0 оценок0% нашли этот документ полезным (0 голосов)
21 просмотров1 страница
Construction Today
The Magazine for the People Who Build America
Construction Today examines best practices in the general building, heavy construction and associated specialty trade sectors. Its readers are leaders at major contracting, engineering and design firms, equipment manufacturers and suppliers of construction materials and building products, as well as public and private project owners and regulators.
Construction Today helps firms navigate the world of business through insightful, cross-industry articles on trends, opinions and legal issues, as well as intriguing interviews with the industry's most interesting and influential men and women.
Construction Today
The Magazine for the People Who Build America
Construction Today examines best practices in the general building, heavy construction and associated specialty trade sectors. Its readers are leaders at major contracting, engineering and design firms, equipment manufacturers and suppliers of construction materials and building products, as well as public and private project owners and regulators.
Construction Today helps firms navigate the world of business through insightful, cross-industry articles on trends, opinions and legal issues, as well as intriguing interviews with the industry's most interesting and influential men and women.
Авторское право:
Attribution Non-Commercial (BY-NC)
Доступные форматы
Скачайте в формате PDF, TXT или читайте онлайн в Scribd
Construction Today
The Magazine for the People Who Build America
Construction Today examines best practices in the general building, heavy construction and associated specialty trade sectors. Its readers are leaders at major contracting, engineering and design firms, equipment manufacturers and suppliers of construction materials and building products, as well as public and private project owners and regulators.
Construction Today helps firms navigate the world of business through insightful, cross-industry articles on trends, opinions and legal issues, as well as intriguing interviews with the industry's most interesting and influential men and women.
Авторское право:
Attribution Non-Commercial (BY-NC)
Доступные форматы
Скачайте в формате PDF, TXT или читайте онлайн в Scribd
bid on several new rehabilitation projects in the next year.” Strain expects TxDOT and other public work to remain strong for the next few years. “There is money until the present highway bill is up,” he says. “Long term, I think there will be more consolidation of contractors. Family construction compa- nies will be absorbed into larger, more pre- dominant companies. I’d say, probably in 15 to 20 years that could happen to this company.” One reason behind this trend, on the local level, is TxDOT bundling projects to- gether, he says. “They used to let a lot of $3 million to $5 million projects,” he explains. “Now, they’re in the $15 million to $25 mil- lion-plus range.”
‘A Little Bit of Everything’
Strain says J.H. Strain and Sons sets itself apart from competitors in the west Texas market by offering a wide range of servic- es. “We do a little bit of everything,” he says. “The trend a few years ago was to spe- cialize, but we haven’t done that. One thing we don’t do is concrete paving. There’s just not much of it in west Texas. “There is a good supply of limestone out here, which makes asphalt paving so much more economical.” Employees, however, are not in such good supply in the area, he notes. The com- pany currently employs 110 people, a num- will travel the roads. “You can’t just blade a road,” he says. “The ber Strain would like to be higher. “It’s tough now with the grade must be less than 10 percent, and the cross-slope can’t be labor force out there,” he says. “We’re in direct competition more than 1 percent, [or] a top-heavy crane could tip over. with the oil field industry, which is booming right now.” “We built Trent Mesa for AEP, and are subcontractors for The company does, however, have a core group of dedicated Mortenson on a BP project, and Wanzek for an Edison Mission staff members. “Thirty-one of them have been with us for 10 project,” Strain adds. years or longer, and 20 have been with us more than 20 years,” The company is finishing up a $15.2 million project on U.S. Strain says. “We have some third-generation employees.” Highway 277 in Haskell, Texas, for TxDOT. It is realigning the He credits this longevity to the company’s willingness to highway, creating a bypass around the city of Haskell. accommodate people. “We understand them having to take off In October 2006, J.H. Strain and Sons started a $22.6 million for family things,” he says. “They’re good to us, and we’re good project on Interstate 20 in Taylor County, Texas, on the north to them. The success and longevity of our company – we owe it edge of Abilene. “We are tearing down and replacing three all to the employees. bridges where IH-20 crosses U.S. 83,” Strain says. “Those “One in particular, Bobby Rushing, came here the same year bridges were 30-plus years old, and the clearance was too low – I did,” he continues. “I’d graduated from college, and he’d been they have been hit numerous times. working for another contractor. He’s a once-in-a-lifetime “We are also upgrading and rebuilding frontage roads,” he employee – honest, knowledgeable, gets along with everyone, adds. “We are changing the traffic pattern out here to one-way knows how to handle everyone from TxDOT engineers to frontage roads around the bridges. We are installing 125,000 superintendents to suppliers to subs. To illustrate, last year, the tons of Ty B hotmix, restabilizing existing base with flyash, son of a retired engineer director, the No. 1 guy at TxDOT, undersealing, and will overlay 43,000 tons of Superpave D.” bought some property around Austin with a creek running There is no shortage of this type of project, Strain says. through it. They had to span the creek, and they called Bobby “TxDOT has a very aggressive replacement program out here in Rushing for his advice.”
Learn Python Programming for Beginners: Best Step-by-Step Guide for Coding with Python, Great for Kids and Adults. Includes Practical Exercises on Data Analysis, Machine Learning and More.
ChatGPT Side Hustles 2024 - Unlock the Digital Goldmine and Get AI Working for You Fast with More Than 85 Side Hustle Ideas to Boost Passive Income, Create New Cash Flow, and Get Ahead of the Curve