Вы находитесь на странице: 1из 244

Building Rates- 2011- NCP

RATES FOR BUILDING CONSTRUCTIONS 2011

PROVINCIAL ENGINEERING DEPARTMENT NORTH CENTRAL PROVINCE

Page 1

Building Rates- 2011- NCP

PROVINCIAL ENGINEERING DEPARTMENT NORTH CENTRAL PROVINCE

Head Office :
Maithreepala Senanayake Mawatha, Anuradhapura. Tel. : 025-2220910, 025-2226157, 025-2225285ax : 025-2220910 F e-mail : ncpengineering@yahoo.com

Divisional Engineer's Offices :


Anuradhapura Kekirawa Mahailluppallama Medawachchiya Polonnaruwa : Tel. : 025 - 2236386 e-mail : ncpenganu@yahoo.com : Tel. : 025 - 2264286 e-mail : ncpengkek@yahoo.com : Tel. : 025 - 2249136 e-mail : ncpengmah@yahoo.com : Tel. : 025 - 2245930 e-mail : ncpengmed@yahoo.com : Tel. : 027 - 2222406 e-mail : ncpengpol@yahoo.com

Quality Control laboratory :


Maradankadawala Road, Kekirawa Tel. : 025-2263285 e-mail : ncpengqckek@yahoo.com

Page 2

Building Rates- 2011- NCP

Vision :

Being the forerunner in performing Engine activities in the North Central Province qualitatively

Mission :

Our mission is to raise the living standards people with the participation of the community, utilizing resources in an environment-friendly m and preserving the identity and the grandeur of Raj and to ensure optimum management for sustainabi the Engineering activities by using modern techn with an institutional and professional responsibility.

Page 3

Building Rates- 2011- NCP

KEY PERSONS
* Eng. C.K.B. Seneviratne C.Eng., MIE(SL), P.G.Dip.(L&W), M-2432 * Eng. (Ms.) K.C.D. Fernando B.Sc. Eng., P.G.Dip.(IWM), C.Eng., MIE(SL), M-5068 * Eng. (Ms.) D.L.B.P. Wijesekara, B.Sc. Eng., M.Sc.(IWRM), C.Eng., MIE(SL), M-4492 * Eng. S.J.K. Alas B.Sc. Eng., AMIE(SL), AM-5978 * Eng. H.M.J. Herath B.Sc. Eng., C.Eng., MIE(SL), M-5822 * Eng.(Ms.) I.K.M.C.K. Illangasinghe B.Sc. Eng., AMIE(SL), AM-4630 * Eng. D.M.U.S.B. Dissanayake B.Sc. Eng., C.Eng., MIE(SL), M-5187 * Eng. (Ms.) M.P.P. Dilhani B.Sc. Eng., C.Eng., MIE(SL), M-5698 * Eng. B.K. Matupala * Eng. W. Jayasundara E.C.(UK), AM-7728 * W.N.P.M.S. Wijithaweera B.Sc. (B.E.) * Eng. S.D.N. Ariyawansha B.Sc. Eng., AMIE(SL), AM-10626 * Eng. B.M.B.S. Bandara B.Sc. Eng., AMIE(SL), AM-10268 * Eng. A.A.D.C.R. Aluthgama B.Sc. Eng., AMIE(SL), AM-10760 * Eng. W.G.S.S. Bandara B.Sc. Eng., AMIE(SL), AM-10614 * Eng. H.M.R.M. Aberathna B.Sc. Eng., AMIE(SL), AM-10023 * Eng. W.H. Hapuarachchi
Page 4

: : :

Deputy Chief Secretary (Enginee Tel.025-2220910 Director (Buildings), 2226157

Director Designs, (Consultancy & Control), Tel. 025-2

Divisional Engineer - Medawach Tel. 025-2245930

: : : : : : : :

Divisional Engineer - Polonnaruw 027-2222406 Divisional Engineer - Kekirawa, Tel. 025-2264286 Engineer - School works, 2222194

Divisional Engineer - Mahaillupp Tel. 025-2249136

Divisional Engineer -Anuradhapu 025-2236386

Engineer in charge (Special proje 025-2225285 Architect, Tel. 025-2225285

Engineer in charge (Health depar projects), Tel. 025-222

Engineer in charge (Other departm projects), Tel. 025-222 Quality Control Engineer, 2263285

: : : :

Additional Engineer - Polonnaruw 027-2222406 Irrigation Engineer, 3779070 Mechanical Engineer , 2225285

Building Rates- 2011- NCP

B.Sc. Eng., AMIE(SL), AM-11257

Mechanical Engineer , 2225285

Page 5

Building Rates- 2011- NCP

GUIDELINES FOR USERS

* All rates in this book have been prepared by using Anuradhapura district buying committee rates and m of materials in North Central Province.

General Specifications :1.

Specifications for Building Works - Volume I - ICTAD Publication No. SCA/4/I - Revised Edition - July

2.

Specifications for Building Works - Volume II - Sanitary Installations - ICTAD Publication No. SCA/4/ Edition - October 2001

3.

Specifications for Water Supply, Sewerage & Storm Water Drainage Works - ICTAD Publication No Revised Edition - April 2002 Specifications for Electrical & Mechanical works Associated with Building & Civil Engineering Publication No. SCA/8 - Revised Edition - August 2000

4.

The Particular Specification shall be read in conjunction with the General Specification where applic event the Particular Specification is in conflict with the General Specification, the Particular Specificat prevail.

Particular Specifications for each category are mentioned above. Full description and relevant notes above for each category in the rate book should be given for each item when preparing estimates.

In the specifications, if any materials/fittings are described by using a trade name, it is only for the indicating the minimum level of quality and standard required. It may be used any other material/ fitting considered as equivalent in quality and standard to those specified therein subject to the approval of the E

Rates can be used as guidance and adjustment could be made to suit the specific site conditions s approval. Overhead and profit applied is 20%. Transport, loading, unloading and material wastage are included in the rates. Prices used are exclusive of VAT.

* * *

Page 6

Building Rates- 2011- NCP

LEDGEND
No. ITEM RATES FOR BUILDING CONSTRUCTIONS A. B. C. D. E. F. G. H. I. J. K. L. M. N. O. P. Q. R. DEMOLISHER EXCAVATION & EARTHWORK MASON CONCRETOR FORMWORK REINFORCEMENT BRICKLAYER PLASTERER PAVIOR ROOFER CARPENTER & JOINER IRONWORK PAINTER & DECORATOR PLUMBER DRAINLAYER ELECTRICAL INSTALLATION MISCELLANEOUS ALUMINIUM WORK UNITS PRICES OF MATERIAL, LABOUR AND PLANT FOR 2011 RATES FOR IRRIGATION CONSTRUCTIONS RATES FOR QUALITY CONTROL TESTS 7-9 10 11 12 - 14 15 16 17 18 - 19 20 - 23 24 - 31 32 - 35 36 - 38 39 - 40 41 - 46 46 - 48 49 - 51 52 53 - 55 56 - 58 60-72 73-75 Page

Page 7

Building Rates- 2011- NCP

Page 8

Building Rates- 2011- NCP

A - DEMOLISHER Rates for Demolisher shall include for: (a) (b) (c) NO. Scaffolding, shoring and shores required.

Protection of site personal, plant and equipment by taking precautions against uncontrolled collaps hazards and fire or explosion risks. Materials arising from the demolition works shall be removed as directed by the Engineer. DESCRIPTION

IMPERIAL UNIT RATE A-1 Brickwork in lime demolished, brick stacked and debris cube 1,483.00 cleared within the site. A-2 Brickwork in cement mortar demolished, brick stacked cube and debris cleared within the site. A-3 Ceiling existing removed, materials stacked and debris cleared within the site sqr. 1,978.00 625.00 8,640.00 18,909.00 711.00

A-4 Cement concrete demolished and debris cleared within the cube site. A-5 Reinforced concrete demolished, reinforcement removed cube and debris cleared within the site. A-6 Corrugated sheets (Iron, asbestos or aluminium) removed from roof or walls and stacked - single storied building A-7 Corrugated sheets (Iron, asbestos or aluminium) removed from roofs or walls and stacked - 2 storied building. A-8 Corrugated sheets (Iron, asbestos or aluminium) removed from roofs or walls and stacked - 3 storied buildings. sqr.

sqr.

772.00

sqr.

834.00

A-9 Door or window with frame size up to 40 sqft. removed from existing walls and stacked. A-10 Door or window with frame size over 40 sqft. removed from existing walls and stacked. A-11 Door or window sash only, up to 40 sqft. removed from existing walls and stacked. A-12 Door or window sash only, over 40 sqft. removed from existing walls and stacked. A-13 Down pipes, old or decayed, removed building and stacked. from existing

no. no. no. no. lft. lft.

960.00 1,440.00 141.00 212.00 10.00 19.00

A-14 Drains demolished and debris cleared within the site.

Page 9

Building Rates- 2011- NCP

A-15 Fence uprooted, barbed wire rolled up and all materials stacked (Length of fencing to be measured)

lft.

40.00

Page 10

Building Rates- 2011- NCP

IMPERIAL UNIT RATE A-16 Floors brick paved, demolished and debris cleared away sqr. 720.00 within the site. A-17 Gate sash removed and stacked after demolishing cement concrete blocks or removing posts and separating pintos (demolishing brickwork where necessary paid for separately) no 960.00

NO.

DESCRIPTION

A-18 Glass panes in doors and windows and fanlights removed and stacked. A-19 Gutter, eaves removed and stacked from roof of single storied building. A-20 Gutter, eaves removed and stacked from roof of 2 storied building A-21 Gutter, eaves removed and stacked from roof of 3 storied building. A-22 Partitions removed and stacked at site, including making good to walls and floors. A-23 Cement, lime plastering chipped and debris cleared away within the site. A-24 Rendering, cement chipped and debris cleared away from brick walls and floors within the site. A-25 Rendering, cement chipped and debris cleared away from cement concrete floors and walls within the site. A-26 Removing of existing roof (tiles, asbestos sheets or GI sheets) with timber frame, stacking usable material and clearing debris in single storied building. A-27 Removing of existing roof (tiles, asbestos sheets or GI sheets) with timber frame, stacking usable material and clearing debris in 2 storied building. A-28 Removing of existing roof (tiles, asbestos sheets or GI sheets) with timber frame stacking usable material and clearing debris in 3 storied and above

sqft. lft. lft. lft. sqft.

41.00 6.00 9.00 12.00 27.00

sqr. sqr.

510.00 1,080.00

sqr.

1,622.00

sqr.

1,410.00

sqr.

1,823.00

sqr.

2,318.00

A-29 Rubble masonry in cement demolished, rubble stacked cube and debris cleared within the site.
Page 11

3,090.00

Building Rates- 2011- NCP

A-30 Tiles, glazed demolished and debris cleared within the site.

sqr.

1,920.00

Page 12

Building Rates- 2011- NCP

IMPERIAL UNIT RATE A-31 Tiles Calicut or half round, removed from roof of single sqr. 494.00 storied buildings and stacked at site. A-32 Tiles Calicut or half round removed from roof of storied building and stacked at site. A-33 Tiles Calicut or half round, removed from roofs of storied and above buildings and stacked at site. 2 sqr. 742.00

NO.

DESCRIPTION

sqr.

989.00

A-34 Waterproof Treatment of hot bitumen taken off from flat roof and debris cleared away. A-35 Ceiling asbestos removed including timber framework stacking usable materials and debris cleared away in single storied building. A-36 Ceiling asbestos removed including timber frame work, stacking usable materials and debris cleared away in 2 storied building. A-37 Valance/Barge boarding removed, materials stacked and debris cleared away in single storied building. A-38 Valance/Barge board removed, materials stacked and debris cleared away in 2 storied building. A-39 Cement plastering in soffit chipped and debris cleared away. A-40 Roof trusses span up to 30' 0" removed from roof and stacked.

sqr. sqr.

1,920.00 2,348.00

sqr.

2,843.00

lft.

6.00

lft.

9.00

sqr. no.

1,384.00 2,966.00 1,680.00

A-41 Transport of debris to a place where 1-5 km away from the cube site as directed by the Engineer including loading.

A-42 Transport of debris to a place where 5-10 km away from cube the site as directed by the Engineer including loading. A-43 Basin, sink, or urinals including all fittings removed and wall made good A-44 Water Closet or Squatting pan, removed, sewer connection plugged and floor made good no. no.

1,950.00

1,146.00 1,804.00

Page 13

Building Rates- 2011- NCP

B - EXCAVATION & EARTHWORK Rates for Excavation and Earthwork shall include for: (a) (b) (c) (d) (e) (f) NO. Trimming sides, keeping clean, leveling, grading and consolidating bottom of bases and trenches etc.

Leveling and consolidating where required under slabs or sub-floor layers. Back filling and well ramming around foundation. Keeping all excavations free from storm or percolating water to keep excavation dry at all stages of const Any necessary additional excavation for working spaces, planking and strutting etc. Providing shoring work where necessary. DESCRIPTION

IMPERIAL UNIT RATE B-1 Removing top soil to a depth of 150mm and depositing as sqr. 816.00 directed within the site B-2 Excavation for foundation in any material except rock cube requiring blasting, part return fill in and ram, and surplus dispose within the site as directed. B-3 Excavation in any material except rock requiring blasting cube including transporting up to 400m, depositing and leveling. B-4 Excavation in trenches for walls and column pits in soft cube disintegrated rock (not requiring blasting) up to a depth of 1.5m and depositing excavated materials to distance not exceeding 10m. B-5 Excavation in trenches for walls and column pits in hard cube rock requiring blasting up to a depth of 1.5m and depositing excavated materials to distance not exceeding 10m. B-6 Filling under floors with gravel or other approved quality cube of filling, spread, watered and well rammed in 150mm layers (material available at site) B-7 Filling under floors with gravel or other approved quality cube of filling, spread, watered and well rammed in 150mm layers (material not available at site) B-8 Anti termite treatment on excavated foundation and compacted soil under floors (Treatment should be done according to the instructions given by the Engineer) Warranty period 10 years sqr. 1,483.00

1,183.00

2,016.00

5,604.00

1,795.00

3,839.00

3,575.00

Page 14

Building Rates- 2011- NCP

B-9 Drains, earth in any soil except rock requiring blasting cut cube to gradient and shaped as directed, soil deposited within site.

1,291.00

Page 15

Building Rates- 2011- NCP

C - MASON Rates for Masonry work shall include for: (a) (b) (c) All joggles, clamps, dowels, ties, and templates. Rough and fair cutting forming splays. Angles, reveals and returns. Instructions : (a) (b) NO. Rubble Masonry C-1 150-225mm Random Rubble Masonry in cement mortar cube 1:5 above 1 cube C-2 150-225mm Random Rubble Masonry in cement mortar cube 1:5 up to 1 cube Block Masonry C-3 150mm thick Hollow block work in cement and sand mortar 1:5 with 400x200x150mm blocks (Cavities unfilled) C-4 100mm thick Hollow block work in cement and sand mortar 1:5 with 400x200x100mm blocks (Cavities unfilled) C-5 150mm thick solid block work in cement and sand mortar 1:5 with 400x200x150mm blocks C-6 100mm thick solid block work in cement and sand mortar 1:5 with 400x200x100mm blocks sqr. 12,083.00 27,327.00 Cement used should be SLS Certified Products for Masonry work Average crushing strength of 10 blocks shall be not less than 2.8 N/mm2 DESCRIPTION IMPERIAL UNIT RATE

29,830.00

sqr.

8,949.00

sqr.

12,365.00

sqr.

9,090.00

Page 16

Building Rates- 2011- NCP

D - CONCRETOR Grade of concrete used in the construction and recommended mixes as follows. (a) (b) (c) (d) (a) (b) (c) (d) (e) (f) (a) (b) (c) (d) NO. Grade 25 Recommended Mix 1 : 1 : 3 (20mm) Grade 20 Recommended Mix 1 : 2 : 4 (20mm) Grade 15 Recommended Mix 1 : 2 1/2 : 5 (25mm) Grade 10 Recommended Mix 1 : 3: 6 (40mm) Rate shall include, Mixing, hoisting, placing and compacting on the surfaces of any material or on formwork. Forming any construction joint. Vibrating, curing and protecting concrete surfaces from harmful weather conditions. Forming sloping on upper surfaces where required. Grouting the earlier concreted edges. Making good after removal of formwork. Instructions Prior approval for any concrete work should be taken from the Engineer.

Approval for constituent materials and test reports for properties of concrete should be taken from Qua Engineer, Quality Control lab, Kekirawa with contractor's expense. Cement used should be SLS certified products approved for concrete. Reinforcement and formwork paid separately where not mentioned. DESCRIPTION IMPERIAL UNIT RATE cube 33,652.00 cube sqr. 35,902.00 9,915.00

D-1 Cement concrete grade 10 above one cube. D-2 Cement concrete grade 10 up to 1 cube. D-3 75mm thick cement concrete grade 15 in floors using concrete mixer and vibrator including laying of gauge 1000 polythene sheet

D-4 Cement concrete grade 20 in column foundation, column cube shaft and plinth beams using mixer and vibrator - up to first floor level D-5 Cement concrete grade 20 in column shaft using mixer cube and vibrator - up to second floor level D-6 Cement concrete grade 20 in column shaft using mixer cube and vibrator - up to third floor level

43,270.00

45,460.00

48,426.00

Page 17

Building Rates- 2011- NCP

D-7 Cement concrete grade 20 in slab, beams and stair case cube using mixer and vibrator - up to first floor level

44,726.00

Page 18

Building Rates- 2011- NCP

NO.

IMPERIAL UNIT RATE D-8 Cement concrete grade 20 in slab, beams and stair case cube 45,714.00 using mixer and vibrator - up to second floor level

DESCRIPTION

D-9 Cement concrete grade 20 in slab, beams and stair case cube using mixer and vibrator - up to third floor level

47,198.00

D-10 Cement concrete grade 25 in column foundation, column cube shaft and plinth beams using mixer and vibrator - up to first floor level D-11 Cement concrete grade 25 in column shaft using mixer cube and vibrator - up to second floor level D-12 Cement concrete grade 25 in column shaft using mixer cube and vibrator - up to third floor level D-13 Cement concrete grade 25 in slab, beams and stair case using mixer and vibrator - up to first floor level D-14 Cement concrete grade 25 in slab, beams and stair case using mixer and vibrator - up to second floor level cube

46,392.00

48,582.00

51,548.00

48,888.00

cube

49,876.00

D-15 Cement concrete grade 25 in slab, beams and stair case using mixer and vibrator - up to third floor level

cube

51,360.00

D-16 Cement concrete grade 20 in lintels (reinforcement and cube shuttering paid separately) using mixer and vibrator - up to first floor level

39,076.00

D-17 Cement concrete grade 20 in lintels (reinforcement and cube shuttering paid separately) using mixer and vibrator - up to second floor level D-18 Cement concrete grade 20 in lintels (reinforcement and cube shuttering paid separately) using mixer and vibrator - up to third floor level

41,054.00

44,020.00

D-19 Lintel, cement concrete grade 20, 112x150mm with 2 nos. 12 mm dia. tor steel bars and form work - up to first floor level
Page 19

Lft.

323.00

Building Rates- 2011- NCP

NO.

DESCRIPTION lft.

IMPERIAL UNIT RATE 334.00

D-20 Lintel, cement concrete grade 20, 112x150mm with 2 nos. 12 mm dia. tor steel bars and form work - up to second floor level D-21 Lintel, cement concrete grade 20, 112x150mm with 2 nos. 12 mm dia. tor steel bars and form work - up to third floor level D-22 Lintel, cement concrete grade 20, 225x150mm with 2 nos. 12 mm dia. tor steel bars and form work - up to first floor level D-23 Lintel, cement concrete grade 20, 225x150mm with 2 nos. 12 mm dia. tor steel bars and form work - up to second floor level D-24 Lintel, cement concrete grade 20, 225x150mm with 2 nos. 12 mm dia. tor steel bars and form work - up to third floor level D-25 Coble stone in grade 20 cement concrete reinforced with 4 n. of 10mm dia. Tor steel, up to 1 cuft. in volume

lft.

341.00

lft.

384.00

lft.

395.00

lft.

402.00

no.

2,824.00

D-26 75mm thick worktop in grade 20 cement concrete with 10mm tor steel at 150mm c/c both ways including formwork and soffit plastering

sqft.

318.00

D-27 100mm thick copping in grade 20 concrete on 225mm thick walls including 2nos. of 8mm tor steel bars and stirrups with 6mm dia. mild steel including formwork finished smooth with 50mm rendering and red cement floating with throat.

lft.

649.00

D-28 100mm thick copping in grade 20 concrete on 112mm thick walls including 2nos. of 8mm tor steel bars and stirrups with 6mm dia. mild steel including formwork finished smooth with 50mm rendering and red cement floating with throat.

lft.

471.00

Page 20

Building Rates- 2011- NCP

E - FORMWORK Rates for formwork shall include for: (a) (b) (c) (a) NO.

All framing, propping, bracing, cutting angles, bolting, wedging, cleaning, wetting and treating bef concrete. Erecting, Striking off and cleaning of formwork. Rubbing down, filling and making good the surface of concrete after removal of formwork. Instructions All the formwork for slabs should be done in such a way that it is good enough to apply a suitable pillar and painting, without soffit plastering. DESCRIPTION

layer of s

IMPERIAL UNIT RATE E-1 12mm Plywood shuttering for slab, beams and staircase sqr. 11,733.00 including dismantling - up to first floor level E-2 12mm Plywood shuttering for slab, beams and staircase including dismantling - up to second floor level E-3 12mm Plywood shuttering for slab, beams and staircase including dismantling - up to third floor level E-4 12mm Plywood shuttering for column shaft including dismantling - up to first floor level E-5 12mm Plywood shuttering for column shaft including dismantling - up to second floor level E-6 12mm Plywood shuttering for column shaft including dismantling - up to third floor level E-7 Shuttering for plinth beams and lintels including dismantling - up to first floor level E-8 Shuttering for lintels including dismantling - up to second floor level E-9 Shuttering for lintels including dismantling - up to third floor level sqr. 12,363.00

sqr.

12,453.00

sqr.

12,620.00

sqr.

13,040.00

sqr. sqr. sqr. sqr. sqr.

13,320.00 7,654.00 8,974.00 9,094.00 4,647.00

E-10 Class III timber shuttering for small works including dismantling

Page 21

Building Rates- 2011- NCP

F- REINFORCEMENT (a) (b) (c) (d) (e) (f) Rates for Reinforcement shall include for: Rolling margin and waste. Bending, cutting, fabricating, hoisting, and placing in position. Holding and supporting including temporary fixing supports, hangers. Cleaning and wire brushing. All spacing, laps etc. in reinforced steel other than design laps.

Tensile strength of Tor Steel should be not less than 460 N/mm2 and Mild Steel should be not less than 25

(a) (b) (c) (d)

Instructions Inevitable laps should be measured. Unless otherwise specified laps to be 50 times the diameter of the bar. Preparation, supplying & binding of cover blocks such that specified cover is maintained at outer-most ro

Reinforcements should be CN, GTB or LANWA. Tensile strength of reinforcements should be tested i from the institution where specified by the Engineer with contractor's expense.

(e) NO. F-1

Some trade names are used only for the purpose of indicating the minimum level of quality and standards IMPERIAL UNIT RATE Tor steel rods reinforcing in Column foundation and cwt. 9,219.00 plinth beams up to DPC, bent to shape laid in position and tied with G.I. Wire as directed Tor steel rods reinforcing in columns, beams, slabs and lintels up to first floor level bent to shape laid in position and tied with G.I. Wire as directed Tor steel rods reinforcing in columns, beams, slabs and lintels up to second floor level bent to shape laid in position and tied with G.I. Wire as directed Tor steel rods reinforcing in columns, beams, slabs and lintels up to third floor level bent to shape laid in position and tied with G.I. Wire as directed Mild steel rods, shape into stirrups and laid in position and tied with GI wires as directed - up to first floor level Mild steel rods, shape into stirrups and laid in position and tied with GI wires as directed - up to second floor level cwt. 9,561.00 DESCRIPTION

F-2

F-3

cwt.

9,869.00

F-4

cwt.

10,074.00

F-5

cwt.

9,513.00

F-6

cwt.

9,821.00

Page 22

Building Rates- 2011- NCP

F-7

Mild steel rod, shape into stirrups and laid in position and tied with GI wires as directed - up to third floor level

cwt.

10,026.00

Page 23

Building Rates- 2011- NCP

G - BRICK LAYER Rates for Brickwork shall include for: Wetting well all the surfaces of the bricks before using. Plumbing angles. Normal straight cuttings. Ranking of joints for plastering. All the necessary scaffolding. Ranking of joints for plastering. Instructions : (a) (b) NO. Cement used should be SLS Certified Products for Masonry work Average crushing strength of 10 bricks shall be not less than 7.0 N/mm2 DESCRIPTION

(a) (b) (c) (d) (e) (f)

IMPERIAL UNIT RATE G-1 Arch, segmental, brick in cement sand 1:3, including cube 39,017.00 plumbing angles, normal straight cutting, forming rebated reveals and raking of joints for plastering

G-2 225mm thick brick work in cement - sand mortar 1:8 (up cube to first floor level) G-3 225mm thick brick work in cement - sand mortar 1:8 (up cube to second floor level) G-4 225mm thick brick work in cement - sand mortar mortar cube 1:8 (up to third floor level) G-5 Brick 112mm thick in cement - sand mortar 1:5 (up to first floor level) G-6 Brick 112mm thick in cement - sand mortar 1:5 (up to second floor level) G-7 Brick 112mm thick in cement - sand mortar 1:5 (up to third floor level) G-8 Coping, brick in cement - sand mortar 1:5, weathered and throated on 112mm walls, cement rendered with 12mm thick 1:3 mix complete sqr. sqr. sqr. lft.

29,562.00 31,046.00 34,012.00 11,732.00 13,215.00 16,182.00 252.00

G-9 Coping, brick in cement - sand mortar 1:5, weathered and throated on 225mm walls, cement rendered with 12mm thick 1:3 mix complete

lft.

345.00

Page 24

Building Rates- 2011- NCP

G-10 Widening R.C.C Column by placing one brick on both side of column to size 450x225mm

lft.

178.00

Page 25

Building Rates- 2011- NCP

H- PLASTERER (a) (b) (c) (d) (e) (f) (g) (h) NO. Rates for wall finishing shall include for: Temporary rules, screeds, ground etc. Ranking out joints of brickwork and backing concrete surface for forming key. Joints between different surfaces. Forming arises and stopping against joinery work, metal work etc. Making good around pipes, sanitary fittings and fixtures. Straight cutting and raking cutting holes, notching and other sundries Labour of a like nature.

Preparing sample panel of different finishes described below for the approval of the Engineer. Each pa than 0.5 m2 in area. Cement used should be SLS Certified Products for masonry work. DESCRIPTION

IMPERIAL UNIT RATE H-1 D.P.C., 20mm thick, in cement-sand mortar 1:2 finished sqr. 6,980.00 with two coats of hot tar applied at the rate of 0.25 liters per sqm. for each coat H-2 20mm thick plinth plaster in 1:3 cement - sand mortar finished smooth with neat cement floating. H-3 20mm thick plinth plaster in 1:3cement - sand mortar finished smooth with red cement floating. H-4 Cement plastering with 1:5 mix, 15mm thick finished semi rough in external walls - up to first floor level H-5 Cement plastering with 1:5 mix, 15mm thick finished semi rough in external walls - up to second floor level H-6 Cement plastering with 1:5 mix, 15mm thick finished semi rough in external walls - up to third floor level H-7 Cement plaster with 1:5 mix, 15mm thick finished smooth with skim coat in internal walls - up to first floor level H-8 Cement plaster with 1:5 mix, 15mm thick finished smooth with skim coat in internal walls - up to second floor level sqr. 5,617.00

sqr.

5,956.00

sqr.

3,648.00

sqr.

3,987.00

sqr.

4,212.00

sqr.

5,134.00

sqr.

5,660.00

Page 26

Building Rates- 2011- NCP

H-9 Cement plaster with 1:5 mix, 15mm thick finished smooth with skim coat in internal walls - up to third floor level

sqr.

5,953.00

Page 27

Building Rates- 2011- NCP

NO.

DESCRIPTION sqr.

IMPERIAL UNIT RATE 4,923.00

H-10 Cement lime plaster with 1:1:5 mix, 15mm thick finished smooth with lime putty in internal walls - up to first floor level H-11 Cement lime plaster with 1:1:5 mix, 15mm thick finished smooth with lime putty in internal walls - up to second floor level H-12 Cement lime plaster with 1:1:5 mix, 15mm thick finished smooth with lime putty in internal walls - up to third floor level H-13 Reveals or plaster band 150mm wide in walls with cement lime and sand 1:1:5 mix finished to match existing H-14 Finish smooth soffit of slab by applying skim coat - up to first floor level H-15 Finish smooth soffit of slab by applying skim coat - up to second level H-16 Finish smooth soffit of slab by applying skim coat - up to third floor level H-17 15mm thick plaster to R.C.C. columns, beams and soffit of slab in cement - sand 1:3 mix including floating with lime putty - up to first floor level

sqr.

5,399.00

sqr.

5,716.00

lft.

65.00

sqr. sqr.

2,458.00 2,599.00

sqr. sqr.

2,693.00 5,602.00

H-18 15mm thick plaster to R.C.C. columns, beams and soffit of slab in cement - sand 1:3 mix including floating with lime putty - up to second floor level

sqr.

6,236.00

H-19 15mm thick plaster to R.C.C. columns, beams and soffit of slab in cement - sand 1:3 mix including floating with lime putty - up to third floor level

sqr.

6,659.00

H-20 15mm thick plastering to wall in cement- sand 1:3 mix including cement floating H-21 Cracks in walls plastered in cement - sand 1:3 mix after chipping to 50-100mm wide

sqr. lft.

3,833.00 24.00

Page 28

Building Rates- 2011- NCP

I - PAVIOR Rates for paving and tiling shall include for: (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) NO. Preparing surfaces of concrete / brick to receive rendering plaster bedding etc. Joints between different surfaces. Finishing to slopes and cross falls. Straight cutting and waste of tiles and other types of floor finishes. Protecting finished surfaces. For temporary rules, screeds, ground etc. All normal cutting arises, rounded edges, bedding and pointing. Slope should be maintained to a suitable direction to flow the water towards out side. Expansion joints so that no cracks propagated. Tiles should be approved by the Architect DESCRIPTION

IMPERIAL UNIT RATE I -1 Floors, cement concrete 1:2 1/2: 5 (25mm), 75mm thick, sqr. 13,595.00 cement rendered 12mm thick, 1:5 with expansion joints filled with cement and sand (including laying gauge 1000 polythene sheet) I -2 Rendering cement 12mm, in 1:5 cement and sand on existing concrete, finished smooth I -3 Rendering cement 12mm, in 1:5 cement and sand on existing concrete, floating coat using red cement finished smooth I -4 Rendering cement 12mm, in 1:5 cement and sand on existing concrete, finished rough I -5 Tile glazed 200x200mm, Sri Lankan made of approved type and colour, with all specials, supplied and fixed to wall including raking plaster and bedding in cement mortar 1:2, with tile beadings on top and edges - Ground floor I -6 Tile glazed 200x200mm, Sri Lankan made of approved type and colour, with all specials, supplied and fixed to wall including raking plaster and bedding in cement mortar 1:2, with tile beadings on top and edges - First floor sqr. sqr. 3,823.00 5,278.00

sqr.

3,401.00

sqr.

26,458.00

sqr.

26,746.00

Page 29

Building Rates- 2011- NCP

NO.

IMPERIAL UNIT RATE I -7 Tile glazed 200x200mm, Sri Lankan made of approved sqr. 26,938.00 type and colour, with all specials, supplied and fixed to wall including raking plaster and bedding in cement mortar 1:2, with tile beadings on top and edges - Second floor I -8 Tile glazed, 300x200mm, Sri Lankan made of approved type and colour, with all specials, supplied and fixed to wall including raking plaster and bedding in cement mortar 1:2 with tile beadings on top and edges - Ground floor I -9 Tile glazed, 300x200mm, Sri Lankan made of approved type and colour, with all specials, supplied and fixed to wall including raking plaster and bedding in cement mortar 1:2 with tile beadings on top and edges - First floor sqr. 26,689.00

DESCRIPTION

sqr.

26,977.00

I -10 Tile glazed, 300x200mm, Sri Lankan made of approved type and colour, with all specials, supplied and fixed to wall including raking plaster and bedding in cement mortar 1:2 with tile beadings on top and edges - Second floor I -11 Floor tile, 300x300mm, Sri Lankan made, nonskid pattern of approved type and colour supplied and laid including plaster bedding 1:2 with skirting and tile beadings on top - Ground floor

sqr.

27,169.00

sqr.

22,748.00

I -12 Floor tile, 300x300mm, Sri Lankan made, nonskid pattern of approved type and colour supplied and laid including plaster bedding 1:2 with skirting and tile beadings on top - First floor

sqr.

23,036.00

I -13 Floor tile, 300x300mm, Sri Lankan made, nonskid pattern of approved type and colour supplied and laid including plaster bedding 1:2 with skirting and tile beadings on top - Second floor

sqr.

23,228.00

Page 30

Building Rates- 2011- NCP

I -14 Floor tile, 200x200mm, Sri Lankan made, nonskid pattern of approved type and colour supplied and laid including plaster bedding 1:2 with skirting and tile beadings on top - Ground floor

sqr.

26,003.00

Page 31

Building Rates- 2011- NCP

IMPERIAL UNIT RATE I -15 Floor tile, 200x200mm, Sri Lankan made, nonskid sqr. 26,291.00 pattern of approved type and colour supplied and laid including plaster bedding 1:2 with skirting and tile beadings on top - First floor

NO.

DESCRIPTION

I -16 Floor tile, 200x200mm, Sri Lankan made, nonskid pattern of approved type and colour supplied and laid including plaster bedding 1:2 with skirting and tile beadings on top - Second floor

sqr.

26,483.00

I -17 Homogeneous Floor tile, 300x300mm, Sri Lankan made, nonskid pattern of approved type and colour supplied and laid including plaster bedding 1:2 with skirting and tile beadings on top - Ground floor

sqr.

25,184.00

I -18 Homogeneous Floor tile, 300x300mm, Sri Lankan made, nonskid pattern of approved type and colour supplied and laid including plaster bedding 1:2 with skirting and tile beadings on top - First floor

sqr.

25,472.00

I -19 Homogeneous Floor tile, 300x300mm, Sri Lankan made, nonskid pattern of approved type and colour supplied and laid including plaster bedding 1:2 with skirting and tile beadings on top - Second floor

sqr.

25,664.00

I -20 Homogeneous Floor tile, 400x400mm, Sri Lankan made, nonskid pattern of approved type and colour supplied and laid including plaster bedding 1:2 with skirting and tile beadings on top - Ground floor

sqr.

25,428.00

I -21 Homogeneous Floor tile, 400x400mm, Sri Lankan made, nonskid pattern of approved type and colour supplied and laid including plaster bedding 1:2 with skirting and tile beadings on top - First floor

sqr.

25,716.00

I -22 Homogeneous Floor tile, 400x400mm, Sri Lankan made, nonskid pattern of approved type and colour supplied and laid including plaster bedding 1:2 with skirting and tile beadings on top - Second floor

sqr.

25,908.00

Page 32

Building Rates- 2011- NCP

IMPERIAL UNIT RATE I -23 Floor tiles Tera cota of approved type laid on existing sqr. 19,629.00 concrete floor including plaster bed in 1:2 cement and sand

NO.

DESCRIPTION

I -24 Skirting 25x150mm in 1:5, projected or flush with walls and including forming groove I -25 Skirting 25x150mm in 1:5, projected or flush with walls and including forming groove finished with red cement

lft.

79.00

lft.

118.00

I -26 Skirting 25x100mm in 1:5, projected or flush with walls and including forming groove I -27 Skirting 25x100 in 1:5, projected or flush with walls and including forming groove finished with red cement I -28 Floor ramp 75mm thick, 750mm width cement concrete 1:21/2:5(25mm) on gauge 1000 polythene layer and cement rendered, expansion joints filled with 1:2 bitumen sand including filling and compacting gravel on the base and providing 150x225mm curb at the edge finished smooth with red cement floating

lft.

51.00

lft.

76.00

lft.

527.00

I -29 225mm width surface drain joined to the existing ramp with 75mm thick 1:2 1/2:5(25mm) concrete base, side wall of 112mm brick work in 1:5 cement sand rendering in 1:5 match to existing floor/ramp complete with expansion joints and necessary excavation

lft.

393.00

I -30 Laying of inter locking paving blocks on 75mm thick sand bed including site preparation, trimming, leveling and compacting with plate compactor as per instructions

sqr.

27,090.00

Page 33

Building Rates- 2011- NCP

J - ROOFER (a) (b) (c) (d) (a) (b) (c) (d) (e) (a) (b) (c) (d) (e) NO. Rates for Roof work shall include for: Hoisting and placing roofing materials in position. Laps, straight cutting and waste.

Galvanized iron J bolts, nuts, limpets and bituminous felt washers, nails screw clips, rivets straps and t Rafter hooks fixing rafters to the wall. Rates for joinery work shall include for: Framing together all works in accordance with the best practices. Nails Screws, Glue, plugs etc. Priming backs before fixing. Rawl plugs, brass screws etc. Drilling and making goods. Instructions Approval for all sizes of timber should be taken from the Engineer before using. All the timber used to be treated with wood preservative to the specifications. Ceiling sheets to be painted with one coat of acetic filler and two coats of emulsion paints. All the beading to be painted with one coat of wood primer and two coats of enamel paints.

For exposed rafter roofs, timber should be well planed and varnished. Timber sizes indicated in the des the sizes before planning. DESCRIPTION Roof including Timber frame Corrugated asbestos sheet roof (sloping to two directions) including 50x100mm imported treated timber rafters at 900 c/c and 50x50mm imported treated timber bearers with necessary coach screws and limpet washers or hook bolts, prepare and apply one coat of wood preservative (black) to structural timber work, including touching up cut end etc. after fixing (Timber used other than those mentioned above measured separately) IMPERIAL UNIT RATE sqr. 18,473.00

J-1

Page 34

Building Rates- 2011- NCP

J-2

Calicut tile roof (sloping to four directions) on imported treated timber framework including 100x100mm struts, 50x175mm ridge, 50x150mm hip and valley rafters, 100x75mm wall plate, 75x125mm purling, 50x100mm rafters, 50x25mm reapers including nuts and bolts and, prepare and apply one coat of wood preservative (black) to structural timber work (Timber beams measured and paid separately)

sqr.

28,906.00

Page 35

Building Rates- 2011- NCP

NO. J-3

IMPERIAL UNIT RATE Zink Alum sheet -colour- (gauge 0.47 mm, strength sqr. 16,377.00 550Mpa) roof on existing framework including necessary fasteners as per Manufacturer's Specifications

DESCRIPTION

J-4

Zink Alum Non-Colour Roofing on existing framework including necessary fasteners as per Manufacturer's Specifications Asbestos corrugated sheet fixed on existing frame with necessary bolt and nuts (single storied building) Asbestos corrugated sheet fixed on existing roof with necessary bolt and nuts (2 storied building)

sqr.

13,525.00

J-5

sqr.

8,665.00

J-6

sqr.

8,904.00

J-7

Corrugated G.I . Roofing sheet 20 BWG on class 1 timber frame work, including 50x100mm rafters at 900mm c/c and 50x50mm bearers at 900mm c/c complete with G.I. ridging, washers, hook bolts or clips including treating timber with wood preservative (sheets to have 150mm end laps and 1 1/2 corrugation side laps)

sqr.

14,102.00

Ceiling including Timber frame J-8 Asbestos ceiling -to existing rafters Asbestos ceiling fixed to existing rafters, with 50x50mm imported treated timber framework, interior beading 38x12mm and outer molding 38x38mm including prepare and apply one coat of wood preservative to structural timber work and application of one coat of Alkali resistant primer and two coats of Emulsion paint to ceiling sheets including necessary nails and screws. sqr. 18,268.00

Page 36

Building Rates- 2011- NCP

NO. J-9

DESCRIPTION Asbestos ceiling -with rafters Asbestos ceiling with 50x100mm imported timber framework at 1.2m c/c and 50x50mm imported treated timber bearer at 600mm c/c, interior beading 37x12mm and outer molding 37x37mm including prepare and apply one coat of wood preservative to structural timber work and application of one coat of Alkali resistant primer and two coats of emulsion paint to ceiling sheets including necessary nails and screws.

IMPERIAL UNIT RATE sqr. 23,750.00

J-10 Plywood ceiling - with rafters 9mm plywood flat ceiling with 50x100mm imported timber framework at 1200mm c/c and 50x50mm imported treated timber bearer at 600mm c/c, prepare and apply one coat of wood preservative to structural timber work and painting plywood sheets with two coats of varnish including necessary nails and screws.

sqr.

26,855.00

J-11 Lunumidella ceiling - to existing rafters Lunumidella slope ceiling under existing rafters with outer molding to the accepted design (All the beading and Lunumidella planks should be painted with one coat of wood sealer mixing with approved colour die and two coats of varnish) sqr. 15,569.00

J-12 Lunumidella ceiling -With rafters Lunumidella flat ceiling on 50x100mm imported timber framework at 600mm centers, with outer molding to the accepted design (All the beading and Lunumidella planks should be painted with one coat of wood sealer mixing with approved colour die and two coats of varnish)

sqr.

25,785.00

Page 37

Building Rates- 2011- NCP

NO.

DESCRIPTION Exposed rafter roof with ceiling

IMPERIAL UNIT RATE sqr. 36,993.00

J-13 Corrugated asbestos sheet roof with exposed rafter asbestos ceiling on 50x100mm imported treated timber rafters at 600mm centers and 50x50mm imported treated timber bearer and 50x25mm reapers for the joints of ceiling sheets with necessary coach screws and limpet washers, and 25x6mm beading including prepare and apply one coat of wood preservative (clear) and varnish to structural timber work and application of one coat of Alkali resistant primer and two coats of emulsion paint to ceiling sheets including touching up cut end etc. after fixing (Timber used other than those mentioned above measured separately)

J-14 Corrugated asbestos sheet roof with exposed rafter Lunumidella ceiling on 50x100mm imported treated timber rafters at 300mm c/c and 50x50mm imported treated timber bearer, with necessary coach screws and limpet washers, including prepare and apply one coat of wood preservative and varnish to structural timber work, including touching up cut end etc. after fixing Lunumidella planks should be painted with one coat of wood sealer mixing with approved colour die and two coats of varnish (Timber used other than those mentioned above measured separately)

sqr.

37,574.00

J-15 Corrugated asbestos sheet roof with exposed rafter plywood (9mm) ceiling on 2"x4" imported treated timber rafters at 2' c/c and 2"x2" imported treated timber bearer at 2' c/c with necessary coach screws and limpet washers, and 25x6mm beading prepare and apply one coat of wood preservative (clear) to structural timber work and painting plywood sheets with two coats of varnish including touching up cut end etc. after fixing (Timber used other than those mentioned above measured separately)

sqr.

38,429.00

Page 38

Building Rates- 2011- NCP

NO.

IMPERIAL UNIT RATE J-16 Calicut tile roofing (sloping to four directions) on sqr. 40,277.00 imported treated timber framework with exposed rafter asbestos ceiling including 100x100mm struts, 50x175mm ridge, 50x150mm hip and valley rafters, 100x75mm wall plate, 75x125mm purlins, 50x100mm rafters, 50x25mm reapers including nuts and bolts and 25x6mm beading including prepare and apply one coat of wood preservative prepare and apply one coat of wood preservative(clear) and varnish to structural timber work and application of one coat of Alkali resistant primer and two coats of emulsion paint to ceiling sheets (Timber beams measured and paid separately)

DESCRIPTION

Ridging J-17 Ridging, Calicut pattern bedded in cement and sand lime mortar 1:1:4 . Colour to match tiles J-18 Riding G.I. 24 BWG 450mm wide overall fixed complete J-19 Ridging with asbestos bedded in cement and sand mortar 1:4 J-20 Supply and fix Zink Alum ridging (colour) - 0.47 mm thick with necessary bolts and nuts J-21 Supply and fix Zink Alum ridging (non-colour) - 0.47 mm thick with necessary bolts and nuts Gutters & Downpipes J-22 Eaves gutter 150mm, rectangular, PVC fixed with PVC brackets with all necessary specials J-23 Down pipes, PVC fixed with wooden plug to wall including all necessary specials J-24 Supply and fix Zink Alum eave gutter (colour) - size 130x145mm, 0.47 mm thick with necessary bolts and nuts J-25 Supply and fix Zink Alum eave gutter (non-colour) - size 130x145mm, 0.47 mm thick with necessary bolts and nuts

lft.

145.00

lft. lft. lft. lft.

162.00 246.00 409.00 379.00

lft. lft.

154.00 141.00

lft.

414.00

lft.

377.00

Page 39

Building Rates- 2011- NCP

J-26 Supply and fix Zink Alum down pipes (colour) - size 100x100mm, 0.47 mm thick to wall with necessary bracket clips

lft.

339.00

Page 40

Building Rates- 2011- NCP

NO.

IMPERIAL UNIT RATE J-27 Supply and fix Zink Alum down pipes (non-colour) - size lft. 304.00 100x100mm, 0.47 mm thick to wall with necessary bracket clips J-28 Supply and fix standard Zink Alum gutter box - colour (0.47mm thick) J-29 Supply and fix standard Zink Alum gutter box - noncolour - (0.47mm thick) Valley gutter J-30 Supply and fix Aluminium valley gutter, 900mm girth bent with end laps not less than 225mm width including 20mm tongued and grooved planks laid to slope and profile on timber members no. no. 936.00 846.00

DESCRIPTION

lft.

955.00

J-31 Supply and fix Zn-Al valley gutter (Colour), on existing steel members as per Manufacturer's Specifications

lft.

377.00

J-32 Supply and fix Zn-Al valley gutter (non-colour), on existing steel members as per Manufacturer's Specifications Flashing J-33 Supplying and fixing gauge 24 GI wall flashing all complete J-34 Supplying and fixing Zn Alum wall flashing (colour) J-35 Supplying and fixing Zn Alum wall flashing (non-colour) Valance & Barge Board J-36 Barge board, Valance, facia, 20mm thick 225mm high, GINISAPU local timber fixed complete with necessary screws, preparing and painting with one coat of primer and two coats of enamel paint

lft.

348.00

lft. lft. lft.

417.00 384.00 350.00

lft.

236.00

Insulation Foil J-37 Furnishing and laying 3mm thick single side Aluminium foil J-38 Furnishing and laying 3mm thick Double side Aluminium foil J-39 Furnishing and laying gauge 17, 75x75mm Galvanized roof mesh
Page 41

sqr. sqr. sqr.

1,004.00 1,412.00 2,020.00

Building Rates- 2011- NCP

NO. Roof Timber

DESCRIPTION

IMPERIAL UNIT RATE lft. 304.00

J-40 Furnishing and fixing of 50x150mm Imported treated timber and apply one coat of wood preservative J-41 Furnishing and fixing of 75x100mm Imported treated timber and apply one coat of wood preservative

lft.

291.00

J-42 Furnishing and fixing of 50x100mm Imported treated timber and apply one coat of wood preservative J-43 Furnishing and fixing of 75x125mm Imported treated timber and apply one coat of wood preservative J-44 Furnishing and fixing of 100x150mm Imported treated timber and apply one coat of wood preservative J-45 Furnishing and fixing of 175x50mm Imported treated timber and apply one coat of wood preservative J-46 Furnishing and fixing of 100x200mm Imported treated timber and apply one coat of wood preservative J-47 Furnishing and fixing of 50x50mm Imported treated timber and apply one coat of wood preservative J-48 Furnishing and fixing of 50x25mm Imported treated timber and apply one coat of wood preservative J-49 Supplying and fixing of Coconut rafters 75x50mm J-50 Supplying and fixing of Coconut rafters 100x50mm J-51 Supplying and fixing 38x12mm beadings for ceiling J-52 Supplying and fixing 38x38mm molding for ceiling

lft.

188.00

lft.

388.00

lft.

785.00

lft.

485.00

lft.

968.00

lft.

92.00

lft.

51.00

lft. lft. lft. lft.

68.00 81.00 33.00 48.00

Page 42

Building Rates- 2011- NCP

NO.

DESCRIPTION

IMPERIAL UNIT RATE sqr. 6,252.00

Maintenance J-53 Corrugated G.I. sheet 24 BWG, fixed to roof, walls or fence with necessary cup washers and hook bolts or screws (timber framing paid for separately)

J-54 Leaks (up to 5 in numbers) in roofs of single storied building made good J-55 Leaks (above 5 in numbers) in roof of single storied building made good J-56 Leaks (up to 5 in numbers) in roofs of two or above storied building made good J-57 Leaks (above 5 in numbers) in roof of two or above storied building made good J-58 Leaks in corrugated sheet roof made good with bitumen washers and G.I. bolts and nuts J-59 Ridging, Calicut pattern removed and re-laid in cement mortar 1:1:4 and colour to match tile J-60 Tiles, Calicut pattern, flat supplied and laid up to 25 tiles in single storied building J-61 Tiles, Calicut pattern, flat supplied and laid above 25 tiles and up to 100 in single storied building J-62 Tiles Calicut pattern supplied and laid on roofs - single storied building J-63 Tiles Calicut pattern supplied and laid on roofs - two storied building J-64 Roof covering with Calicut pattern tiles available at site on existing timber frame. J-65 Roof covering with corrugated asbestos sheets available at site on existing timber frame with necessary roofing screws and washers. J-66 Furnishing and fixing of available timber purlins or rafters for the roof including necessary screws and nails and, application of one coat of wood preservative.

no. no. no. no. no. lft. no. no.

160.00 40.00 200.00 80.00 252.00 139.00 45.00 33.00

sqr. sqr. sqr. sqr.

3,635.00 4,115.00 1,140.00 900.00

lft.

27.00

Page 43

Building Rates- 2011- NCP

K - CAPENTER AND JOINER Rates for carpentry work shall include for: (a) (b) (c) (d) (e) (a) (b) (c) (d) (e) (a) (b) (c) NO

All Labour in framing together all work in accordance with the best practices, complete with all nece spikes, screws etc. Hoisting and fixing in position. Drilling and making good. Applying two coats of and approved wood preservative before fixing. Testing to establish properties to conformity to specification. Rates for joinery work shall include for: Framing together all works in accordance with the best practices. Nails Screws, Glue, plugs etc. Priming backs before fixing. Drilling and making goods. Rawtering all squares. Rates for Glazing shall include for: Straight cutting and grinding edges where required. External miters to polishing and leveled edges. Curving edges. DESCRIPTION

IMPERIAL UNIT RATE K-1 Supply and fix Front door, 95x70mm frame in sqft. 1,670.00 MAHOGANI and 28mm thick and sash with designs in TEAK timber (Fit panels) complete with brass furniture, 2 nos. 150mm barrel bolts and 3 nos. hinges including preparation of surface and application of two coats of Varnish

K-2 Supply and fix Front door, 95x70mm frame and 28mm thick sash with designs in MAHOGANI timber (Fit panels) complete with brass furniture, 2 nos. 150mm barrel bolts and 3 nos. hinges including preparation of surface and application of two coats of Varnish

sqft.

925.00

Page 44

Building Rates- 2011- NCP

K-3 Door or Window, ledge braced and battened with grooved and tongued joints, 95x70mm frame and 19mm to 22mm thick sashes in class 1 timber complete with brass furniture 2 nos. 150mm barrel bolts and 3 nos. hinges including preparation of surface and application of two coats of Varnish

sqft.

909.00

Page 45

Building Rates- 2011- NCP

IMPERIAL UNIT RATE K-4 Door or window glazed and / or paneled with 95x70mm sqft. 1,158.00 frame and 28mm thick sash in class 1 timber fixed complete with brass furniture, 2 nos. 150mm barrel bolts and 6 nos. hinges including preparation of surface and application of two coats of Varnish - Double sash

NO

DESCRIPTION

K-5 Supply and fix Plywood door -GINTOTA or equitant with 95x70mm frame and complete with brass furniture, 2 nos. 150mm barrel bolts and 3 nos. hinges including preparation of surface and application of two coats of Varnish

sqft.

754.00

K-6 Supply and fix PVC door with frame complete with 3 hinges and lock/barrel bolt K-7 Door or window glassed with 95x70mm frame comprising 2 no. of openable sashes with100x28mm outer frame and non-openable 125x28mm timber strips area complete with brass mongers including preparation of surface and application of two coats of varnish

sqft. sqft.

388.00 710.00

K-8 Door or windows glazed and / or paneled, sash only 28mm thick in class 1 timber with brass furniture, 2 nos. 150mm barrel bolts and 3 nos. hinges including preparation of surface and application of two coats of Varnish K-9 Supplied and fixed plywood door sash 28mm thick (GINTOTA or equitant) to the existing frame complete with brass furniture 2 nos. 150mm barrel bolts and 3 nos. hinges including preparation of surface and application of two coats of Varnish

sqft.

764.00

sqft.

433.00

K-10 Supply and fix door sash 19 to 22mm thick, ledge braced and battened with grooved and tongued joints in class 1 timber complete with brass furniture 2 nos. 6" barrel bolts and 3 nos. hinges including preparation of surface and application of two coats of Varnish

sqft.

640.00

K-11 Door frame 95x70mm class 1 timber supplied and fixed in position

sqft.

277.00

Page 46

Building Rates- 2011- NCP

K-12 Door or window sash, removing, easing and re-fixing K-13 Door or window sash easing only

no. no.

448.00 173.00

Page 47

Building Rates- 2011- NCP

NO.

DESCRIPTION

IMPERIAL UNIT RATE no. lft. no. lft. lft. sqft. 411.00 226.00 599.00 132.00 201.00 788.00

K-14 Door or window frames renewed in short length with class 1 timber K-15 Door or window, glazing bars renewed in class 1 timber K-16 Door sash, swing, removed and re-fixed in new position K-17 Louver blade 9mm thick in class 1 timber 100mm wide K-18 Louver blade 9mm thick in class 1 timber 150mm wide K-19 Wicket gate at entrance 1050x900mm double hinge fittings to include 2 pairs of 25x63mm butt hinges and 100mm iron barrel bolts post and sash with 40x40x5mm angle iron and 50mm SWG 10 welded mesh complete with 2 coats of anticorrosive paint

K-20 Glass panes 3 mm thick supplied and fixed with class 1 timber beading K-21 Glass panes 5 mm thick supplied and fixed with class 1 timber beading K-22 Beading or filleting for glass panes fixed complete with brass panel pins (with class 1 timber) K-23 Door or window frame altered, existing, rebate fillets using class 1 timber with screws and sash re-hung on opposite side K-24 Supplying and fix mortise lock - Union 678-24-95CH or equivalent, with 5 years guarantee. (guarantee certificate should be submitted with bills)

sqft. sqft. lft.

223.00 328.00 14.00

no.

3,245.00

no.

5,697.00

K-25 Supplying and fix switch lock - Bird or equivalent Iron furniture K-26 Supply and fix barrel bolt 100mm - Iron with brass screws K-27 Supply and fix barrel bolt 75mm - Iron with brass screws K-28 Supply and fix Hasp and staples 100mm - Iron with brass screws
Page 48

no.

2,271.00

no. no. no.

257.00 214.00 194.00

Building Rates- 2011- NCP

K-29 Supply and fix Hasp and staples 150mm - Iron with brass screws

no.

311.00

Page 49

Building Rates- 2011- NCP

NO.

DESCRIPTION with brass heavy

IMPERIAL UNIT RATE no. no. no. no. no. 211.00 280.00 4,866.00 643.00 717.00

K-30 Supply and fix Casement fasteners - Iron screws

K-31 Supply and fix Casement stays, 250mm - Iron quality with brass screws

K-32 Supply and fix door closer approved type with brass screws K-33 Supply and fix Butt Hinge, 100mm - Iron with brass screws K-34 Supply and fix Butt Hinge, 125mm - Iron with brass screws Brass Furniture K-35 Supply and fix Barrel bolts 150mm - brass, heavy quality with brass screws K-36 Supply and fix Casement fasteners -brass with mortise plate, heavy quality with brass screws K-37 Supply and fix Casement stays, 250mm - brass heavy quality with brass screws K-38 Supply and fix Butt Hinge, 100mm - brass heavy quality with brass screws K-39 Bolts, casement fasteners or stays removed and refixed including making good to holes in frames and sashes

no. no.

399.00 387.00

no. no. no.

344.00 601.00 87.00

Page 50

Building Rates- 2011- NCP

L - IRON WORK Rates for Metal work shall include for: To make good ground at balusters on completion. Welding where necessary. Wire brush and clean metal surfaces prior to painting. All fabricating work handling, hosting, fitting and fixing in position. Preparing surfaces and painting as specified or directed. DESCRIPTION IMPERIAL UNIT RATE sqft. 570.00

(a) (b) (c) (d) (e) NO.

L-1 Supply and fix Iron grill with 20x6 mm flat iron outer frame and horizontal bracings at 300 mm intervals complete with 12x6 mm flat iron verticals at 75 mm c/c as per given design including two coats of anticorrosive paint and enamel paint

L-2 Iron grill with 6 mm mild steel rods welded diagonally at 100 mm cts. both way and outer frame with 20x6 mm flat iron fabricated and fixed complete including two coats of anticorrosive paint and enamel paint.

sqft.

471.00

L-3 50x50mm G.I weld mesh fixed to existing frame with staple including painting (Beading paid separately)

sqft.

132.00

L-4 50x50mm G.I weld mesh supplied and fixed to window frame with 50x6mm class 1 timber beadings and, painted weld mesh with 2 coats of anticorrosive paint and beading with primer coat and 2 coats of enamel paint including making opening for bolts and casement stays

sqft.

296.00

L-5 50x50mm G.I weld mesh fixed to 40x40x5mm angle iron frame fabricated and fixed to wall with rawl plugs and screws including painting with enamel paint and anticorrosive paint

sqft.

347.00

Page 51

Building Rates- 2011- NCP

L-6 Supply and fix gate with Zink Alum gate clad sheet (colour) with 30mm heavy duty GI pipe frame work, 20mm heavy duty squire tube bitterns and vertical members at the top, including application of two coats of anticorrosive primer and finishing coat of enamel paint complete with stap hinges, hasp and staples as per given design

sqft.

523.00

Page 52

Building Rates- 2011- NCP

NO.

IMPERIAL UNIT RATE L-7 Supply and place in position steel roof truss (WEB) - span no 41,340.00 4.5-6.0 lm - complete with double member exterior and single member interior, 6mm gusset plate, 16mm dia. rag bolts, 6mm base plate welded and application of two coats of anti-corrosive paint all as per detail drawing given by the Department

DESCRIPTION

L-8 Supply and place in position steel roof truss (WEB) - span 6.5-7.5 lm - complete with double member exterior and single member interior, 6mm gusset plate, 16mm dia. rag bolts, 6mm base plate welded and application of two coats of anti-corrosive paint all as per detail drawing given by the Department

no.

49,019.00

L-9 Supply and place in position steel roof truss (WEB) - span 8.0-9.0 lm - complete with double member exterior and single member interior, 6mm gusset plate, 16mm dia. rag bolts, 6mm base plate welded and application of two coats of anti-corrosive paint all as per detail drawing given by the Department

no.

65,205.00

L-10 Supply and place in position steel roof truss (FLAT) - span 4.5-6.0 lm - complete with double member exterior and single member interior, 6mm gusset plate, 16mm dia. rag bolts, 6mm base plate welded and application of two coats of anti-corrosive paint all as per detail drawing given by the Department

no

47,325.00

L-11 Supply and place in position steel roof truss (FLAT) - span 6.5-7.5 lm - complete with double member exterior and single member interior, 6mm gusset plate, 16mm dia. rag bolts, 6mm base plate welded and application of two coats of anti-corrosive paint all as per detail drawing given by the Department

no.

64,906.00

L-12 Supply and place in position steel roof truss (FLAT) - span 8.0-9.0 lm - complete with double member exterior and single member interior, 6mm gusset plate, 16mm dia. rag bolts, 6mm base plate welded and application of two coats of anti-corrosive paint all as per detail drawing given by the Department

no.

71,663.00

Page 53

Building Rates- 2011- NCP

IMPERIAL UNIT RATE L-13 Supplying and fixing Angle iron purling 40x40x5mm to lft. 197.00 trusses with 10 mm dia. bolts and nuts including application of anticorrosive paint

NO.

DESCRIPTION

L-14 Supplying and fixing Angle iron purling 50x50x5mm to trusses with 10mm dia. bolts and nuts including application of anticorrosive paint

lft.

191.00

L-15 Supplying and fixing Angle iron purling 65x65x5mm to trusses with 10mm dia. bolts and nuts including application of anticorrosive paint

lft.

283.00

L-16 Supplying and fixing End rafters, 50x50x5mm (double) angle iron on gable ends with purling cleats including application of anticorrosive paint L-17 Furnishing and fixing 100x50mm (Thickness-2mm) CPurlins as per Manufacturer's Specifications L-18 Furnishing and fixing 150x65mm (Thickness - 2mm) CPurlins as per Manufacturer's Specifications L-19 Furnishing and fixing 75x38mm (Thickness - 2mm) CPurlins as per Manufacturer's Specifications

lft.

639.00

lft.

311.00

lft.

449.00

lft.

260.00

Page 54

Building Rates- 2011- NCP

M - PAINTER AND DECORATOR Rates for painting shall include for: (a) (b) (c) (d) (e) (f) (g) (h) NO. Preparation of surfaces, cleaning down. Smoothing, knotting, stopping etc. Protecting floors and fittings etc. Removing and replacing doors furniture and cleaning upon completion. Providing samples and specification of all paints to be used in the works. Providing painting to an approved colour scheme design. All the paints are to be done up to the manufacturers specification.

Preparation sample panels of different finishes for the approval of the Engineer. Each panel not less than area. DESCRIPTION

IMPERIAL UNIT RATE M-1 Prepare and apply one coat of Alkali resistant primer and sqr. 2,346.00 two coats of emulsion paint to walls - up to first floor level M-2 Prepare and apply one coat of Alkali resistant primer and two coats of emulsion paint to walls - up to second floor level M-3 Prepare and apply one coat of Alkali resistant primer and two coats of emulsion paint to walls - up to third floor level M-4 Prepare and apply one coat of Alkali resistant primer and two coats of emulsion paint soffit of slabs - up to first floor level M-5 Prepare and apply one coat of Alkali resistant primer and two coats of emulsion paint to soffit of slabs - up to second floor level M-6 Prepare and apply one coat of Alkali resistant primer and two coats of emulsion paint to soffit of slabs - up to third floor level M-7 Prepare and apply one coat of Acrylic wall filler and two coats of weather proof white and colour paint - up to first floor level M-8 Prepare and apply one coat of Acrylic wall filler and two coats of weather proof white and colour paint - up to second floor level sqr. 2,594.00

sqr.

2,841.00

sqr.

2,413.00

sqr.

2,660.00

sqr.

2,884.00

sqr.

2,785.00

sqr.

3,033.00

Page 55

Building Rates- 2011- NCP

M-9 Prepare and apply one coat of Acrylic wall filler and two coats of weather proof white and colour paint - up to third floor level

sqr.

3,280.00

Page 56

Building Rates- 2011- NCP

IMPERIAL UNIT RATE M-10 Prepare and apply one coat of Acrylic wall filler and two sqr. 3,060.00 coats of bathroom paint, white and colour paint - up to first floor level M-11 Prepare and apply one coat of Acrylic wall filler and two coats of bathroom paint, white and colour paint - up to second floor level M-12 Prepare and apply one coat of Acrylic wall filler and two coats of bathroom paint, white and colour paint - up to third floor level M-13 Prepare and apply two coats of floor paint, red, gray or black M-14 Prepare and apply one coat of wood preservative to structural timber work, including touching up cut end etc. after fixing M-15 Varnishing two coats after sand papering of the surface M-16 Preparing and painting wood work with primer and two coats of enamel paint M-17 Painting aluminum paint 1 coat to metal surfaces M-18 Painting steel on new work with 2 coats of anti-corrosive paint M-19 Painting walls with Emulsion paint, 2 coats, including preparation of surface M-20 Painting Ceiling with 2 coats of Emulsion paint to the ceiling sheets and 2 coats of enamal paint to timber beadings including preparation of surface sqr. 3,307.00

NO.

DESCRIPTION

sqr.

3,554.00

sqr. sqr.

2,469.00 2,057.00

sqr. sqr. sqr. sqr. sqr. sqr.

2,289.00 3,229.00 1,217.00 2,078.00 2,198.00 2,364.00

M-21 Painting walls with Weather shield paint, 2 coats, including preparation of surface M-22 Wall, scraped to original plaster, sand papering and lime putting to cracks and defects, applying plaster of Paris and preparing surface for new or similar application of emulsion, snowcem or similar application

sqr.

2,499.00

sqr.

2,046.00

M-23 Preparing and painting wood work with 2 coats of enamel paint. M-24 White or colour washing two coats to walls with SAMARA
Page 57

sqr. sqr.

2,580.00 642.00

Building Rates- 2011- NCP

M-25 Water - Proofing of Bathrooms with approved materials as per Instructions

sqr.

3,050.00

Page 58

Building Rates- 2011- NCP

N - PLUMBER Rates for Plumbing shall include for: (a)

Excavation of trenches for services, pipes or drain pipes shall include for deepening and widening as n enable the barrels of pipes, ducts etc. to rest on firm ground and to facilitate jointing . Testing installations on completion. Chasing in brickwork / block work / concrete floor / concrete columns and make good. Fixing pipes to brickwork / block work. Solder rivets, screws, nails, clips, brackets, straps etc. Testing installations on completion. Sterilization, of Drinking water pipes on completion. FIXTURES, APPLIANCES AND EQUIPMENT Rates for sanitary fixtures shall include for:

(b) (c) (d) (e) (f) (g)

(a) (b) (c) (a) (b) (c) (d) NO.

Installation complete with plugs. Grated waste outlets. Brackets and all fixings including jointing to pipes. Instructions Prior approval from the architect should be taken for all the sanitary fittings and accessories.

Guarantee certificates of fittings should be submitted to the Department with the bills. No payment is d bills.

All the UPVC pipes to be SLS certified products. Some trade names are used only for the purpose of indicating the minimum level of quality and standards DESCRIPTION lft. lft. lft. lft. lft. lft. no. IMPERIAL UNIT RATE 26.00 60.00 86.00 96.00 120.00 161.00 921.00

N-1 Supply and lay PVC Pipe 20mm - type 1000 including all necessary fittings N-2 Supply and lay PVC Pipe 25mm - type 1000 including all necessary fittings N-3 Supply and lay PVC Pipe 32mm - type 1000 including all necessary fittings N-4 Supply and lay PVC Pipe 40mm - type 600 including all necessary fittings N-5 Supply and lay PVC Pipe 50mm - type 600 including all necessary fittings N-6 Supply and lay PVC Pipe 63mm - type 400 including all necessary fittings N-7 Supply and fix Ball valve PEGLER or equivalent - for overhead tanks - 20mm - all complete

Page 59

Building Rates- 2011- NCP

NO.

DESCRIPTION no.

IMPERIAL UNIT RATE 1,161.00

N-8 Supply and fix Ball valve PEGLER or equivalent - for overhead tanks - 25mm - all complete N-9 Supply and lay 110mm drainage pipe PVC - special for drainage - with necessary fittings complete N-10 Wash basin, ceramic, with pedestal (Chinese made) with 15 years guarantee complete with mono type, chromium plated basin tap - (Momali, Huai or equivalent) - with 5 years guarantee including all necessary fittings (Guarantee certificates should be submitted with the bill)

lft.

200.00

no.

12,774.00

N-11 Supply and fix closet, closed couple, Chinese made with 15 years guarantee complete with hard seat cover and all necessary fittings.(Guarantee certificate should be submitted with the bill)

no.

17,220.00

N-12 Supply and fix 2 PC set, closed couple with hard seat cover, (Chinese made) with 15 years guarantee complete with mono type, chromium plated basin tap - (Momali, Huai or equivalent) - with 5 years guarantee with all necessary fittings.(Guarantee certificate should be submitted with the bill)

no.

26,874.00

N-13 Supply and fix Closet Squatting type (Indian) with foot rest ceramic, medium, with trap

no.

5,400.00

Page 60

Building Rates- 2011- NCP

NO.

DESCRIPTION

IMPERIAL UNIT RATE no. 8,718.00

N-14 Supply and fix stainless steel kitchen Sink, PRINCE or equivalent - with single bawl, one side drain board including chromium plated long neck type sink tap Momali, Huai or equivalent - with 5 years guarantee complete with all necessary fittings - (overall size 900x450mm) - (Guarantee certificate should be submitted with the bill)

N-15 Supply and fix stainless steel kitchen Sink, PRINCE or equivalent with single bawl, without drain board including chromium plated long neck type sink tap Momali, Huai or equivalent - with 5 years guarantee complete with all necessary fittings (overall size 450x375mm) - (Guarantee certificate should be submitted with the bill)

no.

6,162.00

N-16 Supply and fix Ceramic Sink, 24"x15"x7" complete with mono type, chromium plated long neck type sink tap (Momali, Huai or equivalent) - with 5 years guarantee including all necessary fittings (Guarantee certificates should be submitted with the bill)

no.

8,772.00

N-17 Supply and fix corner wash basin complete with mono type, chromium plated basin tap - (Momali, Huai or equivalent) - with 5 years guarantee including all necessary fittings N-18 Supply and fix bidet spray - (Momali, Huai or equivalent) - with 5 years guarantee with all necessities. (Guarantee certificate should be submitted with the bill)

no.

6,384.00

no.

1,983.00

N-19 Supply and fix Urinal bawl type N-20 Supply and fix bath room accessories set (chromium plated with 5 years guarantee) - 4 pcs. (mirror, mirror shelf, towel bar and soap holder) all complete

no. no.

4,470.00 10,590.00

N-21 Supply and fix bath room accessories set (chromium plated with 5 years guarantee) - 6 pcs. (mirror, mirror shelf, towel bar, soap holder, tooth brush holder and toilet paper holder) all complete

no.

13,890.00

Page 61

Building Rates- 2011- NCP

N-22 Supply and fix Mirror, bathroom type, oval shape, 20" x 16" with plastic back and shelves

no.

2,460.00

Page 62

Building Rates- 2011- NCP

NO.

DESCRIPTION

N-23 Supply and fix Plastic Shower rose, with guarantee N-24 Supply and fix head shower, chromium plated heavy with 5 years guarantee N-25 Supply and fix Telephone shower with bar, chromium plated heavy with 5 years guarantee including flexible cable N-26 Supply and fix Soap tray, chromium plated (Chinese), (Momali, Huai or equivalent) with 5 year guarantee (Guarantee certificate should be submitted with the bill)

IMPERIAL UNIT RATE no. 203.00 no. 2,436.00

no.

5,142.00

no.

2,733.00

N-27 Supply and fix towel bar, chromium plated - (Momali, Huai or equivalent) - with 5 year guarantee (Guarantee certificate should be submitted with the bill)

no.

2,865.00

N-28 Supply and fix concealed stop cock - Mono type (Momali, Huai or equivalent) with 5 years guarantee (Guarantee certificate should be submitted with the bill)

no.

2,181.00

N-29 Supply and fix Angle valve (Momali, Huai or equivalent) with 5 years guarantee (Guarantee certificate should be submitted with the bill) N-30 Supply and fix Long neck type Sink tap, chromium plated - (Momali, Huai or equivalent) - with 5 years guarantee (Guarantee certificate should be submitted with the bill)

no.

1,515.00

no.

2,547.00

N-31 Supply and fix bib tap 20mm dia. - (Momali, Huai or equivalent) - with 5 years guarantee (Guarantee certificate should be submitted with the bill)

no.

1,695.00

N-32 Supply and fix 20mm dia. plastic Bib tap - Water Tec or equivalent - all complete N-33 Supply and fix stop cock/gate valve PVC Water Tec or equitant with SLS standards - 20mm dia.

no. no.

399.00 351.00

Page 63

Building Rates- 2011- NCP

N-34 Supply and fix stop cock/gate valve PVC Water Tec or equitant with SLS standards - 25mm dia.

no.

397.00

Page 64

Building Rates- 2011- NCP

IMPERIAL UNIT RATE N-35 Supply and fix stop cock/gate valve PVC Water Tec or no. 508.00 equitant with SLS standards - 32mm dia. N-36 Supply and fix stop cock/gate valve PVC Water Tec or equivalent with SLS standards - 40mm dia. N-37 Plastic shell water tank with 10 years guarantee of capacity 500 ltr. Including transporting, placing in position and fixing to the accepted Engineering standards N-38 Plastic shell water tank with 10 years guarantee of capacity 1000 ltr. Including transporting, placing in position and fixing to the accepted Engineering standards no. 417.00

NO.

DESCRIPTION

no.

13,920.00

no.

20,040.00

N-39 Plastic shell water tank with 10 years guarantee of capacity 2000 ltr. Including transporting, placing in position and fixing to the accepted Engineering standards N-40 Plastic shell water tank with 10 years guarantee of capacity 5000 ltr. Including transporting, placing in position and fixing to the accepted Engineering standards

no.

31,772.00

no.

66,840.00

N-41 Supply and fix Cover and seat for WC - plastic N-42 Supply and fix Chromium plated flexible cable (Momali, Huai or equivalent) N-43 Flushing cistern, plastic low level, with flush pipe and bracket supplied and fixed complete N-44 Closet, pedestal type, available at site fixed with cement concrete after breaking concrete floor and making good and making connection N-45 Supply and fix PVC specials with SLS standards - 20mm dia. (Elbow, Bend, Socket) N-46 Supply and fix PVC specials with SLS standards - 25mm dia. (Elbow, Bend, Socket) N-47 Supply and fix PVC specials with SLS standards - 32mm dia. (Elbow, Bend, Socket)

no. no. no. no.

1,590.00 906.00 6,660.00 1,835.00

no.

104.00

no.

111.00

no.

127.00

Page 65

Building Rates- 2011- NCP

N-48 Supply and fix PVC specials with SLS standards - 40mm dia. (Elbow, Bend, Socket)

no.

152.00

Page 66

Building Rates- 2011- NCP

IMPERIAL UNIT RATE N-49 Supply and fix PVC specials with SLS standards - 50mm no. 197.00 dia. (Elbow, Bend, Socket) N-50 Supply and fix PVC specials with SLS standards - 63mm dia. (Elbow, Bend, Socket) N-51 Supply and fix PVC specials with SLS standards - 20mm dia. Tees N-52 Supply and fix PVC specials with SLS standards - 25mm dia. Tees N-53 Supply and fix PVC specials with SLS standards - 32mm dia. Tees N-54 Supply and fix PVC specials with SLS standards - 40mm dia. Tees N-55 Supply and fix PVC specials with SLS standards - 50mm dia.Tees N-56 Supply and fix PVC specials with SLS standards - 63mm dia. Tees O - DRAINLAYER Rates for underground drainage shall include for: (a) (b) (c) (d) NO. Short lengths, joints and cutting at Manholes. Cutting and fixing pipe work to fittings. Testing. Grading to slopes and falls. DESCRIPTION IMPERIAL UNIT RATE Item 1,442.00 lft. 476.00 no. 270.00

NO.

DESCRIPTION

no. no. no. no. no. no.

79.00 106.00 126.00 163.00 215.00 298.00

O-1 Connection to existing sewer or manhole O-2 Drainage pipe 110mmdia. (type 400) PVC laid on cement concrete 150mm up to 600mm depth of invert including excavation and cement concrete hunching 1:3:6 (40mm)

O-3 Furnishing and fixing of Multi-floor trap including 150mm plastic grating

no.

1,510.00

Page 67

Building Rates- 2011- NCP

O-4 Gulley pit with internal dimension 300x300x300mm deep, 150mm thick 1:3:6(40mm) concrete foundation, 225mm thick brick work in 1:5 ct. sand, 12mm thick cement sand rendering in 1:2 with forming canals and 75mm thick R.C.C. slab as per Drawings

no.

4,205.00

Page 68

Building Rates- 2011- NCP

NO.

IMPERIAL UNIT RATE O-5 Manhole with internal dimension 450x450x600mm deep, no. 9,400.00 150mm thick 1:3:6(40mm) concrete foundation, 225mm thick brick work in 1:5 ct. sand, 12mm thick cement sand rendering in 1:2 with forming cannels and 75mm thick R.C.C. slab as per Drawings

DESCRIPTION

O-6 Manhole with internal dimension 600x600x600mm deep, 150mm thick 1:3:6(40mm) concrete foundation, 225mm thick brick work in 1:5 ct. sand, 12mm thick cement sand rendering in 1:2 with forming canals and 75mm thick R.C.C. slab as per Drawings

no.

12,474.00

O-7 Manhole with internal dimension 750x750x600mm deep, 150mm thick 1:3:6(40mm) concrete foundation, 225mm thick brick work in 1:5 ct. sand, 12mm thick cement sand rendering in 1:2 with forming canals and steel grating with 16mm dia. MS rod welded at 50mm centers to 25 x 25 x 5 mm angle iron frame including application of anticorrosive paint.

no.

16,837.00

O-8 Septic tank with internal dimensions 2325x900x2100mm, partition with same wall, all complete including excavation, 100mm thick base slab with 1:3:6 (40mm), 225mm brick work, 20mm thick 1:3 cement rendering including 75mm cover slab with 10mm bars at 225mm c/c both way and 63mm vent pipe. (Refer relevant Drawings) - for 30 persons

no.

78,499.00

O-9 Septic tank with internal dimensions 3225x900x2100, partition with same wall, all complete including excavation, 100mm thick Base slab with 1:3:6 (40mm), 225mm brick work, 20mm 1:3 cement rendering including 75mm cover slab with 10mm bars at 225mm c/c both way and 63mm vent pipe. (Refer relevant Drawings) - for 60 persons

no.

97,711.00

Page 69

Building Rates- 2011- NCP

NO.

DESCRIPTION

IMPERIAL UNIT RATE


122,592.00

O-10 Septic tank with internal dimensions 4125x1050x2100mm, partition with same wall, all complete including excavation, 100mm thick Base slab with 1:3:6 (40mm), 225mm brick work, 20mm thick 1:3 cement rendering including 75mm cover slab with 10mm bars at 225mm c/c both way and 63mm vent pipe. (Refer relevant Drawings) - for 100 persons

no.

O-11 Soakage pit with internal dia. 1200mm and depth 1500mm, all complete including excavation, ring beam with 4 Nos. 10 mm bars & 6 mm dia. stirrups at 225mm spacing at bottom of wall, 225mm brick work and 75mm thick cover slab with 12mm bars in 150mm c/c both way (as per detail drawing)

no.

74,538.00

O-12 Soakage pit with internal dia. 1200mm and depth 3000mm, all complete including excavation, ring beam with 4 Nos. 10 mm bars & 6 mm dia. stirrups at 225mm spacing at bottom of wall, 225mm brick work and 75mm thick cover slab with 12mm bars in 150mm c/c both way (as per detail drawing)

no.

126,153.00

O-13 Supply and fix 900x2400mm ready made RCC septic tank

no.

31,148.00

Page 70

Building Rates- 2011- NCP

P - ELECTRICAL INSTALLATION Rates for Electrical Installations shall include for: (a) (b) (c) (d) (e) (f) (a) (b) (c) (d) (e) All necessary conduits, cables, fittings, screws, nails clips, brackets straps, and the like. Giving notices, obtaining permits, paying fees etc. Provision of drawings or circuit diagrams etc. Labeling switch and switches or other fittings.

Providing samples of switches or other fittings. Earthening and testing installation as required. Instructions Before conduit pipes are laid on concrete floor slabs, a conduit layout drawing shall be prepared by th for the approval of consultant. All electrical installation shall be for 400 volts / 230 volts 50 Hz. 5 Amp final sub-circuits shall be carried out by the looping-in method. No joints are permitted in the runs of cables. Fixing heights from finished floor level, unless directed otherwise shall be as follows, Main switches (switch fuses) - 1.5 m Lamp fittings - 2.4 m Distribution boards - 1.7 m Ceiling fans - 2.5 m - 0.2 m

(f) (g) (h) (i) NO. P-1

Switches and fan regulators - 1.4 m Socket outlets Current operated ELCBs. Earth resistance shall be less than 5 Ohms, tested on a dry day. All fan regulators to be earthen.

Some trade names are used only for the purpose of indicating the minimum level of quality and standards IMPERIAL UNIT RATE Supply and install Earth electrode G.I. Pipe 50mm Dia. no. 1,737.00 heavy duty, 600mm long fixed on ground with connection Supply and install 65x65x6 mm angle iron, service bracket, D bracket and Insulator with necessary nuts and bolts for main wire fixed to wall or roof frame - Single Phase Supply and install 65x65x6 mm angle iron, service bracket, D bracket and Insulator with necessary nuts and bolts for main wire fixed to wall or roof frame - Three Phase Supply and fix 7/1.35 mm main wire - (Double) no. 3,524.00 DESCRIPTION

P-2

P-3

no.

4,766.00

P-4

lft.

311.00

Page 71

Building Rates- 2011- NCP

P-5

Supply install MCB 6 way, 40A, 2 pole Isolator, 40A ELCB 2-pole and box fixed with 7/1.35mm single core cable - Single Phase

no.

7,800.00

Page 72

Building Rates- 2011- NCP

NO. P-6

IMPERIAL UNIT RATE Supply install MCB 8 way, 40A, 2 pole Isolator, 40A no. 8,673.00 ELCB 2-pole and box fixed with 7/1.35mm single core cable - Single Phase Supply install MCB 10 way, 40A, 2 pole Isolator, 40A ELCB 2-pole and box fixed with 7/1.35mm single core cable - Single Phase Supply install MCB 6 way, 63A, 4 pole Isolator, 63A ELCB 4-pole and box fixed with 7/1.35mm single core cable - Three Phase Supply install MCB 8 way, 63A, 4 pole Isolator, 63A ELCB 4-pole and box fixed with 7/1.35mm single core cable - Three Phase no. 9,606.00

DESCRIPTION

P-7

P-8

no.

22,859.00

P-9

no.

25,478.00

P-10 Supply install MCB 10 way, 63A. 4 pole Isolator, 63A ELCB 4-pole and box fixed with 7/1.35mm single core cable - Three Phase P-11 Supply and install Electric bell and bell push complete with necessary wiring P-12 Supply and install Ceiling fan 56",(230V, 80W) KDK or equivalent with SLS certificate complete with regulator and other fittings P-13 Supply and install Wall fan 16" all complete P-14 Supply and install Exhaust fan all complete P-15 Supply and install Florescent lamp 20W, 600mm single, with plastic cover including switch and necessary wiring P-16 Supply and install Florescent lamp 40W, 1200mm single, with plastic cover including switch and necessary wiring

no.

28,097.00

no. no.

2,935.00 10,801.00

no. no. no.

8,532.00 6,240.00 3,287.00

no.

3,437.00

P-17 Supply and install Florescent lamp 40W, 1200mm, double, with plastic cover including switch and necessary wiring P-18 Supply and install Ceiling lamp barrel type, dia. 150mm - including switch and necessary wiring

no.

4,607.00

no.

4,196.00

Page 73

Building Rates- 2011- NCP

P-19 Supply and install Batten lamp necessary wiring

including switch and

no.

1,962.00

Page 74

Building Rates- 2011- NCP

IMPERIAL UNIT RATE P-20 Supply and install Pendent lamp including switch and no. 2,092.00 necessary wiring P-21 Supply and install CFL bulb - 20w ( spiral or globe) - with guarantee - including switch and necessary wiring P-22 Supply and install Wall lamp bracket type with single glass globe including switch and necessary wiring P-23 Supply and install 5A Switch Socket outlet including necessary wiring P-24 Supply and install 13A Switch Socket outlet including necessary wiring P-25 Supply and install 15A Switch Socket outlet including necessary wiring P-26 Replacing lamp holders P-27 Replacing Florescent lamp 1200mm with shade P-28 Replacing florescent lamp 600mm with plastic shade P-29 Replacing 1/1.13 mm cables P-30 Replacing 7/1.35 mm Cables P-31 Conduit PVC - 3/4" laid in brick or con. Walls AC MACHINES P-32 Supply and install wall mounted AC machine split type 9000 btu - LG or equivalent - with one year guarantee to all and five year guarantee for compressor including free service P-33 Supply and install wall mounted AC machine split type 12000 btu - LG or equivalent - with one year guarantee to all and five year guarantee for compressor including free service P-34 Supply and install wall mounted AC machine split type 18000 btu - LG or equivalent - with one year guarantee to all and five year guarantee for compressor including free service no. 2,576.00

NO.

DESCRIPTION

no.

2,425.00

no. no. no. no. no. no. lft. lft. lft.

3,058.00 3,844.00 4,298.00 71.00 1,211.00 1,091.00 19.00 103.00 76.00

no.

72,490.00

no.

90,090.00

no.

104,390.00

Page 75

Building Rates- 2011- NCP

P-35 Supply and install wall mounted AC machine split type 24000 btu - LG or equivalent - with one year guarantee to all and five year guarantee for compressor including free service

no.

131,890.00

Page 76

Building Rates- 2011- NCP

Q - MISCELLANEOUS Instructions Prior approval for the type of barbed wire should be taken from the Engineer before using. DESCRIPTION

(a) NO.

IMPERIAL UNIT RATE Q-1 Barbed wire fence on concrete posts - (height 1800mm) - lft. 247.00 reinforced with 4 nos. 6mm bars, 2 supports on corner posts, 2 supports for mid of every 6 intervals and 7 nos. wire lines to the accepted Engineering standard. (Posts should be fixed on a concrete pad of 300x300x450mm) Distance between two posts 2400-3000mm

Q-2 Barbed wire fence on concrete posts - (height 2400mm) reinforced with 4 nos. 6mm bars, 2 supports on corner posts, 2 supports for mid of every 6 intervals and 9 nos. wire lines to the accepted Engineering standard. (Posts should be fixed on a concrete pad of 300x300x450mm) Distance between two posts 2400-3000mm

lft.

321.00

Q-3 Furnishing and fixing of fence post - (height 1800 mm, on a concrete pad of 300x300x450mm, including necessary excavation to the accepted Engineering standard

no.

1,153.00

Q-4 Furnishing and fixing of fence post - (height 2400 mm), on a concrete pad of 300x300x450mm including necessary excavation to the accepted Engineering standard

no.

1,531.00

Q-5 Fixing of barbed wire lines to the existing posts with necessary hooks, bolts and nuts Q-6 Furnishing, laying and fixing 300mm dia. RCC Hume pipes with collars Q-7 Furnishing, laying and fixing 450mm dia. RCC Hume pipes with collars Q-8 Furnishing, laying and fixing 600mm dia. RCC Hume pipes with collars

lft. lft. lft. lft.

17.00 900.00 1,365.00 1,868.00

Page 77

Building Rates- 2011- NCP

R - Aluminium Work Specifications


(a) All the Aluminium members used for work should have following properties 1. Temper - T5 2. Tensile Strength - 155 Mpa 3. Elongation - 7% (Minimum) Surface Treatment to be done to get following thicknesses 1. Anodizing - Coating Thickness - 10-15 Microns 2. Powder Coating - Coating Thickness - 60-80 Microns (c) NO. Anodized R-1 Supply and fix Aluminium Sliding window with 5mm float glass, rubber beading stick with silicon gum Brown/Silver Aluminium members complete to the accepted Engineering standards R-2 Supply and fix Aluminium Casement window with 5mm float glass, rubber beading stick with silicon gum Brown/Silver Aluminium members complete to the accepted Engineering standards sqft. 880.00 Glass should be float with thickness 5 mm DESCRIPTION IMPERIAL UNIT RATE

(b)

sqft.

1,073.00

R-3 Supply and fix Aluminium window Fixed type, beading stick with silicon gum Brown/Silver Aluminium members complete to the accepted Engineering standards

sqft.

726.00

R-4 Supply and fix Aluminium Louvered frame, beading stick with silicon gum Brown/Silver Aluminium members complete to the accepted Engineering standards

sqft.

1,232.00

R-5 Supply and fix Aluminium Door with 5mm float glass on top and PVC coated 5mm plywood board at bottom, rubber beading stick with silicon gum Brown/Silver Aluminium members including tie rod and lock complete to the accepted Engineering standards

sqft.

1,265.00

Page 78

Building Rates- 2011- NCP

NO.

IMPERIAL UNIT RATE R-6 Supply and fix Aluminium Door with 5mm float glass on sqft. 1,386.00 top and 0.47 mm Zn-Al covered plywood board at bottom, rubber beading stick with silicon gum Brown/Silver Aluminium members including tie rod and lock complete to the accepted Engineering standards

DESCRIPTION

R-7 Supply and fix Aluminium Partition with 5mm float glass on top and PVC coated 5mm plywood board at bottom, rubber beading stick with silicon gum Brown/Silver Aluminium members complete to the accepted Engineering standards

sqft.

506.00

R-8 Supply and fix Aluminium Partition with 5mm float glass rubber beading stick with silicon gum Brown/Silver Aluminium members complete to the accepted Engineering standards

sqft.

660.00

R-9 Supply and fix Roller shutter door with necessary fittings, beading stick with silicon gum Brown/Silver Aluminium members complete to the accepted Engineering standards

sqft.

1,238.00

Powder coated R-10 Supply and fix Aluminium Sliding window with 5mm float glass, rubber beading stick with silicon gum Powder coated Aluminium members complete to the accepted Engineering standards sqft. 1,095.00

R-11 Supply and fix Aluminium Casement window with 5mm float glass, rubber beading stick with silicon gum Powder coated Aluminium members complete to the accepted Engineering standards

sqft.

1,430.00

R-12 Supply and fix Alumimium window Fixed type, beading stick with silicon gum Powder coated Aluminium members complete to the accepted Engineering standards

sqft.

693.00

Page 79

Building Rates- 2011- NCP

IMPERIAL UNIT RATE R-13 Supply and fix Aluminium Louvered frame, beading stick sqft. 1,402.00 with silicon gum Powder coated Aluminium members complete to the accepted Engineering standards

NO.

DESCRIPTION

R-14 Supply and fix Aluminium Door with 5mm float glass on top and PVC coated 5mm plywood board at bottom, rubber beading stick with silicon gum Powder coated Aluminium members including tie rod and lock complete to the accepted Engineering standards

sqft.

1,738.00

R-15 Supply and fix Aluminium Door with 5mm float glass on top and 0.47 mm Zn-Al covered plywood board at bottom, rubber beading stick with silicon gum Powder coated Aluminium members including tie rod and lock complete to the accepted Engineering standards

sqft.

1,936.00

R-16 Supply and fix Aluminium Partition with 5mm float glass on top and PVC coated 5mm plywood board at bottom, rubber beading stick with silicon gum Powder coated Aluminium members complete to the accepted Engineering standards

sqft.

693.00

R-17 Supply and fix Aluminium Partition with 5mm float glass rubber beading stick with silicon gum Powder coated Aluminium members complete to the accepted Engineering standards

sqft.

825.00

R-18 Supply and fix Roller shutter door with necessary fittings, beading stick with silicon gum Powder coated Aluminium members complete to the accepted Engineering standards

sqft.

1,815.00

Aluminium ceiling

Page 80

Building Rates- 2011- NCP

R-19 Aluminium ceiling with gypsum board of one side decorative and the other side Aluminium foil, fixed with 25x25x1mm angles and 25mm concrete nails to the wall and, 25x25mm main runners at 600mm c/c in one way and 25x25mm cross T in the other way hanged on roof with binding wire as per the instructions

sqft.

159.00

Page 81

Building Rates- 2011- NCP UNITS PRICES OF MATERIAL, LABOUR AND PLANT FOR 2011 Labour No. 01 02 03 04 Item Special Skilled Labour Skilled Labour Semi Skilled Labour Unskilled Labour Plant No. 01 02 Item Concrete Mixer Porker Vibrator Construction Materials No. 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Item Cement - excluding transport Rubble 6"-9" - excluding transport Metal - 1 1/2" - excluding transport Metal - 1 " - excluding transport Metal - 3/4 " - excluding transport Engineering Brick - including 15 km transport Lime - slaked, standard - excluding transport River sand - including transport Earth - excluding transport Gravel - excluding transport Asbestos Corrugated Sheet Asbestos Corrugated Sheet Asbestos Corrugated Sheet Asbestos Corrugated Sheet Asbestos ceiling Sheet Asbestos Ridging - 3' Cement sand hollow blocks, 16"x8"x4" Cement sand hollow blocks, 16"x8"x8" Cement sand solid blocks, 16"x8"x4" Cement sand solid blocks, 16"x8"x8" Calicut tiles - excluding transport Ridge tiles - excluding transport Skim coat Glass pan - 3 mm Glass pan - 5 mm Page 82 Unit 50 kg. Cube Cube Cube Cube no. 20 kg Cube Cube Cube no. no. no. no. no. no. no. no. no. no. no. no. 20 kg sqft. sqft. 1.75 m 2.5 m 3.0 m 3.5 m 1.2x1.2m Size/Gauge Unit Day Day Price (Rs.) 4,750.00 3,750.00 Unit Days Days Days Days Price (Rs.) 1,250.00 1,100.00 900.00 800.00

Building Rates- 2011- NCP 26 27 Paint brush 6" Red cement no. kg

Page 83

Building Rates- 2011- NCP No. 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 Enamel Paint Emulsion Paint Weather shield Paint Anticorrosive Paint Wall filler Wood preservative - Black Wood preservative - Clear Floor paint Aluminum paint Reinforcement Steel -Tor Reinforcement Steel -Mild Barbed wire Binding wire 16 bwg 25x25x5 mm Angle Iron 40X40X5 mm Angle iron 50X50X5 mm Angle iron 50X50X6 mm Angle iron 65X65X6 mm Angle iron Zink alum colour sheet Zink alum non-colour sheet Zink alum ridging -colour Zink alum ridging - non colour Zink Alum gutter - colour Zink Alum gutter - non-colour Zink Alum down pipe -colour Zink Alum down pipe - non-colour Zink Alum gutter box - colour Zink Alum gutter box - non-colour Zink Alum wall flashing - colour Zink Alum wall flashing - non- colour Zink Alum roofing screws Zink Alum valley gutter - colour Zink Alum valley gutter -non- colour AC Machine - split type - wall mounted - 9000btu AC Machine - split type - wall mounted - 12000btu Item Unit ltr. ltr. ltr. ltr. ltr. ltr. ltr. ltr. ltr. Ton Ton 25 kg lb lft. lft. lft. lft. lft. sqft. sqft. lft. lft. lft. lft. lft. lft. no no lft. lft. no. lft. lft. no. no. 12.5 bwg Size/Gauge

Page 84

Building Rates- 2011- NCP 63 64 AC Machine - split type - wall mounted - 18000btu AC Machine - split type - wall mounted - 24000btu no. no.

Page 85

Building Rates- 2011- NCP No. 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 Item Plastishell water tanks - 10 years guarantee - 500l Plastishell water tanks - 10 years guarantee - 1000l Plastishell water tanks - 10 years guarantee - 2000l Plastishell water tanks - 10 years guarantee - 5000l Bathroom accessories set - Chromium plated (4pcs.) Bathroom accessories set - Chromium plated (6pcs.) Ball valve- Pegler - 20mm Ball valve- Pegler - 25mm Wash basin with pedestal - Chinese made Water closet - Chinese made 2 PC set - Chinese made Corner wash basin Kitchen sink with drain board- stainless steel Kitchen sink without drain board - stainless steel Bidet shower - Chinese made Urinal - bawl type Chromium plated soap tray Chromium plated towel bar Chromium plated head shower Chromium plated telephone shower Squatting pan with foot rest Bathroom mirror Ceiling fan KDK with SLS Fluorescent lamp 600mm - single Fluorescent lamp 1200mm - single Fluorescent lamp 1200mm - double CFL bulb Wall bracket 5A socket outlet 15A socket outlet 13A socket outlet Door closer Plywood door - 2025x900mm Mortise lock - Union 678-24-95CH Switch lock - Bird Concrete posts - 1.8m Page 86 Unit no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. no. Size/Gauge

Building Rates- 2011- NCP 101 102 Concrete posts - 2.4m RCC septic tank- 900x2400mm no. no.

Page 87

Building Rates- 2011- NCP

Prepared and Checked by :Rates Preparing Committee 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Eng. (Ms.) D.L.B.P. Wijesekara Eng. S.J.K. Alas Eng. H.M.J. Herath Eng. (Ms.) I.K.M.C.K. Illangasinghe Eng. D.M.U.S.B. Dissanayake Eng. (Ms.) M.P.P. Dilhani Eng. B.K. Mathupala Eng. Waruna Jayasundara Archt. W.N.P.M.S. Wijithaweera Eng. S.D.N. Ariyawansa Eng. B.M.B.S. Bandara Eng. W.G.S.S. Bandara Eng. A.A.D.C.R. Aluthgama Eng. W.H. Hapuarachchi Mr. Palitha Samaraweera Mr. W.J. Gunawardena Mr. U.L.R.G. Weragoda Mr. M.B.A.S. Ariyasinghe Mrs. G.D.S. Shyamali Mrs. D.G.R. Malani Mrs. Namali Gunasinghe Mr. P.A.D.S. Ponnamperuma Mr. R.M.M.R. Amarasena Director (Designs, Consultancy & QC) Divisional Engineer - Medawachchiya Divisional Engineer - Polonnaruwa Divisional Engineer - Kekirawa Engineer- School works Divisional Engineer -Mahailluppallama Divisional Engineer -Anuradhapura Project Engineer Architect Engineer in charge (Health dep. projects) Engineer in charge (Other dep. projects) Quality Control Engineer Mechanical Engineer Divisional Assistant - Anuradhapura Drawing Office Assistant Technical Officer Technical Officer - Kekirawa Draughtsman Draughtsman Management Assistant Autocad Draughtsman Autocad Draughtsman

Additional Divisional Engineer - Polonnaruw

Recommended by :-

Approved by :-

Eng. (Ms.) K.C.D. Fernando Director (Buildings) Provincial Engineering Department North Central Province
Page 88

Eng. C.K.B. Seneviratne Deputy Chief Secretary (Engineering) Provincial Engineering Department North Central Province

Building Rates- 2011- NCP

Anuradhapura.

Anuradhapura.

Page 89

Building Rates- 2011- NCP

RATES FOR IRRIGATION CONSTRUCTIONS 2011


PROVINCIAL IRRIGATION DEPARTMENT NORTH CENTRAL PROVINCE

Page 90

Building Rates- 2011- NCP

PROVINCIAL IRRIGATION DEPARTMENT - NCP RATES FOR IRRIGATION WORKS - 2011 ISR NO. DESCRIPTION JUNGLE CLEARING BY MACHINERY
RN 1 Clearing & grubbing Heavy jungle including removing out

IMPERIAL UNIT RATE acr. 23,331.00

side of the reservation & burning (by machinery).


RN 2 Clearing & grubbing Common jungle including removing

acr.

21,997.00

out side of the reservation & burning (by machinery).


RN 3 Clearing & grubbing Medium jungle including removing

acr.

16,606.00

out side of the reservation & burning (by machinery).


RN 4 Clearing & grubbing Light jungle including removing out

acr.

12,455.00

side of the reservation & burning (by machinery).


RN 5 Clearing & grubbing Shrub jungle including removing

out side of the reservation & burning (by machinery). JUNGLE CLEARING BY MANUAL LABOUR

acr.

4,982.00

RN 6 Clearing & grubbing Light jungle including removing out

acr.

76,800.00

side of the reservation & burning (by manual labour).


RN 7 Clearing

& grubbing Secondary Growth jungle including removing out side of the reservation & burning (by manual labour).

acr.

18,181.00

RN 8 Under bushing by manual labour.

acr.

9,792.00 127.00

STRIPPING BY MACHINERY RN 9 Stripping top soil to a depth of 3" to 6" to receive new cube earth & spoil to waste cut haul 200 ft. by machinery. STRIPPING BY MANUAL LABOUR
RN 10

Stripping top soil to a depth of 3" to 6" to receive new cube earth & spoil to waste haul 100 ft. by manual labour. EARTH WORK BY MACHINARY (TANK BUND FORMATION)

1,920.00

Page 91

Building Rates- 2011- NCP


RN11

Earth excavation from borrow area cut & lift 3 ft. placing cube & compaction earth in damp including watering, compaction by machinery haul 100 ft. (30m)

641.00

Page 92

Building Rates- 2011- NCP

IMPERIAL UNIT RATE RN 12 Earth excavation from borrow area cut & lift 3 ft. placing cube 938.00 & compaction earth in damp including watering, compaction by machinery haul 0.25 mile (0.4 km)

ISR NO.

DESCRIPTION

RN 13

Earth excavation from borrow area cut & lift 3 ft. placing cube & compaction earth in damp including watering, compaction by machinery haul 0.5 mile (0.8 km)

997.00

RN 14

Earth excavation from borrow area cut & lift 3 ft. placing cube & compaction earth in damp including watering, compaction by machinery haul 0.75 mile (1.2 km)

1,062.00

RN 15

Earth excavation from borrow area cut & lift 3 ft. placing cube & compaction earth in damp including watering, compaction by machinery haul 1.0 mile (1.6 km)

1,127.00

RN 16

Earth excavation from borrow area cut & lift 3 ft. placing cube & compaction earth in damp including watering, compaction by machinery haul 1.25 mile (2.0 km)

1,192.00

EARTH WORK BY MANUAL LABOUR (TANK BUND FORMATION)


RN 17

Earth excavation from borrow area cut & lift 5 ft. placing cube & compaction earth in damp including watering, compaction by manually haul 100 ft. (30m)

2,682.00

RN 18

Earth excavation from borrow area cut & lift 3 ft. placing cube & compaction earth in damp including watering, compaction by manually haul 0.5 mile (0.8 km) by T.T

2,809.00

RN 19

Earth excavation from borrow area cut & lift 3 ft. placing cube & compaction earth in damp including watering, compaction by manually haul 1.0 mile (1.6 km) by T.T

2,953.00

RN 20

Earth excavation from borrow area cut & lift 3 ft. placing cube & compaction earth in damp including watering, compaction by manually haul 1.5 mile ( 2.4 km) by T.T

3,098.00

Page 93

Building Rates- 2011- NCP

ISR NO.

DESCRIPTION

IMPERIAL UNIT RATE

COMMON EARTH EXCAVATION & WASTE BY MACHINERY RN 21 Common earth excavation & spoil to waste or fill material cube cut 3 ft. lift up to 3 ft. spread 100 ft. (30 m) by machinery (B-hoe)
RN 22

424.00

Common earth excavation & spoil to waste or fill material cube cut 3 -5 ft. lift up to 5 ft. spread 100 ft. (30 m) by machinery (B-hoe) Common earth excavation & spoil to waste or fill material cube cut 5 -10 ft. lift up to 10 ft. spread 100 ft. (30 m) by machinery (B-hoe) Common earth excavation & spoil to waste or fill material cube cut 10 -15 ft. lift up to 15 ft. spread 100 ft. (30 m) by machinery (B-hoe) Common earth excavation & spoil to waste or fill material cube cut 15 -20 ft. lift up to 20 ft. spread 100 ft. (30 m) by machinery (B-hoe) COMMON EARTH EXCAVATION & WASTE BY MANUAL LABOUR

424.00

RN 23

432.00

RN 24

443.00

RN 25

453.00

RN 26

Common earth excavation & spoil to waste or fill material cube cut 3' lift up to 3 ft. spread 100 ft. (30 m) by manual labour. Common earth excavation & spoil to waste or fill material cube cut 3'-5' lift up to 5 ft. spread 100 ft. (30 m) by manual labour. Common earth excavation & spoil to waste or fill material cube cut 5'-10' lift up to 10 ft. spread 100 ft. (30 m) by manual labour. COMMON EARTH EXCAVATION IN CANAL & WASTE BY MACHINERY

2,400.00

RN 27

2,823.00

RN 28

4,300.00

RN 29

Common earth excavation & spoil to waste cut 3' lift up to cube 3 ft. spread 100 ft. (30 m) by machinery (B-hoe) Common earth excavation & spoil to waste cut 3'-5' lift up cube to 5 ft. spread 100 ft. (30 m) by machinery (B-hoe) Common earth excavation & spoil to waste cut 5'-10' lift cube up to 10 ft. spread 100 ft. (30 m) by machinery (B-hoe) Common earth excavation & spoil to waste cut 10'-15' lift cube up to 15 ft spread 100 ft(30 m) by machinery (B - hoe)

424.00

RN 30

424.00

RN 31

432.00

RN 32

443.00

Page 94

Building Rates- 2011- NCP


RN 33

Common earth excavation & spoil to waste cut 15'-20' lift cube up to 20 ft. spread 100 ft. (30 m) by machinery (B-hoe)

453.00

Page 95

Building Rates- 2011- NCP

ISR NO.

DESCRIPTION EARTH EXCAVATION IN CANAL & FORMING CANAL BUND BY MACHINERY

IMPERIAL UNIT RATE

RN 34

Earth excavation & forming canal bund cut 3 ft. lift up to 3 cube ft. spread 100 ft. (30 m) by machinery (B-hoe) including watering & compaction. Earth excavation & forming canal bund cut 3- 5 ft. lift up cube to 5 ft. spread 100 ft. (30 m) by machinery (B-hoe) including watering & compaction. Earth excavation & forming canal bund cut 5 - 10 ft. lift up cube to 10 ft. spread 100 ft. (30 m) by machinery (B-hoe) including watering & compaction. Earth excavation & forming canal bund cut 10 - 15 ft. lift cube up to 15 ft. spread 100 ft. (30 m) by machinery (B-hoe) including watering & compaction.

589.00

RN 35

589.00

RN 36

597.00

RN 37

606.00

RN 38

Earth excavation & forming canal bund cut 15 - 20 ft lift cube up to 20 ft. spread 100 ft. (30 m) by machinery (B-hoe) including watering & compaction. EARTH EXCAVATION FROM BORROW FORMING CANAL BUND BY MACHINERY &

615.00

RN 39

Earth excavation from borrow & placing watering & cube compacting earth in canal bund cut 3 ft. lift up to 3 ft. spread 100 ft. by machinery. Earth excavation from borrow & placing watering & cube compacting earth canal bund cut 3 ft. lift up to 3 ft. haul 1/4 mile (0.4 km ) by machinery Earth excavation from borrow & placing watering & cube compacting earth canal bund cut 3 ft. lift up to 3 ft. haul 1/2 mile (0.8 km) by machinery Earth excavation from borrow & placing watering & cube compacting earth canal bund cut 3 ft. lift up to 3 ft haul 3/4 mile (1.2 km ) by machinery

589.00

RN 40

886.00

RN 41

945.00

RN 42

1,010.00

Page 96

Building Rates- 2011- NCP


RN 43

Earth excavation from borrow & placing watering & cube compacting earth canal bund cut 3 ft. lift up to 3 ft. haul 1.0 mile (1.6 km) by machinery

1,075.00

Page 97

Building Rates- 2011- NCP

ISR NO.

DESCRIPTION COMMON EARTH EXCAVATION IN CANAL & FORMING CANAL BUND BY MANUAL LABOUR

IMPERIAL UNIT RATE

RN 44

Common earth excavation in canal & forming canal bund cube cut 0 - 3 ft. lift up to 5 ft. spread 100 ft. (30 m) by manual labour Common earth excavation in canal & forming canal bund cube cut 3 - 5 ft. lift up to 5 ft. spread 100 ft. (30 m) by manual labour Common earth excavation in canal & forming canal bund cube cut 5 - 10 ft. lift up to 10 ft. spread 100 ft. (30 m) by manual labour EARTH EXCAVATION FROM BORROW & FORMING CANAL BUND BY MANUAL LABOUR

3,065.00

RN 45

3,488.00

RN 46

3,965.00

RN 47

Earth excavation from borrow & forming canal bund cut 3 cube ft. lift up to 3 ft. spread 100 ft. ( 15 m) & compacting by manual labour, Haul 100 ft. Earth excavation from borrow & forming canal bund cut 3 cube ft. lift up to 3 ft. spread 50 ft. (15 m) & compacting by manual labour, transport by RD. Haul 1/4 mile (0.4 Km)

2,265.00

RN 48

2,561.00

RN 49

Earth excavation from borrow & forming canal bund cut 3 cube ft lift up to 3 ft spread 50 ft.(15 m) & compacting by manual labour, transport by RD. Haul 1/2 mile (0.8 Km)

2,620.00

RN 50

Earth excavation from borrow & forming canal bund cut 3 cube ft lift up to 3 ft. spread 50 ft.(15 m) & compacting by manual labour, transport by RD. Haul 3/4 mile (1.2 Km)

2,685.00

RN 51

Earth excavation from borrow & forming canal bund cut 3 cube ft. lift up to 3 ft. spread 50 ft. ( 15 m) & compacting by manual labour, transport by RD. Haul 1.0 mile (1.6 Km)

2,750.00

CUT OPENING MACHINERY

THE

TANK

BUND

BY

Page 98

Building Rates- 2011- NCP


RN 52

Earth excavation for cut opening the tank bund & dump at cube the site with back filling 75% excavated soil & 25% borrow earth including placing, watering & compaction by machinery, cut 5 - 10 ft. lift up to 10 ft. spread 100 ft.

862.00

Page 99

Building Rates- 2011- NCP

ISR NO.

DESCRIPTION CUT OPENING THE TANK BUND BY MANUALY

IMPERIAL UNIT RATE

RN 53

Earth excavation for cut opening the tank bund & dump at cube the site with back filling 75% excavated soil & 25% borrow earth including placing, watering & compaction by manual labour, cut 5 - 10 ft. lift up to 10 ft. spread 100 ft.

5,731.00

DESILTING IN CANAL BY MANUAL LABOUR


RN 54

Desilting in canal Bed & spoil to waste cut & lift 0 - 5 ft. cube haul 100 ft. (30m) by manual labour.

1,920.00

WEEDING BY MANUAL LABOUR RN 55 Weeding in Canals / Bunds by manual labour.

acr.

16,727.00 278.00 282.00 575.00 633.00 698.00 764.00 829.00

DESILTING BY MACHINARY RN 56 Desilting & spoil to waste cut & lift 0-5 ft. haul 100 ft. cube (30m) by Machinery.
RN 57 RN 58 RN 59 RN 60 RN 61 RN 62

Desilting & spoil to waste cut & lift 0-10 ft. haul 100 ft. cube (30m) by Machinery. Desilting & spoil to waste cut & lift 0-5 ft. haul (0.4 km) cube (Transport by R.D.) Desilting & spoil to waste cut & lift 0-5 ft. haul (0.8 km) cube (Transport by R.D.) Desilting & spoil to waste cut & lift 0-5 ft. haul (1.2 km) cube (Transport by R.D.) Desilting & spoil to waste cut & lift 0-5 ft. haul (1.6 km) cube (Transport by R.D.) Desilting & spoil to waste cut & lift 0-5 ft. haul (2 km) cube (Transport by R.D.) TURFING Furnishing, placing & watering turf till take roots transport 1/2 mile by manual labour. Furnishing, placing & watering turf till take roots transport 1 mile by manual labour. GRAVELLING ON TANK BUND OR AGRI ROAD BY MACHINERY TANSPORT BY FARM TRACTOR sqr. sqr.

RN 63 RN 64

1,298.00 1,339.00

Page 100

Building Rates- 2011- NCP


RN 65

Gravel excavation & use as construction material cut 0 -5 cube ft. lift up to 5 ft. spread 100 ft. including furnishing, placing, watering & compaction transport by farm tractor haul 0.5 mile (0.8 km) by machinery (Transport by T.T.)

1,536.00

Page 101

Building Rates- 2011- NCP

ISR NO.
RN 66

DESCRIPTION

IMPERIAL UNIT RATE 1,680.00

Gravel excavation & use as construction material cut 0 -5 cube ft. lift up to 5 ft. spread 100 ft. including furnishing, placing, watering & compaction transport by farm tractor haul 1.0 mile (1.6 km) by machinery (Transport by T.T.)

RN 67

Gravel excavation & use as construction material cut 0 -5 cube ft. lift up to 5 ft. spread 100 ft. including furnishing, placing, watering & compaction transport by farm tractor haul 1.5 mile (2.4 km) by machinery (Transport by T.T.)

1,825.00

RN 68

Gravel excavation & use as construction material cut 0 -5 cube ft. lift up to 5 ft. spread 100 ft. including furnishing, placing, watering & compaction transport by farm tractor haul 2.0 mile (3.2 km) by machinery (Transport by T.T.)

1,969.00

RN 69

Gravel excavation & use as construction material cut 0 -5 cube ft. lift up to 5 ft. spread 100 ft. including furnishing, placing, watering & compaction transport by farm tractor haul 2.5 mile (4.0 km) by machinery (Transport by T.T.)

2,114.00

RN 70

Gravel excavation & use as construction material cut 0 -5 cube ft. lift up to 5 ft. spread 100 ft. including furnishing, placing, watering & compaction transport by farm tractor haul 3.0 mile (4.8 km) by machinery (Transport by T.T.)

2,258.00

RN 71

Gravel excavation & use as construction material cut 0 -5 cube ft. lift up to 5 ft. spread 100 ft. including furnishing, placing, watering & compaction transport by farm tractor haul 3.5 mile (5.6 km) by machinery (Transport by T.T.)

2,403.00

RN 72

Gravel excavation & use as construction material cut 0 -5 cube ft. lift up to 5 ft. spread 100 ft. including furnishing, placing, watering & compaction transport by farm tractor haul 4.0 mile (6.4 km) by machinery (Transport by T.T.)

2,547.00

Page 102

Building Rates- 2011- NCP

IMPERIAL UNIT RATE RN 73 Gravel excavation & use as construction material cut 0 -5 cube 2,692.00 ft. lift up to 5 ft. spread 100 ft. including furnishing, placing, watering & compaction transport by farm tractor haul 4.5 mile (7.2 km) by machinery (Transport by T.T.)

ISR NO.

DESCRIPTION

RN 74

Gravel excavation & use as construction material cut 0 -5 cube ft. lift up to 5 ft. spread 100 ft. including furnishing, placing, watering & compaction transport by farm tractor haul 5.0 mile (8.0 km) by machinery (Transport by T.T.)

2,836.00

EARTH EXCAVATION FOR FOUNDATION BY MANUAL LABOUR


RN 75

Excavation for foundation in any material except rock cube requiring blasting, ram, and surplus disposed of within site as directed. Cut & fill 0 -5 ft. by manual labour. Excavation for foundation in any material except rock cube requiring blasting, 50% part return fill in and ram , and surplus disposed of within site as directed . Cut & fill 0-5 ft. by manual labour. CONCRETE WORK Cement concrete Grade 10 (1:3:6-40mm) mixing, hoisting cube placing in position, packing temping including vibrating as directed, curing as specified and stop pour construction joint etc. in irrigation structures, without form work by manual labour.

1,920.00

RN 76

2,193.00

RN 77

35,756.00

RN 78

Cement concrete Grade 10 (1:3:6-40mm) above one cube cube mixing, hoisting placing in position, packing temping around reinforcement including vibrating as directed, curing as specified and stop pour construction joint etc. making good after removal off form work, in irrigation structures, with form work by manual labour.

40,342.00

Page 103

Building Rates- 2011- NCP


RN 79

Cement concrete Grade 20 (1:2:4-20mm) mixing, hoisting cube placing in position, packing temping around reinforcement including vibrating as directed, curing as specified and stop pour construction joint etc. making good after removal off form work, in irrigation structures, with form work by manual labour.

46,570.00

Page 104

Building Rates- 2011- NCP

ISR NO.

DESCRIPTION REINFORCEMENT

IMPERIAL UNIT RATE cwt. 11,031.00

RN 80

MILD steel rods to the SLS standards in reinforcing supplying, bending, cutting, fabrication, hoisting, and placing in position and tied with G.I wire as directed including rolling margin, waste, all spacing, laps etc. in reinforced steel other than design laps, holding and supporting including temporary fixing supports, hangers

RN 81

TOR steel rods to the SLS standards in reinforcing supplying, bending, cutting, fabrication, hoisting, and placing in position and tied with G.I wire as directed including rolling margin, waste, all spacing, laps etc. in reinforced steel other than design laps

cwt.

11,164.00

RN 82

FORM WORK Plywood shuttering for irrigation structures including dismantling RUBBLE MASONARY Random rubble masonry in cement mortar 1:5

sqr.

7,643.00

RN 83 RN 84

cube

23,317.00 17,132.00

9" thick pitching in 6" - 9" rubble in 1:5 cement mortar lift cube 0 - 5 ft. haul. RCC SPUN PIPE AND COLLARS IN STRUCTURES

RN 85 RN 86 RN 87 RN 88 RN 89 RN 90 RN 91 RN 92 RN 93

Supplying, laying, joining 4" dia. long Hume pipe. Supplying, laying, joining 6" dia. long Hume pipe. Supplying, laying, joining 9" dia. long Hume pipe. Supplying, laying, joining 12" dia. long Hume pipe. Supplying, laying, joining 15" dia. long Hume pipe. Supplying, laying, joining 18" dia. long Hume pipe. Supplying, laying, joining 24" dia. long Hume pipe. Supplying, laying, joining 30" dia. long Hume pipe. Supplying, laying, joining 36" dia. long Hume pipe.
Page 105

lft. lft. lft. lft. lft. lft. lft. lft. lft.

394.00 452.00 625.00 856.00 1,077.00 1,320.00 1,889.00 2,499.00 3,663.00

Building Rates- 2011- NCP


RN 94

Supplying, laying, joining 48" dia. long Hume pipe.

lft.

5,630.00

Page 106

Building Rates- 2011- NCP

ISR NO.

DESCRIPTION LIGHT DUTY CAST IRON GATES FOR SLUICES

IMPERIAL UNIT RATE

RN 95

Furnishing and install in 6" dia. Cast iron gates & hoist complete with spindle etc. P.No.C501-2-6D. Furnishing and install in 9" dia. Cast iron gates & hoist complete with spindle etc. P.No.C501-2-6D. Furnishing and install in 12" dia. Cast iron gates & hoist complete with spindle etc. P.No.C501-2-6D. Furnishing and install in 15" dia. Cast iron gates & hoist complete with spindle etc. P.No.C501-2-6D. Furnishing and install in 18" dia. Cast iron gates & hoist complete with spindle etc. P.No.C501-2-6D. Furnishing and install in 24" dia. Cast iron gates & hoist complete with spindle etc. P.No.C501-2-6D. Furnishing and install in 30" dia. Cast iron gates & hoist complete with spindle etc. P.No.C501-2-6D. PLASTERING 1/2" thick rough cement plastering in 1:3 cement mortar for rubble masonry faces for all lifts by manual labour.

no.

16,872.00

RN 96

no.

26,568.00

RN 97

no.

33,300.00

RN 98

no.

39,900.00

RN 99

no.

59,430.00

RN 100

no.

84,120.00

RN 101

no.

120,815.00

RN 102

sqr.

3,769.00

CONSTRUCTION OF PUDDLE CORE WALL


RN 103

Earth work from borrow Puddle clay & construction of cube puddle clay wall including watering & compaction by manual labour. Transport by F.T haul 1.0 mile.

4,177.00

SOFT ROCK EXCAVATION BY MACHINERY


RN 104

Soft rock excavation and spoil to waste, cut 0 -5 lift 5' cube spread 100' by machinery Soft rock excavation and spoil to waste, cut 5 -10 lift 10' cube spread 100' by machinery

630.00 641.00

RN 105

Page 107

Building Rates- 2011- NCP


RN 106

Soft rock excavation and spoil to waste, cut 10 -15 lift 15' cube spread 100' by machinery Soft rock excavation and spoil to waste, cut 15 -20 lift 20' cube spread 100' by machinery

652.00 664.00

RN 107

Page 108

Building Rates- 2011- NCP

ISR NO. SOFT ROCK LABOUR


RN 108 RN 109 RN 110 RN 111

DESCRIPTION EXCAVATION BY MANUAL

IMPERIAL UNIT RATE

Soft rock excavation and spoil to waste, cut 0 -5 lift 5' cube spread 100' by manual labour. Soft rock excavation and spoil to waste, cut 5 -10 lift 10' cube spread 100' by manual labour. Soft rock excavation and spoil to waste, cut 10 -15 lift 15' cube spread 100' by manual labour. Soft rock excavation and spoil to waste, cut 15 -20 lift 20' cube spread 100' by manual labour. ROCK EXCAVATION BY MACHINERY Rock excavation and spoil to waste / Quarry products cut 5 cube ft. lift 5 ft. by machinery Rock excavation and spoil to waste / Quarry products cut 5 cube - 10 ft. lift 10 ft. by machinery Rock excavation and spoil to waste / Quarry products cut cube 10 -15 ft. lift 15 ft. by machinery Rock excavation and spoil to waste / Quarry products cut cube 15 - 20 ft. lift 20 ft. by machinery ROCK EXCAVATION BY MANUALY Rock excavation and spoil to waste / Quarry products cut 5 cube ft. lift 5 ft. by manual labour. Rock excavation and spoil to waste / Quarry products cut 5 cube -10 ft. lift 10 ft. by manual labour. Rock excavation and spoil to waste / Quarry products cut cube 10 -15 ft. lift 15 ft. by manual labour. Rock excavation and spoil to waste / Quarry products cut cube 15 - 20 ft. lift 20 ft. by manual labour.

3,505.00 4,692.00 4,791.00 4,907.00

RN 112 RN 113 RN 114 RN 115

2,045.00 2,204.00 2,374.00 2,553.00

RN 116

3,814.00 5,001.00

RN 117

RN 118

6,286.00

RN 119

7,688.00

LABOUR RATES RN 120 Un skilled labour


RN 121 RN 122 RN 123

day day day day hrs.

800.00 900.00 1,250.00 1,100.00 3,841.00

Semi skilled labour Skilled labour - grade 1 Skilled labour - grade 2 MACHINE RATE Motor grader (120 - 140 HP ) Clearing road plat form, reducing high side or cutting side drain of Agri - Road

RN 124

Page 109

Building Rates- 2011- NCP


RN 125

Hydraulic excavator cum back hoe 1.0 Cu.yd.

hrs.

3,630.00

These rates were prepared according to the Irrigation Department rates in 2008.

Page 110

Building Rates- 2011- NCP

Prepared & Checked by :1 2 3 4 5 6 7 8 9 10 Eng. H.M.R.M.Abeyrathna Mr. W.L.G.S.Liyanage Mr. A. L. Ranjith Mendis Mr. P.M.R.L Jayarathna Mr. R.M.M.S.Rathnayake Mrs. H.M.C. Herath Miss. H.T. Kuluge Mr. H.M.U.P. Kumara Mr. D.M.C.K. Dissanayake Mr. H.P.A.P. Amarasinghe Irrigation Engineer Irrigation Engineer Irrigation Engineer Draughtsman Draughtsman Technical Officer Technical Officer Technical Officer Technical Officer Technical Officer

Recommended by :-

Approved by :-

J.K.J. Jayasooriya Irrigation Engineer Provincial Irrigation Department North Central Province Anuradhapura

Eng. C.K.B. Senavirathna Director of Irrigation Provincial Irrigation Department North Central Province Anuradhapura

Page 111

Building Rates- 2011- NCP

Page 112

Building Rates- 2011- NCP

RATES FOR QUALITY CONTROL TESTS 2011


QUALITY CONTROL LABORATORY KEKIRAWA.

Page 113

Building Rates- 2011- NCP

QUALITY CONTROL UNIT- KEKIRAWA


RATES FOR QUALITY CONTROL TESTS CARRIED OUT BY QC LABORATORY KEKIRAWA

Name of the Test


1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 2.0 2.1 2.2 3.0 3.1 3.2 4.0 4.1 4.2 5.0 5.1 5.2 5.3 5.4 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 7.0 7.1 7.2 7.3 8.0

Rate per Test (Rs.)


1,175.00 1,810.00 1,810.00 400.00 1,050.00 3,600.00 2,450.00 3,100.00 6,025.00 610.00 745.00 420.00 845.00 360.00 360.00 360.00 525.00 1,175.00 860.00 860.00 1,650.00 1,650.00 2,220.00 2,700.00 270.00 270.00 270.00 150.00

Soil testing Particle size distribution Consistency limits (LL,PL) Specific gravity test Moisture content test Field density test C.B.R. test Standard compaction test Mackintosh test- per one point Up to 4m depth Above 4m depth Trial pits 1.01.01.5m Additional 1m depth Auger hole- per point Up to 4m depth Above 4m depth Concrete testing Schmidt hammer test (NDT) - per point (readings 10-15) Concrete cube test (for one sample) Interlocking block test (for one sample) PUNDITH test(per point) Aggregate testing Particle size distribution Flakiness index (FI) Elongation index Specific gravity and water absorption Aggregate impact value Aggregate crushing value Los Angeles Abrasion value Aluminium testing(per sample) Powder coating thickness Hardness Sectional thickness Measurement of pipes & steel bars Per sample
Page 114

Building Rates- 2011- NCP 9.0

Transport cost Per 1 km 17.00

Page 115

Building Rates- 2011- NCP

Prepared and Checked by :1 2 3

Eng. I.K.M.C.K. Illangasinghe Eng. A.A.D.C.R. Aluthgama


Mr. M.B.A.S. Ariyasinghe

Divisional Engineer - (Kekirawa) Quality Control Engineer


Technical Officer

Recommended by :-

Approved by :-

Eng. (Ms.) D.L.B.P. Wijesekara Director (Designs Consultancy & QC) Provincial Engineering Department North Central Province Anuradhapura.

Eng. C.K.B. Seneviratne Deputy Chief Secretary (Engineering) Provincial Engineering Department North Central Province Anuradhapura.

Page 116

Building Rates- 2011- NCP

Page 117

Building Rates- 2011- NCP

Cover page designed by : Archt. W.N.P.M.S. Wijithaweera

Page 118

Building Rates- 2011- NCP

Page 119

Building Rates- 2011- NCP

UILDING IONS -

RTMENT NORTH CE

Page 120

Building Rates- 2011- NCP

DEPARTMENT

VINCE

: 025-2220910

Page 121

Building Rates- 2011- NCP

forming Engineering nce qualitatively.

ving standards of the he community, while ment-friendly manner randeur of Rajarata, for sustainability of modern technology l responsibility.

Page 122

Building Rates- 2011- NCP

ty Chief Secretary (Engineering), 25-2220910 Tel. 025-

tor (Buildings), 157

tor Designs, (Consultancy & Quality ol), Tel. 025-2222423

ional Engineer - Medawachchiya, Tel. 025-2245930

ional Engineer - Polonnaruwa, Tel. 2222406

ional Engineer - Kekirawa, Tel. 025-2264286 Tel. 025-

neer - School works, 194

ional Engineer - Mahailluppallama, Tel. 025-2249136

ional Engineer -Anuradhapura, Tel. 2236386

neer in charge (Special projects), Tel. 2225285

tect, Tel. 025-2225285

neer in charge (Health department cts), Tel. 025-2225285

neer in charge (Other department cts), Tel. 025-2225285 Tel. 025-

ty Control Engineer, 285

ional Engineer - Polonnaruwa, Tel. 2222406 Tel. 025Tel. 025Page 123

tion Engineer, 070

anical Engineer , 285

anical Engineer , 285

Tel. 025-

Building Rates- 2011- NCP

Page 124

Building Rates- 2011- NCP

buying committee rates and market prices

CA/4/I - Revised Edition - July 2004

CTAD Publication No. SCA/4/II - Revised

orks - ICTAD Publication No. SCA/3/2-

ilding & Civil Engineering

- ICTAD

al Specification where applicable. In the ation, the Particular Specification shall be

description and relevant notes mentioned en preparing estimates.

rade name, it is only for the purpose of used any other material/ fitting, which are subject to the approval of the Engineer.

the specific site conditions subjected to

s.

Page 125

Building Rates- 2011- NCP

Page 126

Building Rates- 2011- NCP

Page 127

Building Rates- 2011- NCP

against uncontrolled collapse, electrical

by the Engineer. METRIC UNIT RATE cum 524.00 cum sqm cum cum sqm 699.00 67.00 3,053.00 6,682.00 77.00

sqm

83.00

sqm

90.00

no. no. no. no. lm lm

960.00 1,440.00 141.00 212.00 33.00 62.00

Page 128

Building Rates- 2011- NCP

lm

131.00

Page 129

Building Rates- 2011- NCP

METRIC UNIT sqm no. RATE 78.00 960.00

sqm lm lm lm sqm

441.00 20.00 30.00 39.00 291.00

sqm sqm

55.00 116.00

sqm

175.00

sqm

152.00

sqm

196.00

sqm

250.00

cum

1,092.00

Page 130

Building Rates- 2011- NCP

sqm

207.00

Page 131

Building Rates- 2011- NCP

METRIC UNIT sqm sqm RATE 53.00 80.00

sqm

106.00

sqm sqm

207.00 253.00

sqm

306.00

lm

20.00

lm

30.00

sqm no. cum

149.00 2,966.00 594.00

cum

689.00

no. no.

1,146.00 1,804.00

Page 132

Building Rates- 2011- NCP

of bases and trenches etc.

vation dry at all stages of construction.

METRIC UNIT RATE sqm 88.00 cum 524.00

cum

418.00

cum

712.00

cum

1,980.00

cum

634.00

cum

1,357.00

sqm

385.00

Page 133

Building Rates- 2011- NCP

cum

456.00

Page 134

Building Rates- 2011- NCP

METRIC UNIT RATE

cum

9,656.00

cum

10,541.00

sqm

1,301.00

sqm

963.00

sqm

1,331.00

sqm

978.00

Page 135

Building Rates- 2011- NCP

s follows.

r on formwork.

ete should be taken from Quality Control

METRIC UNIT RATE cum 11,891.00 cum sqm 12,686.00 1,067.00

cum

15,290.00

cum

16,064.00

cum

17,112.00

Page 136

Building Rates- 2011- NCP

cum

15,804.00

Page 137

Building Rates- 2011- NCP

METRIC UNIT RATE cum 16,153.00

cum

16,678.00

cum

16,393.00

cum

17,167.00

cum

18,215.00

cum

17,275.00

cum

17,624.00

cum

18,148.00

cum

13,808.00

cum

14,507.00

cum

15,555.00

Lm

1,059.00

Page 138

Building Rates- 2011- NCP

METRIC UNIT lm RATE 1,096.00

lm

1,118.00

lm

1,260.00

lm

1,296.00

lm

1,319.00

no.

2,824.00

sqm

3,422.00

lm

2,129.00

lm

1,545.00

Page 139

Building Rates- 2011- NCP

ing, wetting and treating before pouring

val of formwork. layer of skim coat or

enough to apply a

METRIC UNIT RATE sqm 1,263.00

sqm

1,331.00

sqm

1,340.00

sqm

1,358.00

sqm

1,404.00

sqm sqm sqm sqm sqm

1,434.00 824.00 966.00 979.00 500.00

Page 140

Building Rates- 2011- NCP

Steel should be not less than 250 N/mm2

is maintained at outer-most rod.

nforcements should be tested if requested, nse.

m level of quality and standards. METRIC UNIT RATE M.Ton 184,381.00

M.Ton

191,221.00

M.Ton

197,377.00

M.Ton

201,481.00

M.Ton

190,261.00

M.Ton

196,417.00

Page 141

Building Rates- 2011- NCP

M.Ton

200,521.00

Page 142

Building Rates- 2011- NCP

UNIT cum

METRIC RATE 13,787.00

cum cum cum sqm sqm sqm lm

10,446.00 10,970.00 12,018.00 1,263.00 1,422.00 1,742.00 827.00

lm

1,132.00

Page 143

Building Rates- 2011- NCP

lm

584.00

Page 144

Building Rates- 2011- NCP

ur of a like nature.

oval of the Engineer. Each panel not less

UNIT sqm

METRIC RATE 751.00

sqm

605.00

sqm

641.00

sqm

393.00

sqm

429.00

sqm

453.00

sqm

553.00

sqm

609.00

Page 145

Building Rates- 2011- NCP

sqm

641.00

Page 146

Building Rates- 2011- NCP

METRIC UNIT sqm RATE 530.00

sqm

581.00

sqm

615.00

lm

213.00

sqm sqm

265.00 280.00

sqm sqm

290.00 603.00

sqm

671.00

sqm

717.00

sqm lm 79.00

413.00

Page 147

Building Rates- 2011- NCP

METRIC UNIT RATE sqm. 1,463.00

sqm sqm

412.00 568.00

sqm

366.00

sqm

2,848.00

sqm

2,879.00

Page 148

Building Rates- 2011- NCP

METRIC UNIT RATE sqm 2,900.00

sqm

2,873.00

sqm

2,904.00

sqm

2,925.00

sqm

2,449.00

sqm

2,480.00

sqm

2,500.00

Page 149

Building Rates- 2011- NCP

sqm

2,799.00

Page 150

Building Rates- 2011- NCP

METRIC UNIT RATE sqm 2,830.00

sqm

2,851.00

sqm

2,711.00

sqm

2,742.00

sqm

2,763.00

sqm

2,737.00

sqm

2,768.00

sqm

2,789.00

Page 151

Building Rates- 2011- NCP

METRIC UNIT RATE sqm 2,113.00

lm

259.00

lm

387.00

lm

167.00

lm

249.00

lm

1,729.00

lm

1,289.00

sqm

2,916.00

Page 152

Building Rates- 2011- NCP

screw clips, rivets straps and the like.

emulsion paints.

of enamel paints.

mber sizes indicated in the description are METRIC RATE 1,988.00

UNIT sqm

Page 153

Building Rates- 2011- NCP

sqm

3,112.00

Page 154

Building Rates- 2011- NCP

METRIC UNIT RATE sqm. 1,763.00

sqm

1,456.00

sqm

933.00

sqm

958.00

sqm

1,518.00

sqm

1,966.00

Page 155

Building Rates- 2011- NCP

METRIC UNIT RATE sqm 2,557.00

sqm

2,891.00

sqm

1,676.00

sqm

2,776.00

Page 156

Building Rates- 2011- NCP

METRIC UNIT RATE sqm 3,982.00

sqm

4,045.00

sqm

4,137.00

Page 157

Building Rates- 2011- NCP

METRIC UNIT RATE sqm 4,336.00

lm

476.00

lm lm lm lm

531.00 807.00 1,342.00 1,243.00

lm lm

505.00 462.00

lm

1,358.00

lm

1,237.00

Page 158

Building Rates- 2011- NCP

lm

1,112.00

Page 159

Building Rates- 2011- NCP

METRIC UNIT RATE lm 997.00

no. no.

936.00 846.00

lm

3,132.00

lm

1,237.00

lm

1,141.00

lm lm lm

1,368.00 1,260.00 1,148.00

lm

774.00

sqm sqm sqm

108.00 152.00 217.00

Page 160

Building Rates- 2011- NCP

METRIC UNIT RATE lm 997.00

lm

954.00

lm

617.00

lm

1,273.00

lm

2,575.00

lm

1,591.00

lm

3,175.00

lm

302.00

lm

167.00

lm lm lm lm

223.00 266.00 108.00 157.00

Page 161

Building Rates- 2011- NCP

METRIC UNIT RATE sqm 673.00

no. no. no. no. no. lm no. no.

160.00 40.00 200.00 80.00 252.00 456.00 45.00 33.00

sqm sqm sqm sqm

391.00 443.00 123.00 97.00

lm

89.00

Page 162

Building Rates- 2011- NCP

ctices, complete with all necessary nails,

METRIC UNIT RATE sqm 17,969.00

sqm

9,953.00

Page 163

Building Rates- 2011- NCP

sqm

9,781.00

Page 164

Building Rates- 2011- NCP

METRIC UNIT RATE sqm 12,460.00

sqm

8,113.00

sqm sqm

4,175.00 7,640.00

sqm

8,221.00

sqm

4,659.00

sqm

6,886.00

sqm

2,981.00

Page 165

Building Rates- 2011- NCP

no. no.

448.00 173.00

Page 166

Building Rates- 2011- NCP

METRIC UNIT RATE no. lm no. lm lm sqm 411.00 741.00 599.00 433.00 659.00 8,479.00

sqm sqm lm

2,399.00 3,529.00 46.00

no.

3,245.00

no.

5,697.00

no.

2,271.00

no. no. no.

257.00 214.00 194.00

Page 167

Building Rates- 2011- NCP

no.

311.00

Page 168

Building Rates- 2011- NCP

METRIC UNIT RATE no. no. no. no. no. 211.00 280.00 4,866.00 643.00 717.00

no. no.

399.00 387.00

no. no. no.

344.00 601.00 87.00

Page 169

Building Rates- 2011- NCP

METRIC UNIT RATE sqm 6,133.00

sqm

5,068.00

sqm

1,420.00

sqm

3,185.00

sqm

3,734.00

Page 170

Building Rates- 2011- NCP

sqm

5,627.00

Page 171

Building Rates- 2011- NCP

METRIC UNIT RATE no. 41,340.00

no.

49,019.00

no.

65,205.00

no.

47,325.00

no.

64,906.00

no.

71,663.00

Page 172

Building Rates- 2011- NCP

METRIC UNIT RATE lm 646.00

lm

626.00

lm

928.00

lm

2,096.00

lm

1,020.00

lm

1,473.00

lm

853.00

Page 173

Building Rates- 2011- NCP

ineer. Each panel not less than 0.5 sqm in METRIC UNIT RATE sqm 253.00

sqm

279.00

sqm

306.00

sqm

260.00

sqm

286.00

sqm

310.00

sqm

300.00

sqm

326.00

Page 174

Building Rates- 2011- NCP

sqm

353.00

Page 175

Building Rates- 2011- NCP

METRIC UNIT RATE sqm 329.00

sqm

356.00

sqm

383.00

sqm sqm

266.00 221.00

sqm sqm sqm sqm sqm sqm

246.00 348.00 131.00 224.00 237.00 254.00

sqm

269.00

sqm

220.00

sqm sqm

278.00 69.00
Page 176

Building Rates- 2011- NCP

sqm

328.00

Page 177

Building Rates- 2011- NCP

r deepening and widening as necessary to e jointing .

make good.

s and accessories.

with the bills. No payment is done without

m level of quality and standards. METRIC UNIT lm lm lm lm lm lm no. RATE 85.00 197.00 282.00 315.00 394.00 528.00 921.00

Page 178

Building Rates- 2011- NCP

METRIC UNIT no. RATE 1,161.00

lm

656.00

no.

12,774.00

no.

17,220.00

no.

26,874.00

no.

5,400.00

Page 179

Building Rates- 2011- NCP

METRIC UNIT RATE no. 8,718.00

no.

6,162.00

no.

8,772.00

no.

6,384.00

no.

1,983.00

no. no.

4,470.00 10,590.00

no.

13,890.00

Page 180

Building Rates- 2011- NCP

no.

2,460.00

Page 181

Building Rates- 2011- NCP

METRIC UNIT RATE no. 203.00 no. 2,436.00

no.

5,142.00

no.

2,733.00

no.

2,865.00

no.

2,181.00

no.

1,515.00

no.

2,547.00

no.

1,695.00

no. no.

399.00 351.00

Page 182

Building Rates- 2011- NCP

no.

397.00

Page 183

Building Rates- 2011- NCP

METRIC UNIT RATE no. 508.00

no.

417.00

no.

13,920.00

no.

20,040.00

no.

31,772.00

no.

66,840.00

no. no. no. no.

1,590.00 906.00 6,660.00 1,835.00

no.

104.00

no.

111.00

no.

127.00

Page 184

Building Rates- 2011- NCP

no.

152.00

Page 185

Building Rates- 2011- NCP

METRIC UNIT RATE no. 197.00

no.

270.00

no. no. no. no. no. no.

79.00 106.00 126.00 163.00 215.00 298.00

METRIC UNIT RATE Item 1,442.00 lm 1,561.00

no.

1,510.00

Page 186

Building Rates- 2011- NCP

no.

4,205.00

Page 187

Building Rates- 2011- NCP

METRIC UNIT RATE no. 9,400.00

no.

12,474.00

no.

16,837.00

no.

78,499.00

no.

97,711.00

Page 188

Building Rates- 2011- NCP

METRIC UNIT no. RATE 122,592.00

no.

74,538.00

no.

126,153.00

no.

31,148.00

Page 189

Building Rates- 2011- NCP

and the like.

awing shall be prepared by the contractor

ards - 1.7 m

m level of quality and standards. METRIC UNIT RATE no. 1,737.00

no.

3,524.00

no.

4,766.00

lm

1,020.00

Page 190

Building Rates- 2011- NCP

no.

7,800.00

Page 191

Building Rates- 2011- NCP

METRIC UNIT RATE no. 8,673.00

no.

9,606.00

no.

22,859.00

no.

25,478.00

no.

28,097.00

no. no.

2,935.00 10,801.00

no. no. no.

8,532.00 6,240.00 3,287.00

no.

3,437.00

no.

4,607.00

no.

4,196.00

Page 192

Building Rates- 2011- NCP

no.

1,962.00

Page 193

Building Rates- 2011- NCP

METRIC UNIT RATE no. 2,092.00 no. 2,576.00

no.

2,425.00

no. no. no. no. no. no. lm lm lm

3,058.00 3,844.00 4,298.00 71.00 1,211.00 1,091.00 62.00 338.00 249.00

no.

72,490.00

no.

90,090.00

no.

104,390.00

Page 194

Building Rates- 2011- NCP

no.

131,890.00

Page 195

Building Rates- 2011- NCP

er before using. UNIT lm METRIC RATE 810.00

lm

1,053.00

no.

1,153.00

no.

1,531.00

lm lm lm lm

56.00 2,952.00 4,477.00 6,127.00

Page 196

Building Rates- 2011- NCP

METRIC UNIT sqm RATE 9,469.00

sqm

11,545.00

sqm

7,812.00

sqm

13,256.00

sqm

13,611.00

Page 197

Building Rates- 2011- NCP

METRIC UNIT RATE sqm 14,913.00

sqm

5,445.00

sqm

7,102.00

sqm

13,321.00

sqm

11,782.00

sqm

15,387.00

sqm

7,457.00

Page 198

Building Rates- 2011- NCP

METRIC UNIT RATE sqm 15,086.00

sqm

18,701.00

sqm

20,831.00

sqm

7,457.00

sqm

8,877.00

sqm

19,529.00

Page 199

Building Rates- 2011- NCP

sqm

1,711.00

Page 200

Building Rates- 2011- NCP

Price (Rs.) 710.00 2,800.00 4,800.00 4,850.00 6,200.00 8.00 300.00 7,500.00 600.00 800.00 885.00 1,320.00 1,560.00 1,815.00 410.00 350.00 34.00 45.00 35.00 47.00 21.03 35.14 675.00 95.00 175.00 Page 201

Building Rates- 2011- NCP 750.00 625.00

Page 202

Building Rates- 2011- NCP Price (Rs.) 690.00 553.00 720.00 480.00 167.00 275.00 325.00 590.00 650.00 113,900.00 113,900.00 4,950.00 197.00 60.21 104.00 118.40 131.55 217.73 127.78 104.55 168.90 145.73 175.30 147.56 164.94 140.55 670.00 595.00 176.82 151.21 10.25 168.90 145.73 65,900.00 81,900.00

Page 203

Building Rates- 2011- NCP 94,900.00 119,900.00

Page 204

Building Rates- 2011- NCP Price (Rs.) 5,400.00 10,500.00 20,235.00 49,500.00 7,850.00 10,250.00 650.00 850.00 6,600.00 12,000.00 17,000.00 2,250.00 4,100.00 1,950.00 1,150.00 2,650.00 2,040.00 2,150.00 1,975.00 3,950.00 2,150.00 1,650.00 6,250.00 850.00 975.00 1,950.00 450.00 650.00 340.00 410.00 360.00 3,500.00 4,150.00 3,750.00 895.00 525.00 Page 205

Building Rates- 2011- NCP 840.00 19,055.00

Page 206

Building Rates- 2011- NCP

gns, Consultancy & QC)

ineer - Medawachchiya

ineer - Polonnaruwa

ineer - Kekirawa

ineer -Mahailluppallama

ineer -Anuradhapura

arge (Health dep. projects)

arge (Other dep. projects)

isional Engineer - Polonnaruwa

istant - Anuradhapura

cer - Kekirawa

Secretary (Engineering)

gineering Department

Page 207

Building Rates- 2011- NCP

Page 208

Building Rates- 2011- NCP

OR ON IONS -

PARTMENT VINCE

Page 209

Building Rates- 2011- NCP

T - NCP

011 METRIC UNIT RATE hec. 57,650.00

hec.

54,356.00

hec.

41,035.00

hec.

30,776.00

hec.

12,310.00

hec.

189,772.00

hec.

44,926.00

hec. m3

24,196.00 44.00

m3

678.00

Page 210

Building Rates- 2011- NCP

m3

226.00

Page 211

Building Rates- 2011- NCP

METRIC UNIT RATE m3 331.00

m3

352.00

m3

375.00

m3

398.00

m3

421.00

m3

947.00

m3

992.00

m3

1,043.00

m3

1,094.00

Page 212

Building Rates- 2011- NCP

METRIC UNIT RATE

m3

149.00

m3

149.00

m3

152.00

m3

156.00

m3

160.00

m3

847.00

m3

997.00

m3

1,519.00

m3

149.00

m3

149.00

m3

152.00

m3

156.00

Page 213

Building Rates- 2011- NCP

m3

160.00

Page 214

Building Rates- 2011- NCP

METRIC UNIT RATE

m3

208.00

m3

208.00

m3

210.00

m3

214.00

m3

217.00

m3

208.00

m3

313.00

m3

333.00

m3

356.00

Page 215

Building Rates- 2011- NCP

m3

379.00

Page 216

Building Rates- 2011- NCP

METRIC UNIT RATE

m3

1,082.00

m3

1,232.00

m3

1,753.00

m3

800.00

m3

904.00

m3

925.00

m3

948.00

m3

971.00

Page 217

Building Rates- 2011- NCP

m3

304.00

Page 218

Building Rates- 2011- NCP

METRIC UNIT RATE

m3

2,026.00

m3

678.00

hec. m3 m3 m3 m3 m3 m3 m3

5,908.00 98.00 99.00 203.00 223.00 246.00 269.00 292.00

m2 m2

139.00 144.00

Page 219

Building Rates- 2011- NCP

m3

542.00

Page 220

Building Rates- 2011- NCP

METRIC UNIT RATE m3 593.00

m3

644.00

m3

695.00

m3

746.00

m3

797.00

m3

848.00

m3

899.00

Page 221

Building Rates- 2011- NCP

METRIC UNIT RATE m3 950.00

m3

1,001.00

m3

678.00

m3

774.00

m3

12,630.00

m3

14,250.00

Page 222

Building Rates- 2011- NCP

m3

16,450.00

Page 223

Building Rates- 2011- NCP

METRIC UNIT RATE kg 220.00

kg

223.00

m2

822.00

m3 m3

8,236.00 6,051.00

lm lm lm lm lm lm lm lm lm

1,293.00 1,483.00 2,052.00 2,809.00 3,534.00 4,331.00 6,199.00 8,199.00 12,018.00


Page 224

Building Rates- 2011- NCP

lm

18,468.00

Page 225

Building Rates- 2011- NCP

METRIC UNIT RATE

no.

16,872.00

no.

26,568.00

no.

33,300.00

no.

39,900.00

no.

59,430.00

no.

84,120.00

no.

120,815.00

m2

405.00

m3

1,475.00

m3 m3

222.00 226.00

Page 226

Building Rates- 2011- NCP

m3 m3

230.00 234.00

Page 227

Building Rates- 2011- NCP

METRIC UNIT RATE

m3 m3 m3 m3

1,238.00 1,657.00 1,692.00 1,733.00

m3 m3 m3 m3

722.00 778.00 838.00 901.00

m3 m3

1,347.00 1,766.00

m3

2,220.00

m3

2,715.00

day day day day hrs.

800.00 900.00 1,250.00 1,100.00 3,841.00

Page 228

Building Rates- 2011- NCP

hrs.

3,630.00

2008.

Page 229

Building Rates- 2011- NCP

neer

neer

neer

enavirathna

rigation Province

igation Department

Page 230

Building Rates- 2011- NCP

Page 231

Building Rates- 2011- NCP

UALITY STS -

Page 232

Building Rates- 2011- NCP

WA

C LABORATORY -

est (Rs.)
1,175.00 1,810.00 1,810.00 400.00 1,050.00 3,600.00 2,450.00 3,100.00 6,025.00 610.00 745.00 420.00 845.00 360.00 360.00 360.00 525.00 1,175.00 860.00 860.00 1,650.00 1,650.00 2,220.00 2,700.00 270.00 270.00 270.00 150.00
Page 233

Building Rates- 2011- NCP

17.00

Page 234

Building Rates- 2011- NCP

ineer - (Kekirawa)

Secretary (Engineering)

gineering Department

Page 235

Building Rates- 2011- NCP

Page 236

Building Rates- 2011- NCP

Page 237

Building Rates- 2011- NCP

Page 238

Building Rates - 2010 - NCP


METRIC CONVERSIONS
INCHES 1 12 36 63360 792 7.92 0.04 0.04 39.37 39370.08 FEET 0.08 1 3 5280 66 0.66 0 0.03 3.28 3280.84 YARDS 0.03 0.33 1 1760 22 0.22 0.01 1.09 1093.61 MILES 1 0.01 0 0.62 CHAINS 0 0.02 0.05 80 1 0.01 0 0.05 49.71 LINKS 0.13 1.52 4.55 8000 100 1 0 0.05 4.97 4970.97 MM 25.4 304.8 914.4 20116799 201.16799 1 10 1000 1000000

LENGTH

Sq.Inch.
1 144 1296

Sq.Feet
0.01 1 9 43560 0.0010764 10.76 107639.1

Sq.Yard
0.0007716 0.11 1 3097600 4840 0.0001196 1.2 1195990 11959.9

Sq.Miles
1 0 0.39 0

Acres
0 640 1 247.11 2.47

Sq.mm
645.16 1 -

Sq.cm
6.45 929.03 8361.27 1 10000 -

AREA

0 0.16 1550 -

Cu.Inch.
1 1728 46656

Cu.Feet
0 1 27 43560 0.16 0.02 1.28 0.04 35.31

Cu.Yard
0.04 1 0.01 0.0007707 0.05 0.0013079 1.31

Ac.Feet
1 0

Gallons
0.0036168 6.25 168.75 272.25 1 0.13 8.03 0.22 220.72

Pints
0.0289351 50 1350 8 1 64.22 1.76 0.0017597 1765.73

Bushels
0.0004506 0.78 21.022308 0.1245766 0.02 1 0.03 27.496166

VOLUME

276.48 34.56 2219.36 61.02 0.06 61023.6

Metric Carrots
1 5

Gram(g)
0.2 1 1000 1000000 0.0647989 28.349523 453.59237 50802.345 1016046.9

kg
0 0 1 1000 0.0000648 0.0283495 0.4535924 50.802345 1016.0469

Mertic Ton
0 0 1 0.000454

Grains
3.09 15.43 15432.4 15432400 1 437.5 7000.02 784002.08 15680041

OZ
0.0070547 0.0352739 35.273984 35273.984 0.0022857 1 16 1792 35840

Lbs
0.0004409 0.0022046 2.2 2204.62 0.0001429 0.06 1 112 2240

WEIGHT

5000 5000000 0.32 141.75 2267.96 254011.71 5080234.5

0.05 1.02

FORCE

Lb.F
1 0.22

Ton.F
1 -

N
4.45 9964 1

KN
9.96 -

Lb.F/Sq.in
1 -

Lb.F/Sq.ft
1 -

FORCE

Building Rates - 2010 - NCP


0.1 g = 9.81m/sec2 1 145 0.02

Building Rates - 2010 - NCP

CM 2.54 30.48 91.44 160934.4 2011.6799 20.116799 0.1 1 100 100000

M 0.03 0.3 0.91 1609.34 20.12 0.2011679 0 0.01 1 1000

Sq.m
0.09 0.84 2589987 4046.85 0 1 1000000 10000

Sq.km
2.59 0.0040468 0 1 0.01

Litre
0.0164422 28.32 764.58 4.55 0.5683612 36.37 1 0 1000

Cu.cm
16.39 28317.38 464584 4546.09 568.26 36368.7 1000 1 1000000

Cwts
0.0196841 19.684142 0.0005580 0.0089285 1 20

Ton
0.0009842 0.9843071 0.0000279 0.0004404 0.05 1 -

Ton.F/Sq.ft
1

N/Sq.mm
0.01 1.11

DISCHARGE

Building Rates - 2010 - NCP


1 -

Building Rates - 2010 - NCP

Reinforcement : Weights, Specified Spacings and Unit Weights


Weights of metric (millimetre) bars in kilograms per square metre Size (mm) 6 8 10 12 16 20 25 32 40 Basic weight Weight per metre Weight per mm2 at spacing s(mm) = diameter of bar in millimetres Weight per m (kg) 0.22 0.4 0.62 0.89 1.58 2.47 3.85 6.31 9.86 Length per tonne (m) 4505 2532 1623 1126 633 406 259 158 101 = = = Spacing of bars in millimetres 75 2.960 5.27 8.21 11.84 21.05 32.88 51.39 100 2.220 3.950 6.160 8.880 15.79 24.66 38.54 63.13 125 1.78 3.160 4.93 7.1 12.63 19.73 30.83 50.5 78.91 150 1.480 2.63 4.11 5.920 10.53 16.44 25.69 42.09 65.76 175 1.27 2.26 3.520 5.07 9.02 14.09 22.02 36.07 56.37 200 1.110 1.98 3.080 4.440 7.9 12.33 19.27 31.57 49.32 225 0.99 1.76 2.74 3.95 7.02 10.96 17.13 28.06 43.84 250 0.89 1.580 2.46 3.55 6.32 9.86 15.42 25.25 39.46

0.00785 kg/mm2 per metre 0.006165 2 kg 6.1652/skg

Building Rates - 2010 - NCP

275 0.81 1.44 2.240 3.23 5.74 8.97 14.01 22.96 35.87

300 0.740 1.32 2.05 2.960 5.26 8.220 12.85 21.04 32.88

Вам также может понравиться