STEP BY STEP WITH PRIMAVERA (SAMPLE CASE)

Fery Safaria, MT

Training Program Hard Competency PT Wijaya Karya (Persero) Tbk Juni 2010

STEP BY STEP WITH PRIMAVERA


Sample Case : Construction of Ordinary House (2.5 Months)

STEP BY STEP WITH PRIMAVERA


Sample Case : Construction of Ordinary House (2.5 Months)

STEP BY STEP WITH PRIMAVERA


Sample Case : Construction of Ordinary House (2.5 Months)

STEP BY STEP WITH PRIMAVERA


Sample Case : Construction of Ordinary House (2.5 Months)

- Commencement Date - Working days - Unworking days - Working Hours - Lebaran Holiday

: 10 Agust 2010 : 6 days/week : Sunday : 8 hours/day (1 hour for rest time, incl lunch, and praying time) : H-3 and H+3

STEP BY STEP WITH PRIMAVERA


1. Setting up EPS ;

STEP BY STEP WITH PRIMAVERA


2. Setting up OBS;

STEP BY STEP WITH PRIMAVERA


3. Setting up Currency; 4. Setting up Unit; 5. Setting up Calendars;

STEP BY STEP WITH PRIMAVERA


6. Creating New Project File; File > New. Choose EPS where the project will be developed. Determine ID and the New Project Name; Determine Starting Date of Project; Determine the Responsible Manager; Choose rate type; Choose No, do not run the Project Architect. Finish.

STEP BY STEP WITH PRIMAVERA


7. Setting up Project Information;

STEP BY STEP WITH PRIMAVERA


7. Setting up Work Break Down Structure (WBS);

STEP BY STEP WITH PRIMAVERA

7. Setting up Work Break Down Structure (WBS);

STEP BY STEP WITH PRIMAVERA


8. Setting up Activity Code;

STEP BY STEP WITH PRIMAVERA


9. Adding Activities;
i.e. Activity name, activity code, duration, activity id

STEP BY STEP WITH PRIMAVERA


10. Setting Up Timescale;

STEP BY STEP WITH PRIMAVERA


11. Adding Milestone Activities;

STEP BY STEP WITH PRIMAVERA


12. Assign Activities Relationship;

STEP BY STEP WITH PRIMAVERA


13. Updating and Managing the Schedule ;

STEP BY STEP WITH PRIMAVERA


14. Schedule of Project Ready;

STEP BY STEP WITH PRIMAVERA


15. Resource;
Setting up : Resource Code and Roles

STEP BY STEP WITH PRIMAVERA


15.a Resource;
Adding the Resource Item, complete with the Detail Information

STEP BY STEP WITH PRIMAVERA


15.b Resource;
Modifying Resource Curve

STEP BY STEP WITH PRIMAVERA


15.c. Resource;
Assigning the resource to each Item using detail activity information

STEP BY STEP WITH PRIMAVERA


15.d. Resource;
Determining Production Rate of Each Resource per unit time Determined by User/unit time Automatic Process; Remaining unit x duration

STEP BY STEP WITH PRIMAVERA


15.e. Resource Assignment Layout 1;

STEP BY STEP WITH PRIMAVERA


15.f. Resource Assignment Layout 2

STEP BY STEP WITH PRIMAVERA


16. Budgeting
Setting up Cost Account

STEP BY STEP WITH PRIMAVERA


16. a. Budgeting
Adding Activities Expenses

STEP BY STEP WITH PRIMAVERA


17. Tracking

STEP BY STEP WITH PRIMAVERA


18. Establishing a Project Base Line

STEP BY STEP WITH PRIMAVERA


19. Assigning a Project Base Line

STEP BY STEP WITH PRIMAVERA


20. Up-dating and Comparing Project Base Line vs Current Schedule

STEP BY STEP WITH PRIMAVERA


21. Report

STEP BY STEP WITH PRIMAVERA


21. Report

STEP BY STEP WITH PRIMAVERA


21. Report

STEP BY STEP WITH PRIMAVERA


21. Report

STEP BY STEP WITH PRIMAVERA


22. S-Curve Development Project Tracking (WBS) CT-02 Monthly Project Cash Flow by WBS Connecting with Pertmaster software Exporting to Microsoft Project 2003

STEP BY STEP WITH PRIMAVERA


Connecting with Pertmaster software

STEP BY STEP WITH PRIMAVERA


Connecting with Pertmaster software

STEP BY STEP WITH PRIMAVERA


Exporting to Microsoft Project 2003

STEP BY STEP WITH PRIMAVERA


Exporting to Microsoft Project 2003

STEP BY STEP WITH PRIMAVERA


Exporting to Microsoft Project 2003

STEP BY STEP WITH PRIMAVERA


Exporting to Microsoft Project 2003
PRTS-1 Weeks 8/9/2010 Project Commencement Cumulative Cost Rp0 Project Completion Cumulative Cost Rp0 PEKERJAAN PERSIAPAN Cumulative Cost Engineering Cumulative Cost Rp10,000,000 Mobilisasi Cumulative Cost Rp8,000,000 Land Clearing Cumulative Cost Rp800,000 Direksi Keet Cumulative Cost Rp625,000 Bowplank / Pengukuran Cumulative Cost Rp0 PEKERJAAN PONDASI Cumulative Cost Pemasangan Acuan Pondasi Cumulative Cost Rp0 Pasangan batu kali Cumulative Cost Rp0 Galian Tanah Cumulative Cost Rp0 PEKERJAAN STRUKTUR Cumulative Cost Pemasangan Sloof Cumulative Cost Pembesian Cumulative Cost Rp0 Pemasangan Formwork Cumulative Cost Rp0 Pengecoran Cumulative Cost Rp0 Pemasangan Kolom 8/16/2010 Rp0 Rp0 8/23/2010 Rp0 Rp0 8/30/2010 Rp0 Rp0 9/6/2010 Rp0 Rp0 9/13/2010 Rp0 Rp0 9/20/2010 Rp0 Rp0 9/27/2010 Rp0 Rp0 10/4/2010 Rp0 Rp0

Rp10,000,000 Rp8,000,000 Rp800,000 Rp2,500,000 Rp900,000

Rp10,000,000 Rp8,000,000 Rp800,000 Rp2,500,000 Rp900,000

Rp10,000,000 Rp8,000,000 Rp800,000 Rp2,500,000 Rp900,000

Rp10,000,000 Rp8,000,000 Rp800,000 Rp2,500,000 Rp900,000

Rp10,000,000 Rp8,000,000 Rp800,000 Rp2,500,000 Rp900,000

Rp10,000,000 Rp8,000,000 Rp800,000 Rp2,500,000 Rp900,000

Rp10,000,000 Rp8,000,000 Rp800,000 Rp2,500,000 Rp900,000

Rp10,000,000 Rp8,000,000 Rp800,000 Rp2,500,000 Rp900,000

Rp0 Rp0 Rp400,000

Rp500,000 Rp8,000,000 Rp1,200,000

Rp500,000 Rp8,000,000 Rp1,200,000

Rp500,000 Rp8,000,000 Rp1,200,000

Rp500,000 Rp8,000,000 Rp1,200,000

Rp500,000 Rp8,000,000 Rp1,200,000

Rp500,000 Rp8,000,000 Rp1,200,000

Rp500,000 Rp8,000,000 Rp1,200,000

Rp0 Rp0 Rp0

Rp4,200,000 Rp0 Rp0

Rp8,400,000 Rp0 Rp8,250,000

Rp8,400,000 Rp0 Rp8,250,000

Rp8,400,000 Rp0 Rp8,250,000

Rp8,400,000 Rp0 Rp8,250,000

Rp8,400,000 Rp0 Rp8,250,000

Rp8,400,000 Rp0 Rp8,250,000

FACEBOOK : PLANNING ENGINEERS " PRIMAVERA GUYS "