Вы находитесь на странице: 1из 1

Blackfriars Bridge Foreshore

Location plan
CITY OF LONDON

Introduction

Advance works and phase one construction plan

Construction

Phase two construction plan

Blackfriars Bridge Foreshore

Draft limit of land to be acquired or used Proposed tunnel route centreline Local authority boundary Existing sewer Existing CSO
CITY OF LONDON

Temple Avenue

Temple Place

Fleet Main CSO

CITY OF LONDON Diversion rejoins Thames Path at Temple Place Victoria Embankment Blackfriars Station
Diversion rejoins Thames Path at Temple Place Blackfriars Station

Inner Temple Garden

Victoria Embankment

Low Level Sewer No.1

Blackfriars Station Blackfriars Millennium Pier SOUTHWARK Blackfriars Blackfriars Bridge Rail Bridge

Barge Possible location of President during construction Existing mooring for President Jack up barge servicing piling operations

Working area for pier relocation (advance works only) Blackfriars Bridge Blackfriars Rail Bridge

LAMBETH

Possible location of President during construction

Piling rig Option for contractor to transport materials using barges

Cranes Drop shaft Blackfriars Bridge Blackfriars Rail Bridge

N
Figure 1A: Blackfriars Bridge Foreshore location plan

LAMBETH

SOUTHWARK

LAMBETH

SOUTHWARK

Maximum extent of construction site for advance works and phase 1 Site hoarding/traffic barrier Cofferdam

Site support/welfare Traffic lane coned off for site access Site access

Maximum extent of construction site for phase 2 Site hoarding/traffic barrier Cofferdam Local authority boundary Site support/welfare

Excavated material storage and processing Maintenance workshop and storage Construction support Internal site road

Traffic lane coned off for site access Site access Existing Thames Path Thames Path diversion

Construction

Phase three construction plan

Blackfriars Bridge Foreshore


Existing Thames Path Local authority boundary Thames Path diversion
Figure 2C: Illustrative advance works and phase 1 construction plan

Figure 2D: Illustrative phase 2 construction plan

Aerial view of the completed works

10

Future use

Layout of the site once construction works complete

CITY OF LONDON
Millennium pier permanently relocated Refer to detail below

Diversion rejoins Thames Path at Temple Place Blackfriars Station

Ventilation columns

Provision for small retail kiosk

Access for maintenance vehicles

Level Thames Path over new foreshore structure

Widened pedestrian route under bridge

Stairs from Blackfriars Bridge reinstated

Cranes Possible location of President during construction Option for contractor to transport materials using barges Crane Drop shaft Blackfriars Bridge Blackfriars Rail Bridge
Stepped platform and seating area Victoria Embankment New entrance to public WCs and private sporting facility

Maximum extent of construction site for phase 3 Site hoarding/traffic barrier Cofferdam Local authority boundary Site support/welfare

Maintenance workshop and storage Internal site road Site access Existing Thames Path Thames Path diversion
Figure 3C: Aerial view of the completed works

Electrical and control kiosk under vehicle ramp from Blackfriars Bridge

New Fleet CSO outlet

Blackfriars Bridge N Foreshore structure to extend under bridge deck

LAMBETH

SOUTHWARK

Figure 2E: Illustrative phase 3 construction plan

President reinstated in current position at the end of construction period

Raised viewing platform

New water feature in paving surface in the shape of the River Thames

Ramp provides step free access to viewing platform

11

22

Figure 3D: Layout of site once construction works complete

23

www.thamestunnelconsultation.co.uk