Вы находитесь на странице: 1из 3

Gary D. Duffey 8410 Willow Way Raytown, MO 64138 816-914-8139 gdduffy@aol.com www.linkedin.

com CAREER SUMMARY Procurement Professional with extensive experience in a manufacturing / industri al environment. Proven detail-oriented performer who meets or exceeds project g oals and objectives. Solid analytical and organizational skills, enabling devel opment and implementation of effective and efficient cost-saving methodology. St rong data management skills, including development of relational data bases and creation of systems utilizing Visual Basic & SQL programming language. Experienc e with RFQ / RFB, MRP, ISO9002 and ISO14000 quality processes and requirements. Specific expertise includes: * Project Management * Proposal / Contract Development & Execution * Purchasing * Engineering Design, Detail & Development * Quality Control * Systems Development (Automated & Manual) * Compliance & Specifications * AutoCAD PROFESSIONAL EXPERIENCE BHA / GE / Babcock & Wilcox, Kansas City, Missouri / Kansas 2002 - 2011 B&W supplies products and services to a wide spectrum of industries and markets, including Modular Nuclear Power, Renewable Energy, Government Services, Fossil Power, Environmental and Commercial Nuclear Power. Procurement Specialist Evaluated vendors and negotiated to find replacement parts at a reasonable cost without sacrificing quality. Prioritized parts requests based on urgency, sourci ng and ordering parts from vendors, checking order statuses, and tracking packag es to ensure timely delivery. * Preparation of formal bids for Precipitator Rebuild projects ranging $200K to $50M. * Worked with sales, engineering and vendors to obtain back-to-back terms betwee n customers and vendors. * Outsourced to LCC (low-cost countries) when necessary. * Compared bids from vendors and aggressively sought cost reduction on final pro duct. * Enabled a cost reduction of 10.36% on a buyout budget of $7.5M. Accomplished b y aggressively seeking multiple bids and negotiations with vendors. * Recovered overpayment of $447,563 by AP to a vendor. Executed by tracking curr ent orders and reducing payments until amount was recovered. * Worked directly with the vendor to recover back charges $350,000 for poor qual ity product; able to recover this through direct payments back to BW and withhol ding payments on current projects. Dearborn Mid-West Conveyor Company, Kansas City, KS 1986 - 2002 DMW, has provided material handling systems to the Automotive, Bulk, Industrial, and USPS markets since 1947. The company has evolved from a small fabricating s hop into a major material handling system provider, with full service locations in Michigan andKansas. Estimator 2000 - 2002

Estimated hard bid and conceptual design-build projects, assessing project risks and assigning proper risk costs, reviewing and recommending changes to design i n order to possibly lower the project costs. * Prepared formal bids for material handling projects ranging $200K to $50M. Dearborn Mid-West Conveyor Company (continued) * Devised bid materials, including drawings and specifications. * Solicited bids for negotiated pricing of and consummated contracts for OEM mat erials to meet bid specifications and production schedules. Parts Manager (concurrent) 1996 - 2000 Responsible for maintaining the supply network, pricing, quantity, accuracy, and availability of all parts inventoried related to customer maintenance requireme nts. * Customer service and direct sales responsibility for parts department, having an annual volume of over $2M. * Purchased OEM parts for re-sale to existing customer base. * Coordinated in-house manufacture / assembly of parts for conveyor systems. * Prepared documentation and specifications. Project Engineer 1992 - 1996 Supervised the engineering activity projects. Planed and directed engineering as signments. Technical responsibilities for interpreting, organizing, executing, a nd coordinating these assignments. * Project coordinator and implemented management directives on $50M bulk mail co nveyor system for USPS. * Supervised design / detail engineering personnel, ensuring accuracy and schedu ling milestones. * Coordinated OEM purchasing, production scheduling, manufacturing and delivery of equipment. * Solicited bids and contracted for erection personnel and supervision of erecti on at field site. * Accomplished project objectives as liaison between sales, customer, contractor s, suppliers and site personnel. Detail & Layout Department Supervisor 1986 - 1992 * Supervised design / detail / layout engineering personnel in the creation of d rawings as required for sales, project management, project engineers and manufac turing. * Oversaw quality control to ensure accuracy and scheduling requirements. * Designed and implemented automated program to run computations and generate ma terial cut list which reduced detailing time by 64% from 25 hours to 9 hours. ADDITIONAL EXPERIENCE * Civil engineering and project management experience in the development, design and construction of residential and commercial properties. * Negotiated with municipal entities (city council and engineers) to gain approv al on numerous construction projects. Agreements had to be reached and complian ce achieved on a variety of components, including streets, easements, utilities and environmental impact. * Sales Support (Technical) for a variety of mechanical systems including dust c ollectors & asphalt processing. EDUCATION Associate Degree in Civil Engineering (partial completion) Finlay Engineering College, Kansas City, MO Dale Carnegie Customer Relations, Kansas City, MO COMPUTER SKILLS

Windows, Access, Visual Basic, SQL, Word, Excel, PowerPoint, Internet browsers AutoCAD 14 & AutoCAD 2000i Mechanical ?? ?? ?? ?? Gary D. Duffey Page 2

Вам также может понравиться