Schedule of Values - Quality Control Support and Inspections For HA Projects - Indonesia

Item # Project Scope Item


CENTRAL JAVA
Sambak Primary School
1 Presolicitation and Solicitation Support Services
2 Design Phase Services
3 Construction Phase Services
Subtotal
Bengking Primary School
4 Presolicitation and Solicitation Support Services
5 Design Phase Services
6 Construction Phase Services
Subtotal
Sutopati Primary School
7 Presolicitation and Solicitation Support Services
8 Design Phase Services
9 Construction Phase Services
Subtotal
Menorah Primary School
10 Presolicitation and Solicitation Support Services
11 Design Phase Services
12 Construction Phase Services
Subtotal
Salaman II Primary School
13 Presolicitation and Solicitation Support Services
14 Design Phase Services
15 Construction Phase Services
Subtotal
Bayat Jr. High School
16 Presolicitation and Solicitation Support Services
17 Design Phase Services
18 Construction Phase Services
Subtotal
Kwarasan Primary School
19 Presolicitation and Solicitation Support Services
20 Design Phase Services
21 Construction Phase Services
Subtotal

SULAWESI
Batulubang School #1
22 Presolicitation and Solicitation Support Services
23 Design Phase Services
24 Construction Phase Services
Subtotal
Batulubang School #2
25 Presolicitation and Solicitation Support Services
26 Design Phase Services
27 Construction Phase Services
Subtotal
Paudean School
28 Presolicitation and Solicitation Support Services
29 Design Phase Services
30 Construction Phase Services
Subtotal
Pantenusu Primary School
31 Presolicitation and Solicitation Support Services
32 Design Phase Services
33 Construction Phase Services
Subtotal
Pamurutan Pier and Well
34 Presolicitation and Solicitation Support Services
35 Design Phase Services
36 Construction Phase Services
Subtotal
Lirang Primary School
37 Presolicitation and Solicitation Support Services
38 Design Phase Services
39 Construction Phase Services
Subtotal

BANDA ACEH
Wih Kanis Concrete Bridge
40 Presolicitation and Solicitation Support Services
41 Design Phase Services
42 Construction Phase Services
Subtotal
Remesen Road
40 Presolicitation and Solicitation Support Services
41 Design Phase Services
42 Construction Phase Services
Subtotal
Pula Intan Water Supply
40 Presolicitation and Solicitation Support Services
41 Design Phase Services
42 Construction Phase Services
Subtotal

Total Price (US $)


Offeror certifies that the price(s) specified above represents its full bid amount to complete the work propose
These prices are valid for ____ days (not less than 270 days). All bids must be in US dollars

The Total Amount will be adjusted using bid prices listed for items selected by CH2M HILL.
Each Item shall include all labor, materials, and equipment to complete the required scope
whether specifically shown in the item description or in the SOW. 

Signature:  ______________________________________________________________________

Printed Name:  ___________________________________________________________________

Title:  ___________________________________________________________________________

Date:  ___________________________________________________________________________

Phone:  __________________________________________________________________________

Measurement and Payment
Costs for on­site project oversight, day­to­day project management, materials required but not specifically id
travel and per diem are to be included in the cost for various bid items.  Cumulatively, the sum of all bid item
perform all work identified in the SOW, drawings, and specifications.
cts - Indonesia

Est QTY UOM Price

1 LS
1 LS
1 LS
0

1 LS
1 LS
1 LS
0

1 LS
1 LS
1 LS
0

1 LS
1 LS
1 LS
0

1 LS
1 LS
1 LS
0

1 LS
1 LS
1 LS
0

1 LS
1 LS
1 LS
0

1 LS
1 LS
1 LS
0
1 LS
1 LS
1 LS
0

1 LS
1 LS
1 LS
0

1 LS
1 LS
1 LS
0

1 LS
1 LS
1 LS
0

1 LS
1 LS
1 LS
0

1 LS
1 LS
1 LS
0

1 LS
1 LS
1 LS
0

1 LS
1 LS
1 LS
0

-
 complete the work proposed.

__________

__________

___________

___________

____________

quired but not specifically identified herein, and all required 
vely, the sum of all bid items are to include the total cost to 

Вам также может понравиться