Вы находитесь на странице: 1из 3

SYED AZHAR HUSSAIN

Father’s Name : Syed Ather Hussain (Late)


Date of Birth : Aug. 6, 1973
Postal Address : House no. R165, Sector 11C/1,
North Karachi
Email: rehanrasheed_2008@yahoo.com
Nationality Pakistani
Phone :0333-3352692

Objective

Aspiring for a dynamic atmosphere where I could employ my


[
technical and managerial acumen and hone them further.
Education

M. A. (Political Science) from Shah Abdul Latif Unviersity Khairpur, Sindh.

B. Sc.
Bachelor of Sciecnes from Shah Abdul Latif University of Khairpur, Sindh

2 years Technical Diploma Electrician from Inter National Technical Centre, Rahimyarkhan
affliated Board of Technical Education, Punjab

Special Training
have passed the Special Training of Basic Operator Course with “First”
Position from Training Center WAPDA TPS Guddu.

Power Plant Experience

4 03 years Experience in Operation & Maintenance of Steam turbine (210 MW)


Russia & China located at Wapda Thermal Power Station Guddu.
5 10 years Experience in Operation & Maintenance of 600 MW Combined
Cycle Power Plant (Frame 9 Mark 2 Speed Tronic) of GE USA
6 located at Wapda Thermal Power Station Guddu.
7 One year experience as a Shift Operator Gas Turbine & Steam Turbine (220
MW) LM-6000 PC GE USA.
8 Total 14 years experience of operation and maintenance of Steam Turbine
and Gas Turbines (combined cycle) Power Plants.
9 Electrical System HV/MV/LV Operation of Balance of Plant auxilaries.
10 All Operations carried out through DCS System..
11 6.6 KV Open Cycle Cooling Water Pump
12 0.4 KV Close Cooling Water Pump
13 0.4 KV Air Compressor
14 Fuel Gas Compressor
15 RO Plan Operation for Dami Water Plant
16 Additional Experience of Operation of Switch yard (132 & 500 KV), air
compressors, Cooling Tower, Pumps and also of Control Room Operation of
Combined Cycle Power Plant.
17 a) Hot and Cold Start Up
18 b) Stoping and Shut Down Gas Turbine
19 Secronize with the system
20 Desacronize with the System
21 Turbo Shuttering
22 Natural Gas Operation
23 Air Compressor Operation

WORKING EXPERIENCE

STEAM TURBINE (220 MW) AND BOILER.

This unit consists 02 Steam Turbines (2200 MW each) of Russia & China
and its Boiler’s capacity is 375 T/H. Super heated Steam Temperature is 534’ c and
operating pressure is 130 KP/cm2.

COMBINED CYCLE POWER PLANT (Frame 9 Mark 2 Speed Tronic)

This unit consists (02) Gas Turbines (131 MW each) and 01 Steam Turbine (150 MW) of
GE USA. This unit is a Combined Cycle Power Plant. This plant has 02 HRSGs with
Superheated Steam Pressure 57 bar, superheated steam temperature 528’c and capacity of
each HRSG is 235 T/H.

SWITCH YARD (132 & 500 KV)

132 KV yard consists on 08 Bays. Each Bay has 03 Breakers . This yard exports the
electricity to the Multan, Jamshoro, Larkana and D.G.Khan (Cities).
500 KV Yard exports and imports the electricity from Dadu & Multan and 04
Transmission Lines (500 KV) are distributing from this yard . In this yard 03 Auto
transformers (220/500 KV) are installed.

COOLING TOWER UNIT.

This unit consists 14 cells, three (03) heavy duty centrifugal pumps (6.6 kv). Ejector and
pumps for chemical dozing (Biocide, Bio dispresent, Cl 2 and ClO2 and also controlling
PH with an Acid
.
FRAME-9E GAS TURBINES (600 MW )

This is a combined cycle power plant Guddu Thermal Power Station.

PRESENTLY WORKING
I have worked at Wapda Thermal Power Station Guddu Pakstan. I was working
at 600 MW Combined Cycle Power Plant (Frame 9 Mark 2) GE USA on the post
of Sub-Engineer and my duty was in the Control Room of this unit. Presently I
am working as power Operator with KESC Power Station, Korangi Karachi ON
LM 6000 PC Sprint GE USA (combined cycle power plant)

Computer skill
ENVIRONMENTS: Windows/Win2000, XP, MS Office
I can read, write and speak English easily.

Вам также может понравиться