Research and Development Section Electrical & Mechanical Projects Division Drainage Services Department Jan 2008
EXECUTIVE SUMMARY
The objectives of this R&D Item No. RD2047 - Application of Hydroelectric Technology in Stonecutters Island Sewage Treatment Works (SCISTW) are to investigate the technical feasibility of constructing a pilot hydropower plant in one of the Vertical Outlet Wells in SCISTW and to estimate its cost effectiveness if installed. PolyU Technology & Consultancy Company Ltd. was commissioned in February 2007 to undertake an assignment under the Consultancy Agreement No. DEMP/06/19 for this R&D Item. Literature studies and market searches were conducted and relevant information of similar project was collected. It is recommended that a hydropower plant with a three-phase asynchronous generator and a basic propeller type turbine can be installed in the Vertical Outlet Well of SCISTW. By utilizing the net available pressure of the outflow effluent, the hydropower plant can generate electricity to supply some of the E&M equipment in SCISTW. Site measurements, including effluent outflow velocities, were made for estimation of the static and dynamic heads of the outflow effluent inside the Vertical Outlet Well. A hydropower plant of 45kW capacity is proposed to be installed in the Vertical Outlet Well of Sedimentation Tanks Nos. 40 & 42. The designed effluent flow rates of the hydropower plant are in the range of 1.1 to 1.25 m3/s while the designed available net head is from 4.5 to 5.5m. Possible options in installing the hydropower plant at the Vertical Outlet Well were investigated. Taking into account of technical aspects and site constraints, the configuration with the generator and turbine integrated into one unit and mounted inside the Vertical Outlet Well is recommended. A motorized control valve will be installed on top of the Vertical Outlet Well to control the effluent flow to the hydropower plant. The generated electricity will supply to an existing electrical switchboard in SCISTW, in parallel with the electricity supply of CLP, i.e. the hydropower plant to be grid-connected. The rated generation power of the proposed hydropower plant will only be about 45kW and is within the 200kW limit under the Technical Guidelines on Grid Connection of Small-scale Renewable Energy Power Systems issued by the Electrical & Mechanical Services Department (EMSD). CLP had been provided with relevant technical information of the hydropower plant and was
i
basically satisfied. Nevertheless, CLP advised that the detailed design of the hydropower plant is still required to be submitted to him for formal approval and whether standby charge will be required for the proposed grid-connected hydropower plant can be evaluated after this hydropower plant project has been formally approved for implementation. It is expected that the proposed hydropower plant can provide a yield of about 263,000 kWh per year. The saving in electricity cost is estimated to be HK$201,185 per year based on that no standby charge will be required by CLP. The environmental benefit is 62.4 Metric Ton Carbon Equivalent per year or 229 Metric Ton CO2 Equivalent per year. The estimated capital cost of installing the hydropower plant is about HK$5M. It gives a payback period of 26 years if only the financial aspect is to be considered. Although the financial benefit of this project may not be very attractive, it is considered worthwhile further exploring the application of hydroelectric technology at SCISTW in view of its environmental benefit in the reduction of greenhouse gas emission. If the pilot hydropower plant is decided to be installed, it will be able to be put into operation in end 2009. By then, more knowledge and experience in operating the hydropower plant could be obtained. It is also noted that the HATS Stage 2A project is undergoing, in which additional Sedimentation Tanks and their Vertical Outlet Wells will be built. If civil requirements of hydropower plant(s) are incorporated at the early stage of this project, the hydropower plant(s) can be designed with a lesser capital cost and better maintainability. Further study on the hydropower plants for the HATS Stage 2A project is recommended.
ii
The Government of the Hong Kong Special Administrative Region Drainage Services Department
( Final Report )
January 2008
Submitted by PolyU Technology & Consultancy Co. Ltd.
(Final Report)
TABLE OF CONTENTS
Page No.
INTRODUCTION ......................................................................................................................... 4 1.1 1.2 1.3 Background............................................................................................................................4 Scope of the Assignment .....................................................................................................4 Structure of the Report.........................................................................................................5
2 3
LITERATURE STUDIES ON HYDROELECTRIC TECHNOLOGY ................................ 7 SUITABLE TYPES OF TURBINES AND GENERATORS................................................ 10 3.1 3.2 Suitable Types of Turbines............................................................................................... 10 Suitable types of generators............................................................................................. 13 A 200 kW hydro plant in Puan Hydro, Korea.............................................................. 15 A micro hydro scheme at a waste water treatment plant in Emmerich of Germany.............................................................................................................................. 16 A small hydroelectric station for the new waste water treatment plant in Amann of Jodan ................................................................................................................. 17 A 1.35 MW hydro plant at The Point Loma Wastewater Treatment Plant ............. 18
TECHNICAL DETAILS AND BUDGETS OF SUITABLE TURBINES AND GENERATORS ............................................................................................................................ 19 5.1 5.2 5.3 Tyco-Tamar Design in Australia..................................................................................... 19 Gugler Hydro Energy GmbH from Austria ................................................................. 23 Kubota Corporation of Japan .......................................................................................... 27
MEASUREMENT OF FLOW VELOCITY OF THE FINAL EFFLUENT IN THE VERTICAL WATER OUTFLOW WELL ................................................................................ 29 6.1 6.2 Equipment specification ................................................................................................... 29 Results of measurements and estimations .................................................................... 30
7 8
ESTIMATION OF STATIC AND DYNAMIC HEADS OF THE FINAL EFFLUENT IN THE VERTICAL WATER OUTLET WELL............................................... 32 DESIGN REFERENCES ............................................................................................................. 33 8.1 8.2 Design Inputs ..................................................................................................................... 33 Relevant Standards, Code of Practice and other Manuals/References ................... 33
9 10
PROPOSED HYDROELECTRIC TECHNOLOGY APPLICATION IN SCISTW.......................................................................................................................................... 36 POSSIBLE OPTIONS FOR THE PROPOSED HYDROELECTRIC SYSTEM.............. 38 10.1 10.2 10.3 10.4 10.5 General................................................................................................................................. 38 Turbine / Generator SET.................................................................................................. 38 Control Valve/Gate........................................................................................................... 45 LV Switchboard ................................................................................................................. 47 Cable & Conduit Routing................................................................................................. 47
2
January 2008
(Final Report)
11
HYDRAULIC DESIGN .............................................................................................................. 54 11.1 Surge PRESURE and Back PRESSURE.......................................................................... 54 11.2 Conclusions......................................................................................................................... 56
12
CIVIL & MATERIAL REQUIREMENTS .............................................................................. 57 12.1 12.2 12.3 12.4 12.5 General................................................................................................................................. 57 Support for the Turbine and Genentor.......................................................................... 57 BoTtom metallic screen and its Support........................................................................ 58 The guide tubes and its Support ..................................................................................... 59 Support for the Electricity Cables/conduits................................................................. 60 Major Electrical Equipment ............................................................................................. 61 Hydro-Turbine ................................................................................................................... 61 Generator............................................................................................................................. 63 LV Switchboard and control panel................................................................................. 64
13
14 15
CLPS REQUIREMENTS FOR ON-GRID CONNECTION.............................................. 75 OPERATION AND CONTROL OF THE HYDROPOWER PLANT .............................. 83 15.1 15.2 15.3 15.4 15.5 15.6 Normal Start-up ................................................................................................................. 83 Normal Shut-down ........................................................................................................... 83 Emergency Shut-down ..................................................................................................... 84 Failure of Power Supply................................................................................................... 84 Control and INstrumentation.......................................................................................... 85 Maintenance issues............................................................................................................ 85
16 17
SPECIFICATIONS OF THE PROPOSED HYDROELECTRIC SYSTEM...................... 86 PROJECT INTERFACE AND IMPLEMENTATION SCHEDULE.................................. 88 17.1 Project Interface.................................................................................................................. 88 17.2 Implementation Schedule ................................................................................................ 88
18 19
BUDGETING................................................................................................................................ 89 18.1 Capital Cost and Recurrent Cost .................................................................................... 89 ANNUAL ENERGY YIELD, FINANCIAL AND ENVIRONMENTAL BENEFITS...................................................................................................................................... 91 19.1 Power & Energy Generation............................................................................................ 91 19.2 Power Utilization............................................................................................................... 92 19.3 Environmental Benefits .................................................................................................... 92
20
CONCLUSIONS & RECOMMENDATIONS ...................................................................... 95 20.1 20.2 20.3 20.4 General................................................................................................................................. 95 E & M EquipmeNt & Civil Work.................................................................................... 95 Construction Method Statement..................................................................................... 95 Project Interface and Implementation............................................................................ 95
January 2008
(Final Report)
1 Introduction
1.1 BACKGROUND
The Stonecutter Island Sewage Treatment Work (SCISTW) is capable of handling a daily sewage flow of 1.7 million m3/d. After treatment, the effluent is discharged via a 1.7 km long submarine outfall to the western approach of the Victoria Harbour. There are 36 sedimentation tanks (excluding two prototype tanks) and 18 associated vertical outflow wells in SCISTW. The vertical drop distance of water inside the vertical outflow well can be as high as 5.5 - 8m. The velocity near the bottom of the well can be greater than 7 m/s. Due to the difference in the static water levels, there is a potential to recover pressure energy of the effluent water at the vertical outflow well of the treatment works to generate electricity by a water turbine generator. In February 2007, the Drainage Services Department (DSD) commissioned PolyU Technology & Consultancy Company Limited (PTeC) to undertake an assignment under the Consultancy Agreement No. DEMP/06/19 Application of Hydroelectric Technology in SCISTW (hereinafter called The Assignment), with the objective to investigate the technical feasibility and cost effectiveness for constructing a pilot hydropower plant for the generation of electrical energy to be used as part of the electricity supply to the SCISTW by utilizing the net available pressure of the outflow.
1.2
The scope of this Assignment comprises: To carry out literature studies and market searches to collect the up-to-date information including the technical data and job references, of the hydroelectric technology, in particular the application of low head micro-hydroelectric technology in sewage treatment plants; To investigate the possibility of applying the hydroelectric technology in SCISTW from the engineering point of view, including the required civil modification works, liaison with CLP Power for connecting the hydroelectricity generation plant to his electricity supply grid, etc.; and To carry out a preliminary assessment on the cost-effectiveness of applying the hydroelectric technology in SCISTW
January 2008
(Final Report)
1.3
Following the introductory section, the remainder of this Report is structured as follows:-
Section 7 Measurement of Static and Dynamic Heads of the Final Effluent in the Vertical Water Outlet Well
This section will present the measurement of static and dynamic head of the flow in the Vertical Water Outlet Well.
Section 8 Design References This section will contain the design references for the pilot hydropower plant. Section 9 Proposed Hydroelectric Technology Application in SCISTW This section will highlight the description of the proposed hydro turbine system. Section 10 Possible Options for the Proposed Hydroelectric System This section will summarise the options recommended for the pilot hydropower plant. Section 11 Hydraulic Design This section will provide the hydraulic design for the pilot hydropower plant. Section 12 Civil Requirements This section will give the details of the general arrangement of the hydroelectric system as well as the associated civil and structural requirements.
January 2008
(Final Report)
Section 13 Electrical & Mechanical Works This section will present the electrical and mechanical works for the hydropower system. Section 14 CLPs Requirements for On-grid Connection This section will stipulate the CLPs requirements for the on-grid connection of the proposed hydroelectric system. Section 15 Operational and Control of the Proposed Hydroelectric System The operational requirements of the hydroelectric system will be discussed in this section. Section 16 Specifications of the Proposed Hydroelectric System The construction method statement of the hydroelectric system will be provided in this section. Section 17 Project Interface and Implementation Schedule This section will discuss the project interface and present a tentative implementation programme for the hydroelectric system.
January 2008
(Final Report)
January 2008
(Final Report)
9. A dam can be a useful resource for leisure, fishing, irrigation or flood control. Point #6 may not apply in the sewage treatment plants of DSD. 90% efficiency can only be achieved in hydroelectric station of very large scale and high head. Point #8 does not apply in the proposal of this case. The output power will not be controlled but be simply fed into the grid. Obviously Point #9 does not apply in the sewage treatment plants of DSD. There are however some social, ecological and hydrological effects have to be taken into consideration when planning a hydroelectric power station. These effects can be enormous if the system is very large: 1. Hydropower is only suitable for sites with large volumes of flowing water. Decreased rainfall, due to climate change, would reduce the electricity available. 2. Considerable capital investment is required, especially for large schemes. 3. Dams cause large areas upstream to be flooded. This may cause displacement of people and will destroy animal habitat and flora. 4. Flooded vegetation will rot anaerobically and emit methane, a potent greenhouse gas. 5. The dams and diversion of water may also change the groundwater flows in the local area and this can change the ecology of the area. 6. Damming the river reduces flooding which reduces the amount of silt carried downstream. It also increases the amount deposited in the dam. This may mean that the dam has to eventually be dredged while downstream there is reduced fertility in the soil. The flow rates (as detailed later) in the sewage treatment plants of DSD are large and relatively fairly constant (as against rainfall throughout a year). Hence Point #1 is not applicable. No additional dam or reservoir is required to be constructed to hold the water. Hence the Point 3 to 6 are not applicable. Fortunately, most of the demerits mentioned here are not valid in the sewage treatment plants of DSD, maybe with only Point #2 as the exception. However, in the proposed pilot project, only one pilot hydro generator plant will be installed in one of the 18 vertical outflow wells at SCISTW. Hence the capital investment will not be too large. However, there is one specific point which need to be considered seriously in application of hydro plant in sewage treatment works as compared to other areas of applications. That is sewage water to be highly corrosive and hence all the involved equipment have to have enough protection against it. This point will add considerable amount to the capital cost of the equipment and support structure of the equipment.
Therefore, overall speaking, application of hydroelectricity technology to recover energy from sewage water in general has more merits than demerits.
January 2008
(Final Report)
Reference: Adam Harvey, Micro-hydro Design Manual, Intermediate Technology Publications 1993. Jiandong Tong, Mini Hydropower, John Wiley & Sons, 1996. FM Griffin, Feasibility of Energy Recovery from a Wastewater Treatment Scheme, Proceedings of Hydropower Developments Conference, IMechE, 1997. Edward, B.K., The economics of hydroelectric power, Cheltenham, UK ; Northampton, MA : Edward Elgar, 2003 Grigsby, L.L., The electric power engineering handbook, Boca Raton, Fla.: CRC Press, 2005.
January 2008
(Final Report)
Reaction turbines
Francis
propeller Kaplan
Turbine selection is based mostly on the available water head, and less so on the available flow rate. In general, impulse turbines are used for high head sites, and reaction turbines are used for low head sites. In most sewage treatment plants of DSD, low head should be the usual cases. Hence, only reaction turbines are discussed here. The reaction turbines considered here are the Francis turbine and the propeller turbine. A special case of the propeller turbine is the Kaplan. In all these cases, specific speed is high, i.e. reaction turbines rotate faster than impulse turbines given the same head and flow conditions. Therefore a reaction turbine can often be coupled directly to a generator without requiring a speed-changing mechanism. Some manufacturers even make integrated turbinegenerator sets of this type. Significant cost savings are made in eliminating the speed changing mechanism and the maintenance of the integrated hydro unit is very much simpler. Actually, the Francis turbine is more suitable for medium heads than low heads, while the propeller is more suitable for low heads.
10
January 2008
(Final Report)
Figure 3.1 Selection of turbine based on available water head and power output (Source: http://www.tamar.com.au/)
Francis turbines can either be volute-cased or open-flume machines. The spiral casing is tapered to distribute water uniformly around the entire perimeter of the runner and the guide vanes feed the water into the runner at the correct angle. The runner blades are profiled in a complex manner and direct the water so that it exits axially from the centre of the runner. In doing so, the water imparts most of its pressure energy to the runner before leaving the turbine via a draft tube.
Figure 3.2: Francis turbine (source: adapted from http://lingolex.com/bilc/engine.html & http://starfire.ne.uiuc.edu/~ne201/1996/schoenau/wheel~1.html)
11
January 2008
(Final Report)
The Francis turbine is generally fitted with adjustable guide vanes. These regulate the water flow as it enters the runner and are usually linked to a governing system which matches flow to turbine loading in the same way as a spear valve or deflector plate in a Pelton turbine. When the flow is reduced the efficiency of the turbine falls away. The basic propeller turbine consists of a propeller, similar to a ship's propeller, fitted inside a continuation of the penstock tube. The propeller usually has three to six blades, three in the case of very low head (just a few meters) units and the water flow is regulated by static blades or gates just upstream of the propeller. This kind of propeller turbine is known as a fixed blade axial flow turbine because the pitch angle of the rotor blades cannot be changed. The part-flow efficiency of fixed-blade propeller turbines tends to be very poor.
Figure 3.3: Axial flow propeller turbine For the intended location on the application in SCISTW, the head is low (less than 10 m) and there are more physical constraints in installing Francis turbine, an axial flow propeller turbine is more suitable for installation, such that the propeller is installed with its axis is vertical. Kaplan turbines, is a special type of propeller trubine, in which the pitch of the blades and the guide vanes can be adjusted. They are well-adapted to wide ranges of flow or head conditions, since their peak efficiency can be achieved over a wide range of flow conditions by controlling the gates openings and the pitch angles of the blades. Semi Kaplan turbines are the same as Kaplan turbines, but now the guide vanes are fixed, only the pitch of blades can be changed.
12
January 2008
(Final Report)
Figure 3.5 A drawing showing arrangement for a vertical axis Saxo axial flow Kaplan turbine (Source Bofors-Nohab brochure Small scale hydro turbine program 5702) Anyway, the flow rate at the intended location is relatively constant, hence basic propeller type turbine, not Kaplan type, is more preferable to increase the robustness of the trubine (need no blade angle changing mechanism) and to reduce the complication in control. However, Kaplan type turbine can also be considered.
In theory, any DC generators can also be used and then DC can be converted to three-phase AC via a three-phase grid-connected inverter. However this configuration is not recommended for the proposed system, due to the overall efficiency is low for this configuration in the proposed power range and the complications in the maintenance of the generator and the system.
13
January 2008
(Final Report)
Induction generators are generally more appropriate for relatively smaller systems (in tens/hundreds kilowatt, not megawatt scale). They have the advantage of being rugged, almost maintenance-free and cheaper than synchronous generators (around 10% to 25% lower in price for the range of tens of kilowatt). In fact, the choice on synchronous generators is quite limited for power range of tens of kilowatt. The induction generator is, in fact, a standard three-phase induction motor, wired to operate as a generator. Hence the choice of induction generators at tens of kilowatt power range is many. Induction generators can also allow for a wider variation of shaft speed (hence the water flow rate). Synchronous generators are generally appropriate for multi megawatt systems. They have the advantage of slightly higher efficiency and the excitation is directly controllable. Hence the excitation can be controlled for maintaining the stability, VAR compensation and voltage regulation of the power grid. In the proposed hydro plant, it is recommended to use induction generator. The reasons are: o The water flow rate in the proposed hydro plant is likely to have some variations (although small) due to the variation of amount of the incoming sewage water. Induction generator is more capable in coping with these variations. In the proposed system, the expected range of power is tens kilowatt. It has little impact of the stability of the very large power grid of CLP Power. It is not required to control the excitation of the generator of this hydro plant to help to stabilize the power grid. The efficiency of induction generator at tens/hundreds kilowatt range is well over 90% and it is only slightly (1 to 2 %) less than that of synchronous generator. The capital cost of induction generator of this power range should be 10% to 25% lower than that of synchronous generator. The only regular maintenance required for induction generations of this power range is the regular lubrication of the shaft bearings and the replacement of shaft bearing after long years of services. While these maintenance items are also required by synchronous generators, synchronous generators need regular replacements of carbon brushes and polishing of slip rings. Hence the maintenance cost of an induction generator of this power range should be only 40% to 70% that of a synchronous generator. The advantage of using synchronous generator as VAR compensator is not an important point in this case.
o o o
14
January 2008
(Final Report)
4.1
The turbine generator unit is located in an underground powerhouse which delivers water to a water treatment plant, as well as providing electrical power to the facility. Turbine: 500mm Propeller type Generator: rated power 200 KW @ 1200 RPM Rated head: 19.6 m Rated flow: 1.18 m3/sec
500 mm runner
Figure 4.1: Photos of the hydro plant in Puan Hydro, Korea (Source : http://www.dtlhydro.com/puan.htm)
15
January 2008
(Final Report)
4.2
This is a very small hydro plant at a waste water treatment installation. Technical Data:
o o o o o
Average output power: 13 kW Water head: H=3.6 to 3.8 m Water flow rate: Q = 400 l/s Generator type: Asynchrongenerator 15 kW, 400V/50Hz Expected annual yield: 65,000 kWh
Figure 4.2: Photos of the hydro plant at Emmerich of Germany (Source: http://www.people.freenet.de/hydropress/index_Hp_neu_Flyer.htm)
16
January 2008
(Final Report)
4.3
A SMALL HYDROELECTRIC STATION FOR THE NEW WASTE WATER TREATMENT PLANT IN AMANN OF JODAN
The town of Amann of Jodan has decided to equip itself with a new wastewater treatment plant. In this region, the purification of water is of vital interest and the volume of water to be treated is high: 277,000 m3/day. The engineers who designed the installation, which was commissioned in 2005, found a way to reduce the operating costs of this type of installation. Yearly production has been targeted at 21,900,000 kWh in the long run by turbining of waste water upstream and downstream from the station. The company that is going to build and operate the new sewage treatment plant in Jordan, entrusted the turbining design to a minihydraulics laboratory in Switzerland. This laboratory decided to use the height difference between the town of Amann (site of the pre-treatment plant) and the sewage treatment plant in As Samra (103.5 m), in order to produce electricity between the outlet of the treatment plant and the run-off into the Oued Duleil (47.8 m). The company also claimed that there is great potential for electricity production in a treatment plant, and most sites do not use this potential. Indeed, the digestion gas (biogas) that is produced can be transformed into electricity thanks to a TOTEM (Total Energy Module) and surplus hydraulic pressure can be turbined. When the conditions to use these two potentials are combined, a sewage treatment plant can produce more electricity than it consumes. The engineers of the company realized that the height difference and flow were financially interesting at the Amann site. They decided to recover the surplus pressure at the entrance to or at the outlet of the sewage treatment plant by replacing the dissipating valves with turbo generators thus allowing for the production of electricity. They distinguish between two types of energy recovery. In the first type, raw sewage is turbined at the outlet of the sewage pipes that transport the waste water from the town upstream from the treatment plant. In the second type, treated water from the treatment plant is turbined at the outlet of a pipe or at a stream or river, like in a conventional hydro-electric installation. The town of Amann will make significant energy savings using the principle which was decided upon. Indeed, sewage treatment plants use a great amount of energy. The driving force needed for the sifters, mixers, pumps, fans, etc. consume great quantities of electricity.
17
January 2008
(Final Report)
4.4
The Point Loma Wastewater Treatment Plant of San Diego (California, USA) is located on a bluff above the Pacific Ocean. Treated wastewater (effluent) is discharged into the ocean through a 7.2 km ocean outfall after a 27-m drop from the plant to the outfall. A 1,350 kilowatt hydroelectric plant captures the energy of the effluent as it flows down the outfall connection. The power plant, partially funded by a grant from the California Energy Commission, produces up to 1.35 megawatts for sale to the electric grid, enough power to supply energy to 10,000 homes.
Opened in 1963, the Point Loma Wastewater Treatment Plant treats approximately 662,000 m3/day of wastewater generated in a 1,165-km2 area by more than 2.2 million residents in 12 municipalities. Located on a 16-ha site on the Point Loma bluffs in San Diego, the advanced primary treatment plant has a capacity of 908,400 m3/day.
Figure 4.3: The 1.35 MW generator of the hydroelectric project being installed in the Point
Loma Wastewater Treatment Plant (source: Wastewater Department, City of San Diego Metropolitan).
18
January 2008
(Final Report)
5.1
Tyco-Tamar Design in Tasmania of Australia can supply series of micro to small trubine/generator set with power output from the generator varies from less than a kw to hundreds of watt. Those suitable ones (both in available water head and the rated power, hence the estimated flow rate) off the shelf are high-lighted in red in the table. Table 5.1: Models of micro to mini turbine generator sets from Tyco-Tarmar Design Co. Ltd.
Turbine Type Pelton Turgo Impulse Pelton "" Turgo Impulse "" "" "" Pelton "" Turgo Impulse "" "" "" Pelton "" Turgo Impulse "" Pelton
Code LCP1 LCT1 AP2 AP3 AT1 AT2 AT3 AT3 twin SP3 SP3 twin ST3 ST3 twin ST4 ST4 twin SP4 SP4 twin ST5 ST5 twin SP5
Head range (m) 16 to 100 6 to 42 28 to 120 34 to 150 20 to 70 10 to 90 6 to 80 4 to 50 60 to 150 60 to 150 55 to 100 45 to 70 25 to 120 25 to 80 80 to 160 80 to 110 30 to 130 30 to 110 120 to 230
Electrical Range (kW). 0.1 to 3 0.1 to 3 0.85 to 9.1 1.9 to 15 0.8 to 7 0.49 to 15 0.45 to 15 0.25 to 15 6 to 24 8 to 38 12 to 34 19 to 34 7 to 77 16 to 90 19 to 60 38 to 63 14 to 140 30 to 230 55 to 150
19
January 2008
(Final Report)
20
January 2008
(Final Report)
Electrical Range (kW). 0.1 to 8.5 0.5 to 45 0.8 to 70 0.9 to 104 1.4 to 153 2.0 to 220 2.8 to 300 Electrical Range (kW) 0.3 to 3.5 1.7 to 15.4 2.6 to 23 3.7 to 33 5.7 to 50 8.5 to 75 12.6 to 113 19.2 to 171
Turbine Type Semi Kaplan "" "" "" "" "" "" ""
FS2 - 110 FS2 - 135 FS2 - 165 FS2 - 200 FS2 - 245 FS2 - 300 FS2 - 365 FS2 - 450
Figure5.1: An example of a 110 kW Semi-Kaplan turbine, Model FS2-365, (with hydraulically operated turbine blades) at assembly stage (Source: Tyco-Tarmar Design Co. Ltd.)
21
January 2008
(Final Report)
Figure 5.2: Left: Hydralical power pack with PLC for the controlling the main inlet valve and the blades of the semi-Kaplan trubine to maintain optimum efficiency. Right: The main electrical cabinet which contains the electrical switch gear, gnerator protection, local power distribution circuit breakers, a PLC, and other asscoiated control and electrical equipment. (Source: Tyco-Tarmar Design Co. Ltd.) As mentioned in previous section, Francis type trubine is not recommended due to the head and the physical constainted in the site, only Kaplan or semi-Kaplan trubine from this company will be considered. Then, it seems that the most appropirate one is model FS2-245 semi-Kaplan turbine/generator set: the head can range from 1 to 20m, while the output power ranges from 5. 7 to 50 kW. The company claims that units can be designed and manufactured to suit the particular site to gain maximum efficiency.
22
January 2008
(Final Report)
5.2
Gugler Hydro Energy GmbH is a company of 80-year old and she specializes in small trubine. She claimes that she is worldwide successful as complete provider of small hydropower plants with its innovative products. Gugler Hydro Energy GmbH offers a three-blade Kaplan turbine (model: Gugler KT 50) of turbine diameter of 0.5m, it has mannual adjustable runner blades, fixed wicket gates, the other technical details are: Net head range (Hn): 1-6 m Discharges rate range (QA): 300-1,500 litre/sec Rated trubine output (PT): 2.5 60 kW Rated generator output (PG): 1.8 to 50 kW Turbine speeds (n1): 350-1,000 rpm Runaway speeds (nd): 1,200-3,200 rpm Generator speed (n2 at 50 Hz/60 Hz): 1500-1800 rpm Limits and parameters:
23
January 2008
(Final Report)
Operation curves of the KT-50 turbine/generator set is shown in the following figure.
Figure 5.3: Operation curves of the KT-50 turbine/generator set of Gugler Hydro Energy GmbH
Figure 5.4: the KT-50 turbine/generator set of Gugler Hydro Energy GmbH
24
January 2008
(Final Report)
Another suitable candidate for the proposed project from Gugler Hydro Energy GmbH is its KT-35 model. Its technical details are:
A three blade Kaplan runner Runner diameter 355 mm Manual adjustable runner blades Fixed wicket gates; Net head range (Hn): 1-6 m Discharges rate range (QA): 100-750 litre/sec Rated trubine output (PT): 2.5 40 kW Rated generator output (PG): 1.8 to 35 kW Turbine speeds (n1): 350-1,000 rpm Runaway speeds (nd): 1,200-3,200 rpm Generator speed (n2 at 50 Hz/60 Hz): 1500-1800 rpm Limits and parameters:
25
January 2008
(Final Report)
Figure 5.5: Operation curves of the KT-35 turbine/generator set of Gugler Hydro Energy GmbH
26
January 2008
(Final Report)
5.3
Kubota Corporation established in 1890 and now is a stock-listed company at Tokyo, Osaka, New York and Frankfurt. It has about 24,000 employees and a net sales amount of US$600 million/year. Kubota can supply a turbine/generator set of 45 kW rated power output suitable for this project. The technical details the turbine generator set are:
27
January 2008
(Final Report)
Figure 5.6: Operation curves of the 45 kW Turbine gnerator set from Kubota Corporation (Note: the term reverse running pump turbine is used here in the manufacturers data sheet, however it should be the same as the basic propeller type).
28
January 2008
(Final Report)
of
the
Proposed
6 Measurement of Flow Velocity of the Final Effluent in the Vertical Water Outflow Well
The water flow rates at three different points inside one of those deep vertical outflow wells were measured through tailor-made supporting rigs and a test instrument procured specifically for this project. The measurement was conducted on 23rd July 2007, from 9:00 am to 5:30 pm.
6.1
EQUIPMENT SPECIFICATION
Test device - Safety factor = 1.25 - Anticorrosive materials Flow meter - Range of measurable flow velocity ~ 0 to 9.8 ms-1 - Real-time monitoring - Anticorrosive materials
29
January 2008
(Final Report)
6.2
Measurement Position 1 Depth = 4480 (mm) 1800 (mm) Effective Depth = Time interval = 60 (s) Number of turns - Sample 1 = 879 (Turns), 4.76 ms-1 - Sample 2 = 877 (Turns), 4.75 ms-1 - Sample 3 = 862 (Turns), 4.66 ms-1 4.72 ms-1 Average measured flow velocity = 5.94 ms-1 Theoretical maximum flow velocity at that point 79% Measured/Theoretical= ______________________________________________ Measurement Position 2 Depth = Effective Depth Time interval = Number of turns - Sample 1 = - Sample 2 = - Sample 3 = Average measured flow velocity = Theoretical maximum flow velocity at that point = Measured/Theoretical= Position 3 (the estimated position of the turbine) Depth = Effective Depth (the depth is too deep to be measured by the instrument) Theoretical maximum flow velocity at that point = Estimated flow velocity, based on Measured/Theoretical=~75 %, as obtained in above 2 measurements
______________________________________________
5980 (mm) 3300 (mm) 60 (s) 1113 (Turns), 6.06 ms-1 1108 (Turns), 6.03 ms-1 1115 (Turns), 6.07 ms-1 6.05 ms-1 8.05 ms-1
75%
______________________________________________
30
January 2008
(Final Report)
Remarks: 1. The conversion from the number of turns to flow rate (in ms-1) is based on the conversion information provided from the manufacturer of the flow rate sensor. 2. The theoretical maximum flow velocity is calculated from equation of basic free fall in vacuum. Hence there is expected difference between theoretical maximum flow velocity and the actual velocity due to fluid viscosity and air pressure. 3. The reason for measurements cannot be taken for position 3 is the limitation of the length measurement rod, otherwise the mechanical strength of the whole set up will be too weak.
31
January 2008
(Final Report)
7 Estimation of Static and Dynamic Heads of the Final Effluent in the Vertical Water Outlet Well
Based on the results of the above section, the velocity of the flow at the position of the turbine is about 7.2 ms-1. Hence the dynamic head at the location = v2/(2g) = 2.64 m While the static head is estimated to be 4.8 m. Hence the total head in the worst case is 7.44m. Note this is the worse case, as (i) the installation of the guide tube and turbine in the well will reduce the flow velocity, (ii) the velocity of the flow used here is the velocity at the centre of the flow which is the highest, (iii) it may not be a full-bore condition at the top part of the well (the effective head is likely to be 4.5 m).
32
January 2008
(Final Report)
8 Design references
8.1 DESIGN INPUTS
In this Report, design inputs for the hydropower plant shall include taking references to all statutory requirements, design standards, codes and guidelines, at both local and international dimensions.
8.2
The proposed works shall be designed based on the relevant codes and standards that meet the Drainage Services Department, other local government department, and utility companies requirements as well as to follow the good engineering practice on similar works. The following codes of practice, standards and other manuals/references with the associated amendments and additions shall be adopted for the design of the Project: Table 8-1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
For Civil, Structural and Geotechnical Works: General Specification for Civil Engineering Works, Volumes 1, 2 and 3, Civil Engineering Department Stormwater Drainage Manual, DSD Building Department Practice Note for Authorized Persons & Registered Structural Engineers No. 141 Foundation Design BS 8007 Code of Practice for Design of Concrete Structure for Retaining Aqueous Liquids BS 8110 Structural Use of Concrete BS 4482 Specification for cold reduced steel wire for the reinforcement of concrete BS 4483 Steel fabric for the reinforcement of concrete BS EN 752-2 Drains and Sewer Systems Outside Buildings Performance Requirements BS EN 752-3 Drains and Sewer Systems Outside Buildings Planning BS EN 752-4 Drains and Sewer Systems Outside Buildings Hydraulic Design and Environmental Considerations BS EN 295 Vitrified Clay Pipes and Fittings and Pipe Joints for Drains and Sewers BS 5400-1 Steel, Concrete and Composite Bridges. General Statement BS 5400-2 Steel, Concrete and Composite Bridges. Specification for Loads BS 5400-4 Steel, Concrete and Composite Bridges. Code of Practice for Design of Concrete Bridges BS 8010 Code of Practice for Pipelines BS 4449 Specification for Carbon Steel Bars for the Reinforcement of Concrete BS 4027 Specification for Sulfate-Resisting Portland Cement BS 4248 Specification for Supersulphated Cement BS 8004 Code of Practice for Foundations
33
January 2008
(Final Report)
20 21
BS 534 Specification for Steel Pipes, Joints and Specials for Water and Sewage BS 970-1 Specification for Wrought Steels for Mechanical and Allied Engineering Purposes. General Inspection and Testing Procedures and Specific Requirements for Carbon, Carbon Manganese, Alloy and Stainless Steels BS 4504-3.3 Circular Flanges for Pipes, Valves and Fittings (PN designated). Specification for Copper Alloy and Composite flanges CIRIA report No. 78 Standard Specifications of the Water Supplies Department General Requirements for Electronic Contracts, Specification No. ESG01, Electronics Division, Electrical & Mechanical Services Department, EMSD Supply rules and other requirements of the CLP Power Hong Kong Limited. Renewable Energy Systems and CLPs Electricity Grid, CLPP Code of Practice for the Electricity (Wirings) Regulations, EMSD General Specification for Electrical Installation in Government Buildings of the HKSAR, Architectural Services Department, ASD Regulations for Electrical Installations, Institution of Electrical Engineers, UK Technical Guidelines on Grid Connection of Small-scale Renewable Energy Power Systems, 2005, EMSD IEEE Standard 1547 for Interconnecting Distributed Resources with Electric Power Systems UL 1741, Inverters, Converters, Controllers and Interconnection System Equipment for Use with Distributed Energy Resources EA G59/1, Recommendations for the Connection of Embedded Generating Plant to the Public Electricity Suppliers Distribution Systems Code of Practice for Energy Efficiency of Electrical Installation, EMSD Guidelines on Energy Efficiency of Electrical Installation, EMSD Addenda to Guidelines on Energy Efficiency of Electrical Installations, EMSD
22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37
For Design of Building Services: Electrical Installation 38 39 40 41 42 43 44 45 46 47 48 Electrical Ordinance IEE/IET Regulation Codes of Practice for Electricity (Wiring) Regulation, EMSD General Specification for Electrical Installation in Government buildings BS 6651 Code of Practice for Protection of Structures Against lighting CIBSE Code Code of Practice for Energy Efficiency of Lighting Installation, EMSD Guidelines on Energy Efficiency of Lighting Installations, EMSD Addendum No. 1 to Guidelines on Energy Efficiency of Lighting Installations, EMSD Codes of Practice for Minimum Fire Service Installations and Equipment, Fire Services Department (FSD) FSD Circular Letters
34
January 2008
(Final Report)
49 50 51 52 53 54
L.P.C. Rules Requirement of Water Authority BS 5839 Automatic Fire Detection and Alarm System Fire Offices Committee Rules General Specification for Fire Service Installation in Government Buildings, Hong Kong The requirement of the Hong Kong Fire Services Department including Codes of Practice for Minimum Fire Service Installations and Equipment, and Inspection and Testing of Installations and Equipment issued by the FSD, together with FSD circulars/letters/amendments. Building Ordinance and the affiliated regulations General Specification for Air-conditioning and Refrigeration, Ventilation and Control Monitoring and Control System Installations in Government Buildings CIBSE Guide
MVAC Installation
55 56 57
35
January 2008
(Final Report)
36
January 2008
(Final Report)
Turbine
Generator
LV Switchboard
37
January 2008
(Final Report)
If the odour eliminator can be removed, it is better to install the hydroelectric system to the first well #44-#46.
38
January 2008
(Final Report)
Figure 10.1: Diagram and photo shows the location of Tank #40 and Tank #42 which will be used in the pilot hydro project.
39
January 2008
(Final Report)
Tank #46 Well #44-#46 Tank #44 Tank #42 Well #40-#42 Tank #40 Tank #38 Tank #36
Well #36-#38
Tank #34
Well #34
A platform, a local LV switchboard is under this here Figure 10.2: Relative locations of the some of tanks and some of the wells; the pilot project will use Tank #40 and Tank #42, and also Well #40-#42 (not to scale).
40
January 2008
(Final Report)
Figure 10.3: Upper diagram is the cross section of a typical tank and vertical outflow well. Lower diagram is a photo showing the top of one of the vertical outflow wells (covered), note: one can see a very wide access road is at ground level just next to these wells, this road can be used for transportation and installation of the set up
41
January 2008
(Final Report)
There are three possible ways of mounting the generator (a) The generator is mounted at the top of the vertical outflow well such that the axle of the generator can be coupled to the axle of the turbine. Advantages of this method: The generator is not installed under the water. Hence the construction and requirements is less demanding. The gravitational loading of turbine and the generator now separately act on two different locations. The weight of the turbine acts on the wall sides of the well, while the weight of the generator acts on the footing mounted on the top of the well. Therefore the civil work to be done on the interior wall of the well is less. Easy access to the generator for maintenance can be possible.
Disadvantage of this method: The length of the coupling between the generator and the turbine is very long, about 8m. And this coupling shaft/device has to work under the strong effluent water current. There should be at least two intermediate support along the shaft. It is not easy to maintain the mechanical steadiness of the coupling shaft/device even with these supports.
Generator
Water Inflow
4.8m
Turbine
Figure 10.4 shows the location of the proposed turbine / generator set in case (a).
42
January 2008
(Final Report)
(b) The generator and turbine are integrated into one unit and mounted inside the well Advantages of this method: This will result a more compact design. There is no coupling problem between the turbine and the generator. Hence it gives a more stable operation in mechanical terms. The overall efficiency should be slightly higher than case (a).
Disadvantage of this method: The generator has to work under water and hence the demand on its design is higher. The whole set has to be hoisted up for maintenance, even if only the generator needs maintenance (it is expected that the generator needs more frequent maintenance than the turbine).
Support for the generator/turbine set The vertical outflow well
Water Inflow
4.8m
Generator
Turbine
Figure 10.5 shows the location of the proposed turbine / generator set in case (b). (c) The generator mounted at the same level as the turbine, but outside the well. Advantages of this method: The generator is not installed under the water. Hence the construction and requirements is less demanding.
43
January 2008
(Final Report)
The gravitational loading of turbine and the generator now separately act on two different locations. The weight of the turbine acts on the wall sides of the well, while the weight of the generator acts on the footing mounted at ground level outside the well. Therefore the civil work to be done on the interior wall of the well is less. Easy access to the generator for maintenance.
Disadvantage of this method: The civil work involved will be much larger than case (a) and (b) There is difficulty in the water sealing for the coupling between the generator and the turbine. If the axis of the turbine is vertical, then a complicated coupling device is needed between the turbine and the generator. This will reduce the efficiency and reliability of the system. If the axis of the turbine is horizontal, the physical size of the turbine has to be increased, which may not be feasible in this very limited space situation. This will add certain restriction on the height of the installation of the turbine
The vertical outflow well
Water Inflow
4.8m
Generator
Turbine
Figure 10.6 shows the location of the proposed turbine / generator set in case (c). After consideration of all the 3 ways of mounting the generator and the site situation, the method of case (b) is recommended in this report. It is a much proven way of mounting. Requirements on the civil aspect, the generator and the turbine will be detailed in later Sections of this report.
44
January 2008
(Final Report)
Water Inflow
Turbine
Bottom screen
Figure 10.7: Location of the control gate (side view, not to scale)
Control gate
The vertical outflow well (area 2m x 1.25 m) Horizontal guide tube for flow (in doted lines) Vertical guide tube for flow (in doted lines) (largest part should be with a diameter of 1 2 m) Turbine & Generator
Surplus water flow into the side of the vertical guide tube Water inflow to turbine
Figure 10.8: Location of the control gate (top view, not to scale)
45
January 2008
(Final Report)
A motorised control valve/gate will be installed on the top of the vertical outflow well for controlling the water flow into the turbine. Hence the gate can be used (i) to start the turbine smoothly at the start of the operation and to remove any large surge pressure on the turbine, (ii) to control the generator to run at about synchronous speed during the gridconnection process, (iii) to control the power output after grid connection is made, and (iv) to ensure the turbine will not run over speed.
46
January 2008
(Final Report)
10.4 LV SWITCHBOARD
An existing LV switchboard is used to house the LV switchgear that connect the generated electricity from the turbine generator to the existing LV distribution board. The proposed LV switchboard (2-SWB-003) is inside a switchroom situated near the vertical outflow well (within 60 m of cable length). The location of the switchroom can be shown in Figure 10.2 or 10.9.
Well #36-#38
Tank #34
Figure 10.9 shows the routing of cables/conduits (red lines), from the Well #40-#42, cross Bridge A, along Bridge B, into the room under the platform next to Tank#34 (the red line turns into red dotted line, then to the local LV switchboard.
47
January 2008
(Final Report)
Bridge A
Figure 10.10 shows part of the routing of cables/conduits (red lines), from the Well #40-#42, cross Bridge A (all under the grid)
48
January 2008
(Final Report)
Bridge A
Bridge B
Well #40-#42
49
January 2008
(Final Report)
Bridge B
Figure 10.12 shows part of the routing of cables/conduits (red lines), along Bridge B ( under the grid), coming out from Bridge B, round a corner and then enter into a room under the elevated platform next to Tank #34.
50
January 2008
(Final Report)
A hole on the wall for cables to go outside, the other side of this hole is also shown in last figure
Figure 10.13 shows part of the routing of cables/conduits (red lines): once inside the room under the elevated platform, there are cable trays for running the cables/conduits
51
January 2008
(Final Report)
Figure 10.14 shows part of the routing of cables/conduits (red lines): the cable trays run across the ceiling of the room and then move down to enter the bottom of the local LV switchboard
52
January 2008
(Final Report)
Figure 10.15: A photo shows how cables on the vertical trays entering the raised floor of the local LV switchboard room
53
January 2008
(Final Report)
11 Hydraulic Design
This section will provide the hydraulic design for the pilot hydropower plant
The purpose of the surge modeling is to assess the surge potential resulting from a shutdown or starting of the operation of hydro-turbine driven hydropower generator during adverse operating conditions. Hydraulic transients or surges (also sometimes called water hammer) are pressure changes that occur any time the velocity of flow changes. Velocity changes in the well by starting or stopping of the flow, sudden closure or opening of a valve or check valve, or the loss of power to pump motors. The most severe surge condition for the purposed turbine location would occur as the start of the flow in the well and results in a sudden change on the mechanical load of the hydro-turbine. The mathematical relationship between the pressure change, dp, and the change in velocity, dv, is as follows: dp = a(dv)/g where: a = water pressure wave speed = about 914 m/s, and g = gravitational constant = 9.8m/sec2 The velocity of flow through the well varies along with the depth of well, but at estimated location of the turbine, the velocity is about 7.2 m/s (from a previous section). Therefore it can be seen that for an abrupt (instantaneous) start of flow condition, the resulting pressure increase would be 914 x 7.2/9.8 = 292.5 m = 672 psi. This is a very large value. In practice, velocity changes must occur over some extended period of time so the resulting pressure spike will be considerably less. However, now control gate will be installed at the top of the well and will be controlled to open very slowly, the duration of the opening process is in the order of a minute or minutes (say at least 30 second) instead of sub-second range. Hence the surge pressure should not be a problem here, should be at least less than one-thirtieth of the above calculated value, i.e. less than 10m surge pressure. Together with the worse case static head and dynamic head about 7 m (as discussed in a previous section), the total maximum possible transient head should be less than 17m. 17 m transient head is not a high value, and the turbine should be able to handle this transient surge without damage.
11.1.2
The effective cross section area for the flow through the turbine is much less than the cross section of the original vertical outflow well. There may be worries for building up of back
54
January 2008
(Final Report)
pressure and finally sewage water accumulates in the tanks and raise the water level beyond the limit. However, it should be note that there is a by-pass path next to the turbine (please refer to Figure 10.8). Even under the case of a completely closed gate, the sewage water can flow freely down the by-pass path. The cross section of this by-pass path should be at least 0.8m x 1.0m. Even assume the effective length of the vertical well to 5.5m, while assume effective head of 4.5m, the maximum possible flow rate under very restricted flow assumptions (refer to next paragraph) should be well above 2 m3/s, which is much higher than the maximum expected flow rate of the well. Hence there is so back pressure issue in this case; i.e. installation of the turbine should not affect the handling capacity of the tanks. Pressure loss in a pipe: Where:
p = L2/(2D)
p is the pressure loss is the coefficient of friction of the pipe is the density of the fluid of the flow is the vecocity of the flow
D is the effective diameter of the pipe L is the effective length of the pipe
Equating the above two equations to make that the available pressure from the gravity all losses in the flow, this gives
H g =L2/(2D)
Rearranging it gives:
=(2gDH/(L))
In the proposed case, make a very worst case assumption for the by-pass path: D=0.8 m, H =4.5m, L = 5.5 m, and assume a very rough inner tube surface of =0.15, this gives = 9.3 ms-1. Assume the average velocity is only half of the 9.3 ms-1, with a D=0.8 m, the flow rate will be 2.32 m3s-1. This means that the by-pass path can allow up to 2.32 m3s1 of water to pass through. While the estimated actual total flow rate in the well is about 1.1 to 1.6 m3s1, therefore the by-pass path is large enough even the control valve is totally shut off. In fact the current design flow rate via the turbine can be up to 1.25 m3s1. Hence even with the top total flow rate of 1.6 m3s1,
55
January 2008
(Final Report)
the flow rate through the by-pass path should be less than 3.5 m3s1 when the control valve is fully opened. However one should note that with the installation of the control valve and the horizontal guide tube, the water level at the horizontal channel would be raised by 0.3 m. to 0.5 m. Anyway, this still should not affect the top water level of the sedimentation tank, as the horizontal channel is at a level lower than the top water level of the sedimentation tank.
11.2 CONCLUSIONS
(1) The hydraulic analysis shows that the total maximum possible transient head should be less than 17m of water head acting on the turbine. (2) The back pressure should not be an issue in the design due to the existence of a large by-pass path next to the turbine.
56
January 2008
(Final Report)
57
January 2008
(Final Report)
wind load during installation/operation (if appropriate). Site investigation reveals that there are wide internal access roads right next to the well, and the area around the well is free (please refer to Figure 10.3). Hence there should not be any problem in using a heavy truck with a large hoisting machine for the civil work, as well as the installation of the guide tubes, the turbine generator set and other equipment. A preliminary assessment indicates that the existing civil structure should be able to support loading that mentioned above, as the weight of water that each tank can hold is more than 2,800,000 kg. Hence the static load of 10430 kg and transient load of 18840 kg are only a tiny part of the water loading.
58
January 2008
(Final Report)
after the completion on the mounting of the anchors. This is to ensure that the water proofing characteristic will not be damaged, and the warranty on the lining will also not be damaged.
59
January 2008
(Final Report)
Even the supports are mounted on the inner walls of the well by chemical anchors, the water proof linings on the walls should still be repaired by the original designated lining contractor after the completion on the mounting of the anchors. This is to ensure that the water proofing characteristic will not be damaged, and the warranty on the lining will also not be damaged.
60
January 2008
(Final Report)
13.2 HYDRO-TURBINE
Hydro-turbine is used to convert energy in the form of falling water from the sedimentation tank into rotating shaft power. It is designed to provide most efficient operational range of flows 1.0 to 1.25 m3/s and the available net effective heads ranges from 4.5 to 5.5 meters during normal operating conditions. Axial-flow propeller type hydro-turbine is recommended for the project. The hydro-turbine shall be equipped with valve/gate for control of turbine flow. The shape and quality of the valve/gate shall conform to the hydraulic model to assure proper flow characteristics of water entering the guide pipes of the turbine. Suggested specifications of the turbine are: Type: Axial-flow propeller type Rated effective head: ~ 4.5 m Useful range of flow rate, at least: 1 m3/s 1.25 m3/s (preferably 1 m3/s to 1.6 m3/s) Rated flow rate: about 1.16 to 1.2 m3/s Rated rotation speed: should match with the generator, expect to be around 430 to 450 rpm Efficiency (turbine & generator combined) at rated flow rate: at least 70% Efficiency within the useful range of flow rate: at least 55%, with most of them above 65%. Fluid type: Sewage water Range of fluid temperature: 4 degree C to 40 degree
61
January 2008
(Final Report)
Dead weight (together with generator): should be not more than 5,000 kg Installation orientation: flow direction is vertical, rotational axis is vertical Coupling between turbine and generator: direct, it is preferable to integrate the turbine and the generator together. Thrust bearing: in water turbine
Bearing type & lubricant: - Radial : anti-friction, grease - Thrust: anti-friction, grease Gland seal: mechanical seal Material (includes casing, impeller, shaft): Stainless steel, grade 316 or higher Paint (both inside and outside): thermal set plastic coating system
62
January 2008
(Final Report)
13.3 GENERATOR
The generator is used to convert shaft power to electricity. The generator type is recommended to be induction type, rated at about 45kW, 3 phases, 380V, 50 Hz. The generator should be physically integrated with the turbine as a single unit. The stator of the generator, if possible, should be equipped with temperature sensor. The speed and power output of the hydro-turbine is to be determined by the flow rate. During start-up, prior to connecting the electric output of the turbine driven generator, the flow rate should be controlled to bring the turbine up to a speed matching the 50 Hz utility power supply. Once the turbine driven generator is connected to the distribution system, the flow through the turbine determines the power output of the turbine. The flow through the turbine is controlled by the valve/gate near the tope of the vertical outflow well. The valve/gate is motorized control which is controlled by a control feedback control system with the speed of the generator as the input. Suggested specifications of the generator are: Type: built-in 3-phase squirrel cage induction generator, dry type Rated output power: 45 kW Rated voltage: 380 V Rated frequency: 50 Hz Dead weight (together with turbine): should be not more than 5,000 kg Installation orientation: flow direction is vertical, rotational axis is vertical Coupling between turbine and generator: direct, it is preferable to integrate the turbine and the generator together. Thrust bearing: in water turbine
Bearing type & lubricant: - Radial : anti-friction, grease - Thrust: anti-friction, grease Gland seal: mechanical seal Material (includes casing, shaft): Stainless steel, grade 316 or higher Paint (both inside and outside): thermal set plastic coating system
63
January 2008
(Final Report)
As identified in a previous Section, the power generated by hydropower system is to be connected to and to be consumed by the existing LV system of the Treatment Works. The single line diagrams of the existing LV switchboards are shown in Figure 13-1 to 13-4.
Figure 13-1
Single Line Diagram of the Existing LV Panel for the SCISTW Sedimentation Tanks E & M Equipment , 2-SWB-001 & 2-SWB-003
64
January 2008
(Final Report)
65
January 2008
(Final Report)
66
January 2008
(Final Report)
Figure 13.4 : Typical arrangement of switchboards 2-MCC-001, 2-MCC-003, 2-MCC-005, 2-MCC-0013 and 2-SWB-005, all these boards are fed from 2-SWB-001 & 2-SWB-003 via an interlock. This indicates that 2-SWB-001 & 2-SWB-003 will not be connected together.
67
January 2008
(Final Report)
The new hydro generator circuit will feed electricity via the existing spare panel on 2-SWB003 with a 100A fused switch as shown in Figure 13.5 and 13.6 Protection against reverse power flow into the 11k/380V transformer will be provided by a reverse-power-flow relay, with its CTs and voltage tapping points are installed at the main incoming point of 2-SWB-003 switch board. These CTs & voltage tapping points can also be used by CLP Power for their power-and-energy meter. There will be space available on incoming point of 2-SWB-003 to let CLP Power the energy-and-power meter (if needed), for monitoring the excess power and energy generated by the hydro-generator as shown in Figure 13.5.
68
January 2008
(Final Report)
13.4.2
Protection Provisions
The protection provisions in the existing LV panel will be basically unchanged, except the addition of reverse power flow detection and the CLPs energy-and-power meter. The protection of the additional LV part (the hydrognerator circuit) is shown in Figure 13.6.
69
January 2008
(Final Report)
Feeding to 380V, 100 A fuse switch at 2-SWB-003 Hydro generator circuit (New)
TRIP CB-1
A 3-phase whole current check meter may be installed here by CLP. DSD will provide 100A pre- & post-meter 4-pole switches (with one of them lockable) and other meter provision (e.g. meter board) accordingly.
VT VT
CLOSE TRIP
CB-1
TRIP
RP
LM
OF UF
OV UV
Ha
UB
OC
OT
OS
EF
Legends: Power Control Sense Signal Legends of other symbols will appear in next page. SCADA
VT
VT Te
Ta Ta
HydroGenerator
70
January 2008
Figure 13-6: Details of the connections the hydro-generator, the switchgears and protection relays
Consultancy Agreement No. DEMP/06/19 Application of Hydroelectric Technology in SCISTW Symbols in Figure 13-6: CB: Circuit Breaker (CB-1 is a 4-pole 100A circuit breaker) VT: Voltage transformer (if needed, or just a direct tapping) Ta: Tachometer for sensing shaft speed of the generator Te: Temperature sensor for the internal windings of the generator : Current transformer RP: Reverse Power Flow Relay LM: Loss of Main Relay UV: Under-voltage Relay OV: Over-voltage Relay UF: Under-frequency Relay OF: Over-frequency Relay OC: Over-current Relay EF: Earth Fault Current Relay UB: Unbalanced Current & Voltage Relay OS: Over-speed Relay OT: Over-temperature Relay Syn. check relay: Synchronization check relay
(Final Report)
71
January 2008
(Final Report)
Protection Related to CB-1 RP: If there is reverse power flow (active power into CLPP network), it will trip CB-1. The point of detection of reverse power flow, in this case, can be on the LV side of 11kV/380V transformer of 2-SWB-003, as agreed by CLP Power. Note.: as indicated in Fig.13.4, 2-SWB-001 & 2-SWB-003 will not be connected at any circumstances. Hence the point of detection of reverse power flow needs to be installed on the 2-SWB-003 side only, but not on 2-SWB-001.
LM: If loss of mains is detected at mains side of CB-1, it will trip CB-1 within 0.1 second. This provides the anti-islanding function of the grid-connection requirements. UV: If under-voltage is detected, it will trip CB-1 OV: If over-voltage is detected, it will trip CB-1 UF: OF: If under-frequency, it will trip CB-1 If over-frequency is detected, it will trip CB-1
OC: If over-current is detected in the hydro generator circuit, it will trip CB-B1. EF: If earth-fault current is detected at earthed neutral point of the generator, it will trip CB-1.
Har: If the harmonic contents of the current are large at output of the generator, it will trip CB-1. UB: If unbalanced current or voltage is detected among the three phases of the generator, it will trip CB-1. If over-speed of the generator is detected, it will trip CB-1. If over-temperature of the winding of the generator is detected, it will trip CB-1.
OS: OT:
Syn. check relay: This relay will not allow CB-1 to be closed, unless synchronization conditions are all met. Initial proposed settings of the above relays are as follows. Other relay settings shall be determined during the detailed design stage.
72
January 2008
(Final Report)
Table 13-1:
Item No. 1 2 3 4 5 6
13.4.3
System Earthing
As indicated in the diagram of Figure 13-6, the neutral point of the generator will be earthed individually.
13.4.4
Metering Point of the Generator and Metering Point of the Whole System
As indicated in above discussions, the metering point of the generator can be regarded as at the main side of CB-1. The output power and output energy will be at this point available to CLPP, in real time, via their SCADA system. While the metering point of the whole system (old and new together) remains the same as in the old system, i.e. at the CLPP side. In addition, as mentioned above, CLPP can consider installing a 3-phase 100 A whole current meter at the main side of CB-1. Pre- & post-meter switches of 4-pole type should be provided by DSD.
13.4.5
In this initial stage of design, expected p.u. impedance of the generator is about 0.08. The rated power of the generator is only 45 kW. Hence the impact on the fault level is very minimal, less than an increase 500 A at the bus of 2-SWB-003. This should not affect the system or the design of the remaining part of the system.
13.4.6
No adverse impact on power quality is expected in this system as compared with other renewable energy systems, since no power electronic devices are involved in the system. The voltage and current harmonics from the generator is expected to be very low. However, harmonic current protection, unbalanced voltage protection and unbalance current protection are included in the system design for additional protection.
73
January 2008
(Final Report)
13.4.7
There should be a small scale of SCADA system (as indicated in Figure 13.6), to monitor and log the voltage, current, power, energy, speed of generator, synchronization signal and status of CB-1. These signal can be transmitted to SCADA system of CLPP if needed. Attached to this SCADA system, there should be a feedback control system to control the operation of the whole system. The control system will execute the control strategy as detailed in Section 15.
13.4.8
Other system protection measures or features to fulfill grid connection requirements include: (1) The CB-1 should be lockable and readily accessible, so as to authorized electrical workers to manually isolate the hydro generator from the original electrical installation. Warning labels will be displayed at all electrical equipment fed from the two (old and new) LV panels, the label will alert the maintenance personnel that there are dual power supply sources (from CLPP and RE) in the system. Updated circuit diagram will be displayed in the room of the LV panel 2-SWB-003 and near the generator. This is to facilitate maintenance personnel in properly shutting down the grid connection arrangement under normal and emergency operations. A suitable qualified on-site person in DSD will be designated to communicate directly with CLPP; hence there is a direct communication between DSD and CLPP to ensure safe operation of the grid connection. Equipment of high reliability will be selected in the installation to ensure that the reliability level of the new system is comparable with the existing system.
(2)
(3)
(4)
(5)
74
January 2008
(Final Report)
Guidelines Incorporate an "anti-islanding" function in the design of the SREPSs (Small Renewable Energy Power Systems). This function can automatically disconnect any grid-connected SREPS from the Distribution System in the event that the Grid is deenergized for whatever reasons. The purpose of an "antiislanding" function is to ensure that SREPS would not continue to supply power to the Distribution System so as to allow electrical workers to work safely on the Grid or the Distribution interruption. Install a lockable switch at a readily System during the power
accessible position to allow authorized and it is required as lockable as listed in electrical workers to manually isolate the Point# 1 in Section 13.4.7 SREPS from the Grid whenever necessary.
Display warning labels at all electrical equipment with dual power supply sources so as to alert the maintenance personnel.
Update
circuit
diagrams
regularly
75
January 2008
(Final Report)
facilitate maintenance personnel to properly Section 13.4.7. shut down the grid connection arrangement under normal and emergency operations. Establishing a direct communication channel between the Owner and the Utility is essential to ensure the safe operation of the SREPS and the Grid. Designate a suitably qualified person to communicate directly with the Utility under normal and emergency operations. Carry out assessment on the new fault level The assessment was done in Section due to the connection of the SREPS to the 13.4.5. The increase is estimated to be an Grid such that all equipment in the increase of 500 A only on the fault current. safely under the new fault level. This is a function provided by the Syn. Distribution System and the Grid can Hence all equipment should be operated operate safely under the new fault level. Install facilities with synchronization check breakers making or contactors designated to for the One of the measures as listed in Point #4 in Section 13.4.7.
function, whenever necessary, to circuit Check Relay as listed in the Section 13.4.2. electrical connection
Distribution System. The connection of the SREPS to the Distribution System would only take place when they are operating in synchronization, voltage i.e. the differences angle, in and magnitude, phase
frequency of these two power sources are controlled within acceptable limits. Incorporate protection function in the design The design, listed Section 13.4, will avoid system will not reconnect
of the SREPS to avoid unsynchronized unsynchronized connection. And the hydro connection. To enable fast restoration of generator supply after power failure, the Utility has automatically itself after it is tripped off by equipped with auto-switching and auto- whatever reason. It has to be reconnected reclosing facilities that would operate soon manually.
76
January 2008
(Final Report)
after power failures. If the Distribution System is still energized by the SREPS, unsynchronized connection which would damage equipment of both parties, may occur. Incorporate facilities to isolate the SREPS The isolating switch, in this case, is CB-1, from the Distribution System automatically which when fault occurs in the SREPS. will automatically isolate the hydrogenerator system under various faults as listed in Section 13.4 Use 4-pole type circuit breakers or isolators The isolating switch, in this case, is CB-1, on all isolation points of the SREPS to allow which is a 4-pole circuit breaker as listed in complete isolation from the Distribution Section 13.4.2, as well as the pre- or post System when the SREPS is not in service. meter switch. This arrangement is to ensure that the Distribution System would remain intact and not be affected by the SREPS. Incorporate appropriate protection facilities The protection function listed in Section in the design of the SREPS to avoid 13.4.2 included the tripping of CB-1 under damages to the SREPS caused by transient the cases of over-voltage, under-voltage, abnormalities that would occur in the over frequency, under frequency, and loss Distribution System and the Grid, such as supply interruption, voltage and frequency fluctuation, voltage dip, etc. Incorporate facilities in the SREPS which can automatically disconnect the SREPS from the Distribution System when sustained voltage and frequency fluctuations are detected in the Distribution System. The time delay setting before automatic disconnection can take place may
make reference to the recommendations of international standards as given in Appendix (III) and agreed by both the Owner and the Utility.
The protection function listed in Section 13.4.2 included the tripping of CB-1 under the cases of over-voltage, under-voltage, over frequency, under frequency, and loss of mains, etc. The time delay setting is suggested to be 0.1 second, which is the standard as suggested in the related IEEE standard.
77
January 2008
(Final Report)
Incorporate facilities in the SREPS which back to the Distribution System after
The
hydro
generator
system
will
not
can automatically re-connect the SREPS reconnect automatically itself after it is tripped off by whatever reason. It has to be manually. And this fluctuations in voltage and frequency in the reconnected
Distribution System have been cleared. The reconnection process is just like starting the time delay setting before re-connection can system again manually. take place may make reference to the recommendations of international standards as given in Appendix (III) and agreed by both the Owner and the Utility. The time delay is to avoid repeatedly operation of the circuit breakers due to premature electrical connection. Select an inverter, with high reliability, such as having a high "mean-time-to- failure" index. This is essential since the inverter is the principle component in the SREPS that directly connects the SREPS to the
Distribution System.
Set the operating levels of all the protective As mentioned above, the change in fault devices in the Distribution System to suit the level is very small. Hence no change in new fault level. This arrangement is to avoid operating level of the protective devices is improper operation of protective devices required in this case. during fault conditions. Incorporate a fast responding voltage and frequency regulator that can adjust the output of the SREPS to match the voltage and frequency of the Distribution System. This would reduce electrical stress on the SREPS and help to minimize failure. Provide an automatic disconnection function in the SREPS that can operate when the voltage and frequency of the Distribution The protection function listed in Section 13.4.2 included the tripping of CB-1 under the cases of over-voltage, under-voltage,
The generator used is an induction generator, which will automaticlly adjust the output to
match the voltage and frequency of the Distribution System, in a fast way.
78
January 2008
(Final Report)
System deviate outside the allowable limits persistently for a pre-determined period recommended by international standards as given in Appendix (III) and agreed by both
the Owner and the Utility.
over frequency, under frequency, and loss of mains, etc. The setting can be adjustable such that it suits the requirements as required by CLPP.
Install an inverter with power conditioning There is no inverter in the system. Anyway, function to control the harmonic currents and the output power factor of the SREPS the harmonic relay listed in Section 13.4.2 will ensure that the output current from the
within an acceptable range such that the generator has to meet a certain requirement SREPS can operate efficiently and other which is adjustable to a level as required by parties would not be affected. CLPP.
Install an isolation transformer on the output There is no inverter in the system and the side of the power inverter to eliminate the the SREPS into the Distribution System. Excess direct current injected into the Distribution System would distort its voltage and cause problems to other connected equipment. Install a fast responding voltage and The generator is a 3-phase cage-type output is not expected. Anyway, there will cases of over-voltage, under-voltage, over frequency, under frequency, etc. Evaluate the electromagnetic compatibility requirements specified in international standards as given in Appendix (III) at the design inception stage. Conducted or radiated electromagnetic emissions from the SREPS would then be properly controlled so as not to interfere with the normal operation of other electrical equipment in The generator is a 3-phase cage-type induction machine and there is no inverter or other power electronic equipment in the system. conducted emissions. Hence or there radiated should be no electromagnetic generator is an AC generator. Hence no DC transformer is needed. possibility of injection of direct current from will be produced and no additional isolation
frequency regulator to minimize voltage induction machine. Voltage flickering at the flickering in the Distribution System which is equipment. undesirable to other connected electrical be protection by tripping of CB-1 under the
79
January 2008
(Final Report)
the Distribution System. Design a SREPS with three-phase inverter or three identical single-phase inverters to supply current which is balanced over the three phases to the Grid. This would minimize voltage and current unbalance in the three-phase supply system and would ensure that the capacity of the Distribution System can be fully utilized. However, this provision is not applicable if the site is being supplied or will be supplied with singlephase power from the Utility.
The generator is a 3-phase cage-type induction machine and there is no inverter. Hence there should not be problem of voltage or current balancing. Anyway, there is a voltage and current unbalancing relay installed as listed in Section 13.4.2.
As shown in Figure 13.6, it is expected to monitor the output voltage, current, power energy, status of CB-1, speed and the generator, etc in the system.
measure and monitor the performance of have a SCADA system to measure and
As shown in Figure 13.6, it is expected to monitor the output voltage, current, power energy, status of CB-1, speed and the generator, etc in the system. This data can be provided to CLPP as required.
provide real time data, data summaries and have a SCADA system to measure and
In the Testing and Commissioning phase of the project: (a) To test all the protection level and time delay settings. (b) To check the operation of the antiislanding function.
80
January 2008
(Final Report)
(c) To check the operation at all isolation points. (d) To check that all the warning labels, equipment labels and circuit diagrams are displayed in appropriate locations.
(e) To check and record the voltage and current output of the SREPS including power factor, direct current level and total harmonic distortion. Post-installation Obligations of the Owner: (a) After the SREPS is put into normal operation, the Owner should provide the Utility with information on the electrical energy output of the SREPS on a regular basis, e.g. bi-monthly, if requested by the Utility. The Utility may also install check meters to monitor the electrical energy (kWh) output of the SREPS. (b) Periodic inspection of the SREPS by registered electrical worker is recommended. The Owner can consider adopting an inspection arrangement similar to the requirements as stipulated in the Electricity (Wiring) Regulations of the Electricity Ordinance for fixed electrical installations. It is not necessary for the Owner to submit the relevant inspection certificate and checklist to the Utility. (c) The Utility may conduct on-site All these will be left to the detailed discussion between DSD and CLPP. However, space for installation of check meters to monitor the electrical energy (kWh) output of the hydrogenerator will be factored into the design of the switchboard of the hydrogenerator.
81
January 2008
(Final Report)
inspections and request the Owner to perform verification tests on the operation of the SREPS. In this regard, the Utility may request the Owner to provide access and the test results. (d) It is important for the Owner to compile an operation and maintenance manual to record all procedures needed to operate and maintain the SREPS including all protection settings and test results. Regarding grid connection operational procedures which form part of this manual, the details should be agreed by the Owner and the Utility. This manual should be reviewed regularly and modified where necessary. (e) The Owner should inform the Utility on any change in power rating or modification of the SREPS. In addition, the Utility will also need to be informed when the SREPS is decommissioned. A meeting was held with CLPP on the grid connection issue of the pilot project and technical data related to the grid connection have been passed to CLPP. CLPP is basically satisfied with the technical aspects of the proposed design, after some minor revisions on the design (This report already included the minor revisions). However, once the detailed design is available, a formal application together with the detailed electrical design drawing should be submitted to CLPP for formal approval. In addition, in the detailed design, a detailed operation procedure for the grid connection of the hydro unit is required to be developed by owner (DSD) and agreed by the utility. The DSD is also required to report the energy of the hydro unit monthly to the utility.
82
January 2008
(Final Report)
(4)
(5)
(6)
(7)
(8)
(9)
83
January 2008
(Final Report)
(2)
Once flow is reduced to the point of zero electrical output, the circuit breaker to the plant switchgear is opened, and the wicket gates are closed tight. The turbine will stop. Shut-down of the turbine should occur over a time span of not less than 3 minutes to minimize the potential for damage from surge.
(3)
84
January 2008
(Final Report)
A temperature monitoring system for the generator windings is used to monitor winding temperature to give alarm signals upon detection of any malfunction.
A tachometer for the generator is used for achieving synchronization and controlling the power output of the generator after synchronization. As indicated in Fig.13.6, it is expected to install a SCADA system to monitor and log the data of current, voltage, power, energy, speed of generator, status of CB-1, etc. The readings of these parameters will be used to show the status and performance of the power generation system. And these data will be given to CLPP as required.
85
January 2008
(Final Report)
Materials: Materials (includes casing, impeller, shaft): Stainless steel, grade 316 or higher Paint (both inside and outside): thermal set plastic coating system
86
January 2008
(Final Report)
Guide tubes: Outer diameter: less than 1.2 m Materials: Fibreglass Reinforced Plastic (ASM RTP-1 or ASTM C-582 or equivalent or higher). Control valve: Type: motorised Maximum flow rate: 1.6 m3s-1 Materials : Stainless steel, grade 316 or higher
87
January 2008
(Final Report)
Tasks/ Activities Approval of Project Funding Contract Commencement Testing & Commissioning Completion of the project
88
January 2008
(Final Report)
18 Budgeting
18.1 CAPITAL COST AND RECURRENT COST
The estimated budget of the pilot projects are: Item The integrated hydroturbine and generator unit Guide tubes around the turbine Control gate Bottom screen Support for the integrated hydroturbine and generator unit Support for the guide tubes and control gate/valve Installation cost of the above items Additional LV switchboard and associated electrical equipment/sensors.cabling and its installation cost Administration contractor and other cost of the Cost (HK$) 2,875,000
1,890,000 (The following is not included: Fees related to CLPPs grid connection, interfacing with existing SCADA system, if required)
Service charge of the consultant on detailed design Consultancy fee for detailed design Total 240,000 5,005,000
Note: The above cost estimation does not include any costs from CLPP. Confirmation with CLPP is required. Note: The feedback of hydrogenerator suppliers was not satisfactory. Amongst the hydrogenerator suppliers approached, only Kubuta Corp. and Gugler Hydro Energy replied with a budget. The above budget estimation is based on using the integrated turbinegenerator set supplied from Kubuta Corporation. The cost of the turbine-generator set (of much lower specifications in materials used) alone (simply freight to Hong Kong without insurance, installation or others) is HK$0.7M if a turbine-generator set from Gugler Hydro
89
(Final Report)
Energy, However, this option needs the generator to be installed at the top of the well, which will lead to a great difficulty on installation of the long shaft between the turbine and the generator as explained earlier in Section 10, this will in turn will largely raise the cost of other part of the system and cannot ensure reliable operation. Hence this option is dropped in this proposal. Recurrent cost: The only regular maintenance required for the system is regular greasing on the bearings. During this process the two associated sedimentation tanks have to be suspended from operation. The upper horizontal flow guide tube has to be opened and the whole turbine generator set has to be hoisted up by the support on the top of the well. The estimated cost of the maintenance work is HK$10,000 per year.
90
(Final Report)
Annual energy yield and cost saving based on current average flow rate From the above information - the current minimum flow rate data of 1.16 m3/s and average flow rate of 1.35 m3/s, the maximum allowable flow rate of the selected turbine is 1.25 m3/s with an effective head of 4.5 m. At 1.25 m3/s and effective head of 4.5 m, the selected generator output is about 70%; hence the average output power of the generator is 45 kW. Assuming the system running in only two-third of the year (in the rest of time, the associated well/tanks are under maintenance/inspection/checking/modifications or other activities), the total energy yield will be about 263,000kWh in a year.
91
(Final Report)
From the current electricity bill (the one dated 24-09-2007) of SCISTW the following data are extracted: Demand charge per month for each kVA above 5000 kVA: HK$112/kVA Net energy charge for each kWh above 1,946,000 kWh: HK$0.535/kWh (which includes fuel clause of HK$0.02/kWh). Saving in electricity bill: Assuming a reduction of 45 KVA (the average output power) in month peak demand, saving in demand charge is about HK$60,480 per year. Saving in energy charge is about HK$140,705 per year Total saving is HK$201,185 per year. The only regular maintenance required for the system is regular greasing on the bearings. During this process, the two associated sedimentation tanks have to be suspended from operation. The upper horizontal flow guide tube has to be opened and the whole turbine generator set has to be hoisted up by the support on the top of the well. The estimated cost of the maintenance work is HK$10,000 per year. Taking into account the yearly maintenance cost, the net saving is about HK$191,185 per year. With the estimated cost of the project of HK$5,005,000, a simple analysis gives a pay back period of 26 years, which is relatively long. However, as a pilot project, one should not emphasis on the monetary benefit only, but should also consider the environmental benefits (please refer to sections below) and the demonstration function of the project. This type of project is the first kind in Hong Kong.
92
(Final Report)
Figure 19.1 Range of total greenhouse gas emission from electricity production chains with different type of fuels/sources (unit in gCeq/kWh) (Source: IAEA, International Atomic Energy Agency) In Hong Kong, the one of the three main types of fuel used by CLPP is coal. Therefore to make thing simple, the data of coal 1990 technology (low) from Figure 19.1 is referred. Taking only the stack emission (not include emissions from other chain steps, say power plant construction, decommissioning, etc.), then one can take the value of 216 gCeq/kWh, while the corresponding value for hydroelectric is basically zero (again from Figure 19.1).
93
(Final Report)
Therefore the environment impact of the proposed hydroelectric project is a save of 289,000 kWh/year * 216 gCeq/kWh = 62,424,000 gCeg or about 62.4 MTCE (Metric Ton Carbon Equivalent). 1 metric ton carbon equivalent (MTCE) = 3.667 metric tons of CO2 equivalents (TCO2E) (source: Document EPA-F-05-002, February 2005, from Environment Protection Agency of United States.) If one likes to convert the environment impact to CO2 equivalent, the value is 62.4 MTCE * 3.667 = 229 TCO2E/year
There is no mature emission trading scheme in the region around Hong Kong. But just for information, the price of CO2 in the emission trading market of European Union Emission Trading Scheme in about the last 2 months (1/Aug & 29/Sept of 2007) was about 21 Euro/TCO2E or HK$210/TCO2E. Then 229 TCO2E/year translates into HK$48,000/year. However CO2 price can vary a lot in a year and among different regions.
Figure 19.2: Market price of CO2 in emission trading market of European Union Emission Trading Scheme (Source: www.co2prices.eu)
94
(Final Report)
95
(Final Report)
It is expected that during the construction of the proposed works, there will have a certain extent of interface with the operation of the existing plant. The pilot hydroelectric generator will be able to be put into operation in end 2009. Further implementation of the hydroelectric generators in the existing sedimentation tanks will depend on the performance of the pilot hydroelectric generator after it is put into operation. It is also noted that the HATS Stage 2A project is undergoing, in which additional sedimentation tanks will be built. If civil requirements of the hydrogenerator can be incorporated at the early design stage of the project, one can consider some other configurations to incorporate the hydrogenerators. Hence it will reduce the capital cost of the whole hydroelectric project and as well facilitate the maintenance requirements of the system. Further study on the hydrogenerators for the HATS Stage 2A project is recommended.
96