PREFACE
Dear Customer,
Jinlong Europe, a revolutionary evolution!
Reliability, quality, safety, and high technology are the success of Yongmaos
topless tower cranes all over the world.
In Europe all our cranes are CE approved. This is the result of a constant
technological research.
The absence of tie-bars allows an optimized erection (quicker and safer).
The use of small sized mobile cranes saves air space. The best solution for
installation in job sites next to airports or in the city with several cranes in use and
interfering working areas.
Because of our relentless efforts to improve our products, technical updates are
from time to time necessary. Therefore, the technical data in this manual are subject
to change without warning.
Topless tower cranes, a revolutionary evolution.
Jinlong Europe
Zandvoorstraat 10/6
2800 Mechelen Belgium
Tel: ++ 32/15 28 54 54 Fax: ++32/15 20 96 80
-8-
RCVC1.0ENG
TABLE OF CONTENTS
CHAPTER 1. TECHNICAL DATA .....................................................................................11
1.1. SPECIFICATIONS ............................................................................................................................................... 12
1.1.1. ST 5515 B 6 ton ............................................................................................................................................ 12
1.1.2. ST 5515 B 8 ton .............................................................................................................................................. 15
1.2. PREPARING THE CONSTRUCTION SITE..................................................................................................... 18
1.2.1. SPACE REQUIREMENTS FOR ASSEMBLY ............................................................................................... 18
1.2.1.1. INTRODUCTION .................................................................................................................................... 18
1.2.1.2. DIMENSIONS.......................................................................................................................................... 19
1.2.2. CONCRETE FOUNDATION FOR FOUNDATION ANCHORS................................................................... 24
1.2.2.1. PREPARATION........................................................................................................................................ 24
1.2.2.2. GROUNDPRESSURE.............................................................................................................................. 25
1.2.2.3. GROUNDPRESSURE AND CHOICE OF THE FUNDATION .............................................................. 26
1.2.2.4. DIMENSIONAL FEATURES OF THE FOUNDATION ANCHORS ..................................................... 27
1.2.2.5. INSTALLING THE CRANE FOUNDATION ......................................................................................... 28
1.2.2.6. SYMBOLS ............................................................................................................................................... 30
1.2.3. CENTRAL BALLAST .................................................................................................................................... 32
1.2.3.1. INTRODUCTION .................................................................................................................................... 32
1.2.3.2. CENTRAL BALLAST (STANDARD) .................................................................................................... 33
1.2.3.3. CENTRAL BALLAST DETAILS ............................................................................................................ 34
1.2.4. COUNTER-JIB BALLAST............................................................................................................................. 38
1.2.4.1. INTRODUCTION .................................................................................................................................... 38
1.2.4.2. COUNTER-JIB BALLAST DIMENSIONS ............................................................................................ 39
1.3. RE-REEVING (SEE FIG 1.3.1-1) ........................................................................................................................ 41
1.3.1. FROM DUAL REEVING TO SINGLE REEVING ........................................................................................ 41
1.3.2. FROM SINGLE REEVING TO DUAL REEVING ........................................................................................ 43
1.3.3. CHANGING THE FALLS OF A SINGLE TROLLEY ................................................................................... 45
1.3.3.1. FROM DUAL REEVING TO SINGLE REEVING ................................................................................. 45
RCVC1.0ENG
- 10 -
RCVC1.0ENG
- 11 -
RCVC1.0ENG
1.1. SPECIFICATIONS
1.1.1. ST 5515 B 6 ton
Fig.1.1.1-1
Table 1.1.1-1 (6 ton)
R
55
50
45
40
35
30
R
C
15
(max)m (max) t
20
25
30
35
40
45
50
55
IV
16.24
6.0
6.0
4.66
3.52
2.77
2.23
1.84
1.53
1.28
1.08
II
31.50
3.0
3.0
3.00
3.00
3.00
2.65
2.25
1.95
1.70
1.50
IV
18.38
6.0
6.0
5.42
4.13
3.27
2.66
2.20
1.81
1.58
II
35.81
3.0
3.0
3.00
3.00
3.00
3.00
2.62
2.23
2.00
IV
20.75
6.0
6.0
6.00
4.80
3.83
3.14
2.63
2.23
II
40.51
3.0
3.0
3.00
3.00
3.000
3.00
3.00
2.65
IV
23.00
6.0
6.0
6.00
5.24
4.19
3.45
2.89
II
40.00
3.0
3.0
3.00
3.00
3.00
3.00
3.00
IV
24.29
6.0
6.0
6.00
5.80
4.56
3.85
II
35.00
3.0
3.0
3.00
3.00
3.00
3.00
IV
24.69
6.0
6.0
6.00
5.91
4.75
II
30.00
3.0
3.0
3.00
3.00
3.00
Fall
- 12 -
RCVC1.0ENG
Freestanding
Fig.1.1.1-2
Table 1.1.1-2
Type
Fixed type
In service
F1
F2
F3
Hoisting
capacity
Mobile type
Out of service
98t
66t
In service
Out of service
70t
89t
118t
92t
45t
52t
- 13 -
RCVC1.0ENG
MECANISME
Table 1.1.1-3
Name
Code
24PQC15
Hoisting
QJ63B
Trolleying
m/min
8.5
40
80
8.5
40
80
m/min
kW
3
3
1.5
4.3
20
40
6
6
3
400m
>400m*
3
3
1.5
4.2
20
40
6
6
3
280m
>280m*
24/24/5.5
24/24/5.4
DTC55
057
55Nm
RTC190
0-0.7rpm
2x95Nm
YMD50
0-0.7rpm
2x5.5
RT
12.5-25m/min
2x5.2
Slewing
Travelling
* Please contact us
- 14 -
RCVC1.0ENG
Fig. 1.1.2-1
- 15 -
RCVC1.0ENG
Fall
R(max) C(max)
15
m
t
20
25
30
35
40
45
50
55
IV
12.5
8.0
6.50
4.64
34.3
2.72
2.17
1.74
1.44
1.22
1.08
II
24.0
4.0
4.00
4.00
3.83
3.09
2.50
2.12
1.84
1.64
1.50
IV
13.2
8.0
6.85
5.01
3.95
3.02
2.41
1.97
1.68
1.51
II
26.3
4.0
4.00
4.00
4.00
3.42
3.00
2.56
2.16
1.91
IV
13.6
8.0
7.29
5.56
4.40
3.56
2.93
2.46
2.12
II
29.7
4.0
4.00
4.00
4.00
3.96
3.33
2.86
2.52
IV
14.2
8.0
7.64
5.76
4.52
3.78
3.18
2.73
II
31.3
4.0
4.00
4.00
4.00
4.00
3.58
3.13
55
50
45
40
Fig. 1.1.2-2
- 16 -
RCVC1.0ENG
Table 1.1.2-2
Type
Fixed type
Mobile type
In service
Out of service
98t
66t
118t
92t
F1
F2
F3
Hoisting
capacity
In service
Out of service
70t
89t
45t
52t
MECHANISME SPECIFICATIONS
Table 1.1.2-3
Name
Code
Hoisting
24PQC20
QJ80
Trolleying
m/min
m/min
06.5
30
60
40
80
4
4
2
4
2
3.2
15
30
20
40
8
8
4
8
4
kW
340m
>340m*
360m
>360m*
24/24/5.5
30/30
DTC95
057
95Nm
YMD50
0-0.7rpm
2x5.5
RTC190
0-0.7rpm
2x95Nm
RT
12.5-25m/min
2x5.2
Slewing
Travelling
* Please contact us
- 17 -
RCVC1.0ENG
1.2.1.1. INTRODUCTION
This brochure provides the dimensions of the space requirements for the
crane. It consists of two sections:
- The entire crane with indication of the most important
dimensions.
- The crane is shown in three parts:
Foundation anchors and undercarriage
Mast composition
Range and jib length
Based on the provided dimensions, you can prepare the assembly of the
crane.
- 18 -
RCVC1.0ENG
1.2.1.2. DIMENSIONS
1.2.1.2.1. TOTAL CRANE
- 19 -
RCVC1.0ENG
150
6m
1.
1. 6m
Concrete blocks
- 20 -
RCVC1.0ENG
1.2.1.2.3. UNDERCARRIAGE
G
I
- 21 -
F
H
RP
ST5515
4.50m
6.31m
0.29m
0.42m
4.18m
2.94m
2.94m
2.44m
2.44m
4.50m
5.75m
RCVC1.0ENG
B1
7.50m
C1
3.00m
D1
6.79m
E1
2.09m
F1
3.61m
G1
3.63m
H1
1.07m
K1
0.96m
NxC1
1.60m
K1
H1
B1
A1
C1
ST5515
A1
F1
RP
D1
E1
G1
- 22 -
RCVC1.0ENG
1.2.1.2.5. Jib
Rep
A
(m)
55.5m
15.63m
1.2m
1.6m
3.2m
1.80m
2.35m
1.2m
- 23 -
Rep
(m)
56.25m
15.63m
RCVC1.0ENG
1.2.2.
CONCRETE
ANCHORS
FOUNDATION
FOR
FOUNDATION
1.2.2.1. PREPARATION
The concrete foundatation of the foundation anchors must be executed on
basis of the parameters in Table 1-2-2-21.
- 24 -
RCVC1.0ENG
1.2.2.2. GROUNDPRESSURE
Composition crane mast (fixed type)
Reaction force
Max free standing height (in m)
Track
Total weight
Pressure
Max. weight
In service
Out of service
Shearing force
C:
R:
H:
TRACT:
P:
COMP:
M:
ES:
HS:
ET :
Table 1-2-2-2
Es
C
Kg
Hs
ET
Kg.m
Kg
R
TRACT COMP
Kg
Kg
ET
Kg
Kg.m
Kg
R
TRACT COMP
Kg
Kg
1+0+1 10.25
51200
98596 1631
33740
24045
44645
1+1+1 13.25
35457
23757
44932
1+2+1 16.25
37362
23470
45220
1+2+1 19.25
39455
23182
45507
1+4+1 22.25
41736
22895
45795
1+5+1 25.25
4437
22652
46037
1+6+1 28.25
46711
22410
46280
1+7+6 31.25
49457
27699
52054
1+8+1 34.25
52374
38962
63802
1+9+1 37.25
55464
50982
76307
1+10+1 40.25
58727
69760
89570
1+11+1 43.25
62161
1+12+1 46.25
65767
- 25 -
RCVC1.0ENG
C:
H:
PS:
M:
1,6m x 1,6 m
H
(m)
M64N
M74N
M81N
M101N
PS
PS
PS
PS
1+0+1
10.25
1.61
1.34
1.22
0.97
1+1+1
13.25
1.68
1.38
1.26
1.00
1+2+1
16.25
1.75
1.43
1.30
1.02
1+3+1
19.25
1.83
1.49
1.35
1.05
1+4+1
22.25
1.92
1.54
1.40
1.09
1+5+1
25.25
2.02
1.61
.1.45
1.12
1+6+1
28.25
2.12
1.69
1.51
1.15
1+7+1
31.25
2.24
1.76
1.57
1.19
1+8+1
34.25
2.37
1.85
1.64
1.23
1+9+1
37.25
2.52
1.95
1.72
1.28
1+10+1
40.25
2.35
2.00
1.40
1+11+1
43.25
2.50
1.64
1+12+1
46.25
1.95
- 26 -
RCVC1.0ENG
150
500
500
1600
1600
- 27 -
RCVC1.0ENG
- 28 -
RCVC1.0ENG
Perpendicular
Mast section
Axe
Fixing frame
Axe
Fixing frame
Reinforced
concrete
- 29 -
RCVC1.0ENG
1.2.2.6. SYMBOLS
Example of foundation (M101)
M
: Concrete foundation
33
:number of rails
25
:support diameter in mm
:distance in cm
Lower reinforcement:
ep
D
V
L
I
H
: rod
: density
: volum (m3)
: length
: width
: height (cm)
- 30 -
RCVC1.0ENG
20
555 ( e=17)
2 33HA25x625
3 11x11HA16x155 ( e=51)
1 33HA25x625 555 ( e=17)
135
70
130
20
1 33HA25x625
( e=17)
555 ( e=17)
560
280
2 33HA25x625
555
560
M101N
L=560cm; I=560cm; H=135cm; V=42m3
- 31 -
RCVC1.0ENG
1.2.3.1. INTRODUCTION
De centrale ballast consists of reinforced concrete blocks symmetrically
placed on the undercarriage.
The blocks are marked with the letters C of D.
The central ballast must be composed according to the table below. The
ballast is to be supplied by the client in accordance with:
- Standard chassis
- Fig. 1.2.3.3.1-1 en fig. 1.2.3.3.1-2
- Chassis YZ86X
- Fig. 1.2.3.3.2-1 en fig. 1.2.3.3.2-2
- 32 -
RCVC1.0ENG
:Mast composition
HC
:Hook height in m
NR
:Number of layers
ND
:Number of blocks
LE
LD
:Obtained ballast
RES
:Reaction in service
RHS
RH
:Reaction
1.6 m x 1.6 m
D
RH
R
R
RH
D C
Fig. 1-4-1
CP
HC
NR
ND
LE
LD
RES
2+0+1
13.4m
8C+8D
42.4t
42.4t
44t
5.60t
2+1+1
16.4m
8C+8D
42.4t
42.4t
45t
5.66t
2+2+1
19.4m
8C+8D
42.4t
42.4t
47t
4.72t
2+3+1
22.4m
8C+8D
42.4t
42.4t
48t
5.78t
2+4+1
25.4m
8C+8D
42.4t
42.4t
49t
5.84t
2+5+1
28.4m
8C+8D
42.4t
42.4t
51t
5.90t
2+6+1
31.4m
8C+8D
42.4t
42.4t
52t
5.95t
2+7+1
34.4m
8C+8D
42.4t
42.4t
53t
6.01t
2+8+1
37.4m
8C+8D
42.4t
42.4t
55t
6.06t
2+9+1
40.4m
8C+8D
42.4t
42.4t
57t
2+10+1 43.4m
10C+10D
53.0t
46.4m
12C+12D
63.6t
2+11+1
RHS
59t
6.12t
53.0t
69t
6.17t
63.3t
79t
6.28t
RH
- 33 -
RH
RCVC1.0ENG
420
540
250
900
150
750
1500
3
250
450
750
100
500
2
1
Rep
: Ref.nr.
: Diameter in mm
: Number
L.u
: Length
L.t
: Total lengh
Forme
: Reinforcement type
: Material
mm
40
10
900
7200
10
2200
8800
10
1600
4800
REP
R30
R20
R10
220
( )
115
R3
0
220
L.u
L.t
500
1000
Reinforced concrete
Forme
P: 2800kg D: 2.3
Fig. 1.2.3.3.1-1
- 34 -
RCVC1.0ENG
235-B
500
500
540
420
250
900
150
750
1500
3
250
450
750
100
500
: Diameter in mm
: Number
L.u
: Length in cm
L.t
: Total length
Forme
: Reinforcement type
: Material
mm
40
10
900
10
2200 8800
10
1600 4800
REP
R10
R20
220
R3
0
R30
115
220
( )
L.u
L.t
500
1000
7200
Reinforcement
concrete
P: 2500kg D: 2.3
Fig. 1.2.3.3-2
- 35 -
Forme
235-B
Rep
RCVC1.0ENG
- 36 -
RCVC1.0ENG
- 37 -
RCVC1.0ENG
1.2.4.1. INTRODUCTION
The counter-jib ballast consists of various reinforced concrete blocks A,
B or C. The counter-jib ballast is governed by the length of the jib. These
blocks are suspended one by one at the rear of the counter-jib.
The ballast is to be supplied by the client. The drawings are enclosed.
In accordance with Fig. 1.5.2-1. During installation, care must be taken
to ensure that they cannot be chipped or become loose while operating
the crane.
The admissible tolerance is
+50
0
kg per block.
- 38 -
RCVC1.0ENG
30
35
40
45
50
55
14.89
14.89
14.89
14.89
14.89
14.89
During
Blocks D+E+B D+E+B D+2B+G D+E+B+G D+E+2B D+3E
working & Weight
8200
8200
9500
9800
10600 11200
telescoping in kg
Block type
Density
(t/m3)
L (mm)
Weight (kg)
Tolerance
2.4
830
2400
+50Kg
2.4
1180
3100
+50Kg
2.4
990
2700
+50Kg
2.4
450
1600
+50Kg
- 39 -
RCVC1.0ENG
- 40 -
RCVC1.0ENG
8
5
Fig. 1.3.1-1
- 41 -
RCVC1.0ENG
- Hoist the single hook block (4) against the trolley (jib)
and (2).
- When the trolley (2) is being run out, both trolleys become
separated.
- Reinstall the connecting pin (8) and cotter pins (9) on the rear
trolley.
- This concludes the transition from dual (4-rope) reeving to singel
(2-rope) reeving.
Fig. 1-3-1-2
ATTENTION:
- If operating a significant amount of time with single reeving,
the entire jib length while veering and hoisting the load hook
over the entire hoisting height.
- Revert to single (2-rope) reeving
- 42 -
RCVC1.0ENG
jib foot).
- Press the switch button on the operating panel.
- Connect both trolleys with the connecting pin (8) and secure it
4
3
8
6
Fig.1.3.2-1
- 43 -
RCVC1.0ENG
ATTENTION:
- Working in single reeving configuration with cranes
- 44 -
RCVC1.0ENG
(2-rope) reeving.
- 45 -
RCVC1.0ENG
- 46 -
RCVC1.0ENG
- 47 -
RCVC1.0ENG
2.1. SYMBOLS:
PQC
Vb. 24 PQC15
Fig. 5-1-1
- 48 -
RCVC1.0ENG
ATTENTION
NOTE:
- 49 -
RCVC1.0ENG
2.3. DESCRIPTION
The cable drum is of the grooved type and is driven by a right-angled
bevel gearbox.
The driving motor is of the type TSYDE 180L 2/4/16 with an output of
24/24/5,5 kW.
The motor speeds are 2800 / 1400 / 300 rpm.
The motor is fitted with an electromagnetic disk brake.
The hoisting limiter is of the type 0 x Z4/7 with a transmission ration i =
1: 274.
- 50 -
RCVC1.0ENG
Characteristics:
Operating range
M5
Use category
T4
Load category
L2
Motor type
YSYDE180L2/4/16
2800/1400/300 rpm
80
40
8.5
1.5
m/min
40
20
4.2
Rope diameter
12 mm
Drum capacity
400m
- 51 -
RCVC1.0ENG
- 52 -
RCVC1.0ENG
- 53 -
RCVC1.0ENG
- 54 -
RCVC1.0ENG
29.
Bolt
32.
Bottom adapter
33.
34.
35.
Compression spring
37.
Protection cover
46.
Bolt
52.
Lever
53.
Nameplate
54.
Shaft
55.
Adjusting plate
59.
Adapter
61.
Mounting plate
47.
Electromagnet
Fig. 5-1-2
- 55 -
RCVC1.0ENG
Part
Handling (daily)
Gearbox
Rope
Fittings
Limiter
Lubrication points
- 56 -
RCVC1.0ENG
2.4.3. GEARBOX
Fill opening
Oil level
Drain opening
Fig. 5-1-3
- 57 -
RCVC1.0ENG
- 58 -
RCVC1.0ENG
C
Couple (N.m)
Current brake
Voltage regulator
Slewing mechanism
3.1.1. DESCRIPTION:
Select the slewing speed suitable for the required movement. Gradually
increase or decrease the slewing speed. Slow down gradually instead of
stopping the load abruptly with the slew brake.
The slew brake may only be used to position the jib during hoisting at
wind speeds < 13 m/s (46 km/h).
Avoid simultaneous slewing and hoisting to prevent damage to the hoist
rope (rope twisting risk).
- 59 -
RCVC1.0ENG
ring.
- Safety brakes mounted on the electrodynamic coupling/brake.
- Tacho-dynamo, for speed control.
- Slewing limiter.
- The crane can be put in weathervaning both manually and
electrically.
- 60 -
RCVC1.0ENG
3.2.2. OPERATION
1/ Make the motor run in the desired direction.
2/ The brake releases.
3/ The electrodynamic brake inductor is supplied with direct current.
4/ An amperage change in the inductor produces a speed change. In
- 61 -
RCVC1.0ENG
1.
Motor
2.
Gearbox
3.
Weathervaning mechanism
4.
Slewing ring
5.
Limit switch
6.
Slewing brake
Fig. 2.2.1-1
- 62 -
RCVC1.0ENG
IC
Contactor clockwise direction
RP
IC
IC
IC
Adjustable 3-phase
AC-supply
-V
Voltage Feedback
1/ Benaming
RP:
IC:
Potentiometer
Signal amplifier
2/ Operation:
- 63 -
RCVC1.0ENG
3/ Wiring diagram
A
RDi
RD
RM
B
RG
AC48V
RRa
AC48V
- 64 -
RCVC1.0ENG
3.2.4. MALFUNCTIONS
1/ The slewing mechanism is provided with an electronic control
device that:
- Controls slewing acceleration and deceleration
- Prevents changing of the slewing direction by a control error
2/ If a malfunction occurs, working with the crane must be stopped
Normal
Abnormal
Shunt bridging
Free slewing
- 65 -
RCVC1.0ENG
improper tightening.
5/ Check if the control box still works within the given
parameters.
- 66 -
RCVC1.0ENG
- 67 -
RCVC1.0ENG
4.1. SYMBOLEN
D T C
- 68 -
RCVC1.0ENG
PV1:
PV2:
The disk brake of the trolley winch unit is of the regular closed type
(i.e. release through voltage control).
Normal brake clearance is 0,8 1,2 mm.
The brake clearance is set in an identical way as for the slewing motor.
The brake torque is set by a spring screw Fig. 3-2-1 item 14.
- 69 -
RCVC1.0ENG
10
11
12
23
22
21
20
19
18
16 15 14 13
17
Fig. 3.2-1
1.
2.
Connecting rod
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
Fixing nut
13.
14.
15.
16.
Protection
17.
Spindle connection
18.
19.
Transmission axle
20.
21.
22.
Sealing ring
23.
- 70 -
RCVC1.0ENG
9. Cover
E. Brake clearance
Brakes:
When the current is cut, the electromagnetic attractive force disappears.
The brake spring (2) pushes the pressure disc (6) back on the brake
disc (5). This closes the brake. The brake is of the regular, closed type.
Releasing the brake:
When the excitation coils (1) is energized, the pressure disc (6) is
attracted and the brake pressure spring (2) is pressed in. By this, the
brake discs open up.
Brake clearance:
Normal brake clearance is 0.8 to 1.2 mm. Check the brake clearance
for soiling (oil - grease).
Brake moment adjustment:
The brake moment was factory-set
Releasing the brake manually:
The brake can be released manually by loosening the brake yoke (3).
- 71 -
RCVC1.0ENG
- 72 -
RCVC1.0ENG
RXDAr
SDM 0
XDAV
SDAv
RXDAv
XDGV
XDPV
RDMr
1S
DPv
XDAr
SDAr
XDGV
XDPV
SD
DPv
in
the
energized
1S
Holding position
DGV
DPV
DPV1
DMV1
DMV
DFa
DAr
DAV
PD
SD