Oracle E-Business Suite Release 12.1 Upgrade Best Practices Technical Insight
Udayan Parvate, Director, EBS Release Engineering Lester Gutierrez, Senior Architect, EBS Applications Performance
The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decisions. The development, release, and timing of any features or functionality described for Oracles products remains at the sole discretion of Oracle.
Objectives Provide an overview of the R12.1 release, the technology stack and supported upgrade paths Outline best practices for the R12.1 technical upgrade, with a focus on downtime reduction Review runtime performance monitoring and tuning tips Provide sample customer upgrade profiles and share Oracles GSI upgrade experience
Agenda R12.1 Upgrade Overview Upgrade Best Practices Customer Upgrade Snapshots References Additional Resources Q&A
R12.1 Rapid Install (RI) R12.1 Maintenance Pack (MP) R12.1 was generally available (GA) in May 2009
Via Oracle Electronic Product Delivery (EPD) and Oracle Store For all the supported platforms and languages
Can be used by new and upgrading customers (11.5.9 and above) to go directly to R12.1
If you are on R11i, use R12.1 RI from EPD. Follow instructions from the Upgrade Guide: 11i to 12.1 and 12.1.1 Release notes If you are on R12.0.X, use R12.1 MP (7303030) from My Oracle Support (MOS). Follow instructions from R12.1 Maintenance Pack Install Instructions (752619.1)
7
10.1.2.3
1.0.2.2/1.4.2
10.1.3.0/1.5
10.1.3.4/1.6.0
10.1.3.5
10.1.3.4/1.6
9.2.0.6/9.2.0.6
10.2.0.3
11.1.0.7/11.1.0.7
10.2.0.5/11.2.0.1
10.2.0.4/11.1.0.7
For details Oracle E-Business Suite Release 12.1 Maintenance Pack Installation Instructions (752619.1)
TARGET
12.1
B ,C
11.2.0.1 12.1
B ,C B ,C
10.2.0.5 12.1
B ,C
A. Upgrade database and EBS level in a single downtime B. Upgrade database and EBS level in separate downtimes C. Apply upgrade interoperability DB patches and then upgrade EBS
10
TARGET
12.1
B ,C B ,C A A
10.2.0.4
< = 12.0.3
12.1
B ,C
> = 12.0.4
B ,C
B ,C
A. Upgrade database and EBS level in a single downtime B. Upgrade database and EBS level in separate downtimes C. Apply upgrade interoperability DB patches and then upgrade EBS
12.1 10.2.0.5
11
209
104242
144940
156622
31 GB 26 GB 268359 NA
12
13
Upgrade Best Practices Continued.. Adpatch options and other reporting tools
Use applicable adpatch options to reduce downtime and track key upgrade aspects using in-built tools Use non-interactive patching Use adpatch options such as nomaintainmrc, phtofile, nocompiledb, nolink, nogenform, nogenrep, nocompile jsp, noautoconfig, novalidate (1078973.1) Use optimal values for batch size and #workers Use OAM reports and Patch Wizard functionality to track patch timing, files applied, functionality patched, impacted customized files etc. (976188.1, 976688.1)
16
18
20
21
22
23
24
25
26
Upgrade Best Practices Continued.. Performance testing, monitoring and additional optimizations...
Analyze long runners via timing report, ad_task_timing analysis Mine ad_task_timing to identify low worker utilization due to phasing waits and review responsible culprits Review targeted AWR Instance and SQL reports awrrpt.sql and awrsqrpt.sql Use My Oracle Support to check for known issues and workarounds for the longest running jobs
28
Upgrade Best Practices Continued.. Performance testing, monitoring and additional optimizations continued...
Outside-the-box optimizations Requires Support Approval* Long running index creation and Statistics gathering As these tasks run with little or no concurrent tasks, consider using alter system commands to increase parallel_max_servers and pga_aggregate_target (Need to test so as to not exhaust machine resources) Large indexes: Pre-create, but do not alter column definitions For stats (adsstats.sql ; phase: last+63) : On RAC, consider using all nodes when gathering stats or use exp/imp of stats
29
Upgrade Best Practices Continued.. Performance testing, monitoring and additional optimizations continued...
Outside-the-box optimizations Requires Support Approval*
Long running mv related xdfs (en phases) Cleanup and truncate large MV logs (requires MV complete refresh) Look more closely at long running jobs that you suspect may not be required for your system Thousands of jobs and customer product/data/setup configurations Some of the heavy lifting work may not be required for a specific site Check with Oracle Support to validate A fix maybe available or possible to optimize for your case New 12.1.3 AD timing report by module
30
31
Points to note include11g features for Testing of 11g or 10g workloads with Real Application Testing Managing SQL Execution Plans and minimizing performance degradation with11g SQL Plan Management
32
33
34
35
36
37
38
39
40
41
References
42
References
R12.1 documentation roadmap (790942.1) Oracle E-Business Suite Release 12.1 Info center (806593.1) Database preparation guidelines for R12.1 upgrade (761570.1) Patching FAQs (459156.1, 225165.1) Using staged or shared APPL_TOP and distributed AD (734025.1, 384248.1, 236469.1) OAM Patch Wizard overview and FAQ (976188.1, 976688.1) AD Command Line Options for Release R12 (1078973.1) Recommended Performance Fixes (244040.1) R12 Upgrade Sizing & Best Practices (399362.1)
43
Additional Resources
44
Additional Resources
White paper
Planning Your Oracle E-Business Suite Upgrade from Release 11i to Release 12.1 (987516.1) R12 Upgrade considerations by product: Financials (889733.1)
45
http://launch.oracle.com/?OOW
Contains Presentations RCDs RVPs Videos Customer Stories White Papers etc
46
Oracle Store
Buy Oracle license and support online today at oracle.com/store
47
We encourage you to use the newly minted corporate tagline Software. Hardware. Complete. at the end of all your presentations. This message should replace any reference to our previous corporate tagline Oracle Is the Information Company.
48
Oracle OpenWorld
49
Oracle OpenWorld
Beijing 2010
December 1316, 2010
50
EBS 12.1 UPGRADE DEMOPOD MOSCONE SOUTH, S-089 MON : 9:45 AM 5:30 PM TUE : 9:45 AM 5:30 PM
51
SUMMARY
DOs..
Read and follow official documentation and have a project plan
DONTs..
Ignore including relevant functional SMEs in the planning process from the beginning
52