Labels Alumni List (7) Alumni News (20) CEIM Community News (18) Global Education - Indonesia (5) Global Education - Thailand (21) Global Education - Vietnam (33) Job Vacancy (4) Outreach Activities (8) Research (275) Scholarships (2) Upcoming Events (3) Archives 2012 (5) 2011 (100) November (1) September (8) August (11) July (13) June (12) May (5) April (5) March (16) February (15) Design Management in Design-Build Project Base on ... Owners Involvement in Preliminary Stage of Real E... Owners Project Life Cycle Approach: A Case Study ... Delay in Planning, Design and Construction: A Case... Owners Organization Project Management Maturity: ... Method & Effectiveness of Feasibility Study in Apa... Organizational Project Management Structure in a R... Integrated Project Management Assessment For Devel... Owners Project Control Strategy Project Management Life Cycle and Risk Managerment... Risk Management of Basement Construction Affecting... Risk Factors In Resettlement Project Project: A Ca... Assessment of Risks on Design Management Aspects i... Project Organizational Structure Roles
1 sur 3
22/01/2012 17:11
http://professionalprojectmanagement.blogspot.com/2011/02/owners-p...
related deletions, additions and changes to project specifications and accepting ultimate responsibility for the safety and utility of all project design elements. In this phase, the project owner must approve all design related work performed and must coordinate the overall design integration, safety of the public, compliance with legal and codes. Conclusion for Owners Project Control in Tender Stage All services must be specifically required in the contract documents and not be in violation of any applicable law. Tender documents should be clear before they are issued. The content includes tender time, date, approximate contract amount, project location, licensing requirements, approximate size, plus tender, payment bond requirements, performance, etc. Conclusion for Owners Project Control in Construction Stage The fundamental purpose of the conference is to establish acceptable ground rules for all parties concerned, and to assure that each party understands the complete job requirements and coordinates its work to produce a completed job in a minimum amount of time, with maximum economic gains, and in proper coordination with the owner, architect, engineer, prime contractor, and all subcontractors. The pre-construction conference is primarily concerned with management and operational considerations. It is in these areas of contract interpretation and clarification that the greatest value of the construction conference can be achieved. Progress payment and management of progress payments begins with the contract specifications clearly stating how the contractors work progress is to be measured, how payments are determined based on the measured progress, and what documents and reports are required to be submitted by the contractor to justify the payment request. The project owner should authorize payment only when the contractors progress payment request is in full compliance with the contract requirements and the progress claimed has been independently verified by supervisor. Periodically, perhaps monthly, the project owner should compare schedule progress with that shown on the project program. The purpose is to determine whether those various activities were planned. Recommended framework for owners project control: Based on the literature review, case study and PMBOK (third edition), Mr. Thuan recommended a framework for an owners project control as shown in the table below:
and Respons... Risk Factors in Vietnam Power Plant Projects Cas... January (14) 2010 (121) 2009 (106) 2008 (55) About CEIM Professional Project Management CEIM Reporter Our CEIM/MPM Official Homepage Comments
Comments(0)
- add your comment here -
Post
Site Meter
Abstract The report expresses the key issues in Project Control Strategy that known as the important factor for any owner wants to develop and survive in the construction industry. This study, which refers to the theories have expressed the concept of project control process in design stage, tender and construction stage. What should the owner control in these stages? How can the owner control in these stages? The study has briefed the factors that most effect to them, they consist of cost, quality and schedule. Through a case study, project
2 sur 3
22/01/2012 17:11
http://professionalprojectmanagement.blogspot.com/2011/02/owners-p...
control problems will be analyzed. Some proposed solutions are recommended in order to help the owner can be improved in project control process.
Posted by CEIM Reporter at 15:44 Labels: Research
1 comments:
IB CLever said... "Success or failure of a project relies on how it is being controlled. Project control strategy is an activity which compares overall project performance against the planned project." I agree with the statement above. No matter how small or how big a project or business is, the success of it lies on the management. I think the project control strategy which is to compare the project performance against the planned project is interesting. 16 February 2011 16:44 Post a Comment