Вы находитесь на странице: 1из 2

INTRODUCTION:

Please be informed that there are so many Business opportunities in Myanmar such as, Industrial
zones Development, Constructions, High way roads Development, Maintenance, Export of Agro
products, Timber and Forest products, Marine products etc. At present we are dealing, with Importing
Diesel oil from Singapore, Malaysia, Indonesia, India, Brunei, UAE, Russia and Middle East to
MYANMAR.
Hence we sincerely request you to invest your money in one of the projects as mentioned below. We
also would like to request you to contact us for your benefit and we are looking forward to doing
Business with you.

The Myanmar Maritime Museum Project

Objective

- To provide another attractive to tourism to stay another day in Yangon.


- To boost up the tourist industry in Yangon and Myanmar.
- To provide 1,000 to 1,500 jobs to locals.
- To earn directly US$ 1.5 million per annum from the tourism and provide
opportunity from other related industry to earn US$ 5.0 to 7.0 million a year based
on current traffic of tourist statistic (236,000 pax).

The attraction

- Boat building history


- Fishing history
- Navy history
- Islander history of different states
- Night Bazaar
- Mini seafood processing plant tour
- Traditional teahouse
- Traditional Burmese food center (Different state)
- International seafood center
- River view bar
- Mariner club
- Mini Aquarium
- Ornament fish export supermarket
- Souvenir shops
- Medium size conventional center
- River tour jetty
- Annual speed boat race
- Once in every two year boat & fishing gear / aquaculture exhibition
- Seafood show
The Premise may consist of the following;
1. Display hall (1) - 3,000 m² Air con:
2. Display hall (2) - 2,000 m² Semi air con:
3. Display hall (3) - 1,500 m² Open air
4. Night Bazaar - 120 Stalls Open air but covered
5. Boat jetty - 80 Meter long
6. Club house and conventional center - 1,000-m² Air con:
7. Restaurant area - 1,000 m² Air con:
- 1,000 m² Non-air con:
8. Mini food processing factory - 1,500 m²
9. Parking lot - 120 cars
Multi- story - 30 buses
10. Aquarium - 500 m²

Building concept

It will be just a comfortable and safe like airport for the visitors. Safety equipment, such
as CCTV, metal detector and X- ray M/C will be installed to provide first class safety and
security.

Timing

Planning -6 to 8 months
Building with M/E equipment - 18 to 24 months
Installation - 24 to 36 months

Capital requirement

The building and auxiliary equipment- 8 to 12 millions


Research and display installation - 2 to 3 millions
Operation expenses and contingency - 15 to 20 millions

Revenue

The revenue will be from restaurant, ticket sales and miscellaneous collection. It is expected the cash
flow will break even after 2 years of operation. ROI is expected between 6 to 8 years depend on
arrival of tourist.

Site Plan

Mentioned with attached "JPG file".

Вам также может понравиться