Вы находитесь на странице: 1из 2

AllthefollowingitemsmustbeansweredunlesspreapprovedbytheEngineerprior todriving S/NO 1 2 3 4 5 6 7 8 9 PILEHAMMERCHECKS IstheContractorusingtheapprovedhammersystem? Ispiledrivingequipmentdatasheetonsite? Isthepiledriveheadapproved? IstheCapblock(hammer)cushionapprovedandsuitableforthedrivingequipment? Isthepilecushionapprovedandsuitableforthedrivingequipment? Iffollowersaretobeused,weretheyapprovedbytheengineerorspecifiedinthe contractdocuments? Doyouhaveareferenceelevationsothatyouknowwherethepilecutoffisandcan determinetipelevationsandpenetration? Haveyoudeterminedthepiletipelevation?

Haveyoudeterminedthepiledrivingcriteriausingsetpenetrationasperwave equation? PILEDRIVINGCHECKS Hasallpredrivingdatabeenenteredonthepiledrivingrecord? Hasthe"MinimumTipTarget"markbeendeterminedandentered? Hasthe"stopforspotcheck"markbeendeterminedandentered?([Pilelengthcut offelev.Ref.elev.) Arethepileswithinallowabletolerance?(Makesurepileisalignedaccordingtothe plans.) Arepilesmarkedinthecorrectintervals? Isthehammerwarmedupandsetontheproperenergysettingforstartingout? Ifconcretepilerequiressplicing,isitasapproved? Ifconcretepilerequiressplicing,isitasapproved? Hasitbeendeterminedatwhatintervalstocheckthehammercushionwithaview forreplacement? Hasitbeendeterminedatwhatintervalstocheckthepilecushionwithaviewfor replacement? WHENTOSTOP IsthereaMinimumTipElevationspecified? IfYes,hasthepilereachedMinimumTipElevation? HasthePilemetthedrivingcriteriaspecifiedinwaveequationsetpenetrationbythe engineer? HasthePilereachedPracticalRefusalassetbytheengineer? Isthetopofthepilewithin600mmofCutoffelevation Haveanyofthepilesheaved? Oncethesubstructureiscompletehaveyousentinthepiledrivingrecords? Yes No N/A

10 11 12 13 14 15 16 17 18 19

20 21 22 23 24 25 26

Вам также может понравиться