CONCISE MANUAL

TOWER CRANE ST5515B

EU Importer & Maintenance


Jinlong Europe Zandvoorstraat 10/6 2800 Mechelen Belgium

Tel: ++ 32/15 285454 Fax: ++32/15 209680


Jinlong Europe UK & Ireland 2nd Floor, Titan Court, 3 Bishop Square - Hatfield
AL10 9NA Hertfordshire U.K.
Tel: ++ 44/1707 226 522 Fax: ++44/1707 226 001

Manufacturer:
Fushun Yongmao Construction Machinery C Ltd. China

ST5515 B CONCISE TOWER CRANE MANUAL

-2-

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

-3-

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

-4-

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

-5-

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

-6-

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

-7-

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

PREFACE
Dear Customer,
Jinlong Europe, a revolutionary evolution!
Reliability, quality, safety, and high technology are the success of Yongmaos
topless tower cranes all over the world.
In Europe all our cranes are CE approved. This is the result of a constant
technological research.
The absence of tie-bars allows an optimized erection (quicker and safer).
The use of small sized mobile cranes saves air space. The best solution for
installation in job sites next to airports or in the city with several cranes in use and
interfering working areas.
Because of our relentless efforts to improve our products, technical updates are
from time to time necessary. Therefore, the technical data in this manual are subject
to change without warning.
Topless tower cranes, a revolutionary evolution.
Jinlong Europe
Zandvoorstraat 10/6
2800 Mechelen Belgium
Tel: ++ 32/15 28 54 54 Fax: ++32/15 20 96 80

Jinlong Europe UK & Ireland


2nd Floor, Titan Court, 3 Bishop Square Hatfield
AL10 9NA Hertfordshire
U.K.
Tel.: ++ 44/1707 226 522 Fax: ++44/1707 226 001

-8-

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

TABLE OF CONTENTS
CHAPTER 1. TECHNICAL DATA .....................................................................................11
1.1. SPECIFICATIONS ............................................................................................................................................... 12
1.1.1. ST 5515 B 6 ton ............................................................................................................................................ 12
1.1.2. ST 5515 B 8 ton .............................................................................................................................................. 15
1.2. PREPARING THE CONSTRUCTION SITE..................................................................................................... 18
1.2.1. SPACE REQUIREMENTS FOR ASSEMBLY ............................................................................................... 18
1.2.1.1. INTRODUCTION .................................................................................................................................... 18
1.2.1.2. DIMENSIONS.......................................................................................................................................... 19
1.2.2. CONCRETE FOUNDATION FOR FOUNDATION ANCHORS................................................................... 24
1.2.2.1. PREPARATION........................................................................................................................................ 24
1.2.2.2. GROUNDPRESSURE.............................................................................................................................. 25
1.2.2.3. GROUNDPRESSURE AND CHOICE OF THE FUNDATION .............................................................. 26
1.2.2.4. DIMENSIONAL FEATURES OF THE FOUNDATION ANCHORS ..................................................... 27
1.2.2.5. INSTALLING THE CRANE FOUNDATION ......................................................................................... 28
1.2.2.6. SYMBOLS ............................................................................................................................................... 30
1.2.3. CENTRAL BALLAST .................................................................................................................................... 32
1.2.3.1. INTRODUCTION .................................................................................................................................... 32
1.2.3.2. CENTRAL BALLAST (STANDARD) .................................................................................................... 33
1.2.3.3. CENTRAL BALLAST DETAILS ............................................................................................................ 34
1.2.4. COUNTER-JIB BALLAST............................................................................................................................. 38
1.2.4.1. INTRODUCTION .................................................................................................................................... 38
1.2.4.2. COUNTER-JIB BALLAST DIMENSIONS ............................................................................................ 39
1.3. RE-REEVING (SEE FIG 1.3.1-1) ........................................................................................................................ 41
1.3.1. FROM DUAL REEVING TO SINGLE REEVING ........................................................................................ 41
1.3.2. FROM SINGLE REEVING TO DUAL REEVING ........................................................................................ 43
1.3.3. CHANGING THE FALLS OF A SINGLE TROLLEY ................................................................................... 45
1.3.3.1. FROM DUAL REEVING TO SINGLE REEVING ................................................................................. 45

CHAPTER 2 . WINCH UNIT ............................................................................................ 47


2.1. SYMBOLS:............................................................................................................................................................ 48
Vb. 24 PQC15............................................................................................................................................................ 48
2.2. COMPOSITION OF THE WINCH UNIT: ........................................................................................................ 48
2.3. DESCRIPTION..................................................................................................................................................... 50
2.4. HOISTING WINCH OPERATING PRINCIPLE.............................................................................................. 52
2.4.1. BRAKE ADJUSTMENT ................................................................................................................................ 53
2.4.2. MAINTAING THE HOISING WINCH UNIT ................................................................................................ 56
2.4.3. GEARBOX ...................................................................................................................................................... 57

CHAPTER 3. SLEWING MECHANISM ........................................................................... 58


3.1. SYMBOLEN: (EX. RTC 95) ................................................................................................................................ 59
3.1.1. DESCRIPTION: .............................................................................................................................................. 59
3.2. SLEWING UNIT................................................................................................................................................... 60
3.2.1. DESCRIPTION ............................................................................................................................................... 60
3.2.2. OPERATION ................................................................................................................................................... 61
3.2.3. RTC SCHEMATIC DIAGRAM ...................................................................................................................... 63
-9-

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

3.2.4. MALFUNCTIONS .......................................................................................................................................... 65

CHAPTER 4. TROLLEY WINCH ..................................................................................... 67


4.1. SYMBOLEN.......................................................................................................................................................... 68
4.2. COMPOSITION OF THE TROLLEY WINCH UNIT ..................................................................................... 69
4.3. TROLLEY BRAKE .............................................................................................................................................. 71
4.3.1. DESCRIPTION (fig. 4.3.1-1): ........................................................................................................................ 71
4.4. WIRING DIAGRAM ............................................................................................................................................ 73

- 10 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

CHAPTER 1. TECHNICAL DATA

- 11 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.1. SPECIFICATIONS
1.1.1. ST 5515 B 6 ton

Fig.1.1.1-1
Table 1.1.1-1 (6 ton)
R
55

50

45

40

35

30

R
C
15
(max)m (max) t

20

25

30

35

40

45

50

55

IV

16.24

6.0

6.0

4.66

3.52

2.77

2.23

1.84

1.53

1.28

1.08

II

31.50

3.0

3.0

3.00

3.00

3.00

2.65

2.25

1.95

1.70

1.50

IV

18.38

6.0

6.0

5.42

4.13

3.27

2.66

2.20

1.81

1.58

II

35.81

3.0

3.0

3.00

3.00

3.00

3.00

2.62

2.23

2.00

IV

20.75

6.0

6.0

6.00

4.80

3.83

3.14

2.63

2.23

II

40.51

3.0

3.0

3.00

3.00

3.000

3.00

3.00

2.65

IV

23.00

6.0

6.0

6.00

5.24

4.19

3.45

2.89

II

40.00

3.0

3.0

3.00

3.00

3.00

3.00

3.00

IV

24.29

6.0

6.0

6.00

5.80

4.56

3.85

II

35.00

3.0

3.0

3.00

3.00

3.00

3.00

IV

24.69

6.0

6.0

6.00

5.91

4.75

II

30.00

3.0

3.0

3.00

3.00

3.00

Fall

- 12 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

Freestanding

Anchorage (to a building)

Fig.1.1.1-2

Table 1.1.1-2
Type

Fixed type
In service

F1
F2
F3
Hoisting
capacity

Mobile type

Out of service

98t
66t

In service

Out of service

70t

89t

118t
92t
45t

52t

- 13 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

MECANISME
Table 1.1.1-3

Name

Code

24PQC15
Hoisting

QJ63B

Trolleying

m/min

8.5

40

80

8.5

40

80

m/min

kW

3
3
1.5

4.3
20
40

6
6
3

400m
>400m*

3
3
1.5

4.2
20
40

6
6
3

280m
>280m*

24/24/5.5

24/24/5.4

DTC55

057

55Nm

RTC190

0-0.7rpm

2x95Nm

YMD50

0-0.7rpm

2x5.5

RT

12.5-25m/min

2x5.2

Slewing

Travelling
* Please contact us

- 14 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.1.2. ST 5515 B 8 ton

Fig. 1.1.2-1

- 15 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

Table 1.1.2-1 ( 8 ton)


R

Fall

R(max) C(max)
15
m
t

20

25

30

35

40

45

50

55

IV

12.5

8.0

6.50

4.64

34.3

2.72

2.17

1.74

1.44

1.22

1.08

II

24.0

4.0

4.00

4.00

3.83

3.09

2.50

2.12

1.84

1.64

1.50

IV

13.2

8.0

6.85

5.01

3.95

3.02

2.41

1.97

1.68

1.51

II

26.3

4.0

4.00

4.00

4.00

3.42

3.00

2.56

2.16

1.91

IV

13.6

8.0

7.29

5.56

4.40

3.56

2.93

2.46

2.12

II

29.7

4.0

4.00

4.00

4.00

3.96

3.33

2.86

2.52

IV

14.2

8.0

7.64

5.76

4.52

3.78

3.18

2.73

II

31.3

4.0

4.00

4.00

4.00

4.00

3.58

3.13

55

50

45

40

Fig. 1.1.2-2

- 16 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

Table 1.1.2-2
Type

Fixed type

Mobile type

In service

Out of service

98t
66t

118t
92t

F1
F2
F3
Hoisting
capacity

In service

Out of service

70t

89t

45t

52t

MECHANISME SPECIFICATIONS
Table 1.1.2-3
Name

Code

Hoisting

24PQC20
QJ80

Trolleying

m/min

m/min

06.5
30
60
40
80

4
4
2
4
2

3.2
15
30
20
40

8
8
4
8
4

kW

340m
>340m*
360m
>360m*

24/24/5.5

30/30

DTC95

057

95Nm

YMD50

0-0.7rpm

2x5.5

RTC190

0-0.7rpm

2x95Nm

RT

12.5-25m/min

2x5.2

Slewing

Travelling

* Please contact us

- 17 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.2. PREPARING THE CONSTRUCTION SITE


1.2.1. SPACE REQUIREMENTS FOR ASSEMBLY

1.2.1.1. INTRODUCTION
This brochure provides the dimensions of the space requirements for the
crane. It consists of two sections:
- The entire crane with indication of the most important
dimensions.
- The crane is shown in three parts:
Foundation anchors and undercarriage
Mast composition
Range and jib length
Based on the provided dimensions, you can prepare the assembly of the
crane.

ATTENTION: The provided dimensions do not take account of


sagging under load or any manufacturing tolerances.

- 18 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.2.1.2. DIMENSIONS
1.2.1.2.1. TOTAL CRANE

- 19 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.2.1.2.2. FOUNDATION ANCHORS

150

6m
1.

1. 6m

Concrete blocks

- 20 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.2.1.2.3. UNDERCARRIAGE

G
I

- 21 -

F
H

RP

ST5515

4.50m

6.31m

0.29m

0.42m

4.18m

2.94m

2.94m

2.44m

2.44m

4.50m

5.75m

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.2.1.2.4. Main mast and telescopic cage

B1

7.50m

C1

3.00m

D1

6.79m

E1

2.09m

F1

3.61m

G1

3.63m

H1

1.07m

K1

0.96m

NxC1

1.60m

K1

H1

B1

A1

C1

ST5515

A1

F1

RP

D1

E1

G1

- 22 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.2.1.2.5. Jib

Rep
A

(m)
55.5m

15.63m

1.2m

1.6m

3.2m

1.80m

2.35m

1.2m

- 23 -

Rep

(m)

56.25m

15.63m

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.2.2.
CONCRETE
ANCHORS

FOUNDATION

FOR

FOUNDATION

1.2.2.1. PREPARATION
The concrete foundatation of the foundation anchors must be executed on
basis of the parameters in Table 1-2-2-21.

ATTENTION: THE LISTED PARAMETERS ARE MINIMUM


VALUES TO BE OBSERVED, TAKING ACCOUNT
OF THE STABILITY REQUIREMENTS OF THE
CRANE.

PLEASE CONTACT US IN CASE OF DEVIATING CONDITIONS2.

To be provided by the customer.

Jinlong Europe -Zandvoorstraat 10/6 - 2800 Mechelen Belgium


Tel: ++ 32/15 28 54 54 Fax: ++32/15 20 96 80
Jinlong Europe UK & Ireland - 2nd Floor, Titan Court, 3 Bishop Square Hatfield -AL10 9NA
Hertfordshire -U.K. -Tel.: ++ 44/1707 226 522 Fax: ++44/1707 226 001

- 24 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.2.2.2. GROUNDPRESSURE
Composition crane mast (fixed type)
Reaction force
Max free standing height (in m)
Track
Total weight
Pressure
Max. weight
In service
Out of service
Shearing force

C:
R:
H:
TRACT:
P:
COMP:
M:
ES:
HS:
ET :

Table 1-2-2-2

Es
C

Kg

Hs

ET

Kg.m

Kg

R
TRACT COMP
Kg

Kg

ET

Kg

Kg.m

Kg

R
TRACT COMP
Kg

Kg

1+0+1 10.25

51200

98596 1631

33740

59340 41200 72760 3988

24045

44645

1+1+1 13.25

52350 102842 1764

35457

61632 42350 72760 4413

23757

44932

1+2+1 16.25

53500 107486 1897

37362

64112 43500 72760 4838

23470

45220

1+2+1 19.25

54650 112529 2030

39455

66780 44650 72760 6013

23182

45507

1+4+1 22.25

55800 117970 2162

41736

69636 45800 72760 6438

22895

45795

1+5+1 25.25

56770 123571 2284

4437

72522 46770 72760 6827

22652

46037

1+6+1 28.25

57740 129537 2406

46711

75581 47740 72760 7362

22410

46280

1+7+6 31.25

58710 135868 2527

49457

78812 48710 84478 7897

27699

52054

1+8+1 34.25

59680 142563 2649

52374

82214 49680 108852 8432

38962

63802

1+9+1 37.25

60650 149623 2770

55464

85789 50650 134832 8967

50982

76307

1+10+1 40.25

61620 157047 2892

58727

89537 51620 162415 9502

69760

89570

1+11+1 43.25

62590 164837 3013

62161

93456 52590 191603 10036 77295 103590

1+12+1 46.25

63560 172990 3135

65767

97547 53560 222395 10571 91588 118363

- 25 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.2.2.3. GROUNDPRESSURE AND CHOICE OF THE


FUNDATION
Composition of the crane mast (fixed type)
Height under the hook in m
Ground pressure in 10N/cm2
Type of the fundation block

C:
H:
PS:
M:

Part of the mast


C

1,6m x 1,6 m

H
(m)

M64N

M74N

M81N

M101N

PS

PS

PS

PS

1+0+1

10.25

1.61

1.34

1.22

0.97

1+1+1

13.25

1.68

1.38

1.26

1.00

1+2+1

16.25

1.75

1.43

1.30

1.02

1+3+1

19.25

1.83

1.49

1.35

1.05

1+4+1

22.25

1.92

1.54

1.40

1.09

1+5+1

25.25

2.02

1.61

.1.45

1.12

1+6+1

28.25

2.12

1.69

1.51

1.15

1+7+1

31.25

2.24

1.76

1.57

1.19

1+8+1

34.25

2.37

1.85

1.64

1.23

1+9+1

37.25

2.52

1.95

1.72

1.28

1+10+1

40.25

2.35

2.00

1.40

1+11+1

43.25

2.50

1.64

1+12+1

46.25

1.95

- 26 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.2.2.4. DIMENSIONAL FEATURES OF THE FOUNDATION


ANCHORS
The foundation anchors are placed symmetrically in the foundation block
and are to form a 1,6 m square, based on the dimensions of the mast to be
erected.
The distance between the topside of the mounting plate and the
topside of the foundation block must be 150 mm (see fig).

150

500

500

1600

1600

ATTENTION : Cutting or reducing the reinforcement in the


foundation is prohibited.

- 27 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.2.2.5. INSTALLING THE CRANE FOUNDATION


The foundation anchors are mounted by means of:
4 foundation anchors and 8 associated pins
1 foundation framework and 8 associated pins
1 standard mast section
1 plumb line or measuring device

- Check the framework for any deformation during transport.


The difference between respectively the diagonals and the
bearing surface heights may be at the most 2 mm.
- Install the foundation anchor on the reinforcement and adjust
by means of filling plates.
- Check perpendicularity in both directions after assembly of
the lower mast section on the framework. Adjust if necessary.
- Pour the concrete block and wait until it is completely
hardened before removing the mast section and the
framework

- 28 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

Perpendicular

Mast section

Axe
Fixing frame

Axe

Fixing frame
Reinforced
concrete

- 29 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.2.2.6. SYMBOLS
Example of foundation (M101)
M

: Concrete foundation

101 N : Foundation weight in t.


Upper reinforcement:

33

:number of rails

HA :high strength reinforcement rods


33 HA 25x620 (e : 17)

25

:support diameter in mm

620 :rail length in cm


E

:distance in cm

Lower reinforcement:
ep
D
V
L
I
H

: rod
: density
: volum (m3)
: length
: width
: height (cm)

NOTE : The density of the reinforced concrete is 350 kg/m3 or C30.

- 30 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

20
555 ( e=17)
2 33HA25x625
3 11x11HA16x155 ( e=51)
1 33HA25x625 555 ( e=17)
135
70

130

20

1 33HA25x625

( e=17)

555 ( e=17)

560

280

2 33HA25x625

555

560

M101N
L=560cm; I=560cm; H=135cm; V=42m3

- 31 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.2.3. CENTRAL BALLAST

1.2.3.1. INTRODUCTION
De centrale ballast consists of reinforced concrete blocks symmetrically
placed on the undercarriage.
The blocks are marked with the letters C of D.
The central ballast must be composed according to the table below. The
ballast is to be supplied by the client in accordance with:
- Standard chassis
- Fig. 1.2.3.3.1-1 en fig. 1.2.3.3.1-2
- Chassis YZ86X
- Fig. 1.2.3.3.2-1 en fig. 1.2.3.3.2-2

- 32 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.2.3.2. CENTRAL BALLAST (STANDARD)


CP

:Mast composition

HC

:Hook height in m

NR

:Number of layers

ND

:Number of blocks

LE

:Minimum required ballast in t

LD

:Obtained ballast

RES

:Reaction in service

RHS

:Reaction out of service

RH

:Horizontal reaction force

:Reaction

1.6 m x 1.6 m
D

RH
R
R

RH
D C

Fig. 1-4-1

CP

HC

NR

ND

LE

LD

RES

2+0+1

13.4m

8C+8D

42.4t

42.4t

44t

5.60t

2+1+1

16.4m

8C+8D

42.4t

42.4t

45t

5.66t

2+2+1

19.4m

8C+8D

42.4t

42.4t

47t

4.72t

2+3+1

22.4m

8C+8D

42.4t

42.4t

48t

5.78t

2+4+1

25.4m

8C+8D

42.4t

42.4t

49t

5.84t

2+5+1

28.4m

8C+8D

42.4t

42.4t

51t

5.90t

2+6+1

31.4m

8C+8D

42.4t

42.4t

52t

5.95t

2+7+1

34.4m

8C+8D

42.4t

42.4t

53t

6.01t

2+8+1

37.4m

8C+8D

42.4t

42.4t

55t

6.06t

2+9+1

40.4m

8C+8D

42.4t

42.4t

57t

2+10+1 43.4m

10C+10D

53.0t

46.4m

12C+12D

63.6t

2+11+1

RHS

59t

6.12t

53.0t

69t

6.17t

63.3t

79t

6.28t

RH

- 33 -

RH

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.2.3.3. CENTRAL BALLAST DETAILS


1.2.3.3.1. STANDARD BALLAST

420

540

250

900

150

750

1500
3

250

450

750

100
500

All authorized dimensions: 1cm

2
1

Rep

: Ref.nr.

: Diameter in mm

: Number

L.u

: Length

L.t

: Total lengh

Forme

: Reinforcement type

: Material

mm
40

10

900

7200

10

2200

8800

10

1600

4800

REP

R30

R20

R10

220

( )

115

R3
0

220

L.u

L.t

500

1000

Reinforced concrete

Forme

P: 2800kg D: 2.3

Fig. 1.2.3.3.1-1

- 34 -

RCVC1.0ENG

235-B

Typ central ballast D

ST5515 B CONCISE TOWER CRANE MANUAL

500

500

540

420

250

900

150

750

1500
3

250

450

750

100
500

All authorized dimensions 1cm


: Ref nr.

: Diameter in mm

: Number

L.u

: Length in cm

L.t

: Total length

Forme

: Reinforcement type

: Material

mm
40

10

900

10

2200 8800

10

1600 4800

REP

R10

R20

220

R3
0

R30

115

220

( )

L.u

L.t

500

1000
7200

Reinforcement
concrete

P: 2500kg D: 2.3

Fig. 1.2.3.3-2

- 35 -

Forme

235-B

Rep

Typ central ballast C

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.2.3.3.2. ALTERNATIVE BALLAST

- 36 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

- 37 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.2.4. COUNTER-JIB BALLAST

1.2.4.1. INTRODUCTION
The counter-jib ballast consists of various reinforced concrete blocks A,
B or C. The counter-jib ballast is governed by the length of the jib. These
blocks are suspended one by one at the rear of the counter-jib.
The ballast is to be supplied by the client. The drawings are enclosed.
In accordance with Fig. 1.5.2-1. During installation, care must be taken
to ensure that they cannot be chipped or become loose while operating
the crane.
The admissible tolerance is

+50
0

kg per block.

NOTE: We recommend weighting the concrete block and marking


their weight with paint on a visible side of the block.

- 38 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.2.4.2. COUNTER-JIB BALLAST DIMENSIONS

Length of the jib (m)

30

35

40

45

50

55

Length of the counter


jib(m)

14.89

14.89

14.89

14.89

14.89

14.89

During
Blocks D+E+B D+E+B D+2B+G D+E+B+G D+E+2B D+3E
working & Weight
8200
8200
9500
9800
10600 11200
telescoping in kg

Block type

Density
(t/m3)

L (mm)

Weight (kg)

Tolerance

2.4

830

2400

+50Kg

2.4

1180

3100

+50Kg

2.4

990

2700

+50Kg

2.4

450

1600

+50Kg

- 39 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

- 40 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.3. RE-REEVING (SEE FIG 1.3.1-1)


1.3.1. FROM DUAL REEVING TO SINGLE REEVING
- Bring the trolley against the jib foot and fasten it.
- Lower the hoist hook down to the ground (vertical position).
- Remove the connecting pin (8), connecting arm (5) and single

hook block (4).


- Reinstall the connecting pin (8) on the single hook block and

secure it with cotter pins.

8
5

Fig. 1.3.1-1

- 41 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

- Hoist the single hook block (4) against the trolley (jib)

(see fig. 1-3-1-2).


- Remove the trolley connection pin (8) between both trolleys (1)

and (2).
- When the trolley (2) is being run out, both trolleys become

separated.
- Reinstall the connecting pin (8) and cotter pins (9) on the rear

trolley.
- This concludes the transition from dual (4-rope) reeving to singel

(2-rope) reeving.

Fig. 1-3-1-2

ATTENTION:
- If operating a significant amount of time with single reeving,

the following periodic maintenance must be performed.


- Convert to dual reeving; let the trolley run a few times over

the entire jib length while veering and hoisting the load hook
over the entire hoisting height.
- Revert to single (2-rope) reeving

- 42 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.3.2. FROM SINGLE REEVING TO DUAL REEVING


- Bring the front trolley (2) against the rear trolley (1) (opposite the

jib foot).
- Press the switch button on the operating panel.
- Connect both trolleys with the connecting pin (8) and secure it

with the cotter pins (9).


- Lower the single hook block (4) down to the ground.
- Connect both hook blocks (4 and 3) by means of the fittings (8, 9

and 10) (see Fig. 1-3-2-1).


- This concludes the transition from single to dual reeving.

4
3
8

6
Fig.1.3.2-1

- 43 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

ATTENTION:
- Working in single reeving configuration with cranes

installed above freestanding mast height.


- The crane is designed to work with single reeving up to the

maximum freestanding height.


- In case of higher heights, an imbalance can occur. Please

contact us on this. In that case, the hook blocks must be


ballasted, which will lead to diminished hoisting capacities.

- 44 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.3.3. CHANGING THE FALLS OF A SINGLE TROLLEY

1.3.3.1. FROM DUAL REEVING TO SINGLE REEVING


- Bring the trolley (1) against the jib foot.
- Lower the hoist hook to the ground (vertical position).
- Remove the connecting pin (3).
- Reinstall the connecting pin (3) on the single hookblock and

secure it with cotter pins.


- Hoist the single hook block (2) slowly against the trolley jib.
- This concludes the transition from dual (4-rope) reeving to single

(2-rope) reeving.

- 45 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

Dual reeving to single reeving


NOTE: Changing from 2 falls to 4 falls is the reverse procedure as
mentioned above.

- 46 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

CHAPTER 2 . WINCH UNIT

- 47 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

2.1. SYMBOLS:
PQC

(EX. 24 PQC 15)


Single wire
Type
Motor power in kW

Vb. 24 PQC15

2.2. COMPOSITION OF THE WINCH UNIT:


- Limiter (1)
- Drum (2)
- Gearbox (3)
- Support frame (chassis) (4)
- Motor (5)
- Brake disc (6)
- Cooling motor (7)

Fig. 5-1-1

- 48 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

ATTENTION

- Starting the hoisting movement: use low speed.


- Displacements between 2 hoisting movements: use
medium or high speed.
- Positioning the load: Use low speed.

NOTE:

- Hoisting speed selection is determined by:


- Weight and size of the load.
- Environmental factors.
- Stage

of the hoisting movement.

- 49 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

2.3. DESCRIPTION
The cable drum is of the grooved type and is driven by a right-angled
bevel gearbox.
The driving motor is of the type TSYDE 180L 2/4/16 with an output of
24/24/5,5 kW.
The motor speeds are 2800 / 1400 / 300 rpm.
The motor is fitted with an electromagnetic disk brake.
The hoisting limiter is of the type 0 x Z4/7 with a transmission ration i =
1: 274.

- 50 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

Characteristics:
Operating range

M5

Use category

T4

Load category

L2

Motor type

YSYDE180L2/4/16

Motor speed rpm

2800/1400/300 rpm

Hoisting speed and


load m/min

80

40

8.5

1.5

m/min

40

20

4.2

Rope diameter

12 mm

Drum capacity

400m

- 51 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

2.4. HOISTING WINCH OPERATING PRINCIPLE


The hosting winch is equipped with a three-speed motor coupled to a
mechanical gearbox.
At start-up, the brake is released, after which a selection can be made
between:
- Low hoisting speed (PV)
- Medium hoisting speed (MV)
- High hoisting speed (GV)
When the hoisting movement is interrupted, a built in (0,5 1 sec)
electric time delay prevents undue loading of the mechanical brake, in
order to avoid abnormal wear.
Normally, the medium (MV) and high (GV) hoisting speeds are used.
Low hoisting speed (PV) should only be used to pick up or position loads
and thus only for short times.

- 52 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

2.4.1. BRAKE ADJUSTMENT


Brake moment adjustment (fig. 5-1-2):
- Remove plate (53), pin (54) and lever (52).
- Undo bolt (29) and protection cover (40).
- Set the 3 adjusting screws (37) evenly.
NOTE: When adjusting clockwise, the brake moment is increased.
When unscrewing counter clockwise, the brake moment is
reduced.

ATTENTION: The brake moment must be adjusted in relation to


the maximum permissible load.

Brake clearance adjustment:


- Remove protection cover (40).
- Loosen the electromagnet adjusting spring (39) and (45).
Optimum brake clearance is 0,7 0,8 mm with a maximum deviation of
0,05 mm.
After adjustment, attach the setscrews (39) and (45).

- 53 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

Brake disc replacement:


- Remove protection cover (40).
- Undo the fitting screws (45) and remove the electromagnet
(47).
- Undo the fitting screws (39) and (37) and remove the spring
(35).
- Remove the pressure plate (59) and counter-pressure plate
(33).
- Clean the brake mechanism.
- Replace the brake plate.
- Reinstall in reverse order.

- 54 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

29.

Bolt

32.

Bottom adapter

33.

Brake plate holder

34.

Brake plate casing

35.

Compression spring

37.

Spring adjustment screw

39. 45. Adjusting spring - electromagnet


40.

Protection cover

46.

Bolt

52.

Lever

53.

Nameplate

54.

Shaft

55.

Adjusting plate

59.

Adapter

61.

Mounting plate

47.

Electromagnet
Fig. 5-1-2

- 55 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

2.4.2. MAINTAING THE HOISING WINCH UNIT

Part

Handling (daily)

Gearbox

Check lube-oil level, add oil if necessary.

Rope

Check rope for wear.

Fittings

Check for correct installation and operation.

Limiter

Check limiter for correct operation.

Lubrication points

Lubricate lubrication points.

- 56 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

2.4.3. GEARBOX
Fill opening

Oil level

Drain opening
Fig. 5-1-3

The gearbox is lubricated with oil.


Check oil level every 200 operating hours.
Replace oil every 2400 operating hours.
Check brake clearance and brake moment weekly.
- The brake moment should be 175 N.m.
- Brake clearance is 0.8 mm.
The motor bearings must be replaced as soon as abnormal motor
vibrations or increased motor noises are noticed.
If the motor spindle shows a clearance of 0.1 mm or more, the motor
bearings must be replaced immediately.
Check bearing lubrication every 200 hours.
Lubricate with lithium grease if necessary.
Controleer de remspeling en het remmoment wekelijks

- 57 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

CHAPTER 3. SLEWING MECHANISM

- 58 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

3.1. SYMBOLEN: (EX. RTC 95)


R T

C
Couple (N.m)
Current brake
Voltage regulator
Slewing mechanism

3.1.1. DESCRIPTION:
Select the slewing speed suitable for the required movement. Gradually
increase or decrease the slewing speed. Slow down gradually instead of
stopping the load abruptly with the slew brake.
The slew brake may only be used to position the jib during hoisting at
wind speeds < 13 m/s (46 km/h).
Avoid simultaneous slewing and hoisting to prevent damage to the hoist
rope (rope twisting risk).

- 59 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

3.2. SLEWING UNIT


3.2.1. DESCRIPTION
The RTC slewing unit consists of: ( zie fig.2.2.1-1):
- A motor with squirrel-cage armature turning at constant speed in

the desired direction.


- An electrodynamic coupling/brake to perform the speed changes.
- A gearwheel in which the clutch engages directly on the slewing

ring.
- Safety brakes mounted on the electrodynamic coupling/brake.
- Tacho-dynamo, for speed control.
- Slewing limiter.
- The crane can be put in weathervaning both manually and

electrically.

- 60 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

3.2.2. OPERATION
1/ Make the motor run in the desired direction.
2/ The brake releases.
3/ The electrodynamic brake inductor is supplied with direct current.
4/ An amperage change in the inductor produces a speed change. In

that way, the desired speed can be obtained by means of the


control box.
AT STANDSTILL:
- The power supply to the motor is switched off, power
is supplied to the inductor of the electrodynamic brake
and the jib is brought to a stop;
- The safety brake only locks when, in case of necessity,
the operator presses the thereto-provided button.

ATTENTION: Stopping the jib by counter-slewing is prohibited.


At the end of the workday, the jib must be placed in
weathervaning.

- 61 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1.

Motor

2.

Gearbox

3.

Weathervaning mechanism

4.

Slewing ring

5.

Limit switch

6.

Slewing brake

Fig. 2.2.1-1

- 62 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

3.2.3. RTC SCHEMATIC DIAGRAM


+V

IC
Contactor clockwise direction

RP

IC

IC

Contactor counterclockwise direction

IC

Adjustable 3-phase
AC-supply

-V

Voltage Feedback

1/ Benaming

RP:
IC:

Potentiometer
Signal amplifier

2/ Operation:

The control signal of the potentiometer RP (slewing mechanisme RTC) is


converted through the amplifier IC to a single and three-phase AC voltage
that directly controls the driving motor.
The slewing direction is controlled through a seperate signal.

- 63 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

3/ Wiring diagram
A
RDi

RD

RM

B
RG

AC48V

RRa

AC48V

- 64 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

3.2.4. MALFUNCTIONS
1/ The slewing mechanism is provided with an electronic control

device that:
- Controls slewing acceleration and deceleration
- Prevents changing of the slewing direction by a control error
2/ If a malfunction occurs, working with the crane must be stopped

and its cause must be eliminated.


Table 5-3-1
Operation

Normal

Abnormal

Slewing movement from 0


position on joystick

Slewing starts gradually up to


its maximum speed

Slewing starts abruptly. The


tower deforms

Slewing movement towards


0 position

The slewing movement slows


down and stops after 7-10
seconds

Slewing stops instantly. The


tower deforms

Shunt bridging

Free slewing

Slewing stops suddenly.

- 65 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

NOTE: These malfunctions can have the following causes:


1/ Incorrect connection of the 380 VAC/48 VAC power

supply; excessive voltage fluctuations.


2/ Potentiometer and joystick are not compatible or are

incorrectly adjusted with reference to the resistance OR/2.


3/ Check if the inverter is intact and operates properly

within the parameters.


4/ Check the connections of each part for damage and/or

improper tightening.
5/ Check if the control box still works within the given

parameters.

- 66 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

CHAPTER 4. TROLLEY WINCH

- 67 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

4.1. SYMBOLEN
D T C

(EX. DTC 55)


Couple
Voltage regulator, brake
Voltage regulator
Trolley winch

REMARK: The trolley speed must be selected according to the


distance to be run. Increase and decrease speeds
gradually.

- 68 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

4.2. COMPOSITION OF THE TROLLEY WINCH UNIT


The DTC trolley winch unit consists of the following components (see
fig. 3-2-1):
- Rope drum
- Gearbox
- Electric squirrel-cage motor
- Electromagnetic brake
- Disk brake

Three speeds are available:


MV:

Low speed, realized by a combination of actuation of the


electromagnetic brake and running of the motor at lower
voltage (230 -260 V).

PV1:

Medium speed, realized by partial actuation of the


electromagnetic brake and control of the motor voltage (380
V).

PV2:

High speed; the motor is run at its rated voltage (380 V)


without excitation of the electromagnetic brake.

The disk brake of the trolley winch unit is of the regular closed type
(i.e. release through voltage control).
Normal brake clearance is 0,8 1,2 mm.
The brake clearance is set in an identical way as for the slewing motor.
The brake torque is set by a spring screw Fig. 3-2-1 item 14.

- 69 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

10

11

12

23

22
21

20

19

18

16 15 14 13

17
Fig. 3.2-1

1.

Outer support plate

2.

Connecting rod

3.

Drum and gear housing

4.

Limit switch pin

5.

Inner support plate

6.

Limit switch, model DXZ-4/FW

7.

Motor brake field excitation voltage DC-20 V

8.

Motor, synch rev. 1500 rpm

9.

Motor brake field excitation voltage DC-20 V

10.

Protection cover locknut

11.

Manual brake release lever

12.

Fixing nut

13.

Screw M8 for disc brake

14.

Brake pressure adjusting spring.

15.

Brake disc locknut

16.

Protection

17.

Spindle connection

18.

Bearing type 80212

19.

Transmission axle

20.

Gear coupling, speed ratio r = 30.36

21.

Bearing type 60209

22.

Sealing ring

23.

Trolley rope clamp

- 70 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

4.3. TROLLEY BRAKE


4.3.1. DESCRIPTION (fig. 4.3.1-1):
The electromagnetic brake starts operating as soon as the power supply
is cut. Brake clearance in the active range is automatically adjusted.
1. Operating principle
1. excitation coil
2. Spring
3. Brake yoke nut
4. Movable plate
5. Brake plate
6. Pressure disc
7. Brake lining
8. Screw
Fig. 4.3.1-1

9. Cover
E. Brake clearance

Brakes:
When the current is cut, the electromagnetic attractive force disappears.
The brake spring (2) pushes the pressure disc (6) back on the brake
disc (5). This closes the brake. The brake is of the regular, closed type.
Releasing the brake:
When the excitation coils (1) is energized, the pressure disc (6) is
attracted and the brake pressure spring (2) is pressed in. By this, the
brake discs open up.
Brake clearance:
Normal brake clearance is 0.8 to 1.2 mm. Check the brake clearance
for soiling (oil - grease).
Brake moment adjustment:
The brake moment was factory-set
Releasing the brake manually:
The brake can be released manually by loosening the brake yoke (3).

- 71 -

RCVC1.0ENG

ST5515 B CONCISE TOWER CRANE MANUAL

1/ Every 200 hours or once a month:


2/ Check brake clearance and brake moment, as well as the

condition of the brake discs. Brake clearance is to be 0.8 1.2


mm.
3/ Attention: replace brake discs before they are completely worn.
4/ Check if there is any foreign matter in the brake and if it is free

from oil and grease.

ATTENTION: The brake must immediately be inspected if:


- It does not work properly
- It is overheating
- Abnormal vibrations are noticed
- Braking torque is insufficient

- 72 -

RCVC1.0ENG

ST 5515 B MANUEL CONDENSE

RXDAr

SDM 0

XDAV

SDAv

RXDAv

XDGV

XDPV

RDMr

1S

DPv

XDAr

SDAr

XDGV

XDPV

SD

DPv

Engaged when energized


Disengaged
condition

in

the

energized

1S

Holding position

DGV

DPV

DPV1

DMV1

DMV

DFa

DAr

DAV

PD

SD

4.4. WIRING DIAGRAM

ST 5515 B MANUEL CONDENSE

Importer EG-CE & Maintenance


Jinlong Europe Zandvoorstraat 10/6 2800 Mechelen Belgium

Tel: ++ 32/15 285454 Fax: ++32/15 209680


Jinlong Europe UK & Ireland 2nd Floor, Titan Court, 3 Bishop Square - Hatfield
AL10 9NA Hertfordshire U.K.
Tel: ++ 44/1707 226 522 Fax: ++44/1707 226 001

Manufacturer:
Fushun Yongmao Construction Machinery C Ltd. China

September 2007