Вы находитесь на странице: 1из 7

William Wall Oil & Energy Professional (480)586-7695 ww120e370@westpost.

net Summary Experienced in directing all aspects of project operations, administration, budg eting and equipment install. Results-oriented leader with a proven track record of taking problematic situations and turning them around to a positive outcome f or the client. Excellent technical and analytical skills, organized with strong attention to detail and proven ability to deliver ahead of schedule. Analyzes problem, identifies proposals and collaborates with a team to identify outcomes and a plan for achieving them. TECHNICAL CERTIFICATIONS & LICENSES PMP TRAINING COMPLETE IEEE Power Society,, AZ Lic.# C-11,AZ Lic.# L-11,AZ Lic.# KB-01, CA Lic, Electrical Contractors License WA Master Electrician Lic PMP Ceritification in Progress ACCOMPLISHMENTS Potomac River Generating Station IC&E work 5 Unit outages, 3 Major Overhauls on 108 MW Units, ESP upgrades to controls to i ncrease reliability and efficiency, all UPS upgrades. Decommissioned old Stationary Battery System and Installed state of the art equipment for NERC compliance, Initiated improvements to Plant compressed air systems for unit draw on startup and CEMS shelter air n eeds Saved Company Over $2M in time&materials. Intel Chandler AZ Fab 32 First Open Ballroom Cleanroom Tool Install $300 (Million) Intel Chandler AZ. Fab 12 I&C General Foreman overseeing 50 men on Levelas 2,4,a nd 5 Delivered under Budget and two weeks ahead of schedule. ASU Supper Bowl XXX Sound System on time and within budget State Farm Data Center on time and under Budget ASU Center and North Site Dorms Fire Systems Ahead of Time and within budget Arco Refinery Demineralizer Skid on time and under budget Texaco Data Highway Communications Fiber Optics Cable and interface connections, on time and under budget. Mobil Refinery,Gulftronics Seperator Skid, Neworking, Lan,Wan setup and commissi on, Bioside Skid for chemical injection pumps, tests, and startup. On time and under budget Specialties Contract administration Planning & Scheduling QA/QC inspector Start up & Commissioning Designer & Retrofits LSS inspector Construction coordinator Maintenance reliability

Risk management Procurement Instrumentation & Controls Electrical specialist Information systems Unix, Linux Windows 3.1,95,98,NT 4.0 Windows 2000 AS,WS TCP/IP, FTP Experience ICE Maint Supervisor at Mirant January 2008 -July 2010 (2 years 7 months) aManaged staff of 12 technicians, ensured a competent and motivated staff by adm inistrating a timely training and qualification program, conducting candid Perfo rmance Appraisals and providing leadership to ensure quality work and a highly m otivated work force. aContributed to an effective safety program by promoting a safety conscious atti tude on the part of all employees, ensuring that safe work practices are followe d, and that a safe and clean work environment is maintained.1940 days without a Lost Time Accident aPlanned, schedule maintenance activities (Preventive, Predictive, Corrective an d Outage) in Primavera, Microsoft Project and managed electrical, instrumentatio n, relays, and breakers, transformer and controls maintenance backlogs with Maxi mo. Maintained NERC And FERC and CIP Compliace. aCoordinated the electrical, instrumentation and controls outage activities In P rimavera including tagging, testing, upgrading, modifications, and restoration. aProvided coordination between the Electric and Controls (E&C) Shop and all othe r resource areas of the plant, such as Operations, Procurement, Planning, Fuel & Ash, Combustion Turbine and contractor support groups. Project Coordinator (Intel Corp) Contract Work at June 2006 -January 2008 (1 year 8 months) aDirected the install of Substation additions and utilities aCoordinated all trades and contractors to ensure nd within budget. aMaintained standards set by Intel for buyoffs on Applied Mechanical Remote switching installs from quality installation on time a all phases of tools installed.

aOversaw LSS systems, install responsible for QA/QC of install performed by vari ous contractors. aPre-Inspection of NFPA & NEC code compliance, testing and verification of syste m functions, buyoff's with city and governing authorities. Electrical Foreman-Contract Work at Wilson Electric October 2005 -June 2006 (9 months) aJob site: Arizona State University -Mcallister Village; Responsible for all pha se two construction. aLaid Out installation of electrical work including setup and install of main sw itchgear and subsystems, Incoming Feeders to Main Feeder Transformers, and Feede rs from Secondary Side aDirected test work and buyoffs before energizing equipment. aLaid out underground installation for main cafeteria, including sub panels and equipment feeds. Electrical Superintendent-Contract Work at Elco Electric Inc.

October 2004 -October 2005 (1 year 1 month) a Managed all phases of Electrical work including all inspections. a Installed Electrical power systems in: 42 Subway sandwich stores, Simply Artra geous of Mesa/Chandler a Retrofit Food Court installs in Nogales & Prescott . a Walked job, made modification to drawings necessary to implement new power ins talls. a Made modifications necessary to drawings so install would meet code requiremen ts. Electrical Foreman-Contract Work at Wilson Electric July 2003 -October 2004 (1 year 4 months) Over see construction of new Madison Jail Facility in Phoenix, installation incl uded all make-up air units on all five levels and penthouse. Duties included, take-offs from drawings , all material orders, all lay-out and install of conduit systems to and from lo wer to upper levels. Responsible for buy-offs Phoenix City inspectors. Also responsible for start-up and commissioning of all make-up air units. Responsible for design changes, Electrical Foreman-Contract Work at Hernandez Companies December 2002 -July 2003 (8 months) Responsible for overseeing all field work being scheduled and in progress. Quali ty Assurance Inspector for all work done by electricians on all jobs. Job tracki ng, implementing changes as needed to assure customer satisfaction and code requ irement for city inspections. Pull permits for all work need and do buyoffs before city inspections. Walk jobs, make material l ists and see to the needs of the crews performing the work in the field. IT Technician -Contract Work at Natural Data September 2002 -December 2002 (4 months) Assisted in Win2k rollout an APS Deer Valley and Paridise Valley Facilities. Inc luded, but not limited to the following: User backup using filsave, ghosting in both mulitcast unicast, and restoration of files and settings, customer followup and service in Surpise facility. Decommissioning of old boxes for domation to s tudents. Decommissioning involved killing ntfs partions verifying operation of pcas and fdisk. Sole Proprietor-Contact Work at W.W.Enterprises February 2002 -September 2002 (8 months) Entrepreneurial endeavor including consulting and production in the fields of bo th computer and electrical industries, Computer Systems/Electrical Work both inv olving Installation/Repair, Construction, consultation and design/implementation . a Proposed, bid, worked, launched projects and oversaw ventures from commencemen t to completion, maintained inventory/ supplies, hired and maintained competent work force, maintained payroll, bookkeeping tax records, etc. Met and exceeded p roposal schedules and deadlines, keeping costs to a minimum saving both client and company unnecessary expenditur es hence/thus realizing quality as well as solid value. Adhering to the/keeping within the original bid cost as much as possible. Life Safety Systems Foreman-Contract Work at Kortman Electric, Inc. 2001 -2002 (1 year) Arizona State University, installation and trouble shooting of fire & life safet y systems for both North and Center Dorms on ASU Campus Job Foreman-Contact Work at Lafferty Electric December 1997 -December 1998 (1 year 1 month)

Scheduled workers per job requirements, materials, orders, tool up for all manpo wer, safety onsite per OSHA. a Met and coordinated construction with all sub-contractors, bringing in job und er deadline. a Brought project to completion prior to deadline. I&C General Foreman at Wilson Electric December 1994 -December 1997 (3 years 1 month) Coordinated efforts with Holder Construction and State Farm in the construction of the State Farm Data Center. From the cradle to the grave, site survey, all un derground duct banks and pad concrete pours. All Generator sets and Controls, Ma in Switchgear and backup power systems, Coordinated efforts with TDC and INTEL i n construction and installation on levels 2, 4 and 5 in the Fab 12 Building. Scheduled personnel hours as well as project time spans and forecasting completi on dates with emphasis on cost reduction, meeting specifications and deadlines w hile maintaining quality workmanship, and safety in the workplace. Managed inven tory and materials as well as ordering and keeping materials needed for the job on hand and available. Supervised and oversaw construction from beginning phases to completion and assu red duties would be performed in an efficient timely and professional manner. De ciphered company drawings and engineered own Asbuilts and redline drawings. Dete rmined, procured and consistentiy reviewed manpower requirements to assure maxim um work performance while bearing in mind budget restrictions. Met and exceeded schedule dates for turnover to Intel complete. ASU -Sun Devil Stadium -Tempe, AZ: Project: Superbowl XXX Sound System General Foreman Coordinated efforts with D.L. WITHERS and ASU involving the complete renovation and installation of new sound system designed for use in Superbowl, XXX. Determi ned and scheduled work force needs as well as phases of work. Procured and maint ained job materials with regard to cost and budget Oversaw and supervised constr uction in all phases from commencement to completion. Produced Asbuilts and redl ine drawings. Met and exceeded all goals for scheduled completion for turnover to ASU for FIES TA BOWL and SUPERBOWL xxx. General Foreman Assisted Craig Cederstrom taking over lighting, fire alarm systems and security networks for buildingas 580 and 531.Mcdonnel Douglas Helicopter Plant Capital Projects & Startup Foreman at Seco Indutries (Mobil Oil & Texaco) April 1994 -November 1994 (8 months) Upgraded existing 2300v switchgear, interface dc controls for mcc, interfaced on board dcs Honeywell tdc-3000 systems Made necessary hot cut overs on new instru mentation, hipot and terminated 2300v cables. Perform startup and commissioning of new systems & assist Mobil Oil in debugging of existing loops. At Texaco clientele location was responsible for all underground conduit groundi ng, switchrack installation and 2300volt switchgear tie in and terminations. Turnaround Electrician (Powerine Oil Co.) Contract Work (Atlas Resources) January 1994 -February 1994 (2 months) Provided and installed temporary power to critical loads coming form substation J. Shutdown and PM of main breakers on high side of transformers. Routine inspec tion, testing, maintenance and repair of all secondary MCC systems.

Electrical & Startup Foreman at Instrument Specialist Company (Arco Oil Co.) Con tract Work July 1993 -January 1994 (7 months) Oversaw new construction projects from the ground up. Installed LAN network including five substations for telecommunications interfac e from telephone to fiber optic muff/conductor cables. Installed all necessary power and telephone cable, underground and overhead cond uit installation, test and startup. GULFTRONICS SEPARATOR SKID from the ground u p including startup and commissioning. Developed BIOSIDE SKID, installed new chemical injmection pumps, and performed t esting and startup procedures performed complete installation of Sulfur Tank Upg rades, emergency shutdowns, bypasses and venting to atmosphere. Computer Designer, Builder, and Repair Technician at W.W.Enterprises April 1993 -July 1993 (4 months) . Computer troubleshooting abilities down to board-level. Hardware interface dia gnostics skills include preparation ranging from new installation to earlier mod el system repairs and upgrades. Have working knowledge of installation and configuration of Fiber Optics cables and relay stations. Interfaced with fiber optics cables to computer peripherals, hardware application. Basic/rudimentary knowledge of splicing. Qualifications include ten years hands-on design and cons truction of complete computer systems; software installation and troubleshooting including configuration on installation, software conflicts and debugging. Efficient in systems using Windo ws 3.1, 95, 98 as well as possessing extensive knowledge of Windows NT 4.0 and W indows 2000 AS and Windows NT 2000 WS (Workstation) UNIX and LINUX . TCP/IP,FTP Protocols,as well as Netware and Cisco Network configurations and installs. QA/QC Inspector (Mobil Oil Co.) at American Instruments -Contract Work April 1992 -April 1993 (1 year 1 month) Proofed engineer-submitted blueprints and made corrections accordingly prior to construction of wiring of equipment. Performed field checks for proper installat ion and code requirements and specifications as well as loop checking and verification of all wiring for proper terminations and operati on. Document changes made and redline drawings for engineers asbuilts, Verified calibration reports submitted by the instrumentation department Buy off loop and commission it into service; function test loop back to control console for prop er operation. Submit final reports to client for final buy off. Maintained work performance files at client disposal for reference. Electrical Specialist (Mobil Oil & Texaco Oil) Contract Work at Instrument Speci alist Company February 1991 -April 1992 (1 year 3 months) Troubleshoot all new installations for proper operation prior to startup. Rectified errors and redline drawing mistakes by engineering department. Made modifications to control schemes possessing specialized knowledge of switch gears. Supervised installation of underground duct bank consisting of six three -inch conduits which run a distance of thirty-two hundred feet. Assisted in the feeding of wires through conduit. Conducted final tests of cable before term. Installed new 4160v switchgear and hipot new buss prior to tie in. Hipot all cables prior to termination. Rewired existing control scheme to custo mer requirements and tested controls for proper operation. Configured new PLC controllers for main shipping pumps as well as wiring and tes ting all field devices in main shipper program. Dry ran PLC logic for proper seq uence of all permissives before actual startup.

Check alarm sequence in main control house for proper operation. Programmed main switchgear overloads using lQl000 technology. Setup and tested CTas for proper phasing and pump motor for rotation. Commission ed new shipping pumps. Sole Proprietor-Contact Work at W.W.Enterprises May 1990 -February 1991 (10 months) Electrical Construction, Residential, Comercial,and Industrial Electrical Foreman-Contract Work (Arco & Mobil Oil) at Southwest Veco August 1987 -May 1990 (2 years 10 months) Plant and Refinery Electrical Foreman, responsible for maintenance, new construc tion and refinery revamps. 15 employees were under my supervision. Responsible for the demolition of outmoded equipment in alkylation unit and over saw installation of new equipment conduit and wire in alkylation unit and conduc ted testing and startup of the new equipment Revamped crude unit #1, including modification of existing switchgear. Installed new motors and control circuit and performed diagnostics and startup procedures for local and remote operations. Plant and Refinery Electricial Foreman at Edgington Oil Co. August 1984 -August 1987 (3 years 1 month) As contracted to Edgington Oil was responsible for refineries at Edgington Oil C o. and maintenance of Long Beach facility and Signal Hill facility. Handled all electrical maintenance and construction including all 41 60v switchg ear and motors to I000HP reduced voltage as well as all 480v controls motors and transformers. Maintenance scope also consisted of UPS systems from Ior/tec and exide series 1000-Skva. Responsible for backup generator and emergency lighting as well as that of boiler controls (6 total) and all loading and shipping pumps. Electrical Foreman-Contract Work (Xerox Corp) at Western Industrial August 1983 -August 1984 (1 year 1 month) Provided design, installation and renovation of all machinery and/or fixtures as well as major renovations. Calculated power requirements for computer installat ions. Assessed and made necessary renovations to assure proper operation require ments were met. Provided maintenance for high voltage control. Electrical Foreman (Southern California Edison) at Electrical Systems Testing October 1980 -August 1982 (1 year 11 months) Duties included: Electrical renovations, construction and maintenance work performed mainly on So uthern California Edison plants. 4160V switchgear installation and modifications to existing controllers and 480v air breakers. Calibration and testing of all t he above equipment. Worked on various electrical renovation/construction project s including power plant overhaul, repair and calibration. Projects at local oil companies, and renovation and constructio n projects at utility plants and other heavy industrial plants. Involved with the overhaul 4kv, 480v circuit breakers, switchgear, and motors. I nstalled conduit up to 6a, and installed and terminated cables up to 4kv. Made r evisions to existing protective relaying and control schemes, completed required tests after modifications and corrections to blueprints and drawings. Education Lamberhurst University

BSEE, Electrical Engineering, 2001 -2005 Collins College Associates, Personal Computer/Network Tecnology, 2001 -2003 University of Phoenix MCSE, Microsoft Certified Training, 2000 -2000 DEVRY INSTITUTE OF TECHNOLOGY ELECTRONICS, 1977 -1979 Interests Rebuild and Design Computers and Software Car and Truck Restoration Travel

Вам также может понравиться