Академический Документы
Профессиональный Документы
Культура Документы
Factors Population Track length (Past) (in km) Track length (Existing) (in km) Reserved right-of-way (in km) Type of tram Melbourne
4,077,036
Kolkata
4,486,679
standards
-
Delhi
11,007,835
67.59 57.17 25 Both Steel & fiber body Double boggie 25 km/h 62 seated, 200 total 130 30 mints PARTIALLY SUCCESSFUL
A/C Closing Door, Fiber body Single & double boggie 16 km/h 50 seated, 200 total 684 2-5 mints Successful
30 km/h
-
x x x x x x
CLOSED NOT SUCCESSFU L
co-ordinated public transport Public Transport network. Integrated Tickting System Automatic Vehicle Monitoring
x x x x x x
Ride the most Partially/ Some interesting routes selected routes Visit railway or tramway museums. trains on mainline special tours for tourist Tramtracker app Reasons Improvement of official site of tramways
Dedicated line & route map (color & class division) Tram Yatra Maintainance & cleaning Speed limit sign
x x
Mumbai
12,478,447
x x x x x x
CLOSED NOT SUCCESSFUL
Checklist
Data collection
Current year statistics of daily passenger Number of Trams Running Number of Facility Depots Depot wise Tram numbers Depot wise passenger running Route wise Tram frequency Existing tram routes identified Total Track Length Existing Electricity consumption Tram running cost Government funding Zone wise Polluion data & standard Traffic Survey/ Speed Delay Survey Done Done Done Done Done Not yet Done Done Not yet N/A N/A Done Not yet
Speed reduction
No.
Measures
B1
2 3
Change of road surface material Visual arrengement of road space Raised paving
.. . . . . .. . .. . .. .. .. . . . . . . . . .. .. . .
Speed Increase
Mixed traffic
. . . . .
. .. . .
.. . .
Desired effects
Speed
30 25 20 15 10 5
TSP + Station+ RO
TSP + Station
Axis Title
No Improv ement
Station
TSP+S tation
Speed
TSP+Station+RO W+ New Tram TSP + Station+ ROW
TSP + Station
Station
TSP+S tation