GROUND FLOOR - DETAILED ESTIMATE

Name of Owner:Slno 1 Description Earth work excavation for foundation in all soils except hard rock and depositing earth on banks within a lead of not more than. complete. Column foundation Grade beam Long walls Cross walls 2 Supplying & filling with river sand in foundation and under-floors including watering , ramming etc.., complete. a In foundation Column foundation Grade beam Long walls Cross walls b In basement Porch cum stairs Bed Room I Living Hall Dining Kitchen ,Service Passage & Toilet Bed Room II 1 x 1 x 1 x 15 3 5 1.50 16.48 6.10 1.50 0.30 0.30 1.50 0.35 0.35 50.63 5.19 3.20 59.02 59.00 Nos Length Breadth Depth Total Qty
2

Say m /m /kg
3

1 x 1 x 1 x

15 3 5

1.50 16.48 6.10

1.50 0.30 0.30

0.15 0.10 0.10 (a) 0.60 0.60 0.60 0.60 0.60 0.60 (b)
(a)+(b)

5.06 1.48 0.91 7.46 11.39 5.09 12.12 6.77 8.84 7.12 51.33 58.79 59.00

1 1 1 1 1 1

x x x x x x

1 1 1 1 1 1

3.44 3.05 3.66 4.12 5.30 3.89

5.52 2.78 5.52 2.74 2.78 3.05

Providing and laying in foundation trenches cement concrete 1:5:10 (one cement five sand and ten HBG metal of 40mm size) for foundation and underfloors including curing. consolidation etc., complete. a In foundation Qty as per item No.2(a) 7.46 / b In basement Qty as per item No.2(b) 51.33 / Providing and laying RCC 1:2:4 (one cement two sand.& four 20mm graded stone aggregate nominal size) to the plinth beam including cost of shuttering . labour minnor tools etc., but excluding the cost of reinforcement.

0.20

0.23

8.58

0.85

0.15

9.06 17.64 18.00

GROUND FLOOR - DETAILED ESTIMATE

Name of Owner:Slno Description Nos Length Breadth Depth Total Qty


2

Say m /m /kg
3

a Column footings (Half pyramid formula) b Core Beams Long walls Cross walls c Lintel Long walls Cross walls d Roof Beam Long walls Cross walls

1 x

15

1.50

1.50

0.30

10.13 8.78 18.90

1 x 1 x

3 5

16.48 6.10

0.23 0.23

0.30 0.30

3.41 2.10 5.51

1 x 1 x

3 5

16.48 6.10

0.23 0.23

0.15 0.15

1.71 1.05 2.76 3.41 2.10 5.51 2.29

1 x 1 x

3 5

16.48 6.10

0.23 0.23

0.30 0.30

e Pillars f Roof slab Main building

1 x

15

0.23

0.23

2.88

1 x

16.48

6.75

0.12

13.35 13.35

Net Qty a+b+c+d+e+f 5 Brick work in cement mortar 1:6 (one cement &six sand) using best available country bricks in foundation and superstructure. a In foundation Long walls Cross walls Ded Coloumn

48.32

48.00

1 x 1 x 1 x

3 5 15

16.48 6.10 0.23

0.23 0.23 0.23

0.60 0.60 0.60 (a)

6.82 4.21 -0.48 10.55

b In superstructure Long walls Cross walls c DEDUCTIONS M.D D D1 W W1 KW V

1 x 1 x

3 5

16.48 6.10

0.23 0.23

2.88 2.88 (b) 2.40 2.10 2.10 1.35 1.35 1.35 0.60

32.75 20.19 52.94 0.66 1.74 0.36 1.86 0.56 0.37 0.37

1 1 1 1 1 1 1

x x x x x x x

1 4 1 4 2 1 3

1.20 0.90 0.75 1.50 0.90 1.20 0.90

0.23 0.23 0.23 0.23 0.23 0.23 0.23

GROUND FLOOR - DETAILED ESTIMATE

Name of Owner:Slno Description Nos Length Breadth Depth Total Qty


2

Say m /m /kg
3

(c) (a+b-c) 6 Providing and fixing 38mm thick fully panelled door shutters single ordouble hung using best Teakwood including cost of all fixture and lockingarrangements andfixing chargesetc.,complete.including the wood work.( Teak wood )

5.93 57.56 58.00

M.D D D1

1 x 1 x 1 x

1 4 1

1.20 0.90 0.75

2.40 2.10 2.10

2.88 7.56 1.58 12.02 12.00

Providing and fixing 32mm thick fully glazed window shutters usingstandard glass panes of approvedquality including the cost of allfixture and locking arrangements and fixing chargesetc.., complete.including the wood work ( Teak wood ) W W1 KW V 1 1 1 1 x x x x 4 2 1 3 1.50 0.90 1.20 0.90 1.35 1.35 1.35 0.60 8.10 2.43 1.62 1.62 13.77 14.00

Plastering the both sides of the wall with cement mortar 1:5 (one cement & five sand) 15mm thick to give an even surfaces. Porch cum stairs Bed Room I Living Hall Dining Kitchen ,Service Passage & Toilet Bed Room II

1 1 1 1 1 1 1 1 1 1 1 1

x x x x x x x x x x x x

2 2 2 2 2 2 2 2 2 2 2 2

3.44 5.52 3.05 2.78 3.66 5.52 4.12 2.74 5.30 2.78 3.89 3.05

2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88

19.81 31.80 17.57 16.01 21.08 31.80 23.73 15.78 30.53 16.01 22.41 17.57

GROUND FLOOR - DETAILED ESTIMATE

Name of Owner:Slno Description Nos Length Breadth Depth Total Qty


2

Say m /m /kg
3

(a) b Outside plastering Long walls Cross walls c Deductions M.D D D1 W W1 KW V 1 x 1 x 2 2 16.48 6.10 2.88 2.88 (b) 2.40 2.10 2.10 1.35 1.35 1.35 0.60 (c) (a+b-c) 9 Plastering the ceiling with cement mortar 1:4 (one cement and four sand) of thickness 6mm to give an even surfaces. As per item No.4(f) 10 Painting the wood work two coats with superior quality ready mixed paint (Shalimar wood kote or equivalent) of specified shade over and including a cost of approved ready mixed primer to give a bright and uniform shade on new work. As per item No.6 Qty As per item No.7 Qty Painting the inner walls, ceiling & outer walls, with two coats of interior emulsion and exterior emulsion respectively using the approved colourover one coat of white washing thenew work and give an even shade. As per item No.8 Qty As per item No.9 Qty 1 x 1 13.35 / 0.12

264.10 94.92 35.11 130.03 2.88 7.56 1.58 8.10 2.43 1.62 1.62 25.79 368.34 368.00

1 1 1 1 1 1 1

x x x x x x x

1 4 1 4 2 1 3

1.20 0.90 0.75 1.50 0.90 1.20 0.90

111.24

111.00

1 x 1 x

1 1

12.00 14.00

x x

2.75 2.50

33.00 35.00 68.00 68.00

11

368.00 111.00 479.00 479.00

12

Providing cutting, bending and placing in position of M.S.Bars of various sizes of reinforcement of all RCC works and binding with

GROUND FLOOR - DETAILED ESTIMATE

Name of Owner:Slno Description 16 guage annealed steel wire., etc., complete. As per item No. 4 Qty 13 Providing and laying Granite flooring with cement mortar 1:4 ( 1 cement ; 4 coarse sand) As per item No.9 111.00 111.00 Nos Length Breadth Depth Total Qty
2

Say m /m /kg
3

3 48.00 120.00 Kg/m

5760.00

5760.00

14

Providing and laying Ceramic tiles8mm thick. With cement mortar1:4 ( 1cement ;4 coarse sand) Toilet Kitchen

1 1 1 1

x x x x LS LS LS

2 2 1 1

2.02 1.46 3.05 2.78

2.10 2.10 0.90 0.90

8.48 6.13 2.75 2.50 19.86 20.00

15 16 17

Providing eletcrification works. Providing and fixing Sanitary Instalations Providing Septic tank arrangements and Sump arrangements

18

Rain water Harvesting pits and collection chamber.

LS

OWNER

PREPARED BY

GROUND FLOOR ABSTRACT


0 Name of Owner:Sl.No. Description 1 Earth work excavation for foundation in all soils except hard rock and depositing earth on banks within a lead of not more then. complete. 2 Supplying &filling with river sand in foundation and under -floor including watering, ramming etc., complete 3 Providing and laying in foundation trenches cement concrete 1:5:10 (one cement five sand and ten HBGmetal of 40mm and underfloorsincluding curing. consolidation etc.,complete. 4 Providing and laying RCC 1:2:4 (one cement two sand.& foure 20mm graded stoneaggregate nominal size) to the plinth beam including cost of shuttering . labour minnor tools etc., but excluding the cost of reinforcement. 5 Brick work in cement mortar 1:6 (one cement &six sand) using best availabel country bricks in foundation and superstructure. 6 Providing and fixing 38mm thick fully panelled door shutters single ordouble hung using best Teakwood including cost of all fixture and lockingarrangements andfixing chargesetc.,complete.including the wood work.( Teak wood ) 7 Providing and fixing 32mm thick fully glazed window shutters usingstandard glass panes of approvedquality including the cost of allfixture and locking arrangements and fixing chargesetc.., complete.including the wood work ( Teak wood ) 8 Plastering the both sides of the wallwith cement mortar 1:5 (one cement& five sand) 15mm thick to give aneven surfaces. 368.00 110.00 M2 40480.00 14.00 5000.00 M2 70000.00 12.00 6000.00 M2 72000.00 58.00 2200.00 M3 127600.00 48.00 4000.00 M3 192000.00 18.00 2100.00 M3 37800.00 59.00 800.00 M3 47200.00 Quantity Rate Unit Amount

59.00

350.00

M3

20650.00

GROUND FLOOR ABSTRACT


0 Name of Owner:Sl.No. Description Quantity 9 Plastering the ceiling with cementmortar 1:4 (onr cement and four sand)of thickness 6mm to give an evensurfaces. 10 Painting the wood work two coats with superior quality ready mixed paint (Shalimar wood kote or equivalent) of specified shade over and including a cost of approved ready mixed primer to give a bright and uniform shade on new work. 11 Painting the inner walls, ceiling & outer walls, with two coats of interior emulsion and exterior emulsion respectively using the approved colourover one coat of white washing thenew work and give an even shade. 12 Providing cutting, bending andplacing in position of Bars of various sizes of reinforcement of allRCC works and binding with 16 guageannealed steel wire.., 13 Providing and laying granite flooring with cement mortar 1:4 ( 1 cement ; 4 coarse sand) 14 Providing and laying Ceramic tiles wall tiles 8mm thick. With cement mortar 1:4 ( 1cement ;4 coarse sand) 15 Providing eletcrification works. 16 Providing and fixing Sanitary Instalations 17 Providing Septic tank arrangements and Sump arrangements 18 Rain water Harvesting pits and collection chamber. 20.00 L.S L.S L.S 700.00 M2 14000.00 55000.00 45000.00 35000.00 111.00 2500.00 M2 277500.00 479.00 140.00 M2 67060.00 68.00 125.00 M2 8500.00 111.00 Rate Unit Amount

100.00

M2

11100.00

5760.00

65.00 Kgs

374400.00

L.S TOTAL Rs

22500.00 1517790.00

OWNER

PREPARED BY

FIRST FLOOR DETAILED ESTIMATE


0 Name of Owner:Slno 1 Description Providing and laying RCC 1:2:4 (one cement two sand.& four 20mm graded stoneaggregate nominal size) to the plinth beam including cost of shuttering . labour minnor tools etc., but excluding the cost of reinforcement. a Lintel Long walls Cross walls b Roof Beam Long walls Cross walls Nos Length Breadth Depth Total Qty Say m2/m3/kg

1 x 1 x

3 5

16.48 6.10

0.23 0.23

0.15 0.15

1.71 1.05 2.76 3.41 2.10 5.51 2.29

1 x 1 x

3 5

16.48 6.10

0.23 0.23

0.30 0.30

c Pillars d Roof slab Main building

1 x

15

0.23

0.23

2.88

1 x

16.48

6.75

0.12

13.35 13.35

Net Qty a+b+c+d 2 Brick work in cement mortar 1:6 (one cement &six sand) using best availabel country bricks in foundation and superstructure. a In superstructure Long walls Cross walls Parapet wall

23.91

24.00

1 x 1 x 1 X 1 X

3 5 2 2

16.48 6.10 16.48 6.10

0.23 0.23 0.23 0.23

2.88 2.88 1.05 1.05 (b) 2.40 2.10 2.10 1.35 1.35 0.60 (b) (a-b)

32.75 20.19 7.96 2.94 63.84 0.66 1.74 0.36 1.86 0.56 0.12 5.31 58.53 59.00

DEDUCTIONS MD D D1 W W1 V

1 1 1 1 1 1

x x x x x x

1 4 1 4 2 1

1.20 0.90 0.75 1.50 0.90 0.90

0.23 0.23 0.23 0.23 0.23 0.23

FIRST FLOOR DETAILED ESTIMATE


0 Name of Owner:Slno 3 Description Providing and fixing 38mm thick fully panelled door shutters single ordouble hung using best Teakwood including cost of all fixture and lockingarrangements andfixing chargesetc.,complete.including the wood work.( Teak wood ) MD D D1 Providing and fixing 32mm thick fully glazed window shutters usingstandard glass panes of approvedquality including the cost of allfixture and locking arrangements and fixing chargesetc.., complete.including the wood work ( Teak wood ) W W1 V Nos Length Breadth Depth Total Qty Say m2/m3/kg

1 x 1 x 1 x

1 4 1

1.20 0.90 0.75

2.40 2.10 2.10

2.88 7.56 1.58 12.02 12.00

1 x 1 x 1 x

4 2 1

1.50 0.90 0.90

1.35 1.35 0.60

8.10 2.43 0.54 11.07 11.00

Plastering the both sides of the wall with cement mortar 1:5 (one cement & five sand) 15mm thick to give an even surfaces. Lobby Bed Room I Living Hall Dining Kitchen ,Service Passage & Toilet Bed Room II

1 1 1 1 1 1 1 1 1 1 1 1

x x x x x x x x x x x x

2 2 2 2 2 2 2 2 2 2 2 2

3.44 5.52 3.05 2.78 3.66 5.52 4.12 2.74 5.30 2.78 3.89 3.05

2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 (a)

19.81 31.80 17.57 16.01 21.08 31.80 23.73 15.78 30.53 16.01 22.41 17.57 264.10 133.49 49.37 182.86 2.88

b Outside plastering Long walls Cross walls c DEDUCTIONS MD

1 x 1 x

2 2

16.48 6.10

4.05 4.05 (b)

1 x

1.20

2.40

FIRST FLOOR DETAILED ESTIMATE


0 Name of Owner:Slno D D1 W W1 V Description 1 1 1 1 1 x x x x x Nos Length Breadth Depth Total Qty 4 1 4 2 1 0.90 0.75 1.50 0.90 0.90 2.10 2.10 1.35 1.35 0.60 (c)
(a+b-c)

Say m2/m3/kg

7.56 1.58 8.10 2.43 0.54 23.09 423.87 424.00

Plastering the ceiling with cement mortar 1:4 (one cement and four sand) of thickness 6mm to give an even surfaces. As per item No.1(d)(a) 1 x 1 13.35 / 0.12 111.24 111.00

Painting the wood work two coats with superior quality ready mixed paint (Shalimar wood kote or equivalent) of specified shade over and including cost of approved ready mixed primer to give a bright and uniform shade on new work. As per item No.3 Qty As per item No.4 Qty

1 x 1 x

1 1

12.00 11.00

x x

2.75 2.50

33.00 27.50 60.50 61.00

Painting the inner walls, ceiling & outer walls, with two coats of interior emulsion and exterior emulsion respectively using the approved colourover one coat of white washing thenew work and give an even shade. As per item No.5 Qty As per item No.6 Qty Providing cutting, bending and placing in position of M.S.Bars of various sizes of reinforcement of all RCC works and binding with 16 guage annealed steel wire., etc., complete. As per item No. 1 Qty

424.00 111.00 535.00 535.00

3 24.00 120.00 Kg/m

2880.00

2880.00

10

Providing and laying granite flooring

FIRST FLOOR DETAILED ESTIMATE


0 Name of Owner:Slno Description with cement mortar 1:4 ( 1 cement ; 4 coarse sand) 111.00 11 Providing and laying Ceramic tiles wall tiles 8mm thick. With cement mortar 1:4 ( 1cement ;4 coarse sand) Toilet Kitchen 1 x 1 x 1 x 1 x 2 2 1 1 2.02 1.46 3.05 2.78 2.10 2.10 0.90 0.90 8.48 6.13 2.75 2.50 19.86 12 Providing lime concrete terracing on roofs average thickness 10cms laid to fall with 25mm nominal size brick aggregate and 50% lime mortar 1:2(1 lime putty : 2 surkhi) to a thickness of 10cm including necessary tamping consolidation and finished with belgiri treatment complete. As per item no. 10 qty 13 Providing and laying bricktiles of designation 100 over mumty, roofs grouted with cement mortar 1:3 (1 cement;3 fine sand) mixed with 2% of integral water proofing compound by weight of cement over a 12mm thick layer of cement mortar 1:3 (1 cement : 3 fine sand) and finished with F.P.S brick tiles As per item no. 10 qty 14 15 Providing eletcrification works. Providing and fixing Sanitary Instalations LS LS 111.00 111.00 20.00 111.00 Nos Length Breadth Depth Total Qty Say m2/m3/kg

OWNER

PREPARED BY

FIRST FLOOR ABSTRACT


0 Name of Owner:Sl.No. Description 1 Providing and laying RCC 1:2:4 (one cement two sand.& four 20mm graded stone aggregate nominal size) to the plinth beam including cost of shuttering . labour minnor tools etc., but excluding the cost of reinforcement. Quantity Rate Unit Amount

24.00

4100.00

M3

98400.00

2 Brick work in cement mortar 1:6 (one cement &six sand) using best availabel country bricks in foundation and superstructure. 3 Providing and fixing 38mm thick fully panelled door shutters single ordouble hung using best Teakwood including cost of all fixture and lockingarrangements andfixing chargesetc.,complete.including the wood work.( Teak wood ) 4 Providing and fixing 32mm thick fully glazed window shutters usingstandard glass panes of approvedquality including the cost of allfixture and locking arrangements and fixing chargesetc.., complete.including the wood work ( Teak wood ) 5 Plastering the both sides of the wall with cement mortar 1:5 (one cement & five sand) 15mm thick to give an even surfaces. 6 Plastering the ceiling with cement mortar 1:4 (onr cement and four sand) of thickness 6mm to give an even surfaces. 7 Painting the wood work two coats with superior quality ready mixed paint (Shalimar wood kote or equivalent) of specified shade over and including a cost of approved ready mixed primer to give a bright and uniform shade on new work. 8 Painting the inner walls, ceiling & outer walls, with two coats of interior emulsion and exterior emulsion respectively using the approved colourover one coat of 535.00 140.00 M2 74900.00 61.00 125.00 M2 7625.00 111.00 100.00 M2 11100.00 424.00 110.00 M2 46640.00 11.00 5100.00 M2 56100.00 12.00 6100.00 M2 73200.00 59.00 2300.00 M3 135700.00

FIRST FLOOR ABSTRACT


0 Name of Owner:Sl.No. Description white washing thenew work and give an even shade. Quantity Rate Unit Amount

9 Providing cutting, bending andplacing in position of Bars of various sizes of reinforcement of allRCC works and binding with 16 guageannealed steel wire.., etc.., complete. 10 Providing and laying granite flooring with cement mortar1:4 ( 1 cement ; 4 coarse sand) 11 Providing and laying ceramic tilesflooring with cement mortar1:4 ( 1 cement ; 4 coarse sand) 12 Providing lime concrete terracing onroofs average thickness 10cms laid tofall with 25mm nominal size brickaggregate and 50% lime mortar 1:2(1lime putty : 2 surkhi) to a thickness of10cm including necessary tampingconsolidation and finished with belgiritreatment complete. 13 Providing and laying bricktiles of designation 100 over mumty, roofs grouted with cement mortar 1:3 (1cement;3 fine sand) mixed with 2% ofintegral water proofing compound byweight of cement over a 12mm thicklayer of cement mortar 1:3 (1 cement :3 fine sand) and finished with F.P.Sbrick tiles 14 Providing eletcrification works. 15 Providing and fixing Sanitary Instalations

2880.00

65.00 Kgs

187200.00

111.00

2500.00

M2 `

277500.00

20.00

750.00

M2

15000.00

111.00

450.00

M2

49950.00

111.00 L.S L.S

200.00

M2

22200.00 35000.00 22500.00

TOTAL

Rs

1113015.00