Why So Important ?
Under the current business environment, cost competitiveness and effective maintenance management is key of corporate strategy
The failures of equipments have led to high maintenance and operation costs.
Shutdown Planning is a mega activity in the continuous running plants so that all activities can be completed within a specified span of time.
PMMS Masters linked to all Modules of the System to facilitate Quick and Accurate Performance Analysis of the Equipments along with Optimisation of Data Storage.
Access Control and Different kind of Privileges,Rights on each Module, Form and Report is Monitored by One Separate Data Security Module.
SCHEDULING
MWR
LOG BOOK
MASTERS
PMMS ADMN
EQUIPMENT HISTORY
SHUTDOWN
ANALYTICAL REPORTS
ROUTINE TEST
Common Masters
All Static Information like Unit,Plant, Section, Area, Equipment Category, Technical Specifications, Trouble Shooting Parameters are codified in Masters. Common Masters are being referred by each module of PMMS & will be uniform in all units of IFFCO.
Section
Mechanical
Area Category
Compressor House, HP Section, LP Section etc Turbine, Pump, Compressor,Controller, Motor etc
Ammonia-2
Electrical
Urea-1
Instrument
Urea-2
Equipment Scheduling
MWR
Routine Test
Log Book
Analytical Reports
Equipment History
Shutdown
General PM Schedule
Details
Specifications
Lub Schedule
Drawings
Modifications
AMC
Back
Documents
Common Spares
Visual Inspection Overhauling Tube Thickness Checking Tray Thickness Checking Etc.
Flushing Top-Up Greasing Sampling Lubrication Schedule Calibrator Calibration Multi Meter Caliberation
Equipment Scheduling
Calibration Schedule
Back
Equipment
Calibration
Stages/Flow of MWR
1. New
By Initiating Cost Centre
4. Permit Clearance
Personal No, Name, Shift Material Consumption Job Description SIV No Item Code Item Descp. Qty. & Value MWR NO. Plant Name Man Power Details Employee Status
Job Details
External Agencies Work Order No. Description Vendor Detail Loadable Value Job Employee Details Job Non-Employee Details Job Executed By
Back
10
11
Job Details
Unit,Plant,Tag No.,Category, Eqpt id, Job details & Constraints etc. Symptoms, Defects& Remedy etc. Item Code ,Description ,Type, Qty, Value etc. Man Power Type, Man Hrs. Over Time Details. Maintenance Type ,Work Order No.,Description, Vendor details, Loadable Value Attached documents detail Summary of Jobs done at a Glance Observations &Loss Details.
Equipment History
Back
12
Equipment History
It is built to keep Date wise record of all Important Jobs carried out on a Particular Equipment. Integration with Log Book module facilitates to move consolidated data of Job done, Spares consumed, External Agency details, OT etc.directly from multiple Log Books to History, to avoid duplicacy of Job. History card of an equipment consists Detail of Job Done, Engaged Man Power, Spares Consumed, External Agency, Important Data i.e. Protocol Reading etc. Symptom-Cause-Remedy entry is also provided for better analysis of the problem.
13
Shutdown
This Module of PMMS is built to meet all requirements related to Shutdown/Annual turn around.. This Module covers all Shutdown activities 1. Job List Preparation 2. Manpower and Material Planning 3. Other Requirements like Electrical, Crane/Mobile Equipment, Blinds, Scaffolding etc. 4. Marking of Major/Critical Jobs. 5. Monitoring Plant wise daily Shutdown Activities. 6. Maintaining Job History of Equipment 7. Generating Shutdown Report. Provision of job list preparation from any MWR and MWR preparation from shutdown job list is given. Back
14
15
16
Inspection Tests
Dye Penetrant Test Hardness Test Magnetic Particle Test Gauss Measurement Test Radiographic Test Thickness Measurement Test Ultrasonic Examination Vibration Readings Dynamic Balancing Readings Primary Reformer Monitoring -
(a) Tube Master (b) Creep Measurement (c) Delta P Measurement (d) Metallography Measurement (e) Temperature Measurement (f) Visual Inspection
Back
Rubber Line Thickness Measurement Equipment Skin Temperature Measurement Vendor Site Inspection EOT / Mobile Crane Overload Test
17
Back
Instrumentation - Calibration
Master Calibration Unit Master Plant Calibrator Master Plant Multi Meter Master
Form and Reports Calibrator Calibration Multi Meter Calibration Equipment Calibration Switch Calibration
18
Analytical Report
Equipment Having recurring jobs Plant wise Equipment vs Defect Equipment wise Failure Analysis Cause wise Failure Analysis ( common defect in many Equipment ) Failure vs Frequency Graph Equipment Expenditure Analysis Section wise Equipment Analysis Equipment Wise MWRs Mean Time to Repair (MTTR) MWR wise Expenditure