Overview
Background on juwi Organization PV Plant Optimization Cast Study I: Jacksonville Solar
juwi Organization
juwi Holding AG (parent of juwi solar GmbH)
Based in: 2009 Revenue Founded/CEOs: Wrrstadt, Germany $900 million Private company founded in 1996 by Fred Jung (ju) and Matthias Willenbacher (wi)
Employees:
Business Units:
>1000
Wind (>600 MW) Solar Photovoltaic (>500MW) Biogas (2MW) Geothermal Energy Efficiency Electric Mobility
Wrrstadt, Germany 2000 PV System Development, EPC, Financing, and O&M >500
Utility Scale PV Yield Optimization Conference and Expo US 3
Greece
India
Capacity 53.0 MW
40.0 MW 16.0 MW
Location
Brandenburg, Germany Saxony, Germany Texas, USA Florida, USA Saxony, Germany Ohio, USA Bavaria, Germany West Pomerania, Germany Saxony, Germany New Jersey, USA
5
Jacksonville Solar
Kothen Solar Park Wyandot Solar
15.0 MW
14.8 MW 12.0 MW
2 months
3 years 6 months
12.0 MW
6.8 MW 6.0 MW 2.2 MW
4 years
1.5 Years 5 years 1.25 years
Target Customers/Off-takers
Investor-Owned Utilities Municipalities Cooperatives Industrials/Commercial
Wyandot Solar AEP Ohio 12MW DC Free field project Project between JSI, AEP and PSEG Completed May 2010
Jacksonville Solar JEA Florida 15MW DC Free field project Project between JSI, JEA and PSEG Completed Sep 2010
Blue-Wing Solar CPS Energy Texas 16MW DC Free field project Project between JSI, CPS and DEGS Completed Nov 2010
November 30th 2010
Site Boundary
Wetlands
10
11
12
Wetlands
Site Boundary
13
14
Optimal orientation for San Antonio is 10 degrees west of south Orienting the arrays 25 degrees west of south results in only a 0.4% reduction in generation compared to due south (~2.0% is typical)
Percent Decrease in Generation as a Function of Azimuth
Percent of Due South Generation
San Antonio Typical
101.0%
100.5%
100.0%
99.5%
99.0%
98.5%
98.0%
10
15
20
25
30
16
Summary
For many sites a standard MW-In-A-Box design is not the optimal solution The optimal solution may be a combination of standard and non-standard building blocks Best practices should include optimizing site layouts to accommodate existing site conditions and constraints It is often necessary to perform detailed parametric analysis to optimize land use and generation while reducing balance of system costs