DELHI METRO RAIL CORPORATION LTD.

Traffic Forecast for the Proposed Metro Rail Project in


Pune Metropolitan Area

Report on
Methodology and Data

Submitted by

Transportation Systems Engineering Group


Civil Engineering Department
Indian Institute of Technology Bombay
Powai, Mumbai-400 076
March 2008

TABLE OF CONTENTS
LIST OF TABLES
LIST OF FIGURES
1. INTRODUCTION

1.1 Background

1.2 Review of earlier traffic and transportation studies

1.2.1 Mass Rapid Transit System for Pune Metropolitan Area by RITES, 1998
1.2.2 Comprehensive Study of Integrated Traffic Dispersal System for PCMC
& PMC by CES, 2004
1.3 Objective and Scope

1.4 Structure of the Report

2. METHODOLOGY OF THE PRESENT STUDY

10

2.1 General

10

2.2 Generation of Base Year OD Matrices and Travel Pattern

10

2.3 Development of Travel Demand Model

10

2.4 Horizon Year Travel Demand Forecasts

13

2.5 Ridership Estimation on Metro Corridors

15

3. STUDY AREA, PLAN PERIOD AND TRANSPORT NETWORKS

16

3.1 Study Area

16

3.2 Delineation

16

3.2.1 Traffic Zones

16

3.2.2 Screen Lines and Cordon Lines

16

3.3 Planning Period

20

3.4 Highway and Public Transport Networks

20

3.4.1 Highway Network

20

3.4.2 Public Transport Network

21

4. SECONDARY AND PRIMARY DATA

23

4.1 Secondary Data from RITES (1998) and CES (2004) Studies

23

4.2 Stated Preference Survey

23

4.2.1 Design of SP Experiment

24

4.2.2 Administration of SP Experiment

25

4.2..3 AP Survey Results and Analysis

26

4..2.4 Model Development based on SP Data and Results

27

4.3 Traffic Volume Counts

28

4.4 Occupancy Counts

35

4.5 O-D Surveys

36

4.6 Speed and Delay Survey

36

4.6.1 Corridors selected for Speed and Delay Study

37

4.6.2 Results of Speed and Delay Study

37

4.7 Home Interview Survey (HIS)

38

4.7.1 Types of HIS

38

4.7.2 Survey Format Design

39

4.7.3 Sample Design

39

4.7.4 Administering the Survey

40

4.7.5 Data Analysis and Results

42

5. PLANNING VARIABLES

47

5.1 General

47

5.2 Population

47

5.3 Employment

48

5.4 Vehicle Ownership

50

5.4.1 Modeling of Vehicles for Horizon Years

51

5.5 Future Work

54

5.6 References

54

APPENDIX 1
APPENDIX 2

TRAFFIC VOLUME AT CORDON & SCREEN LINE


STATIONS
ZONAL PLANNING VARIABLES

APPENDIX 3

FORMATS USED FOR COLLECTION OF PRIMARY DATA 165

55
157

LIST OF TABLES
Table No

Description

Page No

1.1

Recommended MRT Network

1.2

Traffic Speeds (km/hr) on Major Roads

1.3

Critical Peak Hour Volume and V/C Ratios on Major Roads

1.4

Proposed Improvements in PCMC Area

1.5

Proposed Improvements in PMC Area

3.1

Different types of Links in Network and their Characteristics

21

3.2

Description of Other Links used in the Network

22

4.1

Calibrated Parameters of Pune Metro SP Model

28

4.2

Subjective Values of attributes obtained from SP Model

28

4.3

Location Details of Screen Line Stations

31

4.4

Location Details of Cordon Stations

32

4.5

PCU Values adopted for the study

32

4.6

Daily Traffic in PCU at Screen Line Stations

33

4.7

DDHV at Screen Lines Stations

33

4.8

Daily Traffic in PCU at Outer Cordon Stations

34

4.9

DDHV in PCU at Outer Cordon Stations

35

4.10

Average Occupancy of Vehicles

35

4.11

Description of the Corridors chosen for Speed and Delay Study

37

4.12

Summary of average speeds in kmph along the Corridors

38

4.13

Bias Correction Factors

43

4.14

Overall Travel Pattern obtained for the study area

46

5.1

Population Growth in study area

47

5.2

Estimated Population in different areas of study area

48

5.3

Additional Employment due to new developments

49

5.4

Employment in Study Area

49

5.5

PMC Motor Vehicle Statistics

50

5.6

PCMC Motor Vehicle Statistics

50

5.7

Projected Vehicle Ownership in PMC and PCMC

53

5.8

Projected number of Private Vehicles in PMC and PCMC

53

LIST OF FIGURES
FIG No

Description

Page No

2.1

Generation of Base Year OD Matrices

11

2.2

Travel Demand Model

13

2.3

Horizon Year Travel Demand

14

3.1

Zonal Map of Study Area

17

3.2

Location of Screen Lines in Study Area

18

3.3

Location of Screen Lines and the External Cordon

19

4.1

Typical Stated Preference Experiment Design

24

4.2

Levels of Attributes in SP Experiment

24

4.3

Typical SP Experiment for Two Wheeler

25

4.4

SP Survey Sample Distribution by Mode

26

4.5

SP Survey Sample Distribution by Income

26

4.6

Household Size Distribution of SP Sample

27

4.7

Modal Share at Outer Cordon Stations

30

4.8

Proportion of traffic at each Outer Cordon Station

30

4.9

GPS Receiver and its Components

37

4.10

Screenshot of a TAZ with samples marked

40

4.11

Index Map for HIS

42

4.12

Household Size Distribution from HIS

43

4.13

Modal Split from HIS

44

4.14

Residence Ownership

44

4.15

Trip Length Frequency Distribution for Motorized Trips from HIS

45

4.16

Trip Length Frequency Distribution for All Trips from HIS

45

4.17

No of Trips Mode wise from HIS

46

5.1

Population projections of different areas of Study Area

48

5.2

Employment Projections for Study Area

49

5.3

Modeled Car Ownership in PMC

51

5.4

Modeled Two wheeler Ownership in PMC

52

5.5

Modeled Car Ownership in PMC

52

5.6

Modified Two Wheeler Ownership in PMC

53

CHAPTER 1

INTRODUCTION
1.1 BACKGROUND
The increasing levels of congestion on Pune road network coupled with high private
vehicle usage prompted the planners and the implementing agencies to go for
transportation infrastructure improvements. The planners have realized the fact that
there should be a phenomenal change in the existing transportation system that
would instigate a substantial shift from Private vehicles to Public Transit. Thus a
need for an appropriate Mass Transit system was felt and DMRC was entrusted with
the preparation of DPR for identifying the potential corridors for implementation of
Metro Rail system in Pune. DMRC in turn has appointed Transportation Systems
Engineering Group of IIT Bombay to perform the Traffic study for estimating
Ridership on the potential Metro corridors. The possible set of potential corridors for
metro was identified by means of a thorough review of relevant past studies carried
out in the study area. The following section provides a review of the same.
1.2 REVIEW OF EARLIER TRAFFIC AND TRANSPORTATION STUDIES
To improve the traffic & transportation situation of the Pune region, the traffic
authorities of Pune have carried out feasibility studies time to time and implemented
the recommended measures to a great extent. The major transportation studies
carried out for Pune region include:
Cycle Network Project for Pune, Town Planning Dept., Pune, 1981
Traffic and Transportation Plan for Pune Metropolitan Area-2001 by Dept. of
Town Planning, Maharashtra, 1984
Traffic and Transportation Flows for Selected Cities in India by CRRI, 1986
Transport in Pune Metropolitan Region by CIRT, Pune, 1987
High Capacity Mass Transit System for Pune: Feasibility Study by MTP
(Railways), 1988
Report of the Pune Action Plan, 1991
Deshmukh Committee Report for Long Term Measures for Pune
Agglomeration, 1994
Report of the Committee appointed by Divisional Commissioner, Pune
Division, Pune to recommend Short Term Measures for Improvement of
Traffic in Pune City, 1994
Pune Traffic 2000 Parking, 1996
Project Report: Mega City of Pune, 1997
Feasibility Report on Construction of Flyovers, Traffic Planning Cell, Pune,
1998
Mass Rapid Transit System for Pune Metropolitan Area by RITES, 1998
Sharing of Inter-City Services Operated by PMT & PCMT, CIRT, 2000
Final Report on Study on the Working of Pune Municipal Transport, CIRT,
2000
A Study on Traffic and Economic Analysis of Road Improvement Project in
Pune by CIRT, 2001
Traffic Study for Pune City by AAKAR Enterprises, 2003
Comprehensive Traffic & Transportation Study for Pune City, Span Travers
Morgan, 2003
1

Integrated Traffic Dispersal System for PMC & PCMC, CES, 2004

All the studies related to mass transit systems suggested that there is a need for
identifying suitable corridors for implementation of mass transit systems. It was
observed that the RITES study was of great prominence and relevance in view of the
present study in terms of its recommendations for potential corridors. The CES study
is also of great importance as it provides the latest possible coded network
information. The CES study also provides information on proposed road
improvements that are to be incorporated in the Horizon year scenarios.
Brief details on RITES and CES studies are presented in the following sections.
1.2.1 Mass Rapid Transit System for Pune Metropolitan Area by RITES, 1998
The objective of this study was to examine the feasibility of a High Capacity Mass
Transport System for Pune Metropolitan Area (PMA) to serve the forecasted travel
demand by the year 2026, identification of cross subsidy schemes to make the
project financially viable and implementation by private participation on Build, Own,
Operate and Transfer (BOOT) basis.
The recommendations of the study were as follows:
MRT network of approximately 85.92 km. length consisting of 6 Lines have
been proposed and their commissioning was proposed in 3 phases. In each
phase 3 Lines have been included. The details are presented in Table 3.3.
A joint venture company owned by PMC and PCMC named Pune Mass Rapid
Transit Authority be incorporated with the responsibility of implementation of
the project and operation of the system.
Enact enabling legislation empowering Pune MRT Authority in the matter of
carriage of the commuters by Pune MRTS.
Land identified for Line (1) and Line (2) to be reserved immediately and action
to acquire the land be initiated.
MSEB be approached for firm commitment to supply power at the requisite
points.
Identify the cross-subsidy schemes to make the project financially viable so
that private capital can be attracted.
Initiate action for administrative approval of various concessions to be made
applicable for this project.
Initiate action to pre-qualify the parties/ firms so that private sector
participation can be expedited.
Traffic speed observed on some of the major roads in PMC and PCMC are
presented in Table 3.4. Critical peak hour volume and Volume/ Capacity ratio on
some of the major roads are presented in Table 3.5.

Table 1.1 Recommended MRT Network


Length
Proposed Year of
Line
(Km.)
Commissioning
Line 1: Agriculture College TELCO
12.54
2002
Line 2: Agriculture College Varje
10.10
2006
Line 3: Karve Road-Swargate11.56
2011
Hadapsar
Line 4: Agriculture College Loni
22.84
2016
Road
Line 5: Agriculture College
16.11
2021
Chinchwad
Line 6: Agriculture College Katraj
12.76
2021
Total
85.92
(Source: Mass Rapid Transit System for Pune Metropolitan Area by RITES, 1998)
Table 1.2 Traffic Speeds (km/hr.) on Major Roads
Morning Peak
Section/ Road
Up

Down

Evening
Peak
Dow
Up
n
19
23
18
18
14
15
12-21 4-23
4-20
3-4
8-38 20-44
11-20 10-33
32-60 20-52
5-22
5-15
33-64 30-57
14-23 18-20
17
16
24-37 23-40
23-39 26-40
5
4
25
26
83
85
9-18 18-23

1. Maldhakka-Laxmi Road (JL Nehru)


15
16
2. Lakshmi Road-7 Loves (JL Nehru)
18
21
3. 7 Loves - Jedhe Chowk (Shankarshet)
24
20
4. Dengale Bridge - Sambhaji Park
23-26
25-28
5. Sambhaji Park - Sambhaji Br.
4-17
3-24
6. Aundh-Sancheti Bridge
28-36
29-50
7. Sancheti-ZP-Pune RS
18-30
11-24
8. Pune RS-ROB
26-43
32-43
9. Alka-Swargate (Tilak)
5-23
4-18
10. Fergusson College Road
22-60
23-58
11. Tilak Road-Shivaji Bridge
19-35
21-32
12. Lal Bahadur Shastri-Bypass (Sinhagad)
20
19
13. PCMC Buld. TELCO Road
25-36
22-40
14. Chapekar Chowk Bypass
5
22-45
15. Bypass - Hinjewadi
5
6
16. Wanwadi - Kondhva
51
19
17. Kondhva PMA Boundary
28
73
18. Phursungi Road Kondhva via Undri
11-19
20-24
19. Bhosari Pradhikaran (TELCO/ Old BB
Pune)
25-52
30-50
22-47 25-47
20. Holkar Bridge Dapodi (Elphinston)
29-85
38-60
29-45 29-60
21. Old Mumbai Pune Road upto Aundh
12-53
7-41
4-39 41-49
(Source: Mass Rapid Transit System for Pune Metropolitan Area by RITES, 1998)

Table 1.3 Critical Peak Hour Volume and V/C Ratios on Major Roads
Critical Peak
Sl.
Road Name
Location
Hour
V/C Ratio
No.
Volume
1
Band Garden
Holiday Inn
5399
0.77
2
J. L. Nehru
Timber Market
5002
1.67
3
Shankarshet
Poornima Towers
4063
1.35
4
Laxmi Road
Pune Central
3765
1.79
Restt.
5
J. L. Nehru
Kabir Chowk
3043
2.54
6
Z.P. Chowk Pune RS Vaishali Hotel
7022
2.42
7
Mothilal
Pune Rly. Stn.
4120
2.06
8
Shivaji
Phadgate Police
6656
3.70
Stn.
9
Baji Rao
Telephone
6062
3.37
Exchange
9
Tilak
Kaka Sweet
4741
2.63
10 Fergusson College
Hotel Sheetal
3897
2.17
11 Karve
Nal Stop
11089
3.7
Law College
12
Law College road
4240
2.36
(Chiplunkar)
13 Bhosri-Krishna Nagar
S. B. Chowk
3420
1.14
14 R.T.O Bridge
R.T.O Bridge
3917
2.18
15 Mothilal
Sangam Bridge
3577
1.19
16 Dangle Bridge
Dangle Bridge
4938
2.74
17 Shivaji Bridge
Shivaji Bridge
6126
3.40
18 Shinde bridge
Shinde bridge
6241
2.60
19 Saras bagh
Patil Plaza
6939
2.89
20 Old Mumbai Pune
Aundh Octroi Post
2890
1.45
21 Chinchwad Rly Stn.
Central Bank
1502
0.83
22 Bhosri Krishna Ngr.
S B Chowk
3420
1.14
(Source: Mass Rapid Transit System for Pune Metropolitan Area by RITES, 1998)
1.2.2 Comprehensive Study of Integrated Traffic Dispersal System for PCMC &
PMC by CES, 2004
In the past, PMC and PCMC have carried out several studies for improvement of the
transport infrastructure in the Pune Metropolitan Area and these studies came out
with various recommendations to ease the traffic congestion, improve the mobility
and overall environment. To integrate the recommendations proposed in past studies
and prepare an Integrated Traffic Dispersal System (Master Plan for Road network
Improvement) for PCMC and PMC areas MSRDC appointed M/s CES Pvt Ltd.
The study involved the following aspects
Review of the adequacy/deficiency of the existing road network in terms of its
capacity versus demand (existing and projected)
Prepare a Master Plan for integrated road development (with effective traffic
dispersal system)

Establish technical, financial and economic feasibility on each scheme as well as


on overall network basis
Prioritisation of the feasible schemes and fixing time frame
Recommended funding options and implementation programme
To evaluate and recommend phasing of the schemes with respect to network
benefits and cost economics
Table 1.4 Proposed Improvements in PCMC Area

Road
Name of the Road
No
1
Dehu - Alandi Road through
Talawade, Chikhali, Moshi and
Dudalgaon
2
Pune - Alandi Road in PCMC limits
from Dighi to Chowis Wadi.
3
Bhosari - Alandi Road
4
Pune - Nashik Road (NH-50) in
PCMC Limits (From Old NH-4 to
Indrayani River - Moshi )
5
Aundh - Rawet - Kiwale Road (SH-56)
5a
From Rajiv Gandhi Bridge (Aundh)
(PMC Limits) to Dange Chowk: SH-56
5b
From Dange Chowk to Westerly
Bypass (Kiwale) through Ravet: SH56
6
Road from Westerly Bypass (Wakad)
to Hinjewadi (Up to Hinjewadi Ph-I
Chowk)
9
Link road at the Boundary of Wakad &
Tathwade, from Westerly Bypass to
MDR-30.
11
Road from Westerly Bypass
(Wakad) to Nashik Phata at
Kasarwadi
11a From Westerly Bypass to Jagtap
Dairy (Aundh - Wakad Road)
11b From Jagtap Dairy to Nashik Phata at
Kasarwadi
13
Road from M-P Expressway Exit
(on W. Bypass) to Bhakti Shakti
Chowk
13a From Expressway Exit to Mumbai Pune Rly line (Ravet)
13b Parallel to Rly line in Ravet upto
Polytechnic in PCNDTA
13c From Polytechniqe to Bhakti Shakti
Chowk.
15
Link from Westerly Bypass (Wakad) to
Dehu-Alandi Road at Chikhali

Proposals/ Improvements
6 Lane Divided
6 Lane Divided
2 Lane
6 Lane Divided +4-Lane Flyover at
Dehu-Alandi road Jn. + 4 Lanes
Elevated Road in Bosari Town
6 Lane Divided
6 Lane Divided
2 Lane + Major Bridge Across Pavna
River Near Kiwale
2 Lane

6 Lane Divided

4 Lane Divided
4 Lane Divided

4 Lane Divided + 4-Lane ROB Across


Mumbai-Pune Rly Line at Nigadi
2 Lanes
4 Lane Divided

Road
Name of the Road
No
15a From Westerly Bypass at Wakad to
old NH-4 at Chinchwad through
Dange Chowk.
15b From old NH-4 at Chinchwad to
TELCO Chowk
15c From TELCO Chowk to Dehu-Alandi
Road at Chikhali through Kudalewadi.
17
Missing DP link from Kalewadi to
Pimpri - Telco road chowk through
Priemer factory
20
Road from old NH-4 at Dapodi to
PCMC Boundary at Sangvi.
21
Mumbai - Pune Road (old NH-4) in
PCMC Limits

22

Proposals/ Improvements
6 Lane Divided + 4 Lane Flyover at
Dange Chowk + Pedestrian Subways at
Chapekar Chowk in Chinchwad
6 Lane Divided
4 Lane Divided + 4 Lane Flyover at
TELCO Chowk
2 Lanes + 2 Lane ROB Across MumbaiPune Rly Line at Pimpri
2 Lanes + 4 Lane ROB cum Flyover at
Dapodi
10 Lane Divided + 4 Lane Flyover at
Pimpri-Finolex Jn + 4 Lane Flyover at
Chinchwad Jn + Flyover at Akurdi Jn +
Pedestrian Subways at Nigdi Gaonthan
+ Pedestrian Subways at Phugewadi
6 Lane Divided

TELCO Road (Including the length in


PCNTDA Limits)
24
Road from Old NH-4 at Pimpri Chowk 4 Lane Divided
to Nehru Nagar.
29
DP Road parallel to Talwade Road
2 Lanes
from prop. Expressway to Indrayani
river
31
Road parallel to Dehu - Alandi Road
6 Lane Divided
(on its south) through Chikhali &
Moshi Villages
32
Road parallel to Dehu - Alandi Road
6 Lane Divided
(on its north) through Chikhali & Moshi
Villages
35
Road from Jadhav Wadi to Indrayani
2 Lanes
river
38
Road from Pune-Alandi road at
2 Lanes
Chowiswadi to Moshi Boundary
40
DP link from Indrayani river to Dighi 4 Lane Divided
Alandi road through Charholi Bk.
41
Lohagaon - Charoli Road parallel to
2 Lanes
Eastern Boundary of Charoli. .
(Source: Comprehensive Study of Integrated Traffic Dispersal System for PCMC &
PMC by CES, 2004)
Table 1.5 Proposed Improvements in PMC Area
Road
No
1

Name of the Road


Swar Gate to Mangewadi (Old
NH4)

Proposals/ Improvements
6 Lane Divided + 4 Lane Flyover at
Market Road Jn. & Premnagar Jn.+ 4
Lane flyover at Satara Arcade Jn. &

Road
No

Name of the Road

Proposals/ Improvements
Padmavathi Jn. + Pedestrian Subways
at Dhankawadi on Old NH4 (Satara Rd)
+ Pedestrian Subways at Swargate on
Old NH4 (Satara Rd)

7
10

12
13
14

15
16

19
20

Link from NH4 at Padmavati to


NH9 at Hadapsar

4 Lane Divided

NH9 -Swargate to Manjari (new


PMC Limits)

10 Lane Divided + 4 Lane Flyover at


Jedhe Chowk at Swargate on NH9 + 6
lane Widening of ROBs Across PuneMiraj Rly line at Ram Tekdi, Hadapsar +
10 Lane Widening of Minor Bridges.

Saswad Road (SH-64) - NH9 to old


PMC Limits
Road from Gorpade Railway
Station(Level crg) to Mundwa
Karadi Road
Link between Mundwa Karadi
Road and Wagholi (parallel to
Mutha River)
Nagar Road to Software Park of
Karadi MIDC
Link between Mundwa Karadi
Road (near river bridge) to Jail
Road Jn.
Link between SH60 and Alandi
Road (at BEG) via Golf Course
Link between Sadalbaba Jn on
SH60 to Bopodi on NH4 through
Khadki
Alandi Road from Bombay
Sappers (BEG) to PMC Limits in
Dighi
Missing DP from Engg College via
Sangamwadi to Sadalbaba Jn

22

Link from Bund Garden Bridge to


NH9 through Circuit House

23

Old NH4 - Bopodi to Sangam


Bridge

24

Ganesh Khind Road

26
28
31

Wadgaon Khurd to Dhayari


Wadgaon Budruk to Nanded
Paud Road - SNDT Flyover

6 Lane Divided
4 Lane Divided + 4 Lane Minor Bridge
Across Bhairoba Nala on Bibwewadi
Kondwa Road
4 Lane Divided + 2 Lane Minor Bridge
Across a Nala on Baner-Aundh link
2 Lanes
4 Lane Divided

2 Lanes

8 Lane Divided

8 Lane Divided
6 Lane Divided
8 Lane Divided + 6 lane Widening of
ROB Across Pune-Miraj/ Solapur Rly
line in Koregaon (Ex.4-lane)
10 Lane Divided + 4 Lane Flyover at
Bopodi Ju on old NH4 + Pedestrian
Subways at Bopodi on old NH4
10 Lane Divided + 4 Lane Flyover at
University Jn, at Rahul Taklkies Jn, at
Simla office Jn, at Sancheti Jn on
Ganesh Khind Road
2 Lanes
2 Lanes
10 Lane Divided + Pedestrian Subways

Road
No

Name of the Road


Bavdhan Khurd

32

Pashan Road from University Jn to


NDA (upto Boundary of Warje)

33

Baner Road - University Jn to


Westerly Bypass

Proposals/ Improvements
at MIT College on Paud Rd + 4 lane
Vehicular Subway across Westerly
Bypass on Paud Rd
4 Lane Divided + Pedestrian Subways
at Pashan Gaonthan on Pashan Rd
4 Lane Divided + Pedestrian Subways
at Baner Gaonthan on Baner Rd + 6Lane Widening of Minor bridge Across
Ram Nadi Near Baner

Link from Westerly Bypass to


Baner though Balewadi
2 Lanes
Link from Westerly
35
Bypass(NICMAR) to Balewadi
2 Lanes
36
Link from Balewadi to Aundh
2 Lanes
Link between Paud Road (Vanaj
37
Industry) to Karve Nagar
2 Lanes
High Capacity Mass Transit Rail
(HCMTR) Corridor
Khadki Railway Station to Netaji
40
6 Lane Divided
Nagar
Netaji Nagar-Hadapsar-Nagar
Road-Alandi Road
4 Lanes Divided
(Source: Comprehensive Study of Integrated Traffic Dispersal System for PCMC &
PMC by CES, 2004)
34

1.3 OBJECTIVE AND SCOPE


The main aim of this study is to forecast the traffic volumes that would realize on
Metro under various network and fare options. Towards this aim the terms of
reference set for this study are as given below.

Collection of the required Primary and secondary data required for the
development of Travel Demand Model.

Generation of the Base Year Travel pattern in the form of OD matrices from HIS
and Outer Cordon OD surveys.

Development of Highway and Transit networks and Validation of Travel pattern


through assignment.

Calibration of Base Year Travel Demand Model

Projections of all Planning Variables for Horizon years and Forecast the ridership
on all the proposed routes of Metro (including the connecting links) for the future
years 2011,2021 and 2031 under normal fares and network scenarios
considering the committed projects by that year.

Carry out fare sensitivity

The deliverables of the study would be the following parameters of the proposed
Metro rail system,

Link Loads
Station Boardings Alightings
Demand in terms of Passenger Km
Fare Sensitivity
Inputs for Economic Analysis
Priorities of Transit Lines

1.4 STRUCTURE OF THE REPORT


This report has been presented by organizing the whole content into five chapters.
The background for this study, the review of relevant traffic studies, objectives and
scope are presented in this first Chapter. The overall methodology adopted for
forecasting the likely traffic volume on Metro for the given fare levels is presented in
Chapter 2. The details of the study area, its delineation into traffic analysis zones,
plan period and networks considered are discussed in Chapter 3. The details of
secondary and primary data collected are given in Chapter 4. In addition to the
details of data that were obtained from past studies, this chapter deals with the
stated preference survey, screen line and cordon line traffic volume counts, origin
destination surveys, speed and delay survey and home interview survey. The details
of planning variables and their projections are covered in Chapter 5.

CHAPTER 2

METHODOLOGY OF THE PRESENT STUDY


2.1 GENERAL
This chapter describes the methodology adopted for forecasting traffic loading on the
potential Metro corridors in the study area. The travel demand analysis that is
performed is based on the secondary data collected in previous similar studies and
on the extensive primary data collected exclusively for this study. CES (2004) study
is the starting point for this present modeling exercise. The methodology adopted for
forecasting traffic volume on Metro corridors consists of the following four steps.
1.
2.
3.
4.

Generation and Validation of base year OD Matrices


Development of Travel Demand Model
Horizon year Travel Demand Forecasts
Ridership Estimation on potential Metro Corridors

The following sections briefly describe each of these steps.

2.2 GENERATION OF BASE YEAR OD MATRICES AND TRAVEL PATTERN


This process starts with the Home Interview Survey data as input. The data collected
from HIS has been checked for bias and the necessary bias correction was applied
and expansion factors have been computed. Thus the expanded partial OD matrices
were obtained. OD surveys conducted at outer cordon were pooled in to get the OD
matrices with all trips. The matrices were loaded on to the network and the assigned
values were compared with the ground counts to validate the Matrices. The entire
process is shown in Figure 2.1.

2.3 DEVELOPMENT OF TRAVEL DEMAND MODEL


Using the planning variables and validated total O-D matrix for base year (2008), trip
end models are calibrated for total internal passenger travel. A single gravity model
is calibrated using the validated trip ends and skims (generalized cost) obtained from
assignment process as the seed values. The revised skims obtained after
successive modal split and traffic assignments will be used to calibrate the gravity
model.
A binary logit, modal split model will be devised, to determine the share
of public transport and private vehicles. The model will be mainly based on the
transport system attributes. The Public transport matrix will include the person trips
performed by bus, rail, auto and taxi, while the Private vehicle matrix will include
person trips by car and two-wheeler. The cost skims that will be obtained from the
assignment will be used to calibrate the mode choice model.

10

Eliminate bias in HH data and compute


expansion factors

Expanded partial O-D matrices

O-D matrices with all trips

Outer cordon O-D


O-D surveys at Workplace based
surveys

Comparison of trips from O-D


matrices with screen line counts
Adjustment of matrices

Load matrices on to the network and


compare the assigned and observed link
flows. Validate matrices. Select appropriate
assignment technique

Network data
Screen line data
Cordon line data
Bus route network

Validated O-D matrices for base


year

Fig 2.1 Generation of Base Year OD Matrices


The peak hour public transport passenger matrix will be assigned to the public
transport network, which includes a) Bus network (prepared by coding all the
PMPML bus routes), b) Intermediate Public Transport (IPT) routes on the road
network and c) Rail network with all the existing links. The public transport
assignment will be based on generalized time, which is a combination of In-Vehicle
Travel Time (IVTT), Waiting Time (WT), No of Transfers (TR), Fare and Discomfort
in time units. The parameters of this generalized time will be obtained from Stated
Preference Survey.
There are two important steps in public transport assignment. These are path
building and loading trips on these paths. The purpose of path building is to
identify all reasonable paths between zones and provide associated travel
information in generalized time, so that the proportion of trips using each path may
be calculated at the loading stage. Between any pair of zones, the maximum number
of trips will be loaded on to the best path. The other paths with longer generalized
times will be loaded with fewer trips. The proportion of trips to be loaded will be
calculated on the basis of a logistic choice function based on generalized time.
The public transport assignment is also required to assign the trips as per the
observed modal shares. In order to achieve this, the parameters of the generalized
time were fixed based on the values obtained from the analysis of stated preference
11

surveys. After performing the public transport assignment, the assigned flows across
the screen lines will be compared with the observed flows.
Highway assignment will be carried out for peak hour, preloading the highway
network with peak hour public transport and commercial vehicle flows. The daily
public transport loadings are factored by the peak hour flow to daily flow ratios to
obtain the peak hour public transport flows. These are converted to PCUs by using
appropriate passengerto-PCU conversion factors. These peak-hour public transport
(bus and IPT) and commercial vehicle flows in terms of PCUs will be preloaded on
to the highway network before loading the private vehicle passenger OD matrices.
The private vehicle passenger matrices will be converted into peak hour PCU units,
by using appropriate regional peak hour ratios and passenger-PCU conversion
factors, based on observed occupancies at screen lines. A user equilibrium
procedure based on generalized cost (sum of vehicle operating cost and time cost)
will be used in loading private vehicle matrices.
The public transport network will be revised with the speeds obtained after assigning
the private trips. The assignment of public transport trips will be performed on the
revised network, and the next iteration of private traffic assignment will be carried out
by taking the bus, taxi, auto and truck flows as preloads. This iterative process
between PT and private vehicle traffic assignment will be repeated until there is no
appreciable change in the link loadings and link costs.
Two skims namely the highway time and highway travel costs will be obtained from
the loaded network. The skims obtained will be used for calibrating the gravity model
and the modal split-model. The process of distribution, modal split and assignment
will be repeated till the OD matrices become stable. The complete model
development process is graphically represented in Figure 2.2.

12

Validated base year


O-D matrices

Trip productions
Trip attractions

Planning Variables
Population
Residential
workers
Vehicle ownership

Trip Generation Modelling


for internal trips
Trip production
equations
Trip attraction

Assignment of PT trips on to the public


transport network
Assignment of highway trips on to the
road network taking PT flows as

PT time/cost skims
Highway time/cost skims

Road network data


PT network data

Calibration of a disaggregate
mode choice model

Calibration of Gravity trip distribution


model for internal trips

Fig 2.2 Travel Demand Model


2.4 HORIZON YEAR TRAVEL DEMAND FORECASTS
The developed Travel Demand Model is used to forecast the Horizon Year loadings
on each mode on all the links. Future forecasts would be done for the Horizon years
2011, 2021 and 2031. Planning variables would be forecasted for Horizon years
based on demographics and also with inputs from respective planning agencies. The
planning variables of horizon year form the input to the Travel demand model along
with the future highway and proposed metro corridors. Trip ends are estimated and
are fed into the calibrated gravity model along with base year highway skims. The
distributed PA matrix so obtained is fed into the Mode split model and mode wise PA
matrices are estimated. This forms the internal portion of the PA matrix. The external
passenger PA portion as well as Commercial vehicle trips are estimated by Furness
method and added to the horizon year internal matrices. The combine PA matrix is
converted into an OD matrix and is loaded on to the highway and PT networks.
Skims obtained from this assignment process are updated in the gravity model and
redistribution of trips is done. Mode wise OD matrices are estimated by the updated
skims. The final matrices thus produced are loaded on to the network and the cycle
is continued till the skims are stable. The procedure is displayed in Figure2.3.

13

Projection of Planning Variables using


Land-use / demographic models for the
future year

Apply trip-end equations and obtain


future year trip-ends of internal trips

Apply calibrated gravity model and


obtain O-D matrix for internal trips

Previous cost/time skims


for initial run

Apply mode choice model and obtain PT,


car and two-wheeler O-D matrices of
passenger internal trips

Matrix of daily PT (bus+rail+taxi+walk)


Passenger trips

AM peak and PM peak matrices of car,


two-wheeler and truck trips in PCU

Regional peak hour to daily flow


ratios, Passenger - PCU
conversion factors
Obtain truck matrix and mode-wise
external O-D matrices by Furness
method using growth factors

Assignment of PT passenger trips


on to the public transport network

Assignment of peak-hour PCU trips


on road network taking peak-hour PT
& truck PCU flows as preloads

No

Road network data and PT


network data for the scenario
under consideration

Link costs
stable?
Yes

Final Link flows


PT Loadings (Bus, MRTS, Rail, Taxi, walk)
LRT Boardings and Alightings
Final PT and Highway Cost/Time skims

Fig 2.3 Horizon Year Travel Demand

14

2.5 RIDERSHIP ESTIMATION ON METRO CORRIDORS


The Horizon year forecast models would give the ridership on all potential Metro
corridors for the respective years. The output would be obtained as link loadings,
station loadings and passenger kilometers.

15

CHAPTER 3

STUDY AREA, PLAN PERIOD AND TRANSPORT


NETWORKS
3.1 STUDY AREA
The proposed Metro Rail System will essentially serve both PMC and PCMC areas.
Therefore, the study area has been taken as the area comprising the present Pune
Municipal Corporation area, Pimpri Chinchwad Municipal Corporation area and both
the cantonment areas namely Pune and Khadki. The study area also includes the
Hinjewadi and the surrounding areas where the IT Parks are coming up. The study
area adopted in the study is similar to the one adopted by CES (2004) but with
appropriate modifications as stated above. The map in Fig 3.1 shows the study area.
The following sections describe the zoning system, and the details of road and rail
networks adopted for Metro Master Plan study.
3.2 DELINEATION
3.2.1 Traffic Zones
The zoning system of the study has been adopted from a previous study namely
Integrated Traffic Dispersal System for PMC & PCMC carried out by CES in 2004. In
addition to the CES zones a few new developments like Hinjewadi IT Park have
been added as new zones. Some disaggregation has also been done in larger zones
like Pashan. The zoning system of the study area for Metro study comprised 53
zones in the PMC area and 38 zones in PCMC area. Pune and Khadki cantonments
have been considered as two zones. The zones in the study area are shown in Fig
3.1. In addition to 91 internal zones, 13 external zones are considered. These
external zones represent the catchment of external transport links feeding into the
city.
3.2.2 Screen-lines and Cordon-Lines
All the past studies more or less adopted two screen lines, one along the existing
railway line and other along Mula Mutha River. In this study also the same two
standard screen lines were adopted. The boundary of the study area as shown in Fig
3.1 is the outer cordon line. Figs. 3.2 and 3.3 show the location of these screen lines
and the external cordon.

16

17

Fig. 3.2 Location of Screen Lines in Study Area

18

Fig. 3.3 Location of Screen Lines and the External Cordon


Screen line count stations were established at all those points where the transport
links intersect the screen lines. In this study traffic volume counts were performed at
about twenty screen line stations. The location of these screen line stations is shown
in Fig 3.3. Outer Cordon stations were established at all those points where the
transport links intersect the outer cordon line. In all there are fourteen outer cordon
stations. Detailed O-D surveys along with traffic volume counts were conducted at all
the cordon points. The location of these cordon stations is also shown in Fig 3.3. The
details of these traffic surveys and the exact location of these counts are dealt in
chapter 4.

19

3.3 PLANNING PERIOD


Since this study was initiated in year 2008, the same is taken as base year.
Estimates of traffic on potential Metro lines are required over a 20 - 30 year period
from the year of opening to traffic for the purpose of financial and economic analysis.
Therefore the horizon year is kept as 2031. The model will give traffic estimates for
2011, 2021 and 2031. The estimates for the intermediate years have to be
interpolated.
In order to analyze the travel demand in the study area and estimate the likely traffic
loading on the proposed Metro links, all relevant data have been collected for the
base year 2008 and collated for the horizon year 2031 and the two intermediate
forecasting years 2011, 2021.
3.4 HIGHWAY AND PUBLIC TRANSPORT NETWORKS
The network information is available from study of Integrated Traffic Dispersal
System for PMC & PCMC by CES (2004). The network information generated by
CES was strategic consisting of only major roads in the study area. The strategic
information was used as a basis for building up the detailed network for Pune Metro
Study. In addition to the road maps available from secondary sources like Google
Earth a road inventory survey was also carried out preparing the road network for
Pune Metro study. For the present study, the network information generated through
CES study was further enhanced with the most recently developed links in
Hinjewadi, Hadapsar and various other areas.
All intersection points in the network where the link characteristics change were
coded as nodes. Separate networks were developed for public and private modes.
In case of public transport network, the speed on road links was appropriately
adjusted to account for the delay at bus stops. The networks for private, public and
IPT modes were coded as per the requirement of Cube-TRIPS software. All the
operating bus routes available in Pune Metropolitan area have been coded
appropriately with their characteristics. The rail network links were also included in
public transport network. Therefore, the public transport network considered in the
present study is essentially a composite network comprising of road and rail links,
and in future scenarios they include Metro/LRT networks also. The routes for IPT
modes, viz., 3 seater autorickshaw and 6 seater autorickshaw were also coded on
the public transport network. The private vehicle network (two wheeler and car)
considered is the road network. The network for private modes is taken as the
network for goods (commercial) vehicles also by incorporating the existing
restrictions of freight vehicular movements. Appropriate provisions were made in
basic network to account for the proposed and / or possible changes in networks in
future years.
3.4.1 Highway Network
The road network inventory carried out during the study identified 13 different types
of road links. All these links types were appropriately recorded while coding the road
network and preparing the link list for basic network for study area. Table 3.1 shows
the different types of road links with their link characteristics and parameters of the
speed flow functions.

20

The existing traffic management measures like one-way road links, restrictions to
truck movement and parking on the roads were made available. Information was
available for following types of control.
a)

One-way streets in the network

b)

Commercial vehicle movement restrictions on the roads

c)

Parking restrictions on the roads / streets

d)

Restrictions on movement of autorickshaw

The road network was properly connected to all the zone centroids by means of
Centroid connectors. The characteristics of Centroid connectors were given based
on the size of the zone and appropriate average speed of travel within the zones.
The length of road network coded is about 620 km.

Table 3.1 Different Types of Links in Network and their Characteristics


Link Characteristics
Link
Type

1
2
3
4
5
10
11
12
13
17
18
19
31*

No. of lanes

One
Lane
Two
Lane
Three Lane
Four Lane
Five Lane
One Lane
Two Lane
Three Lane
Four Lane
Four Lane
Six Lane
Eight Lane
Four Lane

Divided/
Undivided

Type of
flow

Capacity
Per Dirn.
(PCU/hr)

Free
Flow
speed
(km/h)

Speed
at Cap.
(km/h)

Parameters
of speed
flow
function

Undivided

One-way

1650

30

15

0.65

2.25

Undivided

One-way

3200

40

15

0.70

2.20

Undivided
Undivided
Undivided
Undivided
Undivided
Undivided
Undivided
Divided
Divided
Divided
Divided

One-way
One-way
One-way
Two-way
Two-way
Two-way
Two-way
Two-way
Two-way
Two-way
Two-way

4350
5300
6200
600
1100
1500
2150
2600
3800
6200
2600

40
50
50
25
35
35
40
50
50
55
80

15
18
18
12
15
15
18
18
18
20
25

0.70
0.68
0.68
0.65
0.65
0.65
0.70
0.68
0.68
0.68
0.68

2.20
2.00
2.00
1.45
2.00
2.00
1.90
2.00
1.95
1.90
2.00

* High Speed Design

3.4.2 Public Transport Network


The network developed for public transport consists of all road links, suburban rail
links, BRT links and future metro links along with the routes coded on them.

21

All the bus routes were coded on the road network by obtaining the information on all
the routes operated by PMT and PCMT from PMPML. The route system information
such as frequency, bus capacity, stops, etc were obtained and coded appropriately.
The fare tables currently in force were appropriately coded in routes file. The existing
BRT route Hadapsar-Swargate Katraj has also been coded. Total of 268 bus
routes are coded.
The data on rail links were obtained from the railways in Pune for preparing the rail
network. The Central railways operate suburban trains from Pune station to Lonavala
serving 15 stations along its route at an average frequency of 55 min. Currently
there are 16 services being operated between Pune and Lonavala and 2 services
between Pune station and Talegaon daily. The study area has 8 stations in this route
viz. Pune station, Shivajinagar, Khadki, Dapodi, Kasarwadi, Pimpri, Chinchwad and
Akurdi. All the suburban stations in Pune were coded with rail node numbers 3001 to
3008.
The average operating speed of suburban train is around 25-30 km/h. It has been
observed that the actual journey speeds of the suburban train are lower because of
usage of the same corridor by both intercity trains and suburban trains.
The types of transit links coded on the network are shown in Table 3.2. Link type 21
provides walk connection between highway node and transit stop.
Table 3.2 Description of Other Links Used in the Network
Link Type

Description

21

Highway Node to Transit Stop

22

Road Node to Zone Centroid Connection

25

Suburban Rail Links

26

BRT Links

27

Metro Links

22

CHAPTER 4

SECONDARY AND PRIMARY DATA


4.1 SECONDARY DATA FROM RITES (1998) and CES (2004) STUDIES
RITES (1998) conducted the study for Mass Rapid Transit System for Pune
Metropolitan Area and Consulting Engineering Services (CES, 2004) developed an
Integrated Traffic Dispersal System for PMC & PCMC. The present study utilised the
data pertaining to planning variables, transportation system, etc. collected during
previous studies conducted by RITES (1998) and CES (2004). The transportation
system data such as the highway and public transport networks and system
parameters, however, have been updated thoroughly in the present study with the
help of Google imagery and some amount of ground verification. The data on
planning Variables have also been modified based on census 2001 data and latest
employment data incorporating the developments in IT sector in the study area.
The following data that were collected during previous studies were made available
for the present study.
i.

ii.

iii.

Planning Variables
- Population
- Employment
- Vehicle ownership
Transport System data
- Highway network and link attributes
- Public transport network and link attributes
- Public transport routes and system data
Traffic analysis zones

The details of the planning variables and their projections are reported in Chapter 5.
The details of the study area, delineation, highway and public transport networks
have been dealt in Chapter 3. As discussed in chapter 3 the highway and public
transport networks were updated by adding all transport links that have come up
between 2003 and 2008. In addition the entire list of highway and public transport
links were thoroughly verified for their attributes and all the missing links were added.
As detailed in Chapter 3, the public transport routes were also updated as per the
latest information obtained from PMPML.
4.2 STATED PREFERENCE SURVEY
Stated Preference (SP) is a statement by an individual of his/her liking (or disliking)
for one alternative over another. The stated preference technique can be used to
determine the commuter behaviour with respect to the improved transportation
system. In this study, this SP study will determine the commuter preference and
willingness to shift to the proposed Metro rail System. The survey was conducted at
workplaces in the potential areas like Shivajinagar, Chinchwad, etc. The workplaces
included PMC office, PCMC Office, Tata Motors, Shoppers Stop, ICC trade towers,
etc.

23

SP survey of commuters is required to model the generalised cost of travel as


perceived by them along with their willingness to opt for better services. Without any
doubt, the proposed Metro Rail System will provide better quality of service in terms
of substantial reduction in travel time, more comfort and reliability. Therefore, in
order to arrive at the realistic demand for the Metro corridor, it is essential to
calibrate the base year models using a generalised cost of travel comprising waiting
time, travel time, travel cost and discomfort. The data sheets used for conducting the
SP survey are provided in Annexure-3.
4.2.1 Design of SP Experiment
In the present context, attributes of Metro like travel cost, travel time, waiting time,
number of transfers, comfort, convenience and reliability of service would play major
role in attracting the commuters from the existing alternate modes. The present SP
experiment is designed as a rating cum choice experiment by constructing several
options with different attribute levels. The basic format of stated preference
experiment used and the different levels of attributes used are shown in Figure 4.1
and Figure 4.2 respectively.
Existing Trip

Metro

Waiting Time

Stated

Waiting Time

3 Levels

Travel Time

Stated

Travel Time

3 Levels

Travel Cost

Stated

Travel Cost

3 Levels

Stated

No. of Transfers

2 Levels

No. of
Transfers
Discomfort
Definitely
Existing=1

Stated

Discomfort
Choice Scale

Probably
Existing=2

Can't
Say=3

Probably
Metro =4

2 Levels
Definitely Metro
=5

Fig. 4.1 Typical Stated Preference Experiment Design


Attribute

No. of Levels

Values

Units

Waiting Time

3, 8, 15

Minutes

Travel Time

0.5, 1, 1.5 times

Minutes

Travel Cost
No. of
Transfers

0.5, 1, 1.5 times*

Rupees

0, 1

Number

On a scale of
1-5
*0.25, 0.5 and 1 times if the present mode is car
Fig. 4.2 Levels of Attributes in SP Experiment

Discomfort

1, 2

The attribute travel time is considered at three levels, being 0.5, 1 and 1.5 times of
the travel time by the present mode of travel of the commuter. The attribute travel
cost is considered at three levels, being 0.5, 1 and 1.5 times the travel cost by the

24

present mode of travel. However, if the present mode is car, travel time has been
considered as 0.25, 0.5 and 1 times the travel cost by the present mode of travel,
i.e., car. The attribute discomfort is used on a scale of 1 to 5. Discomfort level of 1
indicates comfortable sitting in air-conditioned environment. Discomfort level 5
indicates standing in overcrowded bus (condition exiting in buses on highly travelled
corridors during peak hours in Pune). The attribute No.of.Transfers is considered at
two levels i.e. 0 and 1. The attribute waiting time is considered at 3 levels i.e., 3
minutes, 8 minutes and 15 minutes. A full factorial design results in 108 (33322)
options. However, to make the experiment practicable, a fractional factorial
experimental design was carried out based on the guidelines suggested by
Pearmain and Swanson (1991) and Kroes and Sheldon (1988) which resulted in 12
options.
Each respondent was asked to rate these 12 options for Metro on a rating scale. A
typical SP option out of the 12 options (refer Annexure-I for details) floated is shown
in Figure 4.3.
Existing Trip

Metro

Waiting Time

Waiting Time

Travel Time

40

Travel Time

20

Travel Cost

20

Travel Cost

20

No. of Transfers

No. of Transfers

Discomfort

Discomfort

Choice Scale
Definitely Existing=1

Probably
Existing=2

Can't
Say=3

Probably
Metro =4

Definitely Metro
=5

Fig. 4.3 Typical SP Experiment for Two Wheeler


4.2.2 Administration of SP Experiment
A team of 6 Enumerators (Senior M.Tech students of Transportation systems
engineering, IIT Bombay) was thoroughly trained for a week for administering the SP
experiment on the respondents at work places in Pune. The face-to-face work-based
pilot survey was conducted at Shivajinagar before taking up main survey in order to
arrive at a suitable survey design for this study. Based on the experience gained in
pilot survey a few modifications were made to different parts of the questionnaire
instruments for increasing the efficiency of survey. The main survey was
administered in January 2008 at work places and establishments in the selected
places. In majority of the cases the interviews were conducted by taking prior
appointments from the concerned authorities. The enumerators would first explain
the objective of the study with the help of the leaflet to the respondent and then
collect his/her personal and trip information by filling the appropriate forms. The
attributes travel time, travel cost, waiting time and discomfort level by the existing
travel obtained from trip information are then transferred to the appropriate place in
the SP questionnaire. Travel time and travel cost by metro option is then worked out
as per the procedure explained in preceding section. Each individual is then asked to
compare the attributes of the existing travel pattern with those of Metro option, and

25

give his/her rating for Metro option. Thus one valid sample will give 12 observations
at the time of calibration.
4.2.3 SP survey Results and Analysis
The total number of SP samples collected is around 350. The sample size
distribution by mode and Income are presented in Figures 4.4 and 4.5 respectively.
The household size distribution obtained from the sample is shown as a bar chart in
Figure 4.6. The average household size obtained from the SP sample was 3.6.

Other
2%

Train
18%

Two-Wheeler
41%

Company Bus
6%

Bus
24%

Car
9%

Fig. 4.4 SP Survey Sample Distribution by Mode

30%

No. of Samples

25%
20%
15%
10%
5%
0%
1

10

Income in `000

Fig. 4.5 SP Survey Sample Distribution by Income

26

30%

No. of Samples

25%
20%
15%
10%
5%
0%
1

10

Household Size

Fig. 4.6 Household Size Distribution of SP Sample

4.2.4 Model Development Based on SP Data and Results


Mode wise binary logit models which give the probability of shift from existing
alternatives to Metro were developed using the preferences indicated by the
respondents. These models are of the following form.

eVMetro
Pr( Metro / EM ) = VMetro
e
+ eVEM
VMetro = WTMetro + TTMetro + TCMetro + TRMetro+

DCMetro + CONST

VEM = WTEM + TTEM + TCEM + TREM+ DCEM

(4.1)

(4.2)
(4.3)

Where,
Pr(Metro / EM ) = probability of shifting to Metro conditioned on existing mode (EM),

VMetro = deterministic component of utility of Metro,


VEM = deterministic component of utility of Existing Mode,
WT = waiting time,
TT = travel time,
TC = travel cost,
DC = discomfort,
TR = No.of.Transfers
, , , , = parameters to be estimated using SP data and
CONST = constant that explains the unobserved effects.
27

CONST = constant that explains the unobserved effects.


The parameters of the mode wise logit models were calibrated by employing
maximum likelihood method of estimation. The results of calibration of mode wise
logit models are provided in Table 4.2. The signs of all the parameters are found to
be logical. All the variables that entered the model are found to be statistically
significant. The 2-statistic (a robust goodness-of-fit statistic that varies between 0
and 1) for all the models is found to be reasonably good.

Table 4.1 Calibrated Parameters of Pune Metro SP Model


Mode
(WT) (TT)
(TC)
(TR)
(DC) CONST
TW

CAR

PT

-0.0763

-0.0335

-0.0592

-0.8560

-0.4573

(-6.2)

(-6.8)

(-4.7)

(-7.3)

(-7.1)

-0.0835

-0.0330

-0.0185

-1.129

-0.1441

0.7519

(-3.2)

(-3.9)

(-2.6)

(-4.6)

(-1.3)

(3.4)

-0.0212

-0.0202

-0.038

-0.6464

-0.2993

-0.9123

(-4.2)

(-7.9)

(-3.0)

(-8.6)

(-5.0)

(-6.8)

The subjective values of attributes in terms of monetary units obtained from the
above SP modelling exercise are also presented below in Table 4.3.

Table 4.2 Subjective Values of attributes obtained from SP Model


Waiting
Travel
Transfers Discomfort
Time
Time
Mode
(Rs. Per
(Rs. Per
(Rs./hr)
(Rs./hr)
Transfer) unit Shift)
Two-wheeler

77

34

14

Car

271

107

61

Public Transport

33

32

17

It can be inferred from the above analysis that the users of the private vehicles value
waiting time more than twice the travel time. The travellers, in general, are very
sensitive to the discomfort levels inside the transit vehicles. They are giving a value
of Rs.8 for a unit improvement in comfort levels. From the analysis of SP data it can
also be concluded that, In the study area, the public transport share can be
significantly improved by providing comfortable, frequent and well connected
systems.
4.3 TRAFFIC VOLUME COUNTS
In order to establish the base year travel pattern in the study area, traffic volume
counts and occupancy counts were taken at all the cordon and screen line stations.
As explained in Chapter 3, the outer cordon line and the 2 screen lines were

28

considered in this study for arriving at the travel pattern and validating the base year
travel pattern. Screen line count stations were established at all those points where
the road links cross the screen line. Cordon stations were established at all those
points where the external road links cross the cordon line entering the study area.
The locations of all these screen line and cordon count stations were shown in Figs.
3.2 and 3.3 of chapter 3. The details of the location of screen line stations are
provided in Table 4.4 and those of cordon stations are provided in Table 4.5. The
data sheets used for traffic volume surveys, O-D surveys and occupancy counts are
provided in Annexure-3.
The traffic volume surveys were undertaken for 24 hours in case of important screen
line stations and for other screen line count stations traffic surveys were undertaken
for 16 hours i.e. from 7.00 Hrs to 23.00 Hrs. The traffic volume counts were
undertaken during 15th December 2007 to 20th January 2008. Only normal week
days were considered for carrying out the traffic volume surveys. Holidays, days of
the weekend and Mondays and Fridays were avoided as far as possible. In all, the
traffic volume surveys were undertaken at 20 locations across the 2 screen lines and
at 14 locations on the cordon line.
The hourly mode wise and direction wise traffic volume observed at all fourteen
cordon stations and twenty screen line stations has been tabulated and presented in
Annexure-1. Annexure-1 also provides the variation charts depicting the hourly
variation of traffic at all cordon and screen line stations.
Summaries of traffic volume counts in terms of Average Daily Traffic (ADT) and
Directional Design Hour Volume (DDHV) were produced by converting all classes of
vehicle into passenger car units (PCU). The PCU values adopted for this purpose
are shown in Table 4.6. Directional design hour volume is the peak hour volume in
peak direction in PCU per hour. In addition, K-factor (the proportion of daily volume
occurring during peak hour) and D-factor (proportion of total peak hour volume
occurring in peak direction) were also worked out. Table 4.7 gives the daily traffic
volumes at all the screen line stations. The observed DDHV, K-factor and D-factor
for all the screen line count stations are shown in Table 4.8. The daily traffic volumes
at all the cordon stations are provided in Table 4.9. Table 4.10 gives the observed
DDHV, K-factor and D-factor for all Outer Cordon Stations.
The observed modal shares of the traffic at outer cordon are shown in Figure 4.7,
The proportion of total external traffic entering and leaving the study area through
each of the cordon stations is displayed in Figure 4.8.

29

Auto
Rikhshow
4.55%

Car/Jeep/Van/Taxi
28.19%

Two
Wheelers
27.02%

Bus/Mini bus/Maxi
cab
13.34%
Others
2.24%
Trucks/LCV's
21.81%

Cycle
2.86%

Fig 4.7 Modal Share at Outer Cordon Stations

Nasik Rd.
12%

Satar Rd. (Shindewadi)


7%

Sholapur Rd.
10%

Somatane Phata
9%

Hinjewadi (shivaji
chowk)
14%

Talegaon express
highway
9%

Ahmednagar Rd
7%

Hinjewadi Road
5%
Alandi road
6%
Warje Rd.
4%
Sinhagad Rd.
4%

Perangut Rd.
5%
Saswad kondwa rd.
4%
Saswad Rd.
4%

Fig 4.8 Proportion of traffic at each Outer Cordon Station

30

Table 4.3 Location Details of Screen Line Stations


Station
Name of the Station
No

Landmark

Duration

Occupancy
Survey

Westerly Bye Pass

Mutha river crossing

24

Rajaram Bridge

Sinhagad Road

16

Mathre Bridge

Anant Kan Kahare Path Eradhawane Road

24

SM Joshi Marg

LBS Road -Karve Road

16

Sambhaji Bridge

Connecting Laxmi Road and


Prabhat Road

24

Shinde Bridge

JM Road - Laxmi Road

16

Shivaji Bridge

Veer Santaji Ghorpade Road


(Parallel to Dhagdi Pool)

24

Causeway

Parallel to Shinde Bridge

16

Dhagdi Pool

Veer Santaji Ghorpade Road

16

10

Bund Garden Road

24

24

Mula-Mutha river crossing

16

11
12

Wellesley Road Nagar Road


Ghorpadi Mundwa
Road- A Nagar Road

Bund Garden Road Deccan


College Road
Mula-Mutha river crossing
(Yerwada IT Park)

13

Sangam Bridge

Mumbai Pune Road - R.B


Mothilal Road

24

14

Shivaji Nagar Bridge

JM Road Sangam Bridge

16

15

Pimple Nilakh

Pimple Nilakh Junction

24

16

Pune Mumbai Road

Between Dapodi and Kasarwadi

24

17

Karve Road

Near Law College Road Junction

16

18

Nigdi Crossing

Chinchwad - Nigdi Road

16

19

Akurdi Crossing

16

20

Chinchwad Crossing

24

Chinchwad - Akurdi Road/Nigdi


Road
Chinchwad - Akurdi Road (MIDC
ROAD)

31

Table 4.4 Location Details of Cordon Stations


Station
No

Name of the Station

Landmark

Duration

Remark

Talegaon

Toll Plaza, MSRDC

24 Hrs

OD and Volume Count

Somatane

Toll Plaza, MSRDC

24 Hrs

OD and Volume Count

Nasik Road

Toll Plaza, PWD

24 Hrs

OD and Volume Count

Alandi Road

16 Hrs

OD and Volume Count

Ahmednagar Road

24 Hrs

OD and Volume Count

Sholapur Road

Toll Plaza, NHAI

24 Hrs

OD and Volume Count

Saswad Road

Toll Plaza, MSRDC

16 Hrs

OD and Volume Count

Saswad Kondwa
Road

Kondwa junction

16 Hrs

Volume Count

Satara Road

Toll Plaza, NHAI

24 Hrs

OD and Volume Count

10

Sinhagad Road

After bridge

16 Hrs

OD and Volume Count

11

Warje Road

After bus terminal

16 Hrs

OD and Volume Count

12

Perangut Road

Near Junction

16 Hrs

OD and Volume Count

13

Hinjewadi Road

Bhumkar chowk Hinjewadi Chowk

16 Hrs

OD and Volume Count

14

Hinjewadi Chowk

Hinjewadi Chowk

24 Hrs

OD and Volume Count

Merging Road near


NH50
Merging Road near
Wagoli Road

Table 4.5 PCU Values adopted for the Study


Adopted
S. No
Vehicle Type
PCU Values
1

Car / Jeep

1.0

Bus

3.0

Autorickshaw

0.8

Two-wheeler

0.5

LCV/ Mini-bus

2.5

Truck

3.0

Truck Trailer

3.5

32

Table 4.6 Daily Traffic in PCU at Screen Line Stations


Daily Traffic in PCU's
Station
South Bound North Bound
Total
Akurdi Crossing

11176

10243

21419

Causeway

14185

12751

26936

Dhagdi pool

28942

24257

53199

Ghorpadi Mundwa

20990

15250

36240

Karve road

60763

52562

113325

Nigdi Road

15790

14063

29853

Rajaram bridge

26855

19430

46285

SM Joshi bridge

10240

14103

24343

Shinde bridge

10818

15675

26492

Sancheti Bridge

18134

43497

61631

Bund garden

22752

43873

66625

Chinchwad crossing

16281

17310

33591

Mathre Bridge

22142

22635

44777

Pimple Nilakh

22628

25239

47867

Pune Mumbai

34184

47477

81662

Satara to Mumbai

28488

33476

61964

Sambhaji Bridge

26821

20956

47777

Sangam Bridge

35151

41321

76472

Shivaji bridge

12481

13752

26233

Wellesley Road

22493

19329

41822

Table 4.7 DDHV at Screen Lines Stations


Station

K-FACTOR

D-FACTOR DDHV

Akurdi Crossing

0.08

0.68

1223

Causeway Dangre

0.09

0.56

1416

Dhagdi pool

0.08

0.68

2965

Ghorpadi Mundwa

0.08

0.62

1777

Karve road

0.07

0.55

4367

Nigdi Road

0.13

0.67

2578

33

Station

K-FACTOR

D-FACTOR DDHV

Rajaram bridge

0.08

0.56

2087

SM Joshi bridge

0.08

0.7

1386

Shinde bridge

0.07

0.53

1027

Sancheti Bridge

0.07

0.68

2933

Bund garden

0.07

0.75

3748

Chinchwad crossing

0.07

0.54

1233

Mathre Bridge

0.09

0.52

2087

Pimple Nilakh

0.07

0.58

1983

Pune Mumbai

0.08

0.67

4232

Satara to Mumbai

0.08

0.6

3065

Sambhaji Bridge

0.09

0.87

3615

Wellesley Road

0.08

0.52

1674

Table 4.8 Daily Traffic in PCU at Outer Cordon Stations


Daily Traffic in PCU's
Station
IN
OUT
Total ADT
Hinjewadi Road

13561

11885

25446

Perangut Rd.

9377

11382

20759

Saswad Kondwa rd.

10715

9538

20253

Saswad Rd.

12743

9939

22682

Sinhagad Rd.

13566

6363

19930

Warje Rd.

9994

7939

17933

Alandi

13657

11778

25434

Ahmednagar Rd

12580

12655

25234

Hinjewadi(Shivaji chowk)

19158

16829

35987

Nasik Rd.

22959

23253

46212

Satara Rd. Shindewadi

16129

19110

35239

Sholapur Rd.

19560

20633

40193

Somatane Phata

22419

21778

44197

Talegaon express highway

25070

25469

50539

34

Table 4.9 DDHV in PCU at Outer Cordon Stations


Station

K- Factor

D-Factor

DDHV

Hinjewadi Road

0.08

0.62

1236

Perangut Rd.

0.07

0.63

923

Saswad Kondwa rd.

0.07

0.53

710

Saswad Rd.

0.06

0.54

757

Sinhagad Rd.

0.07

0.63

897

Warje Rd.

0.06

0.6

680

Alandi

0.1

0.6

1547

Ahmednagar Rd

0.07

0.61

1142

Hinjewadi(Shivaji chowk)

0.08

0.68

2048

Nasik Rd.

0.07

0.53

1634

Satara Rd. Shindewadi

0.06

0.7

1481

Talegaon express highway

0.05

0.51

1246

4.4 OCCUPANCY COUNTS


Occupancy counts were taken at selected screen line stations. These occupancy
counts were made during morning and evening peak hours and as well as during the
lean hours of the day. The average occupancy of various vehicle types for the whole
day are given in Table 4.11. These values were obtained at all the 20 screen lines.
These occupancy values corresponding to appropriate time of the day were used to
convert vehicles to passengers and vice-versa.
Table 4.10 Average Occupancy of Vehicles
Vehicle type

Average occupancy

Two Wheeler

1.56

Autorickshaw

2.32

Maxi Cab

4.02

Taxi

3.24

Car/Jeep/Van

2.91

Mini-Bus

16.71

PMC/PCMC Bus

35.19

ST Bus

34.37

Other Buses

25.23

35

4.5 O-D SURVEYS


In order to establish the external trips entering and leaving the study area, Origin and
Destination (O-D) surveys were carried out at the outer cordon stations. The O-D
surveys were carried out by using the standard Road Side Interview method on a
sample basis at the outer cordon stations. The questionnaire used for the O-D
surveys is provided in Annexure-3. The O-D survey carried out at the outer cordon
was utilised in deriving the external travel pattern for the study area. Mode wise
origin-destination matrices were obtained from outer cordon data and home interview
survey data. The overall magnitude of travel in the study area as obtained from these
surveys is provided at the end of section 4.7 of this chapter.
4.6 SPEED AND DELAY SURVEY
Speed and delay survey has been carried out along the potential corridors of mass
transit. The main purpose of this survey is to get the present journey times and
delays along these corridors. This information has been used to adjust the
parameters of the speed-flow relationships of various road links. This information has
also been used to validate the public transport and highway assignment models.
These journey times also gave the extent of travel time saving that one could expect
on Metro.
In order to get accurate data on travel times, delays and their locations, a handheld
GPS (Global Positioning System) palmtop has been used in a probe vehicle moving
with the traffic. GPS receiver logs data continuously at time interval of one second.
The GPS data provides both spatial and time/distance based data from which
various traffic parameters can be derived, including travel time, stopped time, travel
speeds (instantaneous and average), and various congestion indices. The elemental
data provided by the vehicle and the GPS are stored in GIS (Geographical
Information System) software running on a notebook PC in the vehicle or saved to a
file. Thus the recorded data may be displayed, and analyzed using GIS-specific
functionality both during the data collection and afterwards.
The type of GPS receiver used along with its important components is shown in
Fig.4.9. After differential correction the accuracy of the location information given by
this instrument is within one metre. Accurate travel time and speed values are
tagged to these locations every second.

36

Fig. 4.9 GPS Receiver and its Components


4.6.1 Corridors Selected for Speed and Delay Study
Four Major Corridors were selected for doing this survey. Each of these corridors
was further subdivided in to segments in order to capture the exact peak-hour traffic
conditions in the corridor. The description of these corridors and the prominent roads
on the corridors is given in Table 4.12.

Table 4.11 Description of the Corridors chosen for Speed and Delay Study
Sl. No.

Corridors

Roads

Shivajinagar- Swargate

JM road, Tilak Road

Direction
Sancheti to Swargate
Swargate to Sancheti

Shivajinagar- Nigdi

Mumbai-Pune Road

Sancheti to Nigdi Circle


Nigdi circle to Sancheti

Shivajinagar- Yerwada

Shivajinagar- Warje

Bund Garden road,


Nagar road
JM road, Karve road

Sancheti to Wagoli
Wagoli to Sancheti
Sancheti to Karve Circle
Karve Circle to Sancheti

4.6.2 Results of Speed and Delay Study


The data that was collected using the GPS palmtop during the speed and delay
survey was analysed to find variation of speed along the stretches of the four
corridors in northbound as well as southbound directions. The summary of journey
speeds for each of the four corridors is presented in Table 4.13.

37

From the analysis of speed and delay data it can be observed that the journey
speeds are falling below 16 km/hr over certain corridors during peak hours. From
Table 4.13 It can be inferred that the journey speeds during peak hour vary between
a low of 16 km/hr to a high of 26 km/hr on these four corridors. All these corridors are
the main arterials of the city feeding traffic to the CBD. Considering this nature of
these urban arterials and based on the present journey speeds it can be concluded
that the level of service on most of the stretches along these arterials is D. This
indicates that the traffic flows on these streets may have to experience severe
congestion with stop and go movements.
Table 4.12 Summary of Average Speeds in kmph along the Corridors
Morning Peak
Evening Peak
Corridors
Onward
Return
Onward
Return
Shivajinagar- Swargate

24.06

16.19

14.62

14.50

Shivajinagar- Nigdi

29.82

29.46

20.02

27.57

Shivajinagar- Yerwada

20.05

18.91

13.85

17.42

Shivajinagar- Warje

18.84

15.01

14.47

18.72

4.7 HOME INTERVIEW SURVEY (HIS)


Home Interview survey among other surveys is the most important survey for any
transportation study. Representative samples of dwelling units are selected and
personal interviews are conducted to obtain travel characteristics for all members of
the household by all modes of transportation on one full normal working day. Vast
amount of information is collected on various aspects of family structure, socioeconomic characteristics, location of work/study places, and information of travel
attributes by all trips made on that day. This data is employed for analysing existing
travel patterns and behaviour, to help in the calibration of Travel demand Models.
4.7.1 Types of HIS
A household interview can be administered in many different ways. Classification of
techniques relate to the way a household interview is divided and the ways in which
this information is sought from the interviewee
There are various methods to capture information required from the selected house
holds in the study area. Contact with the members of the house hold can be
established by any or a combination of the methods.
In Home personal interviews
Telephonic interviews
Post Card method
For in-home survey the selected household member is contacted in advance, scope
of work is explained, and an appointment is taken for the interview. The required
data is obtained through a pre-designed questionnaire covering all aspects of the
desired information. This method requires large number of trained manpower,
transport to selected households, repeated visits, and sometimes-unpleasant refusal.
But the direct interview techniques help to clarify a many doubts, and helps in
collecting correct information.
Recent advances in mobile computing have enabled use of hand-held computers as
an instrument for data collection while doing survey while personally contacting

38

respondents. While there are no basic advantages of this method over those using
hard printed questionnaire, it does save on data entry and validation costs if budgets
of a study allows acquisition of such equipment.
The telephonic interview methods are gaining more acceptances in recent years; the
main advantage of this method is the ability to call back several times to contact all
trip makers at much less cost. In cities with far less number of households having
telephonic connections, several houses may need direct interviews only. This
method does not cover the entire spectrum of socio economic characteristics for very
obvious reasons.
Post Card method never gained much acceptance, although it has the lowest initial
cost. The disadvantage is that even in well-developed countries the response is very
poor.
Recommended Method:
Apart from methodological suitability, many considerations extraneous to
transportation planning determine the choice of survey technique. Foremost among
these are study budget and Socio Economic Characteristics of the study area.
Methods like telephonic interview and email have been restricted due to presence of
slums and low income groups. Levels of illiteracy prevailing (and lack of awareness)
ruled out methods based on voluntary postal responses.
Thus, personally
administering a questionnaire also known as face to face interview, through trained
enumerators was more of a necessity than a choice. Moreover, enough local
experience was available in doing such surveys. All previous studies in the region
as well as in other part of the country to date have relied on these time-tested
methods. The format designed for the purpose consists of three parts.

4.7.2 Survey Format Design


From the past studies of HIS it was noticed that a lot of information was collected
which was never used. So lot of efforts were put in to prepare the appropriate survey
format which would not collect any unwanted information. The format comprised
three data sheets which collected information about household data, person data
and Trip data.
4.7.3 Sample Design
Home Interview survey is done on a sample basis and thus the method of sampling
plays an indispensable role in collection of unbiased data. The conventional method
of generating samples is by random generation from a list of population, the list
generally being the electoral roll of the study area in the Indian context. The
conventional method has inherent problems like:

Location of the randomly generated house


Rejection at the located house
Distribution of samples over space
Distribution of samples over various Economic classes
Inherent mistakes in the Electoral list

To avoid the errors and problems caused due to the conventional method of
identifying the houses from electoral rolls, an innovative methodology with the aid of
Google Earth has been used to develop the sample locations.
39

The study area was divided into Traffic Analysis Zones and screenshots of each
zone has been taken using Google Earth. The number of houses to be interviewed in
each zone has been estimated and has been marked on the screenshots of the
zones by visual inspection to ensure distribution across all economic classes and
space. The process eliminated the hardships of locating the randomly selected
houses from the electoral roll as in conventional method. The enumerators were
given the freedom to interview the adjoining household if were rejected at the
marked house. A typical screenshot of a traffic analysis zone with samples marked
on it is shown in Fig.4.10

Fig. 4.10 Screenshot of a TAZ with samples marked


4.7.4 Administering the Survey
Home Interview Survey was conducted on a sample basis in 3000 households to
establish the base year travel pattern. The survey included collection of information
regarding the Household, Persons and Trips. A group of 50 graduate enumerators
was entrusted the task of conducting the Interviews. The enumerators were
rigorously trained to adopt themselves to the new procedure. A pilot survey was
conducted to evaluate the performance of the enumerators and the common
mistakes were eliminated. A request letter was published in all major newspapers
with the help of the Municipal Corporations to create awareness among the public

40

and to ensure their cooperation. A team of Senior M.Tech students of IIT BOMBAY
constantly reviewed the work of the enumerators throughout the period of
administration of the survey. The enumerators were provided with the following
material to perform the interview.

Index Map showing the location of TAZ assigned to them


Screenshots of TAZ with marked samples
Authorization letters from PMC and PCMC
HIS formats
Identity card issued by Municipal Corporation
Stationary required

The enumerators were asked to adopt the following procedure to administer the
survey
Get the Zone number of your work area from supervisor
Identify your Zone number on the Index Map
Identify the Name of the area from the table behind the index map
Go through the Location Maps of that Zone
Find a Landmark which can be easily located
Go to that Landmark
Identify your position on the Location Map or Screenshot
Locate any of the circled house
Enter the house
Say Hello, Good Evening etc
Ask for the Head of the Household
Show the Permission Letter
Show the Identity Card
Show the Metro Details
Ask for Interview and tell it will take 30 minutes
Fill the House hold Sheet
Fill the Person Sheet
Fill the Trip Sheet
Say Thank You
Go to all the circled houses in your zone and perform the interview

Check the following things


Address
Contact Number
Map Reference Number
Serial Number of Interview
The index map provided to the enumerators is shown in Fig 4.11 and the HIS
formats are provided in Annexure-3

41

Fig. 4.11 Index Map for HIS


4.7.5 Data Analysis and Results
The collected forms were transformed into soft copy by using different codes as
shown in the HIS formats provided in Annexure-3. The data was checked for
rationality and legal limits during coding. The household distribution obtained from
the sample was observed to be biased towards the lower household sizes. The
average household size came out to be 3.7 as compared to the household size of
4.52 as per 2001 census. Bias corrections were applied to household distribution
and the average household size improved to 4.31 after correction for bias. The
Weightage factors used for bias correction are shown in Table 4.14. Zonal expansion
factors along with these weightage factors were applied to get the expanded
parameters for the whole population. The household size distribution obtained from
the sample is displayed in Figure 4.12.

42

Table 4.13 Bias Correction Factors


HH Size

Weightage Factor

1.00

0.43

0.50

1.00

2.32

2.00

7 & above

1.00

35.00

30.00

Frequency(%)

25.00

20.00

15.00

10.00

5.00

0.00
1

10

11

12

13

14

HH Size

Fig 4.12 Household Size Distribution from HIS

Existing modal split was also evaluated from the HIS data and it was observed that
the share of Public Transit was as low as 13%. Figure 4.13 shows the obtained
Modal Split form HIS data.

43

BICYCLE
8.8%

TRAIN
0.5%

BUS
12.5%

WALK
25.0%

TW
38.6%
IPT
8.3%

CAR
6.3%

Figure 4.13 Modal Split from HIS


It was also observed that majority of the houses were self owned and the proportion
of the rented houses was very less. The ownership characteristics of the sample is
displayed in Figure 4.14
90
80
70

Frequency(%)

60
50
40
30
20
10
0
Own

Rented

Employer Provided

Residence Ownership

Fig 4.14 Residence Ownership


The trip length frequency considering only motorized modes is shown in Figure 4.15
and the corresponding average trip length was found to be 31 minutes. Figure 4.16

44

shows the Trip length frequency for all trips. The average trip length considering all
modes was found to be 26 minutes.
45.00%
Percent Number of Trips

40.00%
35.00%
30.00%
25.00%
20.00%
15.00%
10.00%
5.00%
0.00%
5

15

25

35

45

55

65

75

85

95

105 115 125 135

Travel Time, minutes

Fig 4.15 Trip Length Frequency Distribution for Motorized Trips from HIS

Percent Number of Trips

35.00%
30.00%
25.00%
20.00%
15.00%
10.00%
5.00%
0.00%
5

15

25

35

45

55

65

75

85

95

105 115 125 135

Travel Time, minutes


Fig 4.16 Trip Length Frequency Distribution for All Trips from HIS

From HIS data, trips made by the residents of the study area were obtained. The
mode wise daily trips made by the residents of the study area are depicted in Figure
4.17

45

2000000

1878142

1800000
1600000
No. of Trips

1400000

1215791

1200000
1000000
800000
608785
600000

429641

404205
306034

400000
200000

22519

0
Walk

Bicycle

Twowheeler

Car

IPT

Bus

Train

Mode

Fig 4.17 No of Trips Mode wise from HIS


From OD survey and Traffic volume count at outer cordon the magnitude of external
travel made by the residents as well as the non residents is obtained. The travel
pattern thus obtained from both HIS and outer cordon OD surveys was collated to
get the overall travel pattern of the study area. The same is reported in Table 4.15.
Table 4.14 Overall Travel pattern obtained for the Study Area
No. of Passenger Trips
Mode

Internal to
Internal

Internal to
External

External
to Internal

External to
External

Two Wheeler

1837861

44468

49269

11538

Car

296343

129000

125893

54851

IPT

389537

23099

20159

8379

PT

928734

278538

314849

180567

46

CHAPTER 5

PLANNING VARIABLES
5.1 GENERAL
The travel demand in an area depends on land use distribution and its intensity. The
variables that describe the travel demand traditionally have been the population,
employment and vehicle ownership. The growth of population, employment and
vehicles in study area and their projection into the future is described in the following
sections.
5.2 POPULATION
The total population of study area in 2001 was 35.6 lakh (more than thrice the 1971
population of 10.7 lakh). This data is given in Table 5.1.
Table 5.1 Population Growth in Study Area
PMC
PCMC Pune Cantonment Khadki Cantonment
1961

595762

46031

65838

58496

1971

856105

83542

69451

65497

1981 1203351

220966

85986

80835

1991 1566651

517083

82139

78323

2001 2328349 1083967

80191

77473

The decadal growth in PCMC area is almost 100% in the past three decades. PMC
area has registered an average decadal growth of around 35% and a decline in
population has been observed in both the cantonments
The base estimates of population for the horizon years are based on RITES (1998)
study. An equivalency has been established in the form of Zonal equivalency factors
between RITES zoning system and Zoning system adopted for this study for both
population and employment. A lot of modifications have been applied to the RITES
estimates to incorporate the dynamics of the development. It has been noticed that
the population of PMC has been underestimated by RITES and the population of
PCMC has been overestimated. This finding was the result of validation of RITES
forecasts using 2001 population. Appropriate diminishing compound annual growth
rates have been applied to counter these findings. A growth rate varying from 5 % in
2001 to 1 % in 2031 has been used for PMC and similarly a growth rate varying from
9 % in 2001 to 1 % in 2031 has been adopted for PCMC. The aggregate population
of PMC in the year 2031 was limited to the PMC forecast of 56.57 lakh as per the
City Development Plan 2006-2012. The population of the cantonments was
considered to remain constant, keeping in view the steady decline in the past
decades. The forecasts were made in terms of gross population of PMC, PCMC and
Cantonments separately. The aggregate forecasts thus obtained were apportioned
to individual zones as per their observed incremental growth. The proposed
residential development in Hinjewadi area in PCMC has been appropriately

47

considered in estimating the population of the zones containing the area. The
estimated population figures of study area for the base year 2008, and the horizon
years are given in Table 5.2. The zone wise population forecasts for horizon years is
given in Annexure 2

Table 5.2 Estimated Population in Different Areas of Study Area


Region

2008

2011

2021

2031

PMC
PCMC
Pune Cantonment
Khadki Cantonment

3372919

3756345

1446142

1591873

4807868
1915320

5443642
2106123

83046

84292

88603

93134

80232

81435

85600

89977

Millions

POPULATION FORECAST
9
8

POPULATION

7
6
POPULATION PMC

POPULATION PCMC
4

POPULATION TOTAL

3
2
1
0
2001

2006

2011

2016

2021

2026

2031

YEAR

Fig 5.1 Population projections of different areas of Study Area


5.3 EMPLOYMENT
The aggregate employment data of study area was obtained by assuming worker
participation rates of 32%. The adoption of 32 % was justified by both Census 2001
and City Development plan. The aggregate forecasts thus obtained were distributed
amongst the individual zones as per their present employment levels. Modifications
have been done in view of the recent IT developments as the RITES study did not
witness the IT boom in Pune. A proxy index for employment has been developed
from the HIS data and has been used to moderate the Zone wise Employment
values given in Annexure-2. A lot of change has been observed in the recently
developed zones like Hinjewadi, Talwade, Hadapsar and Yerwada and the changes
have been incorporated in the respective zones. The changes incorporated in view

48

of the IT boom are displayed in Table 5.3 The aggregate forecasts of employment
are given in Table 5.4 and the same is represented in Figure 5.4
Table 5.3 Additional Employment due to new developments
Area
2008 2011
2021
2031
Rajiv Gandhi InfoTech Park Hinjewadi Phase I
21750 21750 21750 21750
Rajiv Gandhi InfoTech Park Hinjewadi Phase II 19075 27250 54500 54500
Rajiv Gandhi InfoTech Park Hinjewadi Phase III
7000 17500 56000 70000
SEZ
Rajiv Gandhi InfoTech Park Hinjewadi Phase IV
0
10000 70000 100000
Kharadi Knowledge Park
6750 6750
6750
6750
Talawade InfoTech Park
6563 9375 18750 18750
Table 5.4 Employment in Study Area
YEAR EMPLOYMENT
2001
1207040
2006
1522845
2011
1846476
2016
2161567
2021
2404298
2026
2571595
2031
2709490

Millions
3.0

2.5

2.0

1.5

EMPLOYMENT

1.0

0.5

0.0
2001

2006

2011

2016

2021

2026

2031

YEAR

Fig 5.2 Employment Projections for Study Area

49

5.4 VEHICLE OWNERSHIP


The data on private vehicles was obtained from the Road Transport Office in Pune.
This data is available for two regions, namely, PMC, and PCMC. The classified
number of vehicles (all types) was collected from 1993 onwards. It was observed
that the number of private vehicles per thousand people is growing steadily. This
clearly shows the inclination of people towards private vehicles. The trend is also
influenced by the income level and the state of public transport in Pune. The vehicle
ownership characteristics of PMC and PCMC were found to be very distinct and thus
modeling has been done differently for both the areas. The number of two wheelers
and cars per thousand populations has been taken as proxy explanatory variables
for Trip Productions. The registered vehicles in PMC and PCMC areas are given in
Table 5.5 and Table 5.6
Table 5.5 PMC Motor Vehicle Statistics
Year
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007

Two wheelers
235601
248398
271355
313242
351538
434000
490411
554155
670982
724952
781541
844326
922270
1021000
1189818

Cars
29159
31574
35545
40728
48439
71069
82513
95799
95950
105118
117231
135092
160448
211235
231288

PMC
Population
1752762
1845768
1938873
2031929
2124873
2228672
2332471
2436270
2540069
2655515
2770962
2886408
3001855
3117301
3245110

TW/1000
134
135
140
154
165
195
210
227
264
273
282
293
307
328
367

CAR/1000
17
17
18
20
23
32
35
39
38
40
42
47
53
68
71

Table 5.6 PCMC Motor Vehicle Statistics


Year
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007

Two Wheeler
41715
46610
53714
58274
66061
88323
104627
123940
146819
173921
206026
244057
289108
342476
424379

Car
2998
3927
4642
4721
6725
7269
9026
11208
13917
17281
21458
26645
33085
41083
61986

PCMC
Pop
641526
703715
765970
828192
890339
936321
982303
1028285
1083967
1126381
1178495
1230610
1282724
1459955
1698215

TW/1000
65
66
70
70
74
94
107
121
135
154
175
198
225
235
250

CAR/1000
5
6
6
6
8
8
9
11
13
15
18
22
26
28
37

50

5.4.1 Modeling of Vehicles for Horizon Years


The number of two wheelers and cars per thousand populations has been modeled
to predict the future year vehicle ownership. Modeling has been carried out
separately for both PMC and PCMC because of their distinct characteristics. The
private vehicle ownership in PMC was increasing more rapidly as compared to
PCMC. The saturation limit of the parameters was taken as 450 for two wheelers
and as 150 for cars. The year of saturation was taken as 2031 for PMC and 2041 for
PCMC. A logistic model of the form

V=

S
1 + e( a + bt )

where
V = vehicles owned per thousand population
S = saturation level
t = time in year
a and b = parameters to be estimated
was used for the vehicle ownership modelling. The estimates of vehicle ownership
per thousand populations obtained for the years, 2011, 2021 and 2031 are given in
Table 5.7. and the models developed are displayed in Figure 5.3 and Figure 5.4 for
PMC and Figure 5.5 and Figure 5.6 for PCMC

PMC CARS / 1000 Population

140
120
LOGISTIC CURVE
PARAMETERS

100
80
60
40

150

-0.125

1.95

20
2029

2026

2023

2020

2017

2014

2011

2008

2005

2002

1999

1996

0
1993

CARS PER 1000 POPULATI ON

160

YEAR
Fig 5.3 Modelled Car Ownership in PMC

51

PMC TWO WHEELERS / 1000 Population


LOGISTIC CURVE
PARAMETERS

500

450

400

-0.16

350

.992

TW PER 1000 POPULATION

450

300
250
200
150
100
50
2031

2029

2027

2025

2023

2021

2019

2017

2015

2013

2011

2009

2007

2005

2003

2001

1999

1997

1995

1993

YEAR

Fig 5.4 Modelled Two wheeler Ownership in PMC

PCMC CARS/1000 Population

160

150

140

-0.12

3.01

120
100
80
60
40
20

2041

2039

2037

2035

2033

2031

2029

2027

2025

2023

2021

2019

2017

2015

2013

2011

2009

2007

2005

2003

2001

1999

1997

1995

0
1993

CARS PER 1000 POPULATION

LOGISTIC CURVE
PARAMETERS

YEAR

Fig 5.5 Modelled Car Ownership in PMC

52

PCMC TWO WHEELERS / 1000 Population

500
450

TW PER 1000 POPULATION

400

LOGISTIC CURVE
PARAMETERS

350
300

450

200

150

1.8

250

100
50

2041

2039

2037

2035

2033

2031

2029

2027

2025

2023

2021

2019

2017

2015

2013

2011

2009

2007

2005

2003

2001

1999

1997

1995

1993

YEAR

Fig 5.6 Modelled Two wheeler Ownership in PMC

Table 5.7 Projected Vehicle Ownership in PMC and PCMC


PMC
PCMC
YEAR TW/1000 Cars/1000 TW/1000 Cars/1000
2001
257
42
152
17
2011
391
86
305
45
2021
437
124
404
88
2031
447
141
438
124
These projected private vehicle ownership values (vehicles per thousand
populations) were then used to project the total number of vehicles in PMC and
PCMC by using the projected population for the respective horizon years. The total
number of vehicles so calculated is given in Table 5.8.
Table 5.8 Estimated Numbers of Private Vehicles in PMC and PCMC
PMC
PCMC
YEAR
Two
Two
Wheelers
Cars
Wheelers
Cars
2001
653043
106027
163285
18368
2011
1467977
323255
476675
70093
2021
2099333
594597
740648
161373
2031
2434606
769605
879090
248390
For estimation of the number of vehicles in each zone, the projected number of
private vehicles of each region was distributed to the zones of that region,
proportionately, based on the zonal vehicle ownership data obtained from HIS. The
same have been attached in Annexure 2.

53

5.5 FUTURE WORK


As of now the methodology regarding development of Base Year Travel Demand
Model, suggested in Chapter 2 has been incorporated in the Transportation Planning
Software CUBE. The forecasted planning variables as discussed in the present
chapter along with the future networks would be used to run the Model for future
years and at the end of the work the outputs mentioned in Scope of the work in
Chapter 1 would be delivered.
The Draft Final Report which is expected to be completed in a week time will include
the following chapters in addition to the submitted 5 chapters of this report

Details of Base Year Travel Demand Model Development


Ridership Estimation on the Potential Metro Corridors.
Conclusions

5.6 REFERENCES
1. Pearmain and Swanson (1991). Stated Preference Techniques: A Guide to
Practice. Steer Davies Gleave, Hague Consulting group, Netherlands.
2. Kroes, E and Sheldon, R. (1988). Are there any limits to the amount
consumers are prepared to pay for product improvement? 15th PTRC
summer Annual Meeting, The University of Bath, England.
3. RITES (1998) Mass Rapid Transit System for Pune Metropolitan Area
4. Consulting Engineering Services (CES, 2004) Integrated Traffic Dispersal
System for PMC & PCMC

54

ANNEXURE 1
Traffic Volume at Cordon and Screen Line
Stations

Hourly Traffic Variation Tables of Outer cordon


stations

19

26

29

35

37

64

52

50

75

122

128

233

245

192

208

210

197

192

197

108

91

27

16

15

12

26

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

22.00 to 23.00

23.00 to 00.00

00.00 to 1.00

1.00 to 2.00

2.00 to 3.00

3.00 to 4.00

4.00 to 5.00

5.00 to 6.00

6.00 to 7.00

7.00 to 8.00

25

61

42

34

35

45

25

32

28

21

27

19

50

19

19

14

34

16

32

59

139

114

200

208

172

149

158

127

147

148

89

97

13

11

11

11

30

44

22

22

18

18

17

10

12

12

11

29

24

19

16

22

17

15

24

12

14

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
127
2
30
4
90
18
6
11
9

20

11

12

11

12

14

11

14

17

32

27

20

12

16

10

10

14

15

23

14

13

17

26

20

19

16

34

20

19

23

24

29

17

16
10

LCV

Other
Bus

28

22

23

18

16

20

25

40

43

56

31

30

49

53

41

30

40

55

45

64

79

80

44

25

2 Axle
Truck

10

10

12

14

12

11

13

27

14

12

3 Axle
Truck

MAV Tractor

18

21

13

42

12

26

26

13

14

13

Total

11

394
12580

335

231

208

198

229

245

376

470

551

553

671

807

715

754

644

515

815

851

729

513

737

459

238
9914

169
273

134

126

151

124

181

259

359

364

443

616

685

752

437

381

661

720

680

566

786

347

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
1
18
4
582
462

Table A1.1 Mode wise hourly traffic volume at Perane toll plaza station on Ahmednagar road towards Ahmednagar to Pune

9.00 to 10.00

8.00 to 9.00

Hour of the
day

55

17.00 to 18.00

16.00 to 17.00

15.00 to 16.00

14.00 to 15.00

13.00 to 14.00

12.00 to 13.00

11.00 to 12.00

10.00 to 11.00

9.00 to 10.00

8.00 to 9.00

282

345

402

62

124

263

295

341

300

394

119

152

10

14

22

27

17

22

20

17

23

11

19

30

37

46

34

30

25

30

22

26

16

24

12

19

18

22

17

19

19

36

11

127

113

101

109

161

158

137

44

151

181

121

135

202

114

160

10

11

13

10

15

38

13

21

11

16

22

14

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
12
11

21

33

45

39

15

20

11

11

19

10

Other
Bus

10

10

15

25

20

19

16

12

19

17

19

25

26

11

13

16

13

LCV

11

18

20

25

28

58

38

15

24

15

30

28

30

11

23

15

2 Axle
Truck

12

21

20

21

41

28

21

20

12

18

10

16

24

11

14

13

3 Axle
Truck

12

10

14

14

18

14

28

40

44

41

38

41

42

29

35

11

376

470

551

553

671

807

715

754

644

515

815

851

729

513

737

459

181

259

359

364

443

616

685

752

437

381

661

720

680

566

786

347

Table A1.2: Mode wise hourly traffic volume at Perane toll plaza station on Ahmednagar road towards Pune to Ahmednagar

18.00 to 19.00
6
2
11

89

Hour of the
day

19.00 to 20.00
152
5
0
15

58

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
582
462

20.00 to 21.00
107
1
0

40

2.00 to 3.00
29

27
3

15

15

18

59

92

49

40

46

49

10

13

10

17

15

19

10

19

11

16

394
12580

335

231

208

198

229

238
9914

273

169

134

126

151

124

21.00 to 22.00
87
0
1

3.00 to 4.00
3

14

11

20

22.00 to 23.00
38
2
2

4.00 to 5.00

28
48

11

23.00 to 00.00
11
0

5.00 to 6.00
94

00.00 to 1.00
11

245

6.00 to 7.00
44

17

1.00 to 2.00

7.00 to 8.00

Total

56

11

19

19

37

56

4.00 to 5.00

5.00 to 6.00

6.00 to 7.00

7.00 to 8.00

22.00 to 23.00

19

69

21.00 to 22.00

3.00 to 4.00

16

133

20.00 to 21.00

19

157

19.00 to 20.00

13

80

202

18.00 to 19.00

2.00 to 3.00

47

332

17.00 to 18.00

313

19

15

298

16.00 to 17.00

1.00 to 2.00

31

284

15.00 to 16.00

58

383

14.00 to 15.00

63

400

13.00 to 14.00

24

75

555

12.00 to 13.00

31

88

523

11.00 to 12.00

00.00 to 1.00

136

311

10.00 to 11.00

23.00 to 00.00

71

309

9.00 to 10.00

8.00 to 9.00

10

94

40

12

11

50

45

35

22

51

89

85

136

62

25

45

61

41

228

227

193

157

37

46

29

35

110

80

100

122

337

250

185

250

135

195

255

232

375

306

293

36

28

11

16

12

21

17

20

18

16

42

18

26

35

17

20

25

40

44

42

21

16

19

23

28

27

29

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
283
103
76
0
291
58
46
0

40

17

12

13

11

13

15

19

21

10

37

12

17

12

19

26

16

23

14

16

11

10

16

16

19

40

87

53

68

60

61

72

53

13

19

24

38
36

LCV

Other
Bus

11

12

10

12

62

38

91

83

76

86

59

17

2 Axle
Truck

11

12

10

10

3 Axle
Truck

MAV Tractor

11

20

20

17

19

87

23

15

Total

0
16829

673

475

270

141

69

47

83

267

318

430

501

964

960

1090

818

1034

1181

1203

1257

1549

1131

1123

0
13950

446

335

220

94

65

51

78

191

227

338

405

804

921

833

743

737

1011

1029

1150

1442

971

908

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
5
0
1245
951

Table A1.3: Mode wise hourly traffic volume at Hinjewadi (Shivaji Chowk) Station on Shivaji Chowk towards Pune to Marel Mode wise

Hour of the
day

57

Table A1.4: Mode wise hourly traffic volume at Hinjewadi(Shivaji Chowk) station on Shivaji Chowk towards Marel to Pune

17.00 to 18.00

16.00 to 17.00

15.00 to 16.00

14.00 to 15.00

13.00 to 14.00

12.00 to 13.00

11.00 to 12.00

10.00 to 11.00

9.00 to 10.00

8.00 to 9.00

1435

1242

615

558

474

436

353

482

478

325

256

292

28

36

24

25

30

29

27

46

51

69

73

58

21

18

21

12

11

13

14

12

13

396

442

636

904

779

603

272

265

355

417

347

320

233

245

143

12

22

66

35

16

47

13

21

20

26

12

19

23

22

23

10

36

15

116

11

19

19

30

18

28

24

Other
Bus

17

17

15

26

45

23

40

28

51

64

74

35

35

LCV

11

10

11

40

58

72

59

56

50

91

67

38

26

2 Axle
Truck

10

3 Axle
Truck

13

326

445

690

872

1254

1831

2048

1280

973

1025

979

1011

1028

1269

1049

897

360

526

759

1053

1440

2437

2279

1371

1000

948

958

939

1024

1089

843

751

Hour of the
day

18.00 to 19.00
17
11
0

267

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
770
668

19.00 to 20.00
693
18
3
0

277

2.00 to 3.00
20

29
2

35

72

52

112

16

12

13

11

11

12

36

29

15

18

19

19158

381

254

186

162

108

135

19731

329

212

168

137

91

146

203

20.00 to 21.00
538
12
2

163

3.00 to 4.00
39

22

21.00 to 22.00
302
3
1

4.00 to 5.00
89

22.00 to 23.00
235
5
0

5.00 to 6.00
147

23.00 to 00.00
75
0

6.00 to 7.00
232

00.00 to 1.00
39

186

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
24
0

1.00 to 2.00

7.00 to 8.00

Total

58

59

8.00 to 9.00
9.00 to 10.00
10.00 to 11.00
11.00 to 12.00
12.00 to 13.00
13.00 to 14.00
14.00 to 15.00
15.00 to 16.00
16.00 to 17.00
17.00 to 18.00
18.00 to 19.00
19.00 to 20.00
20.00 to 21.00
21.00 to 22.00
22.00 to 23.00
23.00 to 24.00
24.00 to 1.00
1.00 to 2.00
2.00 to 3.00
3.00 to 4.00
4.00 to 5.00
5.00 to 6.00
6.00 to 7.00
7.00 to 8.00

Hour of the day

37
102
77
76
132
159
152
151
131
157
200
112
133
213
154
77
13
8
8
5
10
6
41
69

36
65
60
35
49
6
22
6
8
7
16
60
34
12
46
3
4
0
0
0
30
26
39
55

18
64
56
43
55
48
54
29
26
57
34
27
23
15
43
23
9
8
14
12
18
15
15
29

0
0
0
0
10
19
25
23
34
16
0
0
0
12
99
46
23
25
28
26
20
33
44
53

84
86
68
158
160
261
225
235
180
242
276
252
274
148
125
93
39
32
7
18
32
25
20
56

45
44
41
47
22
10
22
13
15
13
7
1
32
18
7
13
13
7
6
11
11
11
9
11

47
64
52
39
35
8
7
10
3
3
1
2
13
4
5
0
0
0
0
0
0
8
3
3

43
62
43
48
29
16
15
20
15
9
9
9
17
8
15
1
1
2
0
0
6
9
7
8

32
65
50
57
31
7
31
19
22
19
14
5
23
18
27
21
21
15
11
16
13
13
12
17

PMT/
Car/Jeep Mini
TwoAuto
Maxi
Other
Taxi
PCMT ST Bus
wheeler Rickshaw Cab
/Van
Bus
Bus
Bus

50
69
51
48
67
72
79
46
53
95
59
66
52
53
24
22
14
10
12
22
36
39
45
39

LCV

71
61
59
59
94
103
129
89
83
113
87
86
65
47
27
25
37
22
22
23
33
52
46
43

50
42
38
54
35
5
14
36
13
14
3
11
41
28
28
13
24
12
23
0
48
51
37
39

2 Axle 3 Axle
Truck Truck

28
17
18
3
5
3
4
16
8
5
4
1
11
16
10
10
6
4
5
0
10
8
13
21

MAV

3
8
3
3
0
0
0
1
1
0
1
4
5
0
0
0
0
0
0
0
0
0
0
0

Tractor

9
0
1
4
0
1
0
0
2
3
0
0
1
1
1
0
0
0
0
0
0
1
0
0

Tractor
Trolley

0
0
0
0
0
1
0
0
0
0
0
4
0
13
1
0
0
0
0
0
0
0
8
13

1280
1593
1325
1372
1325
1271
1479
1139
1072
1423
1107
994
1185
872
868
540
454
291
305
276
579
699
695
819
22959

Total

Hourly
Volume in
PCU's

0
0
0
0
0
75
73
0
53
83
55
24
9
0
0
0
11
0
0
0
0
12
21
12

Bicycle Others

Table A1.5: Mode wise hourly traffic volume at Moshi toll plaza station on Nasik road towards Pune to Nasik

12901

553
749
617
674
724
794
852
694
647
836
766
664
733
606
612
347
215
145
136
133
267
309
360
468

Hourly
Volume in
Vehicles

17.00 to 18.00

16.00 to 17.00

15.00 to 16.00

14.00 to 15.00

13.00 to 14.00

12.00 to 13.00

11.00 to 12.00

10.00 to 11.00

9.00 to 10.00

8.00 to 9.00

320

259

245

185

159

115

130

144

179

170

197

151

65

60

61

66

65

83

41

116

131

145

109

42

63

71

96

87

85

70

57

42

118

101

139

89

39

142

90

96

310

260

225

151

111

118

79

155

170

163

149

178

14

24

25

49

38

32

13

17

27

11

12

12

11

28

12

15

13

13

22

13

14

10

26

32

17

20

18

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
4
9

11

24

11

14

11

32

12

29

12

20

31

12

Other
Bus

25

32

35

36

48

62

69

67

72

72

70

51

42

81

82

68

57

40

LCV

34

49

48

59

90

84

64

90

85

85

87

100

74

136

103

99

95

66

2 Axle
Truck

12

20

12

36

73

49

10

10

28

43

17

11

38

3 Axle
Truck

13

10

13

34

12

10

10

27

39

164

260

168

120

84

51

66

64

45

24

601

654

811

1078

1013

1598

1946

1634

1443

1183

1090

875

1889

1445

1428

1229

284

394

511

517

492

1135

1205

1032

856

703

636

498

996

893

884

792

Table A1.6: Mode wise hourly traffic volume at Moshi toll plaza station on Nashik road towards Nashik to Pune

18.00 to 19.00
7
15
3

122

21

Hour of the
day

19.00 to 20.00
74
12
15
9

61

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
997
633

20.00 to 21.00
97
1
8

33

2.00 to 3.00
0

2
0

62

75

66

24

36

50

15

19

27

21

27

18

15

19

19

14

23

10

19

26

17

13

22

12

18

11

25

17

23253

587

444

258

301

184

191

13661

332

260

138

122

88

103

157

13

21.00 to 22.00
161
2
0

3.00 to 4.00
0

13

22.00 to 23.00
79
0
0

4.00 to 5.00
7

41

23.00 to 00.00
33
0

5.00 to 6.00
65

12

00.00 to 1.00
5

374

6.00 to 7.00
81

21

1.00 to 2.00

7.00 to 8.00

Total

60

29

13

19

17

107

255

214

170

122

140

121

143

195

133

93

52

17

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

22.00 to 23.00

23.00 to 00.00

00.00 to 1.00

1.00 to 2.00

2.00 to 3.00

3.00 to 4.00

4.00 to 5.00

5.00 to 6.00

6.00 to 7.00

7.00 to 8.00

10

10

33

22

33

35

27

15

40

55

122

173

206

262

279

295

212

305

342

345

350

151

22

10

35

35

80

39

45

24

14

22

21

13

13

19

21

29

21

34

57

38

34

38

36

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
0
0
0
0
5
2
1
2

35

48

115

47

34

30

21

18

10

21

17

13

11

17

12

12

21

10

16

26

19

13

10

12

11

29

38

60

55

57

36

42

75

41

55

19

2
37

LCV

Other
Bus

53

84

97

89

76

68

50

100

67

89

100

72

65

86

85

61

77

69

68

90

86

68

2 Axle
Truck

72

71

53

40

47

40

34

47

33

22

31

15

19

10

12

51

66

58

70

41

19

3 Axle
Truck

28

18

16

15

10

11

12

13

11

17

13

26

57

78

65

17

MAV Tractor

Total

12

18

19110

526

605

792

784

1017

688

585

691

507

574

770

667

771

928

907

865

831

1136

1486

1481

1409

826

241

10200

174

203

279

285

339

253

227

240

198

238

385

423

517

657

621

605

538

694

878

915

930

494

95

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
0
0
25
12

Table A1.7: Mode wise hourly traffic volume at Shindewadi station on Satara road towards Pune to Satara

9.00 to 10.00

8.00 to 9.00

Hour of the
day

61

Table A1.8: Mode wise hourly traffic volume at Shindewadi station on Satara road towards Satara to Pune

11.00 to 12.00

10.00 to 11.00

9.00 to 10.00

8.00 to 9.00

140

167

72

32

19

12

12

10

124

176

101

68

125

135

140

40

13

22

34

36

22

33

28

27

34

27

35

16

11

10

Other
Bus

11

17

10

15

22

15

16

12

18

27

LCV

84

73

54

58

53

51

58

56

75

62

2 Axle
Truck

23

24

19

10

10

11

11

21

3 Axle
Truck

10

634

711

608

555

713

548

504

624

689

672

24

361

451

385

361

485

345

289

414

472

396

Hour of the
day

12.00 to 13.00
81
14
5
0
124
3

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
77
86

13.00 to 14.00
96
15
6
0
119

145

13
10

10
0

66

79

85

151

30

24

22

15

46

29

19

12

13

138

114

113

71

56

48

46

44

13

11

993

1012

837

794

676

390

416

376

392

407

14.00 to 15.00
130
10
2
0

82
13
6
0

62

15.00 to 16.00
98
7
4

20.00 to 21.00
69
3
12

155

16.00 to 17.00
108
14

12

21.00 to 22.00
49
2

12

17.00 to 18.00
69

123

22.00 to 23.00
37

46

18.00 to 19.00

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
0
0

19.00 to 20.00

23.00 to 00.00

24

335

266

343

47

665

281

910

323

713

292

830

352

30

703

8226

00.00 to 1.00

776

0
6

16129

0
45

0
86

58

0
9

152

57

10

4
31

12

96

71

50
18

31

106

51

11

131
0

20

24

102

71

12
1

16

26

124

44
43

25

18

20
0

32

13

0
11

38

11

40

38

15
1

17

41

2.00 to 3.00
18
2

17

73

3.00 to 4.00
17

16

4.00 to 5.00
20

12

21

5.00 to 6.00
30

862

6.00 to 7.00
47

1.00 to 2.00

7.00 to 8.00

Total

62

14

16

29

18

67

71

4.00 to 5.00

5.00 to 6.00

6.00 to 7.00

7.00 to 8.00

22.00 to 23.00

10

29

112

21.00 to 22.00

3.00 to 4.00

182

20.00 to 21.00

24

159

19.00 to 20.00

14

88

18.00 to 19.00

2.00 to 3.00

39

178

17.00 to 18.00

35

187

17

142

16.00 to 17.00

1.00 to 2.00

112

15.00 to 16.00

12

134

14.00 to 15.00

13

116

13.00 to 14.00

47

275

12.00 to 13.00

23

13

176

11.00 to 12.00

00.00 to 1.00

31

117

10.00 to 11.00

23.00 to 00.00

21

115

27

19

23

10

45

27

27

56

78

66

47

30

44

47

38

63

24

37

18

15

12

13

14

18

29

32

22

89

53

36

22

12

17

55

38

84

133

244

203

152

198

205

178

125

186

199

261

170

180

117

11

12

11

27

12

11

25

10

11

12

23

12

13

13

13

13

12

10

11

12

13

13

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
100
27
46
56
73
25
28
40
2

15

18

18

19

10

26

11

13

44

67

67

82

36

61

21

90

44

51

43

35

34

23

21

24

28
6

LCV

Other
Bus

18

24

31

18

20

19

25

22

38

74

159

179

119

131

100

200

156

198

121

123

121

93

58

54

2 Axle
Truck

10

12

20

11

17

39

66

39

89

97

85

43

44

26

20

11

14

16

21

3 Axle
Truck

19

22

14

13

10

12

MAV Tractor

18

23

17

13

10

11

14

12

Total

20633

501

400

300

159

180

178

320

321

642

1138

1474

1408

1167

1494

1231

1501

1163

1294

1026

1092

1070

842

708

11704

313

242

154

70

78

73

150

151

318

596

827

782

594

843

758

788

599

710

605

802

672

556

460

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
6
22
0
1024
563

Table A1.9: Mode wise hourly traffic volume at Sholapur toll plaza station on Sholapur road towards Pune to Sholapur

9.00 to 10.00

8.00 to 9.00

Hour of the
day

63

Table A1.10: Mode wise hourly traffic volume at Sholapur toll plaza station on Sholapur road towards Sholapur to Pune

17.00 to 18.00

16.00 to 17.00

15.00 to 16.00

14.00 to 15.00

13.00 to 14.00

12.00 to 13.00

11.00 to 12.00

10.00 to 11.00

9.00 to 10.00

8.00 to 9.00

145

113

114

86

52

63

102

101

101

219

84

43

47

16

19

16

31

10

27

29

54

30

29

24

31

43

57

41

34

29

24

19

23

27

15

11

19

14

15

194

288

158

157

95

141

162

134

569

116

98

133

84

61

31

11

22

25

14

25

19

17

12

18

19

20

13

27

15

14

13

17

22

24

17

18

20

23

15

24

22

10

19

Other
Bus

35

34

79

94

53

123

38

10

13

47

57

40

27

36

32

25

13

LCV

46

54

97

100

111

154

28

38

55

80

70

87

78

67

88

56

35

14

2 Axle
Truck

56

62

75

38

46

36

33

15

32

29

27

40

63

30

35

17

11

3 Axle
Truck

11

23

33

18

20

13

10

11

10

13

11

25

25

12

18

731

1123

1156

1231

1474

834

830

674

928

862

1294

797

979

863

727

462

313

521

611

739

777

553

474

442

531

468

895

460

526

498

519

294

Hour of the
day

18.00 to 19.00
33
26
0

143

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
545
260

19.00 to 20.00
149
30
22
0

84

2.00 to 3.00
6

0
0

62

88

47

24

14

23

18

11

26

24

25

25

34

28

26

21

40

40

39

17

29

17

19

38

46

75

46

39

22

34

46

35

38

19

27

15

24

19

10

388
19560

699

631

802

535

390

217
10563

329

253

297

195

146

245

20.00 to 21.00
126
15
0

48

3.00 to 4.00
18

21.00 to 22.00
83
0
0

4.00 to 5.00
17

11

11

22.00 to 23.00
50
0
0

5.00 to 6.00
32

12

23.00 to 00.00
14
0

6.00 to 7.00
41

00.00 to 1.00
8

607

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
20
29

1.00 to 2.00

7.00 to 8.00

Total

64

16

14

21

25

55

130

87

4.00 to 5.00

5.00 to 6.00

6.00 to 7.00

7.00 to 8.00

22.00 to 23.00

27

34

21.00 to 22.00

3.00 to 4.00

19

20.00 to 21.00

18

43

19.00 to 20.00

15

13

147

18.00 to 19.00

2.00 to 3.00

14

127

17.00 to 18.00

28

232

17

36

208

16.00 to 17.00

1.00 to 2.00

32

141

15.00 to 16.00

30

182

14.00 to 15.00

52

171

13.00 to 14.00

14

34

94

12.00 to 13.00

13

33

77

11.00 to 12.00

00.00 to 1.00

31

76

10.00 to 11.00

23.00 to 00.00

38

81

17

12

11

11

13

12

28

36

28

15

39

34

21

23

27

96

116

74

64

60

20

22

15

23

12

33

108

137

86

71

53

25

31

22

20

44

24

64

184

204

288

262

215

276

190

231

186

164

210

16

48

53

37

10

10

23

15

24

24

22

29

11

20

30

52

44

32

31

53

44

48

42

24

27

32

31

16

14

14

16

24

21

22

35

23

41

29

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
91
45
28
6
128
17
19
23

20

30

53

41

42

16

10

11

13

12

12

13

23

23

28

39

42

66

57

49

40

32

33

25

25

16

24

20

26

48

26

42

24

50

22

14

15

11

13

15

13

33
30

LCV

Other
Bus

53

68

78

71

58

26

31

38

41

42

22

31

72

78

66

45

91

57

52

29

24

19

31

23

2 Axle
Truck

39

45

55

45

59

26

44

51

53

64

38

46

84

60

100

50

61

59

45

10

25

23

22

21

3 Axle
Truck

19

19

26

28

22

19

31

23

34

45

37

43

28

37

31

26

23

21

11

10

10

11

11

13

MAV Tractor

10

10

12

Total

22419

1037

1337

1288

1103

955

479

530

621

564

689

546

697

1086

965

1297

1057

1222

1142

1092

1006

982

975

966

12350

590

758

618

495

427

211

228

245

218

303

223

347

623

578

845

736

707

750

688

612

559

539

578

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
2
3
4
785
472

Table A1.11: Mode wise hourly traffic volume at Somatane Phata station on Talegaon road towards Pune to Talegaon

9.00 to 10.00

8.00 to 9.00

Hour of the
day

65

17.00 to 18.00

16.00 to 17.00

15.00 to 16.00

14.00 to 15.00

13.00 to 14.00

12.00 to 13.00

11.00 to 12.00

10.00 to 11.00

9.00 to 10.00

8.00 to 9.00

109

80

170

249

255

310

161

60

64

72

76

72

11

20

24

25

32

44

29

72

57

75

59

18

12

26

12

39

40

57

24

16

62

23

36

25

52

56

77

89

126

186

177

123

123

90

190

186

206

172

161

19

19

69

18

14

19

22

41

18

26

21

19

18

86

41

18

18

29

25

40

31

24

39

40

20

14

16

26

24

92

20

23

16

21

22

24

19

30

48

28

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
42
44

14

33

18

75

17

15

22

34

27

26

33

38

28

20

46

Other
Bus

32

20

16

25

35

33

76

20

15

25

24

15

13

22

21

14

15

11

LCV

45

30

21

25

25

31

67

76

95

70

86

86

60

69

69

46

57

69

2 Axle
Truck

49

43

17

23

39

30

68

67

87

43

53

56

61

38

48

48

51

46

3 Axle
Truck

30

22

12

13

18

16

91

32

28

38

16

13

11

10

11

21

15

13

14

12

10

431

290

431

632

610

2021

1066

1226

1088

1201

1163

1154

1100

1285

1184

1084

172

128

192

257

295

845

516

700

712

747

783

634

584

686

653

606

Table A1.12: Mode wise hourly traffic volume at Somatane Phata station on Talegaon road towards Talegaon to Pune

18.00 to 19.00
2
3
2

36

Hour of the
day

19.00 to 20.00
33
0
3
0

42

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
1320
693

20.00 to 21.00
3
0
3

36

2.00 to 3.00
5

2
1

10

82

58

51

38

41

41

22

16

21

10

12

20

26

12

23

37

17

18

12

10

12

14

39

29

23

22

25

32

26

37

26

35

40

43

26

35

27

30

58

45

22

17

29

58

33

17

18

21778

783

689

452

614

819

575

11369

469

416

261

282

303

222

213

21.00 to 22.00
10
0
0

3.00 to 4.00
52

12

22.00 to 23.00
7
0
0

4.00 to 5.00
57

14

23.00 to 00.00
1
0

5.00 to 6.00
150

22

00.00 to 1.00
1

564

6.00 to 7.00
134

12

1.00 to 2.00

7.00 to 8.00

Total

66

9.00 to 10.00

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

22.00 to 23.00

23.00 to 00.00

00.00 to 1.00

1.00 to 2.00

2.00 to 3.00

3.00 to 4.00

4.00 to 5.00

5.00 to 6.00

6.00 to 7.00

7.00 to 8.00

8.00 to 9.00

150

170

160

167

159

143

140

153

140

139

138

146

200

330

326

320

323

237

244

286

237

180

113

13

34

27

35

20

17

18

17

25

16

20

18

20

24

30

24

22

15

22

34

36

22

33

28

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
0
0
0
0
121
5
0
27

14

17

14

16

14

26

26

26

22

20

21

24

14

14

11

11

14

11

13

11

12

11

12

18

29

25

28

26

26

25

27

29

13

12

12

13

22

22

23

27

24

22

15

16

13
13

LCV

Other
Bus

68

88

91

92

103

113

101

107

110

115

95

131

155

138

114

98

109

95

104

99

88

97

51

61

2 Axle
Truck

67

119

99

81

135

132

117

101

118

115

60

66

63

75

62

71

59

51

55

122

109

83

82

61

3 Axle
Truck

31

27

34

28

31

32

32

27

30

29

29

28

30

30

34

32

29

24

26

23

32

27

27

27

MAV Tractor

Total

25070

845

1068

1071

955

1145

1187

1103

1087

1113

1123

857

1007

1108

1246

1111

1081

1081

921

1026

1271

1122

1019

775

11482

379

468

463

429

487

490

460

464

464

467

375

431

500

633

584

571

575

465

505

617

532

460

332

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
0
0
754
331

Table A1.13: Mode wise hourly traffic volume at Talegaon Toll Plaza station on Mumbai Pune Expressway towards Mumbai to Pune

Hour of the
day

67

17.00 to 18.00

16.00 to 17.00

15.00 to 16.00

14.00 to 15.00

13.00 to 14.00

12.00 to 13.00

11.00 to 12.00

10.00 to 11.00

9.00 to 10.00

8.00 to 9.00

251

226

300

225

196

224

197

166

199

176

221

228

232

227

222

25

28

24

25

24

22

23

25

19

18

24

23

21

23

26

21

23

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
0
21

17

21

22

16

17

12

11

14

13

15

10

14

14

17

11

17

18

15

Other
Bus

23

26

26

27

26

27

26

28

27

27

25

22

22

21

24

26

23

LCV

131

114

92

120

108

90

95

109

97

114

102

120

103

105

96

99

99

103

2 Axle
Truck

102

106

96

133

86

124

139

127

114

113

71

75

61

54

58

49

51

49

3 Axle
Truck

30

32

26

23

23

23

25

22

20

26

27

29

32

29

29

28

29

1133

1110

1291

1102

1200

1197

1181

1116

1156

959

1067

953

992

965

956

977

497

533

599

520

601

550

526

524

518

431

488

434

478

473

473

477

Table A1.14: Mode wise hourly traffic volume at Talegaon Toll Plaza station on Mumbai Pune expressway towards Pune to Mumbai

18.00 to 19.00
0
0
0

244

0
0

182

153

140

139

138

19

27

23

30

28

25

16

12

11

15

20

18

15

17

17

21

23

19

124

102

106

96

152

86

63

75

62

70

69

124

29

27

27

28

27

28

25469

1063

972

899

926

1108

1048

11741

522

444

400

401

462

440

485

Hour of the
day

19.00 to 20.00
0
0
0
0

184

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
955
465

20.00 to 21.00
0
0
0

153

2.00 to 3.00
0
0

255

21.00 to 22.00
0
0
0

3.00 to 4.00
0

22.00 to 23.00
0
0
0

4.00 to 5.00
0

23.00 to 00.00
0
0

5.00 to 6.00
0

00.00 to 1.00
0

1151

6.00 to 7.00
0

31

1.00 to 2.00

7.00 to 8.00

Total

68

55

80

81

88

85

76

72

66

72

74

68

47

33

30

16

224

178

173

176

189

196

166

146

147

177

196

179

156

143

104

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

22.00 to 23.00

23.00 to 00.00

10

10

13

13

13

14

10

54

97

113

132

202

175

250

209

158

119

102

176

166

112

99

10

27

15

12

13

12

12

22

15

16

23

13

13

26

16

21

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
230
124
64
11
206
23
15
20

10

13

18

19

56

45

35

16

12

11

11

10

21

24

33

25

46

44
12

LCV

Other
Bus

18

28

49

33

21

21

21

25

25

18

21

19

36

38

2 Axle
Truck

10

20

24

10

13

10

12

20

15

21

3 Axle
Truck

11

24

25

12

24

MAV Tractor

12

27

41

49

37

29

38

49

33

50

47

75

Total

12

22

32

20

17

16

20

19

14

17

217
8972

229

305

403

539

700

632

663

572

532

519

502

546

589

554

653

10820

279

483

727

930

781

802

668

605

540

499

548

669

667

846

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
25
84
46
1547
1046

Table A1.15: Mode wise hourly traffic volume at Alandi road station on Alandi road towards Alandi to Pune

9.00 to 10.00

8.00 to 9.00

Hour of the
day

69

11.00 to 12.00

10.00 to 11.00

9.00 to 10.00

8.00 to 9.00

257

151

105

219

185

46

49

34

38

30

38

29

51

45

50

20

18

36

38

21

29

22

136

131

108

109

86

136

139

136

72

76

109

149

11

12

10

14

15

15

14

22

23

15

18

20

13

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
17
1

11

10

11

Other
Bus

11

10

18

17

11

14

14

15

29

92

LCV

16

12

19

22

26

19

17

22

22

23

18

56

2 Axle
Truck

11

25

13

13

10

20

3 Axle
Truck

12

12

12

12

15

10

13

20

14

13

20

16

12

11

43

12

12

11

16

12

39

479

498

601

613

587

742

730

780

479

486

799

354

409

461

545

547

579

561

630

391

358

609

Table A1.16: Mode wise hourly traffic volume at Alandi road station on Alandi road towards Pune to Alandi

12.00 to 13.00
196
25
30
1

Hour of the
day

13.00 to 14.00
230
29
38
0

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
1038
708

14.00 to 15.00
286
29
32
0
54

52

14

11

16

13

12

11

11

157

301

310

139

209

225

60

15.00 to 16.00
269
29
15
4
0

46

16.00 to 17.00
165
29

30
28
0

47

17.00 to 18.00
84

134
67
32
0

18.00 to 19.00
20.00 to 21.00
45
0

19.00 to 20.00
21.00 to 22.00
19

6725

45

8600

22.00 to 23.00

Total

70

22

25

31

17

25

25

10

227

155

147

87

100

57

208

405

154

67

35

51

33

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

12

81

40

50

46

58

94

60

24

10

15

51

31

52

36

21

128

68

100

279

301

190

115

79

93

65

77

75

70

13

29

19

10

10

18

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
164
31
48
2
56
4
4
0

52

46

21

13

13

18

12

21

68

46

23

14

10

17

22

10

15

2
8

LCV

Other
Bus

10

41

30

70

61

51

32

14

51

58

58

56

26

28

2 Axle
Truck

18

10

13

3 Axle
Truck

16

MAV Tractor

17

10

10

19

25

68

60

64

30

25

25

43

42

40

78

Total

8632

269

300

395

921

953

919

725

410

609

530

654

748

632

6520

205

205

259

629

708

844

552

300

434

372

498

525

556

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
15
40
1
570
433

Table A1.17: Mode wise hourly traffic volume at Bhumkar Chowk station at Hinjewadi towards NH-4 to Hinjewadi

9.00 to 10.00

8.00 to 9.00

Hour of the
day

71

Hour of the
day

Table A1.18: Mode wise hourly traffic volume at Bhumkar Chowk station on Hinjewadi towards Hinjewadi to NH-4

50
100

40

92

101

106

33

36

19

10

10

14

44

30

40

35

14

16

84

47

89

113

13

10

14

15

22

64

22

15

14

17

25

12

13

12

12

15

29

36

38

25

53

41

46

44

104

9427

84

377

446

698

593

841

609

368

309

842

997

1236

1213

6809

31

261

274

415

408

554

355

276

298

691

871

992

775

3 Axle
Truck

12
103
60
62
11

84

12

2 Axle
Truck

34
66
50
28

16

48

13

LCV

255
76
37
3
56

20

10

60

Other
Bus

432
71
24
10

43

24

13

39

25

9.00 to 10.00
385
1
21

38
1

43

13

19

97

10.00 to 11.00
266
7
11

19

15

30

11.00 to 12.00
120
18
247
2

22

12.00 to 13.00
88
10
192

26

10

13.00 to 14.00
69
17
10
163

40

14.00 to 15.00
1
27
16
109

13

15.00 to 16.00
80
0
5
6
146

27

16.00 to 17.00
54
0
3
6

17

17.00 to 18.00
52
0
0
0

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
2
1
226

18.00 to 19.00
44
0
0

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
4
4
5
110
0
815
608

19.00 to 20.00
26
0

8.00 to 9.00

20.00 to 21.00
0

Total

21.00 to 22.00

72

10

11

13

12

95

103

87

65

104

106

38

13

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

26

231

12.00 to 13.00

145

28

289

11.00 to 12.00

14.00 to 15.00

35

279

10.00 to 11.00

13.00 to 14.00

45

327

12

50

35

13

14

10

19

24

22

12

48

52

86

79

36

83

84

91

76

77

113

183

75

240

212

333

444

10

11

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
285
16
2
40
318
30
2
5

21

13

21

37

27

35

26

22

16

31

30

24

16

14
8

LCV

Other
Bus

11

13

19

19

17

21

19

34

26

16

22

29

17

17

2 Axle
Truck

3 Axle
Truck

MAV Tractor

Total

6810

182

188

284

322

334

326

420

516

332

608

616

923

1003

6204

100

156

259

279

238

259

333

442

256

609

651

864

1003

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
7
3
757
755

Table A1.19: Mode wise hourly traffic volume at Chandini Chowk station on Perangut road towards Pune to Mulshi

9.00 to 10.00

8.00 to 9.00

Hour of the
day

73

Hour of the
day

Table A1.20: Mode wise hourly traffic volume at Chandini Chowk station on Perangut road towards Mulshi to Pune

15
4

22

12

22

18

25

36

14

282

392

242

81

99

80

66

35

38

15

29

37

19

21

27

26

23

23

34

41

45

26

17

13

13

20

10

12

7912

210

235

550

1034

573

588

690

1032

630

423

514

552

474

7318

178

193

601

1012

519

535

714

988

606

358

422

424

413

3 Axle
Truck

18
3
27

38

32

2 Axle
Truck

214
14
4
26

29

34

LCV

170
15
3

33

19

Other
Bus

9.00 to 10.00
180
12
2

12

17

10.00 to 11.00
160
23
8

15

13

31

11.00 to 12.00
251
20
189
8

10

17

12.00 to 13.00
410
21
179

35

13.00 to 14.00
309
2
31
425

14.00 to 15.00
21
9
33
235

65

15.00 to 16.00
211
14
12
27
91

16.00 to 17.00
204
14
1
0

89

11

17.00 to 18.00
406
15
2
0

11

18.00 to 19.00
274
0
7

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
4
3
181

19.00 to 20.00
60
0

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
1
4
3
7
0
407
355

20.00 to 21.00
56

8.00 to 9.00

21.00 to 22.00

Total

74

33

12

11

10

54

141

188

175

184

192

215

225

225

210

183

164

55

26

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

22.00 to 23.00

37

41

56

51

24

22

12

22

28

33

41

32

21

34

74

41

74

39

33

23

47

27

58

24

30

37

11

23

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
65
40
49
0
32
9
32
0

54

33

25

14

11

10

18

19

22

16

28

40

17

19

45

40

7
0

LCV

Other
Bus

32

13

11

29

41

66

71

71

60

62

64

55

47

26

2 Axle
Truck

12

10

3 Axle
Truck

15

14

11

MAV Tractor

17

12

13

33

14

25

17

17

12

16

11

43

231
7896

Total

356

384

394

523

492

619

587

747

584

636

611

472

612

16

10

11

10

25

26

17

20

15

27

13

20

12

5482

133

211

340

332

432

405

441

427

475

394

434

413

324

342

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
8
51
0
651
379

Table A1.21: Mode wise hourly traffic volume at Kondwa station on Saswad Kondwa road towards Saswad to Pune

9.00 to 10.00

8.00 to 9.00

Hour of the
day

75

Hour of the
day

Table A1.22: Mode wise hourly traffic volume at Kondwa station on Saswad Kondwa road towards Pune to Saswad

28

39

60

52

67

54

45

63

11

17

17

19

37

13

19

21

35

31

34

48

14

20

37

12

14

24

37

35

32

29

43

26

55

45

45

37

13

10

15

22

19

13

18

10

32

10

17

10

22

14

26

18

26

26

19

27

24

36

35

19

35

37

103

197

316

430

423

445

470

550

557

679

710

630

553

635

81

163

269

369

345

367

386

467

486

553

561

615

385

361

3 Axle
Truck

8
32
0
48
0

2 Axle
Truck

22
37
0
46
2

LCV

70
16
32
0
39
0

Other
Bus

151
5
29
0
31

9.00 to 10.00
395
9
18
0
35

37

10.00 to 11.00
290
9
32
0
27

33

11.00 to 12.00
283
4
21
0
25

11

12.00 to 13.00
273
7
20
0

16

13.00 to 14.00
260
7
22
0

50

14.00 to 15.00
205
9
21
0

15.00 to 16.00
198
18
9

43

16.00 to 17.00
182
8
10

17.00 to 18.00
189
1

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
4
0
60

18.00 to 19.00
127
0

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
0
19
8
30
592
314

19.00 to 20.00
78

8.00 to 9.00

20.00 to 21.00
35

5722

21.00 to 22.00

7291

22.00 to 23.00

Total

76

57

56

61

80

55

59

55

95

69

67

48

71

66

147

155

250

242

233

199

180

165

181

124

129

112

126

114

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

22.00 to 23.00

19

48

19

18

63

24

16

14

24

45

24

23

28

90

75

97

115

135

89

142

84

119

112

124

107

149

90

69

11

11

10

10

26

22

22

22

14

15

15

17

19

19

17

14

23

11

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
50
0
40
0
33
3
5
7

13

27

26

27

21

25

22

24

27

24

27

45

29

27

3
5

LCV

Other
Bus

33

35

43

38

41

52

40

46

54

51

56

56

48

19

2 Axle
Truck

15

3 Axle
Truck

10

MAV Tractor

16

17

10

16

19

13

16

14

16

18

19

11

40

Total

11

9741

683

757

702

639

666

654

525

631

681

751

747

814

665

572

7226

441

500

457

480

461

541

420

496

521

612

594

645

475

411

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
17
3
256
172

Table A1.23: Mode wise hourly traffic volume at Mantarwadi station on Saswad road towards Hadapsar to Saswad

9.00 to 10.00

8.00 to 9.00

Hour of the
day

77

Hour of the
day

Table A1.24: Mode wise hourly traffic volume at Mantarwadi station on Saswad road towards Saswad to Hadapsar

4
0

5
44

37

34

16

23

22

14

28

15

21

21

16

13

28

29

25

11

22

26

20

11

23

12

14

20

34

15

20

29

15

34

16

34

18

42

29

41

20

23

14

22

22

11

24

13

30

10

23

10

10

23

11

234

646

648

459

712

634

553

427

553

498

538

323

417

463

141

284

294

243

377

358

320

226

287

273

291

232

262

229

3 Axle
Truck

13
27
0
53
5
11

19

26

12

39

36

2 Axle
Truck

11
19
1
36
7

8
16

15

13

20

33

LCV

31
14
31
0
23

33
8

15

16

17

28

Other
Bus

88
4
21
3

3
51
15

13

20

29

9.00 to 10.00
88
12
19

23

41

10

13

17

10

10.00 to 11.00
70
9
0
42

17

13

11.00 to 12.00
75
10
18
8
28

13

18

12.00 to 13.00
69

20
3
32

21

13.00 to 14.00
57
13
27
1
0

33

14.00 to 15.00
94
12
32
12

22

15.00 to 16.00
106
14
13
7

27

16.00 to 17.00
88
12
3

17.00 to 18.00
54
10
9

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
8
6
17

18.00 to 19.00
36
6

11

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
3
0
0
4
5
221
122

19.00 to 20.00
42

8.00 to 9.00

20.00 to 21.00
36

3939

21.00 to 22.00

7324

22.00 to 23.00

Total

78

13

17

16

11

16

15

13

30

60

54

36

22

165

148

160

79

148

76

116

76

72

86

62

43

25

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

22.00 to 23.00

10

10

11

25

28

44

39

25

57

44

53

30

37

66

69

52

18

59

57

67

33

89

73

80

10

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
0
0
0
0
0
3
7
6

10

11

12

10

11

13

10

15

18

10

17

14

14

12
7

LCV

Other
Bus

10

10

11

15

28

20

16

18

20

16

26

22

13

11

2 Axle
Truck

3 Axle
Truck

MAV Tractor

16

14

19

14

18

38

Total

4864

155

247

269

113

321

360

270

363

362

436

338

516

473

470

3611

111

174

229

39

271

243

182

287

253

351

221

400

369

400

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
25
0
172
81

Table A1.25: Mode wise hourly traffic volume at Sinhagad road station on Sinhagad road towards Pune to Sinhagad

9.00 to 10.00

8.00 to 9.00

Hour of the
day

79

Table A1.26: Mode wise hourly traffic volume at Sinhagad road station on Sinhagad road towards Sinhagad to Pune

66

9
9

10

9
9

10

11

Other
Bus

22

23

14

LCV

22

15

13

10

2 Axle
Truck

11

3 Axle
Truck

11

24

34

22

772

745

566

526

Hour of the
day
2

112
7
7

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
517
352

46

29
126
5

16.00 to 17.00

15.00 to 16.00

14.00 to 15.00

13.00 to 14.00

12.00 to 13.00

110

127

104

105

96

104

155

59

47

46

52

36

43

52

55

41

63

48

43

43

96

29

38

22

42

43

42

38

37

34

80

93

111

101

109

82

100

150

12

10

12

18

24

17

10

12

10

12

10

10

20

13

17

14

12

10

13

11

22

18

26

24

24

33

14

12

12

13

29

32

33

39

22

26

25

29

33

30

27

19

35

33

29

36

21

12

15

13

15

15

14

10

10

28

21

39

44

32

22

23

30

43

569

562

775

398

751

704

644

639

582

599

843

344

304

477

141

520

513

474

472

416

448

630

694

60

100
36
170

17.00 to 18.00
0
44
17

17

80

41
95
37

18.00 to 19.00
0
42
39

42

8.00 to 9.00
135
53
111

19.00 to 20.00
101
22

33

9.00 to 10.00
135
53

20.00 to 21.00
61
37

10

10.00 to 11.00
210

897

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
9
6

11.00 to 12.00

21.00 to 22.00
41

6877

46

9997

22.00 to 23.00

Total

80

17

27

28

22

23

19

18

13

161

188

83

77

63

88

80

84

86

49

68

78

71

68

50

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

22.00 to 23.00

23.00 to 00.00

26

14

25

12

31

14

35

17

18

22

37

30

25

27

17

16

11

15

37

13

37

23

23

19

40

28

10

10

12

23

22

32

33

27

33

31

20

22

34

18

21

18

15

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
31
36
21
0
42
10
18
14

16

13

14

10

10

22

16

19

22

13

24

18

16

33

23

21

20

15

10
0

LCV

Other
Bus

11

21

22

17

17

21

24

20

25

24

15

21

16

2 Axle
Truck

11

11

19

11

3 Axle
Truck

MAV Tractor

49

67

46

81

101

63

15

52

27

67

62

58

56

63

Total

15

21

92
4467

76

285

299

301

300

256

322

234

243

309

310

252

291

383

332

6291

467

454

504

448

356

439

389

314

425

467

326

400

427

343

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
22
0
456
258

Table A1.27: Mode wise hourly traffic volume at Warje station on Warje road towards Malwadi to Shivane

9.00 to 10.00

8.00 to 9.00

Hour of the
day

81

Hour of the
day

Table A1.28: Mode wise hourly traffic volume at Warje station on Warje road towards Malwadi to Shivane

40

26

57

47

49

38

34

31

18

22

23

20

29

22

16

11

13

12

18

13

15

11

15

10

24

16

11

46

81

101

63

46

52

27

67

62

58

56

63

17

14

394

614

597

534

445

547

472

482

490

445

462

398

350

504

533

442

388

450

382

386

393

332

377

337

3 Axle
Truck

30
26
1
67

12

340

470

2 Axle
Truck

33
31
1

12

16

464

680

LCV

125
31
27
1

10

10

18

Other
Bus

144
48
51

14

13

15

12

9.00 to 10.00
95
53
54

18

14

67

10.00 to 11.00
120
30
4

18

49

11.00 to 12.00
107
58
74
4

23

12.00 to 13.00
156
1
67
3

19

13.00 to 14.00
144
29
2
97

17

39

14.00 to 15.00
35
37
1
105

15.00 to 16.00
141
28
45
2
70

22

29

16.00 to 17.00
157
28
62
2

23

29

17.00 to 18.00
182
34
20

12

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
36
14
45

18.00 to 19.00
145
41

12

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
3
5
0
22
0
428
252

19.00 to 20.00
115

13

8.00 to 9.00

20.00 to 21.00

14

107

13

313

12

21

13

14

21

15

75

10

57

10

20

29

22

15

16

26

40
0

93
0

120
0

6043

21.00 to 22.00
0

7765

22.00 to 23.00
23.00 to 00.00

Total

82

Hourly Traffic Variation Charts of Outer cordon


stations

83

PCU's /Vehicles

15.00

14.00

13.00

12.00

11.00

10.00

9.00

Hourly volume in vehicles(NB)

Hourly volume in PCU(NB)

Hourly volume in vehicles(SB)

23.00

22.00

21.00

20.00

19.00

18.00

Hour of the day

6.00

5.00

4.00

3.00

2.00

1.00

24.00

17.00

Fig A1.1 Hourly variation of traffic at Perane toll plaza station on Ahmednagar road

100

200

300

400

500

600

700

800

900

1000

1100

1200

1300

16.00

Hourly volume in PCU(SB)

8.00

7.00

PCU's /Vehicles

1700
1600
1500
1400
1300
1200
1100
1000
900
800
700
600
500
400
300
200
100
0
10.00

11.00

12.00

13.00

23.00

24.00

Hourly volume in PCU(SB)

22.00

Hourly volume in vehicles(SB)

21.00

Hourly volume in PCU(NB)

16.00

17.00

18.00
Hour of the day

15.00

19.00

20.00

Hourly volume in vehicles(NB)

14.00

Fig A1.2 Hourly variation of traffic at Moshi (NH-50) station on Alandi road

84

9.00

85

PCU's /Vehicles

15.00

14.00

13.00

12.00

11.00

10.00

9.00

Hourly volume in vehicles(NB)

Hourly volume in PCU(NB)

Hourly volume in vehicles(SB)

23.00

22.00

21.00

20.00

19.00

18.00

Hour of the day

7.00

6.00

5.00

4.00

3.00

2.00

1.00
24.00

17.00

Fig A1.3 Hourly variation of traffic at Hinjewadi (Shivaji Chowk) station on Marel to Pune road

200

400

600

800

1000

1200

1400

1600

1800

2000

2200

2400

2600

16.00

Hourly volume in PCU(SB)

8.00

PCU's /Vehicles

Hourly volume in PCU(SB)

Hourly volume in vehicles(SB)


Hourly volume in PCU(NB)

22.00

Hourly volume in vehicles(NB)

21.00

1400

20.00

1200

19.00

1000

18.00

800

17.00

600

16.00

Hour of the day

15.00

400

14.00

200
0
10.00

11.00

12.00

13.00

Fig A1.4 Hourly variation of traffic at Bhumkar Chowk station on Hinjewadi road

86

9.00

87

PCU's /Vehicles

200

400

600

800

1000

1200

1400

1600

1800

2000

2200

15.00

14.00

13.00

12.00

11.00

10.00

9.00

Hourly volume in vehicles(NB)

Hourly volume in PCU(NB)

Hourly volume in vehicles(SB)

23.00

22.00

21.00

20.00

19.00

Hour of the day

5.00

4.00

3.00

2.00

1.00
24.00

18.00

17.00

Fig A1.5 Hourly variation of traffic at Moshi toll plaza station on Nasik road

16.00

Hourly volume in PCU(SB)

8.00

7.00

6.00

PCU's /Vehicles

1100
1000
900

Hourly volume in PCU(SB)


Hourly volume in vehicles(SB)
Hourly volume in PCU(NB)
Hourly volume in vehicles(NB)

22.00

800

21.00

700

20.00

600

19.00

500

18.00

400

17.00

300

16.00

Hour of the day

15.00

200

14.00

100
0
10.00

11.00

12.00

13.00

Fig A1.6 Hourly variation of traffic at Chandini Chowk station on Perangut road

88

9.00

89

PCU's /Vehicles

100

200

300

400

500

600

700

800

12.00

11.00

10.00

9.00

Hourly volume in vehicles(NB)

Hourly volume in PCU(NB)

Hourly volume in vehicles(SB)

17.00

16.00

15.00

Hour of the day

21.00

20.00

19.00

18.00

14.00

Fig A1.7 Hourly variation of traffic at Kondwa station on Saswad Kondwa road

13.00

Hourly volume in PCU(SB)

23.00

22.00

PCU's /Vehicles

Hourly volume in PCU(SB)

Hourly volume in vehicles(SB)


Hourly volume in PCU(NB)

Hourly volume in vehicles(NB)

23.00

900

22.00

800

21.00

700

20.00

600

19.00

500

18.00

400

17.00

300

16.00

Hour of the day

15.00

200

14.00

100
0
10.00

11.00

12.00

13.00

Fig A1.8 Hourly variation of traffic at Mantarwadi station on Saswad road

90

9.00

91

1600
1500
1400
1300
1200
1100
1000
900
800
700
600
500
400
300
200
100
0
15.00

14.00

13.00

12.00

11.00

10.00

9.00

PCU's /Vehicles

Hourly volume in vehicles(NB)

Hourly volume in PCU(NB)

Hourly volume in vehicles(SB)

23.00

22.00

21.00

20.00

19.00

18.00

Hour of the day

4.00

3.00

2.00

1.00
24.00

17.00

Fig A1.9 Hourly variation of traffic at Shindewadi station on Satara road

16.00

Hourly volume in PCU(SB)

8.00

7.00

6.00

5.00

PCU's /Vehicles

8.00

Hourly volume in PCU(SB)

7.00

Hourly volume in vehicles(SB)

6.00

Hourly volume in PCU(NB)

5.00

Hourly volume in vehicles(NB)

4.00

1650

3.00

1500

2.00

1350

1.00

1200

24.00

1050

23.00

900

22.00

750

21.00

600

20.00

Hour of the day

19.00

450

18.00

300

17.00

150
0
10.00

11.00

12.00

13.00

14.00

15.00

16.00

Fig A1.10 Hourly variation of traffic at Sholapur toll plaza station on Sholapur road

92

9.00

93

PCU's /Vehicles

100

200

300

400

500

600

700

800

900

1000

12.00

11.00

10.00

9.00

Hourly volume in vehicles(NB)

Hourly volume in PCU(NB)

Hourly volume in vehicles(SB)

17.00

16.00

15.00

Hour of the day

22.00

21.00

20.00

19.00

18.00

14.00

Fig A1.11 Hourly variation of traffic at Sinhagad road junction station on Sinhagad road

13.00

Hourly volume in PCU(SB)

23.00

PCU's /Vehicles

2250
2100
1950
1800
1650
1500
1350
1200
1050
900
750
600
450
300
150
0
10.00

11.00

12.00

13.00

14.00

15.00

16.00

5.00

6.00

7.00

8.00

Hourly volume in PCU(SB)

4.00

Hourly volume in vehicles(SB)

19.00

20.00

21.00

22.00

23.00
Hour of the day

3.00

Hourly volume in PCU(NB)

18.00

24.00

1.00

2.00

Hourly volume in vehicles(NB)

17.00

Fig A1.12 Hourly variation of traffic at Somatane Phata station on Talegaon Pune road

94

9.00

95

15.00

14.00

13.00

12.00

11.00

10.00

9.00

PCU's /Vehicles

Hourly volume in vehicles(NB)

Hourly volume in PCU(NB)

Hourly volume in vehicles(SB)

23.00

22.00

21.00

20.00

19.00

18.00

Hour of the day

5.00

4.00

3.00

2.00

1.00

24.00

17.00

Fig A1.13 Hourly variation of traffic at Talegaon station on Express highway road

300
200
100
0

1400
1300
1200
1100
1000
900
800
700
600
500
400

16.00

Hourly volume in PCU(SB)

8.00

7.00

6.00

PCU's /Vehicles

Hourly volume in PCU(SB)


Hourly volume in vehicles(SB)

24.00

Hourly volume in PCU(NB)

23.00

Hourly volume in vehicles(NB)

22.00

800

21.00

700

20.00

600

19.00

500

18.00

400

17.00

300

16.00

Hour of the day

15.00

200

10.00

11.00

12.00

13.00

Fig A1.14 Hourly variation of traffic at Warje station on Warje road

96

14.00

100
0
9.00

Hourly Traffic Variation Tables of Screen line


stations

187

280

231

265

193

208

246

217

246

292

186

155

87

87

74

40

60

46

78

117

107

215

565

1050

700

520

950

1005

680

399

381

452

237

274

250

250

127

99

103

167

202

312

442

618

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

22.00 to 23.00

23.00 to 00.00

00.00 to 1.00

1.00 to 2.00

2.00 to 3.00

3.00 to 4.00

4.00 to 5.00

5.00 to 6.00

6.00 to 7.00

7.00 to 8.00

210

540

47

36

43

30

43

25

20

27

13

209

157

95

32

25

65

76

125

122

122

208

249

291

289

228

170

150

180

180

390

270

270

255

10

12

10

10

53

39

21

15

15

42

34

38

36

35

39

54

44

33

43

59

45

56

12

15

13

11

18

12

12

13

14

17

18

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
602
218
8
1
203
13
70
16

25

16

12

20

20

11

22

24

15

12

22

13

23

12

15

11

10

14

13

26

32

29

25

38

35

35

46

24

30

20

14
10

LCV

Other
Bus

36

33

40

54

46

55

29

39

56

34

33

2 Axle
Truck

13

26

17

21

16

3 Axle
Truck

MAV Tractor

210

225

134

65

15

34

39

40

79

102

73

125

94

130

100

65

103

106

Total

22752

1134

830

548

279

180

201

223

342

432

432

710

820

1087

1224

1119

1329

1444

1454

1281

1466

1637

1253

1229

24773

1370

1019

707

396

262

246

238

362

500

500

749

810

1184

1179

1113

1377

1685

1632

1295

1596

1882

1297

1281

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
89
0
1228
1288

Table A1.29: Mode wise hourly traffic volume at Bund garden station on Bund garden road towards Swargate to Vimannagar

9.00 to 10.00

8.00 to 9.00

Hour of the
day

97

17.00 to 18.00

16.00 to 17.00

15.00 to 16.00

14.00 to 15.00

13.00 to 14.00

12.00 to 13.00

11.00 to 12.00

10.00 to 11.00

9.00 to 10.00

8.00 to 9.00

930

490

460

490

687

600

574

530

546

855

840

690

580

550

550

545

516

565

635

477

620

440

305

305

810

825

1006

1070

1350

1420

1050

795

410

570

1110

725

555

655

500

13

21

15

22

17

110

94

30

42

19

11

12

11

18

23

49

51

37

60

190

100

91

119

36

98

76

227

64

97

10

43

12

48

21

23

30

17

12

15

12

14

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
69
10

11

10

13

37

11

175

108

29

54

12

10

10

17

26

15

Other
Bus

17

11

17

10

LCV

11

10

20

43

23

27

32

41

22

24

41

52

2 Axle
Truck

14

16

11

18

3 Axle
Truck

11

29

61

81

114

322

315

275

210

250

282

293

262

256

367

389

571

1073

1856

1705

2232

2530

3748

3231

2481

2504

1605

2091

2392

2528

1919

2117

733

1376

2252

700

1100

930

490

460

490

687

600

2269

2551

2451

2352

2393

Table A1.30: Mode wise hourly traffic volume at Bund garden station on Bund garden road towards Vimannagar to Swargate

18.00 to 19.00
343
0
0

505

Hour of the
day

19.00 to 20.00
1100
158
0
0

261

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
1793
2059

20.00 to 21.00
700
204
0

207

2.00 to 3.00
230

159
64

44

35

785

415

355

240

192

135

21

20

16

51

56

52

40

16

12

21

11

28

35

25

23

19

66

30

25

14

23

18

11

242

320

215

153

85

32

43873

2463

1735

1231

815

504

347

47933

1210

870

1304

850

230

159

495

21.00 to 22.00
1065
100
0

3.00 to 4.00
288

182

390

22.00 to 23.00
695
94
0

4.00 to 5.00
405

285

23.00 to 00.00
347
29

5.00 to 6.00
870

445

00.00 to 1.00
238

404

6.00 to 7.00

1210

1.00 to 2.00

7.00 to 8.00

Total

98

1.00 to 2.00

00.00 to 1.00

7.00 to 8.00

11

63

23.00 to 00.00

56

11

93

22.00 to 23.00

310

12

335

21.00 to 22.00

6.00 to 7.00

45

705

20.00 to 21.00

21

76

325

57

71

103

698

19.00 to 20.00

5.00 to 6.00

75

827

18.00 to 19.00

94

658

17.00 to 18.00

25

80

508

16.00 to 17.00

4.00 to 5.00

64

423

15.00 to 16.00

60

614

14.00 to 15.00

12

80

718

13.00 to 14.00

81

532

12.00 to 13.00

25

81

646

11.00 to 12.00

3.00 to 4.00

76

755

10.00 to 11.00

2.00 to 3.00

67

233

19

12

14

17

15

15

15

14

13

32

16

81

31

26

26

25

22

53

72

132

131

105

184

180

159

139

193

190

191

125

165

154

120

10

12

10

10

10

13

10

11

50

21

11

14

19

16

14

16

17

16

20

17

14

11

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
423
106
20
0
249
59
14
0

36

13

14

10

24

10

27

16

24

21

21

20

21

12

22

21

19

21

30

10
0

LCV

Other
Bus

15

20

14

17

17

26

29

25

21

17

25

29

34

40

28

49

30

22

17

30

30

55

2 Axle
Truck

11

32

33

26

45

21

28

20

10

32

34

26

26

17

3 Axle
Truck

10

MAV Tractor

29

63

45

53

96

52

29

61

78

54

43

46

68

51

Total

15894

63

588

184

104

104

140

140

197

260

507

829

701

1041

1134

997

891

879

951

838

815

887

1130

680

17114

310

57

25

25

63

93

335

705

325

698

827

658

508

423

614

718

532

646

755

233

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
62
0
1161
423

Table A1.31: Mode wise hourly traffic volume at Chinchwad crossing station on Chinchwad Chowk road towards
Dangre Chowk to Chinchwad road

9.00 to 10.00

8.00 to 9.00

Hour of the
day

99

Hour of the
day

Table A1.32: Mode wise hourly traffic volume at Chinchwad crossing station on Chinchwad Chowk road towards
Chinchwad road to Dangre Chowk

10.00 to 11.00

9.00 to 10.00

485

703

652

441

90

87

116

55

57

56

16

19

106

143

142

152

125

140

116

156

252

147

113

311

10

20

12

12

14

10

14

13

19

17

28

90

46

74

53

112

86

25

35

89

30

15

17

21

37

34

44

58

54

70

46

29

31

49

10

14

53

15

16

13

19

82

18

118

81

39

82

27

23

135

126

117

78

182

98

75

123

58

117

157

109

171

152

216

269

466

434

381

1323

1233

1428

1011

1038

970

868

1136

848

1387

1025

1088

20

67

95

260

506

493

1862

1269

1180

797

528

952

971

1094

988

1300

1134

1074

3 Axle
Truck

11.00 to 12.00
527
81
3
0
62

2 Axle
Truck

12.00 to 13.00
562
83
7
0

74

30

LCV

13.00 to 14.00
455
107
3
0

20

10

Other
Bus

14.00 to 15.00
528
130
6
0

21

39

15.00 to 16.00
797
107
1

17

49

16.00 to 17.00
1180
85
0

17.00 to 18.00
1269
63

19

18.00 to 19.00
1390
60

119

11

19.00 to 20.00
310
0

71

304

20.00 to 21.00
295
0

43

21.00 to 22.00
31
0

32

14

22.00 to 23.00
260
16

68

23.00 to 00.00
95
7

30

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
14
32
471

00.00 to 1.00
67
7

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
7
0
83
0
1110
1089

1.00 to 2.00
20

8.00 to 9.00

2.00 to 3.00
16

26

152

3.00 to 4.00

223

218

251

26

30

78

5
0

6
1

7
14

23
14

0
0

19

0
0

3
1

2
6

6
20

16
26

14

26

0
0

31

0
1

27
6

26
54

205

5.00 to 6.00
95

4.00 to 5.00
6.00 to 7.00

18994

17310

7.00 to 8.00

Total

100

247

369

539

415

464

239

222

390

348

380

357

185

195

155

130

10

14

14

14

31

40

82

244

439

465

567

445

354

418

387

438

400

462

245

415

392

226

92

45

15

34

40

39

259

507

9.00 to 10.00

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

22.00 to 23.00

23.00 to 00.00

00.00 to 1.00

1.00 to 2.00

2.00 to 3.00

3.00 to 4.00

4.00 to 5.00

5.00 to 6.00

6.00 to 7.00

7.00 to 8.00

8.00 to 9.00

26

18

16

33

54

24

16

18

19

23

77

59

48

40

32

28

108

91

202

267

222

205

332

293

253

284

414

480

637

552

797

447

279

24

11

14

21

11

12

31

27

15

12

38

22

19

18

20

14

12

16

18

30

11

42

26

18

20

16

10

15

11

12

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
189
207
0
0
199
12
24
0

11

14

25

21

14

11

10

13

38

40

35

22

22

10

12

10

27

23

24

19

10

14

51

31

31

62

41

45

83

84

137

132

136

96

30

26

22
20

LCV

Other
Bus

10

12

18

12

34

23

40

26

40

38

61

32

56

17

2 Axle
Truck

3 Axle
Truck

MAV Tractor

37

24

14

10

10

13

19

25

34

11

11

57

40

35

54

12

Total

21958

769

549

246

257

173

127

268

264

556

775

1002

702

1399

1298

1200

1181

1307

1293

1919

1682

2087

1374

833

21963

847

505

191

40

34

15

45

92

226

392

1047

741

1352

1264

1206

1215

1240

354

445

567

2077

1455

865

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
4
0
700
685

Table A1.33: Mode wise hourly traffic volume at Mathre bridge station on Mathre bridge road towards Karvenagar to Mathre bridge

Hour of the
day

101

Table A1.34: Mode wise hourly traffic volume at Mathre bridge station on Mathre bridge road towards Mathre bridge to Karvenagar

17.00 to 18.00

16.00 to 17.00

15.00 to 16.00

14.00 to 15.00

13.00 to 14.00

12.00 to 13.00

11.00 to 12.00

10.00 to 11.00

9.00 to 10.00

8.00 to 9.00

905

931

980

1535

1487

1232

1096

1042

1110

734

732

764

181

335

234

258

286

229

222

395

358

339

198

167

367

313

304

440

221

190

145

179

143

262

676

247

228

11

12

24

15

10

142

21

14

30

18

11

31

10

10

16

18

30

23

17

Other
Bus

10

14

178

120

97

97

79

75

95

86

144

114

172

16

16

LCV

11

13

10

12

2 Axle
Truck

3 Axle
Truck

10

10

115

128

110

75

42

46

47

90

90

119

277

13

279

485

609

820

1367

1580

1570

1268

1486

1424

1281

1167

1581

1955

1408

928

100

187

230

286

442

905

931

980

1535

1487

1232

1096

1962

2414

1559

1232

Hour of the
day

18.00 to 19.00
193
14
306

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
887
1172

19.00 to 20.00
442
171
5
271

2.00 to 3.00
26

33
11

10

102

73

62

30

33

12

10

17

10

29

11

87

66

15

11

53

38

21904

719

408

181

157

90

103

26511

540

291

149

132

81

88

40

20.00 to 21.00
286
68
2

158

3.00 to 4.00
28

200

15

21.00 to 22.00
230
43
3

78

4.00 to 5.00
28

22

22.00 to 23.00
187
6
4

5.00 to 6.00
26

88

23.00 to 00.00
100
3

6.00 to 7.00
43

00.00 to 1.00
40

153

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
16
1

1.00 to 2.00

7.00 to 8.00

Total

102

138

166

154

173

184

184

120

23

45

27

17

13

70

60

17

26

20

25

40

68

103

132

156

569

756

642

592

780

733

790

724

835

680

530

380

495

375

235

265

295

181

172

126

183

190

250

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

22.00 to 23.00

23.00 to 00.00

00.00 to 1.00

1.00 to 2.00

2.00 to 3.00

3.00 to 4.00

4.00 to 5.00

5.00 to 6.00

6.00 to 7.00

7.00 to 8.00

34

57

24

32

46

63

30

80

78

103

72

95

121

106

130

139

113

77

84

35

41

90

221

302

410

890

880

770

419

589

584

556

277

587

482

510

213

12

21

16

11

12

15

20

20

16

12

22

44

34

21

20

24

15

18

14

11

16

22

25

21

29

12

17

19

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
341
126
29
0
168
12
21
13

12

53

61

18

22

14

12

10

12

14

11

11

13

15

12

17

20

19

16

11

12

20

42

29

18

16

18

21

26

26

26

23

12
17

LCV

Other
Bus

13

14

13

14

13

12

20

19

10

12

34

18

24

71

44

41

73

71

43

12

2 Axle
Truck

13

15

13

11

11

10

12

15

12

3 Axle
Truck

MAV Tractor

42

25

14

24

11

19

31

31

82

36

36

37

299

214

328

305

319

245

289

296

218

Total

26628

638

567

506

350

417

239

319

429

689

1143

1376

1347

1495

1559

1537

1406

1697

1832

1507

1634

1745

1983

1350

28168

661

561

486

345

380

277

295

265

235

375

495

380

530

1663

1789

1670

1992

1996

1759

1777

1813

2026

1371

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
5
112
0
864
881

Table A1.35: Mode wise hourly traffic volume at Pimple nilakh junction station on Chest hospital road towards
Dangre Chowk to Shivajinagar

9.00 to 10.00

8.00 to 9.00

Hour of the
day

103

Hour of the
day

Table A1.36: Mode wise hourly traffic volume at Pimple nilakh junction station on Chest hospital road towards
Shivajinagar to Dangre Chowk

47

75

440

475

575

550

560

510

13

12

11

27

35

31

30

40

28

10

10

15

19

25

27

33

24

14

21

22

30

34

19

20

16

12

19

10

12

39

170

145

23

52

47

39

110

80

120

184

1701

1794

1541

1595

1451

1218

1141

1453

1355

1284

1452

1566

1300

1665

1446

560

920

1416

1182

1886

1506

1371

1597

1719

3 Axle
Truck

117
46
0
480

34

11

2 Axle
Truck

70
39
0

20

44

LCV

719
63
37
0

27

23

Other
Bus

690
65
35

37

9.00 to 10.00
540
70
29

18

28

11

41

28

10.00 to 11.00
625
53
3

16

35

12

48

11.00 to 12.00
1190
25
470
0

62

68

18

12.00 to 13.00
502
0
630
0

67

458

861

13.00 to 14.00
740
84
1
520

11

85

622

1108

234

14.00 to 15.00
78
84
0
640

44

15.00 to 16.00
920
117
116
0
650

95

16.00 to 17.00
560
78
106
0

90

17.00 to 18.00
440
56
53

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
36
2
542

18.00 to 19.00
655
53

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
0
0
88
0
1272
1196

19.00 to 20.00
279

11

13

8.00 to 9.00

20.00 to 21.00

16

17

368

15

500

222

18

304

302

20

386

36

37

225

40

31

259

16

11

22

10

19

508

12

25

11

262

10

11

19

12

13

233

38
0

111

24
15

205

21
16
10

65

51

37
20

63

23.00 to 00.00
36
4

10

123

00.00 to 1.00
37
7

12

21.00 to 22.00

1.00 to 2.00
36

14

22.00 to 23.00

2.00 to 3.00

20

39

496

763

570

11

33

912

18

51

670

925

13

33

142

13

13

106

16

18

18

19

25

25

13

33

26

18

12

46

12

225

13

20

10

202

40

40

23

18

39

19

30

269

3.00 to 4.00
70

19

413

5.00 to 6.00
108

44

4.00 to 5.00
6.00 to 7.00

35

24160

159

25239

7.00 to 8.00

Total

104

63

106

48

46

16

19

14

10

20

46

45

13

39

63

1046

1068

1116

859

699

207

173

118

98

37

37

46

536

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

22.00 to 23.00

23.00 to 00.00

00.00 to 1.00

1.00 to 2.00

2.00 to 3.00

3.00 to 4.00

4.00 to 5.00

5.00 to 6.00

6.00 to 7.00

7.00 to 8.00

930

15.00 to 16.00

17.00 to 18.00

64

1174

14.00 to 15.00

75

39

880

13.00 to 14.00

47

41

632

12.00 to 13.00

739

28

670

11.00 to 12.00

1150

50

33

1220

10.00 to 11.00

16.00 to 17.00

35

1460

21

85

17

40

16

10

13

10

83

162

258

160

121

64

14

11

14

21

30

45

53

63

55

27

37

18

306

287

182

160

157

155

65

95

188

252

670

747

1168

1377

1589

1260

869

777

594

572

583

603

616

19

14

18

19

20

33

42

26

26

22

19

13

12

14

52

11

35

10

45

68

72

88

64

42

57

69

77

71

82

84

26

12

12

18

23

44

21

11

17

15

34

43

50

40

24

33

17

18

23

32

46

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
1270
49
15
0
609
12
65
41

17

31

19

29

42

34

17

23

13

16

35

30

49

23

28

15

16

12

14

17

24

43

52

73

91

143

57

78

29

59

53

42

108

21
16

LCV

Other
Bus

103

24

27

24

35

32

69

41

53

42

74

106

91

99

131

171

157

140

109

76

111

109

72

133

2 Axle
Truck

103

19

18

22

36

35

42

29

27

39

60

35

29

50

100

136

111

89

29

42

78

46

75

22

3 Axle
Truck

13

22

26

23

26

36

18

16

13

11

74

18

15

21

19

31

24

25

25

33

28

14

17

15

MAV Tractor

15

11

14

14

17

13

16

23

26

22

17

17

11

Total

47477

1375

1188

651

721

715

805

669

598

689

1238

1971

2361

3144

3815

4232

3810

3197

2793

2159

1821

2095

2367

2520

40066

723

1081

392

419

403

465

118

173

545

1184

1863

2283

2855

3193

3570

2841

2557

2521

1931

1580

1701

2273

2516

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
6
10
0
2545
2376

Table A1.37: Mode wise hourly traffic volume at Kasarwadi station on Kasarwadi road towards Nashik Phata to Pune

9.00 to 10.00

8.00 to 9.00

Hour of the
day

105

17.00 to 18.00

16.00 to 17.00

15.00 to 16.00

14.00 to 15.00

13.00 to 14.00

12.00 to 13.00

11.00 to 12.00

10.00 to 11.00

9.00 to 10.00

8.00 to 9.00

858

1140

1008

1258

1045

1029

1019

889

871

909

921

961

66

36

28

70

131

140

123

114

71

109

116

108

130

156

29

33

49

48

27

22

29

27

11

15

13

29

47

13

40

50

44

69

85

49

88

58

252

74

47

16

49

46

37

32

235

310

1173

1167

1011

828

625

317

358

333

275

336

274

138

99

16

28

19

15

15

11

12

11

12

12

23

49

46

48

37

37

37

52

45

63

43

49

33

110

15

10

10

34

20

15

35

20

22

19

41

18

20

22

14

16

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
217
21

17

11

39

23

55

24

16

16

18

18

15

74

Other
Bus

16

18

18

37

29

23

23

22

19

25

31

21

47

18

22

47

LCV

45

62

146

62

94

38

39

44

46

47

53

15

17

21

42

19

38

57

2 Axle
Truck

39

21

54

21

30

29

12

11

14

34

3 Axle
Truck

22

16

19

14

23

22

14

21

25

494

884

823

1722

2363

2426

2394

2086

1967

1561

1566

1677

1273

1476

1163

1483

134

488

740

1536

901

858

1140

1008

1258

1045

1029

1019

889

871

909

921

Table A1.38: Mode wise hourly traffic volume at Kasarwadi station on Kasarwadi road towards Pune to Nashik Phata

18.00 to 19.00
901
22
7

Hour of the
day

19.00 to 20.00
796
3
15

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
961
2312

20.00 to 21.00
335
9

2.00 to 3.00
119

231
10

12

13

11

14

13

12

11

336

110

128

30

49

41

13

20

15

17

21

40

24

15

13

15

14

13

21

15

14

18

34

12

17

20

18

18

33

19

34

39

88

95

26

15

43

43

88

13

67

18

19

34184

1651

1145

884

591

748

911

34309

2065

1465

921

177

404

231

129

21.00 to 22.00
199
7

3.00 to 4.00
177

14

14

31

22.00 to 23.00
134

4.00 to 5.00
600

24

27

23.00 to 00.00
129

5.00 to 6.00
1154

32

00.00 to 1.00

587

6.00 to 7.00

1440

1.00 to 2.00

7.00 to 8.00

Total

106

51

55

27

24

33

27

18

59

79

49

27

15

36

37

44

415

377

653

488

526

310

266

639

774

649

297

162

148

76

17

38

25

17

45

202

315

291

9.00 to 10.00

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

22.00 to 23.00

23.00 to 00.00

00.00 to 1.00

1.00 to 2.00

2.00 to 3.00

3.00 to 4.00

4.00 to 5.00

5.00 to 6.00

6.00 to 7.00

7.00 to 8.00

8.00 to 9.00

27

54

59

23

14

14

20

25

69

57

51

46

37

28

57

35

27

22

22

29

25

15

37

11

14

10

28

42

590

80

47

43

39

70

33

44

47

86

121

176

315

273

455

431

281

362

512

549

734

432

407

16

13

11

17

17

14

12

15

22

12

13

17

18

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
524
76
51
23
541
36
14
18

13

11

11

26

40

10

13

10

11

10

15

10

14

18

44

48

56

22

13

23

19

17

30

22

22

19

20

35

54

55

19

33

78

52

24

42

20

93
24

LCV

Other
Bus

46

118

74

87

73

90

63

45

73

47

76

88

172

167

189

165

209

203

231

230

206

79

80

37

2 Axle
Truck

85

34

21

30

31

29

20

20

20

24

26

24

16

21

18

14

12

16

23

25

28

53

21

3 Axle
Truck

11

MAV Tractor

53

17

51

124

30

10

23

10

Total

28243

1450

1128

848

596

544

579

491

249

427

497

627

819

1303

1588

1957

1758

1436

1443

1801

2021

2097

1345

1508

21137

1166

781

535

283

227

267

220

116

191

295

420

538

935

1361

1798

1509

936

1042

1440

1497

1778

1128

1204

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
3
7
0
1735
1470

Table A1.39: Mode wise hourly traffic volume at Westerly bye pass station on Mutha river road towards Satara road to Mumbai road

Hour of the
day

107

17.00 to 18.00

16.00 to 17.00

15.00 to 16.00

14.00 to 15.00

13.00 to 14.00

12.00 to 13.00

11.00 to 12.00

10.00 to 11.00

9.00 to 10.00

8.00 to 9.00

365

316

463

499

430

468

469

527

569

495

444

397

43

30

21

23

37

30

28

58

50

41

44

42

21

14

29

30

18

22

41

18

53

75

82

26

33

10

21

17

15

18

22

85

79

109

141

186

188

275

233

396

421

583

490

520

420

405

13

19

15

12

10

20

30

13

11

13

16

29

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
0
28

17

17

59

13

24

32

13

10

16

26

19

Other
Bus

23

29

17

19

29

69

84

67

111

102

104

86

64

165

193

101

88

58

LCV

104

67

71

95

88

151

198

172

140

213

273

292

268

447

330

154

116

82

2 Axle
Truck

60

45

25

35

18

36

57

46

18

25

41

38

28

48

44

109

82

89

3 Axle
Truck

11

13

13

12

16

13

20

41

38

13

19

20

21

13

15

43

18

35

47

632

714

724

630

1012

1461

1341

1364

1816

1907

2059

1899

3065

2597

2259

2068

324

355

410

413

592

938

880

1018

1265

1234

1413

1359

1975

1762

1601

1447

Table A1.40: Mode wise hourly traffic volume at Westerly bye pass station on Mutha river road towards Mumbai road to Satara road

18.00 to 19.00
15
6
0

67

31
5

13

14

26

20

207

173

60

12

14

30

47

27

22

19

17

26

60

110

111

112

85

108

72

75

80

55

48

75

25

18

13

10

10

11

31

18

33086

748

760

771

1033

825

794

21154

409

350

375

614

440

341

306

Hour of the
day

19.00 to 20.00
191
38
0
0

59

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
1874
1333

20.00 to 21.00
141
52
22

32

2.00 to 3.00
35
51

21.00 to 22.00
86
28
9

3.00 to 4.00
68

35

47

22.00 to 23.00
55
30
11

4.00 to 5.00
77

22

16

23.00 to 00.00
56
1

5.00 to 6.00
83

40

00.00 to 1.00
40

735

6.00 to 7.00
149

32

1.00 to 2.00

7.00 to 8.00

Total

108

93

204

191

5.00 to 6.00

6.00 to 7.00

7.00 to 8.00

88

23.00 to 00.00

266

22.00 to 23.00

4.00 to 5.00

475

21.00 to 22.00

49

535

20.00 to 21.00

993

19.00 to 20.00

3.00 to 4.00

728

18.00 to 19.00

38

999

17.00 to 18.00

656

16.00 to 17.00

2.00 to 3.00

636

15.00 to 16.00

30

783

14.00 to 15.00

174

515

13.00 to 14.00

452

12.00 to 13.00

385

11.00 to 12.00

1.00 to 2.00

587

10.00 to 11.00

00.00 to 1.00

608

28

75

85

183

86

54

25

33

37

57

121

170

222

307

556

290

401

556

430

323

361

386

391

266

214

23

17

11

11

11

18

37

25

15

24

10

11

12

14

15

29

34

20

11

19

43

62

73

75

83

89

92

79

82

59

62

51

76

28

15

19

16

10

16

21

38

10

20

13

17

25

23

19

16

26

30

19

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
0
619
0
72
203
18
19
11

13

12

11

14

17

26

11

11

11

10

15

24

38

28

17

11

11

17

23

53

54

59

39

49

56

95

90

95

89

103

112

3
12

LCV

Other
Bus

21

21

19

25

12

19

21

15

12

2 Axle
Truck

23

3 Axle
Truck

Deccan gymkhana to Navi-peth

MAV Tractor

14

60

69

103

100

75

95

61

65

78

115

58

Total

115
20251

291

496

366

175

83

88

82

250

256

531

831

1033

1813

1299

1704

1515

1340

1396

1156

1106

1085

1292

1160

23666

661

460

201

90

114

106

253

329

657

978

1270

1945

1503

1818

1708

1544

1548

1407

1342

1319

1561

1340

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
16
0
1220
1079

Table A1.41: Mode wise hourly traffic volume at Sambhaji bridge station on Sambhaji bridge road towards

9.00 to 10.00

8.00 to 9.00

Hour of the
day

109

Table A1.42: Mode wise hourly traffic volume at Sambhaji bridge station on Sambhaji bridge road towards

22.00 to 23.00

21.00 to 22.00

20.00 to 21.00

19.00 to 20.00

18.00 to 19.00

17.00 to 18.00

16.00 to 17.00

15.00 to 16.00

14.00 to 15.00

13.00 to 14.00

12.00 to 13.00

11.00 to 12.00

10.00 to 11.00

9.00 to 10.00

8.00 to 9.00

75

82

136

190

277

358

334

350

372

327

345

287

356

289

319

305

330

338

227

40

22

42

32

33

29

41

30

45

38

22

14

17

16

12

21

19

14

16

22

59

42

62

111

154

262

320

361

558

439

336

356

332

446

537

465

467

412

453

447

11

10

36

40

36

18

43

29

29

23

38

35

38

46

59

34

30

16

30

35

36

41

52

58

49

50

50

54

62

41

21

20

17

10

15

18

22

17

25

25

13

17

11

11

13

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
22
14

21

16

17

32

38

15

52

43

32

24

33

32

38

52

42

38

Other
Bus

33

31

13

10

13

19

20

11

13

18

18

12

20

15

17

20

35

LCV

16

10

2 Axle
Truck

3 Axle
Truck

20

18

21

26

21

29

11

21

890

815

537

257

133

105

130

253

376

634

924

1025

1341

1112

1269

1215

1075

1212

1347

1289

1353

1300

1235

707

627

396

213

133

118

145

260

369

593

794

844

1102

967

937

919

807

981

1049

1017

1036

987

994

Navi-peth to Deccan gymkhana

23.00 to 00.00
0
66

83

16

38

40

Hour of the
day

00.00 to 1.00
0

163

26

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
1133
893

1.00 to 2.00
0

242

40

2.00 to 3.00
95

28

27

3.00 to 4.00
0

141

251

4.00 to 5.00
0

231

5.00 to 6.00
0

6.00 to 7.00

295

16888

20956

7.00 to 8.00

Total

110

18

46

66

111

54

116

150

5.00 to 6.00

6.00 to 7.00

7.00 to 8.00

170

352

23.00 to 00.00

73

137

397

22.00 to 23.00

4.00 to 5.00

137

457

21.00 to 22.00

147

700

20.00 to 21.00

211

182

710

19.00 to 20.00

3.00 to 4.00

210

785

18.00 to 19.00

29

229

820

17.00 to 18.00

260

203

790

16.00 to 17.00

2.00 to 3.00

234

540

15.00 to 16.00

145

178

635

14.00 to 15.00

106

200

895

13.00 to 14.00

303

220

975

12.00 to 13.00

240

212

883

11.00 to 12.00

1.00 to 2.00

247

793

10.00 to 11.00

00.00 to 1.00

188

345

20

10

14

11

11

18

13

14

12

22

20

14

32

16

10

14

15

12

25

27

27

43

29

30

34

28

92

85

94

96

98

74

150

727

507

599

534

308

443

527

524

465

389

424

388

485

590

496

428

11

10

23

11

10

14

14

13

10

11

25

25

16

16

18

18

23

21

23

16

23

16

27

20

15

10

12

16

11

17

10

12

17

18

26

22

26

19

34

18

23

27

18

13

14

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
574
253
20
39
620
16
48
52

30

34

22

25

22

13

10

30

20

23

17

11

19

10

16

11

18

28

11

10

18

51

18

21

14

11

24

14

16

12

19

23

31

52

54

49

46

41

39

51

45

68

66

41
24

LCV

Other
Bus

55

78

64

68

51

70

69

68

109

74

80

29

36

29

25

22

20

34

54

51

29

22

44

105

2 Axle
Truck

31

26

33

47

34

45

33

52

71

53

43

33

33

43

40

38

59

38

42

44

45

39

31

74

3 Axle
Truck

Ahmednagar road to Mumbai road

20

13

18

32

55

19

19

11

15

31

24

23

35

25

27

41

56

42

50

32

11

27

MAV Tractor

35

26

25

27

31

80

109

61

49

45

64

55

48

102

63

Total

16

650
31685

1010

512

363

399

490

559

663

1389

1311

1395

1402

1362

1590

1824

1920

1755

1480

1543

1883

2047

2001

1918

1221

35151

883

641

773

732

835

843

1596

1632

1589

1586

1313

1591

1756

1852

1685

1597

1625

1941

2035

1961

1876

1305

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
73
0
2494
2008

Table A1.43: Mode wise hourly traffic volume at Sangam bridge station on Sangam bridge road towards

9.00 to 10.00

8.00 to 9.00

Hour of the
day

111

17.00 to 18.00

16.00 to 17.00

15.00 to 16.00

14.00 to 15.00

13.00 to 14.00

12.00 to 13.00

11.00 to 12.00

10.00 to 11.00

9.00 to 10.00

8.00 to 9.00

1313

1202

1125

1001

1036

879

1022

1009

1038

950

880

820

133

272

248

237

318

250

190

201

255

193

265

195

168

223

10

12

95

292

696

780

400

920

1490

1240

920

935

915

607

785

676

855

890

683

242

15

19

19

14

10

15

12

16

22

17

28

17

25

19

28

22

34

16

21

35

20

24

16

27

20

37

17

11

13

23

24

19

18

21

22

25

22

18

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
23
26

16

34

24

38

15

19

17

21

16

15

11

13

10

12

Other
Bus

20

21

37

63

74

34

64

51

35

28

24

26

39

19

33

19

LCV

42

79

98

130

150

76

75

53

53

67

67

94

87

90

105

82

86

32

2 Axle
Truck

19

73

61

91

119

29

17

13

34

16

14

25

24

28

34

21

21

29

3 Axle
Truck

59

43

57

94

13

18

17

10

13

10

11

12

11

1306

1978

2348

2543

2323

2998

2505

2405

2230

2154

1806

2089

2016

2360

2143

1859

961

1516

1915

1930

2488

3282

2851

2605

2396

2349

1894

2265

2116

2431

2254

1939

Table A1.44: Mode wise hourly traffic volume at Sangam bridge station on Sangam bridge road towards Mumbai road to Ahmednagar

18.00 to 19.00
1066
82
0

22
10

82

136

214

112

88

12

17

26

20

21

12

15

17

14

12

14

24

20

26

11

18

12

110

79

88

76

23

29

108

38

49

38

54

15

17

12

27

17

41171

1054

814

914

780

394

347

39508

562

492

466

471

265

199

405

Hour of the
day

19.00 to 20.00
868
42
3

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
1333
1456

20.00 to 21.00
664
31

2.00 to 3.00
59
15

21.00 to 22.00
431
25

3.00 to 4.00
67

27

22.00 to 23.00
371

4.00 to 5.00
52

68

23.00 to 00.00
195

5.00 to 6.00
119

40

00.00 to 1.00

472

6.00 to 7.00
194

14

1.00 to 2.00

7.00 to 8.00

Total

112

68

96

123

96

121

122

111

134

149

117

190

179

159

79

69

32

26

36

86

124

495

649

575

669

748

796

629

747

768

589

991

701

420

353

278

183

112

67

46

25

21

75

139

9.00 to 10.00

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

22.00 to 23.00

23.00 to 00.00

00.00 to 1.00

1.00 to 2.00

2.00 to 3.00

3.00 to 4.00

4.00 to 5.00

5.00 to 6.00

6.00 to 7.00

7.00 to 8.00

8.00 to 9.00

118

63

19

18

29

31

29

53

74

87

95

62

96

71

114

87

73

103

88

77

68

66

69

55

13

10

14

28

33

26

44

30

46

32

44

42

43

42

51

41

25

29

62

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
166
70
0
0
59
8
33
0

13

15

13

12

16

15

13
15

LCV

Other
Bus

2 Axle
Truck

3 Axle
Truck

MAV Tractor

52

14

14

55

70

131

89

133

104

93

102

127

106

90

163

162

Total

12481

512

240

117

84

104

116

161

289

416

480

649

719

1000

627

856

796

679

806

801

682

587

663

701

16767

500

260

102

86

46

67

175

308

471

583

793

1055

1472

907

1222

1131

959

1176

1144

995

886

1013

878

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
82
0
397
431

Table A1.45: Mode wise hourly traffic volume at Shivaji bridge station on Shivaji bridge road towards Shivajinagar to Shanivar wada

Hour of the
day

113

Table A1.46: Mode wise hourly traffic volume at Shivaji bridge station on Shivaji bridge road towards Shanivar wada to Shivajinagar

17.00 to 18.00

16.00 to 17.00

15.00 to 16.00

14.00 to 15.00

13.00 to 14.00

12.00 to 13.00

11.00 to 12.00

10.00 to 11.00

9.00 to 10.00

8.00 to 9.00

270

215

267

265

330

315

241

215

286

278

235

249

228

190

150

222

237

294

229

197

275

245

112

111

29

38

67

20

60

68

42

25

40

30

109

154

180

152

75

175

146

147

79

44

76

37

15

13

13

10

23

23

35

34

59

43

120

160

145

54

68

98

57

32

42

13

12

28

15

15

30

14

14

10

Other
Bus

10

15

10

14

22

16

28

27

11

LCV

2 Axle
Truck

3 Axle
Truck

11

24

31

65

84

67

57

43

53

14

24

12

32

20

261

299

488

626

764

847

764

977

1211

1274

823

660

808

783

648

456

66

339

494

648

785

855

691

828

935

1030

827

643

652

746

665

457

Hour of the
day

18.00 to 19.00
222
10
0

61

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
415
468

19.00 to 20.00
223
196
9
0

37

46

2.00 to 3.00
24

34
21

31

28

12

117

87

84

23

30

23

80

43

16

10

64

35

19

11

13752

525

384

250

156

115

89

12729

354

362

242

152

104

104

35

20.00 to 21.00
196
176
6

3.00 to 4.00
61

21

30

21.00 to 22.00
127
148
7

11

4.00 to 5.00
68

43

22.00 to 23.00
95
37

50

5.00 to 6.00
107

135

23.00 to 00.00
35

66

6.00 to 7.00
0

00.00 to 1.00

132

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
13
8

1.00 to 2.00

7.00 to 8.00

Total

114

222

179

187

175

144

152

191

209

256

234

272

321

252

820

590

530

615

655

745

640

715

810

920

885

1110

1105

975

920

520

9.00 to 10.00

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

22.00 to 23.00

23.00 to 00.00

00.00 to 1.00

1.00 to 2.00

2.00 to 3.00

3.00 to 4.00

4.00 to 5.00

5.00 to 6.00

6.00 to 7.00

7.00 to 8.00

8.00 to 9.00

350

439

655

606

472

511

440

338

329

287

272

216

247

202

353

14

12

15

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
750
0
0
0
245
1
4
1

16

15

15

15

79

42

53

37

42

64

60

58

58

42

52

67

71

79

42

53

37

42

64

60

58

58

67

71

4
4

LCV

Other
Bus

22

21

22

15

28

18

12

14

10

11

26

25

2 Axle
Truck

15

15

12

11

15

22

16

16

18

21

24

25

22

25

17

25

3 Axle
Truck

10

13

14

12

10

13

11

16

19

MAV Tractor

157

98

76

119

63

97

93

96

104

28

52

70

94

157

98

76

114

63

97

93

96

104

70

Total

22493

291

193

180

169

137

235

209

459

1269

1521

1863

1751

1419

1674

1354

1161

1064

1038

1128

1011

1023

1074

1182

26663

241

153

132

162

105

170

157

676

1520

1827

2265

2181

1787

1996

1661

1418

1319

1322

1322

1218

1168

1244

1380

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
94
0
1091
1239

Table A1.47: Mode wise hourly traffic volume at Wellesley road station on Wellesley road towards Kalyaninagar to Koregaon Park

Hour of the
day

115

Table A1.48: Mode wise hourly traffic volume at Wellesley road station on Wellesley road towards Koregaon park to Kalyaninagar

19.00 to 20.00

18.00 to 19.00

17.00 to 18.00

16.00 to 17.00

15.00 to 16.00

14.00 to 15.00

13.00 to 14.00

12.00 to 13.00

11.00 to 12.00

10.00 to 11.00

9.00 to 10.00

8.00 to 9.00

941

957

934

891

834

757

855

810

665

737

1010

874

876

206

229

225

250

193

132

113

115

169

145

207

141

180

265

342

457

509

570

458

541

347

298

249

219

183

219

241

427

413

427

10

17

96

40

40

20

13

16

13

18

14

12

16

22

22

19

27

Other
Bus

20

28

28

51

74

38

42

39

44

46

20

22

29

LCV

14

18

10

14

17

24

16

19

14

17

2 Axle
Truck

632

814

797

941

957

934

891

834

757

855

810

665

737

1010

874

876

3 Axle
Truck

192

186

206

229

225

250

193

132

113

115

169

145

207

141

180

265

342

457

509

570

458

541

347

298

249

219

183

219

241

427

413

427

10

17

96

40

40

915

1136

1275

1414

1337

1545

1308

1045

962

969

981

969

1095

1530

1341

1251

1578

1701

1897

1840

2026

1680

1386

1250

1336

1333

1244

1429

Hour of the
day

20.00 to 21.00
797
186
0

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
1509
1915

21.00 to 22.00
814
192

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
2
0

22.00 to 23.00
632

19329

25505

1921

1718

23.00 to 00.00

Total

116

77

53

33

37

60

60

54

53

41

103

74

46

74

356

404

432

460

413

393

452

450

446

453

488

336

488

9.00 to 10.00

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

8.00 to 9.00

156

116

156

118

133

125

152

167

194

178

124

189

172

11

15

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
0
0
0
0
0
0
0
0

11

13

43

24

43

58

35

41

43

45

42

28

34

27

29

0
6

LCV

Other
Bus

24

10

24

16

18

10

14

20

25

27

2 Axle
Truck

3 Axle
Truck

MAV Tractor

88

60

88

93

43

62

67

73

66

59

56

53

46

Total

7747

765

512

765

737

668

649

669

691

699

675

532

572

578

9270

902

617

902

867

757

775

804

783

813

809

698

741

704

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
0
0
0
0

Table A1.49: Mode wise hourly traffic volume at Akurdi crossing station on Akurdi crossing road towards Akurdi to Chinchwad

Hour of the
day

117

169

15

12

115

155

310

402

14

11

18

14

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
0
0

Other
Bus

11

12

17

17

13

LCV

12

10

14

2 Axle
Truck

12

11

18

18

3 Axle
Truck

65

65

48

37

44

56

61

188

615

646

551

612

517

573

630

749

1223

791

864

686

749

622

694

761

866

1372

Table A1.50: Mode wise hourly traffic volume at Akurdi crossing station on Akurdi crossing road towards Chinchwad to Akurdi

113
0
5
0

19

Hour of the
day

485
120
10
7

12

60

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
0

8.00 to 9.00
325
167
119
7

11

494

9919

565

9.00 to 10.00
365
7
156
4

12

37

10.00 to 11.00
305
0
16
3

11.00 to 12.00
100
0
80

770

1179
0

12.00 to 13.00
310
109
5
8

943
6

13.00 to 14.00
370
0
6

13

628

14.00 to 15.00
126
82

16

355
11

47

83

15.00 to 16.00
0

109
17

540
77

16.00 to 17.00
5

22

14

104

22

480

15

17.00 to 18.00

13

10

17

12

128

139

695

14

395

166

18.00 to 19.00

119

19.00 to 20.00
87

14

19

74

302

20.00 to 21.00

8181

Total

118

124

162

169

165

175

165

255

215

240

217

207

227

160

145

310

275

350

329

350

350

335

375

545

555

295

115

9.00 to 10.00

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

8.00 to 9.00

153

207

241

319

145

113

107

99

95

93

107

118

205

15

15

27

14

13

21

17

17

14

18

11

15

17

19

12

27

12

14

20

11

15

13

13

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
255
95
0
0
207
9
16
18

12

13

12

16

11

15

14

21

25

36

36

17

21

21

11

57

5
11

LCV

Other
Bus

18

12

20

16

25

28

31

43

24

26

30

12

49

2 Axle
Truck

3 Axle
Truck

MAV Tractor

91

85

117

151

63

70

78

62

66

69

76

113

87

Total

10676

699

794

947

1096

824

767

794

767

616

674

653

622

547

11809

629

890

1192

1320

917

831

886

792

729

761

710

760

606

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
74
0
879
786

Table A1.51: Mode wise hourly traffic volume at Dangre pool station on Causeway road towards Kumbarwada to Kamagar road

Hour of the
day

119

Table A1.52: Mode wise hourly traffic volume at Dangre pool station on Causeway road towards Kamagar road to Kumbarwada

12.00 to 13.00

11.00 to 12.00

10.00 to 11.00

9.00 to 10.00

8.00 to 9.00

370

330

380

490

580

282

100

298

294

215

266

307

314

123

75

112

156

115

95

92

97

90

120

120

217

210

140

29

33

40

33

36

36

35

39

34

35

30

21

16

16

11

Other
Bus

46

25

25

22

30

21

27

27

21

11

24

LCV

10

2 Axle
Truck

3 Axle
Truck

11

67

106

90

82

75

82

60

107

91

155

115

447

528

535

1113

765

659

670

809

666

817

877

1045

666

424

574

599

1413

860

755

749

933

769

958

1087

1340

786

Hour of the
day

13.00 to 14.00
215
275
0
0

31

18

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
559
532

14.00 to 15.00
237
285
0

1
0

15.00 to 16.00
285
151

260
97

31

130

16.00 to 17.00
780
0

17.00 to 18.00
214
0
88

18.00 to 19.00
192
0

19.00 to 20.00
220
0

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
31
5

20.00 to 21.00
150

11779

117

10155

21.00 to 22.00

Total

120

779

855

1054

440

346

320

268

376

477

470

430

480

363

2065

1510

1030

512

420

365

460

750

940

870

730

375

341

9.00 to 10.00

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

8.00 to 9.00

355

470

360

630

720

369

500

380

350

460

440

1190

1070

15

10

12

12

10

13

11

16

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
1047
624
0
5
849
16
12
15

11

10

13

10

15

15

10

10

12

19

10

18

12

14

14

10

11

24

11
12

LCV

Other
Bus

14

16

13

15

12

10

14

14

2 Axle
Truck

10

3 Axle
Truck

MAV Tractor

36

42

68

77

71

76

57

44

41

60

64

76

73

Total

22436

973

1198

1228

1660

1767

1259

1119

1025

980

1256

1985

2839

2965

28536

1144

1416

1636

2112

2264

1634

1337

1175

1203

1529

2643

3691

4060

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
69
0
2185
2692

Table A1.53: Mode wise hourly traffic volume at Dhagdi pool station on Dhagdi pool road towards Nana Chowk to Ambedkar road

Hour of the
day

121

Table A1.54: Mode wise hourly traffic volume at Dhagdi pool station on Dhagdi pool road towards Ambedkar road to Nana Chowk

12.00 to 13.00

11.00 to 12.00

10.00 to 11.00

9.00 to 10.00

8.00 to 9.00

385

587

763

820

565

270

240

448

435

418

405

580

470

435

485

330

15

548

540

408

620

408

340

419

305

378

382

540

23

11

10

12

14

16

10

22

15

Other
Bus

27

34

55

67

51

67

62

24

72

60

39

40

64

LCV

27

31

42

23

34

37

33

34

12

20

20

15

26

2 Axle
Truck

33

30

25

30

39

18

21

11

10

14

16

3 Axle
Truck

11

15

10

16

15

30

25

55

51

62

34

21

41

43

65

24

29

1132

1138

1573

1515

1633

1706

1586

1337

1282

1561

1566

1326

1384

1257

1242

1597

1711

1840

1877

1847

1338

1530

1832

1872

1519

1437

Hour of the
day

13.00 to 14.00
825
595
0

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
581
660

14.00 to 15.00
605
352
3

12

15.00 to 16.00
638
333
250

14

16.00 to 17.00
639
0

17.00 to 18.00
520
0
432

18.00 to 19.00
345
0

19.00 to 20.00
498
0

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
0
0

20.00 to 21.00
428

21559

316

19317

21.00 to 22.00

Total

122

606

93

160

143

230

184

61

64

84

109

66

480

489

475

362

460

429

457

522

516

458

396

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

103

170

185

140

169

135

201

147

262

230

161

16

12

21

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
0
0
0
0
0
0
0
0

54

94

108

107

84

69

59

39

76

72

44

0
0

LCV

Other
Bus

65

91

114

131

119

145

119

122

141

205

55

2 Axle
Truck

49

69

73

64

28

72

79

110

134

83

50

3 Axle
Truck

10

16

MAV Tractor

48

71

87

90

85

67

54

36

54

57

47

Total

788
12619

875

1081

1191

1141

1021

1113

1219

983

1336

1277

1469

15316

1293

1450

1413

1191

1388

1431

1328

1777

1758

1411

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
0
0
0
0

Table A1.55: Mode wise hourly traffic volume at Ghorpadi Mundwa road station on Ghorpadi Mundwa road towards
Hadapsar to Nagar road

9.00 to 10.00

8.00 to 9.00

Hour of the
day

123

Hour of the
day

Table A1.56: Mode wise hourly traffic volume at Ghorpadi Mundwa road station on Ghorpadi Mundwa road towards
Nagar road to Hadapsar

121

102

275

21

22

10

14

12

13

59

38

88

75

57

35

91

79

104

91

115

110

12

18

11

15

41

19

11

76

80

80

66

54

79

79

98

69

1092

1302

990

933

895

859

1255

1102

1070

1043

892

1076

1122

907

832

715

738

1147

971

911

849

3 Axle
Truck

0
0
183
14

91

994

2 Axle
Truck

0
0
131

16

LCV

0
0
0
106

107

16

43

Other
Bus

72
0
0

47

90

41

0
70
0
0

66

128

19

243
41
0

41

85

9.00 to 10.00
412
64
0

15

50

24

10.00 to 11.00
493
29
18

72

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
0
0

11.00 to 12.00
572
26
100
15

65

12.00 to 13.00
349
0
145

23

13.00 to 14.00
312
0
0
261

16

14.00 to 15.00
16
0
0
245

15.00 to 16.00
438
32
0
0

16

16.00 to 17.00
452
36
0
228

17.00 to 18.00
496
22
0

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
0
0
0
0
0
0

18.00 to 19.00
535
0

8.00 to 9.00

19.00 to 20.00
30

10163

405

11535

20.00 to 21.00

Total

124

566

521

412

458

376

286

279

388

435

358

314

246

130

65

1874

2072

2073

1816

2167

1742

1527

2053

2258

2118

1617

1058

498

189

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

22.00 to 23.00

14

18

14

16

14

16

18

24

21

17

21

23

337

700

1297

1678

1577

1788

1743

1541

1737

1593

1714

1641

1731

1840

11

12

20

27

25

26

38

29

37

26

29

35

35

39

11

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
1829
457
0
24
1441
14
54
12

12

15

12

33

33

36

35

27

27

28

33

29

46

38

33

35

15
12

LCV

Other
Bus

10

16

14

15

14

18

15

16

13

14

13

14

2 Axle
Truck

3 Axle
Truck

MAV Tractor

20

22

34

77

59

68

59

49

61

38

46

58

80

68

Total

43584

571

1188

2238

3016

3207

3574

3410

2832

3171

3277

3321

3375

3585

3631

54971

640

1398

2716

3784

4213

4658

4358

3505

3945

4290

4157

4317

4546

4493

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
53
0
3188
3951

Table A1.57: Mode wise hourly traffic volume at Karve road station on Karve road towards Warje to Sambhaji Chowk

9.00 to 10.00

8.00 to 9.00

Hour of the
day

125

Table A1.58: Mode wise hourly traffic volume at Karve road station on Karve road towards Sambhaji Chowk to Warje

13.00 to 14.00

12.00 to 13.00

11.00 to 12.00

10.00 to 11.00

9.00 to 10.00

8.00 to 9.00

1710

1756

1636

1816

2117

2492

2583

1893

468

365

425

555

528

597

575

599

503

518

20

21

38

34

14

20

21

18

37

63

36

80

1481

1812

2174

1869

1988

1852

1741

2026

1894

2095

2196

1588

14

11

13

22

23

33

41

41

35

35

37

30

36

34

28

11

11

14

18

Other
Bus

10

26

38

38

44

45

45

28

32

39

43

47

42

70

57

LCV

10

10

10

10

10

10

11

14

12

10

14

14

2 Axle
Truck

3 Axle
Truck

11

35

67

55

55

58

40

63

42

64

110

71

69

93

702

1236

2411

3472

3823

4012

3441

3470

3471

3350

3796

3842

4246

4367

853

1639

3230

4862

5094

4983

4190

4286

4316

4103

4679

4822

5436

5556

Hour of the
day

14.00 to 15.00
1756
406

14

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
3564
4346

15.00 to 16.00
2125
335
1068

16.00 to 17.00
2695
19
466

92

17.00 to 18.00
2887
0
3

18.00 to 19.00
224
0

290

19.00 to 20.00
1770
198
0

20.00 to 21.00
882
0

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
56
10

21.00 to 22.00
95

62395

414

49201

22.00 to 23.00

Total

126

54

64

45

53

28

27

51

32

26

32

35

43

410

990

881

583

358

220

320

320

360

1005

885

495

9.00 to 10.00

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

8.00 to 9.00

38

17

190

260

240

203

182

226

149

169

145

246

236

250

11

17

13

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
0
0
0
0
0
0
0
0
0

12

15

15

34

22

38

74

50

48

32

16

27

38

67

741

0
1

LCV

Other
Bus

16

27

30

17

27

12

23

32

28

30

28

36

2 Axle
Truck

10

16

13

10

10

3 Axle
Truck

MAV Tractor

70

109

110

46

55

44

20

75

52

60

72

721
9810

Total

1147

1106

741

628

637

489

565

753

998

1196

828

89

11711

877

1355

1489

806

668

721

508

641

941

1315

1496

894

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
0
0
0
0

Table A1.59: Mode wise hourly traffic volume at Nigdi crossing station on Chinchwad Nigdi road towards Nigdi road to Akurdi road

Hour of the
day

127

Table A1.60 Mode wise hourly traffic volume at Nigdi crossing station on Chinchwad Nigdi road towards Akurdi road to Nigdi road
Hour of the
day

Other
Bus
LCV

2 Axle
Truck

14

3 Axle
Truck

70

103

98

108

854

1032

1050

1255

1099

1295

1291

1469

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
0
0

12

52

10

0
101

45

10

0
0

21

0
65

35

0
81

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
0
0
0

3
0

45

239
2

0
0
2

8.00 to 9.00
0
0
0

93
1
0

859
217
1

9.00 to 10.00
0
0

0
3

1066

73
0

866

780
212

10.00 to 11.00
163

76

962

84

30

797

52

61

778
1

60

722
0

11.00 to 12.00
1

12.00 to 13.00
11

14.00 to 15.00

163

14

846

33

663

40

51

52

667
0

13.00 to 14.00
0

540

14

15.00 to 16.00

143

1031

29

853

33

55

64

602

59

647

16.00 to 17.00

146

1195

43

958

56

42

753

38

82

17.00 to 18.00

1397

1210

938

1127

154

38

86

190

47

16

193

15

44

45
25

39

89

67

754

13

730

240

18.00 to 19.00
244

19.00 to 20.00

39

955

806

13816

11199

10

33

245

21

72

519

12

20.00 to 21.00

Total

128

250

200

195

205

240

265

230

320

270

280

195

200

695

1567

1280

625

600

610

430

1260

950

1650

1760

1440

9.00 to 10.00

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

8.00 to 9.00

39

13

21

19

17

401

339

355

320

288

199

225

439

672

393

358

354

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
294
185
0
24
376
4
0
0

210

180

210

210

220

195

160

140

112

100

95

115

49

9
0

LCV

Other
Bus

2 Axle
Truck

3 Axle
Truck

MAV Tractor

113

185

315

195

133

81

60

39

115

187

1863
19660

Total

1918

2087

1634

1791

1165

1173

1285

1442

1480

1616

1300

24598

2364

2659

2810

1945

2221

1174

1321

1424

1627

2028

2354

1618

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
112
0
911
1053

Table A1.61: Mode wise hourly traffic volume at Rajaram Bridge station on Rajaram bridge road towards Swargate to Karve road

Hour of the
day

129

Table A1.62: Mode wise hourly traffic volume at Rajaram Bridge station on Rajaram bridge road towards Karve road to Swargate

12.00 to 13.00

11.00 to 12.00

10.00 to 11.00

9.00 to 10.00

8.00 to 9.00

643

1149

1061

1103

1847

863

381

120

85

90

90

195

125

200

150

15

52

29

36

33

28

18

31

23

35

27

64

89

348

279

249

185

181

149

201

239

268

319

230

119

Other
Bus

38

29

23

44

42

20

17

21

31

34

47

44

16

LCV

2 Axle
Truck

3 Axle
Truck

194

144

220

215

151

90

118

121

54

104

199

195

1371

1709

1621

1324

1006

671

662

992

1057

1097

1649

1053

2077

2829

2748

2093

1554

1002

1035

1613

1605

1671

2640

1546

Hour of the
day

13.00 to 14.00
598
158
0

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
488
694

14.00 to 15.00
1023
140

14697

23107

15.00 to 16.00
1391
110
373

74

16.00 to 17.00
2054
42

17.00 to 18.00
2144
0

18.00 to 19.00
163

19.00 to 20.00
1267

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
0
0

20.00 to 21.00

Total

130

237

182

152

133

122

117

126

156

213

222

159

67

35

422

467

511

404

294

340

357

555

570

466

486

453

370

9.00 to 10.00

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

8.00 to 9.00

12

123

150

128

145

145

129

113

91

126

136

120

124

141

40

10

13

15

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
509
173
0
9
132
13
0
0

10

10

24

16

18

26

0
14

LCV

Other
Bus

road

2 Axle
Truck

3 Axle
Truck

MAV Tractor

39

23

59

39

52

47

37

39

54

61

63

112

42

494
7938

Total

662

554

615

664

629

466

390

441

522

570

600

687

11221

621

779

845

889

996

918

661

595

615

753

867

903

892

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
25
0
644
887

Table A1.63: Mode wise hourly traffic volume at S.M. Joshi bridge station on SM Joshi bridge road towards SM Joshi bridge to Karve

Hour of the
day

131

Table A1.64: Mode wise hourly traffic volume at S.M. Joshi bridge station on SM Joshi bridge road towards Karve road to SM Joshi

92

105

46

71

88

118

232

206

216

55

43

10

Other
Bus

21

16

18

46

29

42

23

34

LCV

2 Axle
Truck

3 Axle
Truck

27

56

161

122

100

59

44

120

260

282

221

49

511

1070

1112

1196

766

420

497

459

1262

1157

1386

408

765

1802

1764

1982

1157

593

698

707

1985

1833

2165

584

Bridge

328

217
0
0

32

Hour of the
day
8.00 to 9.00
354
145
0
0
0

30

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
453
597

9.00 to 10.00
1380
129
133
0

10.00 to 11.00
1100
116
6
125
0

12

67

11.00 to 12.00
344

1272
0
1
185

12.00 to 13.00
141
0
1
0

13.00 to 14.00
356
95
0
156

14.00 to 15.00
297
176
1

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
0
0

15.00 to 16.00
674
0

16.00 to 17.00
208
210

1463
1

17.00 to 18.00
0

205
77

143

1156
1

18.00 to 19.00
10

33

270

178

458

1324

19.00 to 20.00

20.00 to 21.00

783

535

11

17415

11

208

11232

84

430

21.00 to 22.00

Total

132

177

238

275

184

118

144

170

229

254

139

154

132

842

1076

590

584

819

576

455

556

545

590

470

393

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

197

283

9.00 to 10.00

8.00 to 9.00

122

148

109

117

103

95

125

134

122

132

128

112

122

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
239
137
10
11
77
0
0
0

15

1
0

LCV

Other
Bus

11

11

2 Axle
Truck

3 Axle
Truck

MAV Tractor

19

56

37

46

69

39

37

42

52

35

36

45

16

443
8386

Total

561

537

636

618

499

559

686

602

703

904

724

489

12921

669

837

876

969

964

766

886

1122

947

1045

1488

1185

642

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
24
0
428
525

Table A1.65: Mode wise hourly traffic volume at Shinde bridge station on Shinde bridge road towards Shanivar wada to Shinde Bridge

Hour of the
day

133

Table A1.66: Mode wise hourly traffic volume at Shinde bridge station on Shinde bridge road towards Shinde bridge to Shanivar wada

12.00 to 13.00

11.00 to 12.00

10.00 to 11.00

9.00 to 10.00

8.00 to 9.00

1022

884

938

1009

1040

626

229

343

269

211

316

363

296

384

192

78

242

222

199

137

145

122

179

145

158

150

105

47

Other
Bus

12

13

13

10

LCV

12

13

19

16

13

14

2 Axle
Truck

3 Axle
Truck

12

21

36

90

73

47

58

88

83

110

119

112

137

531

685

1056

1225

1198

1004

836

899

873

978

1027

1105

712

876

1130

1718

2028

1919

1599

1255

1463

1277

1487

1608

1712

1086

Hour of the
day

13.00 to 14.00
757
340
0

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
293
442

14.00 to 15.00
1056
233

15.00 to 16.00
1289
213
144

76

16.00 to 17.00
1470
0

17.00 to 18.00
1220
0
120

18.00 to 19.00
133
0

19.00 to 20.00
828
0

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
0
0

20.00 to 21.00
90

19907

651

12588

21.00 to 22.00

Total

134

135

165

118

92

97

104

113

159

165

193

177

309

270

388

515

345

302

470

484

480

494

439

465

555

718

642

10.00 to 11.00

11.00 to 12.00

12.00 to 13.00

13.00 to 14.00

14.00 to 15.00

15.00 to 16.00

16.00 to 17.00

17.00 to 18.00

18.00 to 19.00

19.00 to 20.00

20.00 to 21.00

21.00 to 22.00

120

188

254

177

201

187

215

219

222

228

231

318

400

15

11

22

84

73

56

32

23

50

55

42

28

31

72

77

42

55

75

67

32

19

11

11

17

20

19

29

46

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
286
132
0
0
351
27
75
46

11

23

18

11

24

13

13

13

19

17

12

16

14

15

12

10

18

17

26
15

LCV

Other
Bus

Deccan

12

15

2 Axle
Truck

11

3 Axle
Truck

MAV Tractor

12

82

69

61

61

58

42

76

73

84

64

77

96

Total

14058

885

1378

1227

1085

885

798

879

940

863

675

753

1210

1285

14855

1119

1481

1231

1063

970

970

959

1006

963

768

834

1234

1204

Hourly
Hourly
Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
0
95
0
1196
1053

Table A1.67: Mode wise hourly traffic volume at Shivajinagar bridge station on Shivajinagar bridge road towards Shivajinagar to

9.00 to 10.00

8.00 to 9.00

Hour of the
day

135

Table A1.68: Mode wise hourly traffic volume at Shivajinagar bridge station on Shivajinagar bridge road towards Deccan to

25

103

65

77

45

86

39

PMT/
TwoAuto
Maxi
Car/Jeep/ Mini
ST
Taxi
PCMT
wheeler Rickshaw Cab
Van
Bus
Bus
Bus
55
51

20

12

13

10

12

Other
Bus

16

15

10

23

23

13

LCV

12

26

22

27

23

2 Axle
Truck

3 Axle
Truck

124

103

71

98

123

2654

2658

2361

2781

1883

3164

3385

2987

3416

2379

Shivajinagar

8
86
111

Hour of the
day
348

12
84

3248

Hourly
Hourly
Tractor
MAV Tractor
Bicycle Others Volume in Volume in
Trolley
PCU's
Vehicles
1134
1014

436
9
134

2765

34639

2629

40961

3420

0
658
9

46

43

232

0
0
654
12

102

230

220
0
682

8.00 to 9.00
1430
290
0
530

3238

9.00 to 10.00
2100
0
8

2815

10.00 to 11.00
247
3

1825
0

12

101

11.00 to 12.00
0

215

24

147

82

2530

2150
153

2242

2050
24

12

12.00 to 13.00
630

11

117

13.00 to 14.00
0

12

115

205
155

2000
12

2911

14.00 to 15.00
665

13

2490

13

148

219

65

1930

125

15.00 to 16.00
13

636

17

3051

12

2781

237

17

1300

58

165

16.00 to 17.00

121

17

691

18

282

1540

21

17.00 to 18.00

65

185

2595

21

3623

811

2516

2933

222

67

124

1533

18.00 to 19.00

167

150

0
0

26

783

764

10

366

12

335

12

1030

26

2199

51

65

19.00 to 20.00

736

76

20.00 to 21.00
0

15

279

109

2169

21.00 to 22.00

Total

136

Hourly Traffic Variation Charts of Screen line


stations

137

1500
1400
1300
1200
1100
1000
900
800
700
600
500
400
300
200
100
0
11.00

10.00

9.00

PCU's /Vehicles

Hourly volume in vehicles(NB)

Hourly volume in PCU(NB)

Hourly volume in vehicles(SB)

16.00

15.00

14.00

Hour of the day

19.00

18.00

17.00

13.00

Fig A1.15 Hourly variation of traffic at Akurdi crossing station on Akurdi road

12.00

Hourly volume in PCU(SB)

21.00

20.00

PCU's /Vehicles

4000
3750
3500
3250
3000
2750
2500
2250
2000
1750
1500
1250
1000
750
500
250
0
10.00

11.00

12.00

13.00

14.00

15.00

16.00

5.00

6.00

7.00

8.00

Hourly volume in PCU(SB)

4.00

Hourly volume in vehicles(SB)

19.00

20.00

21.00

22.00

23.00
Hour of the day

3.00

Hourly volume in PCU(NB)

18.00

24.00

1.00

2.00

Hourly volume in vehicles(NB)

17.00

Fig A1.16 Hourly variation of traffic at Bund garden station on Bund garden road

138

9.00

139

12.00

11.00

10.00

9.00

PCU's /Vehicles

Hourly volume in vehicles(NB)

Hourly volume in PCU(NB)

Hourly volume in vehicles(SB)

17.00

16.00

15.00

Hour of the day

21.00

20.00

19.00

18.00

14.00

Fig A1.17 Hourly variation of traffic at Causeway Dangre pool station on Kamagar road

1900
1800
1700
1600
1500
1400
1300
1200
1100
1000
900
800
700
600
500
400
300
200
100
0
13.00

Hourly volume in PCU(SB)

22.00

PCU's /Vehicles

5.00

6.00

7.00

8.00

Hourly volume in PCU(SB)

4.00

Hourly volume in vehicles(SB)

3.00

Hourly volume in PCU(NB)

20.00

21.00

22.00

23.00
Hour of the day

19.00

24.00

1.00

2.00

Hourly volume in vehicles(NB)

18.00

2100
1950
1800
1650

17.00

1500
1350
1200
1050
900
750
600
450
300
150
0
10.00

11.00

12.00

13.00

14.00

15.00

16.00

Fig A1.18 Hourly variation of traffic at Chinchwad station on Chinchwad crossing

140

9.00

141

4500
4250
4000
3750
3500
3250
3000
2750
2500
2250
2000
1750
1500
1250
1000
750
500
250
0
12.00

11.00

10.00

9.00

PCU's /Vehicles

Hourly volume in vehicles(NB)

Hourly volume in PCU(NB)

Hourly volume in vehicles(SB)

17.00

16.00

15.00

Hour of the day

20.00

19.00

18.00

14.00

Fig A1.19 Hourly variation of traffic at Dhagdi pool station on Ghorpadi road

13.00

Hourly volume in PCU(SB)

22.00

21.00

PCU's /Vehicles

1950
1800
1650
1500
1350

Hourly volume in PCU(SB)

Hourly volume in vehicles(SB)


Hourly volume in PCU(NB)

Hourly volume in vehicles(NB)

21.00

1200

20.00

1050

19.00

900

18.00

750

17.00

600

16.00

450

15.00

Hour of the day

14.00

300

13.00

150
0
10.00

11.00

12.00

Fig A1.20 Hourly variation of traffic at Mula Mutha River crossing on Ghorpadi Mundwa road

142

9.00

143

6000
5700
5400
5100
4800
4500
4200
3900
3600
3300
3000
2700
2400
2100
1800
1500
1200
900
600
300
0
12.00

11.00

10.00

9.00

PCU's /Vehicles

Hourly volume in vehicles(NB)

Hourly volume in PCU(NB)

Hourly volume in vehicles(SB)

17.00

16.00

15.00

Hour of the day

21.00

20.00

19.00

18.00

14.00

Fig A1.21 Hourly variation of traffic at Law college road junction on Karve road

13.00

Hourly volume in PCU(SB)

23.00

22.00

PCU's /Vehicles

Hourly volume in PCU(SB)

Hourly volume in vehicles(SB)

8.00

Hourly volume in PCU(NB)

7.00

Hourly volume in vehicles(NB)

6.00

2600

5.00

2400

4.00

2200

3.00

2000

2.00

1800

1.00

1600

24.00

1400

23.00

1200

22.00

1000

21.00

800

20.00

600

19.00

Hour of the day

18.00

400

10.00

11.00

12.00

13.00

14.00

15.00

16.00

Fig A1.22 Hourly variation of traffic at Mathre Bridge on Eradhawane road

144

17.00

200
0
9.00

145

PCU's /Vehicles

200

400

600

800

1000

1200

1400

1600

11.00

10.00

9.00

Hourly volume in vehicles(NB)

Hourly volume in PCU(NB)

Hourly volume in vehicles(SB)

16.00

15.00

14.00

Hour of the day

19.00

18.00

17.00

13.00

Fig A1.23 Hourly variation of traffic at Nigdi crossing on Chinchwad Nigdi road

12.00

Hourly volume in PCU(SB)

21.00

20.00

PCU's /Vehicles

8.00

Hourly volume in PCU(SB)

7.00

Hourly volume in vehicles(SB)

6.00

Hourly volume in PCU(NB)

5.00

Hourly volume in vehicles(NB)

4.00

2200

3.00

2000

2.00

1800

1.00

1600

24.00

1400

23.00

1200

22.00

1000

21.00

800

20.00

600

19.00

Hour of the day

146

18.00

400

17.00

200
0
10.00

11.00

12.00

13.00

14.00

15.00

16.00

Fig A1.24 Hourly variation of traffic at Pimple nilakh on Pimple nilakh junction road

9.00

147

4500
4200
3900
3600
3300
3000
2700
2400
2100
1800
1500
1200
900
600
300
0
15.00

14.00

13.00

12.00

11.00

10.00

9.00

PCU's /Vehicles

Hourly volume in vehicles(NB)

Hourly volume in PCU(NB)

Hourly volume in vehicles(SB)

23.00

22.00

21.00

20.00

19.00

18.00

Hour of the day

4.00

3.00

2.00

1.00
24.00

17.00

Fig A1.25 Hourly variation of traffic at Kasarwadi on Pune Mumbai road

16.00

Hourly volume in PCU(SB)

8.00

7.00

6.00

5.00

PCU's /Vehicles

3150
3000
2850
2700
2550
2400
2250
2100
1950
1800
1650
1500
1350
1200
1050
900
750
600
450
300
150
0
10.00

11.00

12.00

13.00

14.00

15.00

16.00

4.00

5.00

6.00

7.00

8.00

Hourly volume in PCU(SB)

3.00

Hourly volume in vehicles(SB)

19.00

20.00

21.00

22.00
Hour of the day

2.00

Hourly volume in PCU(NB)

18.00

23.00

24.00

1.00

Hourly volume in vehicles(NB)

17.00

Fig A1.26 Hourly variation of traffic at Mula Mutha River crossing on Westerly bye pass road

148

9.00

149

3000
2800
2600
2400
2200
2000
1800
1600
1400
1200
1000
800
600
400
200
0
11.00

10.00

9.00

PCU's /Vehicles

Hourly volume in vehicles(NB)

Hourly volume in PCU(NB)

Hourly volume in vehicles(SB)

16.00

15.00

14.00

Hour of the day

19.00

18.00

17.00

13.00

Fig A1.27 Hourly variation of traffic at Rajaram Bridge on Sinhagad road

12.00

Hourly volume in PCU(SB)

21.00

20.00

PCU's /Vehicles

5.00

6.00

7.00

8.00

Hourly volume in PCU(SB)

4.00

Hourly volume in vehicles(SB)

3.00

Hourly volume in PCU(NB)

1.00

2.00

Hourly volume in vehicles(NB)

24.00

2100

23.00

1800

22.00

1500

21.00

1200

20.00

Hour of the day

19.00

900

18.00

600

17.00

300
0
10.00

11.00

12.00

13.00

14.00

15.00

16.00

Fig A1.28 Hourly variation of traffic at Sambhaji Bridge on Laxmi and Prabhat road

150

9.00

151

PCU's /Vehicles

300

600

900

1200

1500

1800

2100

2400

2700

3000

3300

3600

15.00

14.00

13.00

12.00

11.00

10.00

9.00

Hourly volume in vehicles(NB)

Hourly volume in PCU(NB)

Hourly volume in vehicles(SB)

23.00

22.00

21.00

20.00

19.00

Hour of the day

5.00

4.00

3.00

2.00

1.00
24.00

18.00

17.00

Fig A1.29 Hourly variation of traffic at Sangam Bridge on R.B. Mothilal road

16.00

Hourly volume in PCU(SB)

8.00

7.00

6.00

PCU's /Vehicles

2250
2100
1950
1800
1650
1500
1350
1200
1050
900
750
600
450
300
150
0
9.00

11.00

12.00

13.00

21.00

22.00

Hourly volume in PCU(SB)

20.00

Hourly volume in vehicles(SB)

19.00

Hourly volume in PCU(NB)

16.00

17.00
Hour of the day

15.00

18.00

Hourly volume in vehicles(NB)

14.00

Fig A1.30 Hourly variation of traffic at Shinde Bridge on J.M road

152

10.00

153

PCU's /Vehicles

15.00

14.00

13.00

12.00

11.00

10.00

9.00

Hourly volume in vehicles(NB)

Hourly volume in PCU(NB)

Hourly volume in vehicles(SB)

23.00

22.00

21.00

20.00

19.00

Hour of the day

6.00

5.00

4.00

3.00

2.00

1.00
24.00

18.00

17.00

Fig A1.31 Hourly variation of traffic at Shivaji Bridge on Veer Santaji Ghorpade road

150

300

450

600

750

900

1050

1200

1350

1500

1650

16.00

Hourly volume in PCU(SB)

8.00

7.00

PCU's /Vehicles

3900
3600
3300
3000

Hourly volume in PCU(SB)

Hourly volume in vehicles(SB)


Hourly volume in PCU(NB)

Hourly volume in vehicles(NB)

22.00

2700

21.00

2400

20.00

2100
1800

19.00

1500

18.00

1200

17.00

900

16.00

Hour of the day

15.00

600

14.00

300
0
10.00

11.00

12.00

13.00

Fig A1.32 Hourly variation of traffic at Shivajinagar Bridge on JM road Sangam Bridge

154

9.00

155

2400
2250
2100
1950
1800
1650
1500
1350
1200
1050
900
750
600
450
300
150
0
12.00

11.00

10.00

9.00

PCU's /Vehicles

Hourly volume in vehicles(NB)

Hourly volume in PCU(NB)

Hourly volume in vehicles(SB)

17.00

16.00

15.00

Hour of the day

19.00

18.00

14.00

Fig A1.33 Hourly variation of traffic at SM Joshi Bridge on LBS road

13.00

Hourly volume in PCU(SB)

22.00

21.00

20.00

PCU's /Vehicles

2400
2250
2100
1950
1800
1650
1500
1350
1200
1050
900
750
600
450
300
150
0
10.00

11.00

12.00

13.00

23.00

24.00

Hourly volume in PCU(SB)

22.00

Hourly volume in vehicles(SB)

21.00

Hourly volume in PCU(NB)

16.00

17.00

18.00
Hour of the day

15.00

19.00

20.00

Hourly volume in vehicles(NB)

14.00

Fig A1.34 Hourly variation of traffic at Yerwada IT park on Wellesley road

156

9.00

ANNEXURE 2
Zonal Planning Variables

Table A2.1 Zonal Planning Variables for year 2008


Zone
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

Population Employment Two wheelers


73038
18555
27353
70843
719
16153
138390
32160
43170
45288
71750
18840
81875
8311
35123
142540
12216
68969
36774
19380
14313
38238
45376
11750
43728
8171
13773
51701
45412
9779
58247
91
18295
94017
11316
26282
97743
30277
31328
90864
799
28663
24400
2262
6455
100414
5876
36433
82019
14089
33806
97673
23089
31824
73280
22147
23591
77654
61978
30719
81659
32087
30535
68581
4095
28189
60163
8217
26269
51987
103632
21943
77877
17673
21181
63658
10543
14294
50769
15868
16517
78561
6634
18840
58703
2305
22019
49233
2386
17766
95371
2682
39199
33677
23493
13503
94088
78123
28709
52402
33539
14910
76042
22412
25986
90723
6210
34355
17469
1750
7179
33359
6713
7137
66941
3305
18848
51185
22962
25093
62053
7505
16969
63169
17768
12583
50213
62885
14548
58878
1765
11406
56256
123567
26009
78347
7068
30095

Cars Households
2099
16357
2176
14234
2519
30788
3104
10607
3643
19921
40494
32480
626
8567
484
8273
1272
9525
11121
11578
8418
13337
15852
18939
22001
20420
1092
17113
550
4178
1857
21831
1504
18648
3700
21867
3504
16886
2828
17669
1521
19005
4645
16033
10934
14169
3381
13576
4722
20280
5774
15365
4630
12146
1748
17394
4367
13966
5118
11442
6985
22418
2225
7354
10100
20069
6159
10975
7753
17263
10722
19325
668
3967
740
7367
674
15376
821
12101
2309
12525
1262
13222
2955
10387
2573
12131
395
12689
1551
18528
157

Zone
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91

158

Population Employment Two wheelers


96910
44289
6542
41747
3698
11076
83046
26575
34097
80232
10133
15177
23466
8745
5172
59907
9390
14832
39906
1045
8265
22752
21548
4578
54206
6669
8711
43106
12973
7949
56666
15155
8730
5172
19726
1797
47354
2213
13493
1747
4309
425
43308
7983
15667
43360
20785
17070
67567
2213
17792
29813
6552
11508
37164
9690
9643
81568
16457
30642
31133
1036
6536
77250
1959
29346
1901
25468
589
12864
833
3344
34615
7119
10765
26424
11351
6650
40795
2583
12411
89417
3226
28993
82406
476
24041
27680
9893
12035
35426
11653
13560
4904
177
854
53600
12124
9932
39628
8629
7168
43245
69735
16457
26458
5929
8425
49245
95905
24324
36569
1403
11900
30230
9792
8532
11346
831
2965
32076
51951
8673
1864
705
251
18401
0
5573
43110
3464
13884
32660
0
9753

Cars
973
3158
5618
204
852
566
1362
123
755
1310
1628
485
949
64
865
633
1646
1896
1485
1533
1077
1305
97
529
1075
1096
2045
6304
3961
461
2234
77
2310
1181
1049
981
4901
826
1406
488
713
169
918
1483
1263

Households
21018
9147
20985
17071
4972
13646
8228
5509
12946
10540
12856
1203
9456
373
9825
9202
19997
6481
8583
19005
5707
19746
487
3311
11033
6606
9271
21257
19555
6471
8156
1135
10740
8839
9635
6139
11916
8489
6473
2012
5687
466
4299
9737
6071

Table A2.2 Zonal Planning Variables for year 2011


Zone
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

Population Employment Two wheelers


88705
19785
33437
85189
767
19745
153921
34292
52772
55594
76508
23031
113206
8862
42935
180371
13026
84308
47024
20665
17497
39897
48385
14364
44539
8713
16836
56599
48423
11954
60381
97
22364
107034
12066
32127
101414
32285
38295
92498
852
35039
25086
2412
7891
112161
6266
44537
99956
15023
41325
109789
24620
38903
92079
23616
28838
83835
66087
37552
86613
34215
37326
69513
4367
34458
61323
8762
32111
52869
110504
26823
81674
18845
25891
68559
11242
17474
51725
16921
20191
85684
7074
23031
60204
2458
26916
50699
2544
21717
100285
2860
47917
37181
25051
16506
101186
83304
35094
56060
35763
18226
80106
23898
31766
100160
6622
41996
18237
1866
8776
41392
7158
8724
70846
3524
23040
53779
24485
30675
68510
8003
20743
69740
18946
15381
55437
67055
17783
65003
1882
13943
61645
131762
31794
85479
7537
36789

Cars
2774
2876
3329
4103
4815
53517
827
639
1681
14697
11125
20950
29077
1443
727
2454
1987
4890
4631
3737
2010
6138
14450
4468
6241
7631
6119
2311
5772
6764
9232
2940
13348
8140
10246
14171
883
978
890
1085
3052
1667
3905
3400
523
2050

Households
19866
17117
34243
13021
27544
41100
10955
8632
9702
12675
13825
21561
21187
17420
4296
24385
22726
24579
21217
19075
20158
16250
14442
13806
21269
16549
12374
18971
14323
11783
23572
8119
21583
11741
18185
21335
4142
9141
16272
12715
13828
14597
11468
13393
13905
20215
159

Zone
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91

160

Population Employment Two wheelers


105832
47225
7997
46091
3943
13540
84292
28337
41681
81435
10805
18552
25510
9325
6322
65975
10013
18131
43474
1114
10104
24009
22977
5596
58548
7111
10648
44911
13834
9717
61761
16160
10672
5444
21034
2196
49529
2360
16494
1803
4594
520
46535
8512
19152
47495
22163
20867
75625
2360
21750
32255
6987
14068
42131
10333
11788
95675
17548
37457
33660
1104
7990
88051
2089
35873
2132
27157
720
14049
888
4088
35944
7591
13160
28656
12104
8129
43585
2754
15172
101887
3440
35442
93610
508
29388
28520
10549
14711
37065
12426
16576
5694
189
1044
57636
12928
12140
42936
9201
8762
45669
74359
20118
28588
6322
10299
52357
102265
29734
39061
1496
14546
33129
10441
10430
12851
886
3624
43451
76500
10602
2662
752
306
18793
0
6813
54969
3694
16972
47475
0
11922

Cars
1287
4174
7425
270
1126
749
1800
163
997
1731
2152
641
1254
84
1143
837
2175
2506
1962
2025
1423
1725
128
699
1421
1448
2703
8332
5235
609
2953
101
3054
1561
1386
1296
6477
1091
1858
646
942
224
1214
1960
1669

Households
22953
10099
21300
17327
5405
15028
8964
5813
13983
10981
14012
1266
9890
384
10557
10079
22382
7012
9730
22292
6170
22506
547
3616
11457
7164
9905
24222
22214
6667
8533
1318
11549
9577
10175
6633
12669
9068
7094
2279
7704
666
4391
12416
8824

Table A2.3 Zonal Planning Variables for year 2021


Zone
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

Population Employment Two wheelers


97876
24596
48832
85146
953
28836
205145
42630
77068
53486
95109
33634
106816
11017
62703
195016
16193
123124
49877
25690
25553
53733
60149
20977
57968
10831
24587
81354
60196
17458
95848
121
32661
116509
15000
46919
171206
40134
55927
131526
1059
51170
36482
2998
11524
136873
7789
65042
107893
18676
60351
143022
30606
56814
88245
29357
42116
123681
82155
54841
115071
42533
54511
84982
5428
50323
64672
10892
46896
67515
137371
39173
134818
23427
37812
96790
13975
25519
67599
21034
29487
118704
8794
33634
83059
3055
39309
60826
3163
31716
129779
3555
69978
51925
31141
24106
136275
103557
51252
74934
44459
26617
107962
29708
46391
139879
8232
61332
24508
2320
12817
47549
8898
12741
88432
4381
33647
74958
30437
44797
95681
9948
30293
97408
23552
22463
77422
83358
25971
90774
2340
20362
84330
163796
46432
115509
9369
53726

Cars Households
5331
21920
5526
17108
6398
45639
7885
12527
9254
25989
102853
44437
1589
11620
1229
11626
3230
12627
28246
18219
21381
21946
40263
23469
55882
35768
2774
24771
1398
6247
4717
29758
3819
24530
9397
32019
8900
20334
7182
28141
3863
26782
11797
19867
27772
15231
8588
17631
11995
35108
14666
23363
11759
16172
4441
26282
11093
19760
12999
14137
17742
30505
5651
11339
25653
29067
15645
15693
19692
24509
27235
29795
1696
5566
1880
10501
1711
20312
2086
17722
5865
19313
3205
20388
7506
16015
6535
18703
1004
19022
3941
27317
161

Zone
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91

162

Population Employment Two wheelers


147179
58707
11679
64369
4902
19773
88603
35227
60871
85600
13432
27093
29046
18750
9233
78844
12447
26479
49649
1385
14755
26199
28563
8173
67046
8840
15551
47096
17197
14190
71717
20089
15585
4953
26148
3207
50151
2933
24087
1899
5711
759
52519
10582
27970
57415
27551
30474
95497
2933
31763
38279
8685
20545
54337
12845
17215
129024
21814
54702
38035
1373
11668
108651
2597
52390
2713
33760
1052
16359
1104
5970
36891
9437
19219
32729
15047
11872
47856
3424
22157
126045
4276
51759
115343
631
42919
28716
13114
21484
38771
15447
24208
7061
235
1525
65805
16071
17730
50073
11439
12796
49200
92438
29380
33689
7860
15041
57044
127128
43424
43169
1860
21244
39269
12979
15232
15456
1101
5293
96356
202250
15483
12418
935
447
25304
0
9949
57496
4592
24786
44458
0
17411

Cars
2473
8021
14270
519
2164
1439
3459
313
1917
3327
4136
1233
2410
162
2197
1608
4180
4816
3771
3893
2735
3315
247
1343
2730
2783
5194
16013
10061
1170
5675
195
5869
3000
2664
2491
12447
2097
3571
1241
1810
430
2332
3768
3208

Households
31921
14104
22389
18213
6154
17960
10237
6344
16012
11515
16270
1152
10015
405
11914
12184
28263
8322
12549
30062
6972
27772
696
4211
11759
8182
10876
29965
27371
6713
8926
1634
13185
11169
10962
7817
13803
10021
8409
2740
17084
3104
5912
12987
8264

Table A2.4 Zonal Planning Variables for year 2031


Zone
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

Population Employment
107092
27547
89551
1067
238836
47745
55335
106521
109545
12339
208510
18136
53770
28772
62727
67366
66989
12131
93707
67419
116770
135
126862
16799
206252
44950
150754
1186
43498
3358
155087
8724
110966
20916
160955
34278
91114
32880
144742
92013
131012
47636
96306
6079
70619
12199
77596
153854
164685
26238
111727
15652
78222
23558
135262
9849
97868
3422
69297
3542
147024
3982
58985
34878
163473
115983
90907
49793
119331
33273
158904
9219
28255
2598
51659
9965
98432
4907
87212
34089
108695
11142
110928
26378
88442
93360
103469
2620
95704
183449
128973
10493

Two wheelers
56977
33646
89923
39244
73162
143661
29815
24476
28688
20370
38109
54745
65255
59706
13447
75891
70417
66290
49141
63989
63604
58717
54718
45707
44119
29775
34406
39244
45865
37007
81651
28127
59800
31057
54129
71562
14955
14866
39259
52270
35346
26210
30303
23758
54178
62688

Cars Households
7179
23984
7442
17993
8616
53135
10618
12960
12461
26653
138503
47512
2140
12527
1655
13572
4350
14592
38037
20985
28792
26736
54219
25555
75251
43089
3736
28392
1883
7448
6352
33718
5143
25229
12654
36034
11985
20995
9671
32933
5202
30492
15886
22514
37398
16631
11564
20263
16152
42886
19749
26968
15835
18713
5980
29948
14938
23283
17505
16105
23891
34559
7610
12881
34544
34868
21067
19039
26517
27090
36674
33848
2284
6417
2532
11409
2304
22609
2809
20619
7898
21939
4316
23218
10108
18295
8799
21318
1353
21587
5306
30501
163

Zone
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91

164

Population Employment
167849
65751
73132
5490
93134
39453
89977
15044
32265
18750
86340
13940
55217
1551
28548
31990
72875
9901
51525
19260
77839
22499
6017
29285
54383
3285
2038
6397
57599
11852
62278
30857
103973
3285
41563
9728
58850
14386
141239
24432
42108
1537
119242
2908
2919
37810
17831
1237
40444
10569
35879
16852
52379
3835
137988
4789
125881
707
31516
14687
42518
17300
8113
263
71748
18000
54649
12811
53805
103529
36364
8803
62402
142382
47256
2083
43083
14537
17553
1233
116053
246250
13841
1047
29540
0
61635
5143
45439
0

Two wheelers
13627
23072
71025
31613
10773
30895
17217
9536
18145
16557
18184
3742
28105
885
32635
35557
37062
23972
20086
63827
13615
61128
1227
6966
22424
13853
25852
60393
50078
25068
28246
1780
20687
14930
34281
17549
50667
24787
17772
6175
18065
522
11609
28920
20315

Cars
3330
10801
19216
699
2915
1937
4658
421
2581
4480
5569
1660
3245
218
2958
2165
5628
6486
5079
5242
3683
4464
332
1808
3676
3748
6994
21563
13549
1576
7642
263
7903
4039
3587
3354
16762
2824
4808
1671
2438
580
3141
5074
4320

Households
36403
16024
23534
19144
6836
19667
11385
6912
17404
12598
17659
1399
10860
435
13067
13216
30772
9036
13591
32908
7719
30479
748
4589
12891
8970
11904
32804
29872
7368
9788
1878
14376
12189
11988
8437
15100
10970
9226
3112
20577
3460
6902
13922
8446

ANNEXURE 3
Formats used for collection of Primary
Data

Home Interview Survey

Checklist for Enumerators

Appeal to citizens

Identity Card

Pen, pencil and pad

HIS Formats
o Part I Household Datasheet
o Part II Personal Information
o Part III Trip Information

Index Map with list of traffic analysis zones

Location Map of HIS Samples

Salient Features of Metro

Instructions for conducting HIS

165

...

Office Of Additional City Engineer


(Projects),
Pune Municipal Corporation
Shivajinagar
Pune-41100S

Out No. ~~'Le<O


Date:

()

.A

'--UJ I ,':W~

'

Appeal Bv Pune Municipal Corporation

Pune Municipal Corporation and Pimpri-Chinchwad Municipal Corporation are


jointly preparing Detailed Project Report (DPR) for priority section of Metro rail
system in Pune Metropolitan Area covering jurisdictions of both the Municipal
Corporations and cantonments.
Pune Municipal Corporation has appointed Delhi Metro Rail Corporation (DMRC)
to prepare the DPR with assistance from lIT Bombay.
..

DMRC and lIT, will conduct House Hold surveys from randomly selected
households in Pune and Pimpri-Chinchwad. The survey consists of collecting socioeconomic characteristics and information of all the trips made by each member on the
previous working day. Trained local enumerators will approach selected households.
They are provided with Identity cards valid upto 16thJanuary 2008.
All citizens are requested to co-operate and assist in giving the required information
as per approved proforma. Your co-operation will help PMC and DMRC in deciding
the Priority routes for the proposed Metro Railway.

-----

---------- --

---------------\7~,,~'1
~~

166

--

!II!!

!.

~
: (020) 27477777
Fax No. : (020) 27479999
E-mail: pcmc@vsnl.com
PIMPRI CHINCHWAD
MUNICIPAL CORPORATION
MumbaiPune Road, Pimpri- 411 018.
No.:

Date: 2-7/

r 2-./2001

Appeal Bv Pimpri Chinchwad Municipal Corporation


Pune Municipal Corporation and Pimpri-Chinchwad Municipal Corporation are jointly
preparing Detailed Project Report (DPR) for priority section of Metro rail system in
Pune Metropolitan Area covering jurisdictions of both the Municipal Corporations and
cantonments.
Pimpri Chinchwad Municipal Corporation has appointed' Delhi Metro Rail
Corporation (DMRC) to prepare the DPR with assistance from IIT Bombay.
DMRC and IIT, will conduct House Hold surveys from randomly selected households
in Pune and Pimpri-Chinchwad. The survey consists of collecting socio-economic
characteristics and information of all the trips made by each member on the previous
working day. Trained local enumerators will approach selected households. They are
provided with Identity cards valid upto 16thJanuary 2008.
All citizens are requested to co-operate and assist in giving the required information as
per approved proforma. Your co-operation will help PCMC and DMRC in deciding the
Priority routes for the proposed Metro Railway.
-----------------------------------------------------------------

~~Y:
f (Eknath~)

City Engineer
Pimpri Chinchwad Municipal Corporation
Pimpri - 18.

167

HOUSEHOLD LOCATION
Assembly/ Ward No.
Building Name /Number
Street Name
Locality
Area Name
Landmark1
Landmark2
Landmark3
PIN Code

Owned

Map Refrences

Employer
Provided

Electoral Ward No.

Ownership
Rented

Total no. of
Rooms

Parking Available at
household

Others

Bicycles

2-Wheelers

Cars

No. vehicle per household


for personal use

Trip Information

Personal Data

Month

Page no.

Day

Owned by others

Full

Owned by household

Park on Street

Partial

Private Spaces

Refused

Date of Interview

Household Serial Number

Household Data Sheet

Interview Status

Supervisor

Interviewer

Interview No.

DELHI METRO RAIL CORPORATION (DMRC)


MASTER PLANNING FOR PUNE METRO - HOME INTERVIEW SURVEY
PART I: Household Data Sheet

Name of Head of Household

Contact Tel. No.

Type of Residence

Apartment/Flat
Independent House
Common Gallery

2-Wheelers

Slum

Total no persons living in household

Others

Cars

Persons in household of age less than 5 years

168

169

Driving License

Type of Travel Pass

Col. 10

Occupation

Col. 6

Col. 9

Education

Col. 5

Type of work place

Sex

Col. 4

Col. 7

Relation with Head of Family

Col. 2

10

Relation with Head of


Family

Person
No.

Head =1

Illiterate = 1

Sex
5

No Pass = 0

Residential = 1

Wife/ Husband = 2

Bus weekly pass = 1

Office/ IT
/Bank = 3

Employed (Part time) =2

Y/N

Educational
Institute = 5

Bus monthly pass = 2

Shop=4

Self employed = 3

Upto HSC = 3

M/F

Hotel/
Restaurant = 6

11

Others = 5

Rail monthly pass = 3

Entertainment/
Tourism = 7

Cost of Pass
(Rs)

Page No.

Others = 8

Others = 6

Graduation & above = 4

10

Type of
travel
pass

Daily wage = 5

Father/ Mother = 4

Driving License

Student = 4

Income per month


(Rs in thousands)

Son/ Daughter =3

Type of work place

Codes

Below SSC = 2

Occupation

Industry/ Warehouse/
Factory = 2

Employed (Full time) =1

Age

Education
Level

Details of Each Member of Household (5 Years & above)

Part II - Person Information

Locality

Area

Area

Landmark

Locality

Area

Part III - Trip Information

( Exclude Saturday & Sunday)

Parking
Cost (Rs)

Landmark

Locality

Travel
Cost (Rs)

Area

Landmark

Travel
Time (min)

Locality

Area

Waiting
Time (min)

Landmark

Locality

Mode of
Travel

Area

Landmark

Start time of
Journey (24
hr clock)

Locality

Area

Type of
Destination

Landmark

Locality

Destination

Area

Landmark

Type of
Origin

Locality

Area

Origin

Landmark

Locality

Trip
No.

Area

Landmark

12

Locality

Area

11

Landmark

Locality

10

Area

Landmark

Locality

Area

Landmark

Locality

ST Bus = 9

Rail = 10

Govt/
Car pool = 12
Company car = 11

Other purposes = 8

Area

Landmark

PMT/
PCMT = 8

Change of Mode =7

Locality

Chartered/
Contract Bus =7

Business =6

Landmark

Area

Six
Seater = 6

Social/ Recreational = 5

Codes

Area

Locality

Car = 4 Autorickshaw = 5

Shopping = 4

Locality

Landmark

Two
wheeler = 3

Education = 3

Landmark

Walk =1 Cycle = 2

Type of
Residence = 1
Origin/ Destination
Mode of Travel

Work =2

Most recent working day for which travel is being reported:


Person
No.
1

Col. 4&6:
Col. 8:

170

171

Pune Metro - List of Zones


Zone No
Zone Name
Zone No
Zone Name
1
Aundh
47
Tambadi Jogeshwari Mandir
2
Kalas - Danori
48
Ganeshpeth Gurudwara
3
Lohagaon - Kharadi
49
Pune Cantonment
4
Hadapsar/ Vithal Nagar
50
Khadki Contonment
Thalwade-Chikli
5
Wadgaon Dhayri
51
6
Warje
52
Moshi
7
Pashan
53
Chaholi-Dhigi
8
Bopodi
54
Sandvik Colony
9
Golf Club
55
Alandi Road
10
Navi Khadki
56
Gavhane Basthi
11
Aagakhan Palace
57
Indraini Nagar
12
Wadgaon - Sheri
58
Kasar Wadi
13
Korgaon Park
59
Phuge Wadi
14
Kirloskar Pneumatics Company
60
Dhapodi-Bopkel
15
Sadana Vidyalaya
61
Sangvi
16
Wanavdi/ Mohammadwadi
62
Pimple Grove
17
Kondhva - Undari
63
Pimple Soudaghar
18
Katraj-Balajinagar
64
Kale Wadi
19
(A) Dhankwadi & (B) Hingane Khurd
65
Thergaon
20
Karve Nagar
66
Wakad-Piplenilakh
21
Kothrud
67
Kiwale-Ravet
22
MIT College
68
Pradhikaran
23
Gokale Nagar
69
Inigadi Yamuna Nagar
24
Pune Vidyapeeth
70
Ajantha Nagar
25
Sangam Wadi
71
Dattawadi
26
Tadiwala Road
72
Akurdi
27
Bibwewadi
73
Mohan Nagar
28
Sahakarnagar Padmavati
74
Sanghvi Kesari College
29
Karve Road
75
Morwadi Masulkar Colony
30
Fergusson College
76
Nehru Nagar
31
Police Parade Ground
77
Santa Tukaram Nagar
32
Kamala Nehru Hospital
78
Ashok Theatre
33
Sassoon Hospital
79
Jijamatha Hospital
34
Rastapeth Power House
80
Mandai
35
Salisbury Park
81
Chinchwad Gaon
36
Tilak Maharashtra Vidyapeeth
82
Valhekharwadi
37
Shantinagar
83
Pimpri Chinchwad Prekshagruh
38
Parvati
84
Anant Nagar-Bhatnagar
39
Datta Wadi
85
Kharalwadi
40
Gokale Hall
86
Wakad
41
Bandiwan Maruti Mandir
87
Hinjewadi Village
42
Panch Haudmishan
88
Hinjewadi IT Park
National Chemical Lab (Pashan)
43
Arunkumar Vaidya Stadium
89
44
Sonawane Hospital
90
Chandini Chowk
45
Nehru Stadium
91
Sutharwada
46
Maharana Pratap Udyan
172

Pune Metro Rail Salient Features

Up to 50% reduction in travel times


Cost of Travel will be comparable to bus
Fare
Trains will run at a convenient frequency
of 3 min during peak hours.
Comfortable Sitting in A/C environment

Metro Rail on the Tracks

All stations will be equipped with


emergency stop buttons and keeping
in mind the Indian milieu along with
facilities for physically challenged
State-of-art computerized ticketing
system that saves time and facilitates
uninterrupted flow of traffic

Automatic Ticketing Counters

Fully Air-conditioned coaches


for hassle free trips everyday
Passenger Information Display
& Public address system at all
stations and inside trains

Metro Rail Coach


State-of-the-art Safety Features
a) Automatic door closing with safety
features
b) precaution Power Back-up Facility
c) Fire-resistant Coaches
d) Emergency Wireless passenger and
driver communication system

Your whole hearted participation in this home interview survey


will help in deciding the best routes for this proposed metro rail
system
173

Guidelines for conducting HIS


Have your checklist form and see if you have all the mentioned materials
Get the Zone number of your work area from supervisor
Identify your Zone number on the Index Map
Identify the Name of the area from the table behind the index map
Go through the Location Maps of that Zone
Find a Landmark which can be easily located
Go to that Landmark
Identify your position on the Location Map
Locate any of the circled house
Enter the house
Say Hello, Good Evening etc
Ask for the Head of the Household
Show the Permission Letter
Show the Identity Card
Show the Metro Details
Ask for Interview and tell it will take 30 minutes
Fill the House hold Sheet
Fill the Person Sheet
Fill the Trip Sheet
Say Thank You

Check the following things


Address
Contact Number
Map Reference Number
Serial Number of Interview

174

Traffic Volume, OD and Occupancy Surveys

Auto
Two
rickshaw
wheelers
(3w)

Sub
Total
Total
Name of
Enumerator:
Signature

:00

:45

Sub
Total

:45

:30

Sub
Total

:30

:15

Sub
Total

:15

:00

Time
Period

Location_ID:__________

Mid-Block/Junction

Maxi
Cab
(3w)

Day:

Bus
Govt. Bus
PMC
ST Bus
PCMC Bus
Other
Buses

Motorised Traffic

To:______________________

Passenger Vehicles
Car/ Jeep/
Van
Taxi
Mini
(Other
Bus
than Taxi)

Direction
From:___________________

Name of
Road/Location:_______________

LCV

2-Axle
Truck

Date :

3-Axle
Truck

Cycle

Supervisor:
Signature

MAV
Tractor(Truck Tractor
Trolley
Trolley)

Goods Vehicles

Rainy /Sunny/
Cloudy
Lane
No:
Non Motorised
Traffic

______to ________

Weather
Condition:
Sheet
No:

Hours:

DELHI METRO RAIL CORPORATION


MASTER PLANNING FOR PUNE METRO - CLASSIFIED TRAFFIC VOLUME SURVEY

Others (pl.
specify)

175

DELHI METRO RAIL CORPORATION (DMRC)


MASTER PLANNING FOR PUNE METRO ORIGIN DESTINATION SURVEY (COMMERCIAL VEHICLE)
Interviewer:

Name of the road:

Cordon point no:

Traffic From:

Time
(hh:mm)
1

Sheet No:
To:

Date :

Vehicle

Place of Origin

Place of Destination

Place of intermediate
stop
5

Loading

Goods

Codes
Col 2:
Vehicle
Col 6:
Loading
Col 7:
Goods

LCV/Tempo = 1

2 Axle truck = 2

Empty = 0
N.A = 0

176

Partly Full = 1

Food grains = 1

Building
materials =6

3 Axle truck = 3

Fruits/Vegetables = 2

Textiles = 7

Ore/Mineral = 8

Multi Axle truck = 4


Exactly Full = 2

Tractor with trailer = 5


Overloaded =3

Household
goods = 3

Chemicals/Fertilizers = 4

Petroleum = 5

Timber = 9

Manufactured goods = 10

Others = 11

DELHI METRO RAIL CORPORATION (DMRC)


MASTER PLANNING FOR PUNE METRO ORIGIN DESTINATION SURVEY
Interviewer:

Name of the road:

Cordon point no:

Traffic From:

Time
(hh:mm)
1

Vehicle
Type
2

Sheet No:
To:

Date :

Occupancy

Place of Origin

Place of Destination

Place of
intermediate stop
6

Purpose
7

Codes
Col 2:
Vehicle
Type
Col 7:
Purpose

Cycle = 1

Two wheeler = 2

Govt / Company Car = 7


Work = 1

Education = 2

Car = 3

Auto 3 Seater = 4

Chartered / Contract Bus = 8


Business = 3

Shopping = 4

Auto 7 Seater = 5

Car pool = 6

PMT = 9

PCMT = 10

ST Bus = 11

Recreational
/ Social = 5

Other
purpose = 6

Return
Home = 7

177

Name of Road / Location :


Location ID:
Two Wheeler

Auto Rickshaw (3w)

Maxi Cab (3W)

Taxi

Car/ Jeep/ Van

Mini Bus

PMC/ PCMC Bus

ST Bus

Other Bus

To:

Hours:

DELHI METRO RAIL CORPORATION


MASTER PLANNING FOR PUNE METRO - OCCUPANCY SURVEY
Day:
Direction From:

to

Sheet No.

178

Stated Preference Survey

Pune Metro Master Plan


Stated Preference Survey

0. Checklist for Enumerators


1. Letter of Authorisation from PMC and PCMC
2. IIT Bombay Identity Card
3. Pune Metro Leaflet
4. SP Survey Booklet
a. Socio-economic Profile and Existing Trip Information
b. Relevant SP Experiment Sheet
5. Metro Colour Leaflet
6. Pen/Pencil

179

180

181

Pune Metro Rail Salient Features

Up to 50% reduction in travel times


Cost of Travel will be comparable to bus
Fare
Trains will run at a convenient frequency
of 3 min during peak hours.
Comfortable Sitting in A/C environment

Metro Rail on the Tracks

All stations will be equipped with


emergency stop buttons and keeping
in mind the Indian milieu along with
facilities for physically challenged
State-of-art computerized ticketing
system that saves time and facilitates
uninterrupted flow of traffic

Automatic Ticketing Counters

Fully Air-conditioned coaches


for hassle free trips everyday
Passenger Information Display
& Public address system at all
stations and inside trains

Metro Rail Coach


State-of-the-art Safety Features
a) Automatic door closing with safety
features
b) precaution Power Back-up Facility
c) Fire-resistant Coaches
d) Emergency Wireless passenger and
driver communication system

Your whole hearted participation in this stated preference survey will help
in deciding the appropriate operational features for this proposed metro
rail system
182

TRAVEL SURVEY FOR PROPOSED METRO CORRIDOR IN PUNE


A. SOCIO - ECONOMIC BACKGROUND
1. Place of Residence:

Area
Locality

2. Place of Work:

Name of Establishment
Area
Locality

3. Sex:

4. Age :

Years

5. Designation:
6. Monthly income in Rs.
7. Number of members in your family:
No. of Car/s

8. Vehicle Ownership

Cycles

No. of 2-Wheelers
9. Are you provided with a vehicle by your employer:

Car:

Company Bus:

2 Wheeler:

10. What amount do you receive from your employer specially for your travel to work expenses?
11. Are you a pass-holder?
No Pass:

Rs.

Bus Weekly Pass (Rs.):

Bus Monthly Pass (Rs.):

Train Monthly Pass (Rs.):

Train Quarterly Pass (Rs.):

per month

B. DETAILS OF NORMAL MODE OF TRAVEL TO WORK


12. What is your daily parking cost at your workplace?

Rs.

13. Please state as accurately as you can the following aspects of your normal travel to work

Existing Travel Characteristics


Leg
No.

Leg
Mode of
Description
Travel
Residence to 1st
Halt

1
2

1st Halt to 2nd


Halt

2nd Halt to 3rd


Halt

3rd Halt to 4th


Halt

Time (Mins.)
Waiting
Travel

Travel
Cost (Rs.)

Level of
Discomfort

Total
Two Wheeler = 3
Car = 4
Company Bus/Car = 9

Codes for
Mode

Walk = 1

Level of
Discomfort

A/C Seat =1

Comfortable A/C Standing


=2

Non-A/C Seat = 3

Non- A/C
Standing = 4

Non A/C
Standing in
Crowd = 5

Very Low

Low

Moderate

High

Very High

Bus=7

Cycle=2
Train =8

Auto = 5
Six seater=6
Car Pool = 10

183

Existing
Trip
Option 2

Option 3

Option 4

Option 5

Option 6

Option 7

Option 8

Option 9

Option 10

Option 11

Option 12

Stated Preference Experiment


Option 1

3 min

8 min

0.5

3 min

0.5

15 min

0.5

3 min

0.5

15 min

0.5

8 min

0.5

15 min

1.5

8 min

1.5

3 min

1.5

8 min

1.5

3 min

1.5

Waiting
Time (Min)
Travel Time
(Min)

1.5

1.5

1.5

1.5

0.5

0.5

1.5

0.5

No. of
Transfers

Definitely Metro = 5

Probably Metro = 4

Can't Say = 3

Probably Existing = 2

Choice

Definitely Existing = 1

Discomfort
Level

Travel Cost
(Rs.)

Choice
Scale

184

1.5

8 min

Option 2

Definitely Existing = 1

Discomfort
Level

Choice

No. of
Transfers

0.25

Travel Cost
(Rs.)

3 min

Option 1

1.5

Choice
Scale

Existing
Trip

Travel Time
(Min)

Waiting
Time (Min)

185

0.25

1.5

8 min

Option 4

Probably Existing = 2

0.5

1.5

3 min

Option 3

0.25

1.5

0.5

8 min

Option 6

Can't Say = 3

15 min

Option 5

0.5

0.5

3 min

Option 8

Probably Metro = 4

15 min

Option 7

Stated Preference Experiment Car

0.5

0.5

0.5

0.5

3 min

Option 10

Definitely Metro = 5

15 min

Option 9

0.5

0.5

8 min

Option 11

3 min

Option 12

Вам также может понравиться