SADASIVPET MUNICIPALITY

NAME OF THE WORK: CONSTRUCTION OF CC DRAIN FROM 1 H.P. SUBMERSIBLE PUMP SET TO YOUSUF ALI HOUSE IN WARD NO.15 AT RAVINDRA NAGAR COLONY SADASIVPET MUNICIPALITY. UNDER BRGF FUNDS FOR THE YEAR 2011-12. Sl.N o. 1 Description of work 2 No. 3 Measurement L 4 B 5 D 6 Quantity Unit 7 8 Rate (Rs) 9 Amount 10

Earth Work Excavation and depositing on bank with an intital lead of 10m and lift of 2m in case of head load only in loamy and clayee soils like black cotton soils, red earth and ordinary gravel,
1x1 180.00 1.10 0.60 118.80 Cum 88.84 10554.00 Providing of Compacted Sand Bed complying with specification for spreading for drains work 1 Cum 1x1 Plain Cement concrete (1:5:10) using 20mm nominal size graded HBG metal including cost of all materials and lablur charges etc. complete for curved portion. 1x1 Cement concrete (1:2.5:5) using 20mm nominal size graded HBG metal including cost of all materials and lablur charges etc. complete for curved portion. a). For walls a). For flooring Plastering with CM (1:3), 12 mm thick including cost and conveyance of all materials and labour charges etc.complete. 1x1 SUB TOTAL 180.00 0.00 1.20 216.00 Sqm 953.49 20595.00 249085.00 2491.00 9963.00 2491.00 2491.00 2491.00 30988.00 300000.00 1x2 1x1 180.00 180.00 0.23 0.45 0.45 0.05 37.20 4.05 41.25 180.00 1.10 0.10 19.80 Cum 2765.99 54756.00 180.00 1.10 0.10 19.80 Cum 374.40 7413.00

Cum 3776.18

155767.00

6 7 9

Labour Cess @ 1% Vat @ 4% Add L.S. QC Charges @ 1%

10 Add L.S. Technical Person 1% 11 Add L.S. Insurance 12 Add L.S. for unforseen work

MUNICIPAL ENGINEER SADASIVPET MUNICIPALITY

SADASIVPET MUNICIPALITY
NAME OF THE WORK: CONSTRUCTION OF CC DRAIN FROM H.NO. 1-5-1 TO DURGAMMA TEMPLE AT HARIJANAWADA IN WARD NO.1. SADASIVPET MUNICIPALITY. UNDER BRGF FUNDS FOR THE YEAR 2011-12. Sl.N o. 1 Description of work 2 No. 3 Measurement L 4 B 5 D 6 Quantity Unit 7 8 Rate (Rs) 9 Amount 10

Earth Work Excavation and depositing on bank with an intital lead of 10m and lift of 2m in case of head load only in loamy and clayee soils like black cotton soils, red earth and ordinary gravel,
1x1 60.00 1.10 0.60 39.60 Cum 88.84 3518.00 Providing of Compacted Sand Bed complying with specification for spreading for drains work 1 Cum 1x1 Plain Cement concrete (1:5:10) using 20mm nominal size graded HBG metal including cost of all materials and lablur charges etc. complete for curved portion. 1x1 60.00 1.10 0.10 6.60 Cum 2765.49 18252.00 60.00 1.10 0.10 6.60 Cum 374.40 2471.00

Cement concrete (1:2.5:5) using 20mm nominal size graded HBG metal including cost of all materials and lablur charges etc. complete for curved portion. a). For walls a). For flooring Plastering with CM (1:3), 12 mm thick including cost and conveyance of all materials and labour charges etc.complete. 1x1 SUB TOTAL 60.00 0.00 1.20 72.00 Sqm 953.49 6865.13 83104.00 831.00 3324.00 831.00 831.00 831.00 30248.00 TOTAL: 120000.00 1x2 1x1 60.00 60.00 0.23 0.45 0.45 0.05 12.42 1.35 13.77

Cum 3776.18

51998.00

6 7 8 9

Labour Cess @ 1% Vat @ 4% Add L.S. QC Charges @ 1% Add L.S. Technical Person 1%

10 Add L.S. Insurance 11 Add L.S. for unforseen work

MUNICIPAL ENGINEER SADASIVPET MUNICIPALITY

SADASIVPET MUNICIPALITY
NAME OF THE WORK: CONSTRUCTION OF CC DRAIN AND WBM ROAD FROM CRC BUILDING TO SIDDAPUR ROAD, CRC BUILDING TO ICDS ROOM IN WARD NO.4 AT SIDDAPUR COLONY SADASIVPET MUNICIPALITY. UNDER BRGF FUNDS FOR THE YEAR 2011-12. Sl.N o. 1 Measurement Description of work 2 Earth Work Excavation and depositing on bank with an intital lead of 10m and lift of 2m in case of head load only in loamy and clayee soils like black cotton soils, red earth and ordinary gravel, for removal of shabad flooring 1x1 1x1 160.00 160.00 5.00 5.00 0.10 0.10 80.00 80.00 160.00 Forming embankment with side rarth by mechanical means including pre-watering of soil, removal of top soil, excavation of soils depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with vibratory Road Roller @ OMC to meet requirement of table 300-2 of MORTH including all hire and operational charges of T&P and seigniorage charges complete for finished item of work as per MOT&H specification 305 (4th revision) (Payment will be made basedon leel for finished item of work) 1x1 1x1 160.00 160.00 5.00 5.00 0.15 0.15 120.00 120.00 240.00 Granular Sub-base/base/surface course with local Mathilals (Table 400.13) by mix in place method narmal construction of grannlar subbase by providing local matholals spreading in uniforce layers with motor grader on prepared surface, mixing by mix in place method with at once and compacting with smoth wheel roller to achive the desired density complete as per clause 401.4 as per technical specification clause - 408 movd. 1x1 1x1 160.00 160.00 4.00 4.00 0.10 0.10 64.00 64.00 128.00 Cum 295.74 37854.72 Cum 76.61 18386.00 Cum 88.84 14214.40 No. L 3 4 B 5 D 6 7 8 Quantity Unit Rate (Rs) 9 Amount 10

C/O Providing, WBM GRADING-II FORMATION Including laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness hand pacing, rolling with three wheel 8-100 KN static roller / Vibratory Roller 80-100K.N. in stages to proper grade and camber, applying and brooming , crushable creening to fill-up the interstices of coarse aggregative watering and compacting to the required density Grading 2 as per Technical specification Clause 405 MORD/404 MORTH. for compact thickness of 75mm and blindage gravel @ 0.06 cum/10 Sqmt. 1x1 1x1 Providing, WBM GRADING-III FORMATION Including laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness hand pacing, rolling with three wheel 8-100 KN static roller / Vibratory Roller 80-100K.N. in stages to proper grade and camber, applying and brooming , crushable creening to fill-up the interstices of coarse aggregative watering and compacting to the required density Grading 2 as per Technical specification Clause 405 MORD/404 MORTH. for compact thickness of 75mm and blindage gravel @ 0.06 cum/10 Sqmt. 1x1 1x1 160.00 160.00 4.00 4.00 0.08 0.08 48.00 48.00 96.00 160.00 160.00 4.00 4.00 0.075 0.075 48.00 48.00 96.00 B/F

37854.72 37854.72

Cum

1172.65

112574.00

Cum

1377.29

132220.00

315249.00 5 6 7 8 9 Labour Cess @ 1% Vat @ 4% Add L.S. QC Charges @ 1% Add L.S. Insurance 1% Add L.S. for unforseen work TOTAL: 3152.00 12610.00 3152.00 3152.00 62685.00 400000.00

MUNICIPAL ENGINEER SADASIVPET MUNICIPALITY

SADASIVPET MUNICIPALITY
NAME OF THE WORK: LAYING OF CC ROAD FROM CH. NAGAIAH HOUSE TO LAXMAIAH IN WARD NO. 3 AT BACK SIDE OF SHIVA SHAKTHI LODE IN SADASIVPET MUNICIPALITY. UNDER BRGF FUNDS FOR THE YEAR 2011-12. Sl.N o. 1 Description of work 2 Earth Work Excavation and depositing on bank with an intital lead of 10m and lift of 2m in case of head load only in loamy and clayee soils like black cotton soils, red earth and ordinary gravel, for removal of shabad flooring 1x1 Laying of CC (1:5:10) Prop using 40mm Guage HG Metal including cost & conveyance and labour and laying tamping curing etc., for pot holes 1x1
Cement Concrete perminent Construction of un reinforced dowel jointed at expansion and completion joint only. Plan cornet crenate pavement thickness as per Design. Over a prepaid sub base. With 43 grade cement or my other type as per clause 1501:2.2 M30 (Grand) course and fire aggregate conforming to 15:383 Maximum in a Concrete Mixes of not less than 0.2 cm capacity and appropriate weigh batches using approved mix design laid in approved form side formwork ( Steel channel, Laying and fixing of 125 mictron thick polythene fill wedges steel plats including laying the frame work as per drawing ) Spreading the concrete with should be rakes Compacted using needle, Scared and plate Vibrators and Finished in Continues joint applying debording strips and expansion construction joints applying debonding strips and expansion construction joint. Applying debording strips primes, sealant Dow belly approaches to bridges / culverts construction joint admixture as approved laying of concrete slabs for 14- days ceiling compound ( while Speeded ) and water finishing to lines and grade as per

No. 3

Measurement L 4 B 5 D 6

Quanti ty 7

Unit 8

Rate (Rs) 9

Amount 10

95.00 3.00

0.10

28.50

Cum

88.84

2532.00

95.00 3.00 0.075

21.37

Cum

2265.99

48436.00

1x1 4 5 6 7 8 Labour Cess @ 1% Vat @ 4% Add L.S. QC Charges @ 1% Add L.S. Insurance 1% Add L.S. for unforseen work

95.00 3.00

0.10

28.50

Cum

4094.12

116682.00 167650.00 1677.00 6706.00 1677.00 1677.00 20613.00

TOTAL:

200000.00

MUNICIPAL ENGINEER SADASIVPET MUNICIPALITY

SADASIVPET MUNICIPALITY
NAME OF THE WORK: LAYING OF CC ROAD FROM CRC BUILDING TO OFFICE COMPOUND WALL IN SADASIVPET MUNICIPALITY. UNDER BRGF FUNDS FOR THE YEAR 2011-12. Sl.N o. 1 Measurement L 4 B 5 D 6 Quanti ty 7

Description of work 2 Earth Work Excavation and depositing on bank with an intital lead of 10m and lift of 2m in case of head load only in loamy and clayee soils like black cotton soils, red earth and ordinary gravel, for removal of shabad flooring

No. 3

Unit 8

Rate (Rs) 9

Amount 10

1x1 180.00 6.00 Laying of CC (1:5:10) Prop using 40mm Guage HG Metal including cost & conveyance and labour and laying tamping curing etc., for pot holes

0.10

108.00

Cum

88.84

9594.72

1x1 180.00 6.00 0.075

81.00

Cum

2265.99

183545.19

Cement Concrete perminent Construction of un reinforced dowel jointed at expansion and completion joint only. Plan cornet crenate pavement thickness as per Design. Over a prepaid sub base. With 43 grade cement or my other type as per clause 1501:2.2 M30 (Grand) course and fire aggregate conforming to 15:383 Maximum in a Concrete Mixes of not less than 0.2 cm capacity and appropriate weigh batches using approved mix design laid in approved form side formwork ( Steel channel, Laying and fixing of 125 mictron thick polythene fill wedges steel plats including laying the frame work as per drawing ) Spreading the concrete with should be rakes Compacted using needle, Scared and plate Vibrators and Finished in Continues joint applying debording strips and expansion construction joints applying debonding strips and expansion construction joint. Applying debording strips primes, sealant Dow belly approaches to bridges / culverts construction joint admixture as approved laying of concrete slabs for 14- days ceiling compound ( while Speeded ) and water finishing to lines and grade as per

1x1 180.00 6.00 4 5 6 7 8 Labour Cess @ 1% Vat @ 4% Add L.S. QC Charges @ 1% Add L.S. Insurance 1% Add L.S. for unforseen work

0.10

108.00

Cum

4094.12

442164.96 635304.87 6353.00 25412.00 6353.00 6353.00 20224.13

TOTAL:

700000.00

MUNICIPAL ENGINEER SADASIVPET MUNICIPALITY