Assessment Major Project

Working at a Small-to-Medium Business or ISP Major Project Putting It All Together

Advanced Diploma of Computer Systems Engineering Networking 2

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 1 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project


Introduction....................................................................................................................................... 4 Aim..................................................................................................................................................... 4 Objectives ......................................................................................................................................... 4 Background / Preparation ................................................................................................................ 4 Project Teams ................................................................................................................................... 5 Parts and Steps of the Project ......................................................................................................... 6 Progress Reports.............................................................................................................................. 7 Clarification ....................................................................................................................................... 7 Getting Started .................................................................................................................................. 7 Part A - Review the existing network and customer work order ................................................... 8
Step 1: Create company name and logo ............................................................................................................8 Step 2: Work order received from your manager at the ISP ..............................................................................8

Part B Develop the subnet scheme. ........................................................................................... 10


Step 1: Determine the number of hosts and subnets ..................................................................................... 10 Step 2: Calculate the custom subnet mask ..................................................................................................... 10 Step 3: Identify subnet and host IP addresses ................................................................................................ 11

Part C Document network device interfaces and physical topology ....................................... 12


Step 1: Document the customer router interfaces and Host IP addresses ..................................................... 12 Step 2: Document the Linksys interfaces and host IP addresses ................................................................... 12 Step 3: Diagram the upgraded network. ......................................................................................................... 13

Part D Use Packet Tracer to prototype the planned network ................................................... 15


Step 1: Configure all devices, including the ISP devices, using Packet Tracer .............................................. 15 Step 2: Test and verify functionality ................................................................................................................ 15

Part E Configure devices and verify default settings ................................................................ 15


Step 1: Verify default settings for the customer router .................................................................................... 15 Step 2: Configure the customer router ............................................................................................................ 15 Device Configuration Checklist ....................................................................................................................... 16 Step 3: Verify default settings for the Linksys and set the SSID. .................................................................... 17 Step 4: Verify default settings for the 2960 switch. ......................................................................................... 17 Step 5: Verify host PCs are DHCP clients. ..................................................................................................... 17

Part F Configuring a Web Server ................................................................................................ 18


Step 1: Install Windows Server 2003 and configure as a Web server ........................................................ 18 Step 2: Implement a basic level of security on the Web server .................................................................. 18

Part G Connect network devices and verify connectivity ......................................................... 18


Step 1: Connect the network devices .............................................................................................................. 18 Network Equipment Installation Checklist ................................................................................................... 18
All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1 Page 2 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project


Step 2: Verify device configurations and network connectivity ....................................................................... 18 Configuration Verification and Connectivity Checklist ..................................................................................... 19

Part H Class Presentation ........................................................................................................... 20


Step 1: 15 minute Powerpoint presentation .................................................................................................... 20

Part I Final Report ........................................................................................................................ 20 Router Interface Summary ............................................................................................................. 21 Project Timelines ............................................................................................................................ 22
Due Date: Week beginning: 1 August 2011 ............................................................................................ 22
nd st

Part A - Review the existing network and customer work order ................................................................. 22 Due Date: Week beginning 22 August 2011 .......................................................................................... 22 Part B Develop the subnet scheme. ........................................................................................................ 22 Due Date: Week beginning: 5 September 2011 ..................................................................................... 22
th th

Part C Document network device interfaces and physical topology ........................................................ 22 Due Date: Week beginning 12 September 2011 ................................................................................... 22 Part D Use Packet Tracer to prototype the planned network .................................................................. 22 Due Date: Week beginning 10
th

October 2011 ........................................................................................ 22

Part E Configure devices and verify default settings ............................................................................... 22 Due Date: Week beginning: 24
th

October 2011 ....................................................................................... 22

Part F Configuring a Web Server ............................................................................................................. 22 Due Date: Week beginning: 31 October 2011 ........................................................................................ 22
th st

Part G Connect network devices and verify connectivity ......................................................................... 22 Due Date: Week beginning: 7 November 2011 ...................................................................................... 22
th

Part H Class Presentation ........................................................................................................................ 22 Due Date: Week beginning: 14 November 2011 .................................................................................... 22 Part I Final Report .................................................................................................................................... 22 Assessment - Concepts (Presentation) ........................................................................................................... 23 Assessment Report - Overall .......................................................................................................................... 24 Assessment Installation and Configuration ..................................................................................................... 25 Assessment Report Specifics....................................................................................................................... 26

Final Assessment ........................................................................................................................... 27

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 3 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project Introduction


This Work Performance Simulation is part of the assessment for Networking module of The Advanced Diploma of Computer Systems Engineering. You will need to successfully complete the simulation, along with other Work Performance Simulations, to successfully pass Networking. It is based on the project from the Cisco Discovery 2 Working at a Small-to-Medium Business or ISP Major Project - Putting It All Together. As an onsite installation and support technician, you are required to analyze a customers existing network and implement a new network configuration to improve network performance. You will use additional equipment as necessary and develop an IP subnetting scheme to address the customers needs. Note: Resources for you to utilize will be Cisco Discovery 2 Working at a Small-to-Medium Business or ISP and Internet research.

Aim
This project allows you analyse and implement a new network configuration to improve network performance, using the skills gained in Cisco Discovery 2 Working at a Small-to-Medium Business or ISP. You will use the skills that you have learnt and developed to: Review the existing network and upgrade it by adding another router and standalone switch o Depending on availability, router could be 1841, 2600, 2800 series Remove and relocate the existing Linksys WRT300N The new switch is to support connections from wired clients on one subnet The existing Linksys will support wireless clients on another subnet Configure the new router as a DHCP server for the wired network and the Linksys which supports wireless users Test and troubleshoot the new configuration Provide all relevant documentation Present and submit a report of the proposal and implementation

Objectives

Review the customer work order to get an understanding of what is to be achieved Create an IP addressing plan for a small network Implement a network equipment upgrade Install and configure a web server Verify device configurations and network connectivity Prepare and present a technical report to a diverse group, that details your actions and results

Background / Preparation

Your team is responsible for customer support and service for the ISP that employs you You receive a work order specifying your responsibilities which include analyzing the customers existing network configuration and implementing a new configuration to improve network performance You will use additional equipment as necessary and develop an IP subnetting scheme to address the customers needs On an earlier site visit, one of the ISP technicians had created a diagram of the customers existing network

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 4 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project


The following equipment is required: ISP router with 2 Serial and one FastEthernet interface (preconfigured) Ethernet 2960 switch to connect to ISP router (preconfigured) Customer 1841 router (or other suitable router with two FastEthernet interfaces and at least one Serial interface to connect to the ISP) Linksys WRT300N (or other Linksys that supports wireless) Ethernet 2960 switch to connect wired PCs Windows XP-based PC to act as wireless client (wireless NIC) Windows XP-based PC to act as wired client (Ethernet NIC) Cat 5 cabling as necessary Serial cabling as necessary ISP work order (in this lab) Device Configuration Checklist (in this lab) Network Equipment Installation Checklist (in this lab) Configuration Verification and Connectivity Checklist (in this lab)

Project Teams
a. The project is to be undertaken in the allocated teams b. Each team will be allocated a team number c. Each team is to select: Project manager o Fully understand customer requirements and needs o Responsible for managing project o Provide progress reports to teacher / client Technical specialists Network design and implementation o IP addressing o Logical and physical design o Device configuration Documentation and network diagrams o Developing and collating all information and documentation o Preparing network diagrams Network and Web security o Network security including wired and wireless o Web server security Web design and Operating systems o Web server design, installation and implementation Information and communications technology infrastructure o Network equipment o Network standards o Cabling o Testing Note: Responsibilities are to be shared as necessary Teams are to have team meetings to discuss and implement possible solutions Each team member is to have an involvement in the network design, implementation and report Each team will be allocated either AnyCompanyt1 or Anycompany2 as the client by the instructor

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 5 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project Parts and Steps of the Project


To help you successfully complete the project, it has been broken up into a number of parts and steps. Included are a number of sub-tasks or activities that need to be completed within each step.

Part A - Review the existing network and customer work order


Step 1: Create company name and logo Step 2: Review work order received from your manager at the ISP Step 1: Determine the number of hosts and subnets Step 2: Calculate the custom subnet mask Step 3: Identify subnet and host IP addresses Step 1: Document the router interfaces and Host IP addresses Step 2: Document the Linksys interfaces and host IP addresses Step 3: Diagram the upgraded network Step 1: Verify default settings for the customer router Step 2: Configure the new customer router Step 3: Verify default settings for the Linksys and set the SSID Step 4: Verify default settings for the 2960 switch Step 5: Verify host PCs are DHCP clients Step 1: Connect the network devices Step 2: Verify device configurations and network connectivity Install Windows Server 2003 and configure as a Web server Set up a basic web site and FTP site Provide a basic level of security Prepare a 15 minute Powerpoint presentation Produce a comprehensive report on the upgrade Submit a professionally prepared report

Part B Develop the subnet scheme


Part C Document network device interfaces and physical topology


Part D Configure devices and verify default settings


Part E Connect network devices and verify connectivity


Part F Configuring Web Server


Part G Class Presentation

Part H Final Report


All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 6 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project Progress Reports


You are to provide progress reports to the teacher / client as shown in the project timelines during the time of the project. This will ensure that you keep to the specified timelines and that the project is completed to the teacher / clients satisfaction. During these progress reports, the teacher / client will be able to identify any errors or omissions and you will be able to correct these before they become major problems that would impact on the successful completion of the project.

Clarification
If you require clarification on any issues, you should develop your questions relating to the issues and arrange a time to discuss them with your teacher / client. You should treat this exercise as if you were dealing with the client in a real-life situation the closer this exercise is to reality, the more your will benefit. Therefore, you should collate all the information you require and arrange a meeting with your teacher / client in order to ask all questions at once. In a real situation you would want to disturb the client as little as possible but still ascertain the exact details of what your client wants. Know exactly what you want to know, frame the best possible questions to find this out and then talk to the client.

Getting Started
Now that you have an overview of the project, read through the rest of the project to gain an understanding of all the requirements. Read each part and step and make notes of what is required so you are clear on what you need to do to successfully complete each step. Once this is completed you are ready to work through each step. If you require clarification on any of the steps, discuss these with the teacher / client as per the clarification information. After reading through each step, you will note that some information has already been provided by the teacher / client. Read through the information and apply this information to the project or if necessary, ask for clarification as per the clarification information. At each step, read the activities and complete them as necessary. In a live environment more than one activity may be started at a given time, whereas some activities cannot be started until others are completed. The same is true with this project, you do not necessarily have to complete each activity in the order they are given. To assist you with meeting project timelines and completing all the activities, you should prepare a timelines chart using the software package Microsoft Project or something similar.

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 7 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project Part A - Review the existing network and customer work order
Step 1: Create company name and logo You are to create a company name and logo and utilize this throughout your documentation.

ABC-XYZ-ISP Inc. (Note: Replace above with your logo)


Step 2: Work order received from your manager at the ISP

Review the work order and the existing network diagram to get a general understanding of the customers needs and requirements If necessary, schedule further meetings for discussions with the teacher / client for more information or clarification Official Work Order Customer: AnyCompany1 or AnyCompany2 Address: 1234 Fifth Street, Anytown, Customer Contact: Fred Pennypincher, Chief Financial Officer Phone number: 12-34567890 Description of work to be performed Review the existing network and upgrade it by adding a suitable router and standalone 2960 switch to supplement and offload the existing Linksys WRT300N New switch will support connections from wired clients on one subnet Existing Linksys will support wireless clients on another subnet Configure the new router as a DHCP server for the wired network and the Linksys which supports wireless users The wired and wireless client traffic from each subnet will be routed though the new customer router RIP v2 routing protocol is to be used between the new router and the ISP Encapsulation on the WAN link between the customer and ISP is PPP Customer router must use a static address and the ISP router serial interface IP address it must communicate with is: ________10.100.1.5________________

Date: _____________

(Circle the customer name assigned by your instructor)

If your local network is connected to the ISP as AnyCompany1, the IP address of the ISP serial 0 interface is 10.100.1.5 /22. If your local network is connected to the ISP as AnyCompany2, the IP address of the ISP serial 1 interface is 172.27.100.25 /22. Approved by: Bill Broadband, ISP Manager

Assigned to: Guy Netwiz

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 8 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project


Customers Existing Network

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 9 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project Part B Develop the subnet scheme.


Develop a subnet scheme using the address below that will allow the customer network to support two subnets of up to 30 clients each, and allow for growth to as many as 6 subnets in the future. (Note: 1st subnet 0 and last subnets are not able to be used)

Subnet 1 will be used for the wired clients Next subnet will be used to assign an IP address to the Linksys external Internet interface Internal wireless network clients will use the default IP addressing (network 192.168.1.0 /24) assigned by the Linksys Linksys will use NAT/PAT to convert internal wireless client addresses to the external address Internal wireless clients will not require a subnet from the base address

The customer has been assigned an IP address and subnet mask: ____192.168.111.0__ o o If local network customer is AnyCompany1, use 192.168.111.0 /24 If local network customer is AnyCompany2, use 192.168.222.0 /24

Step 1: Determine the number of hosts and subnets a. The largest subnet must be able to support 30 hosts. To support that many hosts, the number of host bits required is __5_______. b. What is the minimum number of subnets required for the new network design that also allows for future growth? ___6______ c. How many host ID bits are reserved for the subnet ID to allow for this number of subnets with each subnet having 30 hosts? ____3__ d. What is the maximum possible number of subnets with this scheme? ________8___ e. What is the maximum usable number of subnets with this scheme? _____6______ Step 2: Calculate the custom subnet mask a. Now that the number of subnet ID bits is known, the subnet mask can be calculated A class C network has a default subnet mask of 24 bits, or 255.255.255.0 After subnetting, you will need a new custom subnet mask

b. The custom subnet mask for this network will be _255.255_.255_.224_, or /_27.

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 10 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project


Step 3: Identify subnet and host IP addresses

Now that the subnet mask is identified, the network addressing scheme can be created Addressing scheme includes the subnet numbers, the subnet broadcast address, and the range of IP addresses assignable to hosts

a. Complete the table showing all the possible subnets for the 192.168.111.0 network (If you are working with AnyCompany1) or 192.168.222.0 network (If you are working with AnyCompany2) b. Identify the usable and non-usable subnets

Subnet

Subnet Address

Host IP Address Range

Usable / Non-usable

Broadcast Address

0 1 2 3 4 5 6 7

192.168.111.0 192.168.111.32 192.168.111.64 192.168.111.96 192.168.111.128 192.168.111.160 192.168.111.192 192.168.111.224 192.168.111.33 ---192.168.111.62 192.168.111.65 ---192.168.111.94 192.168.111. 97 ---192.168.111.126 192.168.111.129 ---192.168.111.158 192.168.111. 161 ---192.168.111.190 192.168.111. 193 ---192.168.111.222

N 30/2 30/2 30/2 30/2 30/2 30/2 N 192.168.111.63 192.168.111.95 192.168.111.127 192.168.111.159 192.168.111.191 192.168.111.223

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 11 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project Part C Document network device interfaces and physical topology
Step 1: Document the customer router interfaces and Host IP addresses a. Fill in the following table with the IP addresses, subnet masks and connection information for the customer router interfaces b. If an interface is not used enter N/A c. This information will be used in configuring the customer router Note: If you are using a router other than an 1841, use the interface chart at the end of the lab to determine the proper interface designations
Interface (1841) Serial 0/0/0 Serial 0/0/1 Fa 0/0 Fa 0/1 10.100.1.6 /22 255.255.252.0 N/A 192.168.111.160/27 255.255.255.224 192.168.111.32 / 27 255.255.255.224 IP Address / subnet mask Connects to device / interface ISP ROUTER-----S0/0/0 N/A 2960 swtich 0/1 Linksys Router Fa 0/2 Connects to device IP Address (if applicable) 10.100.1.5 / 22 255.255.252.0 N/A Customer Router

Customer Router

Step 2: Document the Linksys interfaces and host IP addresses d. Fill in the following table with the IP addresses, subnet masks and connection information for the Linksys interfaces Note:

The Linksys should be reset to its factory default setting and should not be configured, except for changing the SSID. SSID is to be AnyCompan1x (AnyCompany2x) x = team number

Interface (Linksys) Internet Interface (external address) LAN gateway (internal address) DHCP Wireless Hosts address range

IP Address / subnet mask 10.100.1.6 /22 255.255.252.0

Connects to device / interface Customer Router Fa 0/1

Connects to device IP Address (if applicable) 10.100.1.6

192.168.111.33 / 27 255.255.255.224 192.168.111.34--192.168.111.62

Customer Routyer

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 12 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project


Step 3: Diagram the upgraded network. a. Draw and complete a logical and physical network diagram, showing all network devices, PCs and cabling, as necessary b. Identify all devices and interfaces according to the interface chart and indicate the IP address and subnet mask (using /xx format) for each interface, based on the entries from the previous steps

FA0/0 IP Address 172.20.27.1 / 24


FA0/0

Company Web and Email Server IP Address: 172.20.27.10 Subnet Mask: 255.255.255.0

ISP Router
S0/0 AnyCompany1

ISP Switch
S0/1 AnyCompany2

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 13 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 14 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project Part D Use Packet Tracer to prototype the planned network
Step 1: Configure all devices, including the ISP devices, using Packet Tracer a. Connect and configure the network as per your design b. Apply relevant IP addresses, subnet masks and default gateways c. Configure Linksys ISR d. Implement wireless SSID security Note: To test full functionality, include the ISP router, switch and web server Step 2: Test and verify functionality a. All the link lights should be green if the connections are correct b. Test various scenarios such as traffic coming from the Internet to the internal hosts and host traffic moving to the Internet c. Confirm that the wireless network behaves as expected Note:

Not all features of the designed network will be able to be tested using Packet Tracer Include the Packet Tracer file as part of your final report

Part E Configure devices and verify default settings


Note: To test full functionality, include the ISP router, switch and web server Step 1: Verify default settings for the customer router a. Connect to the customer router and verify that is in the factory default state b. If using SDM to configure basic settings, use the Reset to Factory Defaults option from the SDM GUI main menu. Also verify that your router has SDM version 2.4 or later installed. If not, contact your instructor c. If using IOS CLI to configure the router, erase the startup-config and issue the reload command from privileged mode Note:

If the startup-config is erased in an SDM router, SDM will no longer come up by default when the router is restarted It will be necessary to build a basic config

Step 2: Configure the customer router a. Use the following checklist to assist in configuring the customer router b. Check off the configuration items as you complete them Note: Some of the basic router settings can be configured using SDM if available c. Display the running-config of the router and save it as a file for reference

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 15 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project


Device Configuration Checklist
Device Manuf. / Model Number: _________________________ IOS version: ___________________

Configuration Item Configure the router host name Configure passwords

Configuration value AnyCompany1 or AnyCompany2 Console: cisco Enable: cisco Enable Secret: class VTY terminals: cisco

Notes / IOS Commands or SDM used

Configure FastEthernet interface 0/0 Configure FastEthernet interface 0/1 Configure the WAN interface Serial 0/0/0 (ISP provides clock rate, encapsulation PPP) Configure DHCP server for internal networks (wired and linksys wireless pools) Configure Static route to the wireless network Configure a default route to the ISP router Configure RIP version 2 to advertise the customer networks

IP Addr:192.168.111.160/27 SN mask:255.255.255.224 IP Addr:192.168.111.32 SN mask:255.255.255.224 IP Addr: 10.100.1.6 /22 SN mask: 255.255.252.0

Subnet 1: _192.168.111.162---.190 Subnet 2: _192.168.111.34 ---.62_

Net: ____________________ Net: ____________________ Net: ____________________

Display the running-config and verify all settings Save running-config to startup-config

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 16 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project


Step 3: Verify default settings for the Linksys and set the SSID. a. Log in to the Linksys and verify that it is in the factory default state b. Use the factory default of no user ID and password of admin c. The router internal IP address should be set to 192.168.1.1 and a subnet mask of 255.255.255.0 d. The DHCP address range should be 192.168.1.100 through 192.168.1.149 e. All security settings should be default, with no MAC filtering etc. f. If necessary, reset the ISR using the Administration tab and the Factory Defaults option g. Change the default Service Set Identifier (SSID) of linksys to the SSID created previously AnyCompany1x (or AnyCopmany2x) and ensure that it is broadcast Step 4: Verify default settings for the 2960 switch. a. Log in to the switch and verify that it is in the factory default state b. Use IOS CLI to reset the switch by deleting vlan.dat, erasing the startup-config and issuing the reload command from privileged mode c. It may be necessary to power cycle the switch for the changes to take effect Step 5: Verify host PCs are DHCP clients. a. Use the Control Panel > Network Connections option to verify that both the wired and wireless host PCs are set to obtain their IP addresses automatically via DHCP

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 17 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project Part F Configuring a Web Server


The Web server needs to installed and configured Web server will be the Company Web and Email Server at the ISP site

Step 1: Install Windows Server 2003 and configure as a Web server a. Set up a basic web site and FTP site for test purposes b. Provide a suitable IP address for the web server c. Create a basic home page on the web site d. FTP site to contain test files for downloading Step 2: Implement a basic level of security on the Web server To provide a level of security, users of the FTP site will need to provide a login in name and password a. Users should be able to browse the website without a login or password b. No files or information should be able to be uploaded to the web site c. Users of the FTP site will need to provide a login and password before accessing the site d. Users can download files but not upload files

Part G Connect network devices and verify connectivity


Step 1: Connect the network devices a. Use the following checklist to assist in connecting network devices using the proper cables b. Check off the installation items as you complete them Network Equipment Installation Checklist
Devices connected Connect the Linksys to the 1841. Connect the 1841 to the ISP router Connect the 1841 to the switch Connect wired PC to switch Connect wireless PC to Linksys SSID entered in Part D Step 2 From Device /Interface To Device /Interface Cable type

Step 2: Verify device configurations and network connectivity a. Use the following checklist to verify the IP configuration of each host and test network connectivity b. You will also display the various running-configs and routing tables c. Check off the items as you complete them

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 18 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project


Configuration Verification and Connectivity Checklist
Verification Item From command prompt of wired PC, display the IP address, subnet mask and default gateway. From command prompt of wireless PC, display the IP address, subnet mask and default gateway. Login to Linksys GUI from wireless host and record the LAN IP address and subnet mask, the Internet IP address and subnet mask and default gateway Ping from the wired host to 1841 default gateway Ping from the wired host to ISP S0/0 interface Ping from the wired host to ISP FA0/0 Ping from the wired host to ISP Web and Email server Ping from the wireless host to 1841 default gateway Ping from the wireless host to ISP S0/0 interface Ping from the wireless host to ISP FA0/0 interface Ping from the wireless host to ISP Web and Email server Access the Web server from the wired and wireless host Display the IP routing table for the customer router. What routes are known and how were they learned? Capture the runningconfig from the customer 1841 router in a text file on the desktop to show to the instructor. Name the file using your initials. Record results here

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 19 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project Part H Class Presentation


Step 1: 15 minute Powerpoint presentation Your team is to prepare a professional 15 minute Powerpoint presentation that is to be given to the prospective client and to your company management Presentation should be no less than 15 minutes and no longer than 20 minutes, and should include: Team members and assigned roles Project overview and expected outcomes Subnetting scheme developed Network diagrams Demonstration of prototype using Packet Tracer Device configuration information Testing and verification results Benefits, recommendations and summary Each member of the team will be responsible for presenting their assigned part of the project

Part I Final Report


The final report for the client is to be submitted on CD and professionally presented The report is to be in prepared in Microsoft Word or a suitable application that is compatible with the teacher / client application A HTML version of the report, viewable in a web browser (Internet Explorer or Mozilla Firefox), is also to be included Final report to contain all actions, diagrams, plans, findings and any possible recommendations that are necessary to complete all the objectives and should be in proper report format

The report should contain all relevant information: A cover page Title page and table of contents A list of the team members and their responsibilities Executive summary a report summary and benefits of the proposal in non technical terms Introduction why has the report been prepared and who is the intended audience An overview of the project and its aims - what have been identified as the client needs A timelines chart - (Gantt chart) that shows project progress and milestones Body of report - actions, diagrams, plans, findings, etc. - how you will meet the goals and objectives (your proposal and solution) Evaluation issues with the current network and why the new network will resolve the issues Summary and any recommendations why your proposal will benefit the client in the short term as well as in the longer term and why any options beyond the essential ones should be accepted Appended information may include: Diagrams Specifications Support information Warranty information Glossary Bibliography and references CD should also contain: The class Powerpoint presentation Packet Tracer file used for prototyping and testing HTML version of the report to be viewed in a web browser
All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1 Page 20 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project Router Interface Summary


Router Interface Summary Router Model 800 (806) 1600 1700 1800 2500 2600 Ethernet Interface #1 Ethernet 0 (E0) Ethernet 0 (E0) Fast Ethernet 0 (FA0) Fast Ethernet 0/0 (FA0/0) Ethernet 0 (E0) Fast Ethernet 0/0 (FA0/0) Ethernet Interface #2 Ethernet 1 (E1) Ethernet 1 (E1) Fast Ethernet 1 (FA1) Fast Ethernet 0/1 (FA0/1) Ethernet 1 (E1) Fast Ethernet 0/1 (FA0/1) Serial 0 (S0) Serial 0 (S0) Serial 0/0/0 (S0/0/0) Serial 0 (S0) Serial 0/0 (S0/0) Serial 1 (S1) Serial 1 (S1) Serial 0/0/1 (S0/0/1) Serial 1 (S1) Serial 0/1 (S0/1) Serial Interface #1 Serial Interface #2

NOTE: In order to find out exactly how the router is configured, look at the interfaces. Doing this will identify the type of router as well as how many interfaces the router has. There is no way to effectively list all of the combinations of configurations for each router class. What is provided are the identifiers for the possible combinations of interfaces in the device. This interface chart does not include any other type of interface, even though a specific router may contain one. An example of this might be an ISDN BRI interface. The string in parenthesis is the legal abbreviation that can be used in IOS command to represent the interface.

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 21 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project Project Timelines


Due Date: Week beginning: 1st August 2011 Part A - Review the existing network and customer work order Step 1: Create company name and logo Step 2: Work order received from your manager at the ISP Due Date: Week beginning 22nd August 2011 Part B Develop the subnet scheme. Step 1: Determine the number of hosts and subnets Step 2: Calculate the custom subnet mask Step 3: Identify subnet and host IP addresses Due Date: Week beginning: 5th September 2011 Part C Document network device interfaces and physical topology Step 1: Document the customer router interfaces and Host IP addresses Step 2: Document the Linksys interfaces and host IP addresses Step 3: Diagram the upgraded network. Due Date: Week beginning 12th September 2011 Part D Use Packet Tracer to prototype the planned network Step 1: Configure all devices using Packet Tracer Step 2: Test and verify functionality Due Date: Week beginning 10th October 2011 Part E Configure devices and verify default settings Step 1: Verify default settings for the customer router Step 2: Configure the customer router Step 3: Verify default settings for the Linksys and set the SSID. Step 4: Verify default settings for the 2960 switch. Step 5: Verify host PCs are DHCP clients. Due Date: Week beginning: 24th October 2011 Part F Configuring a Web Server Step 1: Install Windows Server 2003 and configure as a Web server Step 2: Implement a basic level of security on the Web server Due Date: Week beginning: 31st October 2011 Part G Connect network devices and verify connectivity Step 1: Connect the network devices Step 2: Verify device configurations and network connectivity Due Date: Week beginning: Part H Class Presentation Step 1: 15 minute PowerPoint presentation Due Date: Week beginning: Part I Final Report 7th November 2011

14th November 2011

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved.

Page 22 of 26

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project


Assessment - Concepts (Presentation) Can answers be provided to questions that are based on the theoretical concepts?
Exceptional (10 pts)
Extremely well organized; logical format that was easy to follow; flowed smoothly from one idea to another and cleverly conveyed; the organization enhanced the effectiveness of the project Totally accurate and complete; all relevant information was precise and explicit Was extremely clever and presented with originality; a unique approach that truly enhanced the project Was extremely clever and presented with originality; a unique approach that truly showed understanding of being a professional Was engaging, provocative, and captured the interest of the audience and maintained this throughout the entire presentation; great variety of visual aids and multimedia; visual aids were colourful and clear Completed within allowed timelines

Admirable (8 9 pts)
Presented in a thoughtful manner; there were signs of organization and most transitions were easy to follow, but at times ideas were unclear Mostly accurate and complete; a few inconsistencies, errors or lack of information Was clever at times; thoughtfully and uniquely presented Was clever at times; thoughtfully and uniquely presented; a logical approach that showed a good understanding of being a professional

Acceptable (5 -7 pts)
Somewhat organized; ideas were not presented coherently and transitions were not always smooth, which at times distracted the audience Somewhat accurate and complete; more than a few inconsistencies, errors or lack of information Added a few original touches to enhance the project but did not incorporate it throughout Added a few original touches to enhance the project but did not incorporate it throughout; showed understanding of being a professional Was at times interesting and was presented clearly and precisely; was clever at times and was organized in a logical manner; limited variety of visual aids and visual aids were not colourful or clear Just completed within allowed timelines. Short or over.

Amateur (1 -4 pts )
Choppy and confusing; format was difficult to follow; transitions of ideas were abrupt and seriously distracted the audience Completely inaccurate and incomplete; many inconsistencies, errors or lack of information Little creative energy used during this project; was bland, predictable, and lacked zip Little creative energy used during this project presentation; showed no originality; showed very little understanding of being a professional Was not organized effectively; was not easy to follow and did not keep the audience interested; no use of visual aids Not completed within allocated timelines. Well short or well over.

Organization

Objectives / Deliverables

Creativity

Professionalism

Presentation Mechanics

Was well done and interesting to the audience; was presented in a unique manner and was very well organized; some use of visual aids

Time Management

Completed within allowed timelines. Just short or just over.

Total

/ 60

50 % or better - Competent

Less than 50% = Not Competent

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 23 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project


Assessment Report - Overall Can an acceptable solution be provided, in the form of a report, to a scenario that has been given? Exceptional (10)
Organization Extremely well organized; logical format that was easy to follow; flowed smoothly from one idea to another and cleverly conveyed; the organization enhanced the effectiveness of the project Completely accurate; all facts were precise and explicit Totally accurate and complete; all relevant information was precise and explicit Went above and beyond to research information; solicited material in addition to what was provided; brought in personal ideas and information to enhance project; and utilized more than 8 types of resources to make project effective Was extremely clever and presented with originality; a unique approach that truly enhanced the project Was engaging, provocative, and captured the interest of the audience and maintained this throughout the entire presentation; great variety of visual aids and multimedia; visual aids were colourful and clear / 60 %

Admirable (8 - 9)
Presented in a thoughtful manner; there were signs of organization and most transitions were easy to follow, but at times ideas were unclear Mostly accurate; a few inconsistencies or errors in information Mostly accurate and complete; a few inconsistencies, errors or lack of information Did a very good job of researching; utilized materials provided to their full potential; solicited more than 6 types of research to enhance project; at times took the initiative to find information outside of school Was clever at times; thoughtfully and uniquely presented

Acceptable (5 - 7)
Somewhat organized; ideas were not presented coherently and transitions were not always smooth, which at times distracted the audience Somewhat accurate; more than a few inconsistencies or errors in information Somewhat accurate and complete; more than a few inconsistencies, errors or lack of information

Amateur (1 - 4)
Choppy and confusing; format was difficult to follow; transitions of ideas were abrupt and seriously distracted the audience Completely inaccurate; the facts in this project were misleading to the audience Completely inaccurate and incomplete; many inconsistencies, errors or lack of information

Content Accuracy Objectives / Deliverables

Research

Used the material provided in an acceptable manner, but did not consult any additional resources

Did not utilize resources effectively; did little or no fact gathering on the topic

Creativity

Presentation Mechanics

Was well done and interesting to the audience; was presented in a unique manner and was very well organized; some use of visual aids

Added a few original touches to enhance the project but did not incorporate it throughout Was at times interesting and was presented clearly and precisely; was clever at times and was organized in a logical manner; limited variety of visual aids and visual aids were not colourful or clear

Little creative energy used during this project; was bland, predictable, and lacked zip Was not organized effectively; was not easy to follow and did not keep the audience interested; no use of visual aids

Total

50 % or better - Competent

Less than 50% = Not Competent

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 24 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project


Assessment Installation and Configuration Can a working model be successfully implemented based on what has been proposed in the theoretical concepts and the report?
Exceptional (10 pts) Organization Extremely well organized; logical format that was easy to follow; flowed smoothly from one idea to another and cleverly conveyed; the organization enhanced the effectiveness of the project Completely accurate; all requirements fulfilled; additional enhancements configured; network fully functional Was extremely clever and presented with originality; a unique approach that truly showed understanding of faultfinding; all faults located and rectified ahead of time Completely accurate; all facts were precise and explicit / 40 % Admirable (8 9 pts) Presented in a thoughtful manner; there were signs of organization and most transitions were easy to follow, but at times ideas were unclear Mostly accurate; most requirements fulfilled; network will have acceptable functionality Was clever at times; thoughtfully and uniquely presented; a logical approach that showed a good understanding of faultfinding; all faults located and rectified on time Mostly accurate; a few inconsistencies or errors in information Acceptable (5 -7 pts) Somewhat organized; ideas were not presented coherently and transitions were not always smooth, which at times distracted the audience Somewhat accurate; minimal requirements fulfilled; network will have limited but acceptable functionality Added a few original touches to enhance the project but did not incorporate it throughout; showed understanding of faultfinding; faults located and rectified with minimal extra time Somewhat accurate; more than a few inconsistencies or errors in information Amateur (1 -4 pts ) Choppy and confusing; format was difficult to follow; transitions of ideas were abrupt and seriously distracted the audience Completely inaccurate; network will have very limited or no functionality Little creative energy used during this project; showed no originality; showed very little understanding of faultfinding; not all faults located and rectified; all faults not rectified within extra time allocated Completely inaccurate; the facts in this project were misleading to the audience

Configuration

Troubleshooting

Content Accuracy Total

50 % or better - Competent

Less than 50% = Not Competent

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 25 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project


Assessment Report Specifics
Assessment Criteria 1 2 3 4 5 6 7 8 9 10

Part A - Review the existing network and customer work order Step 1: Create company name and logo Step 2: Work order received from your manager at the ISP Part B Develop the subnet scheme Step 1: Determine the number of hosts and subnets Step 2: Calculate the custom subnet mask Step 3: Identify subnet and host IP addresses Part C Document network device interfaces and physical topology Step 1: Document the customer router interfaces and Host IP addresses Step 2: Document the Linksys interfaces and host IP addresses Step 3: Diagram the upgraded network. Part D Use Packet Tracer to prototype the planned network Step 1: Configure all devices using Packet Tracer Step 2: Test and verify functionality Part E Configure devices and verify default settings Step 1: Verify default settings for the customer router Step 2: Configure the customer router Step 3: Verify default settings for the Linksys and set the SSID Step 4: Verify default settings for the 2960 switch. Step 5: Verify host PCs are DHCP clients Part F Configuring a Web Server Step 1: Install Windows Server 2003 and configure as a Web server Step 2: Implement a basic level of security on the Web server Part G Connect network devices and verify connectivity Step 1: Connect the network devices Step 2: Verify device configurations and network connectivity
Total / 70 % 50 % or better - Competent Less than 50% = Not Competent

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1

Page 26 of 27

Computer Engineering and Applied Science Networking 2 2011


Certificate IV in Information Technology (Networking)

Assessment Major Project Final Assessment


Final Assessment % Competent / Not Competent

Concepts (Presentation) Report - Overall Report Specifics Installation and configuration


Total

/4

Final Result

All contents are Copyright Chisholm Institute and 19922011 Cisco Systems, Inc. All rights reserved. Document1