MT> F-25381A(USAF) 23 March 1972 Superseding MIL-F-25381 (USAF) 12 April 1956

MILITARY SPECIFICATION FL~GHT TESTING, ELECTRIC SYSTEM, PILOTED AII?CRA?W ~D : GUI!)Ell MISSIW, GENERAL REQUIREMEiJI,

1.

SCOPE

1.1 Scope. This specification covers the general requirements for flight testing of electric systems of piloted aircraft aridguided missiles.
1.2 Objective. The objective of this specification is to require sufficient flight tests to insure that a satisfactory electric system is installed i~ the aircraft or guided missile.

2.

APPLICABLE DOCUMENTS

* 2.1 The followinK document, of the issue in effect on date of invltatlOn for bids or request for proposal, forms a part of this specification to the extent Specliled herein: STANDARDS Military MIL-STD-831 Test Reports, Preparation of

(Copies of specifications, standards, drawings, and publications required by suppliers in connection with specific procu~ernent functions sh~uld be obtzinea from the procuring activity or as directed by t.?l-ontractinF officer.) c 3. REQUIREMENTS

* 3.1 Gene~al requirements. ?rior to, and throughout the test program, the equipment shall be inspected for loose and broker.part? , chafed i~sd]atiorl, aric general condition. Brush covers, Diast-air housing, or other cover ~lat~s shal: Deremoved during inspection. On rotatirlg maclhines tneconditicn of , the sii~ rings, conmutatcr, brushes, e:.cetera, S]-Jai] noted. Upon coT,plebe , tier.cf ~h.einspectiorj all pa?ts stall be reassembled ~ritheir pr~per TrJ:7cij+.ion, Loci.wirir,gshall be replacea where necessary.

Source: http://www.assistdocs.com -- Downloaded: 2007-07-18T15:22Z Check the source to verify that this is the current version before use.

3,4 LoaC banks, Loa6 benk.cnay be useti:C z<!nulate the power req~<~enen;s of actual load equtpnent prcvided the suDstitution will not adversely &fect the syste!ntes~ res~l?s.

frorthe standpoint of perfcmsr.ce, safety, and.reliability. shall:

Ilhese

tests

in t:heaircraft or guidei missile. c. Estaoliskthe cll~wecieaajust~.er.z on systen performance. d. Deternipe ??La:;he system,electric applicable nil:ta~ specificetior..

.2
-

Source: http://www.assistdocs.com -- Downloaded: 2007-07-18T15:22Z Check the source to verify that this is the current version before use.

MIL-F-25381A(USAF)

3.5.1.1 Electrical test items. The system shall be tested to determine the system characteristics or the effect OE the system of those items listed below, where applicable. If necessary to assure compliance with the requirements of this specification, or at the optiofiof the testing facility, the list shall be supplemented with additional items. a, Voltage

(1)
(2) (3) (4) (5) (6) (7) (/3)
L

Regulation - main bus or regulation point (steady state) Regulatiorl load bus or load (steady state) Phase unbalance Transient limits and stability Phase displacement Waveform (crest factor and harmonic content) Amplitude modulation Phase rotation Ripple Interruption (power transfer or fault clearing) Drift (during warmup)

(9) (lo) (11) b.

Frequency (1) Regulation (steady state) (~) Iransientlimits and stabil~ty (3) Modulation

c.

Capacity (1) Normal (2) Overload (3) Fault

Source: http://www.assistdocs.com -- Downloaded: 2007-07-18T15:22Z Check the source to verify that this is the current version before use.

MIL-F-25381A(USAF)

(k) Minimum d. Para.ileioperation (1) Real-load division (2) Reactive-load divisicn (3) Stability

(h) Synchronizing e, Manual controk (i) Range of ac,justments f ~rotectio~ (1) Undervoltage (2) overvoltage (:) Jnder?requency (4) (5)
--

Overfrequency ~eilin~ excitation

(6) Generator, wire, and bus fa~lt (including interrupting capacity and coordination) (7) Reverse current !8) Reverse power

($1~ Miscellaneous control-system f~~it~ (iO) Coordination: i3, I,oads (1) Switching (2) Automatic transfer

Source: http://www.assistdocs.com -- Downloaded: 2007-07-18T15:22Z Check the source to verify that this is the current version before use.

!!IL-F-25381A(USAT)
L

(3) Voltage self-modulation! (b) :ompatitility Jitkpower suppl:~.

3.5.2 Environmental tests. Sufficient flight tests shall be conducted on the electric syster!to uncover any adverse effects resulting from the operational environ!!er!ts the aircraft or missile. of weight, and termir.al !narkir.g 3.6 Dimensions. ?ertinent outside f!imensi.zns, and location shall be noted for major items of electrical equipment &nc co?r,pared with the applicable specification requirements. l!. QUALITY ASSURANCE PROVISIONS * * h,l Test procedure. When specified in the test procedure applicable to the particular be prepareti by the cor,tractor a,ndsubmitted activity prior to actual testing. The test

contract (see 6.2), a detailed a<rcraft or guided m~ssile sndl for apprcval ofthe procuring procedure shall cover all re-

Source: http://www.assistdocs.com -- Downloaded: 2007-07-18T15:22Z Check the source to verify that this is the current version before use.

MU-F-25381A(usAp)

b. Exact testing procedure followed snd reasons for any changes from the approved test procedure c. d. Detailed results of the testing - lria~, type,
~d

manufacturer of

teSt

instruments

e. Serial, type, and manufacturer of test components, including a.ppli cable specifications f.
~.

Applicable environmental test conditions

Appropriate photographs, sketches, diagr~s, and curves to explain test installations and results Recommendations and conclusions

h.

i. An appendix recording all pertinent changes made in the system (including circuitry and equipment) during testing, and reasons for each change. 5. PREPARATION FOR DELIVERY

* This section is not applicable to thi~ spcciiication. 6. NOTES

6.1 Intended use. This specification is intended for use by contractors in conducting flight tests of aircraft or guided missile electric systems. * 6,2 Data. Data generated by this specification js not de?~verable unless i,ist (DL Form lh23) referencing ~peclf~ed on the Contract Data Requirement.s the appropriate data item description ir!the military departments Authorized Data List (ADL). The data produced by this specification is as follows: a. b, 6.3 Test procedure (see ~}.1)
lest report (see 4.3).

Definition

6.3.1 Electric system. The term electric system, as usea nerein, should be construed to mean power-generation equipment, batteries, conversion equipment, distribution circuits, and all associated control and protection equipment, Load equipment should be considered cJn2yZG the extent of its effect on , or the extent tc which it.is affe(~ted by tl)eoperatio~ of the system.

Source: http://www.assistdocs.com -- Downloaded: 2007-07-18T15:22Z Check the source to verify that this is the current version before use.

MIL-F-25381A(USAF)

6.4 Identification of changes. The margins of this specification are marked with w asterisk to indicate where changes (additions, modifications, corrections, deletions) from the previous iss~e were made. This was done as a whatsoever for any convenience only and the Government assu!mes no liabi!ity inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last previous issue.

Custodian: Air Force - 11

Preparing activity: Air Force - 11 Project No, KSC F806

Source: http://www.assistdocs.com -- Downloaded: 2007-07-18T15:22Z Check the source to verify that this is the current version before use.

Source: http://www.assistdocs.com -- Downloaded: 2007-07-18T15:22Z Check the source to verify that this is the current version before use.

FOLD

..

OFFICIAL
PENALTY FOR

M. JSINESS PRIVATE uSE $~~

--

ASDf4950/TZS Wrig}lt-Patterson AFB, OH 45433

FOLD

..

Source: http://www.assistdocs.com -- Downloaded: 2007-07-18T15:22Z Check the source to verify that this is the current version before use.

STANDARDIZATION
[N STRUCTIONS
ment DoD are of Invite-d of be of suitable to the use contractors, dGtIVLLI m

DOCUMENT

IMPROVEMENT
sol IcIt m]nlmurrl hcmcficltil delai vendnrs J. i+r~ ncl

PROPOSAL
ur

I
side, s[aple au:hor12at:, AI I-L-F, ant 10 [om

OMEI

A[, prO. al NV, .!? W<<

The purpose of [h!s products aI reasrrnahlc govemmcnt submit rt, (erenced improving to comments CUI111;IL4J:L thts preparing ANO TITLE activities, (o the bdbml[tc

form IS to COSI and or J on or gok, emmenl this If

commcn!s wh}ch will olhcr~ise who are r prospecl)ve :7.~!j ~ttdch reverse

WII! he]{ a,-hievc prol. urt, enhance us{ U( the documen: suppliers ,n comer. Jn t,, prrtlni,n! and
pldc.

manuf~clllrers (.)rn

of ,., ..,..

!hr an,!

prvduc[ ,nd ,:, ! w!,,, III !, a t,,

Fold cmIInes on
< ..r,s!~lul, < untr.iclu~l ddd)!l~,niil

preptifir)~ port]on may envelope IOCUMENT

document(s) riorilmenl. actlvlty.

LIJ dm.>r)d There

rvqu>r,::,cr.?. paper>,

data bulb

addressed IDENTIFIER

AAt E OF

ORGANIZATION

AND

ADDRESS

CONTRACT

NUMBER

MATERIAL ,:2 HAS uSE? A GIVE PA R4GRAPu


t4uM13ER AN@ WORDING

PRoCURED

uNDER

A .SSJPC594TQ ACT

DIRECT OR

GOVERNMENT

CO N- RACT

ANY

PART

OF

THE

DOCUMENT

CREATED

PROBLEMS

REQUIRED

Interpretation

IN PROCUREMENT

13

REC0Mh4ENDA710N5

FOu

CO RW*.

CTf

NG

7WE

DEFICIENCIES

CO MM EN TSON

ANY

OOCUMENT

REQUIREMENT

CONSIDERED

TOO

RIGID

IS THE ~

DOCUMENT Yss ~

REST NO

RI CT IVE~ (II <Ye8 *, in who: Wayy)

REMARKS

JBMITTED

BY (Prfnfed

O, Iyped

n~e

md

qddreas

- Opt fonal)

TEL

EpHONE

NO

OATE

-.

--..