Chart of Accounts Conversion

System Landscape Optimization SAP Germany AG & Co. KG

Agenda

As-is Situation Specific Details on Conversion Service Chart of Accounts Conversion Prerequisites for a Conversion Project Project Steps

Please see also the service description for more detailed information!

As-is Situation

When are changes to the chart of accounts necessary?


One or more digits should be added to the existing account numbers Accounts should be merged The chart of accounts should be harmonized Different units in the company (e.g. a service and a production unit ) are using the same chart of accounts should be changed

How will the conversion be realized?


The conversion covers master data, transaction data and customizing data Standard as well as customer-specific tables will be converted The relevant data will be changed directly at database level The system will look after conversion as if it had always been in the new state

Specific Details on Conversion Service Chart of Accounts Conversion


Following mapping tables are possible:
General ledger accounts / primary cost elements Secondary cost elements Other accounts Languages

If certain prerequisites are met, it is also possible to convert several chart of accounts in one step. A chart of accounts conversion has to be done for all company codes that belong to the affected controlling area, because they use the same chart of accounts. The conversion must be coordinated with the auditor.

Prerequisites for a Conversion Project

Project Team
Project manager Contact person from application department Contact person from system administration

Test system
The test system is reserved exclusively for the conversion The hardware must be as similar as possible to production system Current copy of productive system It must be possible to carry out transports from the test system into the production system

Authorization
The Service Delivery specialist needs the SAP_ALL authorization in all systems that you want to convert

Project Steps
Commercial preparations
Specifying the desired results Defining the test procedures

Technical preparations
Building up the test system Importing of the conversion package

Two test conversions


First tests starts twelve to fourteen weeks before production conversion Conversion of complete system and checking of the results by the customer Written confirmation of success of the conversion by the customer

Production conversion
Usually during one weekend Conversion of the complete system and application tests by the customer

Application tests (after each test conversion)


The test procedures have to be defined by the customer Detailed checking that the system is converted correctly and there are no inconsistencies