Академический Документы
Профессиональный Документы
Культура Документы
prepared for
Fairmont Marion County Regional
Airport Authority
Fairmont, West Virginia
February 2006 ©
TABLE OF CONTENTS
1.0 OVERVIEW
1.1 Introduction
1.2 Objectives
County: Marion
Coraopolis, Pa 15108
1.2 OBJECTIVES
The goal of the storm water permit program is to improve the quality of surface
waters by reducing the amount of pollutants potentially contained in the storm
water runoff being discharged.
3. To provide other elements such as, but not limited to, a facility
inspection program, site compliance evaluation program, record
keeping, and reporting program that will help the contractor comply
with the terms and conditions of their storm water discharge permit.
The member(s) of the team and their primary responsibilities (i.e. implementing,
maintaining, record keeping, submitting reports, conducting inspections,
employee training, testing for non-storm water discharges, signing the required
certifications) are as follows:
Batteries/Battery Batteries on site will be N/A This item does not pose to
Acid located in the be a potential contaminate
equipment. to the soil or ground water
in our project situation.
Storage area for The Contractor will have to It is recommended that storage
raw materials, include information on the areas be secured either in a
product, or wastes storage of on-site materials. trailer, lock and key or some
A dumpster may be used on-site equivalent means.
for disposal of any F.O.D This will help prevent
(Foreign Object Debris) that the vandalism, spills and
Contractor produces during unwanted use of the materials.
construction.
Closest Well Head Protection Area: See WVDHHR letter, attn: Dr. Feng
Closest Source Water Protection Area: See WVDHHR letter, attn: Dr. Feng
This GPP must be available on site for review at all times. WV DEP or engineer
may require modification of a GPP to assure adequate protection of ground
water.
If a facility does not have adequate ground water protection practices in place
they may submit a compliance schedule for implementation of the necessary
practices. This compliance schedule would allow them time (no longer than
thirty days) to implement the necessary practices.
FACILITY/SITE INFORMATION
Facility name: Fairmont Municipal Airport
Facility location: Pleasant Valley County: Marion
Latitude: 39 26 53.4 Longitude: 80 10 01.3
Contact person: Dave Floyd Telephone: (304)-612-4211
Company Name: Fairmont Municipal Airport
Mailing address: P.O Box 387
City, State, Zip: Fairmont, WV 26555
Date Construction to begin: June 2006
Date Construction to end: October 2006?
I certify that I have personally examined and approved this Groundwater Protection
Plan (GPP). This GPP will be implemented and adhered to during the period
construction is in progress at this site.
Designated Representative: Title:
Signature: Date:
The following pages contain sample forms for the record keeping and reporting
by the Contractor associated with the SWPPP. The following forms are
examples; they are not required to be used.
Location: _______________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
________________________________________________________________
___________________________________
Signature
Signature: ____________________________________________________________
Observations/Results: ___________________________________________________
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
_______________________________ ________________________________
_______________________________ ________________________________
_______________________________ ________________________________
_______________________________ ________________________________
_______________________________ ________________________________
_______________________________ ________________________________
_______________________________ ________________________________
_______________________________ ________________________________
_______________________________ ________________________________
_______________________________ ________________________________
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
Signature: ____________________________________________________________
parking areas
fuel pumps
outfalls
dumpsters
Signature: ____________________________________________________________
Signature: ____________________________________________________________
parking lots
storage areas
dumpsters
equipment