This document specifies the Preliminary Acceptance Test approach for the ZAIN OptiX OSN3500 Project.

ZAIN Transmission Project Preliminary Acceptance Test Manual

Table of Contents OPTIX SDH Transmission PAT


TEST TABLE ........................................................................................................................................... 4 1.1 INSTALLED EQUIPMENT INSPECTION (BY DISTRICT)........................................................................ - 4 1.2 QUALITY INSPECTION (BY DISTRICT) ............................................................................................. - 5 1.3 SINGLE STATION BASIC ITEMS TEST ............................................................................................... - 6 1.3.1 Power-on Function of the Rack (By District) ......................................................................... - 6 1.3.2 Average Optical Power Transmitted (By District) .................................................................. - 7 1.3.3 Actual Received Optical Power (By District) ......................................................................... - 8 1.3.4 E1 Tributary Test and Cabling Test (By District) .................................................................... - 9 1.3.5 E3/STM-1e Tributary Test and Cabling Test (By District) ..................................................... - 10 1.3.6 Tributary Unit Protection (E1/E3/STM-1e) (By District) ...................................................... - 11 1.3.7 Power Input Unit Protection (By District)............................................................................ - 12 1.3.8 Fan Rotational Speed Automatically Adjustment (By District) .............................................. - 13 1.4 Network Management Function Test ....................................................................................... - 14 1.4.1 Configuration Management (By TO).................................................................................... - 14 1.4.2 Alarm Management (By TO)................................................................................................ - 14 1.4.3 Security Management (By TO)............................................................................................. - 14 APPENDIX 1-TEST INSTRUMENTS............................................................................................... - 15 APPENDIX 2- ABBREVIATION....................................................................................................... - 15 -

ZAIN Transmission Project Preliminary Acceptance Test Table


Site NO/Name: Rack Position: Shelf Location:

Test Table
1.1 Installed Equipment Inspection (By District)
Slot OptiX OSN3500
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Bar number

Board Type

Remarks

Host software version Huawei Representative


Signature: Name: Phone #: I.D #: Date:

O& M contractor Witness*


Signature: Name: Phone #: I.D #: Date:

ZAIN Representative
Signature: Name: Phone #: I.D #: Date:

OSN 3500 Preliminary Acceptance Test Table V4.03

Page - 4 - of 15

ZAIN Transmission Project Preliminary Acceptance Test Table


Site NO/Name: Rack Position: Shelf Location:

1.2 Quality Inspection (By District)


Serial. Name of item No. Standards & requirements
(1) Location for installing cabinets meets requirement (as floor plan) (2) Cabinets installed stably 1 Cabinets (3) Cabinets neatly arranged (4) Markings of cabinets in readiness (5) All fixtures fastened & not loose (1) Route and binding technology of internal optical fiber meet requirement (ODF cable arrangement) 2 Cable wiring (2) Route and binding technology of trunk cable meet requirement (3) Power cable neatly arranged (1) Connecting method of ground wire up to standard 3 Ground wire (2) Route and binding technology of ground wire meet requirement (1) No short circuit between internal power wire and ground 4 Power supply (2) Route and layout of power line arranged neatly (3) Connector of DC power line meets requirement 5 Labels The labels are arranged clearly

Test results

Huawei Representative
Signature: Name: Phone #: I.D #: Date:

O& M contractor Witness*


Signature: Name: Phone #: I.D #: Date:

ZAIN Representative
Signature: Name: Phone #: I.D #: Date:

OSN 3500 Preliminary Acceptance Test Table V4.03

Page - 5 - of 15

ZAIN Transmission Project Preliminary Acceptance Test Table


Site NO/Name: Rack Position: Shelf Location:

1.3 Single Station Basic Items Test


1.3.1 Power-on Function of the Rack (By District)
Test Sub-item Equipment No. Power Provided by user (V) Power-on function of the rack Voltage between NEG1(-) and RTN1(+) (V) Voltage between NEG2(-) and RTN2(+) (V) Result

Requirements: PW-I,II required range should be 38.4-72V Remark:

Huawei Representative
Signature: Name: Phone #: I.D #: Date:

O& M contractor Witness*


Signature: Name: Phone #: I.D #: Date:

ZAIN Representative
Signature: Name: Phone #: I.D #: Date:

OSN 3500 Preliminary Acceptance Test Table V4.03

Page - 6 - of 15

ZAIN Transmission Project Preliminary Acceptance Test Table


Site NO/Name: Rack Position: Shelf Location:

1.3.2 Average Optical Power Transmitted (By District)


Test Sub-item Equipment No. Slot Unit Name Port No. Optical module type Average optical power transmitted Test Value dBm Result

Requirements Optical Interface Board Type I-64.1 I-64.2 S-64.2a S-64.2b L-64.2b V-64.2a S-16.1 Remark Optical Transmitting Optical Power (dBm) -6 to -1 -5 to -1 -5 to -1 -1 to 2 10 to 13 10 to 13 -5 to 0 Optical Interface Board Type L-16.1 L-16.2 Le-16.2 V-16.2 U-16.2 I-4 S-4.1 Optical Transmitting Optical Power (dBm) -2 to 3 -2 to 3 2~5 10~13 12~15 -15 to -8 -15 to -8 Optical Interface Board Type L-4.1 L-4.2 I-1 S-1.1 L-1.1 L-1.2 Optical Transmitting Optical Power (dBm) -3 to 2 -3 to 2 -15 to -8 -15 to -8 -5 to 0 -5 to 0

Huawei Representative
Signature: Name: Phone #: I.D #: Date:

O& M contractor Witness*


Signature: Name: Phone #: I.D #: Date:

ZAIN Representative
Signature: Name: Phone #: I.D #: Date:

OSN 3500 Preliminary Acceptance Test Table V4.03

Page - 7 - of 15

ZAIN Transmission Project Preliminary Acceptance Test Table


Site NO/Name: Rack Position: Shelf Location:

1.3.3 Actual Received Optical Power (By District)


Test Sub-item Equipment No. Slot Unit Name Port No. Optical module type Actual received optical power Test value dBm Result

RequirementsThe actual received optical power at the receiving interface side of optical board should be 3dBs larger than the sensitivity index of this optical board and 5dBs less than its minimum overload index, the best value of actual received optical power can be in the middle of both the sensitivity index and the minimum overload index. Optical Interface Board Type Optical Receiving Sensitivity (BER of 1*10-12) (dBm) -11 -14 -18 -14 -14 -25 -18 Optical Receiving minimum overload Optical Power (dBm) -1 -1 -8 -1 3 -9 0 Optical Interface Board Type Optical Receiving Sensitivity( BER of 1*10-12) (dBm) -27 -28 -28 -25 -34 -23 -28 Optical Receiving minimum overload Optical Power (dBm) -9 -9 -9 -9 -18 -8 -8 Optical Interface Board Type Optical Receiving Sensitivity (BER of 1*10-12) (dBm) -28 -28 -23 -28 -34 -34 Optical Receiving minimum overload Optical Power (dBm) -8 -8 -8 -8 -10 -10

I-64.1 I-64.2 S-64.2a S-64.2b L-64.2b V-64.2a S-16.1 Remark

L-16.1 L-16.2 Le-16.2 V-16.2 U-16.2 I-4 S-4.1

L-4.1 L-4.2 I-1 S-1.1 L-1.1 L-1.2

Huawei Representative
Signature: Name: Phone #: I.D #: Date:

O& M contractor Witness*


Signature: Name: Phone #: I.D #: Date:

ZAIN Representative
Signature: Name: Phone #: I.D #: Date:

OSN 3500 Preliminary Acceptance Test Table V4.03

Page - 8 - of 15

ZAIN Transmission Project Preliminary Acceptance Test Table


Site NO/Name: Rack Position: Shelf Location:

1.3.4 E1 Tributary Test and Cabling Test (By District)


Test Sub-item Equipment No. Slot Test port E1 Tributary Test and Cabling Test Result

Requirements

Remark

Huawei Representative
Signature: Name: Phone #: I.D #: Date:

O& M contractor Witness*


Signature: Name: Phone #: I.D #: Date:

ZAIN Representative
Signature: Name: Phone #: I.D #: Date:

OSN 3500 Preliminary Acceptance Test Table V4.03

Page - 9 - of 15

ZAIN Transmission Project Preliminary Acceptance Test Table


Site NO/Name: Rack Position: Shelf Location:

1.3.5 E3/STM-1e Tributary Test and Cabling Test (By District)


Test Sub-item Equipment No. Slot Test port E3/STM-1e Tributary Test and Cabling Test Result

Requirements

Remark

Huawei Representative
Signature: Name: Phone #: I.D #: Date:

O& M contractor Witness*


Signature: Name: Phone #: I.D #: Date:

ZAIN Representative
Signature: Name: Phone #: I.D #: Date:

OSN 3500 Preliminary Acceptance Test Table V4.03

Page - 10 - of 15

ZAIN Transmission Project Preliminary Acceptance Test Table


Site NO/Name: Rack Position: Shelf Location:

1.3.6 Tributary Unit Protection (E1/E3/STM-1e) (By District)


Test Sub-item Equipment No. Working Slot Protection slot Tributary Unit Protection Switch-over Time Result

Requirements:

Remark:

Huawei Representative
Signature: Name: Phone #: I.D #: Date:

O& M contractor Witness*


Signature: Name: Phone #: I.D #: Date:

ZAIN Representative
Signature: Name: Phone #: I.D #: Date:

OSN 3500 Preliminary Acceptance Test Table V4.03

Page - 11 - of 15

ZAIN Transmission Project Preliminary Acceptance Test Table


Site NO/Name: Rack Position: Shelf Location:

1.3.7 Power Input Unit Protection (By District)


Test Sub-item Equipment No. Working Slot Protection slot Power Input Unit Protection Result

Requirements:

Remark:

Huawei Representative
Signature: Name: Phone #: I.D #: Date:

O& M contractor Witness*


Signature: Name: Phone #: I.D #: Date:

ZAIN Representative
Signature: Name: Phone #: I.D #: Date:

OSN 3500 Preliminary Acceptance Test Table V4.03

Page - 12 - of 15

ZAIN Transmission Project Preliminary Acceptance Test Table


Site NO/Name: Rack Position: Shelf Location:

1.3.8 Fan Rotational Speed Automatically Adjustment (By District)


Test Sub-item Equipment No. Fan Rotational Speed Automatically Adjustment FAN NO. Test results

Requirements:

Remark:

Huawei Representative
Signature: Name: Phone #: I.D #: Date:

O& M contractor Witness*


Signature: Name: Phone #: I.D #: Date:

ZAIN Representative
Signature: Name: Phone #: I.D #: Date:

OSN 3500 Preliminary Acceptance Test Table V4.03

Page - 13 - of 15

ZAIN Transmission Project Preliminary Acceptance Test Table


Site NO/Name: Rack Position: Shelf Location:

1.4 Network Management Function Test 1.4.1 Configuration Management (By TO)
Class Item
Define network element Configure service Configuration management Clock configuration Time configuration

Test results

1.4.2 Alarm Management (By TO)


Class Item
View current alarm Alarm Management View history alarm Alarm level setting

Test results

1.4.3 Security Management (By TO)


Class
Security Management NMS user login

Item
NE user level configuration

Test results

Huawei Representative
Signature: Name: Phone #: I.D #: Date:

O& M contractor Witness*


Signature: Name: Phone #: I.D #: Date:

ZAIN Representative
Signature: Name: Phone #: I.D #: Date:

OSN 3500 Preliminary Acceptance Test Table V4.03

Page - 14 - of 15

ZAIN Transmission Project Preliminary Acceptance Test Table


Site NO/Name: Rack Position: Shelf Location:

Appendix 1-Test instruments


Name of instrument and equipment SDH tester SDH/PDH tester SDH/PDH tester SDH/PDH tester SDH/PDH tester Data Network Analyzer PDH tester PCM bit error analyzer Optical power meter Variable optical attenuation Multi-meter Laptop Type ME3620 MP1550A ANT-20E ANT-20 HP37717C SmartBits600 PF140 YG.BERT2 PMS-1 OLA-15B

Appendix 2- Abbreviation
PAT: Preliminary Acceptance Test TO: Transmission Operation group in ZAIN which managed