Вы находитесь на странице: 1из 14

. GRAND ABSTRACT S.NO/ 1. 2. 3. 4. 5.

DESCRIPTION OF WORK Value of work in Ground Floor Value of work in First Floor Value of work in Second Floor Value of Work Under Ground Sump Value of Work Over Head Tank Sub Total 6. 7. 8. Electrical instllation 10% Watering & Sanitary Arrangements 12% 5 Dia Bore well 7.5 deep with Electric motor or pump room complete. Architectural Feature Plot Development and 3 sides compound wall Unforseen expenses (if any) Front Compound Wall pillars & MS Gate = = = = = = = = AMOUNT

9. 10. 11. 12.

= = = =

Net Value =

MATERIALS BASIC PRICE ON DATE

S.NO. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12.A) B 13 A) B. Cement

PARTICULARS OF WORK

RATE Rs.

River Sand Pit sand Steel (MS & TOR) Stock Bricks 40mm metal 20mm Metal Marble Designer Tiles Verified tiles Pavit Tiles Teak wood scantling Teak wood planks Padak wood scantling Padak Planks

GROUND FLOOR

S.NO. PARTICULARS OF WORK 1. 2. 3. 4. 5. 6. 7. Earth work excavation in all types of soil for foundation depth of 0 to 6-6 Filling in foundation with river sand and consolidation Filling in basement with pit sand approved earth & consolidation Excavated earth re-filling & consolidation Pre-construction anti-treatment as per ISI standard. PCC 1:4:8 mix concrete using 40mm stone jelly for foundation All as above 30mm stone jelly for flooring in leveling course For all RCC work the cost should include cost of shuttering curing vibration etc but exclude cost of reinforcement RCC 1:1.5:3 FOR COLUMN FOOTING RCC 1:1.5:3 for grade beams Ground Level RCC 1:1.5:3 mix columns in super structure RCC 1:1.5:3 for lintels As above for beams in Ground Floor RCC 1:1.5:3 mix purcola purling with steel and finishing as per drawing. RCC 1:1.5:3 for that roof Slab Ground Floor.

QTY RATE Rs.

PER AMOUNT UNIT RS. P Per Cft Per Cft Per Cft Per Cft Per Sft Per Cft Per Cft

8. 9. 10. 11. 12. 12A 13.

Per Cft Per Cft Per Cft Per Cft Per Cft Per sft Per Cft

S.NO 14. 15. 16. 17. 17A. B. 18. 19. 20. 21. 22.

PARTICULARS OF WORK Do for stair flight landing slab in Ground Floor 1:1.5:3 mix RCC 1:1.5:3 for loft slab 3 thick RCC 1:1.5:3 for sunshade 2 mix RCC 1:1.5:3 for platform slab 2 thick Supply and fixing both side polished cuddapa slab over kitchen platform Supply and fixing polished granite slab over kitchen platform Brick work in CM 1:5 in foundation basement Brick work in CM 1:6 over super structure Ground Floor. Brick wall 4 brick in Cft 1:4 reinforced with 2 Nos of 6mm dia rods at every fifth course Brick sill 4 height for bottom of cupboards RCC precast folding steps all as for drawing cost in situ, with all materials and labour complete bottom finishing inclusive. Supplying, cutting, bending, placing, in position, and binding TOR / MS rods reinforcement bars for All RCC works including co of binding wire, cover blocks etc in all floors. Fabricating welded MS grills for all windows and fixing in position with all screws etc complete. Supplying and fixing in position Country wood hand rail 4 x 2 size fixed room & rod 16mm square for every step

QTY RATE

PER UNIT Per Cft Per Sft Per Sft Per Sft Per Sft Per Sft Per Cft Per Cft Per Cft Per Sft Each

AMOUNT Rs P

23.

Per Kg

24. 25.

Per Sft Per Rft

S.NO. 26. 27. 28. 29.

PARTICULARS OF WORK Plastering the ceiling & other exposed rec surfaces with cm 1:3 smooth Plastering the internal walls with cm 1:4 smooth Plastering the external walls with cm 1:4 rough Supply and fixing Teak wood door cum windows fully glazed using 5 x 3 door frame and 1 Glazed shutter using 5.5 mm plain glass. For main door Supplying and fixing Country wood glazed for each window using 4 x 21/2 frame and using 4mm plain glass 1 mix shutter. Supplying and fixing Country wood Flush door using 4 x 2 mix shutter. Supplying and fixing Teak wood ventilator 4 x 2 outer frame with 4mm plain glass. Supplying and fixing AC frame 32 x 22 made out of 4 x 2 Teak wood frame Supplying and fixing 4 x 2 Country wood outer frame and 1 thick shutter with 5mm plain glass of French windows. Providing verified tile flooring set in cm 1:4 & pointing as specified Providing 100mm height skirting of marble set in cm 1:2 and pointing as directed.

QTY

RATE Rs.

PER UNIT Per Sft Per Sft Per Sft Per Sft

AMOUNT Rs. P.

30.

Per Sft Per Sft Per Sft Each

31.

32.

33A..

33B

Per Sft Per Sft Per Rft

34. 35.

S.NO. PARTICULARS OF WORK 36. 37. 38. 39. 40. 41. 42. 43. Providing Designer tiles 200 and 300mm for wall DADO set in cm 1:2 and pointed with coloured pigment. White lime wash 3 coats to ceiling Cement paint to internal walls Cement paint to external walls Providing with 2 coats of enamel paint over a coat of primer for wood and steel work Polishing with filler polish for new wood work Furniture fittings to joinery (Actual plus 10% fixing charges will be measured) Weathering course with 20mm brick jelly in slaked lime all as per dia 3 thick average Supplying and fixing pressed tile 8 x 8 or 10 x 10 set in cm 1:3 with water proof mix including fleshing & pointing. Supply of west coast manglore tile set in cm 1: 4 base over sloped fascia in ground Floor. Net Value

QTY RATE Rs.

PER UNIT Per Sft Per Sft Per Sft Per Sft Per Sft Per Sft Per Sft Per Sft Per Sft

AMOUNT Rs. P.

44. 45.

c/o to SUMMARY

FIRST FLOOR

S.NO. PARTICULARS OF WORK 1. 2. 3. 4. 5. 5B. 6. 7. 8. 9. 10. 11. 12. 13. RCC 1:1.5:3 mix columns RCC 1:1.5:3 mix in lintels RCC 1:1.5:3 mix in beams RCC 1:1.5:3 for flat roof slab RCC precast folding steps RCC prucpla to details as per drawing RCC 1:1.5:3 mix for loft slab 3 thick RCC 1:1.5:3 mix in sunshade 2 thick RCC 1:1.5:3 mix in 1 thick slab BJC 1:4:8 mix over sloped fascia Supplying and fixing RCC 12 exhaust fan ring Brick work in 1:5 for 9 walls and over first floor Brick walls 4 thick in CM 1:4 reinforced with 2 Nos 6mm dia rods at every film course. Brick 4 height for bottom of ward role & over platform

QTY

RATE Rs.

PER AMOUNT UNIT Rs. P. Per Cft Per Cft Per Cft Per Cft Each Per Sft Per Sft Per Sft Per Sft Each Cft Per Sft Per Sft

S.NO 14.

PARTICULARS OF WORK Supplying, cutting, bending, placing in position and binding TOR/MS rod for reinforcement bars for all RCC works including cost of binding wire cover blocks etc in all floor Fabricating welded MS grill for all windows and fixing in position with all screws etc. complete. Supplying, fabricating, fixing in position 4 x 2: teak wood hand rail fixed to MS Rod 16mm square for every step Water proof plastering in cm 1:3-20 mm thick with water proofing compound as per manufactures specification. (Sunken floors) Plastering the ceiling and other exposed RCC surfaces with CM 1:3 smooth Plastering the internal walls in cm 1:4 12mm thick Plastering external walls with CM 1:4 15mm thick Supplying country wood paneled door using best country wood using 4 x 2 frames and 1 thick shutter Supplying and fixing fully glazed windows using 4 x 2 frames and 1 thick shutter frames and 4mm plain glass Similar to above country wood ventilator Supplying and fixing AC frames 32 x 22 made out of 4 x 2 country wood frame

QTY

RATE Rs.

PER AMOUNT UNIT Rs. P. Kg

15.

Per Sft Per Rft Per Sft

16.

17.

18. 19. 20. 21.

Per Sft Per Sft Per Sft Per Sft Per Sft Per Sft Each

22.

23. 24.

S.NO. 25. 26.

PARTICULARS OF WORK Provision for fitting and fixtures for doors and windows (actual plus 10%) fixing charges will be measured Providing vertified tiles flooring set in cm 1:4 and pointed with coloured pigment etc floors F.Floor. Providing Designer tiles 200 x 300mm for wall DADO set in cm 1:2 and pointed with coloured pigment Providing granite tile skirting 4 high at junction of wall and floor Providing one layer of well burnt pressed key tile set and pointed with cement mortar 1:3 mixed with water proof compound Red-oxide pigment to be added Providing one layer of brick jelly concrete 1:3 (no sand) for an average 3 thickness consolidated all as per MDSS Providing well burnt manglore tiles set cm 1:3 for sloped fascia White lime wash 3 coats to ceiling Cement paint of approved colour 2 coats over a coat of white for walls internal and external Plastering with pillar polish and for new wood work Providing 2 coating enamel paint over a coat primer for wood and steel work TOTAL FIRST FLOOR

QTY

RATE Rs.

PER AMOUNT UNIT Rs. P.

Per Sft Per Sft Per Rft Per Sft Per Sft Per Sft Per Sft Per Sft Per Sft Per Sft

27.

28. 29.

30.

31.

32. 33. 34. 35.

C/O to SUMMARY SECOND FLOOR WITH HEAD ROOM

S.NO. 1. 2. 3. 4. 5. 6. 7. 8.

PARTICULARS OF WORK RCC 1:1.5:3 mix column RCC 1:1.5:3 RCC 1:1.5:3 in beams RCC for Flat roof slab 1:1.5:3 mix RCC for sun shade 2 thick Brick masonry in CM 1:5 for 9 wall 4 thick in cm 1:4 reinforced with 2 Nos 6mm dia rods at every fifth course Supplying, cutting preveling placing in position and binding RTS /MS rods for reinforcement Bars for all RCC works, including cost of binding wire, course blocks etc., wall floors. Fabricating welded MS grill for all windows and fixing in position with all screws on complete. Plastering the ceiling and other exposed RCC surfaces with CM 1:3 Smooth Plastering the Internal walls with CM 1:4 smooth Plastering the external walls with CM 1:4 15mm thick Supplying and fixing paneled door 4 x 2 frames and 1 thick size thick Supplying and fixing country wood window frame using 4 x 2 and 3 x 1 shutter frames and 4mm plain glass Supplying and fixing C.W glazed ventilator using 4 x 21/2 frames and 3 x 1 shutter frame and 3mm glass

QTY

RATE Rs.

PER AMOUNT UNIT Rs. P. Per Cft Per Cft Per Cft Per Cft Per Sft Per Cft Per Sft Kg

9.

Per Sft Per Sft Per Sft Per Sft Per Sft Per Sft Per Sft

10. 11. 12. 13. 14.

15.

S.NO. 16. 17.

PARTICULARS OF WORK Provision for fixing fittings & fixtures to joinery Providing one layer of brick jelly lime concrete 1:3 (No Sand) all as for MDSS arrange 3: thick Providing one layer of pressed Clay tile set and pointed with CM 1:3 mixed with water proof compound White Lime wash to ceiling Cement painting 3 coats of approved make & colour Enamel painting 2 coat over 1 coat of primer of approved make & colour Total Second floor

QTY

RATE Rs.

PER AMOUNT UNIT Rs. P.

Per Sft Per Sft Per Sft Per Sft Per Sft

18.

19. 20. 21.

C/O. to Summary

UNDER GOROUND SUMP

S.NO. PARTICULARS OF WORK 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Earth work River Sand Filling RCC 1:4:8 for foundation RCC 1:1 :3 for raft RCC 1:1 :3 for side walls RCC 1:2:4 roof slab Steel reinforcement & Fabrication with binding wire CI manhole cover 2.0 x 2.0 (heavy duty) Water proof plastering Providing & fittings PVC steps

QTY

RATE Rs.

PER UNIT Per Cft Per Cft Per Cft Per Cft Per Cft Per Cft Per Kg Each Sft Per Sft

AMOUNT Rs. P.

Total c/o. to Summary FRONT COMPOUND WALL 1. Compound wall with 8 dia sur pile foundation, RCC 1:2:4 mix grade beam and above 4 thick brick work in CM 1:4 upto 5 0 HT including finishing and 3 coats of cement painting decorative design. Providing and fixing MS grill gate to detail supply and erection with 3 coats of enamel painting 18 square pillars with foundation Net Total c/o. to Summary OVER HEAD TANK Rft

2.

Sft

3.

Each

S.NO. PARTICULARS OF WORK 1. Brick Masonry in CM 1:3 water proof mix as specified. RCC 1:1 :3 columns

QTY

RATE Rs.

PER AMOUNT UNIT Rs. P. Per Cft Per Cft Per Cft Per Cft Per Sft Per Sft Per Kg

2.

3.

RCC 1:1 :3 for roof slab and floor slab

4.

RCC 1:1 :3 for side walls

5.

Plastering with CM 1:4 for exterior walls

6.

Plastering with CM 1:3 mixed with water proof compound for tank Providing steel reinforcements fabrication with binding wire

7.

8.

Supplying and fixing medium manhole cover (c1 (20 x 20) c/o Grand Abstract Total

Each

c/o, to summary

S.NO.

K.MISCELANOUS

QTY

RATE Rs.

PER AMOUNT UNIT Rs. P.

1. 2. 3. 4. 5. 6.

Providing plaster grooves x Providing plaster grooves 3 x Providing plaster hands 4 x Providing plaster bands 4 x Provision for other architectural/features Provision for one bore well 5 dia and 750 deep with electric pumpset and pipe line etc complete & foundation Total

Rft Rft Rft Rft PS

Each

c/o. to summary

PLOT DEVELOPMENT & COMPUND WALL & 3 SIDES

S.NO.

PARTICULARS OF WORK

QTY

RATE Rs.

PER UNIT

AMOUNT Rs. P.

1.

Plot Development Compound wall with 8 dia supplies @ every 7 0 c/c RCC 1:2:4 mix GRADE BEAM, BJLS 4 wall in cm 1:4 5 0 1+ 1 in between pillar 9 square including finishing and cement painting 3 coats.