VALVE MATRIX
Project Code Client Name 04A11 EXHIBITION Equipment Name P&ID Number & Revision
CIP DOCKING SKID
04A11.VM.01
Prepared by
ST
DDE-100L-CIP-101.001 REV:00
Checked by
CXVWFI -01
CXVWFI -02
CXVCD -01
CXVCD -02
CXVCD -03
CXVPW-01
CXVCR-01
CXVPA-01
CXVCI -01
CXVCI -02
CXVCI -03
CXVCI -04
CXVCI -05
PLC flag
Step No
DPL-01
DPL-02
AXV-01
CP-01
CP-02
PS-01
TE-01
TE-02
FS-01
FS-02
Step
Step ready
Step transition
VII)
Filling
1.1
WFI filling level = Set point for level in the parameterc screen
Feedback from level senor for controlling the valve for WFI inlet
Monitor feedback for 7 sec delay, if levels Process Value = Set value proceed to transfer
1.2
CONDUCTIVITY BASED WFI RINSE, Filling & draining simultaneously until set-conducitivity is achieved
after initial set level is achieved & SYSTEM Prepares for transfer, open wfi inlet valve & again start filling simulatenouesly with transfer
2.0
Open valves at bottom outlet, Transfer of Purified water pump discharge & HE outlet for transfer to subjected to Subjected Vessel vessel wait for feedback from flow switch at the Suction of CP01
Transfer
2.1
2.2
Start filling & wfi transfer Positive feedback from FS01 sensing flow in line simultaneously
3.0
Transfer & simultaneous Open valves for CIP retrun & draining from subjected draining from the subjected vessel outlet vessel Wait for feedback from flow switch at the Suction of CP02
3.1
REV:00
9/3/2011
AIE-1
Temperature indicator in DV01 Temperature indicator @ HE outlet Flow switch at suction of CP01 Flow switch at suction of CP02 Conductivity sensor for dosing of acid/alkali
DV Outlet Valve
Level Indicator
DV drain valve
1/3
Page 2
VALVE MATRIX
Project Code Client Name 04A11 EXHIBITION Equipment Name P&ID Number & Revision
CIP DOCKING SKID
04A11.VM.01
Prepared by
ST
DDE-100L-CIP-101.001 REV:00
Checked by
CXVWFI -01
CXVWFI -02
CXVCD -01
CXVCD -02
CXVCD -03
CXVPW-01
CXVCR-01
CXVPA-01
CXVCI -01
CXVCI -02
CXVCI -03
CXVCI -04
CXVCI -05
PLC flag
Step No
DPL-01
DPL-02
AXV-01
CP-01
CP-02
PS-01
TE-01
TE-02
FS-01
FS-02
Step
Step ready
Step transition
3.2
Positive feedback from FS02 sensing flow in line FEED back from conductivity sensor at CIP return line monitoring WFI rinse FEED back from conductivity sensor at CIP return line monitoring WFI rinse
When PV for final WFI conductivity value >= SV keep WFI inlet valve open
AIE-1
Temperature indicator in DV01 Temperature indicator @ HE outlet Flow switch at suction of CP01 Flow switch at suction of CP02 Conductivity sensor for dosing of acid/alkali
DV Outlet Valve
Level Indicator
DV drain valve
When PV for final WFI conductivity value < SV monitor CT-02 Value reading for 10 seconds
FEED back from conductivity sensor at CIP return line monitoring WFI rinse
When PV for final WFI conductivity value CT-02 < SV for 10 seconds. Close WFI inlet valve
RECORD THID VALUE for CT-02 AS FINAL WFI CONDUCTIVITY IN THE REPORT
4.0
When Feedabck from FS-01 is negative indicating no flow Complete transfer of WFI @ suction of CP-01 line with programmed delay of 5 from DV-01 seconds, Switch OFF CP01 pump
Draining
4.1
Close valve at discharge of CP-01 & open drain valve for Supply pump & dilution vessel
REV:00
9/3/2011
2/3
Page 3
VALVE MATRIX
Project Code Client Name 04A11 EXHIBITION Equipment Name P&ID Number & Revision
CIP DOCKING SKID
04A11.VM.01
Prepared by
ST
DDE-100L-CIP-101.001 REV:00
Checked by
CXVWFI -01
CXVWFI -02
CXVCD -01
CXVCD -02
CXVCD -03
CXVPW-01
CXVCR-01
CXVPA-01
CXVCI -01
CXVCI -02
CXVCI -03
CXVCI -04
CXVCI -05
PLC flag
Step No
DPL-01
DPL-02
AXV-01
CP-01
CP-02
PS-01
TE-01
TE-02
FS-01
FS-02
Step
Step ready
Step transition
4.2
When Feedabck from FS-02 is negative indicating no flow @ suction of CP-02 line with setable delay, Switch OFF CP02 pump
Draining complete
10
Process Air supply to Dilution vessels & throught the line.Pressurize Dilution vessel & CIP system for 10 seconds
PRESSURIZATION
Cloase Process Air supply Vlave & open all valves incl;uding drain for 15 seconds
DE-PRESSURIZATION
Legend :
X = Valve Open
Blank = Valve Closed F = Feedback from sensing instruments for control of parameters & progress of Cycle P = Pump ON/OFF depending upon set point of CT-01
REV:00
9/3/2011
AIE-1
Temperature indicator in DV01 Temperature indicator @ HE outlet Flow switch at suction of CP01 Flow switch at suction of CP02 Conductivity sensor for dosing of acid/alkali
DV Outlet Valve
Level Indicator
DV drain valve
3/3