charges 1time 5.2 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each

19.71.2 75 mm
Details of cost of one no.
Materials-
M.S. stayes & clamps includingbolts and
each 1.00 1335
nuts for 100m pipe
Carriage of material & fixing charges 1time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each

19.71.3 50 mm
Details of cost of one no.
Materials-
M.S. stayes & clamps includingbolts and
each 1.00 1334
nuts for 100m pipe
Carriage of material & fixing charges 1time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each
19.72 P/F sand cast iron trap of self cleansing
design with sand cast iron screwed down or
hinged grating with or withour vent arm
complete , including cot of cutting and
making good the walls and floors:
19.72.1 100 mm inlet and 100 mm outlet
Details of cost of one no.
Materials-
sand cast iron trap with 100 mm inlet and
each 1.00 1897
100 mm outlet
cement, sand and grit etc. 1 time 5.20 9999
Carriage of materials 1time 1.05 9999
Labour:-
Mason Ist class each 0.50 123
Beldar each 0.50 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each
19.72.2 100mm inlet and 75 mm outlet
Details of cost of one no.
Materials-
sand cast iron trap with 100 mm inlet and
each 1.00 1898
75mm outlet
cement, sand and grit etc. 1 time 5.20 9999
Carriage of materials 1time 1.05 9999
Labour:-
Mason Ist class each 0.50 123
Beldar each 0.50 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each
19.72.3 100mm inlet and 50 mm outlet
Details of cost of one no.
Materials-
sand cast iron trap with 100 mm inlet and 50
each 1.00 1899
mm outlet
cement, sand and grit etc. 1 time 5.20 9999
Carriage of materials 1time 1.05 9999
Labour:-
Mason Ist class each 0.50 123
Beldar each 0.50 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each
19.92 Cutting chases in brick masonry walls for
following diameter sand cat iron/centrifugally
cast(spun)ironpipes and making good the
same with cement concrete 1:3:6 including
necessary plaster and pointing in cement
mortar 1:4.
19.92.1 100mm dia
Details of cost of one metre length
Materials-
Cement concrete 1:3:6(Rate as per item no.
cum 0.022
4.6.5)
Plastering in cement mortar 1:4 1 time 4.00 9999 A
Carriage of materials 1time 1.60 9999
Labour:-
Mason Ist class each 0.14 123
Beldar each 0.27 114
Add for water charges@ 1% except on "A"
Add for contractor's profit and overheads @
10% except on "A"
Cost of one no.
Say Rs. each

19.92.2 75mm dia


Details of cost of one metre length
Materials-
Cement concrete 1:3:6(Rate as per item no.
cum 0.015
4.6.5)
Plastering in cement mortar 1:4 1 time 3.00 9999
Carriage of materials 1time 1.35 9999
Labour:- A
Mason Ist class each 0.10 123
Beldar each 0.20 114
Add for water charges@ 1% except on "A"
Add for contractor's profit and overheads @
10% except on "A"
Cost of one no.
Say Rs. each

19.92.3 50mm dia


Details of cost of one metre length
Materials-
Cement concrete 1:3:6(Rate as per item no.
cum 0.008
4.6.5)
Plastering in cement mortar 1:4 1 time 2.00 9999 A
Carriage of materials 1time 1.05 9999
Labour:-
Mason Ist class each 0.07 123
Beldar each 0.14 114
Add for water charges@ 1% except on "A"
Add for contractor's profit and overheads @
10% except on "A"
Cost of one no.
Say Rs. each
19.94 Painting CI cistern with bitumastic or any
other anticorrosive paint inside and white
paint over a cost of zinc chromate yellow
primer (of approved quality) on the outside
surface of the cistern flush pipe, other
fittings, etc/ complete for new work.
Details of cost of one cistern with fittings
Materials-
Anticorrosive bitumastic paint 1 time 0.23 828
Ready mixed white paint 1 time 0.2 843
Polishing of wooden seat and cleaning of
1 time 7.95 9999
W.C. pan with acid
sundries and carriage of materials 1 time 2.75 9999
Labour:-
Painter each 0.20 131
Beldar each 0.25 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each
19.95A Repainting CI cistern with synthetic enamel
paint of approved colour brand and
manufacture on the outside surface of
cistern flush pipe. Other fittings etc.
Complete
Details of cost of one cistern with fittings
Materials-
synthetic enamel paint 1 time 0.2 834
sundries and carriage of materials 1 time 1.4 9999
Labour:-
Painter each 0.09 181
Beldar each 0.12 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each
19.96 Painting sand cast iron/centrifugally cast
(spun)iron soil, waste vent pipes and fittings
with paint of any colour such as chocolate
gray, or buff etc, over a coat of primer (of
approved quality)for new work.
19.96.1 50 mm diameter pipe (A) Ratei/cs
water
Details of cost for 10 metres charges
Materials- C.P. &
Permeter =pai x 60mm = 188.57 overheads.
Area 10x188.57 = 1.89sqm
Priming coat sqm 1.89
(Rate as per item no. 13.82.1 of S.H.
finishing)
Painting two coats with paint of any colour
such as chocolate, grey or buff etc.
(Rate as per item no. 13.81.1 of S.H.
sqm 1.89
finishing)
Add for delay 1time 5.20 9999
Add for water charges@ 1% except on "A"
Add for contractor's profit and overheads @
10% except on "A"
Cost of 10 metres
Cost of 1 metres
Say Rs. per metre
19.96.2 100 mm diameter pipe
Details of cost for 10 metres (A) Ratei/cs
Materials- water
Permeter =pai x 110mm = 345.71 charges
Area 10x0.3457 = 3.46 sqm C.P. &
Priming coat sqm 3.46 overheads.
(Rate as per item no. 13.81.1 of S.H.
finishing)
Painting two coats with paint of any colour
such as chocolate, grey or buff etc.
(Rate as per item no. 13.81.1 of S.H.
sqm 3.46
finishing)
Add for delay 1time 6.60 9999
Add for water charges@ 1% except on "A"
Add for contractor's profit and overheads @
10% except on "A"
Cost of 10 metres
Cost of 1 metres
Say Rs. per metre
19.96.3 75 mm diameter pipe
Details of cost for 10 metres (A) Ratei/cs
Materials- water
Permeter =pai x 82mm = 257.71 charges
Area 10x0.2577 =2.577 sqm C.P. &
sqm 2.6 overheads.
Priming coat
(Rate as per item no. 13.81.3
Painting two coats with paint of any colour
such as chocolate, grey or buff etc.
(Rate as per item no. 13.82.1 sqm 2.6
Add for delay 1time 5.85 9999
Add for water charges@ 1% except on "A"
Add for contractor's profit and overheads @
10% except on "A"
Cost of 10 metres
Cost of 1 metres
Say Rs. per metre

19.97 Repainting sand cast iron/centrifugally cast


iron (spun) iron soil, waste, vent pipes and
fittings with paint of any colour such as
chocolate gray, or buff etc,
19.97.1 50 mm diameter pipe (A) Ratei/cs
Details of cost for 10 metres water
Painting onecoats with paint of any colour charges
such as chocolate, grey or buff etc. C.P. &
overheads.
(Rate as per item no. 13.82.3 of S.H.
sqm 1.89
finishing)
Add for delay 1time 2.6 9999
Add for water charges@ 1% except on "A"
Add for contractor's profit and overheads @
10% except on "A"
Cost of 10 metres
Cost of 1 metres
Say Rs. per metre
19.97.2 100 mm diameter pipe
Details of cost for 10 metres (A) Ratei/cs
Materials- water
Painting one coats with paint of any colour charges
such as chocolate, grey or buff etc. C.P. &
overheads.
(Rate as per item no. 13.82.3 of S.H.
sqm 3.46
finishing)
Add for delay 1time 4.70 9999
Add for water charges@ 1% except on "A"
Add for contractor's profit and overheads @
10% except on "A"
Cost of 10 metres
Cost of 1 metres
Say Rs. per metre
19.97.3 75 mm diameter pipe
Details of cost for 10 metres (A) Ratei/cs
Materials- water
charges
C.P. &
overheads.
(A) Ratei/cs
water
Paintingone coats with paint of any colour charges
such as chocolate, grey or buff etc. C.P. &
overheads.
(Rate as per item no. 13.82.3 sqm 2.577
Add for delay 1time 3.65 9999
Add for water charges@ 1% except on "A"
Add for contractor's profit and overheads @
10% except on "A"
Cost of 10 metres
Cost of 1 metres
Say Rs. per metre
19.98 Repainting bath tub of size 1700x730x430
mm with enamel paint.
Details of cost for one tub
Materials-
Paint of approved quality litre 0.90 830
Sundries 1time 2.60 9999
Labour-
Painter each 0.25 131
Coolie each 0.25 115
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each
19.99 P/F vitreous china dual purpose closet
suitable for use as squatting pan of
European type water closet (Anglo Indian
W.C.pan) with seat lid with C.P. brass
hinges and rubber buffers, 10 litre low level
flushing cistern with fitting and brackets,
40mm flush bend 20mm overflow pipe with
specials of standard make and mosquito
proof coupling of approved municipal design
complete, including panting of fittings and
brackets, cutting and making good the walls
and floors wherever required.

19.99.1 White vitreous china dual purpose WC pan


with white solid plastic seat and lid with
white vitreous china flushing cistern and
C.P. flush bend.
Details of cost for one tub
Materials-
White plastic seat andlid with C.P. brass
each
hinges and rubber buffers etc.
White vitreous china dual purpose closet
each
(anglo Indian WC pan)
10 litre white vitreous china low level
flushing cistern with fittings and brackets each 1.00 1875
and 40mm porcelain enamelled flush bend
20 mm G.I. Over flow pipe and specials for
1time 1.00 1965
over flow pipe
each 1.00 7006
Mosquito proof coupling of approved
1time 106.25 9999
municipal design
1time 1.00 1350
Plugs, screws,etc 1time 22.75 9999
Red lead, white lead and gaskin etc. 1time 27.60 9999
Cement, sand and grit 1time 45.55 9999
Carriage of materials 1time 45.55 9999
Labour-
Fitter each 1.00 116
Mason, 1st class each 1.00 123
Beldar each 1.00 114
Add for water charges@ 1%
Add for contractor's profit and overheads @
10%
Cost of one no.
Say Rs. each
Rate Analysis
As Per DAR Volume 6 , Page No
Rate Cost
Item No Description Unit Qty Remarks
Code (Rs)
WATER SUPPLY
G.I PIPE AND FITTING
20.2 Providing and fixing G.I. Pipes
complete with G.I. Fittings and
clamps, including cutting and
making good the walls etc.
(internal work)
20.2.1 Exposed on walls
20.2.1.1 15 mm dia nominal bore
Details of cosst for 10 metre
Materials-
15mm dia G.I. Pipes metre 10.00 1545
Carriage of pipes, approximate
weight of 10m = 12.30kg tonne 0.01 2271
Add 15% for fittings and wastage
of (A+B) White lead hemp, oil etc.
1 time 3.10 9999
Cement, sand and grit 1time 1.05 9999
Labour-
Fitter each 0.33 116
Asstt. Fitter each 0.66 117
Beldar each 0.66 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 metre
Cost for 1 metre Say Rs. per metre

20.2.1.2 20 mm dia nominal bore


Details of cosst for 10 metre
Materials-
20 mm dia G.I. Pipes metre 10.00 1546 A
Carriage of pipes, approximate
weight of 10 m = 15.90 kg tonne 0.02 2271 B
Add 15% for fittings and wastage
of (A+B) White lead hemp, oil etc.
1 time 3.10 9999
Cement, sand and grit 1time 1.05 9999
Labour-
Fitter each 0.33 116 300
Asstt. Fitter each 0.82 117
Beldar each 0.66 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 metre
Cost for 1 metre Say Rs. per metre

20.2.1.3 25 mm dia nominal bore


Details of cosst for 10 metre
Materials-
25 mm dia G.I. Pipes metre 10.00 1547 A
Carriage of pipes, approximate
weight of 10 m = 24.60 kg tonne 0.02 2271 B
Add 15% for fittings and wastage
of (A+B) White lead hemp, oil etc.
1 time 3.65 9999
Cement, sand and grit 1time 1.60 9999
Labour-
Fitter each 0.33 116
Asstt. Fitter each 0.98 117
Beldar each 0.66 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 metre
Cost for 1 metre Say Rs. per metre

20.2.1.4 32 mm dia nominal bore


Details of cosst for 10 metre
Materials-
32 mm dia G.I. Pipes metre 10.00 1548 A
Carriage of pipes, approximate
weight of 10 m = 31.70 kg tonne 0.03 2271 B
Add 15% for fittings and wastage
of (A+B) White lead hemp, oil etc.
1 time 3.65 9999
Cement, sand and grit 1time 1.60 9999
Labour-
Fitter each 0.33 116
Asstt. Fitter each 0.98 117
Beldar each 0.98 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 metre
Cost for 1 metre Say Rs. per metre

20.2.1.5 40 mm dia nominal bore


Details of cosst for 10 metre
Materials-
40 mm dia G.I. Pipes metre 10.00 1549 A
Carriage of pipes, approximate
weight of 10 m = 36.50 kg tonne 0.04 2271 B
Add 15% for fittings and wastage
of (A+B) White lead hemp, oil etc.
1 time 5.20 9999
Cement, sand and grit 1time 2.05 9999
Labour-
Fitter each 0.33 116
Asstt. Fitter each 1.31 117
Beldar each 1.31 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 metre
Cost for 1 metre Say Rs. per metre

20.2.1.6 50 mm dia nominal bore


Details of cosst for 10 metre
Materials-
50 mm dia G.I. Pipes metre 10.00 1550 A
Carriage of pipes, approximate
weight of 10 m = 51.70 kg tonne 0.05 2271 B
Add 15% for fittings and wastage
of (A+B) White lead hemp, oil etc.
1 time 5.20 9999
Cement, sand and grit 1time 2.05 9999
Labour-
Fitter each 0.33 116
Asstt. Fitter each 1.64 117
Beldar each 1.64 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 metre
Cost for 1 metre Say Rs. per metre

20.2.2 Concealed pipe including painting


with anti corrosive bitumastic
paint cutting chases and making
good the wall
20.2.2.1 15 mm dia nominal bore
Details of cosst for 10 metre
Materials-
15mm dia G.I. Pipes metre 10.00 1545
Carriage of pipes, approximate
weight of 10m = 12.30kg tonne 0.01 2271
Add 15% for fittings and wastage
of (A+B) White lead hemp, oil etc.
1 time 3.10 9999
Painting G.I. Pipe with anti- C' rate I/cs
corrsive bitumastic paint two or W.C. , C.P. &
more coats(same as per item no. metre 10.00 overheads
20.78.1) chases upto 7.5x7.5 cm
Making D' rate I/cs
in walls and making good the W.C. , C.P. &
same(Rate as per item no. 22.15) metre 10.00 9999 overheads
Labour-
Fitter each 0.33 116
Asstt. Fitter each 0.66 117
Beldar each 0.66 114
Add for water charges@ 1% on
all except C+D
Add for contractor's profit and
overheads @ 10% on all except
C+D
Cost for 10 metre
Cost for 1 metre Say Rs. per metre
20.2.2.2 20 mm dia nominal bore
Details of cosst for 10 metre
Materials-
20 mm dia G.I. Pipes metre 10.00 1546 A
Carriage of pipes, approximate
weight of 10 m = 15.90 kg tonne 0.02 2271 B
Add 15% for fittings and wastage
of (A+B) White lead hemp, oil etc.
1 time 3.10 9999
Painting G.I. Pipe with anti- C' rate I/cs
corrsive bitumastic paint two or W.C. , C.P. &
more coats(same as per item no. metre 10.00 overheads
20.78.1) chases upto 7.5x7.5 cm
Making D' rate I/cs
in walls and making good the W.C. , C.P. &
same(Rate as per item no. 22.15) metre 10.00 9999 overheads
Labour-
Fitter each 0.33 116
Asstt. Fitter each 0.82 117
Beldar each 0.66 114
Add for water charges@ 1% on
all except C+D
Add for contractor's profit and
overheads @ 10% on all except
C+D
Cost for 10 metre
Cost for 1 metre Say Rs. per metre

20.3 Providing and fixing G.I. Pipes


complete with G.I. Fittings
including trenching and refilling
etc. (external work)
20.3.1 15 mm dia nominal bore
Details of cosst for 10 metre
Materials-
15mm dia G.I. Pipes metre 10.00 1545 A
Carriage of pipes, approximate
weight of 10m = 12.30kg tonne 0.01 2271 B
Add 2% for fittings and wastage
of (A+B) White lead hemp, oil etc.
1 time 2.05 9999
Labour-
Fitter each 0.08 116
Beldar each 0.16 114
Trenching and refiling etc.
Beldar each 0.66 114
Coolie each 0.66 115
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 metre
Cost for 1 metre Say Rs. per metre

20.3.2 20 mm dia nominal bore


Details of cosst for 10 metre
Materials-
20mm dia G.I. Pipes metre 10.00 1546 A
Carriage of pipes, approximate
weight of 10m = 15.90kg tonne 0.02 2271 B
Add 2% for fittings and wastage
of (A+B) White lead hemp, oil etc.
1 time 2.05 9999
Labour-
Fitter each 0.08 116
Beldar each 0.16 114
Trenching and refiling etc.
Beldar each 0.66 114
Coolie each 0.66 115
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 metre
Cost for 1 metre Say Rs. per metre

20.3.3 25 mm dia nominal bore


Details of cosst for 10 metre
Materials-
25mm dia G.I. Pipes metre 10.00 1547 A
Carriage of pipes, approximate
weight of 10m = 24.60kg tonne 0.02 2271 B
Add 2% for fittings and wastage
of (A+B) White lead hemp, oil etc.
1 time 2.60 9999
Labour-
Fitter each 0.12 116
Beldar each 0.25 114
Trenching and refiling etc.
Beldar each 0.66 114
Coolie each 0.66 115
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 metre
Cost for 1 metre Say Rs. per metre

20.3.4 32 mm dia nominal bore


Details of cosst for 10 metre
Materials-
32mm dia G.I. Pipes metre 10.00 1548 A
Carriage of pipes, approximate
weight of 10m = 31.70kg tonne 0.03 2271 B
Add 2% for fittings and wastage
of (A+B) White lead hemp, oil etc.
1 time 2.60 9999
Labour-
Fitter each 0.12 116
Beldar each 0.25 114
Trenching and refiling etc.
Beldar each 0.66 114
Coolie each 0.66 115
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 metre
Cost for 1 metre Say Rs. per metre
20.3.5 40 mm dia nominal bore
Details of cosst for 10 metre
Materials-
40mm dia G.I. Pipes metre 10.00 1549 182.08 1820.80 A
Carriage of pipes, approximate
weight of 10m = 36.50kg tonne 0.04 2271 122 4.45 B
Add 2% for fittings and wastage
of (A+B) White lead hemp, oil etc.
1 time 3.65 9999 36.51 133.26
Labour-
Fitter each 0.16 116 250 40.00
Beldar each 0.33 114 150 49.50
Trenching and refiling etc.
Beldar each 0.66 114 150 99.00
Coolie each 0.66 115 150 99.00
2246.01
Add for water charges@ 1% 22.46
Add for contractor's profit and
224.60
overheads @ 10%
Cost for 10 metre 2493.08
Cost for 1 metre 249.31
Say Rs. 249 per metre
20.3.6 50 mm dia nominal bore
Details of cosst for 10 metre
Materials-
50mm dia G.I. Pipes metre 10.00 1550 221.67 2216.67 A
Carriage of pipes, approximate
weight of 10m = 51.70kg tonne 0.05 2271 122 6.31 B
Add 2% for fittings and wastage
of (A+B) White lead hemp, oil etc.
1 time 3.65 9999 44.46 162.28
Labour-
Fitter each 0.16 116 250 40
Beldar each 0.33 114 150 49.5
Trenching and refiling etc.
Beldar each 0.66 114 150 99
Coolie each 0.66 115 150 99
2672.76
Add for water charges@ 1% 26.73
Add for contractor's profit and
267.28
overheads @ 10%
Cost for 10 metre 2966.76
Cost for 1 metre 296.68
Say Rs. 297 per metre
20.3.8 80 mm dia nominal bore
Details of cosst for 10 metre
Materials-
80mm dia G.I. Pipes metre 10.00 1552 364.17 3641.67 A
Carriage of pipes, approximate
weight of 10m =86.40kg tonne 0.09 2271 122 10.54 B
Add 2% for fittings and wastage
of (A+B) White lead hemp, oil etc.
1 time 5.20 9999 73.04 379.83
Labour-
Fitter each 0.25 116 250 62.50
Beldar each 0.66 114 150 99.00
Trenching and refiling etc.
Beldar each 0.66 114 150 99
Coolie each 0.66 115 150 99
4391.54
Add for water charges@ 1% 43.92
Add for contractor's profit and
439.15
overheads @ 10%
Cost for 10 metre 4874.61
Cost for 1 metre 487.46
Say Rs. 487 per metre
20.3.9 100 mm dia nominal bore
Details of cosst for 10 metre
Materials-
100mm dia G.I. Pipes metre 10.00 7383 A
Carriage of pipes, approximate
weight of 10m = 127.00kg tonne 0.13 2271 B
Add 2% for fittings and wastage
of (A+B) White lead hemp, oil etc.
1 time 7.80 9999
Labour-
Fitter each 0.37 116
Beldar each 0.97 114
Trenching and refiling etc.
Beldar each 0.80 114
Coolie each 0.80 115
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 metre
Cost for 1 metre Say Rs. per metre

20.3.10 150 mm dia nominal bore


Details of cosst for 10 metre
Materials-
150mm dia G.I. Pipes metre 10.00 7384 A
Carriage of pipes, approximate
weight of 10m = 202.00kg tonne 0.2 2271 B
Add 2% for fittings and wastage
of (A+B) White lead hemp, oil etc.
1 time 11.70 9999
Labour-
Fitter each 0.58 116
Beldar each 1.54 114
Trenching and refiling etc.
Beldar each 1.20 114
Coolie each 1.20 115
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 metre
Cost for 1 metre Say Rs. per metre

20.4 Making connection of G.I.


Distribution branch with G.I. Main
of following sizes by providing
and fixing tee, including cutting
and threading the pipe
etc.complete.
20.4.1 25 to 40 mm nominal bore
Details of cost for one connection
. Take 25 mm dia as an average
size.
Materials-
G.I. Tee 25 mm dia each 1.00 1608
G.I. Jam nut 25 mm each 1.00 1555
Carriage of materials and
sundries 1time 2.05 9999
Labour-
Fitter each 0.33 116
Beldar each 0.33 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 1 connection
Say Rs. per connection

20.4.2 50 to 80 mm nominal bore


Details of cost for one connection
. Take 65 mm dia as an average
size.
Materials-
G.I. Tee each 1.00 1612
G.I. Jam nut each 1.00 1559
Carriage of materials and
sundries 1time 2.05 9999
Labour-
Fitter each 0.45 116
Beldar each 0.45 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 1 connection
Say Rs. per connection

20.4.3 100 to 150 mm nominal bore


Details of cost for one connection
. Take 125 mm dia as an average
size.
Materials-
G.I. Tee 150mm each 1.00 7384
G.I. Jam nut 150mm each 1.00 7397
Carriage of materials and
sundries 1time 2.05 9999
Labour-
Fitter each 0.45 116
Beldar each 0.45 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 1 connection
Say Rs. per connection
20.6 Fixing water meter and stop cock
in G.I. Pipe line including cutting
and threading the pipe and
making long screws etc. complete
(cost of water meter and stop
cock to be paid separately).
Details of cost for one meter with
stop cock
Materials-
G.I. Jam nut 25mm each 1.00 1555
Carriage of materials and
sundries 1time 2.05 9999
Labour-
Fitter each 0.33 116
Beldar each 0.33 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one meter with stop cock
Say Rs. per stop cock

BRASS FITTINGS
20.7 Providing and fixing brass bib
cock of approved quality.
20.7.1 15 mm nominal bore
Details of cost for one no.
Materials-
15 mm dia brass bib cock each 1.00 1339
Carriage of materials and fixing
charges 1 time 3.10 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.7.2 20 mm nominal bore


Details of cost for one no.
Materials-
20 mm dia brass bib cock each 1.00 1340
Carriage of materials and fixing
charges 1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.7.3 25 mm nominal bore


Details of cost for one no.
Materials-
25 mm dia brass bib cock each 1.00 1341
Carriage of materials and fixing
charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.8 Providing and fixing brass stop


cock of approved quality.
20.8.1 15 mm nominal bore
Details of cost for one no.
Materials-
15 mm dia brass stop cock each 1.00 1342
Carriage of materials and fixing
charges 1 time 3.10 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.8.2 20 mm nominal bore


Details of cost for one no.
Materials-
20 mm dia brass stop cock each 1.00 1343
Carriage of materials and fixing
charges 1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
20.8.3 25mm nominal bore
Details of cost for one no.
Materials-
25 mm dia brass stop cock each 1.00 1344
Carriage of materials and fixing
charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.8.4 32mm nominal bore


Details of cost for one no.
Materials-
32 mm dia brass stop cock each 1.00 1345
Carriage of materials and fixing
charges 1 time 4.70 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.8.5 40mm nominal bore


Details of cost for one no.
Materials-
40 mm dia brass stop cock each 1.00 1346
Carriage of materials and fixing
charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.8.6 50mm nominal bore


Details of cost for one no.
Materials-
50 mm dia brass stop cock each 1.00 1347
Carriage of materials and fixing
charges 1 time 5.70 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
20.9 Providing and fixing brass gate
valve with C.I. Wheel of approved
quality(screwed end)
20.9.1 15 mm nominal bore
Details of cost for one no.
Materials-
15 mm dia brass gate valve with
wheel each 1.00 1925
Carriage of materials and fixing
charges 1 time 3.10 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.9.2 20 mm nominal bore


Details of cost for one no.
Materials-
20 mm dia brass gate valve with
wheel each 1.00 1926
Carriage of materials and fixing
charges 1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.9.3 25 mm nominal bore


Details of cost for one no.
Materials-
25 mm dia brass gate valve with
wheel each 1.00 1927
Carriage of materials and fixing
charges 1 time 4.15 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.9.4 32 mm nominal bore


Details of cost for one no.
Materials-
32 mm dia brass gate valve with
wheel each 1.00 1928
Carriage of materials and fixing
charges 1 time 4.70 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
20.9.5 40 mm nominal bore
Details of cost for one no.
Materials-
40mm dia brass gate valve with
wheel each 1.00 1929 850.00 850.00
Carriage of materials and fixing
charges 1 time 5.20 9999 100.00
Add for water charges@ 1% 9.50
Add for contractor's profit and
95.95
overheads @ 10%
Cost for one no. 1,055.45
Say Rs. 1,056.00 each

20.9.6 50 mm nominal bore


Details of cost for one no.
Materials-
50mm dia brass gate valve with
wheel each 1.00 1930 1,300.00 1,300.00
Carriage of materials and fixing
charges 1 time 5.70 9999 125.00
Add for water charges@ 1% 14.25
Add for contractor's profit and
143.93
overheads @ 10%
Cost for one no. 1,583.18
Say Rs. 1,584.00 each
20.9.7 65 mm nominal bore
Details of cost for one no.
Materials-
65mm dia brass gate valve with
wheel each 1.00 1931 -
Carriage of materials and fixing
charges 1 time 6.20 9999
Add for water charges@ 1% -
Add for contractor's profit and
-
overheads @ 10%
Cost for one no. -
Say Rs. - each

20.9.8 80 mm nominal bore


Details of cost for one no.
Materials-
80 mm dia brass gate valve with
wheel each 1.00 1932 2,700.00 2,700.00
Carriage of materials and fixing
charges 1 time 7.25 9999 150.00
Add for water charges@ 1% 28.50
Add for contractor's profit and
287.85
overheads @ 10%
Cost for one no. 3,166.35
Say Rs. 3,167.00 each
20.10 Providing and fixing ball valve
(brass) of approved quality
complete
20.10.3 High or low pressure with plastic
floats
20.10.3.115 mm nominal bore
Details of cost for one no.
Materials-
15 mm ball valve each 1.00 1922
Carriage of materials and fixing
charges 1 time 8.30 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.10.3.220 mm nominal bore


Details of cost for one no.
Materials-
20 mm ball valve each 1.00 1923
Carriage of materials and fixing
charges 1 time 10.35 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.10.3.325 mm nominal bore


Details of cost for one no.
Materials-
25 mm ball valve each 1.00 1924
Carriage of materials and fixing
charges 1 time 12.40 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
20.11 Providing and fixing gun metal
non-return valve of approved
quality (screwed end)
20.11.1 25 mm nominal bore
20.11.1.1Horizontal
Details of cost for one no.
Materials-
25 mm non-return valve each 1.00 1933
Add for water charges@ 1% 1 time 5.20 9999
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
20.11.1.2Vertical
Details of cost for one no.
Materials-
25 mm gun metal non-return each 1.00 3080
valvefor water charges@ 1%
Add 1 time 5.20 9999
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
20.11.2 32 mm nominal bore
20.11.2.1Horizontal
Details of cost for one no.
Materials-
32 mm non-return valve each 1.00 1934
Add for water charges@ 1% 1 time 5.70 9999
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
20.11.2.2Vertical
Details of cost for one no.
Materials-
32 mm gun metal non-return each 1.00 3084
valvefor water charges@ 1%
Add 1 time 5.70 9999
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.11.3 40 mm nominal bore


20.11.3.1Horizontal
Details of cost for one no.
Materials-
40 mm non-return valve each 1.00 1935
Add for water charges@ 1% 1 time 6.20 9999
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
20.11.3.2Vertical
Details of cost for one no.
Materials-
40 mm gun metal non-return each 1.00 3088
valvefor water charges@ 1%
Add 1 time 6.20 9999
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.11.4 50 mm nominal bore


20.11.4.1Horizontal
Details of cost for one no.
Materials-
50 mm non-return valve each 1.00 1936
Add for water charges@ 1% 1 time 6.75 9999
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
20.11.4.2Vertical
Details of cost for one no.
Materials-
50 mm gun metal non-return each 1.00 3092
valvefor water charges@ 1%
Add 1 time 6.75 9999
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.11.5 65 mm nominal bore


20.11.5.1Horizontal
Details of cost for one no.
Materials-
65 mm non-return valve each 1.00 1937
Add for water charges@ 1% 1 time 7.25 9999
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
20.11.5.2Vertical
Details of cost for one no.
Materials-
65 mm gun metal non-return each 1.00 3096
valvefor water charges@ 1%
Add 1 time 7.25 9999
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.11.6 80 mm nominal bore


Horizontal
Details of cost for one no.
Materials-
80 mm non-return valve each 1.00 1938
Add for water charges@ 1% 1 time 7.80 9999
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
20.11.6.2Vertical
Details of cost for one no.
Materials-
80 mm gun metal non-return each 1.00 3300
valvefor water charges@ 1%
Add 1 time 7.80 9999
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
20.11.7 100 mm nominal bore
20.11.7.1Horizontal
Details of cost for one no.
Materials-
100 mm non-return valve each 1.00 7433
Add for water charges@ 1% 1 time 9.00 9999
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
20.11.7.2Vertical
Details of cost for one no.
Materials-
100 mm gun metal non-return
valve each 1.00 7434
Add for water charges@ 1% 1 time 9.00 9999
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
20.12 Providing and fixing brass ferrule
with C.I. Mouth cover including
boring and tapping the main
20.12.1 15 mm nominal bore
Details of cost for one no.
Materials-
15 mm diameter brass-ferrule each 1.00 1360
Carriage of materials and fixing
charges 1 time 15.50 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.12.2 20 mm nominal bore


Details of cost for one no.
Materials-
20 mm diameter brass-ferrule each 1.00 1361
Carriage of materials and fixing
charges 1 time 18.15 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.12.3 25 mm nominal bore


Details of cost for one no.
Materials-
25 mm diameter brass-ferrule each 1.00 1362
Carriage of materials and fixing
charges 1 time 20.70 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
20.13 Providing and fixing uplasticised
PVC connection pipe with brass
20.13.1 unions
30cm length
20.13.1.115 mm nominal bore
Details of cost for one no.
Materials-
15 mm PVC connection pipe with
brass unions each 1.00 1687
Carriage of materials and fixing
charges 1 time 4.70 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.13.1.220 mm nominal bore


Details of cost for one no.
Materials-
20 mm PVC connection pipe with
brass unions each 1.00 1688
Carriage of materials and fixing
charges 1 time 4.70 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.13.2 45 cm length
20.13.2.115 mm nominal bore
Details of cost for one no.
Materials-
15 mm PVC connection pipe with
brass unions each 1.00 1689
Carriage of materials and fixing
charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.13.2.220 mm nominal bore


Details of cost for one no.
Materials-
20 mm PVC connection pipe with
brass unions each 1.00 1690
Carriage of materials and fixing
charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
20.14 Providing and fixing C.P. brass
shower rose with 15 or 20 mm
inlet
20.14.1 100 mm diameter
Details of cost for one no.
Materials-
100 mm dia C.P. brass shower
rose each 1.00 1878
Carriage of materials and fixing
charges 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20.14.2 150 mm diameter


Details of cost for one no.
Materials-
150mm dia C.P. brass shower
rose each 1.00 1879
Carriage of materials and fixing
charges 1 time 3.10 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
C.I.PIPES AND SPECIALS
20.19 Laying in position centrifugally
cast (spun)iron S&S or flanged
pipes
Details of cost for one quintal.
Materials-
10 m of 200 mm dia C.I. Pipes
class'A'
Wt = (2x257)=514 kg =5.14
quintal
Labour for laying pipe-
Fitter each 0.17 116 250 42.5
Asstt.Fitter each 0.17 117 200 34
Beldar each 1.33 114 150 199.5
sundries 1 time 6.20 9999 1 6.2
Add for water charges@ 1% 2.82
Add for contractor's profit and
overheads @ 10% 28.50
Cost for 5.14 quintal 313.52
Cost per quintal 44.79
Say Rs. 45.00 per quintal
20.20 Laying in position S&S or flanged
C.I. Special such as tees, bends,
tapers and caps etc.
Details of cost for 1 quintal.
10 Nos. Tee 200x150mm weight
= 70x10=700 kg.
Labour for laying tee-
Fitter each 0.93 116 250 232.50
Asstt.Fitter each 0.62 117 200 124.00
Beldar each 2.48 114 150 372.00
sundries 1 time 15.45 9999 1 15.45
Add for water charges @ 1% 7.44
Add for contractor's profit and
overheads @ 10% 75.14
Cost for 7 quintal 826.53
Cost per 1 quintal 118.08
Say Rs. 119.00 per quintal
20.21 P/L S&S centrifugally cast iron
pipes (class LA)
Details of cost for 1 quintal.
Materials-
cost of pipes quintal 1.00 1461
Carriage of pipes quintal 0.10 2309
Labour:
For laying as per item no.20.19 (B) rate
includes water
charges C.P.
Add for water charges@ 1% & overheads
Add for contractor's profit and
overheads @ 10% on all except
(B)
Cost per 1 quintal
Say Rs. per quintal
20.24 P/L S&S C.I. Standard specials
such as tees, bends, collars,
tapers, caps etc. (Heavy class)
20.24.1 Upto 300 mm dia
Details of cost for 1 quintal.
Materials-
cost of specials quintal 1.00 1464
Carriage of materials tonne 0.10 2309
Labour:
For laying as per item no.20.20 (B) rate
includes water
charges C.P.
& overheads
Add for water charges@ 1% on
all except (B)
Add for contractor's profit and
overheads @ 10% on all except
(B)
Cost per 1 quintal
Say Rs. per quintal
20.24.2 Over 300 mm dia
Details of cost for 1 quintal.
Materials-
cost of specials quintal 1.00 1468
Carriage of materials tonne 0.10 2309
Labour:
For laying as per item no.20.20 (B) rate
includes water
charges C.P.
& overheads
Add for water charges@ 1% on
all except (B)
Add for contractor's profit and
overheads @ 10% on all except
(B)
Cost per 1 quintal
Say Rs. per quintal
20.25 P/L S&S flanged C.I. Standard
specials such as tees, bends,
collars, tapers, caps etc. (Heavy
class)
Upto 300 mm dia
Details of cost for 1 quintal.
Materials-
cost of specials quintal 1.00 1468
Carriage of materials tonne 0.10 2309
Labour:
For laying as per item no.20.20 (B) rate
includes water
charges C.P.
& overheads
Add for water charges@ 1% on
all except (B)
Add for contractor's profit and
overheads @ 10% on all except
(B)
Cost per 1 quintal
Say Rs. per quintal
20.25.2 Over 300 mm dia
Details of cost for 1 quintal.
Materials-
cost of specials quintal 1.00 1470
Carriage of materials tonne 0.10 2309
Labour:
For laying as per item no.20.20 (B) rate
includes water
charges C.P.
& overheads
Add for water charges@ 1% on
all except (B)
Add for contractor's profit and
overheads @ 10% on all except
(B)
Cost per 1 quintal
Say Rs. per quintal

20.26A P/L S&S C.I. Non standard


specials (Heavy class)
20.26A.1Upto 300 mm dia
Details of cost for 1 quintal.
Materials-
cost of specials quintal 1.00 1465
Carriage of materials tonne 0.10 2309
Labour:
For laying as per item no.20.20 (B) rate
includes water
charges C.P.
& overheads
Add for water charges@ 1% on
all except (B)
Add for contractor's profit and
overheads @ 10% on all except
(B)
Cost per 1 quintal
Say Rs. per quintal
20.26A.2Over 300 mm dia
Details of cost for 1 quintal.
Materials-
cost of specials quintal 1.00 1467
Carriage of materials tonne 0.10 2309
Labour:
For laying as per item no.20.20 (B) rate
includes water
charges C.P.
& overheads
Add for water charges@ 1% on
all except (B)
Add for contractor's profit and
overheads @ 10% on all except
(B)
Cost per 1 quintal
Say Rs. per quintal
20.26B P/L flanged C.I. Non standard
specials (Heavy class)
20.26B.1Upto 300 mm dia
Details of cost for 1 quintal.
Materials-
cost of specials quintal 1.00 1469
Carriage of materials tonne 0.10 2309
Labour:
For laying as per item no.20.20 (B) rate
includes water
charges C.P.
& overheads
Add for water charges@ 1% on
all except (B)
Add for contractor's profit and
overheads @ 10% on all except
(B)
Cost per 1 quintal
Say Rs. per quintal
20.26B.2Over 300 mm dia
Details of cost for 1 quintal.
Materials-
cost of specials quintal 1.00 1471
Carriage of materials tonne 0.10 2309
Labour:
For laying as per item no.20.20 (B) rate
includes water
charges C.P.
& overheads
Add for water charges@ 1% on
all except (B)
Add for contractor's profit and
overheads @ 10% on all except
(B)
Cost per 1 quintal
Say Rs. per quintal
20.27 Providing and laying S&S
centrifugally cast (spun) iron
pipes
20.27.1 80 mm dia pipe
Details of cost for 10 metre
Materials-
80 mm dia spun iron pipes(in
3.66 m lengths weight of 10m
pipes = (59x10)/3.66
= 161 kg = 1.61 quintal quintal 1.61 1461
Carriage of pipes tonne 0.16 2318
Labour:
For laying rate same as per item (B) rate
no.20.19 includes water
quintal 1.61 charges C.P.
Add for water charges@ 1% on & overheads
all except (B)
Add for contractor's profit and
overheads @ 10% on all except
(B)
Cost for 10 metre
Cost per metre
Say Rs. per quintal

20.27.2 100 mm dia pipe


Details of cost for 10 metre
Materials-
100 mm dia spun iron pipes(in
3.66 m lengths weight of 10m
pipes = (75x10)/3.66
= 205 kg = 2.05 quintal quintal 2.05 1461
Carriage of pipes 100m 0.10 2319
Labour:
For laying rate same as per item (B) rate
no.20.19 includes water
charges C.P.
quintal 2.05 & overheads
Add for water charges@ 1% on
all except (B)
Add for contractor's profit and
overheads @ 10% on all except
(B)
Cost for 10 metre
Cost per metre
Say Rs. per quintal

20.27.3 125 mm dia pipe


Details of cost for 10 metre
Materials-
125 mm dia spun iron pipes(in
3.66 m lengths weight of 10m
pipes = (98x10)/3.66
= 268 kg = 2.68 quintal quintal 2.68 1461
Carriage of pipes 100m 0.10 2320
Labour:
For laying rate same as per item (B) rate
no.20.19 includes water
charges C.P.
quintal 2.68 & overheads
Add for water charges@ 1% on
all except (B)
Add for contractor's profit and
overheads @ 10% on all except
(B)
Cost for 10 metre
Cost per metre
Say Rs. per quintal
20.27.4 150 mm dia pipe
Details of cost for 10 metre
Materials-
150 mm dia spun iron pipes(in
3.66 m lengths weight of 10m
pipes = (122x10)/3.66
= 333kg = 3.33 quintal quintal 3.33 1461
Carriage of pipes 100m 0.10 2321
Labour:
For laying rate same as per item (B) rate
no.20.19 includes water
charges C.P.
quintal 3.33 & overheads
Add for water charges@ 1% on
all except (B)
Add for contractor's profit and
overheads @ 10% on all except
(B)
Cost for 10 metre
Cost per metre
Say Rs. per quintal

20.27.5 200 mm dia pipe


Details of cost for 10 metre
Materials-
200 mm dia spun iron pipes(in
3.66 m lengths weight of 10m
pipes = (178 x10)/3.66
= 486 kg = 4.86 quintal quintal 4.86 1461
Carriage of pipes 100m 0.10 2322
Labour:
For laying rate same as per item (B) rate
no.20.19 includes water
charges C.P.
quintal 4.86 & overheads
Add for water charges@ 1% on
all except (B)
Add for contractor's profit and
overheads @ 10% on all except
(B)
Cost for 10 metre
Cost per metre
Say Rs. per quintal
20.27.6 250 mm dia pipe
Details of cost for 10 metre
Materials-
250 mm dia spun iron pipes(in
3.66 m lengths weight of 10m
pipes = (240 x10)/3.66
= 656 kg = 6.56 quintal quintal 6.56 1461
Carriage of pipes 100m 0.10 2323
Labour:
For laying rate same as per item (B) rate
no.20.19 includes water
charges C.P.
quintal 6.56 & overheads
Add for water charges@ 1% on
all except (B)
Add for contractor's profit and
overheads @ 10% on all except
(B)
Cost for 10 metre
Cost per metre
Say Rs. per quintal
20.27.7 300 mm dia pipe
Details of cost for 10 metre
Materials-
300mm dia spun iron pipes(in
3.66 m lengths weight of 10m
pipes = (310 x10)/3.66
= 847 kg =8.47 quintal quintal 8.47 1461
Carriage of pipes 100m 0.10 2324
Labour:
For laying rate same as per item (B) rate
no.20.19 includes water
charges C.P.
quintal 8.47 & overheads
Add for water charges@ 1% on
all except (B)
Add for contractor's profit and
overheads @ 10% on all except
(B)
Cost for 10 metre
Cost per metre
Say Rs. per quintal
20.27.8 350 mm dia pipe
Details of cost for 10 metre
Materials-
350mm dia spun iron pipes(in
3.66 m lengths weight of 10m
pipes = (390 x10)/3.66
= 1066 kg =10.66 quintal quintal 10.66 1461
Carriage of pipes 100m 0.10 2325
Labour:
For laying rate same as per item (B) rate
no.20.19 includes water
charges C.P.
quintal 10.66 & overheads
Add for water charges@ 1% on
all except (B)
Add for contractor's profit and
overheads @ 10% on all except
(B)
Cost for 10 metre
Cost per metre
Say Rs. per quintal
20.27.9 400 mm dia pipe
Details of cost for 10 metre
Materials-
400mm dia spun iron pipes(in
3.66 m lengths weight of 10m
pipes = (474 x10)/3.66
= 1295 kg =12.95 quintal quintal 12.95 1461
Carriage of pipes 100m 0.10 2326
Labour:
For laying rate same as per item (B) rate
no.20.19 includes water
charges C.P.
quintal 12.95 & overheads
Add for water charges@ 1% on
all except (B)
Add for contractor's profit and
overheads @ 10% on all except
(B)
Cost for 10 metre
Cost per metre
Say Rs. per quintal
20.27.10 450 mm dia pipe
Details of cost for 10 metre
Materials-
450mm dia spun iron pipes(in
3.66 m lengths weight of 10m
pipes = (572 x10)/3.66
= 1563 kg =15.63 quintal quintal 15.63 1461
Carriage of pipes 100m 0.10 2327
Labour:
For laying rate same as per item (B) rate
no.20.19 includes water
charges C.P.
quintal 15.63 & overheads
Add for water charges@ 1% on
all except (B)
Add for contractor's profit and
overheads @ 10% on all except
(B)
Cost for 10 metre
Cost per metre
Say Rs. per quintal
20.27.11 500 mm dia pipe
Details of cost for 10 metre
Materials-
500mm dia spun iron pipes(in
3.66 m lengths weight of 10m
pipes = (671 x10)/3.66
= 1833 kg =18.33 quintal quintal 18.33 1461
Carriage of pipes 100m 0.10 2328
Labour:
For laying rate same as per item (B) rate
no.20.19 includes water
charges C.P.
quintal 18.33 & overheads
Add for water charges@ 1% on
all except (B)
Add for contractor's profit and
overheads @ 10% on all except
(B)
Cost for 10 metre
Cost per metre
Say Rs. per quintal
20.27.12 600 mm dia pipe
Details of cost for 10 metre
Materials-
600mm dia spun iron pipes(in
3.66 m lengths weight of 10m
pipes = (894 x10)/3.66
= 2443 kg =24.43 quintal quintal 24.43 1461
Carriage of pipes 100m 0.10 2329
Labour:
For laying rate same as per item (B) rate
no.20.19 includes water
charges C.P.
quintal 24.43 & overheads
Add for water charges@ 1% on
all except (B)
Add for contractor's profit and
overheads @ 10% on all except
(B)
Cost for 10 metre
Cost per metre
Say Rs. per quintal

20.30 P/L S&S C.I. standard bends


(Heavy class)
Details of cost for one no.
20.30.1 80 mm diameter C.I. Bend 90°
(Rate as per item no. 20.24.1) quintal 0.18
Cost per metre
Say Rs. each

Note Details of analysis of rates for


items 20.30.2 to 20.44.12 are for
one no.
20.30.2 80 mm diameter C.I. Bend 45°
Rate same as per item no.
20.24.1 quintal 0.18
20.30.3 80 mm diameter C.I. Bend 22
1/2°
Rate same as per item no.
20.24.1 quintal 0.16
20.30.4 80mm diameter C.I. Bend 11 1/4°
Rate same as per item no.
20.24.1 quintal 0.15
20.30.5 100 mm diameter C.I. Bend 90°
Rate same as per item no.
20.24.1 quintal 0.24
20.30.6 100 mm diameter C.I. Bend 45°
Rate same as per item no.
20.24.1 quintal 0.24
20.30.7 100 mm diameter C.I. Bend 22
1/2°
Rate same as per item no.
20.24.1 quintal 0.21
20.30.8 100 mm diameter C.I. Bend 11
1/4°
Rate same as per item no.
20.24.1 quintal 0.19
20.30.9 125 mm diameter C.I. Bend 90°
Rate same as per item no.
20.24.1 quintal 0.33
20.30.10 125 mm diameter C.I. Bend 45°
Rate same as per item no.
20.24.1 quintal 0.32
20.30.11 125 mm diameter C.I. Bend 22
1/2°
Rate same as per item no.
20.24.1 quintal 0.27
20.30.12 125 mm diameter C.I. Bend 11
1/4°
Rate same as per item no.
20.24.1 quintal 0.25
20.30.13 150 mm diameter C.I. Bend 90°
Rate same as per item no.
20.24.1 quintal 0.43
20.30.14 150 mm diameter C.I. Bend 45°
Rate same as per item no.
20.24.1 quintal 0.41
20.30.15 150 mm diameter C.I. Bend 22
1/2°
Rate same as per item no.
20.24.1 quintal 0.35
20.30.16 150 mm diameter C.I. Bend 11
1/4°
Rate same as per item no.
20.24.1 quintal 0.32
20.30.17 200 mm diameter C.I. Bend 90°
Rate same as per item no.
20.24.1 quintal 0.67
20.30.18 200 mm diameter C.I. Bend 45°
Rate same as per item no.
20.24.1 quintal 0.62
20.30.19 200 mm diameter C.I. Bend 22
1/2°
Rate same as per item no.
20.24.1 quintal 0.53
20.30.20 200 mm diameter C.I. Bend 11
1/4°
Rate same as per item no.
20.24.1 quintal 0.48
20.30.21 250 mm diameter C.I. Bend 90°
Rate same as per item no.
20.24.1 quintal 0.98
20.30.22 250 mm diameter C.I. Bend 45°
Rate same as per item no.
20.24.1 quintal 0.89
20.30.23 250mm diameter C.I. Bend 22
1/2°
Rate same as per item no.
20.24.1 quintal 0.75
20.30.24 250 mm diameter C.I. Bend 11
1/4°
Rate same as per item no.
20.24.1 quintal 0.67
20.30.25 300 mm diameter C.I. Bend 90°
Rate same as per item no.
20.24.1 quintal 1.35
20.30.26 300 mm diameter C.I. Bend 45°
Rate same as per item no.
20.24.1 quintal 1.21
20.30.27 300mm diameter C.I. Bend 22
1/2°
Rate same as per item no.
20.24.1 quintal 1.00
20.30.28 300 mm diameter C.I. Bend 11
1/4°
Rate same as per item no.
20.24.1 quintal 0.98
20.30.29 350 mm diameter C.I. Bend 90°
Rate same as per item no.
20.24.1 quintal 1.81
20.30.30 350 mm diameter C.I. Bend 45°
Rate same as per item no.
20.24.2 quintal 1.59
20.30.31 350mm diameter C.I. Bend 22
1/2°
Rate same as per item no.
20.24.2 quintal 1.30
20.30.32 350 mm diameter C.I. Bend 11
1/4°
Rate same as per item no.
20.24.2 quintal 1.15
20.30.33 400 mm diameter C.I. Bend 90°
Rate same as per item no.
20.24.2 quintal 2.34
20.30.34 400 mm diameter C.I. Bend 45°
Rate same as per item no.
20.24.2 quintal 2.02
20.30.35 400mm diameter C.I. Bend 22
1/2°
Rate same as per item no.
20.24.2 quintal 1.64
20.30.36 400 mm diameter C.I. Bend 11
1/4°
Rate same as per item no.
20.24.2 quintal 1.44
20.30.37 450 mm diameter C.I. Bend 90°
Rate same as per item no.
20.24.2 quintal 2.90
20.30.38 450 mm diameter C.I. Bend 45°
Rate same as per item no.
20.24.2 quintal 2.48
20.30.39 450mm diameter C.I. Bend 22
1/2°
Rate same as per item no.
20.24.2 quintal 1.97
20.30.40 450 mm diameter C.I. Bend 11
1/4°
Rate same as per item no.
20.24.2 quintal 1.72
20.30.41 500 mm diameter C.I. Bend 90°
Rate same as per item no.
20.24.2 quintal 3.70
20.30.42 500 mm diameter C.I. Bend 45°
Rate same as per item no.
20.24.2 quintal 3.10
20.30.43 500mm diameter C.I. Bend 22
1/2°
Rate same as per item no.
20.24.2 quintal 2.46
20.30.44 500 mm diameter C.I. Bend 11
1/4°
Rate same as per item no.
20.24.2 quintal 2.15
20.30.45 600 mm diameter C.I. Bend 90°
Rate same as per item no.
20.24.2 quintal 5.46
20.30.46 600 mm diameter C.I. Bend 45°
Rate same as per item no.
20.24.2 quintal 4.48
20.30.47 600mm diameter C.I. Bend 22
1/2°
Rate same as per item no.
20.24.2 quintal 3.51
20.30.48 600 mm diameter C.I. Bend 11
1/4°
Rate same as per item no.
20.24.2 quintal 3.02
20.31 Providing and laying S&S C.I.
Standard tees (Heavy class)
20.31.1 80x80 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 0.23
20.31.2 100x80 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 0.28
20.31.3 100x100 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 0.30
20.31.4 125x80 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 0.36
20.31.5 125x100 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 0.38
20.31.6 125x125 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 0.41
20.31.7 150x80 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 0.45
20.31.8 150x100 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 0.74
20.31.9 150x125 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 0.50
20.31.10 150x150 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 0.53
20.31.11 200x80 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 0.67
20.31.12 200x100 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 0.69
20.31.13 200x125 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 0.71
20.31.14 200x150 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 0.74
20.31.15 200x200 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 0.81
20.31.16 250x80 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 0.94
20.31.17 250x100 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 0.96
20.31.18 250x125 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 0.99
20.31.19 250x150 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 1.02
20.31.20 250x200 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 1.08
20.31.21 250x250 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 1.16
20.31.22 300x80 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 1.28
20.31.23 300x100 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 1.29
20.31.24 300x125 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 1.32
20.31.25 300x150 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 1.34
20.31.26 300x200 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 1.42
20.31.27 300x250 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 1.50
20.31.28 300x300 mm C.I. Tee
(Rate same as per item no.
20.24.1) quintal 1.59
20.31.29 350x200 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 1.82
20.31.30 350x250 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 1.90
20.31.31 350x300 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 1.99
20.31.32 350x350 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 2.09
20.31.33 400x200 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 2.29
20.31.34 400x250 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 2.37
20.31.35 400x300 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 2.46
20.31.36 400x350 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 2.56
20.31.37 400x400 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 2.68
20.31.38 450x250 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 2.95
20.31.39 450x300 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 3.04
20.31.40 450x350 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 3.14
20.31.41 450x400 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 3.24
20.31.42 450x450 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 3.37
20.31.43 500x250 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 3.56
20.31.44 500x300 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 3.65
20.31.45 500x350 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 3.75
20.31.46 500x400 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 3.86
20.31.47 500x450 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 3.98
20.31.48 500x500 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 4.13
20.31.49 600x300 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 5.21
20.31.50 600x350 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 5.31
20.31.51 600x400 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 5.43
20.31.52 600x450 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 5.56
20.31.53 600x500 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 5.69
20.31.54 600x600 mm C.I. Tee
(Rate same as per item no.
20.24.2) quintal 6.02
20.32 Providing and laying S&S C.I.
crosses (Heavy class)
20.32.1 80x80x80x80 mm C.I. Cross
(Rate same as per item no.
20.24.1) quintal 0.30
20.32.2 100x100x100x100 mm C.I. Cross
(Rate same as per item no.
20.24.1) quintal 0.39
20.32.3 125x125x125x125 mm C.I. Cross
(Rate same as per item no.
20.24.1) quintal 0.52
20.32.4 150x150x150x150 mm C.I. Cross
(Rate same as per item no.
20.24.1) quintal 0.67
20.32.5 200x200x200x200 mm C.I. Cross
(Rate same as per item no.
20.24.1) quintal 1.02
20.32.6 250x250x250x250 mm C.I. Cross
(Rate same as per item no.
20.24.1) quintal 1.45
20.32.7 300x300x300x300 mm C.I. Cross
(Rate same as per item no.
20.24.1) quintal 1.97
20.33 Providing and laying S&S C.I.
Standard tapers with larger end
socketed (Heavy class)
20.33.1 100x80 mm C.I. Taper
(Rate same as per item no. quintal 0.16
20.33.2 20.24.1)
125x80 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.21
20.33.3 125x100 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.23
20.33.4 150x80 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.27
20.33.5 150x100 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.28
20.33.6 150x125 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.31
20.33.7 200x100 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.40
20.33.8 200x125 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.42
20.33.9 200x150 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.45
20.33.10 250x125 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.56
20.33.11 250x150 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.59
20.33.12 250x200 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.66
20.33.13 300x150 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.80
20.33.14 300x200 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.88
20.33.15 300x250 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.97
20.33.16 350x200 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 1.04
20.33.17 350x250 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 1.13
20.33.18 350x300 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 1.23
20.33.19 400x250 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 1.43
20.33.20 400x300 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 1.54
20.33.21 400x350 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 1.66
20.33.22 450x350 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 1.85
20.33.23 450x400 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 1.99
20.33.24 500x350 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 2.11
20.33.25 500x400 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 2.25
20.33.26 500x450 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 2.40
20.33.27 600x400 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 3.00
20.33.28 600x450 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 3.16
20.33.29 600x500 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 3.33
20.34 Providing and laying S&S C.I.
Standard tapers with smaller end
socketed (Heavy class)
20.34.1 100x80 mm C.I. Taper
(Rate same as per item no. quintal 0.16
20.34.2 20.24.1)
125x80 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.19
20.34.3 125x100 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.21
20.34.4 150x80 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.23
20.34.5 150x100 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.25
20.34.6 150x125 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.29
20.34.7 200x100 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.34
20.34.8 200x125 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.38
20.34.9 200x150 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.42
20.34.10 250x125 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.49
20.34.11 250x150 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.53
20.34.12 250x200 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.69
20.34.13 300x150 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.70
20.34.14 300x200 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.80
20.34.15 300x250 mm C.I. Taper
(Rate same as per item no.
20.24.1) quintal 0.93
20.34.16 350x200 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 0.92
20.34.17 350x250 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 1.04
20.34.18 350x300 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 1.18
20.34.19 400x250 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 1.29
20.34.20 400x300 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 1.44
20.34.21 400x350 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 1.61
20.34.22 450x350 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 1.77
20.34.23 450x400 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 1.95
20.34.24 500x350 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 1.94
20.34.25 500x400 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 2.12
20.34.26 500x450 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 2.30
20.34.27 600x400 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 2.73
20.34.28 600x450 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 2.93
20.34.29 600x500 mm C.I. Taper
(Rate same as per item no.
20.24.2) quintal 3.20
20.35 Providing and laying C.I. Double
socket collars(Heavy class)
20.35.1 80 mm C.I.collar
(Rate same as per item no.
20.24.1) quintal 0.14
20.35.2 100 mm C.I.collar
(Rate same as per item no.
20.24.1) quintal 0.17
20.35.3 125 mm C.I.collar
(Rate same as per item no.
20.24.1) quintal 0.22
20.35.4 150 mm C.I.collar
(Rate same as per item no.
20.24.1) quintal 0.28
20.35.5 200 mm C.I.collar
(Rate same as per item no.
20.24.1) quintal 0.40
20.35.6 250 mm C.I.collar
(Rate same as per item no.
20.24.1) quintal 0.55
20.35.7 300 mm C.I.collar
(Rate same as per item no.
20.24.1) quintal 0.71
20.35.8 350 mm C.I.collar
(Rate same as per item no.
20.24.2) quintal 0.90
20.35.9 400 mm C.I.collar
(Rate same as per item no.
20.24.2) quintal 1.10
20.35.10 450 mm C.I.collar
(Rate same as per item no.
20.24.2) quintal 1.33
20.35.11 500 mm C.I.collar
(Rate same as per item no.
20.24.2) quintal 1.59
20.35.12 600 mm C.I.collar
(Rate same as per item no.
20.24.2) quintal 2.16
20.36 Providing and laying C.I. Plugs
(Heavy class)
20.36.1 80 mm C.I. plug
(Rate same as per item no.
20.24.1) quintal 0.03
20.36.2 100 mm C.I. plug
(Rate same as per item no.
20.24.1) quintal 0.04
20.36.3 125 mm C.I. plug
(Rate same as per item no.
20.24.1) quintal 0.06
20.36.4 150 mm C.I. plug
(Rate same as per item no.
20.24.1) quintal 0.09
20.36.5 200 mm C.I. plug
(Rate same as per item no.
20.24.1) quintal 0.14
20.36.6 250 mm C.I. plug
(Rate same as per item no.
20.24.1) quintal 0.22
20.36.7 300 mm C.I. plug
(Rate same as per item no.
20.24.1) quintal 0.30
20.36.8 350 mm C.I. plug
(Rate same as per item no.
20.24.1) quintal 0.41
20.36.9 400mm C.I. plug
(Rate same as per item no.
20.24.1) quintal 0.54
20.36.10 450mm C.I. plug
(Rate same as per item no.
20.24.1) quintal 0.69
20.36.11 500 mm C.I. plug
(Rate same as per item no.
20.24.1) quintal 0.89
20.36.12 600 mm C.I. plug
(Rate same as per item no.
20.24.1) quintal 1.27
20.37 Providing and laying C.I. caps
(Heavy class)
20.37.1 80 mm C.I. caps
(Rate same as per item no.
20.24.1) quintal 0.07
20.37.2 100 mm C.I. caps
(Rate same as per item no.
20.24.1) quintal 0.09
20.37.3 125 mm C.I. caps
(Rate same as per item no.
20.24.1) quintal 0.12
20.37.4 150 mm C.I. caps
(Rate same as per item no.
20.24.1) quintal 0.15
20.37.5 200 mm C.I. caps
(Rate same as per item no.
20.24.1) quintal 0.24
20.37.6 250 mm C.I. caps
(Rate same as per item no.
20.24.1) quintal 0.34
20.37.7 300 mm C.I. caps
(Rate same as per item no.
20.24.1) quintal 0.46
20.37.8 350 mm C.I. caps
(Rate same as per item no.
20.24.1) quintal 0.61
20.37.9 400mm C.I. caps
(Rate same as per item no.
20.24.1) quintal 0.77
20.37.10 450mm C.I.caps
(Rate same as per item no.
20.24.1) quintal 0.97
20.37.11 500 mm C.I. caps
(Rate same as per item no.
20.24.1) quintal 1.18
20.37.12 600 mm C.I. caps
(Rate same as per item no.
20.24.1) quintal 1.71
20.38 Providing and laying double
flanged C.I. Bends(Heavy class)
20.38.1 80 mm dia C.I. bend 90°
(Rate same as per item no.
20.25.1) quintal 0.13
20.38.2 80 mm dia C.I. bend 45°
(Rate same as per item no.
20.25.1) quintal 0.14
20.38.3 100 mm dia C.I. bend 90°
(Rate same as per item no.
20.25.1) quintal 0.17
20.38.4 100 mm dia C.I. bend 45°
(Rate same as per item no.
20.25.1) quintal 0.18
20.38.5 125 mm dia C.I. bend 90°
(Rate same as per item no.
20.25.1) quintal 0.23
20.38.6 125 mm dia C.I. bend 45°
(Rate same as per item no.
20.25.1) quintal 0.25
20.38.7 150 mm dia C.I. bend 90°
(Rate same as per item no.
20.25.1) quintal 0.31
20.38.8 150 mm dia C.I. bend 45°
(Rate same as per item no.
20.25.1) quintal 0.34
20.38.9 200 mm dia C.I. bend 90°
(Rate same as per item no.
20.25.1) quintal 0.49
20.38.10 200 mm dia C.I. bend 45°
(Rate same as per item no.
20.25.1) quintal 0.54
20.38.11 250 mm dia C.I. bend 90°
(Rate same as per item no.
20.25.1) quintal 0.72
20.38.12 250 mm dia C.I. bend 45°
(Rate same as per item no.
20.25.1) quintal 0.80
20.38.13 300 mm dia C.I. bend 90°
(Rate same as per item no.
20.25.1) quintal 1.00
20.38.14 300 mm dia C.I. bend 45°
(Rate same as per item no.
20.25.1) quintal 1.12
20.38.15 350 mm dia C.I. bend 90°
(Rate same as per item no.
20.25.2) quintal 1.37
20.38.16 350 mm dia C.I. bend 45°
(Rate same as per item no.
20.25.2) quintal 1.15
20.38.17 400 mm dia C.I. bend 90°
(Rate same as per item no.
20.25.2) quintal 1.81
20.38.18 400 mm dia C.I. bend 45°
(Rate same as per item no.
20.25.2) quintal 1.49
20.38.19 450 mm dia C.I. bend 90°
(Rate same as per item no.
20.25.2) quintal 2.26
20.38.20 450 mm dia C.I. bend 45°
(Rate same as per item no.
20.25.2) quintal 1.85
20.38.21 500 mm dia C.I. bend 90°
(Rate same as per item no.
20.25.2) quintal 2.90
20.38.22 500 mm dia C.I. bend 45°
(Rate same as per item no.
20.25.2) quintal 2.31
20.38.23 600 mm dia C.I. bend 90°
(Rate same as per item no.
20.25.2) quintal 4.42
20.38.24 600 mm dia C.I. bend 45°
(Rate same as per item no.
20.25.2) quintal 3.42
20.39 Providing and laying double
flanged C.I. Duck foot bends 90°
(Heavy class)
20.39.1 80 mm dia bend
(Rate same as per item no.
20.25.1) quintal 0.21
20.39.2 100 mm dia bend
(Rate same as per item no.
20.25.1) quintal 0.26
20.39.3 125 mm dia bend
(Rate same as per item no.
20.25.1) quintal 0.36
20.39.4 150 mm dia bend
(Rate same as per item no.
20.25.1) quintal 0.47
20.39.5 200 mm dia bend
(Rate same as per item no.
20.25.1) quintal 0.74
20.39.6 250 mm dia bend
(Rate same as per item no.
20.25.1) quintal 1.11
20.39.7 300 mm dia bend
(Rate same as per item no.
20.25.1) quintal 1.56
20.39.8 350 mm dia bend
(Rate same as per item no.
20.25.2) quintal 2.14
20.39.9 400 mm dia bend
(Rate same as per item no.
20.25.2) quintal 2.81
20.39.10 450 mm dia bend
(Rate same as per item no.
20.25.2) quintal 3.50
20.39.11 500 mm dia bend
(Rate same as per item no.
20.25.2) quintal 4.46
20.39.12 600 mm dia bend
(Rate same as per item no.
20.25.2) quintal 6.77
20.40 Providing and laying double
flanged C.I. Tees (Heavy class)
20.40.1 80x80 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 0.21
20.40.2 100x80 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 0.25
20.40.3 100x100 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 0.26
20.40.4 125x80 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 0.32
20.40.5 125x100 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 0.34
20.40.6 125x125 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 0.36
20.40.7 150x80 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 0.41
20.40.8 150x100 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 0.42
20.40.9 150x125 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 0.45
20.40.10 150x150 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 0.47
20.40.11 200x80 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 0.62
20.40.12 200x100 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 0.63
20.40.13 200x125 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 0.66
20.40.14 200x150 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 0.68
20.40.15 200x200 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 0.74
20.40.16 250x80 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 0.89
20.40.17 250x100 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 0.90
20.40.18 250x125 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 0.93
20.40.19 250x150 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 0.96
20.40.20 250x200 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 1.02
20.40.21 250x250 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 1.09
20.40.22 300x80 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 1.22
20.40.23 300x100 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 1.24
20.40.24 300x125 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 1.26
20.40.25 300x150 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 1.29
20.40.26 300x200 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 1.36
20.40.27 300x250 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 1.43
20.40.28 300x300 mm C.I. tee
(Rate same as per item no.
20.25.1) quintal 1.51
20.40.29 350x200 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 1.69
20.40.30 350x250 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 1.73
20.40.31 350x300 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 1.88
20.40.32 350x350 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 1.95
20.40.33 400x200 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 2.11
20.40.34 400x250 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 2.15
20.40.35 400x300 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 2.32
20.40.36 400x350 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 2.39
20.40.37 400x400 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 2.46
20.40.38 450x250 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 2.60
20.40.39 450x300 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 2.77
20.40.40 450x350 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 2.84
20.40.41 450x400 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 2.90
20.40.42 450x450 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 2.96
20.40.43 500x250 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 3.15
20.40.44 500x300 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 3.34
20.40.45 500x350 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 3.42
20.40.46 500x400 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 3.49
20.40.47 500x450 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 3.56
20.40.48 500x500 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 3.63
20.40.49 600x300 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 3.66
20.40.50 600x350 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 4.75
20.40.51 600x400 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 4.85
20.40.52 600x450 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 4.92
20.40.53 600x500 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 4.99
20.40.54 600x600 mm C.I. tee
(Rate same as per item no.
20.25.2) quintal 5.16
20.41 Providing and laying double
flanged C.I. Crosses (Heavy
class)
20.41.1 80x80x80x80 mm C.I. Cross
(Rate same as per item no.
20.25.1) quintal 0.27
20.41.2 100x100x100x100 mm C.I. Cross
(Rate same as per item no.
20.25.1) quintal 0.34
20.41.3 125x125x125x125 mm C.I. Cross
(Rate same as per item no.
20.25.1) quintal 0.46
20.41.4 150x150x150x150 mm C.I. Cross
(Rate same as per item no.
20.25.1) quintal 0.60
20.41.5 200x200x200x200 mm C.I. Cross
(Rate same as per item no.
20.25.1) quintal 0.93
20.41.6 250x250x250x250 mm C.I. Cross
(Rate same as per item no.
20.25.1) quintal 1.35
20.41.7 300x300x300x300 mm C.I. Cross
(Rate same as per item no.
20.25.1) quintal 1.86
20.42 Providing and laying double
flanged C.I. Tapers (Heavy
class)
20.42.1 100x80 mm C.I. Taper
(Rate same as per item no.
20.25.1) quintal 0.12
20.42.2 125x80 mm C.I. Taper
(Rate same as per item no.
20.25.1) quintal 0.20
20.42.3 125x100 mm C.I. Taper
(Rate same as per item no.
20.25.1) quintal 0.22
20.42.4 150x80 mm C.I. Taper
(Rate same as per item no.
20.25.1) quintal 0.23
20.42.5 150x100 mm C.I. Taper
(Rate same as per item no.
20.25.1) quintal 0.25
20.42.6 150x125 mm C.I. Taper
(Rate same as per item no.
20.25.1) quintal 0.27
20.42.7 200x100 mm C.I. Taper
(Rate same as per item no.
20.25.1) quintal 0.31
20.42.8 200x125 mm C.I. Taper
(Rate same as per item no.
20.25.1) quintal 0.34
20.42.9 200x150 mm C.I. Taper
(Rate same as per item no.
20.25.1) quintal 0.37
20.42.10 250x125 mm C.I. Taper
(Rate same as per item no.
20.25.1) quintal 0.41
20.42.11 250x150 mm C.I. Taper
(Rate same as per item no.
20.25.1) quintal 0.44
20.42.12 250x200 mm C.I. Taper
(Rate same as per item no.
20.25.1) quintal 0.50
20.42.13 300x150 mm C.I. Taper
(Rate same as per item no.
20.25.1) quintal 0.51
20.42.14 300x200 mm C.I. Taper
(Rate same as per item no.
20.25.1) quintal 0.58
20.42.15 300x250 mm C.I. Taper
(Rate same as per item no.
20.25.1) quintal 0.65
20.42.16 350x200 mm C.I. Taper
(Rate same as per item no.
20.25.2) quintal 0.87
20.42.17 350x250 mm C.I. Taper
(Rate same as per item no.
20.25.2) quintal 0.96
20.42.18 350x300 mm C.I. Taper
(Rate same as per item no.
20.25.2) quintal 1.06
20.42.19 400x250 mm C.I. Taper
(Rate same as per item no.
20.25.2) quintal 1.09
20.42.20 400x300 mm C.I. Taper
(Rate same as per item no.
20.25.2) quintal 1.20
20.42.21 400x350 mm C.I. Taper
(Rate same as per item no.
20.25.2) quintal 1.32
20.42.22 450x350 mm C.I. Taper
(Rate same as per item no.
20.25.2) quintal 1.30
20.42.23 450x400 mm C.I. Taper
(Rate same as per item no.
20.25.2) quintal 1.45
20.42.24 500x350 mm C.I. Taper
(Rate same as per item no.
20.25.2) quintal 1.58
20.42.25 500x400 mm C.I. Taper
(Rate same as per item no.
20.25.2) quintal 1.60
20.42.26 500x450 mm C.I. Taper
(Rate same as per item no.
20.25.2) quintal 1.74
20.42.27 600x400 mm C.I. Taper
(Rate same as per item no.
20.25.2) quintal 1.86
20.42.28 600x450 mm C.I. Taper
(Rate same as per item no.
20.25.2) quintal 2.10
20.42.29 600x500 mm C.I. Taper
(Rate same as per item no.
20.25.2) quintal 2.22
20.43 Providing and laying C.I. Flanged
socketed tail pieces (Heavy
class)
20.43.1 80 mm C.I. Flanged socket
(Rate same as per item no.
20.25.1) quintal 0.13
20.43.2 100 mm C.I. Flanged socket
(Rate same as per item no.
20.25.1) quintal 0.16
20.43.3 125 mm C.I. Flanged socket
(Rate same as per item no.
20.25.1) quintal 0.20
20.43.4 150 mm C.I. Flanged socket
(Rate same as per item no.
20.25.1) quintal 0.26
20.43.5 200 mm C.I. Flanged socket
(Rate same as per item no.
20.25.1) quintal 0.27
20.43.6 250 mm C.I. Flanged socket
(Rate same as per item no.
20.25.1) quintal 0.62
20.43.7 300 mm C.I. Flanged socket
(Rate same as per item no.
20.25.1) quintal 0.79
20.43.8 350 mm C.I. Flanged socket
(Rate same as per item no.
20.25.2) quintal 1.00
20.43.9 400 mm C.I. Flanged socket
(Rate same as per item no.
20.25.2) quintal 1.23
20.43.10 450 mm C.I. Flanged socket
(Rate same as per item no.
20.25.2) quintal 1.42
20.43.11 500 mm C.I. Flanged socket
(Rate same as per item no.
20.25.2) quintal 1.73
20.43.12 600 mm C.I. Flanged socket
(Rate same as per item no.
20.25.2) quintal 2.34
20.44 Providing and laying C.I. Flanged
spigot tail pieces (Heavy class)

20.44.1 80 mm C.I. flanged spigot


(Rate same as per item no.
20.25.1) quintal 0.12
20.44.2 100 mm C.I. flanged spigot
(Rate same as per item no.
20.25.1) quintal 0.14
20.44.3 125 mm C.I. flanged spigot
(Rate same as per item no.
20.25.1) quintal 0.19
20.44.4 150 mm C.I. flanged spigot
(Rate same as per item no.
20.25.1) quintal 0.23
20.44.5 200 mm C.I. flanged spigot
(Rate same as per item no.
20.25.1) quintal 0.39
20.44.6 250 mm C.I. flanged spigot
(Rate same as per item no.
20.25.1) quintal 0.53
20.44.7 300 mm C.I. flanged spigot
(Rate same as per item no.
20.25.1) quintal 0.68
20.44.8 350 mm C.I. flanged spigot
(Rate same as per item no.
20.25.2) quintal 0.85
20.44.9 400 mm C.I. flanged spigot
(Rate same as per item no.
20.25.2) quintal 1.04
20.44.10 450 mm C.I. flanged spigot
(Rate same as per item no.
20.25.2) quintal 1.23
20.44.11 500 mm C.I. flanged spigot
(Rate same as per item no.
20.25.2) quintal 1.46
20.44.12 600 mm C.I. flanged spigot
(Rate same as per item no.
20.25.2) quintal 2.27
20.45 Providing lead caulked joints to
spun iron or C.I. Pipes and
specials including testing of joints
but excluding the cost of pig lead
20.45.1 80mm diameter pipe
Details of cosst for 10 joints
Materials-
Spun yarn 0.113x10 = 1.13 kg. Kg 1.13 1881
Fuel wood quintal 0.19 761
Kerosene oil litre 0.38 771
sundries 1 time 2.05 9999
Carriage of materials 1 time 2.05 9999
Labour-
Fitter each 1.00 116
Asstt. Fitter each 1.00 117
Beldar each 2.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.45.2 100mm diameter pipe
Details of cosst for 10 joints
Materials-
Spun yarn 0.17x10 = 1.70 kg. Kg 1.70 1881
Fuel wood quintal 0.28 761
Kerosene oil litre 0.38 771
sundries 1 time 2.60 9999
Carriage of materials 1 time 2.05 9999
Labour-
Fitter each 1.00 116
Asstt. Fitter each 1.00 117
Beldar each 2.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.45.3 125mm diameter pipe
Details of cosst for 10 joints
Materials-
Spun yarn 0.20x10 = 2.00 kg. Kg 2.00 1881
Fuel wood quintal 0.37 761
Kerosene oil litre 0.76 771
sundries 1 time 3.65 9999
Carriage of materials 1 time 3.65 9999
Labour-
Fitter each 1.50 116
Asstt. Fitter each 1.50 117
Beldar each 3.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.45.4 150mm diameter pipe
Details of cosst for 10 joints
Materials-
Spun yarn 0.23x10 = 2.30 kg. Kg 2.30 1881
Fuel wood quintal 0.42 761
Kerosene oil litre 0.76 771
sundries 1 time 4.15 9999
Carriage of materials 1 time 4.15 9999
Labour-
Fitter each 1.50 116
Asstt. Fitter each 1.50 117
Beldar each 3.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.45.5 200mm diameter pipe
Details of cosst for 10 joints
Materials-
Spun yarn 0.3x10 = 3.00 kg. Kg 3.00 1881
Fuel wood quintal 0.56 761
Kerosene oil litre 0.76 771
sundries 1 time 5.20 9999
Carriage of materials 1 time 5.2 9999
Labour-
Fitter each 2.00 116
Asstt. Fitter each 2.00 117
Beldar each 4.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each

20.45.6 250mm diameter pipe


Details of cosst for 10 joints
Materials-
Spun yarn 0.4x10 = 4.00 kg. Kg 4.00 1881
Fuel wood quintal 0.65 761
Kerosene oil litre 1.14 771
sundries 1 time 6.75 9999
Carriage of materials 1 time 6.75 9999
Labour-
Fitter each 2.50 116
Asstt. Fitter each 2.50 117
Beldar each 5.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each

20.45.7 300mm diameter pipe


Details of cosst for 10 joints
Materials-
Spun yarn 0.54x10 = 5.40 kg. Kg 5.40 1881
Fuel wood quintal 0.75 761
Kerosene oil litre 1.52 771
sundries 1 time 7.80 9999
Carriage of materials 1 time 7.8 9999
Labour-
Fitter each 3.00 116
Asstt. Fitter each 3.00 117
Beldar each 6.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.45.8 350mm diameter pipe
Details of cosst for 10 joints
Materials-
Spun yarn 0.62x10 = 6.20 kg. Kg 6.20 1881
Fuel wood quintal 0.93 761
Kerosene oil litre 1.70 771
sundries 1 time 9.30 9999
Carriage of materials 1 time 9.3 9999
Labour-
Fitter each 3.00 116
Asstt. Fitter each 3.00 117
Beldar each 6.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.45.9 400mm diameter pipe
Details of cosst for 10 joints
Materials-
Spun yarn 0.74x10 = 7.40 kg. Kg 7.40 1881
Fuel wood quintal 1.12 761
Kerosene oil litre 1.70 771
sundries 1 time 10.35 9999
Carriage of materials 1 time 10.35 9999
Labour-
Fitter each 4.00 116
Asstt. Fitter each 4.00 117
Beldar each 8.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.45.10 450mm diameter pipe
Details of cosst for 10 joints
Materials-
Spun yarn 0.79x10 = 7.90 kg. Kg 7.90 1881
Fuel wood quintal 1.21 761
Kerosene oil litre 2.27 771
sundries 1 time 11.95 9999
Carriage of materials 1 time 11.95 9999
Labour-
Fitter each 4.50 116
Asstt. Fitter each 4.50 117
Beldar each 9.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.45.11 500mm diameter pipe
Details of cosst for 10 joints
Materials-
Spun yarn 0.85x10 = 8.50 kg. Kg 8.50 1881
Fuel wood quintal 1.31 761
Kerosene oil litre 2.27 771
sundries 1 time 12.95 9999
Carriage of materials 1 time 12.95 9999
Labour-
Fitter each 4.75 116
Asstt. Fitter each 7.75 117
Beldar each 9.50 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.45.12 600mm diameter pipe
Details of cosst for 10 joints
Materials-
Spun yarn 1.02x10 = 10.20 kg. Kg 10.20 1881
Fuel wood quintal 1.68 761
Kerosene oil litre 2.84 771
sundries 1 time 15.50 9999
Carriage of materials 1 time 15.50 9999
Labour-
Fitter each 6.50 116
Asstt. Fitter each 6.50 117
Beldar each 13.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.45.13 700mm diameter pipe
Details of cosst for 10 joints
Materials-
Spun yarn 1.17x10 = 11.70kg. Kg 11.70 1881
Fuel wood quintal 2.14 761
Kerosene oil litre 3.41 771
sundries 1 time 18.60 9999
Carriage of materials 1 time 18.60 9999
Labour-
Fitter each 7.70 116
Asstt. Fitter each 7.70 117
Beldar each 15.40 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.45.14 800mm diameter pipe
Details of cosst for 10 joints
Materials-
Spun yarn 1.33x10 = 13.30kg. Kg 13.30 1881
Fuel wood quintal 2.33 761
Kerosene oil litre 3.41 771
sundries 1 time 20.70 9999
Carriage of materials 1 time 20.70 9999
Labour-
Fitter each 8.50 116
Asstt. Fitter each 8.50 117
Beldar each 17.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.45.15 900mm diameter pipe
Details of cosst for 10 joints
Materials-
Spun yarn 1.56x10 = 15.60kg. Kg 15.60 1881
Fuel wood quintal 2.80 761
Kerosene oil litre 4.55 771
sundries 1 time 23.30 9999
Carriage of materials 1 time 23.33 9999
Labour-
Fitter each 10.00 116
Asstt. Fitter each 10.00 117
Beldar each 20.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.45.16 1000mm diameter pipe
Details of cosst for 10 joints
Materials-
Spun yarn 1.70x10 = 17.00kg. Kg 17.00 1881
Fuel wood quintal 3.00 761
Kerosene oil litre 4.55 771
sundries 1 time 25.90 9999
Carriage of materials 1 time 25.90 9999
Labour-
Fitter each 11.00 116
Asstt. Fitter each 11.00 117
Beldar each 22.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.45.17 1100mm diameter pipe
Details of cosst for 10 joints
Materials-
Spun yarn 1.87x10 = 18.70kg. Kg 18.70 1881
Fuel wood quintal 3.36 761
Kerosene oil litre 5.13 771
sundries 1 time 28.50 9999
Carriage of materials 1 time 28.50 9999
Labour-
Fitter each 12.00 116
Asstt. Fitter each 12.00 117
Beldar each 24.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.45.18 1200mm diameter pipe
Details of cosst for 10 joints
Materials-
Spun yarn 2.04x10 = 20.40kg. Kg 20.40 1881
Fuel wood quintal 3.73 761
Kerosene oil litre 5.68 771
sundries 1 time 31.05 9999
Carriage of materials 1 time 31.05 9999
Labour-
Fitter each 13.00 116
Asstt. Fitter each 13.00 117
Beldar each 26.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.45.19 1300mm diameter pipe
Details of cosst for 10 joints
Materials-
Spun yarn 2.23x10 = 22.30 kg. Kg 22.30 1881
Fuel wood quintal 4.06 761
Kerosene oil litre 6.53 771
sundries 1 time 33.65 9999
Carriage of materials 1 time 33.65 9999
Labour-
Fitter each 14.50 116
Asstt. Fitter each 14.50 117
Beldar each 29.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.45.20 1400mm diameter pipe
Details of cosst for 10 joints
Materials-
Spun yarn 2.39x10 = 23.90 kg. Kg 23.90 1881
Fuel wood quintal 4.36 761
Kerosene oil litre 7.01 771
sundries 1 time 36.20 9999
Carriage of materials 1 time 36.20 9999
Labour-
Fitter each 15.50 116
Asstt. Fitter each 15.50 117
Beldar each 31.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.45.21 1400mm diameter pipe
Details of cosst for 10 joints
Materials-
Spun yarn 2.52x10 = 25.20 kg. Kg 25.20 1881
Fuel wood quintal 4.67 761
Kerosene oil litre 7.38 771
sundries 1 time 38.85 9999
Carriage of materials 1 time 38.85 9999
Labour-
Fitter each 16.50 116
Asstt. Fitter each 16.50 117
Beldar each 33.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.46 Supplying pig lead at site of work
Details of cost for 1 quintal.
Materials-
Lead kg 100.00 1397
Carriage tonne 0.10 2341
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost per one quintal
Say Rs. per quintal
20.47 Providing flanged joints to double
flanged C.I. Pipes and specials
including testing of joints.
20.47.1 80mm diameter pipe
Details of cosst for 10 joints
Materials-
Rubber insertion 3 mm thick each 10.00 1373
Bolts and nuts 16 mm dia 60 mm
long each 40.00 1956
Carriage and materials 1 time 1.05 9999
Labour-
Fitter each 0.15 116
Asstt. Fitter each 0.15 117
Beldar each 0.80 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.47.2 100mm diameter pipe
Details of cosst for 10 joints
Materials-
Rubber insertion 3 mm thick each 10.00 1374
Bolts and nuts 16 mm dia 60 mm
long each 80.00 1956
Carriage and materials 1 time 1.60 9999
Labour-
Fitter each 0.25 116
Asstt. Fitter each 0.25 117
Beldar each 1.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.47.3 125mm diameter pipe
Details of cosst for 10 joints
Materials-
Rubber insertion 3 mm thick each 10.00 1375
Bolts and nuts 16 mm dia 65 mm
long each 80.00 1957
Carriage and materials 1 time 1.60 9999
Labour-
Fitter each 0.25 116
Asstt. Fitter each 0.25 117
Beldar each 1.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.47.4 150mm diameter pipe
Details of cosst for 10 joints
Materials-
Rubber insertion 3 mm thick each 10.00 1376
Bolts and nuts 20 mm dia 65 mm
long each 80.00 1958
Carriage and materials 1 time 1.60 9999
Labour-
Fitter each 0.30 116
Asstt. Fitter each 0.30 117
Beldar each 1.10 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.47.5 200mm diameter pipe
Details of cosst for 10 joints
Materials-
Rubber insertion 3 mm thick each 10.00 1377
Bolts and nuts 20 mm dia 70 mm
long each 80.00 1959
Carriage and materials 1 time 1.60 9999
Labour-
Fitter each 0.30 116
Asstt. Fitter each 0.30 117
Beldar each 1.10 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.47.6 250mm diameter pipe
Details of cosst for 10 joints
Materials-
Rubber insertion 3 mm thick each 10.00 1378
Bolts and nuts 20 mm dia 75 mm
long each 120.00 1960
Carriage and materials 1 time 1.60 9999
Labour-
Fitter each 0.40 116
Asstt. Fitter each 0.40 117
Beldar each 1.30 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.47.7 300mm diameter pipe
Details of cosst for 10 joints
Materials-
Rubber insertion 3 mm thick each 10.00 1379
Bolts and nuts 20 mm dia 75 mm
long each 120.00 1960
Carriage and materials 1 time 2.05 9999
Labour-
Fitter each 0.40 116
Asstt. Fitter each 0.40 117
Beldar each 1.30 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.47.8 350mm diameter pipe
Details of cosst for 10 joints
Materials-
Rubber insertion 3 mm thick each 10.00 1380
Bolts and nuts 20 mm dia 80 mm
long each 160.00 1961
Carriage and materials 1 time 2.05 9999
Labour-
Fitter each 0.50 116
Asstt. Fitter each 0.50 117
Beldar each 1.50 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.47.9 400mm diameter pipe
Details of cosst for 10 joints
Materials-
Rubber insertion 3 mm thick each 10.00 1381
Bolts and nuts 24 mm dia 85 mm
long each 160.00 1962
Carriage and materials 1 time 3.10 9999
Labour-
Fitter each 0.50 116
Asstt. Fitter each 0.50 117
Beldar each 1.50 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.47.10 450mm diameter pipe
Details of cosst for 10 joints
Materials-
Rubber insertion 3 mm thick each 10.00 1382
Bolts and nuts 24 mm dia 85 mm
long each 200.00 1962
Carriage and materials 1 time 3.10 9999
Labour-
Fitter each 0.60 116
Asstt. Fitter each 0.60 117
Beldar each 1.70 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.47.11 500mm diameter pipe
Details of cosst for 10 joints
Materials-
Rubber insertion 3 mm thick each 10.00 1383
Bolts and nuts 24 mm dia 90 mm
long each 200.00 1963
Carriage and materials 1 time 3.10 9999
Labour-
Fitter each 0.65 116
Asstt. Fitter each 0.65 117
Beldar each 1.80 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.47.12 600mm diameter pipe
Details of cosst for 10 joints
Materials-
Rubber insertion 3 mm thick each 10.00 1384
Bolts and nuts 27 mm dia 100
mm long each 160.00 1964
Carriage and materials 1 time 3.65 9999
Labour-
Fitter each 0.75 116
Asstt. Fitter each 0.75 117
Beldar each 2.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.48 Providing and fixing C.I. Sluice
valves (with cap) complete with
bolts, nuts, rubber insertions etc.
(the tail pieces if required will be
20.48.1 paid
80 mmseparately)
diameter
20.48.1.1Class I
Details of cost for 10 sluice (B) Rate I/cs
valves
Materials- water charges
80 mm dia sluice valves(with cap) each 10.00 1939 C.P. and
Carriage of sluice valves overheads.
wt = 32.3x10= 323 kg = 0.323t.
Say 0.32t. tonne 0.32 2309
Labour for laying sluice valves
(Rate as per item no. 20.20) quintal 3.23

Providing flanged joints to sluice


valves with bolts, nuts and rubber
insertion etc
(Rate as per item no. 20.47.1)
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost for 10 valve
Cost per 1 valve
Say Rs. each

20.48.1.2Class II
(Analysis in similar to class I vide
item no. 20.48.1.1 except code
for sluice valves will be 3308 and
weight for carriage and labour for
laying will be 3.73 qtl. In place of
20.48.2 3.23
100 mmqtl.)diameter
20.48.2.1Class I
Details of cost for 10 sluice (B) Rate I/cs
valves
Materials- water charges
100 mm dia sluice valves(with C.P. and
cap) each 10.00 1940 overheads.
Carriage of sluice valves
wt = 44.3x10 = 443 kg = 0.443 t.
Say 0.44 t. tonne 0.44 2309
Labour for laying sluice valves
(Rate as per item no. 20.20) quintal 4.43

Providing flanged joints to sluice


valves with bolts, nuts and rubber
insertion etc
(Rate as per item no. 20.47.2) each 20.00
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost for 10 valve
Cost per 1 valve
Say Rs. each
20.48.2.2Class II
(Analysis in similar to class I vide
item no. 20.48.2.1 except code
for sluice valves will be 3311 and
weight for carriage and labour for
laying will be 5.63 qtl. In place of
4.43qtl.)
20.48.3 125 mm diameter
20.48.3.1Class I
Details of cost for 10 sluice (B) Rate I/cs
valves
Materials- water charges
125 mm dia sluice valves(with C.P. and
cap) each 10.00 1941 overheads.
Carriage of sluice valves
wt = 56.3x10 = 563 kg = 0.563 t.
Say 0.56 t. tonne 0.56 2309
Labour for laying sluice valves
(Rate as per item no. 20.20) quintal 5.63

Providing flanged joints to sluice


valves with bolts, nuts and rubber
insertion etc
(Rate as per item no. 20.47.3) each 20.00
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost for 10 valve
Cost per 1 valve
Say Rs. each
20.48.3.2Class II
(Analysis in similar to class I vide
item no. 20.48.3.1 except code
for sluice valves will be 3314 and
weight for carriage and labour for
laying will be 6.83 qtl. In place of
5.63qtl.)
20.48.4 150 mm diameter
20.48.4.1Class I
Details of cost for 10 sluice (B) Rate I/cs
valves
Materials- water charges
150 mm dia sluice valves(with C.P. and
cap) each 10.00 1942 overheads.
Carriage of sluice valves
wt = 72.5x10 = 725 kg = 0.725 t.
Say 0.72 t. tonne 0.72 2309
Labour for laying sluice valves
(Rate as per item no. 20.20) quintal 7.25

Providing flanged joints to sluice


valves with bolts, nuts and rubber
insertion etc
(Rate as per item no. 20.47.4) each 20.00
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost for 10 valve
Cost per 1 valve
Say Rs. each

20.48.4.2Class II
(Analysis in similar to class I vide
item no. 20.48.4.1 except code
for sluice valves will be 3317 and
weight for carriage and labour for
laying will be 8.65 qtl. In place of
7.25 qtl.)
20.48.5 200 mm diameter
20.48.5.1Class I
Details of cost for 10 sluice (B) Rate I/cs
valves
Materials- water charges
200 mm dia sluice valves(with C.P. and
cap) each 10.00 1943 overheads.
Carriage of sluice valves
wt = 121.5x10 = 1215 kg = 1.215
t. Say 1.22 t. tonne 1.22 2309
Labour for laying sluice valves
(Rate as per item no. 20.20) quintal 12.15

Providing flanged joints to sluice


valves with bolts, nuts and rubber
insertion etc
(Rate as per item no. 20.47.5) each 20.00
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost for 10 valve
Cost per 1 valve
Say Rs. each
20.48.5.2Class II
(Analysis in similar to class I vide
item no. 20.48.5.1 except code
for sluice valves will be 3320 and
weight for carriage and labour for
laying will be 15.05 qtl. In place
of 12.15 qtl.)
20.48.6 250 mm diameter
20.48.6.1Class I
Details of cost for 10 sluice (B) Rate I/cs
valves
Materials- water charges
250 mm dia sluice valves(with C.P. and
cap) each 10.00 1944 overheads.
Carriage of sluice valves
wt = 179.9x10 = 1799 kg = 1.799
t. Say 1.80 t. tonne 1.80 2309
water charges
C.P. and
overheads.

Labour for laying sluice valves


(Rate as per item no. 20.20) quintal 17.99

Providing flanged joints to sluice


valves with bolts, nuts and rubber
insertion etc
(Rate as per item no. 20.47.6) each 20.00
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost for 10 valve
Cost per 1 valve
Say Rs. each

20.48.6.2Class II
(Analysis in similar to class I vide
item no. 20.48.6.1 except code
for sluice valves will be 3321 and
weight for carriage and labour for
laying will be 22.99 qtl. In place
20.48.7 of
300 mm diameter
17.99 qtl.)
20.48.7.1Class I
Details of cost for 10 sluice (B) Rate I/cs
valves
Materials- water charges
300 mm dia sluice valves(with C.P. and
cap) each 10.00 1945 overheads.
Carriage of sluice valves
wt = 242.4x10 = 2424 kg = 2.424
t. Say 2.42 t. tonne 2.42 2309
Labour for laying sluice valves
(Rate as per item no. 20.20) quintal 24.24

Providing flanged joints to sluice


valves with bolts, nuts and rubber
insertion etc
(Rate as per item no. 20.47.6) each 20.00
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost for 10 valve
Cost per 1 valve
Say Rs. each
20.48.7.2Class II
(Analysis in similar to class I vide
item no. 20.48.7.1 except code
for sluice valves will be 3326 and
weight for carriage and labour for
laying will be 30.34 qtl. In place
of 24.24 qtl.)
Providing and fixing spindle fire
hydrant with 65 mm outlet
complete with bolts, nuts and
20.49 rubber insertion etc.
Details of cost for 10 sluice
valves
Materials-
Fire hydrant with 65 mm outlet each 10 1371
Carriage of fire hydrants
wt = 28.58x10 = 286 kg = 0.286 t.
Say 0.29 t. tonne 0.29 2309
Rubber insertion 3 mm thick each 20.00 1373
Bolts and nuts 16mm dia 60 mm
long each 80.00 1956
Carriage of rubber insertion and
bolts and nuts 1 time 1.35 9999
Labour-
Fitter each 1.50 116
Asstt. Fitter each 1.00 117
Beldar each 4.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joints
Say Rs. each
20.50 Construction masonry chamber
30x30x50 cm. Inside with 75
class designation brick work in
cement mortar 1:5 (1 cement :5
fine sand) for stop cock, with C.I.
Surface box 100x100x75 mm
(inside) with hinged cover fixed in
cement concrete slab 1:2:4 mix
necessary excavation foundation
concrete 1:5:10(1 cement 5: fine
sand:10 graded stone aggregate
40 mm nominal size ) and inside
plastering with cement mortar 1:3
(1 cement 3: coarse sand ) 12
mm thick finished with a floating
20.50.2 cost
With of neatbricks
F.P.S. cement complete as
per standard design.
Details of cost for 1chamber
Materials-
(I) Earth work in excavation
including refilling and disposal of
surplus earth 0.68x0.68x0.65 m =
0.301 cum say 0.30 cum
(Rate as per item no. 2.8.1+2.26) cum 0.30
ii) Cement concrete 1:5:10 (1
cement 5: fine sand:10 graded
stone aggregate 40 mm nominal
size )
0.68x0.68x0.075 m = 0.035 cum
say 0.04 cum cum 0.04
(Rate as per item no. 4.5.11)
iii) Second class brick work in
cement morar 1:5 (1 cement 5:
fine sand) in foundation and
plinth 1.66mx0.115x0.50m =
0.068 cum say 0.10 cum
(Rate as per item no. 6.1.9) cum 0.10
iv) 12 mm cement plaster 1:3 (1
cement 3: coarse sand) finished
with a floating with a floating coat
of neat cement
1.20x0.50 = 0.60 sqm
0.30x0.30 = 0.09 sqm
= 0.69 sqm. say
0.70sqm sqm 0.70
v) C.I. Surface box with
(Rate as per item no. 13.17) hinged
cover 100x100x75 mm (inside) each 1.00 1304
vi) Carriage of C.I. Surface box 1 time 0.55 9999 A
vii) Cement concrete 1:2:4(1
cement :2 coarse sand:4 graded
stone aggregate 20 mm nominal
size)
in slab = 0.53m x0.53m x0.075 m
= 0.02107 cum
Less surface box
0.112x0.112x0.076 =(-) 0.00094
cum = 0.0201 cum cum 0.02
viii) Sundries
say 0.02 cum 1 time 1.60 9999 A
Add for water charges@
(Rate as per item no. 5.3) 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost per one manhole
Say Rs. each
20.51 Construction masonry chamber
60x60x75 cm. Inside with 75
class designation brick work in
cement mortar 1:5 (1 cement :5
fine sand) for sluice valve, with
C.I. Surface box 100x160x180
mm (inside) with chained lid and
RCC top slab 1:2:4 mix(1 cement
:2 coarse sand:4 graded stone
aggregate 20 mm nominal size)
necessary excavation foundation
concrete 1:5:10(1 cement 5: fine
sand:10 graded stone aggregate
40 mm nominal size ) and inside
plastering with cement mortar 1:3
(1 cement 3: coarse sand ) 12
mm thick finished with a floating
20.51.2 cost
With of neatbricks
F.P.S. cement complete as
per standard
Details of costdesign.
for 1chamber
Materials-
(I) Earth work in excavation
including refilling and disposal of
surplus earth 1.21x1.21x1.00 m =
1.464 cum say 1.46 cum
(Rate as per item no. 2.8.1+2.26) cum 1.46
ii) Cement concrete 1:5:10 (1
cement 5: fine sand:10 graded
stone aggregate 40 mm nominal
size )
1.21x1.21x0.1 m = 0.146 cum
say 0.15 cum
(Rate as per item no. 4.5.11) cum 0.15
iii) Second class brick work in
cement morar 1:5 (1 cement 5:
fine sand) in foundation and
plinth 3.32mx0.23x0.75m = 0.573
cum say 0.57 cum
(Rate as per item no. 6.1.9) cum 0.57
iv) 12 mm cement plaster 1:3 (1
cement 3: coarse sand) finished
with a floating with a floating coat
of neat cement
2.40x0.75 = 1.80 sqm
0.60x0.60 = 0.36 sqm
= 2.16 sqm.
(Rate as per item no. 13.17) sqm 2.16
v) C.I. Surface box with chained
lid each 1.00 1305 A
vi) Carriage of C.I. Surface box 1 time 3.10 9999
vii) Cement concrete 1:2:4(1
cement :2 coarse sand:4 graded
stone aggregate 20 mm nominal
size)
in slab = 1.06m x1.06m x0.15 m
= 0.1685 cum
Less surface box pai/4xd2x0.18 m
0.7854x0.156m x0.156m x 0.18
=(-) 0.0034 cum
= 0.1651 cum
say 0.17 cum
(Rate as per item no. 5.3) cum 0.17
viii) Mild steel reinforcement for
RCC work etc.
0.165cumx80 kg/cum =13.2 kg
(Rate as per item no. 5.29.1) kg 13.20
ix) Form work 0.60mx0.60m =
0.36 sqm
3.32mx0.15m =
sqm 0.86
0.50 sqm
x) Sundries = 1 time 3.10 9999 A
Add for
0.86 sqm water charges@ 1% on
'A'
(Rate as per item no. 5.14.3) B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost per one manhole

Say Rs. each


20.52 Construction masonry chamber
90x90x100 cm. Inside with 75
class designation brick work in
cement mortar 1:5 (1 cement :5
fine sand) for sluice valve, with
C.I. Surface box 100x160x180
mm (inside) with chained lid and
RCC top slab 1:2:4 mix(1 cement
:2 coarse sand:4 graded stone
aggregate 20 mm nominal size)
necessary excavation foundation
concrete 1:5:10(1 cement 5: fine
sand:10 graded stone aggregate
40 mm nominal size ) and inside
plastering with cement mortar 1:3
(1 cement 3: coarse sand ) 12
mm thick finished with a floating
20.52.2 cost
With of neatbricks
F.P.S. cement complete as
per
Details of costdesign.
standard for 1chamber
Materials-
(I) Earth work in excavation
including refilling and disposal of
surplus earth 1.51x1.51x1.25 m =
2.85 cum cum 2.85
(Rate
ii) as per item
Cement no. 2.8.1+2.26)
concrete 1:5:10 (1
cement 5: fine sand:10 graded
stone aggregate 40 mm nominal
size )
1.51x1.51x0.1 m = 0.228 cum
say 0.23 cum
(Rate as per item no. 4.5.11) cum 0.23
iii) Second class brick work in
cement morar 1:5 (1 cement 5:
fine sand) in foundation and
plinth 4.52mx0.23x1.00m = 1.04
cum say 1.04cum
(Rate as per item no. 6.1.9) cum 1.04
iv) 12 mm cement plaster 1:3 (1
cement 3: coarse sand) finished
with a floating with a floating coat
of neat cement
3.60x1.00 = 3.60 sqm
0.90x0.90 = 0.81 sqm
= 4.41 sqm.
(Rate as per item no. 13.17) sqm 4.41
v) C.I. Surface box with chained
lid each 1.00 1305 A
vi) Carriage of C.I. Surface box 1 time 3.10 9999
vii) Cement concrete 1:2:4(1
cement :2 coarse sand:4 graded
stone aggregate 20 mm nominal
size)
in slab = 1.36m x1.36m x0.15 m
= 0.2774 cum
Less surface box
pai/4xd2xthickness
0.7854x0.156m x0.156m x 0.18
=(-) 0.0034 cum
= 0.2740 cum
say 0.27 cum
(Rate as per item no. 5.3) cum 0.27
viii) Mild steel reinforcement for
RCC work etc.
0.274cumx80 kg/cum =21.92 kg
(Rate as per item no. 5.29.1) kg 21.62
ix) Form work 0.90mx0.90m =
0.81 sqm
4.52mx0.15m =
0.68 sqm sqm 1.49
x) Sundries = 1 time 3.10 9999 A
1.49 sqmwater charges@ 1% on
Add for
(Rate as per item no. 5.14.3)
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost per one manhole

Say Rs. each

20.53 Construction masonry chamber


120x120x100 cm. Inside with 75
class designation brick work in
cement mortar 1:5 (1 cement :5
fine sand) for sluice valve, with
C.I. Surface box 100x160x180
mm (inside) with chained lid and
RCC top slab 1:2:4 mix(1 cement
:2 coarse sand:4 graded stone
aggregate 20 mm nominal size)
necessary excavation foundation
concrete 1:5:10(1 cement 5: fine
sand:10 graded stone aggregate
40 mm nominal size ) and inside
plastering with cement mortar 1:3
(1 cement 3: coarse sand ) 12
mm thick finished with a floating
20.53.2 cost
With of neatbricks
F.P.S. cement complete as
per
Details of costdesign.
standard for 1chamber
Materials-
(I) Earth work in excavation
including refilling and disposal of
surplus earth 1.81x1.81x1.25 m =
4.095 cum
Say 4.10 cum cum 4.10
(Rate as per item no. 2.8.1+2.26)
ii) Cement concrete 1:5:10 (1
cement 5: fine sand:10 graded
stone aggregate 40 mm nominal
size )
1.81x1.81x0.1 m = 0.328 cum
say 0.33 cum cum 0.33
(Rate
iii) as per class
Second item no. 4.5.11)
brick work in
cement morar 1:5 (1 cement 5:
fine sand) in foundation and
plinth 5.72mx0.23x1.00m = 1.316
cum say 1.32cum
(Rate as per item no. 6.1.9) cum 1.32
iv) 12 mm cement plaster 1:3 (1
cement 3: coarse sand) finished
with a floating with a floating coat
of neat cement
4.80x1.00 = 4.80 sqm
1.20x1.20 = 1.44 sqm
= 6.42 sqm.
(Rate as per item no. 13.17) sqm 6.42
v) C.I. Surface box with chained
lid each 1.00 1305 A
vi) Carriage of C.I. Surface box 1 time 3.10 9999
vii) Cement concrete 1:2:4(1
cement :2 coarse sand:4 graded
stone aggregate 20 mm nominal
size)
in slab = 1.66m x1.66m x0.15 m
= 0.4133 cum
Less surface box pai/4xd2x
thickness
0.7854x0.156m x0.156m x 0.18
=(-) 0.0034 cum
= 0.4099 cum
say 0.41 cum
(Rate as per item no. 5.3) cum 0.41
viii) Mild steel reinforcement for
RCC slab steel @ 80/cum .
0.41cumx80 kg/cum =32.80 kg
(Rate as per item no. 5.29.1) kg 32.80
ix) Form work 1.20mx1.20m =
1.44 sqm
5.72mx0.15m =
0.86 sqm sqm 2.30
x) Sundries = 1 time 3.10 9999 A
2.30 sqm
Add for water charges@ 1% on
(Rate as per item no. 5.14.3)
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost per one manhole
Say Rs. each
20.54 Construction masonry chamber
60x60x100 cm. Inside with 75
class designation brick work in
cement mortar 1:5 (1 cement :5
fine sand) for sluice valve, with
C.I. Surface box 350x350 mm top
and 165 mm deep (inside) with
chained lid and RCC top slab
1:2:4 mix(1 cement :2 coarse
sand:4 graded stone aggregate
20 mm nominal size) necessary
excavation foundation concrete
1:5:10(1 cement 5: fine sand:10
graded stone aggregate 40 mm
nominal size ) and inside
plastering with cement mortar 1:3
(1 cement 3: coarse sand ) 12
20.54.2 mm
With thick
F.P.S.finished
bricks with a floating
cost
Details of costcement
of neat complete as
for 1chamber
per standard design.
Materials-
(I) Earth work in excavation
including refilling and disposal of
surplus earth 1.21x1.21x1.00 m =
1.464 cum say 1.46 cum
(Rate as per item no. 2.8.1+2.26) cum 1.46
ii) Cement concrete 1:5:10 (1
cement 5: fine sand:10 graded
stone aggregate 40 mm nominal
size )
1.21x1.21x0.10 m = 0.146 cum
say 0.15 cum
(Rate as per item no. 4.5.11) cum 0.15
iii) Second class brick work in
cement morar 1:5 (1 cement 5:
fine sand) in foundation and
plinth 3.32mx0.23x0.75m =
0.5736 cum say 0.57cum
(Rate as per item no. 6.1.9) cum 0.57
iv) 12 mm cement plaster 1:3 (1
cement 3: coarse sand) finished
with a floating with a floating coat
of neat cement
2.40x0.75 =1.80 sqm
0.60mx0.60 = 0.36 sqm
= 2.16 sqm.
(Rate as per item no. 13.17) sqm 2.16
v) C.I. Surface box with chained
lid each 1.00 1305 A
vi) Carriage of C.I. Surface box 1 time 20.70 9999
vii) Cement concrete 1:2:4(1
cement :2 coarse sand:4 graded
stone aggregate 20 mm nominal
size)
in slab = 1.06m x1.06m x0.15 m
= 0.1685 cum
Less surface box
0.614x0.41m x0.15m
=(-) 0.0375 cum
= 0.131 cum
say0.13 cum
(Rate as per item no. 5.3) cum 0.41
viii) Mild steel reinforcement for
RCC slab steel @ 80/cum .
0.131cumx80 kg/cum =10.48 kg
(Rate as per item no. 5.29.1) kg 10.48
ix)Form work 0.60mx 0.60m =
0.36 sqm
3.32mx0.15m =
0.50 sqm sqm 2.30
x) Sundries = 1 time 3.10 9999 A
0.86sqm
Add for water charges@ 1% on
(Rate as per item no. 5.14.3)
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost per one manhole

Say Rs. each


20.55 Construction masonry chamber
60x45x50 cm. Inside with 75
class designation brick work in
cement mortar 1:5 (1 cement :5
fine sand) for sluice valve, with
C.I. Surface box 400x200x200
mm (inside) with locking
arrangement and RCC top slab
1:2:4 mix(1 cement :2 coarse
sand:4 graded stone aggregate
20 mm nominal size) necessary
excavation foundation concrete
1:5:10(1 cement 5: fine sand:10
graded stone aggregate 40 mm
nominal size ) and inside
plastering with cement mortar 1:3
(1 cement 3: coarse sand ) 12
20.55.2 mm
With thick
F.P.S.finished
bricks with a floating
cost of of
Details neat
costcement complete as
for 1chamber
per standard
Materials- design.
(I) Earth work in excavation
including refilling and disposal of
surplus earth 1.21x1.06x0.85 m =
1.09 cum cum 1.09
(Rate as per item no. 2.8.1+2.26)
ii) Cement concrete 1:5:10 (1
cement 5: fine sand:10 graded
stone aggregate 40 mm nominal
size )
1.21x1.06x0.10 m =0.128 cum
say 0.13 cum
(Rate as per item no. 4.5.11) cum 0.13
iii) Second class brick work in
cement morar 1:5 (1 cement 5:
fine sand) in foundation and
plinth 3.02mx0.23x0.50m = 0.347
cum say 0.35 cum
(Rate as per item no. 6.1.9) cum 0.35
iv) 12 mm cement plaster 1:3 (1
cement 3: coarse sand) finished
with a floating with a floating coat
of neat cement
2.10x0.50 =1.05 sqm
0.60mx0.45 = 0.27 sqm
= 1.32 sqm.
(Rate as per item no. 13.17) sqm 1.32
v) C.I. Surface box
400x200x200mm (inside) with each 1.00 1305 A
locking arrangement.
vi) Carriage of C.I. Surface box 1 time 5.20 9999
vii) Cement concrete 1:2:4(1
cement :2 coarse sand:4 graded
stone aggregate 20 mm nominal
size)
in slab = 1.06m x0.91m x0.25 m
= 0.241 cum
Less surface box
0.42x0.22m x0.2m
=(-) 0.018cum
= 0.223 cum
say 0.22 cum
(Rate as per item no. 5.3) cum 0.22
viii) Mild steel reinforcement for
RCC slab steel @ 80/cum .
0.223 cumx80 kg/cum =17.84 kg
(Rate as per item no. 5.29.1) kg 17.84
ix)Form work 0.60mx 0.45m =
0.27 sqm
3.02mx0.25m =
0.76sqm sqm 1.03
x) Sundries = 1 time 3.10 9999 A
1.03sqm
Add for water charges@ 1% on
(Rate as per item no. 5.14.3)
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost per one manhole

Say Rs. each

ASBESTOS CEMENT PRESURE PIPES AND SPECIALS


Providing and laying A.C.
20.68 pressure pipes(Class15)
20.68.1 80 mm diameter pipe
Details of cost for 10 metre
Materials-
80 mm dia A.C.
pipe(Weight=5.50x10 = 55kg =
0.60 t) metre 10.00 1398 (B) Rate I/cs
Carriage of pipe tonne 0.06 2310 water charges
Labour for laying C.P. and
(Rate as per item no. 20.19) quintal 0.55 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost for 10 metre
Cost per metre
Say Rs. per metre
20.68.2 100 mm diameter pipe
Details of cost for 10 metre
Materials-
100 mm dia A.C.
pipe(Weight=8.25x10 = 82.5kg metre 10.00 1399 (B) Rate I/cs
Carriage of pipe 100m 0.10 2250 water charges
Labour for laying C.P. and
(Rate as per item no. 20.19) quintal 0.82 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost for 10 metre
Cost per metre
Say Rs. per metre
20.68.3 125 mm diameter pipe
Details of cost for 10 metre
Materials-
125 mm dia A.C.
pipe(Weight=11.25x10 = 112.5
kg) metre 10.00 1400 (B) Rate I/cs
Carriage of pipe 100m 0.10 2251 water charges
Labour for laying C.P. and
(Rate as per item no. 20.19) quintal 1.12 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost for 10 metre
Cost per metre
Say Rs. per metre
20.68.4 150 mm diameter pipe
Details of cost for 10 metre
Materials-
150 mm dia A.C.
pipe(Weight=14.50x10 = 145 kg) metre 10.00 1401 (B) Rate I/cs
Carriage of pipe 100m 0.10 2252 water charges
C.P. and
overheads
(B) Rate I/cs
water charges
Labour for laying C.P. and
(Rate as per item no. 20.19) quintal 1.45 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost for 10 metre
Cost per metre
Say Rs. per metre
20.68.5 200 mm diameter pipe
Details of cost for 10 metre
Materials-
200mm dia A.C.
pipe(Weight=22x10 = 220kg) metre 10.00 1402 (B) Rate I/cs
Carriage of pipe 100m 0.10 2253 water charges
Labour for laying C.P. and
(Rate as per item no. 20.19) quintal 2.20 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost for 10 metre
Cost per metre
Say Rs. per metre
20.68.6 250 mm diameter pipe
Details of cost for 10 metre
Materials-
250mm dia A.C.
pipe(Weight=29x10 = 290kg) metre 10.00 1403 (B) Rate I/cs
Carriage of pipe 100m 0.10 2254 water charges
Labour for laying C.P. and
(Rate as per item no. 20.19) quintal 2.90 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost for 10 metre
Cost per metre
Say Rs. per metre
20.68.7 300 mm diameter pipe
Details of cost for 10 metre
Materials-
300mm dia A.C.
pipe(Weight=41.25x10 =
412.5kg) metre 10.00 1404 (B) Rate I/cs
Carriage of pipe 100m 0.10 2255 water charges
Labour for laying C.P. and
(Rate as per item no. 20.19) quintal 4.12 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost for 10 metre
Cost per metre
Say Rs. per metre

Providing and laying plain ended


C.I. Bends for asbestos cement
20.69 pressure pipes.
20.69.1 80 mm dia
20.69.1.190° bend.
Details of cost for 1 bend.
Materials- (B) Rate I/cs
Cost of one bend each 1.00 1473 water charges
Carriage (Weight = 9.2 kg) tonne 0.01 2309 C.P. and
Labour- overheads
(Rate as per item no. 20.20) quintal 0.09
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each
20.69.1.245° bend.
Details of cost for 1 bend.
Materials- (B) Rate I/cs
Cost of one bend each 1.00 1479 water charges
Carriage (Weight = 5.6 kg) tonne 0.01 2309 C.P. and
Labour- overheads
(Rate as per item no. 20.20) quintal 0.06
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each
20.69.1.322 ½° bend.
Details of cost for 1 bend.
Materials- (B) Rate I/cs
Cost of one bend each 1.00 1475 water charges
Carriage (Weight = 4.5 kg) tonne 0.004 2309 C.P. and
Labour- overheads
(Rate as per item no. 20.20) quintal 0.045
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each
20.69.1.411 ¼ ° bend.
Details of cost for 1 bend.
Materials-
Cost of one bend each 1.00 1476 (B) Rate I/cs
Carriage (Weight = 3.5 kg) tonne 0.004 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.035 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each
20.69.2 100mm dia
20.69.2.190 ° bend.
Details of cost for 1 bend.
Materials-
Cost of one bend each 1.00 1477 (B) Rate I/cs
Carriage (Weight =15.5 kg) tonne 0.02 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.16 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each
20.69.2.245 ° bend.
Details of cost for 1 bend.
Materials-
Cost of one bend each 1.00 1478 (B) Rate I/cs
Carriage (Weight =10.8 kg) tonne 0.01 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.11 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each

20.69.2.322 ½° bend.
Details of cost for 1 bend.
Materials- (B) Rate I/cs
Cost of one bend each 1.00 1479 water charges
Carriage (Weight = 6.5 kg) tonne 0.01 2309 C.P. and
Labour- overheads
(Rate as per item no. 20.20) quintal 0.06
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each
20.69.2.411 ¼ ° bend.
Details of cost for 1 bend.
Materials-
Cost of one bend each 1.00 1480 (B) Rate I/cs
Carriage (Weight = 5.5 kg) tonne 0.01 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.06 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each
20.69.3 125mm dia
20.69.3.190 ° bend.
Details of cost for 1 bend.
Materials-
Cost of one bend each 1.00 1481 (B) Rate I/cs
Carriage (Weight =21.6 kg) tonne 0.02 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.22 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each
20.69.3.245 ° bend.
Details of cost for 1 bend.
Materials-
Cost of one bend each 1.00 1482 (B) Rate I/cs
Carriage (Weight =13.7 kg) tonne 0.01 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.14 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each

20.69.3.322 ½° bend.
Details of cost for 1 bend.
Materials- (B) Rate I/cs
Cost of one bend each 1.00 1483 water charges
Carriage (Weight = 9.5 kg) tonne 0.01 2309 C.P. and
C.P. and
Labour- overheads
(Rate as per item no. 20.20) quintal 0.10
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each
20.69.3.411 ¼ ° bend.
Details of cost for 1 bend.
Materials-
Cost of one bend each 1.00 1484 (B) Rate I/cs
Carriage (Weight =8.8 kg) tonne 0.01 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.09 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each

20.69.4 150mm dia


20.69.4.190 ° bend.
Details of cost for 1 bend.
Materials-
Cost of one bend each 1.00 1485 (B) Rate I/cs
Carriage (Weight =33.2 kg) tonne 0.03 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.22 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each
20.69.4.245 ° bend.
Details of cost for 1 bend.
Materials-
Cost of one bend each 1.00 1486 (B) Rate I/cs
Carriage (Weight =21.9 kg) tonne 0.02 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.22 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each
20.69.4.322 ½° bend.
Details of cost for 1 bend.
Materials- (B) Rate I/cs
Cost of one bend each 1.00 1487 water charges
Carriage (Weight =14 kg) tonne 0.01 2309 C.P. and
Labour- overheads
(Rate as per item no. 20.20) quintal 0.14
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each
20.69.4.411 ¼ ° bend.
Details of cost for 1 bend.
Materials-
Cost of one bend each 1.00 1488 (B) Rate I/cs
Carriage (Weight =12.6 kg) tonne 0.01 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.13 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each

20.69.5 200 mm dia


20.69.5.190 ° bend.
Details of cost for 1 bend.
Materials-
Cost of one bend each 1.00 1489 (B) Rate I/cs
Carriage (Weight =59.5 kg) tonne 0.06 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.60 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each
20.69.5.245 ° bend.
Details of cost for 1 bend.
Materials-
Cost of one bend each 1.00 1490 (B) Rate I/cs
Carriage (Weight =40 kg) tonne 0.04 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.40 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each

20.69.5.322 ½° bend.
Details of cost for 1 bend.
Materials- (B) Rate I/cs
Cost of one bend each 1.00 1491 water charges
Carriage (Weight =26.5 kg) tonne 0.03 2309 C.P. and
Labour- overheads
(Rate as per item no. 20.20) quintal 0.265
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each

20.69.6 250 mm dia


20.69.6.190 ° bend.
Details of cost for 1 bend.
Materials-
Cost of one bend each 1.00 1492 (B) Rate I/cs
Carriage (Weight =101 kg) tonne 0.10 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 1.01 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each
20.69.6.245 ° bend.
Details of cost for 1 bend.
Materials-
Cost of one bend each 1.00 1493
Carriage (Weight =57.6 kg) tonne 0.06 2309
Labour- (B) Rate I/cs
(Rate as per item no. 20.20) quintal 0.58 water charges
Add for water charges@ 1% on C.P. and
all except 'B' overheads
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each

20.69.6.322 ½° bend.
Details of cost for 1 bend.
Materials-
Cost of one bend each 1.00 1494 (B) Rate I/cs
Carriage (Weight =40.4 kg) tonne 0.04 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.04 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one bend
Say Rs. each

Providing and laying plain ended


C.I. Tees for asbestos cement
20.70 pressure pipes
20.70.1 80x80 mm plain ended C.I. Tee
Details of cost for 1 tee.
Materials-
Cost of tee each 1.00 1495 (B) Rate I/cs
Carriage (Weight =7.7 kg) tonne 0.01 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.08 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one tee.
Say Rs. each
20.70.2 100x80 mm plain ended C.I. Tee
Details of cost for 1 tee.
Materials-
Cost of tee each 1.00 1496 (B) Rate I/cs
Carriage (Weight =10.7 kg) tonne 0.01 2309 water charges
Labour- C.P. and
overheads
(Rate as per item no. 20.20) quintal 0.11
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one tee.
Say Rs. each

20.70.3 100x100 mm plain ended C.I.


Tee
Details of cost for 1 tee.
Materials- (B) Rate I/cs
Cost of tee each 1.00 1497 water charges
Carriage (Weight =11.5 kg) tonne 0.01 2309 C.P. and
Labour- overheads
(Rate as per item no. 20.20) quintal 0.12
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one tee.
Say Rs. each

20.70.4 125x125 mm plain ended C.I.


Tee
Details of cost for 1 tee.
Materials- (B) Rate I/cs
Cost of tee each 1.00 1498 water charges
Carriage (Weight =20.0 kg) tonne 0.02 2309 C.P. and
Labour- overheads
(Rate as per item no. 20.20) quintal 0.20
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one tee.
Say Rs. each
20.70.5 150x80 mm plain ended C.I. Tee
Details of cost for 1 tee.
Materials-
Cost of tee each 1.00 1499 (B) Rate I/cs
Carriage (Weight =18.0 kg) tonne 0.02 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.18 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one tee.
Say Rs. each
20.70.6 150x100 mm plain ended C.I.
Tee
Details of cost for 1 tee.
Materials-
Cost of tee each 1.00 1500 (B) Rate I/cs
Carriage (Weight =20.5 kg) tonne 0.02 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.20 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one tee.
Say Rs. each

20.70.7 150x125 mm plain ended C.I.


Tee
Details of cost for 1 tee.
Materials-
Cost of tee each 1.00 1501 (B) Rate I/cs
Carriage (Weight =23 kg) tonne 0.02 2309 water charges
C.P. and
overheads
(B) Rate I/cs
water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.23 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one tee.
Say Rs. each
20.70.8 150x150 mm plain ended C.I.
Tee
Details of cost for 1 tee.
Materials-
Cost of tee each 1.00 1502 (B) Rate I/cs
Carriage (Weight =26 kg) tonne 0.03 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.26 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one tee.
Say Rs. each

20.70.9 200x80 mm plain ended C.I. Tee


Details of cost for 1 tee.
Materials-
Cost of tee each 1.00 1503 (B) Rate I/cs
Carriage (Weight =25.5 kg) tonne 0.03 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.26 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one tee.
Say Rs. each

20.70.10 200x100 mm plain ended C.I.


Tee
Details of cost for 1 tee.
Materials-
Cost of tee each 1.00 1504 (B) Rate I/cs
Carriage (Weight =28.5 kg) tonne 0.03 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.28 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one tee.
Say Rs. each
20.70.11 200x125 mm plain ended C.I.
Tee
Details of cost for 1 tee.
Materials-
Cost of tee each 1.00 1505 (B) Rate I/cs
Carriage (Weight =32 kg) tonne 0.03 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.32 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one tee.
Say Rs. each

20.70.12 200x200 mm plain ended C.I.


Tee
Details of cost for 1 tee.
Materials-
Cost of tee each 1.00 1506 (B) Rate I/cs
Carriage (Weight =40.5 kg) tonne 0.04 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.40 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one tee.
Say Rs. each

20.70.13 250x250mm plain ended C.I. Tee


Details of cost for 1 tee.
Materials-
Cost of tee each 1.00 1507 (B) Rate I/cs
Carriage (Weight =78.8 kg) tonne 0.08 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.79 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one tee.
Say Rs. each
20.70.14 300x100 mm plain ended C.I.
Tee
Details of cost for 1 tee.
Materials-
Cost of tee each 1.00 1508 (B) Rate I/cs
Carriage (Weight =80.6 kg) tonne 0.08 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.81 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one tee.
Say Rs. each
20.70.15 300x200 mm plain ended C.I.
Tee
Details of cost for 1 tee.
Materials-
Cost of tee each 1.00 1509 (B) Rate I/cs
Carriage (Weight = 98.2 kg) tonne 0.10 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.98 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one tee.
Say Rs. each

Providing and laying plain ended


C.I. Crosses for asbestos cement
20.71 pressure pipes
80x80x80x80 mm plain ended
20.71.1 C.I. Cross
Details of cost for 1 cross.
Materials-
Cost of cross. each 1.00 1510 (B) Rate I/cs
Carriage (Weight = 98.2 kg) tonne 0.10 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.10 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one cross.
Say Rs. each
100x100x80x80 mm plain ended
20.71.2 C.I. Cross
Details of cost for 1 cross.
Materials-
Cost of cross. each 1.00 1511 (B) Rate I/cs
Carriage (Weight = 13.5 kg) tonne 0.01 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.14 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one cross.
Say Rs. each
100x100x100x100 mm plain
20.71.3 ended C.I. Cross
Details of cost for 1 cross.
Materials-
Cost of cross. each 1.00 1512 (B) Rate I/cs
Carriage (Weight = 15.6 kg) tonne 0.02 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.16 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one cross.
Say Rs. each
125x125x125x125 mm plain
20.71.4 ended C.I. Cross
Details of cost for 1 cross.
Materials-
Cost of cross. each 1.00 1513 (B) Rate I/cs
Carriage (Weight = 23.2 kg) tonne 0.02 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.23 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one cross.
Say Rs. each
150x150x80x80 mm plain ended
20.71.4 C.I. Cross
Details of cost for 1 cross.
Materials-
Cost of cross. each 1.00 1514 (B) Rate I/cs
Carriage (Weight = 22.1 kg) tonne 0.02 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.22 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one cross.
Say Rs. each
Providing and laying plain ended
C.I. Caps for asbestos cement
20.72 pressure pipes
20.72.1 80 mm plain ended C.I. Cap
Details of cost for 1 cap
Materials-
Cost of cap each 1.00 1515 (B) Rate I/cs
Carriage (Weight = 2.6 kg) tonne 0.003 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.22 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one Cap.
Say Rs. each
20.72.2 100 mm plain ended C.I. Cap
Details of cost for 1 cap
Materials-
Cost of cap each 1.00 1516 (B) Rate I/cs
Carriage (Weight = 5.1 kg) tonne 0.005 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.05 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one Cap.
Say Rs. each
20.72.3 150 mm plain ended C.I. Cap
Details of cost for 1 cap
Materials-
Cost of cap each 1.00 1517 (B) Rate I/cs
Carriage (Weight = 7.8 kg) tonne 0.008 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.08 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one Cap.
Say Rs. each
20.72.4 200 mm plain ended C.I. Cap
Details of cost for 1 cap
Materials-
Cost of cap each 1.00 1518 (B) Rate I/cs
Carriage (Weight = 13.6 kg) tonne 0.01 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.14 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one Cap.
Say Rs. each
20.72.5 250 mm plain ended C.I. Cap
Details of cost for 1 cap
Materials-
Cost of cap each 1.00 1519 (B) Rate I/cs
Carriage (Weight = 20 kg) tonne 0.02 2309 water charges
C.P. and
overheads
(B) Rate I/cs
water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.20 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one Cap.
Say Rs. each

Providing and laying plain ended


C.I.flange for asbestos cement
20.73 pressure pipes
20.73.1 80 mm plain ended C.I. flange adopter
Details of cost for 1 flange
adopter
Materials-
Cost of flange adopter each 1.00 1520 (B) Rate I/cs
Carriage (Weight = 6.4 kg) tonne 0.006 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.06 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one flange adopter.
Say Rs. each
20.73.2 100 mm plain ended C.I. flange adopter
Details of cost for 1 flange
adopter
Materials-
Cost of flange adopter each 1.00 1521 (B) Rate I/cs
Carriage (Weight = 8.5 kg) tonne 0.008 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.08 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one flange adopter.
Say Rs. each
20.73.3 150 mm plain ended C.I. flange adopter
Details of cost for 1 flange
adopter
Materials-
Cost of flange adopter each 1.00 1522 (B) Rate I/cs
Carriage (Weight =15.2 kg) tonne 0.02 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.15 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one flange adopter.
Say Rs. each
20.73.4 250 mm plain ended C.I. flange adopter
Details of cost for 1 flange
adopter
Materials-
Cost of flange adopter each 1.00 1519 (B) Rate I/cs
Carriage (Weight = 20 kg) tonne 0.02 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.20 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one flange adopter.
Say Rs. each

Providing and laying plain ended


C.I. reducers for asbestos cement
20.74 pressure pipes
100x80 mm plain ended C.I.
20.74.1 reducers
Details of cost for 1 reducers
Materials- (B) Rate I/cs
Cost of reducers each 1.00 1524 water charges
Carriage (Weight =5 kg) tonne 0.005 2309 C.P. and
Labour- overheads
(Rate as per item no. 20.20) quintal 0.05
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one reducers .
Say Rs. each
125x80 mm plain ended C.I.
20.74.2 reducers
Details of cost for 1 reducers
Materials- (B) Rate I/cs
Cost of reducers each 1.00 1525 water charges
Carriage (Weight =6.9 kg) tonne 0.007 2309 C.P. and
Labour- overheads
(Rate as per item no. 20.20) quintal 0.07
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one reducers .
Say Rs. each
125x100 mm plain ended C.I.
20.74.3 reducers
Details of cost for 1 reducers
Materials-
Cost of reducers each 1.00 1526 (B) Rate I/cs
Carriage (Weight =8.7 kg) tonne 0.01 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.09 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one reducers .
Say Rs. each
150x80 mm plain ended C.I.
20.74.4 reducers
Details of cost for 1 reducers
Materials-
Cost of reducers each 1.00 1527 (B) Rate I/cs
Carriage (Weight =12.3 kg) tonne 0.01 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.10 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one reducers .
Say Rs. each
150x100 mm plain ended C.I.
20.74.5 reducers
Details of cost for 1 reducers
Materials-
Cost of reducers each 1.00 1528 (B) Rate I/cs
Carriage (Weight =12.3 kg) tonne 0.01 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.12 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one reducer .
Say Rs. each
200x150 mm plain ended C.I.
20.74.6 reducers
Details of cost for 1 reducers
Materials-
Cost of reducers each 1.00 1529 (B) Rate I/cs
Carriage (Weight =18.6 kg) tonne 0.02 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.19 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one reducer .
Say Rs. each
250x150 mm plain ended C.I.
20.74.7 reducers
Details of cost for 1 reducers
Materials-
Cost of reducers each 1.00 1530 (B) Rate I/cs
Carriage (Weight =21.9 kg) tonne 0.02 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.22 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one reducer .
Say Rs. each
300x200 mm plain ended C.I.
20.74.8 reducers
Details of cost for 1 reducers
Materials-
Cost of reducers each 1.00 1531 (B) Rate I/cs
Carriage (Weight =63.5 kg) tonne 0.06 2309 water charges
Labour- C.P. and
(Rate as per item no. 20.20) quintal 0.64 overheads
Add for water charges@ 1% on
all except 'B'
Add for contractor's profit and
overheads @ 10% on all except
'B'
Cost of one reducer .
Say Rs. each

20.75 Providing cast iron detachable


joints to asbestos cement
pressure pipes and plain ended
C.I. Specials with collars rubber
rings, flanges, bolts and nuts
etc.complete, including testing of
joints:
20.75.1 80 mm diameter pipes
Details of cost for 10 joints
Materials-
80 mm C.I. Detachable joint
complete each 10.00 1385
Carriage of all materials
(Weight = 4.08x10 =40.8 kg tonne 0.04 2309
=0.04
Labour- t)
Fitter each 0.30 116
Asstt. Fitter each 0.30 117
Beldar each 1.60 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joint
Say Rs. each
20.75.2 100 mm diameter pipes
Details of cost for 10 joints
Materials-
100 mm C.I. Detachable joint
complete each 10.00 1386
Carriage of all materials
(Weight = 5.90x10 =59 kg =0.06
t) tonne 0.06 2309
Labour-
Fitter each 0.50 116
Asstt. Fitter each 0.50 117
Beldar each 2.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joint
Say Rs. each
20.75.3 125 mm diameter pipes
Details of cost for 10 joints
Materials-
125 mm C.I. Detachable joint
complete each 10.00 1387
Carriage of all materials
(Weight = 7.71x10 = 77 kg =0.08
t) tonne 0.08 2309
Labour-
Fitter each 0.50 116
Asstt. Fitter each 0.50 117
Beldar each 2.00 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joint
Say Rs. each
20.75.4 150 mm diameter pipes
Details of cost for 10 joints
Materials-
150 mm C.I. Detachable joint
complete each 10.00 1388
Carriage of all materials
(Weight = 9.30x10 = 93 kg =0.09
t) tonne 0.09 2309
Labour-
Fitter each 0.60 116
Asstt. Fitter each 0.60 117
Beldar each 2.20 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joint
Say Rs. each
20.75.5 200 mm diameter pipes
Details of cost for 10 joints
Materials-
200 mm C.I. Detachable joint
complete each 10.00 1389
Carriage of all materials
(Weight = 14.97x10 = 149.70 kg
=0.15 t) tonne 0.15 2309
Labour-
Fitter each 0.60 116
Asstt. Fitter each 0.60 117
Beldar each 2.20 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joint
Say Rs. each
20.75.6 250 mm diameter pipes
Details of cost for 10 joints
Materials-
250 mm C.I. Detachable joint
complete each 10.00 1390
Carriage of all materials
(Weight = 22.00x10 = 220 kg
=0.22 t) tonne 0.22 2309
Labour-
Fitter each 0.50 116
Asstt. Fitter each 0.80 117
Beldar each 2.60 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joint
Say Rs. each
20.75.7 300 mm diameter pipes
Details of cost for 10 joints
Materials-
300 mm C.I. Detachable joint
complete each 10.00 1391
Carriage of all materials
(Weight =29.00 x 10 = 290 = 0.29
t) tonne 0.29 2309
Labour-
Fitter each 0.80 116
Asstt. Fitter each 0.80 117
Beldar each 2.60 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 10 joints
Cost per one joint
Say Rs. each
Painting G.I. Pipe and fittings with
white paint over a ready mixed
priming coat, both of approved
20.76 quality for new work
20.76.1 15 mm diameter pipe
Details of cost for 10 metre
Perimeter = 0.0673 metre
Area = 10x0.0673 m = 0.673 sqm
Priming coat- sqm 0.67
(Rate as per item no. 13.81.3
Finishing sub-head)
Painting two coats excluding
sqm 0.67
priming coat with white paint on
new work.
(Rate as per item no. 13.82.1 of
S.H. finishing ). 1 time 5.20 9999 A
Add for delay
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost for 10 metre
Cost for one metre Say Rs. each

20.76.2 20 mm diameter pipe


Details of cost for 10 metre
Perimeter = 0.0845 metre
Area = 10x0.0845 m = 0.845 sqm
Priming coat- sqm 0.85
(Rate as per item no. 13.81.3
Finishing sub-head)
Painting two coats excluding
sqm 0.85
priming coat with white paint on
new work.
(Rate as per item no. 13.82.1 of
S.H. finishing ). 1 time 5.20 9999 A
Add for delay
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost for 10 metre
Cost for one metre Say Rs. each
20.76.3 25 mm diameter pipe
Details of cost for 10 metre
Perimeter = 0.1061 metre
Area = 10x0.1061 m = 1.061 sqm
Priming coat- sqm 1.06
(Rate as per item no. 13.81.3
Finishing sub-head)
Painting two coats excluding
priming coat with white paint on sqm 1.06
new work.
(Rate as per item no. 13.82.1 of
S.H. finishing ). 1 time 7.80 9999 A
Add for delay
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost for 10 metre
Cost for one metre Say Rs. each

20.76.4 32 mm diameter pipe


Details of cost for 10 metre
Perimeter = 0.1334 metre
Area = 10x0.1334 m = 1.334 sqm
Priming coat- sqm 1.33
(Rate as per item no. 13.81.3
Finishing sub-head)
Painting two coats excluding
priming coat with white paint on sqm 1.33
new work.
(Rate as per item no. 13.82.1 of
S.H. finishing ). 1 time 7.80 9999 A
Add for delay
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost for 10 metre
Cost for one metre Say Rs. each

20.76.5 40 mm diameter pipe


Details of cost for 10 metre
Perimeter = 0.1520 metre
Area = 10x0.1520 m = 1.520 sqm
Priming coat- sqm 1.520
(Rate as per item no. 13.81.3
Finishing sub-head)
Painting two coats excluding
priming coat with white paint on sqm 1.520
new work.
(Rate as per item no. 13.82.1 of
S.H. finishing ). 1 time 10.35 9999 A
Add for delay
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost for 10 metre
Cost for one metre Say Rs. each

20.76.6 50 mm diameter pipe


Details of cost for 10 metre
Perimeter = 0.1894 metre
Area = 10m.x0.1894 sqm = 1.894
sqm
sqm 1.89
Priming coat-
(Rate as per item no. 13.81.3
Finishing sub-head)
Painting two coats excluding
priming coat with white paint on sqm 1.89
new work.
(Rate as per item no. 13.82.1 of
S.H. finishing ). 1 time 10.35 9999 A
Add for delay
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost for 10 metre
Cost for one metre Say Rs. each

Repainting G.I. Pipes and fittings


with white paint of approved
20.77 quality.
20.77.1 15 mm diameter pipe
Details of cost for 10 metre
Painting one coat with white paint
on old work,(Rate as per item no. sqm 0.67
13.82.3 of S.H. finishing)
Add for delay 1 time 3.10 9999 A
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost for 10 metre
Cost for one metre Say Rs. each

20.77.2 20 mm diameter pipe


Details of cost for 10 metre
Painting one coat with white paint
on old work,(Rate as per item no. sqm 0.85
13.82.3 of S.H. finishing)
Add for delay 1 time 3.10 9999 A
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost for 10 metre
Cost for one metre Say Rs. each

20.77.3 25 mm diameter pipe


Details of cost for 10 metre
Painting one coat with white paint
on old work,(Rate as per item no. sqm 1.06
13.82.3 of S.H. finishing)
Add for delay 1 time 4.15 9999 A
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost for 10 metre
Cost for one metre Say Rs. each

20.77.4 32 mm diameter pipe


Details of cost for 10 metre
Painting one coat with white paint
on old work,(Rate as per item no. sqm 1.33
13.82.3 of S.H. finishing)
Add for delay 1 time 4.20 9999 A
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost for 10 metre
Cost for one metre Say Rs. each

20.77.5 40 mm diameter pipe


Details of cost for 10 metre
Painting one coat with white paint
on old work,(Rate as per item no. sqm 1.52
13.82.3 of S.H. finishing)
Add for delay 1 time 5.20 9999 A
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost for 10 metre
Cost for one metre Say Rs. each

20.77.6 50 mm diameter pipe


Details of cost for 10 metre
Painting one coat with white paint
on old work,(Rate as per item no. sqm 1.89
13.82.3 of S.H. finishing)
Add for delay 1 time 5.20 9999 A
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost for 10 metre
Cost for one metre Say Rs. each

Painting G.I. Pipes and fittings


with two coats of anti-corrosive
20.78
bitumastic paint of approved
quality.
20.78.1 15 mm diameter pipe
Details of cost for 10 metre
Painting with anti - corrosive
paint two coats.(Rate as per item
no. 13.97.1 of sub-heads
finishing) sqm 0.67
Add for delay 1 time 3.10 9999 A
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost for 10 metre
Cost for one metre Say Rs. each

20.78.2 20 mm diameter pipe


Details of cost for 10 metre
Painting with anti - corrosive
paint two coats.(Rate as per item
no. 13.97.1 of sub-heads
finishing) sqm 0.85
Add for delay 1 time 3.10 9999 A
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost for 10 metre
Cost for one metre Say Rs. each

20.78.3 25 mm diameter pipe


Details of cost for 10 metre
Painting with anti - corrosive
paint two coats.(Rate as per item
no. 13.97.1 of sub-heads
finishing) sqm 1.06
Add for delay 1 time 4.15 9999 A
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost for 10 metre
Cost for one metre Say Rs. each
20.78.4 32 mm diameter pipe
Details of cost for 10 metre
Painting with anti - corrosive
paint two coats.(Rate as per item
no. 13.97.1 of sub-heads
finishing) sqm 1.33
Add for delay 1 time 4.15 9999 A
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost for 10 metre
Cost for one metre Say Rs. each

20.78.5 40 mm diameter pipe


Details of cost for 10 metre
Painting with anti - corrosive
paint two coats.(Rate as per item
no. 13.97.1 of sub-heads
finishing) sqm 1.52
Add for delay 1 time 4.70 9999 A
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost for 10 metre
Cost for one metre Say Rs. each

20.78.6 50 mm diameter pipe


Details of cost for 10 metre
Painting with anti - corrosive
paint two coats.(Rate as per item
no. 13.97.1 of sub-heads
finishing) sqm 1.89
Add for delay 1 time 4.70 9999 A
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost for 10 metre
Cost for one metre Say Rs. each
20.78.7 65 mm diameter pipe
Details of cost for 10 metre
Painting with anti - corrosive
paint two coats.(Rate as per item
no. 13.97.1 of sub-heads
finishing) sqm 2.39
Add for delay 1 time 5.20 9999 A
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost for 10 metre
Cost for one metre Say Rs. each

20.78.8 80 mm diameter pipe


Details of cost for 10 metre
Painting with anti - corrosive
paint two coats.(Rate as per item
no. 13.97.1 of sub-heads
finishing) sqm 2.8
Add for delay 1 time 5.70 9999 A
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost for 10 metre
Cost for one metre Say Rs. each
Providing and filling sand of
grading zone V or coarser grade
alroung he G.I. Pipes in external
20.79 work
20.79.1 15 mm dia pipe
Details of cost for 1cum sand
Materials-
Fine sand cum 1.00 6501 350 350.00
Carriage of sand cum 1.00 2335 125 125.00 lead for 15 Km
Labour-
Beldar each 0.09 114 150 13.50
Coolies each 0.11 115 150 16.50
Add for water charges@ 1% 5.05
Add for contractor's profit and
overheads @ 10% 51.01
Cost for one cum 561.06 per cum
Say Rs. 562.00 A
Details of cost of sand filling
alround 15 mm dia pipe 10 meter
long
Width of sand filling= 300 mm
Depth of sand filling
Under the pipe = 75 mm
Above the pipe = 150 mm
Max. external dia of pipe = 21.8
mm
= 246.8 mm
A
say 247 mm
Quantity of sand = 10x0.30x0.247
= 0.744 cum
Less for pipe = pai/4(21.8)2x10 =
(-) 0.004 cum
= 0.74 cum
cum 0.74 562 415.88
Cost of cost for 10 metre long
pipe 415.88
Cost of sand filling for one metre 41.59
Say Rs. 42.00 per metre

20.79.2 20 mm dia pipe


Details of cost for 10 metre long
pipe
Width of sand filling= 300 mm
Depth of sand filling =
75+150+27.3 = 252.3 say 252
mm
Quantity of sand = 10x0.30x0.252
= 0.756 cum
Less for pipe = pai/4(27.3)2x10
= (-) 0.006 cum
= 0.750 cum
Cost of sand filling for 10 metre
long pipe(Rate as in item no. A
20.79.1 marked 'A') cum 0.75
Cost of 1 metre
Say Rs. per metre
20.79.3 25 mm dia pipe
Details of cost for 10 metre long
pipe
Width of sand filling= 300 mm
Depth of sand filling =
75+150+34.2 = 259.2 say 259
mm
Quantity of sand = 10x0.30x0.259
= 0.777 cum
Less for pipe = pai/4(34.2)2x10
= (-) 0.009 cum
= 0.768 cum
say = 0.77 cum
Cost of sand filling for 10 metre
long pipe(Rate as in item no. A
20.79.1 marked 'A') cum 0.77
Cost of 1 metre
Say Rs. per metre

20.79.4 32 mm dia pipe


Details of cost for 10 metre long
pipe
Width of sand filling= 300 mm
Depth of sand filling =
75+150+42.9 = 267.9 say 268
mm
Quantity of sand = 10x0.30x0.268
= 0.804 cum
Less for pipe = pai/4(42.9)2x10
= (-) 0.014 cum
= 0.790cum
20.79.5 40 mm dia pipe
Details of cost for 10 metre long
pipe
Width of sand filling= 300 mm
Depth of sand filling =
75+150+48.4 = 273.8 say 274
mm
Quantity of sand = 10x0.30x0.274
= 0.82 cum
Less for pipe = pai/4(48.4)2x100
= (-) 0.019 cum
= 0.801cum
say 0.80 cum
Cost of sand filling for 10 metre
long pipe(Rate as in item no. A
20.79.1 marked 'A') cum 0.8 562 449.6
Cost of 1 metre 44.96
Say Rs. 45.00 per metre

20.79.6 50 mm dia pipe


Details of cost for 10 metre long
pipe
Width of sand filling= 300 mm
Depth of sand filling =
75+150+60.8 = 285.8 say 286
mm
Quantity of sand = 10x0.30x0.286
= 0.858cum
Less for pipe = pai/4(60.8)2x10
= (-) 0.029cum
= 0.829cum
say 0.803cum
Cost of sand filling for 10 metre
long pipe(Rate as in item no. A
20.79.1 marked 'A') cum 0.83 562 466.46
Cost of 1 metre 46.65
Say Rs. 47.00 per metre

20.79.8 80 mm dia pipe


Details of cost for 10 metre long
pipe
Width of sand filling= 450 mm
Depth of sand filling =
75+150+89.9 = 314.9 say 315
mm
Quantity of sand = 10x0.45x0.315
=1.418 cum
Less for pipe = pai/4(89.9)2x10
= (-) 0.0640 cum
= 1.354cum
say 1.35 cum

Cost of sand filling for 10 metre


long pipe(Rate as in item no. A
20.79.1 marked 'A') cum 1.35 562 758.7
Cost of 1 metre 75.87
Say Rs. 76.00 per metre
20.79.9 100 mm dia pipe
Details of cost for 10 metre long
pipe
Width of sand filling=450 mm
Depth of sand filling =
75+150+115 = 340 say 340 mm
Quantity of sand = 10x0.45x0.34
= 1.53 cum
Less for pipe = pai/4(0.115)2x10
= (-) 0.10 cum
= 1.43cum
say 1.43 cum
Cost of sand filling for 10 metre
long pipe(Rate as in item no. A
20.79.1 marked 'A') cum 1.43 562 803.66
Cost of 1 metre 80.37
Say Rs. 81.00 per metre

20.79.10 150 mm dia pipe


Details of cost for 10 metre long
pipe
Width of sand filling= 600 mm
Depth of sand filling =
75+150+166.50 = 391.50 say
0.392 mm
Quantity of sand = 10x0.60x0.392
= 2.35 cum
Less for pipe = pai/4(0.167)2x10
= (-) 0.22 cum
=2.13cum
Cost of sand filling for 10 metre
long pipe(Rate as in item no. A
20.79.1 marked 'A') cum 2.13 562 1197.06
Cost of 1 metre 119.71
Say Rs. 120.00 per metre
Providing and fixing RCC post for
hydrant, size 25x25 cm at the
bottom and 15x15 cm at the top,
of 170 cm height out of which 60
cm shall be kept below ground
level including plastering the
exposed surface and up to 15 cm
below ground level with 6mm
thick cement mortar 1:4 (1
cement 4: fine sand) finished with
a floating coat of nar cement
20.8 including providing and
embedding GI pipe complete with
Details of cost for one post
all earth work required as per
Materials-
standard design.
Earth work in excavation
including disposal of surplus
earth
1x0.25x0.25x0.6m = 0.0375 cum
say 0.04 cum 0.04
(Rate as per item no. 2.8.1 of
S.H. earth work)
Cement concrete 1:2:4(1 cement
:2 coarse sand:4 graded stone
aggregate 12.5 mm nominal size)
=1.7/3
[ (0.25)2+(0.15)2+(0.25x0.15) ]
= 1.7/390.0625+0.0225+0.0375)
= 0.0694 cum cum 0.07
say 0.07
(Rate cum
as per item no.5.7.3 of S.H.
Concrete work).Steel
reinforcement-
10 mm dia M.S. bars
4x(166+17) cm = 7.32 metre say
7.30 metre
7.30 metre @ 0.6 kg/m = 4.38 kg
6 mm dia M.S. stirrups-
6x83 cm = 4.98 metre
say 5 m @ 0.2 kg/m = 1.00 kg
= 5.38 kg kg 5.38
(Rate as per item no.5.29.1 of
S.H. RCC work) Form work-
4(0.15+0.25
2 x 1.70 metre = 1.36 sqm 1.36
sqm
(Rate as per item no.5.14.6 of
S.H. RCC work)
6 mm thick cement plaster 1:4 (1
cement :4 fine sand) including
neat cement finish)
4(0.15+0.23
2 x 1.25 m = 0.95 sqm
1x0.15x0.15 m = 0.02 sqm
0.97 sqm sqm 0.97
(Rate as per item no.13.24.2 &
13.26 of S.H finishing
GI pipe 15 mm nominal size 1.80
m. m 1.8 1545
Carriage of G.I. Pipe
(1.80m @ 1.21 kg/m) 0.0206 q =
0.00206 tonne. tonne 0 2271
Labour for threading and fixing
G.I. Pipe etc.
Fitter each 0.05 116
Beldar each 0.05 114 A
Add for delay 1 time 1.7 9999
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost per one post
Say Rs. each

Making hydrant pillar of brick


work with bricks of class
designation 75 in cement mortar
1:4 (1 cement :4 fine sand )
including 10 cm thick cement
concrete coping 1:2:4 ( 1 cement
:2 coarse sand:4 graded stone
aggregate 12.5 mm nominal size)
rendered smooth with neat
cement and plastered with 12
mm cement mortar 1:4( 1
cement:4 coarse sand( including
finishing with a floating coat of
neat cement , 15 cm thick
foundation concrete 1:5:10(1
cement :5 fine sand:10 graded
stone aggregate 40 mm nominal
size) including earth work and
disposal of surplus earth
20.81 complete as per standard design.
1 ½ brick thick(square) and 110
20.81.1 cm high.
20.81.1.2with F.P.S. bricks
Details of cost for one no.
Materials-
I) Earth work in excavation
including disposal of surplus
earth
0.495 m x 0.495 m x 0.15 m =
0.037 cum say 0.04 cum cum 0.04
(Rate as per item no. 2.8.1)
ii) Cement Concrete 1:5:10(1
cement :5 fine sand:10 graded
stone aggregate 40 mm nominal
size)
= 0.495 m x 0.495 m x 0.15 m =
0.037 cum say 0.04
(Rate as per item no. 4.5.11) cum 0.04
iii) Second class brick work in
cement mortar 1:4 (1 cement:4
fine snd)
0.345 m x 0.345x1.00 m =0.119
cum say 0.12 cum
(Rate as per item no. 6.1.8) cum 0.12
iv) Extra for square pillar
0.345 m x 0.345x1.00 m =0.119
cum say 0.12 cum
(Rate as per item no. 6.6.1) cum 1.12
v) 12 mm cement plaster 1:4 (1
cement :4 coarse sand) finishd
with floating coat of neat cement
= 4x 0.345 mx 1.00 m = 1.38 sqm
(Rate as per item
no.13.11.2+13.26) sqm 1.38
vi) Cement Concrete 1:2:4(1
cement :2 fine sand:4 graded
stone aggregate 12.5 mm
nominal size)
= 0.345 m x 0.345 m x 0.10 m =
0.0119 cum say 0.012 cum
(Rate as per item no. 4.5.3) cum 0.01
vii) Extra for floating coat of neat
cement top 0.345m x 0.345 m =
0.119 sqm
Sides 4x0.345 m x 0.1 m = 0.138
sqm
=
0.257 sqm say 0.26 sqm
(Rate as per item no. 13.26) sqm 0.26
viii) Add for delay 1 time 1.70 9999 A
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost per one
Say Rs. each
1Brick thick(square) sand 110 cm
20.81.2 high.
20.81.2.2with F.P.S. bricks
Details of cost for one no.
Materials-
I) Earth work in excavation
including disposal of surplus
earth
0.38 m x 0.38 m x 0.15 m = 0.022
cum cum 0.02
(Rate as per item no. 2.8.1)
ii) Cement Concrete 1:5:10(1
cement :5 fine sand:10 graded
stone aggregate 40 mm nominal
size)
= 0.38 m x 0.38 m x 0.15 m =
0.022 cum
(Rate as per item no. 4.5.11) cum 0.02
iii) Second class brick work in
cement mortar 1:4 (1 cement:4
fine snd)
0.23 m x 0.23x1.00 m =0.053
cum say 0.05 cum
(Rate as per item no. 6.1.8) cum 0.05
iv) Extra for square pillar
(Rate as per item no. 6.6.1) cum 0.05
v) 12 mm cement plaster 1:4 (1
cement :4 coarse sand) finishd
with floating coat of neat cement
= 4x 0.23 m x 1.00 m = 0.92 sqm
(Rate as per item
no.13.11.2+13.26) sqm 0.92
vi) Cement Concrete 1:2:4(1
cement :2 fine sand:4 graded
stone aggregate 12.5 mm
nominal size)
= 0.23 m x 0.23x1.00 m m =
0.005 cum
(Rate as per item no. 4.5.3) cum 0.01
vii) Extra for floating coat of neat
cement top 0.23m x 0.23 m =
0.053 sqm
Sides 4x0.23 m x 0.1 m = 0.92
sqm
=
0.973 sqm say 0.97 sqm
(Rate as per item no. 13.26) sqm 0.97
viii) Add for delay 1 time 1.70 9999 A
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost per one
Say Rs. each
Making platform for stand post
with 40 m thick cement concrete
1:2:4 ( 1 cement :2 coarse sand:4
graded stone aggregate 20 mm
nominal size) over a base of 10
cm thick cement concrete
1:5:10(1 cement :5 fine sand:10
graded stone aggregate 40 mm
nominal size) with 1/2 brick x 1
brick thick kerb in brick masonry
with bricks of class designation
75 in cement mortar 1:4 (1
cement:4 fine sand) finishing on
top and sides with 12 mm cement
plaster1:4 (1 cement :4 coarse
sand ) including a floating coat of
20.82 neat cement over concrete floor
20.82.1 and
120x120kerbcmincluding
inside excavation
and disposal of
20.82.1.2with F.P.S. bricks surplus earth
complete as per standard design.
Details of cost for one no.
Materials-
I) Earth work in excavation
including disposal of surplus
earth
1.58 m x1.58 m x 0.10 m = 0.025
cum cum 0.25
(Rate
ii) as per item
Cement no. 2.8.1)
Concrete 1:5:10(1
cement :5 fine sand:10 graded
stone aggregate 40 mm nominal
size)
=1.58 m x1.58 m x 0.10 m =
0.025 cum
(Rate as per item no. 4.5.11) cum 0.25
iii) Second class brick work in
cement mortar 1:4 (1 cement:4
fine snd) for kerb
5.32 m x 0.23x0.115 m = 0.141
cum say 0.14 cum
(Rate as per item no. 6.1.8) cum 0.14
vi) 40 mm thick Cement Concrete
flooring 1:2:4(1 cement :2 fine
sand:4 graded stone aggregate
20 mm nominal size) finishing
with a floating coat of neat
cement
= 1.20 m x 1.20x m = 1.44 sqm
(Rate as per item no. 11.4.2) sqm 1.44
v) 12 mm cement plaster 1:4 (1
cement :4 coarse sand) finished
with floating coat of neat cement
Top of kerb: 5.32x 0.115 m =
0.610 sqm
Inside kerb: 4.80x0.16 m = 1.316
sqm
2.694
sqm
say 2.69 sqm
sqm 2.69
viii) Add for delay 1 time 4.15 9999 A
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost per one
Say Rs. each

20.82.2 90x90 cm inside


20.82.2.2with F.P.S. bricks
Details of cost for one no.
Materials-
I) Earth work in excavation
including disposal of surplus
earth
1.28 m x1.28 m x 0.10 m = 0.164
cum say 0.16 cum cum 0.16
(Rate
ii) as per item
Cement no. 2.8.1)
Concrete 1:5:10(1
cement :5 fine sand:10 graded
stone aggregate 40 mm nominal
size)
=1.28 m x1.28 m x 0.10 m =
0.164 cum say 0.16 cum
(Rate as per item no. 4.5.11) cum 0.16
iii) Second class brick work in
cement mortar 1:4 (1 cement:4
fine snd) for kerb
4.06 m x 0.23x0.115 m = 0.107
cum say 0.11 cum
(Rate as per item no. 6.1.8) cum 0.11
vi) 40 mm thick Cement Concrete
flooring 1:2:4(1 cement :2 fine
sand:4 graded stone aggregate
20 mm nominal size) finishing
with a floating coat of neat
cement
= 0.9 m x 0.9x m = 0.81 sqm
(Rate as per item no. 11.4.2) sqm 0.81
v) 12 mm cement plaster 1:4 (1
cement :4 coarse sand) finished
with floating coat of neat cement
Top of kerb:4.06x 0.115 m =
0.467 sqm
Inside kerb: 3.60x0.16 m = 0.576
sqm
outside kerb : 4.50x0.23 m =
1.040 sqm
2.083
sqm
say 2.08 sqm
sqm 2.08
viii) Add for delay 1 time 4.15 9999 A
Add for water charges@ 1% on
'A' B
Add for contractor's profit and
overheads @ 10% on (A+B)
Cost per one
Say Rs. each

Boring with 100 mm diameter


casting pipe for hand pump/tube
well in all soils except ordinary
hand rocks requiring blasting
including removing the casing
pipe after the hand pipe/tube well
20.83 is lowered and tested .
20.83.1 Upto 6 metre depth.
Labour
For boring and removing the pipe-

Fittar each 0.50 116


Beldar each 3.00 114
Hire charges for derick monkey
rope and other accessories 1 day 0.62 10
Depreciation @ 2% of the cost of
casing pipe 6 metre @ Rs. Per 1 metre 0.12 1472
metre
Sundries 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost of 6 metre
Cost per metre
Say Rs. per metre

20.83.2 Beyond 6 m and upto 12 m depth


Labour
For boring and removing the pipe-

Fittar each 0.62 116


Beldar each 3.50 114
Hire charges for derick monkey
rope and other accessories 1 day 0.62 10
Depreciation @ 2%as in item no.
20.83.1
Sundries 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost of 6 metre
Cost per metre
Say Rs. per metre

Beyond 12 m and upto 18 m


20.83.3 depth
Labour
For boring and removing the pipe-

Fittar each 0.75 116


Beldar each 4.00 114
Hire charges for derick monkey
rope and other accessories 1 day 0.75 10
Depreciation @ 2%as in item no.
20.83.1
Sundries 1 time 5.20 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost of 6 metre
Cost per metre
Say Rs. per metre

P/P in position filters of 40 mm


diameter G.I. Pipe with brass
20.84 strainer of approved quality.
Details of cost for one strainer 1.5
long
Materials:
Cost of strainer 40mm diameter
1.5 m long each 1.00
Carriage to site 1 time 5.20
Labour
Fittar each 0.17 116
Beldar each 0.17 114
Sundries including hamp white
lead etc. 1 time 2.75 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost of 1.5 metre
Cost per metre
Say Rs. per metre

P/F to filter and lowering to


proper levels 40 mm G.I. Pipe for
tube well including cleaning and
20.85 priming the tube well.
Details of cost for depth of 10
metre
Materials:
40mm G.I. Pipe metre 10.00 1549
Carriage to 40 mm pipe (35.9kg) tonne 0.04 2271 A
Add 2% wastage and fitting on A
White lead, hamp and oil etc. 1 time 2.60 9999
Labour
Fittar each 0.33 116
Beldar each 0.75 114
Sundries including hamp white
lead etc. 1 time 2.75 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost of 10 metre
Cost per metre
Say Rs. per metre
P/P in position hand pump of
approved quality for 40 mm
diameter G.I. Pipe complete with
20.86 all accessories.
Details of cost for one pump
Materials:
cost of hand pump each 1.00 1693
Carriage 1 time 5.20 9999
Labour
Fittar each 0.10 116
Beldar each 0.10 114
Sundries 1 time 1.70 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one hand pump
Say Rs. per metre
P/F G.I. Union in G.I. Pipe
including cutting and threading
the pipe and making long screws
20.87 etc. complete(new work)
20.87.1 15 mm nominal bore
Details of cost for one no.
Materials:
15 mm nominal bore each 1.00 1641
Carriage of materials and sundries1 time 0.70 9999
Labour
Fittar each 0.11 116
Beldar each 0.11 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one each no.
Say Rs. each

20.87.2 20mm nominal bore


Details of cost for one no.
Materials:
20 mm nominal bore each 1.00 1642
Carriage of materials and sundries1 time 0.70 9999
Labour
Fittar each 0.11 116
Beldar each 0.11 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one each no.
Say Rs. each
20.87.3 25 mm nominal bore
Details of cost for one no.
Materials:
25 mm nominal bore each 1.00 1643
Carriage of materials and sundries1 time 0.70 9999
Labour
Fittar each 0.11 116
Beldar each 0.11 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one each no.
Say Rs. each
20.87.4 32 mm nominal bore
Details of cost for one no.
Materials:
32 mm nominal bore each 1.00 1644
Carriage of materials and sundries1 time 0.70 9999
Labour
Fittar each 0.11 116
Beldar each 0.11 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one each no.
Say Rs. each
20.87.5 40mm nominal bore
Details of cost for one no.
Materials:
40 mm nominal bore each 1.00 1645
Carriage of materials and sundries1 time 0.70 9999
Labour
Fittar each 0.11 116
Beldar each 0.11 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one each no.
Say Rs. each

20.87.6 50 mm nominal bore


Details of cost for one no.
Materials:
50 mm nominal bore each 1.00 1646
Carriage of materials and sundries1 time 0.70 9999
Labour
Fittar each 0.15 116
Beldar each 0.15 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one each no.
Say Rs. each

20.87.7 65 mm nominal bore


Details of cost for one no.
Materials:
65 mm nominal bore each 1.00 1647
Carriage of materials and sundries1 time 0.70 9999
Labour
Fittar each 0.15 116
Beldar each 0.15 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one each no.
Say Rs. each

20.87.8 80 mm nominal bore


Details of cost for one no.
Materials:
80 mm nominal bore each 1.00 1648
Carriage of materials and sundries1 time 0.70 9999
Labour
Fittar each 0.15 116
Beldar each 0.15 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one each no.
Say Rs. each

20.87.9 100 mm nominal bore


Details of cost for one no.
Materials:
100 mm nominal bore each 1.00 7398
Carriage of materials and sundries1 time 0.70 9999
Labour
Fittar each 0.20 116
Beldar each 0.20 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one each no.
Say Rs. each

20.87.10 150 mm nominal bore


Details of cost for one no.
Materials:
150 mm nominal bore each 1.00 7399
Carriage of materials and sundries1 time 0.70 9999
Labour
Fittar each 0.20 116
Beldar each 0.20 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one each no.
Say Rs. each
P/F G.I. Union in existing G.I.
Pipe line cutting and threading
the pipe and making long screws
including excavation, refilling the
earth or cutting of wall and
making good the same complete
20.88 wherever required.
20.88.1 15 mm nominal bore
Details of cost for one no.
Materials:
15 mm nominal bore each 1.00 1641
Carriage of materials and sundries1 time 0.70 9999
Labour
Fittar each 0.33 116
Beldar each 0.33 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one each no.
Say Rs. each

20.88.2 20mm nominal bore


Details of cost for one no.
Materials:
20 mm nominal bore each 1.00 1642
Carriage of materials and sundries1 time 0.70 9999
Labour
Fittar each 0.33 116
Beldar each 0.33 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one each no.
Say Rs. each
20.88.3 25 mm nominal bore
Details of cost for one no.
Materials:
25 mm nominal bore each 1.00 1643
Carriage of materials and sundries1 time 0.70 9999
Labour
Fittar each 0.33 116
Beldar each 0.33 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one each no.
Say Rs. each
20.88.4 32 mm nominal bore
Details of cost for one no.
Materials:
32 mm nominal bore each 1.00 1644
Carriage of materials and sundries1 time 0.70 9999
Labour
Fittar each 0.33 116
Beldar each 0.33 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one each no.
Say Rs. each
20.88.5 40mm nominal bore
Details of cost for one no.
Materials:
40 mm nominal bore each 1.00 1645
Carriage of materials and sundries1 time 0.70 9999
Labour
Fittar each 0.33 116
Beldar each 0.33 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one each no.
Say Rs. each

20.88.6 50 mm nominal bore


Details of cost for one no.
Materials:
50 mm nominal bore each 1.00 1646
Carriage of materials and sundries1 time 0.70 9999
Labour
Fittar each 0.45 116
Beldar each 0.45 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one each no.
Say Rs. each

20.88.7 65 mm nominal bore


Details of cost for one no.
Materials:
65 mm nominal bore each 1.00 1647
Carriage of materials and sundries1 time 0.70 9999
Labour
Fittar each 0.45 116
Beldar each 0.45 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one each no.
Say Rs. each

20.88.8 80 mm nominal bore


Details of cost for one no.
Materials:
80 mm nominal bore each 1.00 1648
Carriage of materials and sundries1 time 0.70 9999
Labour
Fittar each 0.45 116
Beldar each 0.45 114
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one each no.
Say Rs. each

P/P on terrace(at all floor levels)


polyethylene water storage tank
of approved brand and
manufacture with cover and
suitable locking arrangement and
making necessary holes for inlet,
outlet and overflow pipes but
without fittings and the base
20.89 support for tank.
Details of cost for 500 litres, tank
1 no.
Materials:
Polyethylene water storage tank litre 500.00 1649
Carriage to site 1 time 69.00 9999
placing at terrace 1 time 34.50 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for 500 litre
Cost per litre
Say Rs. per litre capacity

Providing and fixing C.P. brass


bib cock of approved quality
20.9 conforming to IS : 8931
15 mm nominal bore
Details of cost for one no.
Materials:
15 mm dia meter C.P. brass bib cock
each 1.00 7257
Carriage of materials and sundries1 time 4.45 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
P/F C.P. brass long nose bib
cock of approved quality
conforming to IS standards and
20.91 weighing not less than 810 gms.
15 mm nominal bore
Details of cost for one no.
Materials:
15 mm dia meter C.P. brass long
nose bib cock each 1.00 7258
Carriage of materials and fixing charges
1 time 6.25 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
P/F C.P. brass long body bib
cock of approved quality
conforming to IS standards and
20.92 weighing not less than 690 gms.
15 mm nominal bore
Details of cost for one no.
Materials:
15 mm dia meter C.P. brass long
body bib cock each 1.00 7259
Carriage of materials and fixing charges
1 time 5.35 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

P/F C.P. brass stop cock


(concealed) of standards design
20.93 and of approved make
conforming
15 mm nominalto ISbore
: 8931
Details of cost for one no.
Materials:
15 mm dia meter C.P. brass stop
cock (concealed) each 1.00 7260
Carriage of materials and fixing charges
1 time 4.45 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

P/F C.P. brass angle valve for


basin mixer and gyser points of
approved quality conforming to IS
20.94 : 8931
15 mm nominal bore
Details of cost for one no.
Materials:
C.P. brass angle valve each 1.00 7261
Carriage and fixing charges 1 time 4.35 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

P/F C.P. brass close hole basin


mixer pillar tap of approved
quality and mae, weighting not
20.95 less than 1.970 kg
15 mm nominal bore of standard
back type
Details of cost for one no.
Materials:
15 mm dia metre C.P. brass
basin mixer pillar tap each 1.00 7262
Carriage and fixing charges 1 time 15.26 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

PVC BIB & STOP COCKS


P/F P.T.M.T. (An Engineering
thermoplastic)bib cock of
approved quality colour and
20.96 make.
15 mm nominal size, 86mm long,
102 mm high and 43 mm wide
with 12 mm seat dia and
replaceable washers, weighing
20.96.1 not less than 90 gms.
Details of cost for one no.
Materials:
15 mm dia P.T.M.T. bib cock each 1.00 7400
Carriage of materials and fixing charges
1 time 3.10 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

15 mm nominal size, 122 mm


long, 110 mm high and 43 mm
wide with 12 mm seat dia and
replaceable washers, weighing
20.96.2 not less than 105 gms.
Details of cost for one no.
Materials:
15 mm dia P.T.M.T. bib cock each 1.00 7401
Carriage of materials and fixing charges
1 time 3.10 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

15 mm nominal size, 180 mm


long, 110 mm high and 43 mm
wide with 12 mm seat dia and
replaceable washers, weighing
20.96.3 not less than 126 gms.
Details of cost for one no.
Materials:
15 mm dia P.T.M.T. bib cock each 1.00 7402
Carriage of materials and fixing charges
1 time 3.10 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

P/F P.T.M.T. (An Engineering


thermoplastic) stop cock of
approved quality colour and
20.97 make.
15 mm nominal size, 86mm long,
90 mm high and 43 mm wide with
12 mm seat dia and replaceable
washers, weighing not less than
20.97.1 95gms.
Details of cost for one no.
Materials:
15 mm dia P.T.M.T. stop cock each 1.00 7403
Carriage of materials and fixing charges
1 time 3.10 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

15 mm nominal size, 86 mm
long(F/T), 90 mm high and 43
mm wide with 12 mm seat dia
and replaceable washers,
20.97.2 weighing not less than 95 gms.
Details of cost for one no.
Materials:
15 mm dia P.T.M.T. stop cock each 1.00 7404
Carriage of materials and fixing charges
1 time 3.10 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

20 mm nominal size, 89 mm long,


86 mm high and 43 mm wide with
12 mm seat dia and replaceable
washers, weighing not less than
20.97.3 95 gms.
Details of cost for one no.
Materials:
20 mm dia P.T.M.T. stop cock each 1.00 7405
Carriage of materials and fixing charges
1 time 3.10 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

P/F P.T.M.T. (An Engineering


thermoplastic) pillar cock of
approved quality colour and
20.98 make.
15 mm nominal size, 107mm
long, 131 mm high and 43 mm
wide with 12 mm seat dia and
20.98.1 replaceable washers, weighing
not lessofthan
Details cost120gms.
for one no.
Materials:
15 mm dia P.T.M.T. pillar cock each 1.00 7406
Carriage of materials and fixing charges
1 time 3.65 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

P/F P.T.M.T. (An Engineering


thermoplastic) push cock of
approved quality colour and
20.99 make.
15 mm nominal size, with 20mm
B.S.P. female threads,100mm
long, 57 mm high and 33 mm
wide with 12 mm seat dia and
20.99.1 replaceable washers, weighing
Details
not lessofthan
cost75gms.
for one no.
Materials:
15 mm dia P.T.M.T. push cock each 1.00 7407
Carriage of materials and fixing charges
1 time 3.10 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

15 mm nominal size, with 20mm


B.S.P. female threads,80mm
long, 30 mm high and 30 mm
wide with 12 mm seat dia and
replaceable washers, weighing
20.99.2 not less than 47gms.
Details of cost for one no.
Materials:
15 mm dia P.T.M.T. push cock each 1.00 7408
Carriage of materials and fixing charges
1 time 3.10 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
P/F P.T.M.T. (An Engineering
thermoplastic) grating of
approved quality colour and
20.100 make.
20.100.1 circular type

100 mm nominal dia 12 mm high,


domed shape conforming to IS
standards and weighing not less
than 25 gms
20.100.1.1
Details of cost for one no.
Materials:
100 mm dia P.T.M.T. grating each 1.00 7409
Carriage of materials and fixing charges
1 time 1.60 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
125mm nominal dia 15 mm high,
domed shape conforming to IS
standards and weighing not less
than 40 gms
20.100.1.2
Details of cost for one no.
Materials:
125 mm dia P.T.M.T. grating each 1.00 7410
Carriage of materials and fixing charges
1 time 1.60 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

125mm nominal dia 14 mm high,


domed shape with 31 mm waste
hole conforming to IS standards
and weighing not less than 40
gms
20.100.1.3
Details of cost for one no.
Materials:
125 mm dia P.T.M.T. grating each 1.00 7411
Carriage of materials and fixing charges
1 time 1.60 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

Rectangular type with openable


20.100.2 circular lid.
150 mm nominal size square, 18
mm high with 100 mm dia of the
inner hinged round grating
domed shape conforming to IS
standards, weighing not less than
110 gms.
20.100.2.1
Details of cost for one no.
Materials:
150 mm size square P.T.M.T.
grating each 1.00 7412
Carriage of materials and fixing charges
1 time 1.60 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each
150 mm nominal size square, 18
mm high with 100 mm dia of the
inner hinged round grating
domed shape with 31 mm waster
hole conforming to IS standards,
weighing not less than 110 gms.
20.100.2.2
Details of cost for one no.
Materials:
150 mm size square P.T.M.T.
grating each 1.00 7413
Carriage of materials and fixing charges
1 time 1.60 9999
Add for water charges@ 1%
Add for contractor's profit and
overheads @ 10%
Cost for one no.
Say Rs. each

P/F C.I. Double acting air valve of


approved quality with bolts , nuts,
rubber insertions etc. complete
(The tail pieces, tapers etc. if
20.1 required will be paid separately)
20.101.1 50 mm dia
Details of cost for 10 no. double
acting air valves
Materials:
50 mm dia double acting air valve each 10.00 7415
Carriage of air valves 1 time 10.00 9999
Labour for laying double acting 1 time 15.00 9999
air valve
Providing flanged joints to
double acting air valve with bolts,
buts and rubber insertions
etc.(Rate same as per item no. each 10.00 A
20.47.1)
Add for water charges@ 1% on
all excep 'A'
Add for contractor's profit and
overheads @ 10% on all excep
'A'
Cost for 10 air valves
Cost for one air valves Say Rs. each

20.101.2 80 mm dia
Details of cost for 10 no. double
acting air valves
Materials:
80 mm dia double acting air valve each 10.00 7416
Carriage of air valves 1 time 10.00 9999
Labour for laying double acting
air valve 1 time 15.00 9999
Providing flanged joints to
double acting air valve with bolts,
buts and rubber insertions
etc.(Rate same as per item no. each 10.00 A
20.47.1)
Add for water charges@ 1% on
all excep 'A'
Add for contractor's profit and
overheads @ 10% on all excep
'A'
Cost for 10 air valves
Cost for one air valves Say Rs. each

20.101.3 100 mm dia


Details of cost for 10 no. double
acting air valves
Materials:
100 mm dia double acting air
valve each 10.00 7417
Carriage of air valves 1 time 10.00 9999
Labour for laying double acting
air valve 1 time 20.00 9999
Providing flanged joints to
double acting air valve with bolts,
buts and rubber insertions
etc.(Rate same as per item no. each 10.00 A
20.47.1)
Add for water charges@ 1% on
all excep 'A'
Add for contractor's profit and
overheads @ 10% on all excep
'A'
Cost for 10 air valves
Cost for one air valves Say Rs. each

Providing and fixing enclosed


type water meter (bulk type )
conforming to IS: 2373 and tested
by Municipal Board complete with
bolts, nuts, rubber insertions
etc.(The tail pieces if required will
20.1 be paid separated).
20.102.1 80 mm dia nominal bore
Details of cost for 1 no. water
meter
Materials:
80 mm dia water meter each 1.00 7418
Testing charges 1 time 50.00 9999
Carriage of water meter 1 time 10.00 9999
Labour for laying water meter 1time 15.00 9999
Providing flanged joints to water
meter with bolts, nuts and rubber
insertions etc. A
(Rate same as per item no.
20.47.1) each 2.00
Add for water charges@ 1% on
all excep 'A'
Add for contractor's profit and
overheads @ 10% on all excep
'A'
Cost for one water meter Say Rs. each

20.102.2 100 mm dia nominal bore


Details of cost for 1 no. water
meter
Materials:
100 mm dia water meter each 1.00 7419
Testing charges 1 time 50.00 9999
Carriage of water meter 1 time 10.00 9999
Labour for laying water meter 1time 20.00 9999
Providing flanged joints to water
meter with bolts, nuts and rubber
insertions etc. A
(Rate same as per item no.
20.47.2) each 2.00
Add for water charges@ 1% on
all excep 'A'
Add for contractor's profit and
overheads @ 10% on all excep
'A'
Cost for one water meter Say Rs. each

20.102.3 150 mm dia nominal bore


Details of cost for 1 no. water
meter
Materials:
150 mm dia water meter each 1.00 7420
Testing charges 1 time 60.00 9999
Carriage of water meter 1 time 15.00 9999
Labour for laying water meter 1time 25.00 9999
Providing flanged joints to water
meter with bolts, nuts and rubber
insertions etc. A
(Rate same as per item no.
20.47.4) each 2.00
Add for water charges@ 1% on
all excep 'A'
Add for contractor's profit and
overheads @ 10% on all excep
'A'
Cost for one water meter Say Rs. each

20.102.4 200 mm dia nominal bore


Details of cost for 1 no. water
meter
Materials:
200 mm dia water meter each 1.00 7421
Testing charges 1 time 60.00 9999
Carriage of water meter 1 time 20.00 9999
Labour for laying water meter 1time 40.00 9999
Providing flanged joints to water
meter with bolts, nuts and rubber
insertions etc. A
(Rate same as per item no.
20.47.1) each 2.00
Add for water charges@ 1% on
all excep 'A'
Add for contractor's profit and
overheads @ 10% on all excep
'A'
Cost for one water meter Say Rs. each
nnection

nnection

nnection
e capacity
DRAINAGE
Rate Cost
Item No Description Unit Qty
Code (Rs)
Providing and fixing C.I. Dirt box strainer for bulk
type water meter with nuts,bolts, rubber insertions
20.1 etc. complete conforming t IS: 2373
20.103.1 80 mm dia
Details of cost for 1 no.dirt box strainer
Materials:
80 mm dia dirt box strainer each 1.00 7422
Carriage of dirt box strainer 1 time 10.00 9999
Labour for laying dirt box strainer 1time 15.00 9999
Providing flanged joints to dirt box strainer with bolts,
nuts and rubber insertions etc.
(Rate same as per item no. 20.47.1) each 2.00
Add for water charges@ 1% on all excep 'A'
Add for contractor's profit and overheads @ 10% on
all excep 'A'
Cost for one dirt box strainer Say Rs.

20.103.2 100 mm dia


Details of cost for 1 no.dirt box strainer
Materials:
100 mm dia dirt box strainer each 1.00 7423
Carriage of dirt box strainer 1 time 10.00 9999
Labour for laying dirt box strainer 1time 20.00 9999
Providing flanged joints to dirt box strainer with bolts,
nuts and rubber insertions etc.
(Rate same as per item no. 20.47.2) each 2.00
Add for water charges@ 1% on all excep 'A'
Add for contractor's profit and overheads @ 10% on
all excep 'A'
Cost for one dirt box strainer Say Rs.
20.103.3 150 mm dia
Details of cost for 1 no.dirt box strainer
Materials:
150 mm dia dirt box strainer each 1.00 7424
Carriage of dirt box strainer 1 time 15.00 9999
Labour for laying dirt box strainer 1time 25.00 9999
Providing flanged joints to dirt box strainer with bolts,
nuts and rubber insertions etc.
(Rate same as per item no. 20.47.4) each 2.00
Add for water charges@ 1% on all excep 'A'
Add for contractor's profit and overheads @ 10% on
all excep 'A'
Cost for one dirt box strainer Say Rs.
20.103.4 200 mm dia
Details of cost for 1 no.dirt box strainer
Materials:
200 mm dia dirt box strainer each 1.00 7425
Carriage of dirt box strainer 1 time 20.00 9999
Labour for laying dirt box strainer 1time 40.00 9999
Providing flanged joints to dirt box strainer with bolts,
nuts and rubber insertions etc.
(Rate same as per item no. 20.47.5) each 2.00
Add for water charges@ 1% on all excep 'A'
Add for contractor's profit and overheads @ 10% on
all excep 'A'
Cost for one dirt box strainer Say Rs.

Note: The rates given for all the items under sub-
head 'Drainage' are applicable to work executed in
solis above sub-solil water level. Extra allowance
has to be made for work under sub-soil water level.
(A) STONE WARE PIPES AND FITTINGS
Providing, laying and jointing glazed stoneware
pipes grade 'A' with stiff mixture of cement mortar in
the proportion of 1:1(1 cement :1 fine sand)
21.1 including testing of joints etc. complete.
21.1.1 100 mm dia metre
Details of cost for 30 metre
Materials:
100 mm stone ware pipes 60 cm long each 50.00 1854
Carriage of pipes 100m 0.30 2224
10% allowance for breakage on items(I) & (ii)
tonne 0.07 367
Cement of 50 joints = 0.045 cum = 0.065 tonne
Carriage of cement tonne 0.07 2209
Fine sand cum 0.05 983
Carriage of fine sand cum 0.05 2261
Spun yarn of plain gaskin @ 0.09 kg per joint =
kg 4.50 1881
0.09x50 = 4.50 kg.
Labour:
Mason 1st class each 1.00 123
Mason 2nd class each 1.00 124
Beldar each 3.00 114
Bhishti each 1.00 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 30 mrretre
Cost for 1 metre Say Rs.

21.1.2 150 mm dia metre


Details of cost for 30 metre
Materials:
150 mm stone ware pipes 60 cm long each 50.00 1855
Carriage of pipes 100m 0.30 2225
10% allowance for breakage on items(I) & (ii)
tonne 0.097 367
Cement of 50 joints = 0.068 cum = 0.097 tonne
Carriage of cement tonne 0.097 2209
Fine sand cum 0.068 983
Carriage of fine sand cum 0.068 2261
Spun yarn of plain gaskin @ 0.18 kg per joint =
kg 9.00 1881
0.18x50 = 9 kg.
Labour:
Mason 1st class each 1.50 123
Mason 2nd class each 1.50 124
Beldar each 4.00 114
Bhishti each 1.00 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 30 mrretre
Cost for 1 metre Say Rs.
21.1.3 200 mm dia metre
Details of cost for 30 metre
Materials:
200 mm stone ware pipes 60 cm long each 50.00 1856
Carriage of pipes 100m 0.30 2226
10% allowance for breakage on items(I) & (ii)
tonne 0.13 367
Cement of 50 joints = 0.091 cum = 0.13 tonne
Carriage of cement tonne 0.13 2209
Fine sand cum 0.091 983
Carriage of fine sand cum 0.091 2261
Spun yarn of plain gaskin @ 0.24 kg per joint =
kg 12.00 1881
0.24x50 = 12.00 kg.
Labour:
Mason 1st class each 1.75 123
Mason 2nd class each 1.75 124
Beldar each 4.50 114
Bhishti each 1.25 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 30 mrretre
Cost for 1 metre Say Rs.
21.1.4 230 mm dia metre
Details of cost for 30 metre
Materials:
230 mm stone ware pipes 60 cm long each 50.00 1857
Carriage of pipes 100m 0.30 2227
10% allowance for breakage on items(I) & (ii)
tonne 0.146 367
Cement of 50 joints = 0.102 cum = 0.146 tonne
Carriage of cement tonne 0.146 2209
Fine sand cum 0.102 983
Carriage of fine sand cum 0.102 2261
Spun yarn of plain gaskin @ 0.27 kg per joint =
kg 13.50 1881
0.27x50 = 13.50 kg.
Labour:
Mason 1st class each 1.50 123
Mason 2nd class each 1.50 124
Beldar each 4.00 114
Bhishti each 1.00 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 30 mrretre
Cost for 1 metre Say Rs.
21.1.5 250 mm dia metre
Details of cost for 30 metre
Materials:
250 mm stone ware pipes 60 cm long each 50.00 1858
Carriage of pipes 100m 0.30 2228
10% allowance for breakage on items(I) & (ii)
tonne 0.162 367
Cement of 50 joints = 0.1133 cum = 0.162 tonne
Carriage of cement tonne 0.162 2209
Fine sand cum 0.113 983
Carriage of fine sand cum 0.113 2261
Spun yarn of plain gaskin @ 0.30 kg per joint =
kg 15.00 1881
0.30x50 = 15.00 kg.
Labour:
Mason 1st class each 2.25 123
Mason 2nd class each 2.25 124
Beldar each 5.50 114
Bhishti each 1.50 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 30 mrretre
Cost for 1 metre Say Rs.
21.1.6 300 mm dia metre
Details of cost for 30 metre
Materials:
300 mm stone ware pipes 60 cm long each 50.00 1859
Carriage of pipes 100m 0.30 2229
10% allowance for breakage on items(I) & (ii)
tonne 0.194 367
Cement of 50 joints = 0.136 cum = 0.194 tonne
Carriage of cement tonne 0.194 2209
Fine sand cum 0.136 983
Carriage of fine sand cum 0.136 2261
Spun yarn of plain gaskin @ 0.36 kg per joint =
kg 18.00 1881
0.36x50 = 18 kg.
Labour:
Mason 1st class each 2.50 123
Mason 2nd class each 2.50 124
Beldar each 6.00 114
Bhishti each 1.50 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 30 mrretre
Cost for 1 metre Say Rs.
21.1.7 450 mm dia metre
Details of cost for 30 metre
Materials:
450 mm stone ware pipes 60 cm long each 50.00 1861
Carriage of pipes 100m 0.30 2232
10% allowance for breakage on items(I) & (ii)
tonne 0.293 367
Cement of 50 joints = 0.204 cum = 0.293 tonne
Carriage of cement tonne 0.293 2209
Fine sand cum 0.204 983
Carriage of fine sand cum 0.204 2261
Spun yarn of plain gaskin @ 0.54 kg per joint =
kg 27.00 1881
0.54x50 = 27.00 kg.
Labour:
Mason 1st class each 3.50 123
Mason 2nd class each 3.50 124
Beldar each 10.00 114
Bhishti each 2.00 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 30 mrretre
Cost for 1 metre Say Rs.
21.1.8 350 mm dia metre
Details of cost for 30 metre
Materials:
350 mm stone ware pipes 60 cm long each 50.00 3803
Carriage of pipes 100m 0.30 2230
10% allowance for breakage on items(I) & (ii)
tonne 0.225 367
Cement of 50 joints = 0.159 cum = 0.225 tonne
Carriage of cement tonne 0.225 2209
Fine sand cum 0.159 983
Carriage of fine sand cum 0.159 2261
Spun yarn of plain gaskin @ 0.42 kg per joint =
kg 21.00 1881
0.42x50 = 21.00 kg.
Labour:
Mason 1st class each 2.83 123
Mason 2nd class each 2.83 124
Beldar each 7.33 114
Bhishti each 1.67 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 30 mrretre
Cost for 1 metre Say Rs.
21.1.9 400 mm dia metre
Details of cost for 30 metre
Materials:
400 mm stone ware pipes 60 cm long each 50.00 3804
Carriage of pipes 100m 0.30 2231
10% allowance for breakage on items(I) & (ii)
tonne 0.256 367
Cement of 50 joints = 0.181 cum = 0.256 tonne
Carriage of cement tonne 0.256 2209
Fine sand cum 0.181 983
Carriage of fine sand cum 0.181 2261
Spun yarn of plain gaskin @ 0.48 kg per joint =
kg 24.00 1881
0.48x50 = 24 kg.
Labour:
Mason 1st class each 3.17 123
Mason 2nd class each 3.17 124
Beldar each 8.67 114
Bhishti each 1.83 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 30 mrretre
Cost for 1 metre Say Rs.

Providing, laying and jointing glazed stoneware


pipes grade 'A' with stiff mixture of cement mortar in
the proportion of 1:3(1 cement :3 fine sand)
21.1A including testing of joints etc. complete.
21.1A.1 100 mm dia metre
Details of cost for 30 metre
Materials:
100 mm stone ware pipes 60 cm long each 50.00 1854
Carriage of pipes 100m 0.30 2224
10% allowance for breakage on items(I) & (ii)
tonne 0.03 367
Cement of 50 joints = 0.0225 cum = 0.032 tonne
Carriage of cement tonne 0.03 2209
Fine sand 3x0.0225 cum = 0.0675 say 0.068 cum cum 0.068 983
Carriage of fine sand cum 0.068 2261
Spun yarn of plain gaskin @ 0.09 kg per joint =
kg 4.50 1881
0.09x50 = 4.50 kg.
Labour:
Mason 1st class each 1.00 123
Mason 2nd class each 1.00 124
Beldar each 3.00 114
Bhishti each 1.00 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 30 mrretre
Cost for 1 metre Say Rs.
21.1A.2 150 mm dia metre
Details of cost for 30 metre
Materials:
150 mm stone ware pipes 60 cm long each 50.00 1855
Carriage of pipes 100m 0.30 2225
10% allowance for breakage on items(I) & (ii)
tonne 0.048 367
Cement of 50 joints = 0.034 cum = 0.048 tonne
Carriage of cement tonne 0.048 2209
Fine sand 3x0.034 cum = 0.102cum cum 0.102 983
Carriage of fine sand cum 0.102 2261
Spun yarn of plain gaskin @ 0.18 kg per joint =
kg 9.00 1881
0.18x50 = 9 kg.
Labour:
Mason 1st class each 1.50 123
Mason 2nd class each 1.50 124
Beldar each 4.00 114
Bhishti each 1.00 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 30 mrretre
Cost for 1 metre Say Rs.
21.1A.3 200 mm dia metre
Details of cost for 30 metre
Materials:
200 mm stone ware pipes 60 cm long each 50.00 1856
Carriage of pipes 100m 0.30 2226
10% allowance for breakage on items(I) & (ii)
tonne 0.064 367
Cement of 50 joints = 0.0455 cum = 0.064 tonne
Carriage of cement tonne 0.064 2209
Fine sand 3x 0.0455 = 0.1365 cum say 0.137 cum cum 0.137 983
Carriage of fine sand cum 0.137 2261
Spun yarn of plain gaskin @ 0.24 kg per joint =
kg 12.00 1881
0.24x50 = 12.00 kg.
Labour:
Mason 1st class each 1.75 123
Mason 2nd class each 1.75 124
Beldar each 4.50 114
Bhishti each 1.25 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 30 mrretre
Cost for 1 metre Say Rs.
21.1A.4 230 mm dia metre
Details of cost for 30 metre
Materials:
230 mm stone ware pipes 60 cm long each 50.00 1857
Carriage of pipes 100m 0.30 2227
10% allowance for breakage on items(I) & (ii)
tonne 0.072 367
Cement of 50 joints = 0.051 cum = 0.072 tonne
Carriage of cement tonne 0.072 2209
Fine sand 3x 0.051 = 0.153 cum cum 0.153 983
Carriage of fine sand cum 0.153 2261
Spun yarn of plain gaskin @ 0.27 kg per joint =
kg 13.50 1881
0.27x50 = 13.50 kg.
Labour:
Mason 1st class each 2.00 123
Mason 2nd class each 2.00 124
Beldar each 5.00 114
Bhishti each 1.50 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 30 mrretre
Cost for 1 metre Say Rs.
21.1A.5 250 mm dia metre
Details of cost for 30 metre
Materials:
250 mm stone ware pipes 60 cm long each 50.00 1858
Carriage of pipes 100m 0.30 2228
10% allowance for breakage on items(I) & (ii)
tonne 0.080 367
Cement of 50 joints = 0.0566 cum = 0.080 tonne
Carriage of cement tonne 0.080 2209
Fine sand 3x0.0566 cum = 0.1698 say 0.17 cum cum 0.170 983
Carriage of fine sand cum 0.170 2261
Spun yarn of plain gaskin @ 0.30 kg per joint =
kg 15.00 1881
0.30x50 = 15.00 kg.
Labour:
Mason 1st class each 2.25 123
Mason 2nd class each 2.25 124
Beldar each 5.50 114
Bhishti each 1.50 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 30 mrretre
Cost for 1 metre Say Rs.
21.1A.6 300 mm dia metre
Details of cost for 30 metre
Materials:
300 mm stone ware pipes 60 cm long each 50.00 1859
Carriage of pipes 100m 0.30 2229
10% allowance for breakage on items(I) & (ii)
tonne 0.096 367
Cement of 50 joints = 0.0.68 cum = 0.096 tonne
Carriage of cement tonne 0.096 2209
Fine sand 3x0.068 cum = 0.204 cum cum 0.204 983
Carriage of fine sand cum 0.204 2261
Spun yarn of plain gaskin @ 0.36 kg per joint =
kg 18.00 1881
0.36x50 = 18 kg.
Labour:
Mason 1st class each 2.50 123
Mason 2nd class each 2.50 124
Beldar each 6.00 114
Bhishti each 1.50 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 30 mrretre
Cost for 1 metre Say Rs.

21.1A.7 350 mm dia metre


Details of cost for 30 metre
Materials:
350 mm stone ware pipes 60 cm long each 50.00 3803
Carriage of pipes 100m 0.30 2230
10% allowance for breakage on items(I) & (ii)
tonne 0.112 367
Cement of 50 joints = 0.0795 cum = 0.112 tonne
Carriage of cement tonne 0.112 2209
Fine sand 3x0.0795 cum = 0.2385 cum say 0.239
cum 0.239 983
cum
Carriage of fine sand cum 0.239 2261
Spun yarn of plain gaskin @ 0.42 kg per joint =
kg 21.00 1881
0.42x50 = 21.00 kg.
Labour:
Mason 1st class each 2.83 123
Mason 2nd class each 2.83 124
Beldar each 7.33 114
Bhishti each 1.67 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 30 mrretre
Cost for 1 metre Say Rs.

21.1A.8 400 mm dia metre


Details of cost for 30 metre
Materials:
400 mm stone ware pipes 60 cm long each 50.00 3804
Carriage of pipes 100m 0.30 2231
10% allowance for breakage on items(I) & (ii)
Cement of 50 joints = 0.362/4 = 0.0905 cum say tonne 0.129 367
0.091 cum = 0.129 tonne
Carriage of cement tonne 0.129 2209
Fine sand 3x0.0905 = 0.2715 cum say 0.272 cum cum 0.272 983
Carriage of fine sand cum 0.272 2261
Spun yarn of plain gaskin @ 0.48 kg per joint =
kg 24.00 1881
0.48x50 = 24 kg.
Labour:
Mason 1st class each 3.17 123
Mason 2nd class each 3.17 124
Beldar each 8.67 114
Bhishti each 1.83 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 30 mrretre
Cost for 1 metre Say Rs.

21.1A.9 450 mm dia metre


Details of cost for 30 metre
Materials:
450 mm stone ware pipes 60 cm long each 50.00 3804
Carriage of pipes 100m 0.30 2231
10% allowance for breakage on items(I) & (ii)
tonne 0.144 367
Cement of 50 joints = 0.102 cum = 0.144 tonne
Carriage of cement tonne 0.144 2209
Fine sand 0.306 cum cum 0.306 983
Carriage of fine sand cum 0.306 2261
Spun yarn of plain gaskin @ 0.54 kg per joint =
kg 27.00 1881
0.54x50 = 27 kg.
Labour:
Mason 1st class each 3.50 123
Mason 2nd class each 3.50 124
Beldar each 10.00 114
Bhishti each 2.00 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 30 mrretre
Cost for 1 metre Say Rs.

Providing and laying cement concrete 1:5:10 (1


cement:5 coarse sand:10 graded stone aggregate
40 mm nominal size) alround S.W. pipes including
21.2 bed concrete as per standard design.
21.2.1 100 mm diameter S.W. pipe
Area = Wx(W/2)+½ x(pai/4xw 2) - (pai/4xd2)
= W 2(½+½xpai/4) - (pai/4xd2)

Where
W = D+X
D = 100+12+12 = 124 mm or 12.4 cum
X = 300 mm as trch depth is less than 1200 mm cum 1.48
Area = (30.0+12.4)2 (0.5+ pai x 1/8) - pai x ¼ x
(12.4)2
= (42.4)2 (0.50+3.14/8) - 3.14/4x(12.4) 2
= (1797.76) (0.89) - 0.7854 x 153.76
= 1600.01 - 120.76 = 1479.2 sq.cm
= 0.1479 sqm say 0.148 sqm
For 10 lenght qty. of conc. reqd. = 1.48 cum
(Rate vide code no. 4.5.10 of SH : concrete work)
Cost for 10 metres
Cost pr metre Say Rs.

21.2.2 150 mm diameter S.W. pipe


Area = Wx(W/2)+½ x(pai/4xw 2) - (pai/4xd2)
= W 2(½+½xpai/4) - (pai/4xd2)
Where
W = D+X
D = 150+16+16 = 182 mm or 18.2 cum
X = 300 mm as trch depth is less than 1200 mm
Area = (30.0+18.2)2 (0.5+ pai x 1/8) - pai x ¼ x
(18.2)2 cum 1.81
= (42.4)2 (0.50+3.14/8) - 3.14/4x(18.2) 2
= (2323.24) (0.89) - 260.02
= 2067.68 - 260.02 = 1807.66 sq.cm
= 0.1808 sqm say 0.181 sqm
For 10 lenght qty. of conc. reqd. = 1.81 cum
(Rate vide code no. 4.5.10 of SH : concrete work)
Cost for 10 metres
Cost pr metre Say Rs.

21.2.3 200 mm diameter S.W. pipe


Area = Wx(W/2)+½ x(pai/4xw 2) - (pai/4xd2)
= W 2(½+½xpai/4) - (pai/4xd2)
Where
W = D+X
D = 200+17+17 = 234 mm or 23.4 cum
X = 300 mm
Area = (30.0+23.4)2 (0.5+ pai x 1/8) - pai x ¼ x
(23.4)2 cum 2.11
= (53.4)2 (0.50+3.14/8) - 3.14/4x(23.4) 2
= (2851.56) (0.89) - 429.83
= 2537.89 - 429.83 = 2108.06 sq.cm
= 0.2108 sqm say 0.211 sqm
For 10 lenght qty. of conc. reqd. = 2.11 cum
(Rate vide code no. 4.5.10 of SH : concrete work)
Cost for 10 metres
Cost pr metre Say Rs.

21.2.4 230 mm diameter S.W. pipe


Area = Wx(W/2)+½ x(pai/4xw 2) - (pai/4xd2)
= W 2(½+½xpai/4) - (pai/4xd2)
Where
W = D+X
D = 230+19+19 = 268 mm or 26.8 cum
X = 300 mm
Area = (30.0+26.8)2 (0.5+ pai x 1/8) - pai x ¼ x
(26.8)2 cum 2.31
= (56.8)2 (0.50+3.14/8) - 3.14/4x(26.8) 2
= 2307.53 sq.cm.
=0.2308 sqm say 0.231 sqm
For 10 lenght qty. of conc. reqd. = 2.31 cum
(Rate vide code no. 4.5.10 of SH : concrete work)
Cost for 10 metres
Cost pr metre Say Rs.
21.2.5 250 mm diameter S.W. pipe
Area = Wx(W/2)+½ x(pai/4xw 2) - (pai/4xd2)
= W 2(½+½xpai/4) - (pai/4xd2)
Where
W = D+X
D = 250+20+20 = 290 mm or 29.0 cum
X = 300 mm as trch depth is less than 1200 mm
W = 30.00+29.0 = 59.00 cm
Area = (30.0+29.0)2 (0.5+ pai x 1/8) - pai x ¼ x
(29.0)2 cum 2.44
= (59.0)2 (0.50+3.14/8) - 3.14/4x(29.0) 2
= (3098.09) - 660.19

= 2437.90 sq.cm.
=0.24379 sqm say 0.244 sqm
For 10 lenght qty. of conc. reqd. = 2.44 cum
(Rate vide code no. 4.5.10 of SH : concrete work)
Cost for 10 metres
Cost pr metre Say Rs.

21.2.6 300 mm diameter S.W. pipe


Area = Wx(W/2)+½ x(pai/4xw 2) - (pai/4xd2)
= W 2(½+½xpai/4) - (pai/4xd2)
Where
W = D+X
D = 300+25+25 = 350 mm or 35.0 cum
X = 300 mm = 30 cm
W = 30+35 = 65 cm
Area = (30.0+35.0)2 (0.5+ pai x 1/8) - pai x ¼ x cum 2.80
(35.0)2
= (65.0)2 (0.50+3.14/8) - 3.14/4x(35.0) 2
= 2798.68 sq.cm.
= 0.2799 sqm say 0.280 sqm
For 10 lenght qty. of conc. reqd. = 2.80 cum
(Rate vide code no. 4.5.10 of SH : concrete work)
Cost for 10 metres
Cost pr metre Say Rs.

21.2.7 350 mm diameter S.W. pipe


Area = Wx(W/2)+½ x(pai/4xw 2) - (pai/4xd2)
= W 2(½+½xpai/4) - (pai/4xd2)
Where
W = D+X
D = 350+30+30 = 410 mm or 41.0 cum
X = 300 mm = 30 cm
W = 30+41 = 71 cm
Area = (30.0+41.0 )2 (0.5+ pai x 1/8) - pai x ¼ x cum 3.17
(41.0 )2
= (71.0)2 (0.50+3.14/8) - 3.14/4x(41.0 ) 2
= 3166.9 sq.cm.
= 0.3167 sqm say 0.317 sqm
For 10 lenght qty. of conc. reqd. = 3.17 cum
(Rate vide code no. 4.5.10 of SH : concrete work)
Cost for 10 metres
Cost pr metre Say Rs.

21.2.8 400 mm diameter S.W. pipe


Area = Wx(W/2)+½ x(pai/4xw 2) - (pai/4xd2)
= W 2(½+½xpai/4) - (pai/4xd2)
Where
W = D+X
D = 400+35+35 = 470 mm or 47.0 cum
X = 300 mm = 30 cm
W = 30+47 = 77 cm
Area = (30.0+47.0 )2 (0.5+ pai x 1/8) - pai x ¼ x cum 3.54
(47.0 )2
= (77.0)2 (0.50+3.14/8) - 3.14/4x(47.0 ) 2
= 3542.74 sq.cm.
= 0.3543 sqm say 0.354 sqm
For 10 lenght qty. of conc. reqd. = 3.54 cum
(Rate vide code no. 4.5.10 of SH : concrete work)
Cost for 10 metres
Cost pr metre Say Rs.

21.2.9 450 mm diameter S.W. pipe


Area = Wx(W/2)+½ x(pai/4xw 2) - (pai/4xd2)
= W 2(½+½xpai/4) - (pai/4xd2)

Where
W = D+X
D = 450+38+38 = 526 mm or 52.6 cum
X = 300 mm
W = 30+52.6 =82.6 cm cum 3.90
Area = (30.0+52.6 )2 (0.5+ pai x 1/8) - pai x ¼ x
(52.6 )2
= (82.6)2 (0.50+3.14/8) - 3.14/4x(52.6 ) 2
= 3900.35 sq.cm.
= 0.390 sqm
For 10 lenght qty. of conc. reqd. = 3.90 cum
(Rate vide code no. 4.5.10 of SH : concrete work)
Cost for 10 metres
Cost pr metre Say Rs.

Providing and laying cement concrete 1:5:10 (1


cement:5 coarse sand:10 graded stone aggregate
40 mm nominal size) up to haunches of S.W. pipes
21.3 including bed concrete as per standard design.
21.3.1 100 mm diameter S.W. pipe
Details of cost for 10 metres length pipe
Area = WxD +2x½ x R (CotQ)xR-2 [ R2/2(pai/2-Q)] -
(pai/2) R2
= WD 1+R2(CotQ)-R2(pai/2-Q) - (pai/2)R2
=
WD 1+R2(CotQ - pai) + R2Q
= WD 1+R2(CotQ - pai + Q)
Where
Sin Q = [R/(W/2)] = 2R/W
W = D+X;x =300 mm, D = 100+12+12 = 124 mm
W = 124+300 = 424 mm
D1 = Depth = 100+( ½ x 124 ) = 162 mm
R = 62 mm
sin Q = (2x62)/424 = 0.292 therefore Q = 17º 0' cum 0.7
Hence Tan Q = 0.3057
Area = 424x162+(62)2 (Cot Q - pai + Q)
= [ 68688+3844 ( 1/0.3057 - 180º + 17º 0')] sqmm
= [ 68688+3844 (3.27 - 163 x 3.14/180)]sqmm
= (68688+3844x0.43) sqmm
= (68688+1652.92) sqmm = 70340.92 sqmm
say 70341 sqmm or 0.070341 sqm
For 10 meter lenght qty. of concrete required=
0.07034 x 10 = 0.7034 cum
(Rate vide code no. 4.5.10 of sub-head concrete)

Cost for 10 metres


Cost pr metre Say Rs.
21.3.2 150 mm diameter S.W. pipe
Details of cost for 10 metres length pipe
Area = WxD 1 +2x½ x R (CotQ)xR-2 [ R2/2(pai/2-Q)]
- (pai/2) R2
= WD 1+R2(CotQ)-R2(pai/2-Q) - (pai/2)R2
=
WD 1+R2(CotQ - pai) + R2Q
= WD 1+R2(CotQ - pai + Q)
Where
Sin Q = [R/(W/2)] = 2R/W
W = D+X;x =300 mm, D = 150+16+16 = 182 mm
W = 182+300 = 482 mm
D1 = Depth = 150+( ½ x 182 ) = 241 mm
R = 91 mm
sin Q = (2x91)/482 = 0.3776 therefore Q = 22º 12'
Hence Tan Q = 0.4081 cum 1.14
Area = 482x241+(91)2 (Cot Q - pai + Q)
= [ 116162+8281 ( 1/0.4081 - 180º + 22º 12')] sqmm
= [ 116162+8281 (2.45 - 157º 48"x 3.14/180)]sqmm
= [116162+8281x(2.45 - 2.75] sqmm
= [116162+8281x (- 0.30) ] sqmm
= [116162- 2484.3]
= 113677.7 sqmm or 0.1136777 sqm
For 10 meter lenght qty. of concrete required=
0.1136777 x 10 = 1.136777 cum say 1.14 cum
(Rate vide code no. 4.5.10 of sub-head concrete)

Cost for 10 metres


Cost pr metre Say Rs.

21.3.3 200 mm diameter S.W. pipe


Details of cost for 10 metres length pipe
Area = WxD 1 +2x½ x R (CotQ)xR-2 [ R2/2(pai/2-Q)]
- (pai/2) R2
= WD 1+R2(CotQ)-R2(pai/2-Q) - (pai/2)R2
=
WD 1+R2(CotQ - pai) + R2Q
= WD 1+R2(CotQ - pai + Q)
Where
Sin Q = [R/(W/2)] = 2R/W
W = D+X;x =300 mm, D = 200+17+17 = 234 mm
W = 234+300 = 534 mm
D1 = Depth = 150+( ½ x 234 ) = 267 mm
R = 117 mm
sin Q = (2x117)/534 = 0.4382 therefore Q = 26º 0'
Hence Tan Q = 0.4877 cum 1.34
Area = 534x267+(117)2 (Cot Q - pai + Q)
= [ 142578+13689 ( 1/0.4877 - 180º + 26º 0')] sqmm
= [ 142578+13689 (2.05 - 154º 0"x 3.14/180)]sqmm
= [142578+13689x(2.05 - 2.69] sqmm
= [142578+13689x (- 0.64) ] sqmm
= [116162- 8760.96]
= 133817.04 sqmm or 0.134 sqm
For 10 meter lenght qty. of concrete required= 0.134
x 10 = 1.34
(Rate vide code no. 4.5.10 of sub-head concrete)

Cost for 10 metres


Cost pr metre Say Rs.

21.3.4 230 mm diameter S.W. pipe


Details of cost for 10 metres length pipe
Area = WxD 1 +2x½ x R (CotQ)xR-2 [ R2/2(pai/2-Q)]
- (pai/2) R2
= WD 1+R2(CotQ)-R2(pai/2-Q) - (pai/2)R2
=
WD 1+R2(CotQ - pai) + R2Q
= WD 1+R2(CotQ - pai + Q)
Where
Sin Q = [R/(W/2)] = 2R/W
W = D+X;x =300 mm, D = 230+19+19 = 268 mm
W = 268+300 = 658 mm
D1 = Depth = 150+( ½ x 268 ) = 284 mm
R = 134 mm
sin Q = (2x134)/568 = 0.47183 therefore Q = 28º 9'
Hence Tan Q = 0.5351
Area = 568x284+(134)2 (Cot Q - pai + Q) cum 1.47
= [ 161312+17956 ( 1/0.5351 - 180º + 22º 12')]
sqmm
= [ 161312+17956 (1.87 - 151º 51"x 3.14/180)]sqmm
= [161312+17956x(1.87 - 2.65] sqmm
= [161312+17956x (- 0.78) ] sqmm
= [116162- 14005.68]
= 147306 sqmm or 0.147 sqm
For 10 meter lenght qty. of concrete required= 0.147
x 10 = 1.47
(Rate vide code no. 4.5.10 of sub-head concrete)

Cost for 10 metres


Cost pr metre Say Rs.

21.3.5 250 mm diameter S.W. pipe


Details of cost for 10 metres length pipe
Area = WxD 1 +2x½ x R (CotQ)xR-2 [ R2/2(pai/2-Q)]
- (pai/2) R2
= WD 1+R2(CotQ)-R2(pai/2-Q) - (pai/2)R2
=
WD 1+R2(CotQ - pai) + R2Q
= WD 1+R2(CotQ - pai + Q)
Where
Sin Q = [R/(W/2)] = 2R/W
W = D+X;x =300 mm, D = 250+20+20 = 290 mm
W = 290+300 = 590 mm
D1 = Depth = 150+( ½ x 290 ) = 295 mm
R = 145 mm
sin Q = (2x145)/590 = 0.49154 therefore Q = 29º 26'
Hence Tan Q = 0.5635
Area = 590x295+(145)2 (Cot Q - pai + Q) cum 1.56
= [ 174050+21025 ( 1/0.5635 - 180º + 29º 26')]
sqmm
= [ 174050+21025 (1.77 - 150º 34"x 3.14/180)]sqmm
= [174050+21025x(1.77 - 2.63] sqmm
= [174050+21025x (- 0.86) ] sqmm
= [174050 - 18081.5]
= 155968.5 sqmm or 0.156 sqm
For 10 meter lenght qty. of concrete required= 0.156
x 10 = 1.56
(Rate vide code no. 4.5.10 of sub-head concrete)

Cost for 10 metres


Cost pr metre Say Rs.

21.3.6 300 mm diameter S.W. pipe


Details of cost for 10 metres length pipe
Area = WxD 1 +2x½ x R (CotQ)xR-2 [ R2/2(pai/2-Q)]
- (pai/2) R2
= WD 1+R2(CotQ)-R2(pai/2-Q) - (pai/2)R2
=
WD 1+R2(CotQ - pai) + R2Q
= WD 1+R2(CotQ - pai + Q)
Where
Sin Q = [R/(W/2)] = 2R/W
W = D+X;x =300 mm, D = 300+25+25 = 350 mm
W = 350+300 = 650 mm
D1 = Depth = 150+( ½ x 350 ) = 325 mm
R = 175 mm
sin Q = (2x175)/650 = 0.5385 therefore Q = 32º 34'
Hence Tan Q = 0.6387
Area = 650x325+(175)2 (Cot Q - pai + Q) cum 1.80
= [ 211250+30625 ( 1/0.6387 - 180º + 32º 34')]
sqmm
= [ 211250+30625 (1.566 - 147º 26"x
3.14/180)]sqmm
= [211250+30625x(1.566 - 2.571] sqmm
= [211250+30625x (- 1.005) ] sqmm
= [211250 - 30778.13]
= 180471.87 sqmm or 0.180 sqm
For 10 meter lenght qty. of concrete required= 0.180
x 10 = 1.80
(Rate vide code no. 4.5.10 of sub-head concrete)

Cost for 10 metres


Cost pr metre Say Rs.

21.3.7 350 mm diameter S.W. pipe


Details of cost for 10 metres length pipe
Area = WxD 1 +2x½ x R (CotQ)xR-2 [ R2/2(pai/2-Q)]
- (pai/2) R2
= WD 1+R2(CotQ)-R2(pai/2-Q) - (pai/2)R2
=
WD 1+R2(CotQ - pai) + R2Q
= WD 1+R2(CotQ - pai + Q)
Where
Sin Q = [R/(W/2)] = 2R/W
W = D+X;x =300 mm, D = 350+30+30 = 410 mm
W = 410+300 = 710 mm
D1 = Depth = 150+( ½ x 410 ) = 355 mm
R = 205 mm
sin Q = (2x205)/710 = 0.5775 therefore Q = 35º 16'
Hence Tan Q = 0.7071
Area = 710x355+(205)2 (Cot Q - pai + Q) cum 2.05
= [ 252050+42025 ( 1/0.7071 - 180º + 35º 16')]
sqmm
= [ 252050+42025 (1.41 - 144º 44"x
3.14/180)]sqmm
= [ 252050+42025x(1.41 - 2.52] sqmm
= [ 252050+42025x (- 1.11) ] sqmm
= [252050 - 46647.75]
= 205402.25 sqmm or 0.205 sqm
For 10 meter lenght qty. of concrete required= 0.205
x 10 = 2.05
(Rate vide code no. 4.5.10 of sub-head concrete)

Cost for 10 metres


Cost pr metre Say Rs.

21.3.8 400 mm diameter S.W. pipe


Details of cost for 10 metres length pipe
Area = WxD 1 +2x½ x R (CotQ)xR-2 [ R2/2(pai/2-Q)]
- (pai/2) R2
= WD 1+R2(CotQ)-R2(pai/2-Q) - (pai/2)R2
=
WD 1+R2(CotQ - pai) + R2Q
= WD 1+R2(CotQ - pai + Q)
Where
Sin Q = [R/(W/2)] = 2R/W
W = D+X;x =300 mm, D = 400+35+35 = 470 mm
W = 470+300 = 770 mm
D1 = Depth = 150+( ½ x 470 ) = 385 mm
R = 235 mm
sin Q = (2x235)/770 = 0.6104 therefore Q = 37º 37'
Hence Tan Q = 0.7706
Area = 770x385+(235)2 (Cot Q - pai + Q) cum 2.31
= [ 296450+55225 ( 1/0.7706 - 180º + 37º 37')]
sqmm
= [ 296450+55225 (1.298 - 142º 23"x
3.14/180)]sqmm
= [ 296450+55225x(1.298 - 2.48] sqmm
= [ 296450+55225x (- 1.182) ] sqmm
= [296450 - 65717.75]
= 230732.25 sqmm or 0.231sqm
For 10 meter lenght qty. of concrete required= 0.231
x 10 = 2.31
(Rate vide code no. 4.5.10 of sub-head concrete)

Cost for 10 metres


Cost pr metre Say Rs.

21.3.9 450 mm diameter S.W. pipe


Details of cost for 10 metres length pipe
Area = WxD 1 +2x½ x R (CotQ)xR-2 [ R2/2(pai/2-Q)]
- (pai/2) R2
= WD 1+R2(CotQ)-R2(pai/2-Q) - (pai/2)R2
=
WD 1+R2(CotQ - pai) + R2Q
= WD 1+R2(CotQ - pai + Q)
Where
Sin Q = [R/(W/2)] = 2R/W
W = D+X;x =300 mm, D = 450+38+38 = 526 mm
W = 526+300 = 826 mm
D1 = Depth = 150+( ½ x 826 ) = 413 mm
R = 263 mm
sin Q = (2x263)/826 = 0.6368 therefore Q = 97º 37'
Hence Tan Q = 0.8258
Area = 826x413+(263)2 (Cot Q - pai + Q) cum 2.55
= [ 341138+69169 ( 1/0.8258 - 180º + 39º 33')]
sqmm
= [ 341138+69169 (1.21 - 140º 27"x
3.14/180)]sqmm
= [ 341138+69169x(1.21 - 2.45] sqmm
= [ 341138+69169x (- 1.24) ] sqmm
= [341138 -85769.56]
= 255368.44 sqmm or 0.255368sqm
For 10 meter lenght qty. of concrete required=
0.255368 x 10 = 2.55
(Rate vide code no. 4.5.10 of sub-head concrete)

Cost for 10 metres


Cost pr metre Say Rs.

P/F square-mouth S.W. gully trap grade 'A' complete


with C.I. Grating brick masonry chamber with bricks
of class designation 75 and water tight C.I. Cover
with frame of 300x300 mm size(inside)the weight of
cover to be not less than 4.50 kg and frame to be
not less than 2.70 kg as per standard design:
21.4
21.4.1 100x100 mm size P type
21.4.1.2 With F.P.S. bricks
Details of cost for one gully trap
100x100 mm Gully trap'P' type each 1.00 1900
C.I. Grating 100x100 mm each 1.00 1364
C.I. Cover with frame 300x300 mm inside each 1.00 1352
Carriage of materials 1 time 1.73 9999
Cement Concrete 1:5:10(1 cement :5 fine sand:10
graded stone aggregate 40 mm nominal size)
0.68x0.68x0.10 m = 0.046 cum
Concrete around trap
0.30x0.30x0.67 m = 0.061 cum
= 0.107 cum
Deduct:
0.345 ÷ 3x[0.09+0.01+(0.09x0.01) ½] = 0.015 cum
pai/4x(0.124)2 x 0.47 =0.006 cum cum 0.09
= 0.021 cum
Net quantity 0.107 cum( -) 0.021 cum
= 0.086 cum say 0.09 cum
(Rate as per item 4.5.11 of subhead : concrete)

Brick work with 75 class designation bricks in


cement mortar 1;5 (1 cement:5 fine sand) cum 0.13
1.66x0.115x0.675 m = 0.129 cum say 0.13 cum
Csement concrete 1:2:4 ( 1 cement :2 coarse sand:4
graded stone aggregate 20 mm nominal size)
1.66x0.115x0.04 m = 0.008 cum cum 0.01
(Rate as per item no. 13.17 of subhead: finishing)

12 mm cement plaster 1:3 (1 cement :3 coarse


sand)finishing with floating coat of near cement:
[1/2x0.358x(1.20+0.40)] = 0.286 sqm. Say 0.29 sqm sqm 0.29
(Rate as per item no. 13.17 of subhead: finishing)

Add for water charges@ 1% on 'A'


Add for contractor's profit and overheads @ 10% on
A+B
Cost for one trap
Say Rs.

21.4.2 100x100 mm size P type


21.4.2.2 With F.P.S. bricks
Details of cost for one gully trap
125x100 mm Gully trap'P' type each 1.00 1901
C.I. Grating 125x125 mm each 1.00 1365
C.I. Cover with frame 300x300 mm inside each 1.00 1352
Carriage of materials 1 time 1.73 9999
Cement Concrete 1:5:10(1 cement :5 fine sand:10
graded stone aggregate 40 mm nominal size)
0.68x0.68x0.10 m = 0.046 cum
Concrete around trap
0.30x0.30x0.67 m = 0.061 cum
= 0.107 cum
Deduct: cum 0.09
0.345 ÷ 3x[0.09+0.01+(0.09x0.01) ½] = 0.015 cum
pai/4x(0.124)2 x 0.47 =0.006 cum
= 0.021 cum
Net quantity 0.107 cum( -) 0.021 cum
= 0.086 cum say 0.09 cum
(Rate as per item 4.5.11 of subhead : concrete)
Brick work with 75 class designation bricks in
cement mortar 1;5 (1 cement:5 fine sand) cum 0.13
1.66x0.115x0.675 m = 0.129 cum say 0.13 cum
Csement concrete 1:2:4 ( 1 cement :2 coarse sand:4
graded stone aggregate 20 mm nominal size)
1.66x0.115x0.04 m = 0.008 cum cum 0.01
(Rate as per item no. 13.17 of subhead: finishing)

12 mm cement plaster 1:3 (1 cement :3 coarse


sand)finishing with floating coat of near cement:
[1/2x0.358x(1.20+0.40)] = 0.286 sqm. Say 0.29 sqm sqm 0.29
(Rate as per item no. 13.17 of subhead: finishing)

Add for water charges@ 1% on 'A'


Add for contractor's profit and overheads @ 10% on
A+B
Cost for one trap
Say Rs.

21.4.3 150x100 mm size P type


21.4.3.2 With F.P.S. bricks
Details of cost for one gully trap
150x100 mm Gully trap'P' type each 1.00 1902
C.I. Grating 150x150 mm each 1.00 1366
C.I. Cover with frame 300x300 mm inside each 1.00 1352
Carriage of materials 1 time 1.73 9999
Cement Concrete 1:5:10(1 cement :5 fine sand:10
graded stone aggregate 40 mm nominal size)
0.68x0.68x0.10 m = 0.046 cum
Concrete around trap
0.30x0.30x0.675 m = 0.061 cum
= 0.107 cum
Deduct: cum 0.08
0.322 ÷ 3x[0.09+0.23+(0.09x0.023) ½] = 0.017 cum
pai/4x(0.124)2 x 0.485 =0.006 cum
= 0.023 cum
Net quantity 0.107 cum( -) 0.023 cum
= 0.086 cum say 0.08 cum
(Rate as per item 4.5.11 of subhead : concrete)
Brick work with 75 class designation bricks in
cement mortar 1;5 (1 cement:5 fine sand) cum 0.13
1.66x0.115x0.675 m = 0.129 cum say 0.13 cum
Csement concrete 1:2:4 ( 1 cement :2 coarse sand:4
graded stone aggregate 20 mm nominal size)
1.66x0.115x0.04 m = 0.008 cum cum 0.01
(Rate as per item no. 13.17 of subhead: finishing)

12 mm cement plaster 1:3 (1 cement :3 coarse


sand)finishing with floating coat of near cement:
[1/2x0.337x(1.20+0.60)] = 0.303 sqm. Say 0.30 sqm sqm 0.30
(Rate as per item no. 13.17 of subhead: finishing)

Add for water charges@ 1% on 'A'


Add for contractor's profit and overheads @ 10% on
A+B
Cost for one trap
Say Rs.

21.4.4 180x100 mm size P type


21.4.4.2 With F.P.S. bricks
Details of cost for one gully trap
180x100 mm Gully trap'P' type each 1.00 1903
C.I. Grating 180x180 mm each 1.00 1367
C.I. Cover with frame 300x300 mm inside each 1.00 1352
Carriage of materials 1 time 1.73 9999
Cement Concrete 1:5:10(1 cement :5 fine sand:10
graded stone aggregate 40 mm nominal size)
0.65x0.65x0.10 m = 0.042 cum
Concrete around trap
0.30x0.30x0.675 m = 0.061 cum
= 0.103 cum
Deduct: cum 0.08
0.295 ÷ 3x[0.09+0.32+(0.09x0.032) ½] = 0.017 cum
pai/4x(0.124)2 x 0.480 =0.006 cum
= 0.023 cum
Net quantity 0.103 cum( -) 0.08 cum
(Rate as per item 4.5.11 of subhead : concrete)
Brick work with 75 class designation bricks in
cement mortar 1;5 (1 cement:5 fine sand) cum 0.13
1.66x0.115x0.675 m = 0.129 cum say 0.13 cum
Csement concrete 1:2:4 ( 1 cement :2 coarse sand:4
graded stone aggregate 20 mm nominal size)
1.66x0.115x0.04 m = 0.008 cum cum 0.01
(Rate as per item no. 13.17 of subhead: finishing)

12 mm cement plaster 1:3 (1 cement :3 coarse


sand)finishing with floating coat of near cement:
[1/2x0.301x(1.20+0.72)] = 0.289 sqm. Say 0.29 sqm sqm 0.29
(Rate as per item no. 13.17 of subhead: finishing)

Add for water charges@ 1% on 'A'


Add for contractor's profit and overheads @ 10% on
A+B
Cost for one trap
Say Rs.

21.4.5 180x150 mm size P type


21.4.5.2 With F.P.S. bricks
Details of cost for one gully trap
180x150 mm Gully trap'P' type each 1.00 1903
C.I. Grating 180x180 mm each 1.00 1367
C.I. Cover with frame 300x300 mm inside each 1.00 1352
Carriage of materials 1 time 1.73 9999
Cement Concrete 1:5:10(1 cement :5 fine sand:10
graded stone aggregate 40 mm nominal size)
0.68x0.68x0.10 m = 0.046 cum
Concrete around trap
0.30x0.30x0.675 m = 0.061 cum
= 0.107 cum
Deduct: cum 0.08
0.155 ÷ 3x[0.09+0.32+(0.09x0.032) ½] = 0.008 cum
pai/4x(0.182)2 x 0.70 =0.018 cum
= 0.026 cum
Net quantity 0.107 cum( -) 0.026 cum
= 0.081 cum say 0.08 cum
(Rate as per item 4.5.11 of subhead : concrete)
Brick work with 75 class designation bricks in
cement mortar 1;5 (1 cement:5 fine sand) cum 0.13
1.66x0.115x0.675 m = 0.129 cum say 0.13 cum
Csement concrete 1:2:4 ( 1 cement :2 coarse sand:4
graded stone aggregate 20 mm nominal size)
1.66x0.115x0.04 m = 0.008 cum cum 0.01
(Rate as per item no. 13.17 of subhead: finishing)

12 mm cement plaster 1:3 (1 cement :3 coarse


sand)finishing with floating coat of near cement:
[1/2x0.166x(1.20+0.72)] = 0.159 sqm. Say 0.16 sqm sqm 0.16
(Rate as per item no. 13.17 of subhead: finishing)

Add for water charges@ 1% on 'A'


Add for contractor's profit and overheads @ 10% on
A+B
Cost for one trap
Say Rs.

21.4.6 Deduct for providing


125x100 mm 'Q' type instead of 'P' type trap
Details of cost for one qully trap
Materials:
125x100 gully trap'P' type each 1.00 1901
125x100 mm gully trap'Q' type
each 1.00 1905(-)
Defference.
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for one trap
Say Rs.

21.4.7 Extra for providing 'S' type instead of 'P' type trap
21.4.7.1 125x100 mm size
Details of cost for one qully trap
Materials:
125x100 gully trap 'S' type each 1.00 1906
125x100 mm gully trap'P'type each 1.00 1901
Defference.
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for one trap
Say Rs.

21.4.7.2 150x100 mm size


Details of cost for one qully trap
Materials:
125x100 gully trap 'S' type each 1.00 1907
125x100 mm gully trap'P'type each 1.00 1902
Defference.
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for one trap
Say Rs.

Dismantling of old S.W. pipes including breaking of


joints and bed concrete stacking of useful materials
near the site within 50 m lead and disposal of
21.5 unserviceable materials into municipal dumps:
21.5.1 100 mm diameter
Details of cost for 10m.
Labour:
Beldar each 0.49 114
Coolie each 0.36 115
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 meter
Cost for one meter Say Rs.

21.5.2 150 mm diameter


Details of cost for 10m.
Labour:
Beldar each 0.49 114
Coolie each 0.45 115
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 meter
Cost for one meter Say Rs.

21.5.3 200 mm diameter


Details of cost for 10m.
Labour:
Beldar each 0.49 114
Coolie each 0.51 115
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 meter
Cost for one meter Say Rs.

21.5.4 230 mm diameter


Details of cost for 10m.
Labour:
Beldar each 0.49 114
Coolie each 0.54 115
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 meter
Cost for one meter Say Rs.

21.5.5 250 mm diameter


Details of cost for 10m.
Labour:
Beldar each 0.49 114
Coolie each 0.57 115
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 meter
Cost for one meter Say Rs.

21.5.6 300 mm diameter


Details of cost for 10m.
Labour:
Beldar each 0.49 114
Coolie each 0.63 115
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 meter
Cost for one meter Say Rs.

21.5.7 350 mm diameter


Details of cost for 10m.
Labour:
Beldar each 0.49 114
Coolie each 0.69 115
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 meter
Cost for one meter Say Rs.

21.5.8 400 mm diameter


Details of cost for 10m.
Labour:
Beldar each 0.49 114
Coolie each 0.75 115
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 meter
Cost for one meter Say Rs.

21.5.9 450 mm diameter


Details of cost for 10m.
Labour:
Beldar each 0.49 114
Coolie each 0.81 115
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 meter
Cost for one meter Say Rs.

P/L non-pressure NP2 class(light duty) RCC pipes


with collars jointed with stiff mixture of cement
21.6 mortar in the proportion of joint etc. complete:
21.6.1 100 mm dia R.C.C. pipe
Material:
Details of cost for 10m.
100 mm dia pipe (in 2 m. length = 5 Nos.) metre 10.00 1700
Collars 5 Nos. each 5.00 1714
Carriage of pipes 100m 0.10 2275
Cement for 5 joints = 5x 0.00065= 0.00325 cum =
tonne 0.005 367
0.0048 t say .005 tonne
Carriage of cement tonne 0.005 2209
Fine sand for 5 joints = 0.0013x5 = 0.0065 cum =
cum 0.006 983
0.006 cum
Carriage of sand cum 0.006 2261
Labour:
Mason 1st class each 0.32 123
Mason 2nd class each 0.32 124
Beldar each 0.63 114
Bhishti each 0.16 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.
21.6.2 150 mm dia R.C.C. pipe
Material:
Details of cost for 10m.
150 mm dia pipe (in 2 m. length = 5 Nos.) metre 10.00 1701
Collars 5 Nos. each 5.00 1715
Carriage of pipes 100m 0.10 2281
Cement for 5 joints = 5x 0.0008= 0.004 cum = 0.006
tonne 0.006 367
t
Carriage of cement tonne 0.006 2209
Fine sand for 5 joints = 0.0016x5 = 0.008 cum =
cum 0.008 983
0.006 cum
Carriage of sand cum 0.008 2261
Labour:
Mason 1st class each 0.39 123
Mason 2nd class each 0.39 124
Beldar each 0.78 114
Bhishti each 0.16 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.6.3 250 mm dia R.C.C. pipe


Material:
Details of cost for 10m.
250 mm dia pipe (in 2 m. length = 5 Nos.) metre 10.00 1702
Collars 5 Nos. each 5.00 1716
Carriage of pipes 100m 0.10 2287
Cement for 5 joints = 5x 0.0012= 0.006 cum = 0.009
tonne 0.009 367
t
Carriage of cement tonne 0.009 2209
Fine sand for 5 joints = 0.0024x5 = 0.012 cum cum 0.012 983
Carriage of sand cum 0.012 2261
Labour:
Mason 1st class each 0.54 123
Mason 2nd class each 0.54 124
Beldar each 1.50 114
Bhishti each 0.23 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.6.4 300 mm dia R.C.C. pipe


Material:
Details of cost for 10m.
300 mm dia pipe (in 2.5 m. length = 4 Nos.) metre 10.00 1703
Collars 4 Nos. each 4.00 1717
Carriage of pipes 100m 0.10 2290
Cement for 4 joints = 4x 0.00185= 0.0074 cum =
tonne 0.011 367
0.011 t
Carriage of cement tonne 0.011 2209
Fine sand for 4 joints = 0.0037x4 = 0.0148 cum say
cum 0.015 983
0.015 cum
Carriage of sand cum 0.015 2261
Labour:
Mason 1st class each 0.59 123
Mason 2nd class each 0.59 124
Beldar each 1.16 114
Bhishti each 0.20 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.6.5 450 mm dia R.C.C. pipe


Material:
Details of cost for 10m.
450 mm dia pipe (in 2.5 m. length = 4 Nos.) metre 10.00 1704
Collars 4 Nos. each 4.00 1718
Carriage of pipes 100m 0.10 2299
Cement for 4 joints = 4x 0.0041= 0.0164 cum =
tonne 0.024 367
0.024 t
Carriage of cement tonne 0.024 2209
Fine sand for 4 joints = 0.0082x4 = 0.033 cum cum 0.033 983
Carriage of sand cum 0.033 2261
Labour:
Mason 1st class each 0.75 123
Mason 2nd class each 0.75 124
Beldar each 1.50 114
Bhishti each 0.33 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.6.6 500 mm dia R.C.C. pipe


Material:
Details of cost for 10m.
500 mm dia pipe (in 2.5 m. length = 4 Nos.) metre 10.00 1705
Collars 4 Nos. each 4.00 1719
Carriage of pipes 100m 0.10 2299
Cement for 4 joints = 4x 0.0045= 0.018 cum = 0.026
tonne 0.026 367
t
Carriage of cement tonne 0.026 2209
Fine sand for 4 joints = 0.0089x4 = 0.036 cum cum 0.036 983
Carriage of sand cum 0.036 2261
Labour:
Mason 1st class each 0.81 123
Mason 2nd class each 0.81 124
Beldar each 1.62 114
Bhishti each 0.33 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.6.7 600 mm dia R.C.C. pipe


Material:
Details of cost for 10m.
600 mm dia pipe (in 2.5 m. length = 4 Nos.) metre 10.00 1706
Collars 4 Nos. each 4.00 1720
Carriage of pipes 100m 0.10 2223
Cement for 4 joints = 4x 0.0054= 0.0216 cum =
tonne 0.032 367
0.032 t
Carriage of cement tonne 0.032 2209
Fine sand for 4 joints = 0.0108x4 = 0.043 cum cum 0.043 983
Carriage of sand cum 0.043 2261
Labour:
Mason 1st class each 0.92 123
Mason 2nd class each 0.92 124
Beldar each 1.83 114
Bhishti each 0.33 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.6.8 700 mm dia R.C.C. pipe


Material:
Details of cost for 10m.
700 mm dia pipe (in 2.5 m. length = 4 Nos.) metre 10.00 1707
Collars 4 Nos. each 4.00 1721
Carriage of pipes 100m 0.10 2223
Cement for 4 joints = 4x 0.0062= 0.0248 cum =
tonne 0.037 367
0.037 t
Carriage of cement tonne 0.037 2209
Fine sand for 4 joints = 0.0124x4 = 0.0496 cumsay
cum 0.05 983
0.05 cum
Carriage of sand cum 0.05 2261
Labour:
Mason 1st class each 1.03 123
Mason 2nd class each 1.03 124
Beldar each 2.06 114
Bhishti each 0.42 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.6.9 800 mm dia R.C.C. pipe


Material:
Details of cost for 10m.
800 mm dia pipe (in 2.5 m. length = 4 Nos.) metre 10.00 1709
Collars 4 Nos. each 4.00 1723
Carriage of pipes 100m 0.10 2223
Cement for 4 joints = 4x 0.0072= 0.0288 cum =
tonne 0.042 367
0.042 t
Carriage of cement tonne 0.042 2209
Fine sand for 4 joints = 0.0143x4 = 0.0572 cumsay
cum 0.057 983
0.057 cum
Carriage of sand cum 0.057 2261
Labour:
Mason 1st class each 1.14 123
Mason 2nd class each 1.14 124
Beldar each 2.28 114
Bhishti each 0.42 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.6.10 900 mm dia R.C.C. pipe


Material:
Details of cost for 10m.
900 mm dia pipe (in 2.5 m. length = 4 Nos.) metre 10.00 1710
Collars 4 Nos. each 4.00 1724
Carriage of pipes 100m 0.10 2331
Cement for 4 joints = 4x 0.0082= 0.0328 cum =
tonne 0.049 367
0.0488 t say 0.049 t.
Carriage of cement tonne 0.049 2209
Fine sand for 4 joints = 0.0164x4 = 0.066 cum cum 0.066 983
Carriage of sand cum 0.066 2261
Labour:
Mason 1st class each 1.25 123
Mason 2nd class each 1.25 124
Beldar each 3.00 114
Bhishti each 0.50 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.6.11 1000 mm dia R.C.C. pipe


Material:
Details of cost for 10m.
1000 mm dia pipe (in 2.5 m. length = 4 Nos.) metre 10.00 1711
Collars 4 Nos. each 4.00 1725
Carriage of pipes 100m 0.10 2332
Cement for 4 joints = 4x 0.0092= 0.0368 cum =
tonne 0.055 367
0.055 t
Carriage of cement tonne 0.055 2209
Fine sand for 4 joints = 0.0185x4 = 0.074 cum cum 0.074 983
Carriage of sand cum 0.074 2261
Labour:
Mason 1st class each 1.36 123
Mason 2nd class each 1.36 124
Beldar each 4.33 114
Bhishti each 0.50 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.6.12 1100 mm dia R.C.C. pipe


Material:
Details of cost for 10m.
1100 mm dia pipe (in 2.5 m. length = 4 Nos.) metre 10.00 1712
Collars 4 Nos. each 4.00 1726
Carriage of pipes 100m 0.10 2333
Cement for 4 joints = 4x 0.0103= 0.0412 cum =
tonne 0.061 367
0.061 t
Carriage of cement tonne 0.061 2209
Fine sand for 4 joints = 0.0206x4 = 0.0824 cumsay
cum 0.082 983
0.082 cum
Carriage of sand cum 0.082 2261
Labour:
Mason 1st class each 1.47 123
Mason 2nd class each 1.47 124
Beldar each 6.30 114
Bhishti each 0.60 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.6.13 1200 mm dia R.C.C. pipe


Material:
Details of cost for 10m.
1200 mm dia pipe (in 2.5 m. length = 4 Nos.) metre 10.00 1713
Collars 4 Nos. each 4.00 1727
Carriage of pipes 100m 0.10 2334
Cement for 4 joints = 0.0114x4 = 0.0456 cum =
tonne 0.068 367
0.068 t
Carriage of cement tonne 0.068 2209
Fine sand for 4 joints = 0.0229x4 = 0.0916 cum say
cum 0.092 983
0.092 cum
Carriage of sand cum 0.092 2261
Labour:
Mason 1st class each 1.59 123
Mason 2nd class each 1.59 124
Beldar each 8.67 114
Bhishti each 0.67 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.
P/L class P1,RCC pressure pipes with collars tested
to 20 m. head jointed with stiff mixture of cement
mortar in the proportion 1:2(1 cement ;2 fine sand)
21.7 including testing of joints etc. complete.
21.7.1 100 mm dia R.C.C. pipe
Details of cost for 10 m.
Material:
100 mm dia pipe (in 2 m. length = 5 Nos.) metre 10.00 1728
Collars 5 Nos. each 5.00 1737
Add same as X of item no. 21.6.1
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.7.2 150 mm dia R.C.C. pipe


Details of cost for 10 m.
Material:
150 mm dia pipe (in 2 m. length = 5 Nos.) metre 10.00 1729
Collars 5 Nos. each 5.00 1738
Add same as X of item no. 21.6.2
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.7.3 250 mm dia R.C.C. pipe


Details of cost for 10 m.
Material:
250 mm dia pipe (in 2 m. length = 5 Nos.) metre 10.00 1730
Collars 5 Nos. each 5.00 1739
Add same as X of item no. 21.6.3
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.7.4 300 mm dia R.C.C. pipe


Details of cost for 10 m.
Material:
300 mm dia pipe (in 2.5 m. length = 4Nos.) metre 10.00 1731
Collars 4 Nos. each 4.00 1740
Add same as X of item no. 21.6.4
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.7.5 450 mm dia R.C.C. pipe


Details of cost for 10 m.
Material:
450 mm dia pipe (in 2.5 m. length = 4 Nos.) metre 10.00 1732
Collars 4 Nos. each 4.00 1741
Add same as X of item no. 21.6.5
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.7.6 500 mm dia R.C.C. pipe


Details of cost for 10 m.
Material:
500 mm dia pipe (in 2.5 m. length = 4 Nos.) metre 10.00 1733
Collars 4 Nos. each 4.00 1742
Add same as X of item no. 21.6.6
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.7.7 600mm dia R.C.C. pipe


Details of cost for 10 m.
Material:
600 mm dia pipe (in 2.5 m. length = 4 Nos.) metre 10.00 1734
Collars 4 Nos. each 4.00 1743
Add same as X of item no. 21.6.7
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.7.8 700 mm dia R.C.C. pipe


Details of cost for 10 m.
Material:
700 mm dia pipe (in 2.5 m. length = 4 Nos.) metre 10.00 1735
Collars 4 Nos. each 4.00 1744
Add same as X of item no. 21.6.8
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.
21.7.9 80 mm dia R.C.C. pipe
Details of cost for 10 m.
Material:
80 mm dia pipe (in 2 length = 5 Nos.) class P1 metre 10.00 3786
P1 Collars each 5.00 3840
Carriage of pipes tonne 0.197 2274
Cement for 5 joints = 5x 0.00052 cum = 0.000260
tonne 0.004 367
cum = 0.038 t say 0.0040 tonne
Carriage of cement tonne 0.004 2209
Fine sand for 5 joints = 0.0013x5x08 = 0.0052 cum
cum 0.005 983
say 0.005 cum
Carriage of sand cum 0.005 2261
Labour:
Mason 1st class each 0.26 123
Mason 2nd class each 0.26 124
Beldar each 0.50 114
Bhishti each 0.13 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.7.10 350 mm dia R.C.C. pipe


Details of cost for 10 m.
Material:
350 mm dia pipe (in 2.5 length = 4 Nos.) class P1 metre 10.00 3787
P1 Collars each 4.00 3841
Carriage of pipes tonne 0.197 2293
Cement for 4 joints = 4x 0.0026 cum = 0.00104 cum
tonne 0.015 367
= 0.0147 t say 0.015 tonne
Carriage of cement tonne 0.015 2209
Fine sand for 4 joints = 0.0052x4 = 0.00208 cum
cum 0.021 983
say 0.021 cum
Carriage of sand cum 0.021 2261
Labour:
Mason 1st class each 0.64 123
Mason 2nd class each 0.64 124
Beldar each 1.27 114
Bhishti each 0.24 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.7.11 400 mm dia R.C.C. pipe


Details of cost for 10 m.
Material:
400 mm dia pipe (in 2.5 length = 4 Nos.) class P1 metre 10.00 3788
P1 Collars each 4.00 3842
Carriage of pipes 100m 10.00 2296
Cement for 4 joints = 4x 0.0033 cum = 0.00132 cum
tonne 0.019 367
= 0.0187 t say 0.019 tonne
Carriage of cement tonne 0.019 2209
Fine sand for 4 joints = 0.0067x4 = 0.00268 cum
cum 0.027 983
say 0.027 cum
Carriage of sand cum 0.027 2261
Labour:
Mason 1st class each 0.70 123
Mason 2nd class each 0.70 124
Beldar each 1.39 114
Bhishti each 0.29 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

P/L class P2,RCC pressure pipes with collars tested


to 40 m. head jointed with stiff mixture of cement
mortar in the proportion 1:2(1 cement ;2 fine sand)
21.8 including testing of joints etc. complete.
21.8.1 100 mm dia R.C.C. pipe
Details of cost for 10 m.
Material:
100 mm dia pipe (in 2 m. length = 5 Nos.) metre 10.00 1746
Collars 5 Nos. each 5.00 1753
Add same as X of item no. 21.6.1
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.8.2 150 mm dia R.C.C. pipe


Details of cost for 10 m.
Material:
150 mm dia pipe (in 2 m. length = 5 Nos.) metre 10.00 1747
Collars 5 Nos. each 5.00 1754
Add same as X of item no. 21.6.2
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.8.3 250 mm dia R.C.C. pipe


Details of cost for 10 m.
Material:
250 mm dia pipe (in 2 m. length = 5 Nos.) metre 10.00 1748
Collars 5 Nos. each 5.00 1755
Add same as X of item no. 21.6.3
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.8.4 300 mm dia R.C.C. pipe


Details of cost for 10 m.
Material:
300 mm dia pipe (in 2.5 m. length = 4Nos.) metre 10.00 1749
Collars 4 Nos. each 4.00 1759
Carriage of pipe 100m 0.10 2290
Cement for 4 joints = 0.00205x4 = 0.0082 cum =
tonne 0.01 367
0.012 t
Carriage of cement tonne 0.012 2209
Fine sand for 4 joints = 0.0041x4 = 0.0164 cum say
cum 0.016 983
0.016 cum
Carriage of sand cum 0.016 2261
Labour:
Mason 1st class each 0.59 123
Mason 2nd class each 0.59 124
Beldar each 1.16 114
Bhishti each 0.20 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.8.5 450 mm dia R.C.C. pipe


Details of cost for 10 m.
Material:
450 mm dia pipe (in 2.5 m. length = 4Nos.) metre 10.00 1750
Collars 4 Nos. each 4.00 1757
Carriage of pipe 100m 0.10 2299
Cement for 4 joints = 0.00455x4 = 0.0182 cum =
tonne 0.03 367
0.027 t
Carriage of cement tonne 0.03 2209
Fine sand for 4 joints = 0.0091x4 = 0.0364 cum say
cum 0.036 983
0.036 cum
Carriage of sand cum 0.036 2261
Labour:
Mason 1st class each 0.75 123
Mason 2nd class each 0.75 124
Beldar each 1.50 114
Bhishti each 0.33 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.8.6 500 mm dia R.C.C. pipe


Material:
Details of cost for 10m.
500 mm dia pipe (in 2.5 m. length = 4 Nos.) metre 10.00 1751
Collars 4 Nos. each 4.00 1758
Carriage of pipes 100m 0.10 2299
Cement for 4 joints = 4x 0.00515= 0.0206 cum =
tonne 0.030 367
0.030 t
Carriage of cement tonne 0.030 2209
Fine sand for 4 joints = 0.0103x4 = 0.0412 cum say
cum 0.041 983
0.041
Carriage of sand cum 0.041 2261
Labour:
Mason 1st class each 0.81 123
Mason 2nd class each 0.81 124
Beldar each 1.62 114
Bhishti each 0.33 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.8.7 600 mm dia R.C.C. pipe


Material:
Details of cost for 10m.
600 mm dia pipe (in 2.5 m. length = 4 Nos.) metre 10.00 1752
Collars 4 Nos. each 4.00 1759
Carriage of pipes 100m 0.10 2223
Cement for 4 joints = 4x 0.00635= 0.0254 cum =
tonne 0.038 367
0.038 t
Carriage of cement tonne 0.030 2209
Fine sand for 4 joints = 0.0127x4 = 0.0508 cum say
cum 0.051 983
0.051
Carriage of sand cum 0.051 2261
Labour:
Mason 1st class each 0.92 123
Mason 2nd class each 0.92 124
Beldar each 1.83 114
Bhishti each 0.33 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.8.8 80 mm dia R.C.C. pipe


Details of cost for 10 m.
Material:
80 mm dia pipe (in 2 length = 5 Nos.) class P2 metre 10.00 3794
P2 Collars = 4 Nos. each 5.00 3848
Carriage of pipes tonne 0.197 2274
Cement for 5 joints = 5x 0.00052 cum = 0.00260
tonne 0.004 367
cum = 0.038 t say 0.004 tonne
Carriage of cement tonne 0.004 2209
Fine sand for 5 joints = 0.00104x5 = 0.005 cum say
cum 0.005 983
0.005 cum
Carriage of sand cum 0.005 2261
Labour:
Mason 1st class each 0.26 123
Mason 2nd class each 0.26 124
Beldar each 0.50 114
Bhishti each 0.13 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.8.9 350 mm dia R.C.C. pipe


Details of cost for 10 m.
Material:
350 mm dia pipe (in 2.5 length = 4 Nos.) class P2 metre 10.00 3795
P2 Collars = 4 Nos. each 4.00 3849
Carriage of pipes tonne 0.197 2293
Cement for 4 joints = 4x 0.00288 cum = 0.01152
tonne 0.016 367
cum = 0.016 t
Carriage of cement tonne 0.016 2209
Fine sand for 4 joints = 0.0058x4 = 0.00232 cum
cum 0.023 983
say 0.023 cum
Carriage of sand cum 0.023 2261
Labour:
Mason 1st class each 0.64 123
Mason 2nd class each 0.64 124
Beldar each 1.27 114
Bhishti each 0.24 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.8.10 400 mm dia R.C.C. pipe


Details of cost for 10 m.
Material:
400 mm dia pipe (in 2.5 length = 4 Nos.) class P2 metre 10.00 3796
P2 Collars = 4 Nos. each 4.00 3850
Carriage of pipes 100m 10.00 2296
Cement for 4 joints = 4x 0.00372 cum = 0.01488
tonne 0.021 367
cum = 0.021 t
Carriage of cement tonne 0.021 2209
Fine sand for 4 joints = 0.00744x4 = 0.02976 cum
cum 0.03 983
say 0.03 cum
Carriage of sand cum 0.03 2261
Labour:
Mason 1st class each 0.70 123
Mason 2nd class each 0.70 124
Beldar each 1.39 114
Bhishti each 0.29 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

P/L class P3,RCC pressure pipes with collars tested


to 60 m. head jointed with stiff mixture of cement
mortar in the proportion 1:2(1 cement ;2 fine sand)
21.9 including testing of joints etc. complete.
21.9.1 100 mm dia R.C.C. pipe
Details of cost for 10 m.
Material:
100 mm dia pipe (in 2 m. length = 5 Nos.) metre 10.00 1760
Collars 5 Nos. each 5.00 1764
Add same as X of item no. 21.6.1
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.9.2 150 mm dia R.C.C. pipe


Details of cost for 10 m.
Material:
150 mm dia pipe (in 2 m. length = 5 Nos.) metre 10.00 1761
Collars 5 Nos. each 5.00 1765
Add same as X of item no. 21.6.2
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.9.3 250 mm dia R.C.C. pipe


Details of cost for 10 m.
Material:
250 mm dia pipe (in 2 m. length = 5Nos.) metre 10.00 1762
Collars 5 Nos. each 5.00 1766
Carriage of pipe 100m 0.10 2287
Cement for 5 joints = 0.00135x5 = 0.00675 cum =
tonne 0.01 367
0.01 t
Carriage of cement tonne 0.01 2209
Fine sand for 5joints = 0.0027x5 = 0.0135 cum say
cum 0.014 983
0.014 cum
Carriage of sand cum 0.014 2261
Labour:
Mason 1st class each 0.54 123
Mason 2nd class each 0.54 124
Beldar each 1.05 114
Bhishti each 0.23 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.9.4 300 mm dia R.C.C. pipe


Details of cost for 10 m.
Material:
300 mm dia pipe (in 2.5 m. length = 4Nos.) metre 10.00 1763
Collars 4 Nos. each 4.00 1767
Carriage of pipe 100m 0.10 2290
Cement for 4 joints = 0.00215x4 = 0.0086 cum =
tonne 0.01 367
0.013 t
Carriage of cement tonne 0.01 2209
Fine sand for 4 joints = 0.0043x4 = 0.0172 cum say
cum 0.017 983
0.017 cum
Carriage of sand cum 0.017 2261
Labour:
Mason 1st class each 0.59 123
Mason 2nd class each 0.59 124
Beldar each 1.16 114
Bhishti each 0.20 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.9.5 80 mm dia R.C.C. pipe


Details of cost for 10 m.
Material:
80 mm dia pipe (in 2 length = 5 Nos.) metre 10.00 3797
P3 Collars = 5 Nos. each 5.00 3851
Carriage of pipes tonne 0.197 2274
Cement for 5 joints = 5x 0.0052 cum = 0.0026 cum =
tonne 0.004 367
0.0037 t say 0.004 tonne
Carriage of cement tonne 0.004 2209
Fine sand for 5 joints = 0.00104x5 = 0.00520 cum
cum 0.005 983
say 0.005 cum
Carriage of sand cum 0.005 2261
Labour:
Mason 1st class each 0.26 123
Mason 2nd class each 0.26 124
Beldar each 0.50 114
Bhishti each 0.13 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.
21.9.6 350 mm dia R.C.C. pipe
Details of cost for 10 m.
Material:
350 mm dia pipe (in 2.5 length = 4 Nos.) metre 10.00 3798
P3 Collars = 4 Nos. each 4.00 3852
Carriage of pipes tonne 0.197 2293
Cement for 4 joints = 4x 0.00295 cum = 0.0118 cum
tonne 0.017 367
= 0.017 t
Carriage of cement tonne 0.017 2209
Fine sand for 4 joints = 0.0059x4 = 0.00236 cum
cum 0.024 983
say 0.024 cum
Carriage of sand cum 0.024 2261
Labour:
Mason 1st class each 0.64 123
Mason 2nd class each 0.64 124
Beldar each 1.27 114
Bhishti each 0.24 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.9.7 400 mm dia R.C.C. pipe


Details of cost for 10 m.
Material:
400 mm dia pipe (in 2.5 length = 4 Nos.) metre 10.00 3799
P3 Collars = 4 Nos. each 4.00 3853
Carriage of pipes 100m 10.00 2296
Cement for 4 joints = 4x 0.00375 cum = 0.015
tonne 0.021 367
=1.4126x0.015=0.021 t
Carriage of cement tonne 0.021 2209
Fine sand for 4 joints = 0.0075x4 = 0.0300 cum say
cum 0.03 983
0.03 cum
Carriage of sand cum 0.03 2261
Labour:
Mason 1st class each 0.69 123
Mason 2nd class each 0.69 124
Beldar each 1.38 114
Bhishti each 0.26 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

Providing and laying unreinforced cement concrete


pipes class NP1 with collars jointed with stiff mixture
of cement mortar in the proportion of 1:2 (1
cement:2 fine sand) including testing of joints
21.10 etc.complete:
21.10.1 80 mm dia C.C. pipes(NP1)
Details of cost for 10 metre
Material:
80 mm dia pipes including collars(in 1 metre length =
metre 10.00 3862
10 Nos. ) NP1
Carriage of pipes tonne 0.2 2274
5% allowance for breakage on 'X' cement for 10
tonne 0.01 367
joints = 0.008 tonne
Carriage of cement tonne 0.01 2209
Fine sand for 10 joints cum 0.01 983
Carriage of fine sand cum 0.01 2261
Labour:
Mason 1st class each 0.69 123
Mason 2nd class each 0.69 124
Beldar each 1.38 114
Bhishti each 0.26 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.10.2 100 mm dia C.C. pipes(NP1)


Details of cost for 10 metre
Material:
100 mm dia pipes including collars(in 1 metre length
metre 10.00 3868
= 10 Nos. ) NP1
Carriage of pipes 100m 0.10 2277
5% allowance for breakage on 'X' cement for 10
tonne 0.01 367
joints = 0.0096 tonne say 0.01 t
Carriage of cement tonne 0.01 2209
Fine sand for 10 joints = 10x 0.0013 = 0.013 cum cum 0.01 983
Carriage of fine sand cum 0.01 2261
Labour:
Mason 1st class each 0.64 123
Mason 2nd class each 0.64 124
Beldar each 1.00 114
Bhishti each 0.32 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.10.3 150 mm dia C.C. pipes(NP1)


Details of cost for 10 metre
Material:
150 mm dia pipes including collars(in 1 metre length
metre 10.00 3869
= 10 Nos. ) NP1
Carriage of pipes 100m 0.10 2283
5% allowance for breakage on 'X' cement for 10
tonne 0.01 367
joints = 10x0.0008 =0.008 cum say 0.012 t
Carriage of cement tonne 0.01 2209
Fine sand for 10 joints = 10x 0.0016 = 0.016 cum cum 0.02 983
Carriage of fine sand cum 0.02 2261
Labour:
Mason 1st class each 0.78 123
Mason 2nd class each 0.78 124
Beldar each 1.25 114
Bhishti each 0.32 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.10.34 250 mm dia C.C. pipes(NP1)


Details of cost for 10 metre
Material:
250 mm dia pipes including collars(in 1 metre length
metre 10.00 3870
= 10 Nos. ) NP1
Carriage of pipes 100m 0.10 2289
5% allowance for breakage on 'X' cement for 10
tonne 0.02 367
joints = 10x0.0012 =0.012 cum say 0.018 t
Carriage of cement tonne 0.02 2209
Fine sand for 10 joints = 10x 0.0024 = 0.024 cum cum 0.02 983
Carriage of fine sand cum 0.02 2261
Labour:
Mason 1st class each 1.08 123
Mason 2nd class each 1.08 124
Beldar each 1.50 114
Bhishti each 0.46 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.10.5 300 mm dia C.C. pipes(NP1)


Details of cost for 10 metre
Material:
300 mm dia pipes including collars(in 1 metre length
metre 10.00 3871
= 10 Nos. ) NP1
Carriage of pipes 100m 0.10 2292
5% allowance for breakage on 'X' cement for 10
tonne 0.03 367
joints = 10x0.00185 =0.0185 cum say 0.027 t
Carriage of cement tonne 0.03 2209
Fine sand for 10 joints = 10x 0.0037 = 0.037 cum cum 0.04 983
Carriage of fine sand cum 0.04 2261
Labour:
Mason 1st class each 1.25 123
Mason 2nd class each 1.25 124
Beldar each 1.75 114
Bhishti each 0.50 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.10.6 350 mm dia C.C. pipes(NP1)


Details of cost for 10 metre
Material:
350 mm dia pipes including collars(in 1 metre length
metre 10.00 3800
= 10 Nos. ) NP1
Carriage of pipes 100m 0.10 2295
5% allowance for breakage on 'X' cement for 10
joints = 10x0.0025 =0.025 cum =0.0353 t say 0.035 t tonne 0.04 367

Carriage of cement tonne 0.04 2209


Fine sand for 10 joints = 10x 0.005 = 0.05 cum cum 0.05 983
Carriage of fine sand cum 0.05 2261
Labour:
Mason 1st class each 1.42 123
Mason 2nd class each 1.42 124
Beldar each 2.00 114
Bhishti each 0.54 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.10.7 400 mm dia C.C. pipes(NP1)


Details of cost for 10 metre
Material:
400 mm dia pipes including collars(in 1 metre length
metre 10.00 3801
= 10 Nos. ) NP1
Carriage of pipes 100m 0.10 2298
5% allowance for breakage on 'X' cement for 10
tonne 0.04 367
joints = 10x0.00315 =0.0315 cum say 0.044 t
Carriage of cement tonne 0.04 2209
Fine sand for 10 joints = 10x 0.0066 = 0.063 cum cum 0.06 983
Carriage of fine sand cum 0.06 2261
Labour:
Mason 1st class each 1.59 123
Mason 2nd class each 1.59 124
Beldar each 2.25 114
Bhishti each 0.58 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

21.10.8 450 mm dia C.C. pipes(NP1)


Details of cost for 10 metre
Material:
450 mm dia pipes including collars(in 1 metre length
metre 10.00 3802
= 10 Nos. ) NP1
Carriage of pipes 100m 0.10 2301
5% allowance for breakage on 'X' cement for 10
tonne 0.05 367
joints = 10x0.0038 =0.038 cum say 0.054 t
Carriage of cement tonne 0.05 2209
Fine sand for 10 joints = 10x 0.0076 = 0.076 cum cum 0.08 983
Carriage of fine sand cum 0.08 2261
Labour:
Mason 1st class each 1.76 123
Mason 2nd class each 1.76 124
Beldar each 2.5 114
Bhishti each 0.62 101
Add for water charges@ 1%
Add for contractor's profit and overheads @ 10%
Cost for 10 mrretre
Cost for per metre Say Rs.

Constructing brick masonry manhole with 75 class


designation bricks in cement mortar 1:4 (1 cement:4
coarse sand) RCC top slab with 1:2:4 mix ( 1 cement
:1 coarse sand:4 graded stone aggregate 20 mm
nominal size) foundation concrete 1:4:8 mix (1
cement :4 coarse sand : 8 graded stone aggregate
40 mm nominal size) inside plastering 12 mm thick
with cement mortar 1:3 ( 1 cement :3 coarse sand)
finished with floating coat of neat cement and
making channels in cement concrete 1:2:4 ( 1
cement :1 coarse sand:4 graded stone aggregate 20
mm nominal size) finished with a floating coat of
neat cement complete as per standard design.
21.11
Inside size 90x80 cm and 45 cm deep including C.I.
Cover with frame (light duty) 455 x 610 mm internal
diamensions total weight of cover and frame to be
not less than 38 kg (weight of cover 23 kg and
21.11.1 weight of frame 15 kg)
21.11.1.2 With F.P.S. bricks
Material:
Cement concrete 1:4:8 (1 cement :4 coarse sand : 8
graded stone aggregate 40 mm nominal size) cum 0.43
1.51x1.41x0.20 m = 0.426 cum say 0.43 cum
(Rate as per item 4.5.8 of sub head concrete brick
work with bricks of class designation 75 in
foundation & plinth in cement mortar 1:4 (1cement :4
coarse sand) 4.32x0.23x0.35 m = 0.348 cum Less cum 0.34
pipe 2pai/4(0.15m) 2x0.23m = (-) 0.008 cum
= 0.340 cum
(Rate as per item 6.1.12 of sub head brick work)
1:2:4 ( 1 cement :1 coarse sand:4 graded stone
aggregate 20 mm nominal size) for benching =
2x0.90x(0.80/2)x(0.30+0.20)/2 = 0.18cum Less pipe cum 0.16
1x0.90xpai/4(0.15m)2 = (-) 0.02 cum
= 0.16 cum
(Rate as per item4.5.3 of sub head : concrete)
12 mm cement plaster 1:3 )1 cement :3 coarse
sand) finishing with floating coat of neat cement
3.40mx0.05m =0.17 sqm sqm 0.25
2x1/2x0.80x0.10 m = 0.08 sqm
= 0.25 sqm
(Rate as per item4.5.3 of sub head :finishing)
Reinforced cement concrete work 1:2:4 ( 1 cement
:1 coarse sand:4 graded stone aggregate 20 mm
nominal size)
for slab: 1.36x1.26x0.15 m = 0.257 cum cum 0.22
less cover = 0.61x0.455m = (-) 0.042cum
= 0.215 cum
say 0.22
(Rate as per item 5.3 of sub head RCC work)
Mild steel reinforcement for slab: kg 10.57
= 0.22 cum @ 48.06 kg/cum = 10.57 kg
(Rate as per item 5.29.1 of sub head RCC work)
Form work = 0.90x0.80 = 0.72 sqm
cum 0.44
less cover = 0.61x0.455m = (-)0.278 sqm
= 0.442sqm say 0.44 sqm
Labour:
Mason 1st class each 0.06 123
Mason 2nd class each 0.06 124
C.I. Cover with frame 455x610mm (Inside) each 1.00 1354
Carriage of C.I. Cover and frame 1time 2.60 9999
Painting of C.I. Cover and frame with coal tar 1time 2.60 9999
Sundries 1time 5.20 9999
Add for water charges@ 1% on A+B
Add for contractor's profit and overheads @ 10%
A+B+C
Cost of one manhole
Say Rs.

Inside size 90x80 cm and 60 cm deep including C.I.


Cover with frame (light duty) 455 x 610 mm internal
diamensions total weight of cover and frame to be
not less than 38 kg (weight of cover 23 kg and
21.11.2 weight of frame 15 kg)
21.11.2.2 With F.P.S. bricks
Material:
Cement concrete 1:4:8 (1 cement :4 coarse sand : 8
graded stone aggregate 40 mm nominal size) cum 0.43
1.51x1.41x0.20 m = 0.426 cum say 0.43 cum
(Rate as per item 4.5.8 of sub head concrete brick
work with bricks of class designation 75 in
foundation & plinth in cement mortar 1:4 (1cement :4
coarse sand) 4.32x0.23x0.50 m = 0.497 cum Less
cum 0.49
pipe 2pai/4(0.15m) 2x0.23m = (-) 0.008 cum
= 0.489 cum say
0.49 cum

cement concrete 1:2:4 ( 1 cement :1 coarse sand:4


graded stone aggregate 20 mm nominal size) for
benching = 2x0.90x(0.80/2)x(0.30+0.20)/2 =
0.18cum Less pipe 1x0.90xpai/4(0.15m)2 = (-) cum 0.16
0.02 cum
= 0.16 cum
(Rate as per item 4.5.3 of sub head : concrete)
12 mm cement plaster 1:3 )1 cement :3 coarse
sand) finishing with floating coat of neat cement
3.40mx0.20m =0.68 sqm sqm 0.76
2x1/2x0.80x0.10 m = 0.08 sqm
= 0.76 sqm
(Rate as per item 13.17 of sub-head finishing)
Reinforced cement concrete work 1:2:4
Steel work
Form work
Same as marked 'X' in item no. 21.11.1.2
Extra labour for making channeld
same as marked 'A' in item no. 21.11.1.2
Labour:
Mason 1st class each 0.06 123
Mason 2nd class each 0.06 124
C.I. Cover with frame 455x610mm (Inside) each 1.00 1354
Carriage of C.I. Cover and frame 1time 2.60 9999
Painting of C.I. Cover and frame with coal tar 1time 2.60 9999
Sundries 1time 5.20 9999
Add for water charges@ 1% on A+B
Add for contractor's profit and overheads @ 10%
A+B+C
Cost of one manhole
Say Rs.

Inside size 120x90 cm and 90 cm deep including C.I.


Cover with frame (light duty) 500mm internal
diamensions total weight of cover and frame to be
not less than 116 kg (weight of cover 58 kg and
21.11.3 weight of frame 58 kg)
21.11.3.2 With F.P.S. bricks
Material:
Cement concrete 1:4:8 (1 cement :4 coarse sand : 8
graded stone aggregate 40 mm nominal size) cum 0.55
1.81x1.51x0.20 m = 0.547 cum say 0.55 cum
(Rate as per item 4.5.8 of sub head concrete brick
work with bricks of class designation 75 in
foundation & plinth in cement mortar 1:4 (1cement :4
coarse sand) 5.12x0.23x0.80 m = 0.942 cum Less
cum 0.93
pipe 2pai/4(0.15m) 2x0.23m = (-) 0.008 cum
= 0.934 cum say
0.93 cum

(Rate as per item 6.1.12 of sub head brick work)


1:2:4 ( 1 cement :1 coarse sand:4 graded stone
aggregate 20 mm nominal size) for benching =
2x1.2x0.90(0.80/2)x(0.30+0.20)/2 = 0.270 cum Less
cum 0.25
pipe 1.2xpai/4(0.15m)2 = (-) 0.021 cum
= 0.249 cum say
0.25

(Rate as per item 4.5.3 of sub head : concrete)


12 mm cement plaster 1:3 )1 cement :3 coarse
sand) finishing with floating coat of neat cement
4.2mx0.50m =2.10 sqm sqm 2.19
2x1/2x0.90x0.10 m = 0.09 sqm
= 2.19 sqm
(Rate as per item 13.17 of sub head :finishing)
Reinforced cement concrete work 1:2:4 ( 1 cement
:1 coarse sand:4 graded stone aggregate 20 mm
nominal size)
For slab: 1.66x1.36x0.15 m = 0.339 cum cum 0.31
less for C.I. covers pai/4xd 2xthickness
0.7854x(0.50)2x0.15 m = (-) 0.029cum
= 0.31 cum
Rate as per item 5.3 of sub head RCC work
Form work
inside area of man hole 1.20x0.90 = 1.08 sqm sqm 0.88
less cover = pai/4x(0.5)2 = (-) 0.196 sqm
= 0.884 sqm say 0.88
Rate as per item 5.14.3 of sub head RCC work
Mild steel reinf. For slab @ 80.09 kg/per cum for kg 24.83
0.31 cum = 24.83 kg
Rate as per item 5.29.1 of sub head RCC work
Extra labour for making channel:
Labour:
Mason 1st class each 0.08 123
Mason 2nd class each 0.08 124
C.I. Cover with frame 455x610mm (Inside) each 1.00 1354
Carriage of C.I. Cover and frame 1time 2.60 9999
Painting of C.I. Cover and frame with coal tar 1time 2.60 9999
Sundries 1time 6.40 9999
Add for water charges@ 1% on A+B
Add for contractor's profit and overheads @ 10%
A+B+C
Cost of one manhole
Say Rs.
Inside size 120x90 cm and 90 cm deep including C.I.
Cover with frame (light duty) 560mm internal
diamensions total weight of cover and frame to be
not less than 208 kg (weight of cover 108 kg and
21.11.4 weight of frame100 kg)
21.11.4.2 With F.P.S. bricks
Material:
Cement concrete 1:4:8 (1 cement :4 coarse sand : 8
graded stone aggregate 40 mm nominal size) cum 0.55
1.81x1.51x0.20 m = 0.547 cum say 0.55 cum
(Rate as per item 4.5.8 of sub head concrete brick
work with bricks of class designation 75 in
foundation & plinth in cement mortar 1:4 (1cement :4
coarse sand)
5.12x0.23x0.65 m = 0.765 cum
1x0.56x0.23x0.15m = 0.019 cum
1x0.79x0.23x0.15m = 0.027 cum cum 0.80
= 0.811 cum
Less pipe 2pai/4(0.15m) 2x0.23m = (-) 0.008 cum
= 0.803 cum

say 0.80 cum


(Rate as per item 6.1.12 of sub head brick work)
1:2:4 ( 1 cement :1 coarse sand:4 graded stone
aggregate 20 mm nominal size) for benching =
2x1.2x0.90(0.80/2)x(0.30+0.20)/2 = 0.270 cum Less
cum 0.25
pipe 1.2xpai/4(0.15m)2 = (-) 0.021 cum
= 0.249 cum
say 0.25

(Rate as per item 4.5.3 of sub head : concrete)


12 mm cement plaster 1:3 )1 cement :3 coarse
sand) finishing with floating coat of neat cement
4.2mx0.35m =1.47 sqm
2x0.56x0.15m = 0.17
2x1/2x0.90x0.10 m = 0.09 sqm
for fixing cover 0.96x0.96m = 0.922 sqm sqm 2.41
= 2.652 sqm
less cover pai/4x(0.56)2 = (-) 0.246 sqm
2.406 sqm
say 2.41 sqm

(Rate as per item 13.17 of sub head :finishing)


Reinforced cement concrete work 1:2:4 ( 1 cement
:1 coarse sand:4 graded stone aggregate 20 mm
nominal size)
For slab: 1.66x1.36x0.15 m = 0.339 cum
Add extra concreting cum 0.33
1x(0.56+0.79)x0.15x0.15m = 0.03 cum
= 0.369 cum
less covers pai/4xd2xthickness
0.7854x(0.56)2x0.15 m = (-) 0.037cum
= 0.332 say 0.33 cum
Rate as per item 5.3 of sub head RCC work
steel reinf. For slab @ 80.09 kg/per cum for 0.33 kg 26.43
cum = 26.43 kg
Rate as per item 5.29.1 of sub head RCC work
Form work inside area of man- hole
1.20x0.90 = 1.08 sqm sqm 0.83
less cover = pai /4x(0.56)2 = (-) 0.246 sqm
= 0.834 sqm say 0.83
Rate as per item 5.14.3 of sub head RCC work
Extra labour for making channel:
Labour:
Mason 1st class each 0.08 123
Mason 2nd class each 0.08 124
C.I. Cover with frame 455x610mm (Inside) each 1.00 1354
Carriage of C.I. Cover and frame 1time 5.20 9999
Painting of C.I. Cover and frame with coal tar 1time 2.60 9999
Sundries 1time 7.80 9999
Add for water charges@ 1% on A+B
Add for contractor's profit and overheads @ 10%
A+B+C
Cost of one manhole
Say Rs.

21.12 Extra for depth for manholes


21.12.1 Size 90x80 cm
21.12.1.2 With F.P.S. bricks
Details of cost for one metre
Material:
Brick work with bricks of class designation 75 in
cement mortar 1:4 (1 cement :4 coarse sand) cum 0.99
4.32x0.23x1.0 m = 0.994 cum say 0.99 cum
Rate as per item no. 6.1.12 of sub head brick work
12 mm cement plaster 1:3 (1 cement :3 coarse
sand) finished with floating coat of neat cement sqm 3.4
3.40x1m = 3.40 sqm
(Rate as per item no 13.17 of sub head finishing)
Cost of one manhole
Say Rs.

21.12.2 Size 120x90 cm


21.12.2.2 With F.P.S. bricks
Details of cost for one metre
Material:
Brick work with bricks of class designation 75 in
cement mortar 1:4 (1 cement :4 coarse sand) cum 1.18
5.12x0.23x1.0 m = 1.178 cum say 1.18 cum
Rate as per item no. 6.1.12 of sub head brick work
12 mm cement plaster 1:3 (1 cement :3 coarse
sand) finished with floating coat of neat cement sqm 4.20
4.20x1m = 4.20 sqm

(Rate as per item no 13.17 of sub head finishing)


Cost of one manhole
Say Rs.

Constructing brick masonry arched type manhole


140x90 cm inside size with 75 class designation
bricks in cement mortar 1:4 (1 cement:4 coarse
sand) arch work with bricks of class designation 75
in cement mortar 1:3 ( 1 cement :3 coarse sand)
inside plastering 12 mm thick with cement mortar
1:3 ( 1 cement :3 coarse sand) finished with floating
coat of neat cement up to the height of crown level
of arch above the benching level and cement
pointed with cement mortar 1:2 (1cement :2 fine
sand) for the remaining portion , RCC top slab 1:2:4
mix ( 1 cement :1 coarse sand:4 graded stone
aggregate 20 mm nominal size) foundation concrete
1:4:8 (1 cement :4 coarse sand : 8 graded stone
aggregate 40 mm nominal size) and making
channels in cement concrete 1:2:4 mix ( 1 cement :1
coarse sand:4 graded stone aggregate 20 mm
nominal size) neatly finished complete as per
standard design.
21.13
2.45 m deep with C.I. Cover and frame (medium
duty) 500 mm internal diameter, total weight of cover
and frame to be not less than 116 kg (weight of
21.13.1 cover 58 kg and weight of frame 58 kg)
21.13.1.2 With F.P.S. bricks
Details of cost for one metre
Material:
Cement concrete 1:4:8 (1 cement :4 coarse sand : 8
graded stone aggregate 40 mm nominal size) cum 0.72
2.16x1.66mx0.20 m = 0.72 cum
(Rate as per item 4.5.8 of SH concrete) brick work
with bricks of class designation 75 in foundation &
plinth in cement mortar 1:4 (1cement :4 coarse
sand)
5.52x0.23x1.20 m = 1.524 cum
3.92x0.23x1.15m = 1.037 cum
= 2.561 cum cum 2.54
Deduct arch ring and portion of pipe
2x1/2xpaix0.25mx0.23x0.1m = 0.018 cum
2xpai/4(0.15)2x0.23 m = 0.008 cum
(-)0.026 cum
Net 2.561 (-) 0.026 = 2.535 cum say 2.54 cum
(Rate as per item 6.1.12 of SH brick work)
Brick work in Arches with 75 class designation
Bricks in cement mortar 1:3 (1cement:3 fine snad)
1/2xpaix1.13x0.80x0.23m = 0.327 cum cum 0.35
2x1/2xpaix0.25x0.23x0.10 = 0.018 cum
= 0.345 cum say 0.35
(Rate as per item 6.15.2(-) 6.3 of SH brick work
cement concrete 1:2:4 mix ( 1 cement :1 coarse
sand:4 graded stone aggregate 20 mm nominal
size)for cum 0.29
benching 2x1.4x0.90/2x(0.20+0.30)/2=0.315 cum
less pipe 1.4xpai/4x(0.15)2 = (-) 0.025 cum
= 0.290 cum
(Rate as per item 4.5.3 of SH concrete)
12 mm cement plaster 1:3 )1 cement :3 coarse
sand) finishing with floating coat of neat cement on
the side upto crown level
4.6mx0.90m =4.14 sqm sqm 7.31
2x1/2x0.90x0.10 m = 0.09 sqm
3.0x0.65m = 1.95 sqm
1/2xpaix0.90x0.80 = 1.13 sqm
= 7.31 sqm
(Rate as per item no 13.17 of sub head finishing)
cement pointing 1:2 (1cement :2 fine sand)on the sqm 1.50
inside above cornn level 3.00mx0.50m =1.50 sqm
(Rate as per annuxure'A' )
Reinforced concrete work 1:2:4 (1 cement :2 coarse
sand: 4 graded stone aggregate 20mm nominal size)
for slab : 1.36m x 1.06mx0.15 = 0.216 cum cum 0.19
less cover paix(0.25)2x0.15 (-) 0.029 cum
= 0.187 cum say 0.19 cum

Rate as per item 5.3 of sub head RCC work


steel reinforcement for slab @ 48.06 kg/cum kg 9.13
for 0.19 cum = 0.19 cum x 48.06kg = 9.13 kg
(Rate as per item no. 5.29.1 of SH: RCC work)
Form work:
Inside area of Man-hole = 0.90x0.60m = 0.540 sqm
less cover paix(0.25)2 = (-) 0.196 sqm sqm 0.34
= 0.344 sqm
say 0.34 sqm

(Rate as per item no. 5.14.3 of SH: RCC work)


Extra for making channels
Mason 1st class each 0.10 123
Mason 2nd class each 0.10 124
C.I. Cover500 mm dia with frame (medium duty) each 1.00 1354
Carriage of C.I. Cover and frame 1time 2.60 9999
Painting of C.I. Cover and frame with coal tar 1time 2.60 9999
Sundries 1time 6.40 9999
Add for water charges@ 1% on A+B
Add for contractor's profit and overheads @ 10%
A+B+C
Cost of one no.
Say Rs.

Annuxure-'A'
Pointing on brick work with cement mortar 1:2 (1
cement :2 fine sand)
Details of cost of one sqm.
Pointing on brick work with cement mortar 1:3 (1
sqm 1.00
cement :3 fine sand)
(Rate as per itme no. 13.56.1)
Add difference in cost of cement mortar (1 cement :2 2106-
cum 0
fine sand) instead of cement mortar (1 cement :3 2107
fine sand)
Add for water charges@ 1% on B
Add for contractor's profit and overheads @ 10%
B+C
Cost per sqm
Say Rs.

2.45 m deep with C.I. Cover and frame (heavy duty)


560 mm internal diameter, total weight of cover and
frame to be not less than 208 kg (weight of cover
108 kg and weight of frame 100 kg)
21.13.2
21.13.2.2 With F.P.S. bricks
Details of cost for one metre
Material:
Cement concrete 1:4:8 (1 cement :4 coarse sand : 8
graded stone aggregate 40 mm nominal size) cum 0.72
2.16x1.66mx0.20 m = 0.72 cum
(Rate as per item 4.5.8 of SH concrete) brick work
with bricks of class designation 75 in foundation &
plinth in cement mortar 1:4 (1cement :4 coarse
sand)
5.52x0.23x1.20 m = 1.524 cum
3.92x0.23x1.15m = 1.037 cum
= 2.561 cum cum 2.54
Deduct arch ring and portion of pipe
2x1/2xpaix0.25mx0.23x0.1m = 0.018 cum
2xpai/4(0.15)2x0.23 m = 0.008 cum
(-)0.026 cum
Net 2.561 (-) 0.026 = 2.535 cum say 2.54 cum
(Rate as per item 6.1.12 of SH brick work)
Brick work in Arches with 75 class designation
Bricks in cement mortar 1:3 (1cement:3 fine snad)
1/2xpaix1.13x0.80x0.23m = 0.327 cum cum 0.35
2x1/2xpaix0.25x0.23x0.10 = 0.018 cum
= 0.345 cum say 0.35
(Rate as per item 6.15.2(-) 6.3 of SH brick work
cement concrete 1:2:4 mix ( 1 cement :1 coarse
sand:4 graded stone aggregate 20 mm nominal
size)for cum 0.29
benching 2x1.4x0.90/2x(0.20+0.30)/2=0.315 cum
less pipe 1.4xpai/4x(0.15)2 = (-) 0.025 cum
= 0.290 cum
(Rate as per item 4.5.3 of SH concrete)
12 mm cement plaster 1:3 )1 cement :3 coarse
sand) finishing with floating coat of neat cement on
the side upto crown level
4.6mx0.90m =4.14 sqm sqm 7.31
2x1/2x0.90x0.10 m = 0.09 sqm
3.0x0.65m = 1.95 sqm
1/2xpaix0.90x0.80 = 1.13 sqm
= 7.31 sqm
(Rate as per item no 13.17 of sub head finishing)
cement pointing 1:2 (1cement :2 fine sand)on the sqm 1.50
inside above cornn level 3.00mx0.50m =1.50 sqm
(Rate as per annuxure'A' )
Reinforced concrete work 1:2:4 (1 cement :2 coarse
sand: 4 graded stone aggregate 20mm nominal size)
for slab : 1.36m x 1.06mx0.15 = 0.216 cum
less cover paix(0.28)2x0.15 (-) 0.037 cum cum 0.18
= 0.179 cum say 0.18 cum

Rate as per item 5.3 of sub head RCC work


steel reinforcement for slab @ 48.06 kg/cum kg 8.65
for 0.18 cum = 0.18 cum x 48.06kg = 8.65 kg
(Rate as per item no. 5.29.1 of SH: RCC work)
Form work:
Inside area of Man-hole = 0.90x0.60m = 0.540 sqm
less cover paix(0.28)2 = (-) 0.246 sqm sqm 0.29
= 0.294 sqm
say 0.29 sqm

(Rate as per item no. 5.14.3 of SH: RCC work)


Extra for making channels
Mason 1st class each 0.10 123
Mason 2nd class each 0.10 124
C.I. Cover 560 mm dia with frame (heavy duty) each 1.00 1354
Carriage of C.I. Cover and frame 1time 5.20 9999
Painting of C.I. Cover and frame with coal tar 1time 2.60 9999
Sundries 1time 7.80 9999
Add for water charges@ 1% on A+B
Add for contractor's profit and overheads @ 10%
A+B+C
Cost of one no.
Say Rs.

2.45 m deep with C.I. Cover and frame (medium


duty) 500 mm internal diameter, total weight of cover
and frame to be not less than 116 kg (weight of
cover 58 kg and weight of frame 58 kg)
21.13.3
21.13.3.2 With F.P.S. bricks
Details of cost for one metre
Material:
Cement concrete 1:4:8 (1 cement :4 coarse sand : 8
graded stone aggregate 40 mm nominal size) cum 0.72
2.16x1.66mx0.20 m = 0.72 cum
(Rate as per item 4.5.8 of SH concrete) brick work
with bricks of class designation 75 in foundation &
plinth in cement mortar 1:4 (1cement :4 coarse
sand)
5.52x0.23x1.20 m = 1.524 cum
3.92x0.23x2.95m = 2.660 cum
= 4.184 cum cum 4.00
Deduct arch ring and portion of pipe
2x1/2xpaix0.70mx0.23x0.1m = 0.051 cum
2xpai/4(0.60)2x0.23 m = 0.130 cum
(-)0.181 cum
Net 4.184 (-) 0.181 = 4.003 cum say 4.00 cum
(Rate as per item 6.1.12 of SH brick work)
Brick work in Arches with 75 class designation
Bricks in cement mortar 1:3 (1cement:3 fine snad)
1/2xpaix1.13x0.80x0.23m = 0.327 cum cum 0.38
2x1/2xpaix0.70x0.23x0.10 = 0.051 cum
= 0.378 cum say 0.38
(Rate as per item 6.15.2(-) 6.3 of SH brick work
cement concrete 1:2:4 mix ( 1 cement :1 coarse
sand:4 graded stone aggregate 20 mm nominal
size)for cum 0.49
benching 2x1.4x0.90/2x(0.65+0.75)/2=0.882 cum
less pipe 1.4xpai/4x(0.60)2 = (-) 0.396 cum
= 0.486 cum say 0.49
(Rate as per item 4.5.3 of SH concrete)
12 mm cement plaster 1:3 )1 cement :3 coarse
sand) finishing with floating coat of neat cement on
the side upto crown level
4.6mx0.90m =4.14 sqm sqm 7.31
2x1/2x0.90x0.10 m = 0.09 sqm
3.0x0.65m = 1.95 sqm
1/2xpaix0.90x0.80 = 1.13 sqm
= 7.31 sqm
(Rate as per item no 13.17 of sub head finishing)
cement pointing 1:2 (1cement :2 fine sand)on the sqm 5.55
inside above cornn level 3.00mx1.85m =5.55 sqm
(Rate as per annuxure'A' )
Reinforced concrete work 1:2:4 (1 cement :2 coarse
sand: 4 graded stone aggregate 20mm nominal size)
for slab : 1.36m x 1.06mx0.15 = 0.216 cum cum 0.19
less cover paix(0.25)2x0.15 (-) 0.029 cum
= 0.187 cum say 0.19 cum

Rate as per item 5.3 of sub head RCC work


steel reinforcement for slab @ 48.06 kg/cum kg 9.13
for 0.19 cum = 0.19 cum x 48.06kg = 9.13 kg
(Rate as per item no. 5.29.1 of SH: RCC work)
Form work:
Inside area of Man-hole = 0.90x0.60m = 0.540 sqm
less cover paix(0.25)2 = (-) 0.196 sqm sqm 0.34
= 0.344 sqm
say 0.34 sqm

(Rate as per item no. 5.14.3 of SH: RCC work)


Extra for making channels
Mason 1st class each 0.10 123
Mason 2nd class each 0.10 124
C.I. Cover 500 mm dia with frame (medium duty) each 1.00 1354
Carriage of C.I. Cover and frame 1time 2.60 9999
Painting of C.I. Cover and frame with coal tar 1time 2.60 9999
Sundries 1time 6.40 9999
Add for water charges@ 1% on A+B
Add for contractor's profit and overheads @ 10%
A+B+C
Cost of one no.
Say Rs.

4.25 m deep with C.I. Cover and frame (heavy duty)


560 mm internal diameter, total weight of cover and
frame to be not less than 208 kg (weight of cover
108 kg and weight of frame 100 kg)
21.13.4
21.13.4.2 With F.P.S. bricks
Details of cost for one metre
Item as marked "X" in item no. 21.13.3.2
Item as marked "Y" in item no. 21.130.2.2
Extra labour for making channels: Same as marked
"A" in item no. 21.13.2.2
Item as marked "B" in item no. 21.13.2.2
Add for water charges@ 1% on A+B
Add for contractor's profit and overheads @ 10%
A+B+C
Cost of one no.
Say Rs.

9.75 m deep with C.I. Cover and frame (medium


duty) 500 mm internal diameter, total weight of cover
and frame to be not less than 116 kg (weight of
21.13.5 cover 58 kg and weight of frame 58 kg)
21.13.5.2 With F.P.S. bricks
Details of cost for one metre
Material:
Cement concrete 1:4:8 (1 cement :4 coarse sand : 8
graded stone aggregate 40 mm nominal size) cum 1.36
2.39x1.89mx0.30 m = 1.355 cum say 1.36 cum
(Rate as per item 4.5.8 of SH concrete) brick work
with bricks of class designation 75 in foundation &
plinth in cement mortar 1:4 (1cement :4 coarse
sand)
5.98x0.345x2.55 m = 5.261 cum
3.92x0.23x4.10m = 3.697 cum
= 13.491 cum cum 13.22
Deduct arch ring and portion of pipe
2x1/2xpaix0.70mx0.345x0.1m = 0.076 cum
2xpai/4(0.60)2x0.345 m = 0.195 cum
(-)0.271 cum
Net 13.491 (-) 0.271 = 13.22 cum say 13.22 cum
(Rate as per item 6.1.12 of SH brick work)
Brick work in Arches with 75 class designation
Bricks in cement mortar 1:3 (1cement:3 fine snad)
1/2xpaix1.13x0.80x0.23m = 0.327 cum cum 0.40
2x1/2xpaix0.70x0.345x0.10 = 0.076 cum
= 0.403 cum say 0.40
(Rate as per item 6.15.2(-) 6.3 of SH brick work
cement concrete 1:2:4 mix ( 1 cement :1 coarse
sand:4 graded stone aggregate 20 mm nominal
size)for cum 0.49
benching 2x1.4x0.90/2x(0.65+0.75)/2=0.882 cum
less pipe 1.4xpai/4x(0.60)2 = (-) 0.396 cum
= 0.486 cum say 0.49
(Rate as per item 4.5.3 of SH concrete)
12 mm cement plaster 1:3 )1 cement :3 coarse
sand) finishing with floating coat of neat cement on
the side upto crown level
4.6mx1.80m =8.28 sqm sqm 11.45
2x1/2x0.90x0.10 m = 0.09 sqm
3.0x0.65m = 1.95 sqm
1/2xpaix0.90x0.80 = 1.13 sqm
= 11.45 sqm
(Rate as per item no 13.17 of sub head finishing)
cement pointing 1:2 (1cement :2 fine sand)on the sqm 19.35
inside above cornn level 3.00mx6.45m =19.35 sqm
(Rate as per annuxure'A' )
Reinforced concrete work 1:2:4 (1 cement :2 coarse
sand: 4 graded stone aggregate 20mm nominal size)
for slab : 1.36m x 1.06mx0.15 = 0.216 cum cum 0.19
less cover paix(0.25)2x0.15 (-) 0.029 cum
= 0.187 cum say 0.19 cum

Rate as per item 5.3 of sub head RCC work


steel reinforcement for slab @ 48.06 kg/cum kg 9.13
for 0.19 cum = 0.19 cum x 48.06kg = 9.13 kg
(Rate as per item no. 5.29.1 of SH: RCC work)
Form work:
Inside area of Man-hole = 0.90x0.60m = 0.540 sqm
less cover paix(0.25)2 = (-) 0.196 sqm sqm 0.34
= 0.344 sqm
say 0.34 sqm
(Rate as per item no. 5.14.3 of SH: RCC work)
Extra for making channels
Mason 1st class each 0.10 123
Mason 2nd class each 0.10 124
C.I. Cover 500 mm dia with frame (medium duty) each 1.00 1354
Carriage of C.I. Cover and frame 1time 2.60 9999
Painting of C.I. Cover and frame with coal tar 1time 2.60 9999
Sundries 1time 6.40 9999
Add for water charges@ 1% on A+B
Add for contractor's profit and overheads @ 10%
A+B+C
Cost of one no.
Say Rs.

MISCELLANEOUS
Cutting holes up to 30 X30 cm in walls including
22.9 making good the same.
With F.P.S. Bricks.

details of cost for 10 holes Size 30X30 cm in 34 cm


wall.

22.9.2 Labour for cutting holes


Mason 1st class 1 day 0.16 (0,123)
Mason 2nd class 1 day 0.16 (0,124) A'
Beldar 1 day 1.25 (0,114)

Brick work with bricks of class designation 75in


cement mortar 1:4 (cement : 4 fine sand 10x 0.30x
0.30x 0.344mm =0.309 cum
less 33% for pipe etc. = (-) 0.102 cum
= 0.207 cum say 0.21 cum Cum. 0.21
(Rate as per item no. 6.1.18 = 6.3 of S.H. brick wrok)

12mm cement plaster 1:4 ( 1 cement : 4 coarse


sand ) with a floating coat of neat cement
10x2x0.3x0.3 m = 1.80 sqm.

less 33% for pipe etc. = (-) 0.59 cum


= 1.21 sqm. say 1.20 sqm. sqm. 1.20
(Rate as per item no. 13.11.2 of S.H.finishing )
Add for delay 1 time 6.20 (9999) B'
Sundries 1 time 3.1 (9999)

Add for water charges @ 1 % on A+B C


Add for Contractor's profit and overheads @ 10% on
A+B+C

Cost for 10 holes


Cost per hole Say Rs.per hole
Cutting holes up to 15x15 cm in R.C.C floors and
roofs for passing drain pipe etc. and reparing the
hole after insertion of drain pipe etc. with cement
concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded
stone aggregate 20 mm nominal size) including
finishing complete so as to make it leak proof.
22.10
deetails of cost for 10 holes
Average size 15x 15 x15 cm

Labour for cutting holes-


Mason 1 st class Each 0.83 (0,123)
Mason 2nd Class Each 0.83 (0,124) A'
Beldar Each 1.67 (0,114)

Cement concrete 1: 2; 4 ( 1 cement : 2 coarse sand :


4 gradesd stone aggregate 20mm nominal size)

10x0.15x0.15x0.15 m = 0.033 cum.

less 33% for pipe etc. = (-) 0.011 cum


= 0.022 cum say 0.02 cum
Cum.
(Rate as per item no. 4.5.3 of S.H. Concrete work)

Finishing top and bottm and making the holes leak


proof 1 time 46.60 (9999)
Add for delay 1 time 15.50 (9999) B'
Sundries 1 time 8.30 (9999)
Add for Contractor's profit and overheads @ 10% on
A+B+C

Cost for 10 holes


Cost per hole
Say Rs.per hole

Making chases upto 7.5 x 7.5 cm in walls including


22.15 making good after housing G.I. pipe etc.
Details of cost for 10 metres

Labour for mking chases


Mason 1 st class Each 0.25 (0,123)
Mason 2nd class Each 0.25 (0,124) A'
Beldar Each 1.00 (0,114)
Cement concrete 1:3:6 ( 1 cement : 3 coarse sand :
6 graded stone aggregate 20mm nominal size)
0.075x0.075x10m =0.05625 cum Rate i/.cs
water
less 33% for pipe etc. = (-) 0.01856 cum charges
= 0.03769 cum say 0.04 cum C.P. and
overhead
(Rate as per item no. 4.6.5 OF S.H. conrete work) Cum 0.04 s 'B'

Add for water charges @ 1 % on (A)


Add for Contracator's profit and overheads @10%
on (A) + (B)
Cost for 10 metre
Cost per metre
Say Rs…………. Per metre
Making hole upto 20x20 cm and embedding pipes
upto 150mm diameter in masonary and filling with
cement concrete 1:3:6 (1 cement : 3 coarse sand : 6
graded stone aggregate 20 mm nominal size)
22.16 including disposal of malba.

Details of cost for 10 metre

cement concrete 1:3:6 (1 cement : 3 coarse sand : 6


graded stone aggregate 20 mm nominal size)
including disposal of malba.
0.2x0.2x10m = 0.40 cum
less for pipe π x (0.15) 2/ 4x10m = (-) 0.177 cum
0.223 cum
Say 0.22 cum

Cum 0.22
(Rate as per item no. 4.6.5of S.H. conrete work)
Disposla of malba 1 time 5.2 (9999) A'
Add for water charges @ 1%
Add for contractor's profit and overheads @ 10% on
(A)
Cost for 10 metre
Cost per metre Say Rs.per metre
Constructing masonry dust bin with 60cm wide
platform towards opening of 75 class designation
brick work in cement mortar 1;4 ( 1 cement : 4 fine
sand) with top of wall sloped inside over 45 cm wide
and 15 cm thick cement concrete 1:5:10 ( 1 cement :
5 fine sand : 10 graded stone aggregate 40 mm
nominal size) in foundation 40mm thick cement
concrete 1:5:10 ( 1 cement : fine sand : 10 graded
stone aggregate 40 mm nominal size) including 12
mm cement plaster coat of neat cemnt over exposed
sufrace of masonry walls and 10 cm depth below
ground legvel including all excavation, refulling and
disposal of surplus earth complete as per standard
22.17 design.

22.17.1 180x120 cm
22.17.1.2 With F.P.S. bricks
Edtails of cost for one dust bin.
Earth work in excavation including dispossla of
surplous earth and refilling of excavated earth
6.92x0.45x0.45 m = 1.40 cum
1.66x0.475x0.075m = 0.06cum
= 1.46 cum Cum 1.46
(Rate as per item no. 4.6.5of S.H. conrete work)

Cement concrete 1:5:10 (1cment : 5 fine sand: 10


graded stone agrregate 40 mm nominal size)
6.92x0.15x0.45m = 0.47 cum
1.80x1.20x.075m = 0.16 cum
0.70x0.23x0.075m = 0.07 cum
= 0.71 cum Cum 0.71
(Rate as per item no. 4.5.11 of S.H. Concrete work)

Second class brick work in cement mortar 1:4


Disinfecting C.I. water mains by flushing with water
containing bleaching powder at 0.5 gms per litre of
water and cleaning the same with fresh water,
operation to be repeated three times including getting
the sample of water from the disinfected main tested in
22.20 the municipal laboratory.
80 mm diametre C.I. pipe
Details of cost for 100 metre
Materials:
Bleaching powder
3xpie/4x(80/10)2x(100x100)/1000x0.5 gms
= 754.28 gms say 0.008 q quintal 0.01 1301
Labour:
Fitter each 0.33 0,116
Beldar each 1.31 0,114
Sundries inlcuding testing of samples etc. 1 time 3.80 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre

22.20.2 100 mm diametre C.I. pipe


Details of cost for 100 metre
Materials:
Bleaching powder
3xpie/4x(100/10)2x(100x100)/1000x0.5 gms
= 1178.57 gms say 0.012 q quintal 0.01 1301
Labour:
Fitter each 0.49 0,116
Beldar each 1.64 0,114
Sundries inlcuding testing of samples etc. 1 time 5.20 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre

22.20.3 125 mm diametre C.I. pipe


Details of cost for 100 metre
Materials:
Bleaching powder
3xpie/4x(125/10)2x(100x100)/1000x0.5 gms
= 1841.52 gms say 0.018 q quintal 0.02 1301
Labour:
Fitter each 0.66 0,116
Beldar each 1.97 0,114
Sundries inlcuding testing of samples etc. 1 time 6.90 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre
22.20.4 150 mm diametre C.I. pipe
Details of cost for 100 metre
Materials:
Bleaching powder
3xpie/4x(150/10)2x(100x100)/1000x0.5 gms
= 2651 gms say 0.027 q quintal 0.03 1301
Labour:
Fitter each 0.82 0,116
Beldar each 2.30 0,114
Sundries inlcuding testing of samples etc. 1 time 8.80 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre

22.20.5 200 mm diametre C.I. pipe


Details of cost for 100 metre
Materials:
Bleaching powder
3xpie/4x(200/10)2x(100x100)/1000x0.5 gms
= 4712.39 gms say 0.047 q quintal 0.05 1301
Labour:
Fitter each 1.15 0,116
Beldar each 2.95 0,114
Sundries inlcuding testing of samples etc. 1 time 12.10 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre

22.20.6 250 mm diametre C.I. pipe


Details of cost for 100 metre
Materials:
Bleaching powder
3xpie/4x(250/10)2x(100x100)/1000x0.5 gms
= 7363.10 gms say 0.074 q quintal 0.07 1301
Labour:
Fitter each 1.48 0,116
Beldar each 3.61 0,114
Sundries inlcuding testing of samples etc. 1 time 15.50 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre

22.20.7 300 mm diametre C.I. pipe


Details of cost for 100 metre
Materials:
Bleaching powder
3xpie/4x(300/10)2x(100x100)/1000x0.5 gms
= 10602.88 gms say 0.106 q quintal 0.11 1301
Labour:
Fitter each 1.64 0,116
Beldar each 3.94 0,114
Sundries inlcuding testing of samples etc. 1 time 17.10 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre

22.20.8 350 mm diametre C.I. pipe


Details of cost for 100 metre
Materials:
Bleaching powder
3xpie/4x(350/10)2x(100x100)/1000x0.5 gms
= 14431.7 gms say 0.144 q quintal 0.14 1301
Labour:
Fitter each 1.8 0,116
Beldar each 4.27 0,114
Sundries inlcuding testing of samples etc. 1 time 18.60 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre

22.20.9 400 mm diametre C.I. pipe


Details of cost for 100 metre
Materials:
Bleaching powder
3xpie/4x(400/10)2x(100x100)/1000x0.5 gms
= 18849.6 gms say 0.189 q quintal 0.19 1301
Labour:
Fitter each 1.97 0,116
Beldar each 4.59 0,114
Sundries inlcuding testing of samples etc. 1 time 20.70 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre

22.20.10 450 mm diametre C.I. pipe


Details of cost for 100 metre
Materials:
Bleaching powder
3xpie/4x(450/10)2x(100x100)/1000x0.5 gms
= 23856.5 gms say 0.239 q quintal 0.24 1301
Labour:
Fitter each 2.13 0,116
Beldar each 4.92 0,114
Sundries inlcuding testing of samples etc. 1 time 22.40 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre

22.20.11 500 mm diametre C.I. pipe


Details of cost for 100 metre
Materials:
Bleaching powder
3xpie/4x(500/10)2x(100x100)/1000x0.5 gms
= 29452.4 gms say 0.295 q quintal 0.3 1301
Labour:
Fitter each 2.3 0,116
Beldar each 5.25 0,114
Sundries inlcuding testing of samples etc. 1 time 24.50 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre

22.20.12 600 mm diametre C.I. pipe


Details of cost for 100 metre
Materials:
Bleaching powder
3xpie/4x(600/10)2x(100x100)/1000x0.5 gms
= 42411.5 gms say 0.424 q quintal 0.42 1301
Labour:
Fitter each 2.62 0,116
Beldar each 5.91 0,114
Sundries inlcuding testing of samples etc. 1 time 27.45 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre

Extra for every operation of disinfecting the C.I. main by


flushing with water containing bleaching powder at 0.5
gms per litre of water and cleaning the same with fresh
water, including getting the samples of water tested in
22.21 the municipal laboratory.
22.21.1 80 mm diametre C.I. pipe.
Details of cost for 100 metre
Materials:
Bleaching powder quintal 0 1301
Labour:
Fitter each 0.11 0,116
Beldar each 0.49 0,114
Sundries inlcuding testing of samples etc. 1 time 1.70 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre
22.21.2 100 mm diametre C.I. pipe.
Details of cost for 100 metre
Materials:
Bleaching powder quintal 0 1301
Labour:
Fitter each 0.16 0,116
Beldar each 0.57 0,114
Sundries inlcuding testing of samples etc. 1 time 1.70 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre

22.21.3 125 mm diametre C.I. pipe.


Details of cost for 100 metre
Materials:
Bleaching powder quintal 0.01 1301
Labour:
Fitter each 0.22 0,116
Beldar each 0.66 0,114
Sundries inlcuding testing of samples etc. 1 time 2.10 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre

22.21.4 150 mm diametre C.I. pipe.


Details of cost for 100 metre
Materials:
Bleaching powder quintal 0.01 1301
Labour:
Fitter each 0.27 0,116
Beldar each 0.74 0,114
Sundries inlcuding testing of samples etc. 1 time 2.75 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre

22.21.5 200 mm diametre C.I. pipe.


Details of cost for 100 metre
Materials:
Bleaching powder quintal 0.02 1301
Labour:
Fitter each 0.58 0,116
Beldar each 0.90 0,114
Sundries inlcuding testing of samples etc. 1 time 0.80 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre
22.21.6 250 mm diametre C.I. pipe.
Details of cost for 100 metre
Materials:
Bleaching powder quintal 0.03 1301
Labour:
Fitter each 0.60 0,116
Beldar each 1.10 0,114
Sundries inlcuding testing of samples etc. 1 time 4.15 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre

22.21.7 300 mm diametre C.I. pipe.


Details of cost for 100 metre
Materials:
Bleaching powder quintal 0.04 1301
Labour:
Fitter each 0.60 0,116
Beldar each 1.30 0,114
Sundries inlcuding testing of samples etc. 1 time 5.20 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre

22.21.8 350 mm diametre C.I. pipe.


Details of cost for 100 metre
Materials:
Bleaching powder quintal 0.05 1301
Labour:
Fitter each 0.70 0,116
Beldar each 1.50 0,114
Sundries inlcuding testing of samples etc. 1 time 6.20 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre

22.21.9 400 mm diametre C.I. pipe.


Details of cost for 100 metre
Materials:
Bleaching powder quintal 0.06 1301
Labour:
Fitter each 0.80 0,116
Beldar each 1.70 0,114
Sundries inlcuding testing of samples etc. 1 time 6.90 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre
22.21.10 450 mm diametre C.I. pipe.
Details of cost for 100 metre
Materials:
Bleaching powder quintal 0.08 1301
Labour:
Fitter each 0.90 0,116
Beldar each 1.90 0,114
Sundries inlcuding testing of samples etc. 1 time 7.95 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre

22.21.11 500 mm diametre C.I. pipe.


Details of cost for 100 metre
Materials:
Bleaching powder quintal 0.1 1301
Labour:
Fitter each 1.00 0,116
Beldar each 2.10 0,114
Sundries inlcuding testing of samples etc. 1 time 8.95 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre

22.21.12 600 mm diametre C.I. pipe.


Details of cost for 100 metre
Materials:
Bleaching powder quintal 0.14 1301
Labour:
Fitter each 1.20 0,116
Beldar each 2.50 0,114
Sundries inlcuding testing of samples etc. 1 time 10.00 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 metre
Rs. Per 100 metre
Dismantling old C.I. pipes including excavation and
refilling trenches after taking out the pipes, breaking
lead caulked joints, melting of lead and making into
blocks including stacking of pipes at site lead upto 50
22.22 metre.
22.22.1 80 mm diametre C.I. pipe.
Details of cos for 40.26 m or 11 nos. joints.
Earth work in excavation for dismantling pipes
including refilling of excavated earth
1x40.26x0.55x0.75 m = 16.61 cum
Deduct for pipe 1x40.26xpai/4x(0.098) 2 m =(-)0.30
cum
= 16.31 cum
(Rate as per item no. 2.8.1+2.26 of SH . Earth work) cum 16.31
Breaking lead caulked joints, making blocks and
stacking
Materials:
Fuel wood required quintal 0.37 0,761
Kerosene oil litre 0.38 0,771
Labour:
Assistant Fitter each 0.50 0,117
Beldar each 4.00 0,114
Sundries and carriage 1 time 20.70 9999
Add for water harges @ 1% on all except on 'A'
Add for contractor's frofit and overheads @ 10% on
all except on 'A'
Cost for 40.26 metre
Cost for one metre
Say Rs. Per metre

22.22.2 100 mm diametre C.I. pipe.


Details of cos for 40.26 m or 11 nos. joints.

Earth work in excavation for dismantling pipes


including refilling of excavated earth
1x40.26x0.55x0.75 m = 16.61 cum
Deduct for pipe 1x40.26xpai/4x(0.118) 2 m =(-)0.40
cum
= 16.17 cum
(Rate as per item no. 2.8.1+2.26 of SH . Earth work) cum 16.17
Breaking lead caulked joints, making blocks and
stacking
Materials:
Fuel wood required quintal 0.47 0,761
Kerosene oil litre 0.38 0,771
Labour:
Assistant Fitter each 0.63 0,117
Beldar each 4.50 0,114
Sundries and carriage 1 time 20.70 9999
Add for water harges @ 1% on all except on 'A'
Add for contractor's frofit and overheads @ 10% on
all except on 'A'
Cost for 40.26 metre
Cost for one metre
Say Rs. Per metre

22.22.3 125 mm diametre C.I. pipe.


Details of cos for 40.26 m or 11 nos. joints.

Earth work in excavation for dismantling pipes


including refilling of excavated earth
1x40.26x0.55x0.75 m = 16.61 cum
Deduct for pipe 1x40.26xpai/4x(0.144) 2 m =(-)0.65
cum
= 15.96 cum
(Rate as per item no. 2.8.1+2.26 of SH . Earth work) cum 15.96
Breaking lead caulked joints, making blocks and
stacking
Materials:
Fuel wood required quintal 0.56 0,761
Kerosene oil litre 0.57 0,771
Labour:
Assistant Fitter each 0.75 0,117
Beldar each 0.50 0,114
Sundries and carriage 1 time 20.70 9999
Add for water harges @ 1% on all except on 'A'
Add for contractor's frofit and overheads @ 10% on
all except on 'A'
Cost for 40.26 metre
Cost for one metre
Say Rs. Per metre

22.22.4 150 mm diametre C.I. pipe.


Details of cos for 40.26 m or 11 nos. joints.

Earth work in excavation for dismantling pipes


including refilling of excavated earth
1x40.26x0.55x0.75 m = 16.61 cum
Deduct for pipe 1x40.26xpai/4x(0.17) 2 m =(-)0.91
cum
= 15.70 cum
(Rate as per item no. 2.8.1+2.26 of SH . Earth work) cum 15.70
Breaking lead caulked joints, making blocks and
stacking
Materials:
Fuel wood quintal 0.65 0,761
Kerosene oil litre 0.57 0,771
Labour:
Assistant Fitter each 0.88 0,117
Beldar each 5.50 0,114
Sundries and carriage 1 time 25.85 9999
Add for water harges @ 1% on all except on 'A'
Add for contractor's frofit and overheads @ 10% on
all except on 'A'
Cost for 40.26 metre
Cost for one metre
Say Rs. Per metre

22.22.5 200 mm diametre C.I. pipe.


Details of cos for 40.26 m or 11 nos. joints.

Earth work in excavation for dismantling pipes


including refilling of excavated earth
1x40.26x0.55x0.75 m = 16.61 cum
Deduct for pipe 1x40.26xpai/4x(0.222) 2 m =(-)1.56
cum
= 16.56 cum
(Rate as per item no. 2.8.1+2.26 of SH . Earth work) cum 16.56
Breaking lead caulked joints, making blocks and
stacking
Materials:
Fuel wood quintal 0.840 0,761
Kerosene oil litre 0.76 0,771
Labour:
Assistant Fitter each 1.10 0,117
Beldar each 6.50 0,114
Sundries and carriage 1 time 25.85 9999
Add for water harges @ 1% on all except on 'A'
Add for contractor's frofit and overheads @ 10% on
all except on 'A'
Cost for 40.26 metre
Cost for one metre
Say Rs. Per metre

22.22.6 250 mm diametre C.I. pipe.


Details of cos for 40.26 m or 11 nos. joints.

Earth work in excavation for dismantling pipes


including refilling of excavated earth
1x40.26x0.55x0.75 m = 16.61 cum
Deduct for pipe 1x40.26xpai/4x(0.274) 2 m =(-)2.37
cum
= 17.26cum
(Rate as per item no. 2.8.1+2.26 of SH . Earth work) cum 17.26
Breaking lead caulked joints, making blocks and
stacking
Materials:
Fuel wood quintal 1.03 0,761
Kerosene oil litre 1.14 0,771
Labour:
Assistant Fitter each 1.30 0,117
Beldar each 7.50 0,114
Sundries and carriage 1 time 21.05 9999
Add for water harges @ 1% on all except on 'A'
Add for contractor's frofit and overheads @ 10% on
all except on 'A'
Cost for 40.26 metre
Cost for one metre
Say Rs. Per metre

22.22.7 300 mm diametre C.I. pipe.


Details of cos for 40.26 m or 11 nos. joints.

Earth work in excavation for dismantling pipes


including refilling of excavated earth
1x40.26x0.55x0.75 m = 16.61 cum
Deduct for pipe 1x40.26xpai/4x(0.326) 2 m =(-)3.36
cum
= 17.79 cum
(Rate as per item no. 2.8.1+2.26 of SH . Earth work) cum 17.79
Breaking lead caulked joints, making blocks and
stacking
Materials:
Fuel wood required quintal 1.120 0,761
Kerosene oil litre 1.52 0,771
Labour:
Assistant Fitter each 1.50 0,117
Beldar each 8.50 0,114
Sundries and carriage 1 time 36.20 9999
Add for water harges @ 1% on all except on 'A'
Add for contractor's frofit and overheads @ 10% on
all except on 'A'
Cost for 40.26 metre
Cost for one metre
Say Rs. Per metre

22.22.8 350 mm diametre C.I. pipe.


Details of cos for 40.26 m or 11 nos. joints.

Earth work in excavation for dismantling pipes


including refilling of excavated earth
1x40.26x0.55x0.75 m = 16.61 cum
Deduct for pipe 1x40.26xpai/4x(0.378) 2 m =(-)4.51
cum
= 18.14 cum
(Rate as per item no. 2.8.1+2.26 of SH . Earth work) cum 18.14
Breaking lead caulked joints, making blocks and
stacking
Materials:
Fuel wood quintal 1.213 0,761
Kerosene oil litre 1.52 0,771
Labour:
Assistant Fitter each 1.75 0,117
Beldar each 9.50 0,114
Sundries and carriage 1 time 41.40 9999
Add for water harges @ 1% on all except on 'A'
Add for contractor's frofit and overheads @ 10% on
all except on 'A'
Cost for 40.26 metre
Cost for one metre
Say Rs. Per metre
22.22.9 400 mm diametre C.I. pipe.
Details of cos for 40.26 m or 11 nos. joints.

Earth work in excavation for dismantling pipes


including refilling of excavated earth
1x40.26x0.55x0.75 m = 16.61 cum
Deduct for pipe 1x40.26xpai/4x(0.429) 2 m =(-)5.93
cum
= 18.23 cum
(Rate as per item no. 2.8.1+2.26 of SH . Earth work) cum 18.23
Breaking lead caulked joints, making blocks and
stacking
Materials:
Fuel wood quintal 1.306 0,761
Kerosene oil litre 1.89 0,771
Labour:
Assistant Fitter each 2.00 0,117
Beldar each 10.50 0,114
Sundries and carriage 1 time 46.55 9999
Add for water harges @ 1% on all except on 'A'
Add for contractor's frofit and overheads @ 10% on
all except on 'A'
Cost for 40.26 metre
Cost for one metre
Say Rs. Per metre

22.22.10 450 mm diametre C.I. pipe.


Details of cos for 40.26 m or 11 nos. joints.

Earth work in excavation for dismantling pipes


including refilling of excavated earth
1x40.26x0.55x0.75 m = 16.61 cum
Deduct for pipe 1x40.26xpai/4x(0.48) 2 m =(-)7.29
cum
= 18.38 cum
(Rate as per item no. 2.8.1+2.26 of SH . Earth work) cum 18.38
Breaking lead caulked joints, making blocks and
stacking
Materials:
Fuel wood quintal 1.400 0,761
Kerosene oil litre 2.27 0,771
Labour:
Assistant Fitter each 2.25 0,117
Beldar each 11.50 0,114
Sundries and carriage 1 time 51.75 9999
Add for water harges @ 1% on all except on 'A'
Add for contractor's frofit and overheads @ 10% on
all except on 'A'
Cost for 40.26 metre
Cost for one metre
Say Rs. Per metre
22.22.11 500 mm diametre C.I. pipe.
Details of cos for 40.26 m or 11 nos. joints.

Earth work in excavation for dismantling pipes


including refilling of excavated earth
1x40.26x0.55x0.75 m = 16.61 cum
Deduct for pipe 1x40.26xpai/4x(0.532) 2 m =(-)8.94
cum
= 18.24 cum
(Rate as per item no. 2.8.1+2.26 of SH . Earth work) cum 18.24
Breaking lead caulked joints, making blocks and
stacking
Materials:
Fuel wood quintal 1.492 0,761
Kerosene oil litre 2.65 0,771
Labour:
Assistant Fitter each 2.50 0,117
Beldar each 12.50 0,114
Sundries and carriage 1 time 56.90 9999
Add for water harges @ 1% on all except on 'A'
Add for contractor's frofit and overheads @ 10% on
all except on 'A'
Cost for 40.26 metre
Cost for one metre
Say Rs. Per metre

22.22.12 600 mm diametre C.I. pipe.


Details of cos for 40.26 m or 11 nos. joints.

Earth work in excavation for dismantling pipes


including refilling of excavated earth
1x40.26x0.55x0.75 m = 16.61 cum
Deduct for pipe 1x40.26xpai/4x(0.635) 2 m =(-)12.76
cum
= 17.44 cum
(Rate as per item no. 2.8.1+2.26 of SH . Earth work) cum 17.44
Breaking lead caulked joints, making blocks and
stacking
Materials:
Fuel wood quintal 1.680 0,761
Kerosene oil litre 3.41 0,771
Labour:
Assistant Fitter each 3.00 0,117
Beldar each 14.50 0,114
Sundries and carriage 1 time 67.25 9999
Add for water harges @ 1% on all except on 'A'
Add for contractor's frofit and overheads @ 10% on
all except on 'A'
Cost for 40.26 metre
Cost for one metre
Say Rs. Per metre
22.23 Labour for cutting C.I. pipe with steel saw.
22.23.1 80 mm diametre C.I. pipe
Details of cost for one cut.
Labour:
Fitter each 0.06 0,116
Beldar each 0.06 0,114
Sundries 1 time 0.70 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for each cut
Say Rs. each cut

22.23.2 100 mm diametre C.I. pipe


Details of cost for one cut.
Labour:
Fitter each 0.08 0,116
Beldar each 0.08 0,114
Sundries 1 time 1.05 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for each cut
Say Rs. each cut

22.23.3 125 mm diametre C.I. pipe


Details of cost for one cut.
Labour:
Fitter each 0.11 0,116
Beldar each 0.11 0,114
Sundries 1 time 1.70 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for each cut
Say Rs. each cut

22.23.4 150 mm diametre C.I. pipe


Details of cost for one cut.
Labour:
Fitter each 0.15 0,116
Beldar each 0.15 0,114
Sundries 1 time 2.05 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for each cut
Say Rs. each cut

22.23.5 200 mm diametre C.I. pipe


Details of cost for one cut.
Labour:
Fitter each 0.2 0,116
Beldar each 0.20 0,114
Sundries 1 time 2.75 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for each cut
Say Rs. each cut

22.23.6 250 mm diametre C.I. pipe


Details of cost for one cut.
Labour:
Fitter each 0.25 0,116
Beldar each 0.25 0,114
Sundries 1 time 3.10 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for each cut
Say Rs. each cut

22.23.7 300 mm diametre C.I. pipe


Details of cost for one cut.
Labour:
Fitter each 0.30 0,116
Beldar each 0.30 0,114
Sundries 1 time 3.80 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for each cut
Say Rs. each cut

22.23.8 350 mm diametre C.I. pipe


Details of cost for one cut.
Labour:
Fitter each 0.35 0,116
Beldar each 0.40 0,114
Sundries 1 time 4.80 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for each cut
Say Rs. each cut

22.23.9 400 mm diametre C.I. pipe


Details of cost for one cut.
Labour:
Fitter each 0.4 0,116
Beldar each 0.40 0,114
Sundries 1 time 4.80 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for each cut
Say Rs. each cut

22.23.10 450 mm diametre C.I. pipe


Details of cost for one cut.
Labour:
Fitter each 0.45 0,116
Beldar each 0.45 0,114
Sundries 1 time 5.20 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for each cut
Say Rs. each cut

22.23.11 500 mm diametre C.I. pipe


Details of cost for one cut.
Labour:
Fitter each 0.5 0,116
Beldar each 0.50 0,114
Sundries 1 time 5.85 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for each cut
Say Rs. each cut

22.23.12 600 mm diametre C.I. pipe


Details of cost for one cut.
Labour:
Fitter each 0.6 0,116
Beldar each 0.60 0,114
Sundries 1 time 6.20 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for each cut
Say Rs. each cut

Supplying and stacking of hard stone (for stone


22.24 pitching) 22.5 cm thick at site
Details of cost for 2.25 cum
Materials:
22.5 cm thick stone (Hard) cum 2.25 1158
Carriage by mechanicla transport including loading,
unloading and staccking cum 2.25 2215
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 2.25 cum
Cost for one cum
Say Rs. each cut

Dry stone pitching 22.5cm thick laid in courses and


required profile with hammer dressed stones having no
side less than 15 cm, with minimum depth of 20cm
including preparing the bedding surface etc. all
22.25A complete.
Details of cost for 10 sqm
Labour:
Mason 1st class each 1.08 0,123
Mason 2nd class each 1.08 0,124
Beldar each 2.15 0,114
Coolie each 1.61 0,115
Sundries 1 time 2.60 9999
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 10 sqm
Cost for one sqm
Say Rs. Per sqm

75 mm thick back filling for pitching including supplying


of required materials and consolidation etc. complete
22.26 with.
22.26.1 Moorum
Details of cost for 10 sqm
Materials:
Moorum 100sqmx 7.5 cm = 7.5 cum cum 7.5 0,810
Carriage of moorum by mechanical transport
including loading, unloading and stacking. cum 7.5 2265
Labour:
Beldar each 1.64 0,114
Bhishti each 0.13 0,101
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 sqm
Cost for sqm
Say Rs. Per sqm

22.26.2 Stone aggregate 20 mm nominal size


Details of cost for 100 sqm
Materials:
Stone aggregate 20mm nominal size
100 sqmx7.5 cm = 7.5 cum 7.5 0,295
Carriage of stone aggregate 20mm nominal size
including loading, unloading and stacking. cum 7.5 2202
Labour:
Beldar each 2.05 0,114
Bhishti each 0.13 0,101
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 sqm
Cost for sqm
Say Rs. Per sqm

22.26.3 Stone aggregate 40 mm nominal size


Details of cost for 100 sqm
Materials:
Stone aggregate 40mm nominal size
100 sqmx7.5 cm = 7.5 cum 7.5 0,293
Carriage of stone aggregate 40mm nominal size
including loading, unloading and stacking. cum 7.5 2206
Labour:
Beldar each 2.05 0,114
Bhishti each 0.13 0,101
Add for water harges @ 1%
Add for contractor's frofit and overheads @ 10%
Cost for 100 sqm
Cost for sqm
Say Rs. Per sqm

22.0 MISCELLANEOUS
Description Rate Cost
Item No. Unit Qty.
Code Rs. Remarks
Cutting holes up to 30 X30 cm in walls including
22.9 making good the same.
With F.P.S. Bricks.

details of cost for 10 holes Size 30X30 cm in 34 cm


wall.

22.9.2 Labour for cutting holes


Mason 1st class 1 day 0.16 (0,123)
Mason 2nd class 1 day 0.16 (0,124) A'
Beldar 1 day 1.25 (0,114)

Brick work with bricks of class designation 75in


cement mortar 1:4 (cement : 4 fine sand 10x 0.30x
0.30x 0.344mm =0.309 cum
less 33% for pipe etc. = (-) 0.102 cum
= 0.207 cum say 0.21 cum Cum. 0.21
(Rate as per item no. 6.1.18 = 6.3 of S.H. brick wrok)

12mm cement plaster 1:4 ( 1 cement : 4 coarse


sand ) with a floating coat of neat cement
10x2x0.3x0.3 m = 1.80 sqm.

less 33% for pipe etc. = (-) 0.59 cum


= 1.21 sqm. say 1.20 sqm. sqm. 1.20
(Rate as per item no. 13.11.2 of S.H.finishing )
Add for delay 1 time 6.20 (9999) B'
Sundries 1 time 3.1 (9999)

Add for water charges @ 1 % on A+B C


Add for Contractor's profit and overheads @ 10% on
A+B+C

Cost for 10 holes


Cost per hole Say Rs.per hole
Cutting holes up to 15x15 cm in R.C.C floors and
roofs for passing drain pipe etc. and reparing the
hole after insertion of drain pipe etc. with cement
concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded
stone aggregate 20 mm nominal size) including
finishing complete so as to make it leak proof.
22.10
deetails of cost for 10 holes
Average size 15x 15 x15 cm

Labour for cutting holes-


Mason 1 st class Each 0.83 (0,123)
Mason 2nd Class Each 0.83 (0,124) A'
Beldar Each 1.67 (0,114)

Cement concrete 1: 2; 4 ( 1 cement : 2 coarse sand :


4 gradesd stone aggregate 20mm nominal size)

10x0.15x0.15x0.15 m = 0.033 cum.

less 33% for pipe etc. = (-) 0.011 cum


= 0.022 cum say 0.02 cum
Cum.
(Rate as per item no. 4.5.3 of S.H. Concrete work)

Finishing top and bottm and making the holes leak


proof 1 time 46.60 (9999)
Add for delay 1 time 15.50 (9999) B'
Sundries 1 time 8.30 (9999)
Add for Contractor's profit and overheads @ 10% on
A+B+C

Cost for 10 holes


Cost per hole
Say Rs.per hole

Making chases upto 7.5 x 7.5 cm in walls including


22.15 making good after housing G.I. pipe etc.
Details of cost for 10 metres

Labour for mking chases


Mason 1 st class Each 0.25 (0,123)
Mason 2nd class Each 0.25 (0,124) A'
Beldar Each 1.00 (0,114)
Cement concrete 1:3:6 ( 1 cement : 3 coarse sand :
6 graded stone aggregate 20mm nominal size)
0.075x0.075x10m =0.05625 cum Rate i/.cs
water
less 33% for pipe etc. = (-) 0.01856 cum charges
= 0.03769 cum say 0.04 cum C.P. and
overhead
(Rate as per item no. 4.6.5 OF S.H. conrete work) Cum 0.04 s 'B'

Add for water charges @ 1 % on (A)


Add for Contracator's profit and overheads @10%
on (A) + (B)
Cost for 10 metre
Cost per metre
Say Rs…………. Per metre
Making hole upto 20x20 cm and embedding pipes
upto 150mm diameter in masonary and filling with
cement concrete 1:3:6 (1 cement : 3 coarse sand : 6
graded stone aggregate 20 mm nominal size)
22.16 including disposal of malba.

Details of cost for 10 metre

cement concrete 1:3:6 (1 cement : 3 coarse sand : 6


graded stone aggregate 20 mm nominal size)
including disposal of malba.
0.2x0.2x10m = 0.40 cum
less for pipe π x (0.15) 2/ 4x10m = (-) 0.177 cum
0.223 cum
Say 0.22 cum

Cum 0.22
(Rate as per item no. 4.6.5of S.H. conrete work)
Disposla of malba 1 time 5.2 (9999) A'
Add for water charges @ 1%
Add for contractor's profit and overheads @ 10% on
(A)
Cost for 10 metre
Cost per metre Say Rs.per metre
Constructing masonry dust bin with 60cm wide
platform towards opening of 75 class designation
brick work in cement mortar 1;4 ( 1 cement : 4 fine
sand) with top of wall sloped inside over 45 cm wide
and 15 cm thick cement concrete 1:5:10 ( 1 cement :
5 fine sand : 10 graded stone aggregate 40 mm
nominal size) in foundation 40mm thick cement
concrete 1:5:10 ( 1 cement : fine sand : 10 graded
stone aggregate 40 mm nominal size) including 12
mm cement plaster coat of neat cemnt over exposed
sufrace of masonry walls and 10 cm depth below
ground legvel including all excavation, refulling and
disposal of surplus earth complete as per standard
22.17 design.

22.17.1 180x120 cm
22.17.1.2 With F.P.S. bricks
Edtails of cost for one dust bin.
Earth work in excavation including dispossla of
surplous earth and refilling of excavated earth
6.92x0.45x0.45 m = 1.40 cum
1.66x0.475x0.075m = 0.06cum
= 1.46 cum Cum 1.46
(Rate as per item no. 4.6.5of S.H. conrete work)

Cement concrete 1:5:10 (1cment : 5 fine sand: 10


graded stone agrregate 40 mm nominal size)
6.92x0.15x0.45m = 0.47 cum
1.80x1.20x.075m = 0.16 cum
0.70x0.23x0.075m = 0.07 cum
= 0.71 cum Cum 0.71
(Rate as per item no. 4.5.11 of S.H. Concrete work)

Second class brick work in cement mortar 1:4


Remarks

each

each

each
A

each

per metre
per metre

per metre
per metre

per metre

per metre
per metre

per metre
per metre

per metre
per metre

per metre

per metre
per metre

per metre
per metre

per metre
per metre

per metre
per metre

per metre

per metre
per metre

per metre

per metre
per metre

per metre

per metre
per metre
per metre
per metre
per metre
per metre
per metre
per metre
per metre

A
each

A
B

each

A
B

each

B
each

each
each

each

each

per metre
per metre

per metre

per metre

per metre

per metre
per metre

per metre

per metre

per metre
X

per metre

per metre
X

per metre

per metre

X
per metre

per metre

X
per metre

per metre

per metre
X

per metre

per metre

X
per metre

per metre

per metre

per metre
per metre

per metre

per metre

per metre

per metre
per metre

per metre
per metre

per metre

per metre
per metre

per metre

per metre
per metre

per metre
per metre

per metre
per metre

per metre

per metre
per metre

per metre

per metre
per metre

per metre
X

per metre

per metre

X
per metre

per metre

X
per metre

per metre

per metre
X

per metre
X

B
C

each
A

B
C

each
A

B
C

each
A

B
C

each

per metre
per metre
A

each
A

per sqm

X'
A

each
X'

X'

X'

X'

X'

X'

Y
Y

each

B
C

each

X'
X'

X'

X'

X'

X'

Y
A

each
……. Per metre
Per 100 metre

Per 100 metre

Per 100 metre


Per 100 metre

Per 100 metre

Per 100 metre


Per 100 metre

Per 100 metre

Per 100 metre


Per 100 metre

Per 100 metre

Per 100 metre

Per 100 metre


Per 100 metre

Per 100 metre

Per 100 metre

Per 100 metre


Per 100 metre

Per 100 metre

Per 100 metre

Per 100 metre


Per 100 metre

Per 100 metre

Per 100 metre


(A) rate
I/cs water
charges
C.P. and
overheads

Rs. Per metre

(A) rate
I/cs water
charges
C.P. and
overheads

Rs. Per metre


(A) rate
I/cs water
charges
C.P. and
overheads

Rs. Per metre

(A) rate
I/cs water
charges
C.P. and
overheads

Rs. Per metre


(A) rate
I/cs water
charges
C.P. and
overheads

Rs. Per metre

(A) rate
I/cs water
charges
C.P. and
overheads

Rs. Per metre


(A) rate
I/cs water
charges
C.P. and
overheads

Rs. Per metre

(A) rate
I/cs water
charges
C.P. and
overheads

Rs. Per metre


(A) rate
I/cs water
charges
C.P. and
overheads

Rs. Per metre

(A) rate
I/cs water
charges
C.P. and
overheads

Rs. Per metre


(A) rate
I/cs water
charges
C.P. and
overheads

Rs. Per metre

(A) rate
I/cs water
charges
C.P. and
overheads

Rs. Per metre


Rs. each cut

Rs. each cut

Rs. each cut

Rs. each cut


Rs. each cut

Rs. each cut

Rs. each cut

Rs. each cut

Rs. each cut


Rs. each cut

Rs. each cut

Rs. each cut

Rs. each cut


Rs. Per sqm

Rs. Per sqm

Rs. Per sqm


Rs. Per sqm
……. Per metre
Based on DAR 1997
Cost
Item No Description Unit Qty Rate ( Rs) Remarks
(Rs)
Providing and
fixing G.I. Pipes
complete with G.I.
Fittings including
trenching and
refilling etc.
(external work)
20.3.4 32 mm dia
nominal bore
Details of cost for
10 metre
Materials-
32mm dia G.I.
Pipes metre 10.00 A
Carriage of pipes,
approximate
weight of 10m =
31.70kg tonne 0.03 B
Add 2% for fittings
and wastage of
(A+B) White lead
hemp, oil etc. 1 time 2.60
Labour-
Fitter each 0.12
Beldar each 0.25
Trenching and
refiling etc.
Beldar each 0.66
Coolie each 0.66
Add for water
charges@ 1%
Add for
contractor's profit
and overheads @
10%
Cost for 10 metre
Cost for 1 metre

Based on DAR 1997


Cost
Item No Description Unit Qty Rate ( Rs) Remarks
(Rs)
Providing and
fixing G.I. Pipes
complete with G.I.
Fittings including
trenching and
refilling etc.
20.3.5 (external work)
Details of cost for
10 metre
Materials-
40mm dia G.I.
Pipes metre 10.00
Carriage of pipes,
approximate
weight of 10m =
36.50kg tonne 0.04
Add 2% for fittings
and wastage of
(A+B) White lead
hemp, oil etc. 1 time 3.65
Labour-
Fitter each 0.16
Beldar each 0.33
Trenching and
refiling etc.
Beldar each 0.66
Coolie each 0.66

Add for water


charges@ 1%
Add for
contractor's profit
and overheads @
10%
Add W. C Tax @
8.40%
Cost for 10 metre
Cost for 1 metre

Based on DAR 1997


Cost
Item No Description Unit Qty Rate ( Rs) Remarks
(Rs)
Providing and
fixing G.I. Pipes
complete with G.I.
Fittings including
trenching and
refilling etc.
20.3.6 (external work)
Details of cost for
10 metre
Materials-
50mm dia G.I.
Pipes metre 10.00
Carriage of pipes,
approximate
weight of 10m =
51.70kg tonne 0.05
Add 2% for fittings
and wastage of
(A+B) White lead
hemp, oil etc. 1 time 3.65
Labour-
Fitter each 0.16
Beldar each 0.33
Trenching and
refiling etc.
Beldar each 0.66
Coolie each 0.66

Add for water


charges@ 1%
Add for
contractor's profit
and overheads @
10%
Add W. C Tax @
8.40%
Cost for 10 metre
Cost for 1 metre

Based on DAR 1997


Cost
Item No Description Unit Qty Rate ( Rs) Remarks
(Rs)
Providing and
fixing G.I. Pipes
complete with G.I.
Fittings including
trenching and
refilling etc.
20.3.8 (external work)
Details of cost for
10 metre
Materials-
80mm dia G.I.
Pipes metre 10.00
Carriage of pipes,
approximate
weight of 10m
=86.40kg tonne 0.09
Add 2% for fittings
and wastage of
(A+B) White lead
hemp, oil etc. 1 time 5.20
Labour-
Fitter each 0.25
Beldar each 0.66
Trenching and
refiling etc.
Beldar each 0.66
Coolie each 0.66

Add for water


charges@ 1%
Add for
contractor's profit
and overheads @
10%
Add W. C Tax @
8.40%
Cost for 10 metre
Cost for 1 metre

Based on DAR 1997


Cost
Item No Description Unit Qty Rate ( Rs) Remarks
(Rs)
Providing, laying and
jointing glazed
stoneware pipes
grade 'A' with stiff
mixture of cement
mortar in the
proportion of 1:1(1
cement :1 fine sand)
including testing of
21.1 joints etc. complete.
21.1.2 150 mm dia metre
Details of cost for 30
metre
Materials:
150 mm stone ware
each 50.00
pipes 60 cm long
Carriage of pipes 100m 0.30
10% allowance for
breakage on items(I)
& (ii) Cement of 50 tonne 0.097
joints = 0.068 cum =
0.097 tonne
Carriage of cement tonne 0.097
Fine sand cum 0.068
Carriage of fine sand cum 0.068
Spun yarn of plain
gaskin @ 0.18 kg per
kg 9.00
joint = 0.18x50 = 9 kg.

Labour:
Mason 1st class each 1.50
Mason 2nd class each 1.50
Beldar each 4.00
Bhishti each 1.00
Add for water
charges@ 1%
Add for contractor's
profit and overheads
@ 10%
Add W. C Tax @
8.40%

Cost for 1 metre

Based on DAR 1997


Cost
Item No Description Unit Qty Rate ( Rs) Remarks
(Rs)
Constructing brick
masonry manhole
with 75 class
designation bricks in
cement mortar 1:4 (1
cement:4 coarse
sand) RCC top slab
with 1:2:4 mix ( 1
cement :1 coarse
sand:4 graded stone
aggregate 20 mm
nominal size)
foundation concrete
1:4:8 mix (1 cement :4
coarse sand : 8
graded stone
aggregate 40 mm
nominal size) inside
plastering 12 mm
thick with cement
mortar 1:3 ( 1 cement
:3 coarse sand)
finished with floating
coat of neat cement
and making channels
in cement concrete
1:2:4 ( 1 cement :1
coarse sand:4 graded
stone aggregate 20
mm nominal size)
finished with a floating
coat of neat cement
complete as per
standard design.

21.11
Inside size 90x80 cm
and 60 cm deep
including C.I. Cover
with frame (light duty)
455 x 610 mm internal
diamensions total
weight of cover and
frame to be not less
than 38 kg (weight of
cover 23 kg and
weight of frame 15 kg)
21.11.2
21.11.2.2 With F.P.S. bricks
Material:
Cement concrete
1:4:8 (1 cement :4
coarse sand : 8
graded stone
aggregate 40 mm cum 0.43
nominal size)
1.51x1.41x0.20 m =
0.426 cum say 0.43
cum
(Rate as per item
4.5.8 of sub head
concrete brick work
with bricks of class
designation 75 in
foundation & plinth in
cement mortar 1:4
(1cement :4 coarse
sand) 4.32x0.23x0.50 cum 0.49
m = 0.497 cum Less
pipe
2pai/4(0.15m) 2x0.23m
= (-) 0.008 cum

= 0.489
cum say 0.49 cum
cement concrete 1:2:4
( 1 cement :1 coarse
sand:4 graded stone
aggregate 20 mm
nominal size) for
benching =
2x0.90x(0.80/2)x(0.30
+0.20)/2 = 0.18cum cum 0.16
Less pipe
1x0.90xpai/4(0.15m)2
= (-) 0.02 cum

= 0.16 cum

(Rate as per item


4.5.3 of sub head :
concrete)
12 mm cement plaster
1:3 )1 cement :3
coarse sand) finishing
with floating coat of
neat cement sqm 0.76
3.40mx0.20m
=0.68 sqm
2x1/2x0.80x0.10 m
= 0.08 sqm

= 0.76 sqm
(Rate as per item
13.17 of sub-head
finishing)
Reinforced cement
concrete work 1:2:4
Steel work
Form work
Same as marked 'X'
in item no. 21.11.1.2
Extra labour for
making channeld
same as marked 'A' in
item no. 21.11.1.2
Labour:
Mason 1st class each 0.06
Mason 2nd class each 0.06
C.I. Cover with frame
each 1.00
455x610mm (Inside)
Carriage of C.I. Cover
1time 2.60
and frame
Painting of C.I. Cover
and frame with coal 1time 2.60
tar
Sundries 1time 5.20
Add for water
charges@ 1% on A+B

Add for contractor's


profit and overheads
@ 10% A+B+C
Add W. C Tax @
8.40%
Cost of one manhole

Inside size 120x90 cm


and 90 cm deep
including C.I. Cover
with frame (light duty)
560mm internal
diamensions total
weight of cover and
frame to be not less
than 208 kg (weight of
cover 108 kg and
weight of frame100
21.11.4 kg)
21.11.4.2 With F.P.S. bricks
Material:
Cement concrete
1:4:8 (1 cement :4
coarse sand : 8
graded stone
aggregate 40 mm cum 0.55
nominal size)
1.81x1.51x0.20 m =
0.547 cum say 0.55
cum
(Rate as per item
4.5.8 of sub head
concrete brick work
with bricks of class
designation 75 in
foundation & plinth in
cement mortar 1:4
(1cement :4 coarse
sand)
5.12x0.23x0.65 m =
0.765 cum
1x0.56x0.23x0.15m =
0.019 cum
1x0.79x0.23x0.15m = cum 0.80
0.027 cum
=
0.811 cum
Less pipe
2pai/4(0.15m) 2x0.23m
= (-) 0.008 cum

= 0.803
cum

say 0.80
cum

(Rate as per item


6.1.12 of sub head
brick work) 1:2:4 ( 1
cement :1 coarse
sand:4 graded stone
aggregate 20 mm
nominal size) for
benching =
2x1.2x0.90(0.80/2)x(0
.30+0.20)/2 = 0.270 cum 0.25
cum Less pipe
1.2xpai/4(0.15m)2 =
(-) 0.021 cum

= 0.249
cum

say 0.25
(Rate as per item
4.5.3 of sub head :
concrete)
12 mm cement plaster
1:3 )1 cement :3
coarse sand) finishing
with floating coat of
neat cement
4.2mx0.35m
=1.47 sqm
2x0.56x0.15m
= 0.17
2x1/2x0.90x0.10 m
= 0.09 sqm sqm 2.41
for fixing cover
0.96x0.96m = 0.922
sqm

= 2.652 sqm
less cover
pai/4x(0.56)2 = (-)
0.246 sqm

2.406 sqm
say 2.41 sqm

(Rate as per item


13.17 of sub head
:finishing)
Reinforced cement
concrete work 1:2:4
( 1 cement :1 coarse
sand:4 graded stone
aggregate 20 mm
nominal size)
For slab:
1.66x1.36x0.15 m
= 0.339 cum
Add extra concreting cum 0.33
1x(0.56+0.79)x0.15x0
.15m = 0.03 cum

= 0.369 cum
less covers
pai/4xd2xthickness
0.7854x(0.56)2x0.15
m = (-)
0.037cum

= 0.332 say 0.33


cum

Rate as per item 5.3


of sub head RCC
work
steel reinf. For slab kg 26.43
@ 80.09 kg/per cum
for 0.33 cum = 26.43
kg
Rate as per item
5.29.1 of sub head
RCC work
Form work inside area
of man- hole
1.20x0.90
= 1.08 sqm sqm 0.83
less cover = pai
/4x(0.56)2 = (-)
0.246 sqm

= 0.834 sqm say


0.83
Rate as per item
5.14.3 of sub head
RCC work
Extra labour for
making channel:
Labour:
Mason 1st class each 0.08
Mason 2nd class each 0.08
C.I. Cover with frame
each 1.00
455x610mm (Inside)
Carriage of C.I. Cover
1time 5.20
and frame
Painting of C.I. Cover
and frame with coal 1time 2.60
tar
Sundries 1time 7.80
Add for water
charges@ 1% on A+B

Add for contractor's


profit and overheads
@ 10% A+B+C
Add W. C Tax @
8.40%
Cost of one manhole

Based on DAR 1997


Cost
Item No Description Unit Qty Rate ( Rs) Remarks
(Rs)
500 mm dia R.C.C.
21.6.6 pipe NP 3 Class
Material:
Details of cost for
10m.
500 mm dia pipe (in
2.5 m. length = 4 metre 10.00
Nos.) incld. Carriage 1450 14500
Collars 4 Nos. each 4.00 125 500
Cement for 4 joints =
4x 0.0045= 0.018 cum tonne 0.026
= 0.026 t 6000 156
Fine sand for 4 joints
= 0.0089x4 = 0.036 cum 0.036
cum 300 10.8
Labour: 0
Mason 1st class each 0.81 250 202.5
Mason 2nd class each 0.81 200 162
Beldar each 1.62 150 243
Bhishti each 0.33 150 49.5
Total 15823.8
Add for water
charges@ 1% 158.24
Add for contractor's
profit and overheads
@ 10% 1598.20
Add W . C Tax
@8.40% 1476.74
Cost for 10 metre 19056.98
Cost for per metre 1905.70
Say Rs 1906.00

Based on DAR 1997


Cost
Item No Description Unit Qty Rate ( Rs) Remarks
(Rs)
300 mm dia R.C.C.
21.6.4 pipe NP 3 Class
Material:
Details of cost for
10m.
300 mm dia pipe (in
2.5 m. length = 4
metre 10.00
Nos.) incldg. Carriage
800 8000
Collars 4 Nos. each 4.00 80 320
Cement for 4 joints =
4x 0.00185= 0.0074 tonne 0.011
cum = 0.011 t 6000 66
Fine sand for 4 joints
= 0.0037x4 = 0.0148 cum 0.015
cum say 0.015 cum 300 4.5
Labour: 0
Mason 1st class each 0.59 250 147.5
Mason 2nd class each 0.59 200 118
Beldar each 1.16 150 174
Bhishti each 0.20 150 30
Total 8860
Add for water
charges@ 1% 88.60
Add for contractor's
profit and overheads
@ 10% 894.86
Add W . C Tax
@8.40% 826.85
Cost for 10 metre 10670.31
Cost for per metre 1067.03
Say Rs 1067.00
Based on DAR 1997 and site condition
Rate Cost
Item No Description Unit Qty
( Rs) (Rs)
Providing, laying and jointing glazed PVC
pipes grade 'A' with including testing of
1 joints etc. complete.
150 mm dia metre
Details of cost for 30 metre
Materials:
150 mm PVC pipes 3 m long each 10.00 1,150.00 11,500.00
Carriage of pipes 100m 0.30 141.88 42.56
10% allowance for breakage on items(I) &
(ii) Cement of 50 joints = 0.068 cum = 0.097 tonne 0.097
tonne - -
Carriage of cement tonne 0.097 - -
Fine sand cum 0.068 - -
Carriage of fine sand cum 0.068 - -
Spun yarn of plain gaskin @ 0.18 kg per joint
kg 9.00
= 0.18x50 = 9 kg. - -
Glue for Joinning 150.00
Labour: -
Mason 1st class each 0.50 300.00 150.00
Mason 2nd class each 0.50 250.00 125.00
Beldar each 1.00 160.00 160.00
Bhishti each 0.00 160.00 -
Add for water charges@ 1% 121.28
Add for contractor's profit and overheads @
10% 1,224.88
Add W. C Tax @ 8.40% 102.89
13,576.61
Cost for 1 metre 452.55
Say Rs. 453.00
Remarks