Organization Job Duration Department Designation Major Responsibilities : : : : : Bashundhara City development ltd, Panthapath, Dhaka. Oct. 2002 to Till Today. Engineering. Sr. General Manager Design, drawing, estimating & costing of distribution panel, starter panel & Electrical Distribution Network Installation, testing & commissioning of 33KV GIS panel (14 Nos.), 2.5 MVA (33KV/ .415KV) dry type transformers (07Nos.), 1.6MVA (33/.415KV) dry type transformers (02Nos.), LT distribution panel, BBT (415V, 2000A), Diesel Generator 1400KVA, 415V (02Nos.), 316KVA, 415V (02Nos.) Have to maintain operation, maintenance & modification of 33KV switchgear, Diesel Generator, distribution network, distribution panel, starter panel & different type of controlling system including PLC. Operation, maintenance of fire alarm system, MATV, CCTV. PA & BAS. Operation and maintenance of HVAC (1150 TON x 05 Nos. chiller) system. With out these chiller I have to maintain and operate nineteen package machine. Operation timing and

temperature of these chillers and packages are controlled by automation system. At the same time I have to manage all the spare parts of the electrical & automation system.

Personal Information
Name Fathers Name Mailing Address Contact No Permanent Address Date of Birth Height Weight Marital Status Blood Group Nationality Salary Expectation : : : : : : : : : : : : Nimai Chandra Paul Late Sarat Chandra Paul House No.-227/3B, Road No.-19 (Old), West Dhanmondi, Dhaka 1209. 01713366662. Vill. Deara, P.O. Jugihati, P.S. Rupsha, Dist - Khulna, Bangladesh. 03rd August 1966. 1.65 M. 56 kg. Married O + Bangladeshi by birth Tk.2,00,000/= per month and attached vehicle for full time.

EDUCATIONAL QUALIFICATION
Graduation : Completed the Degree Bachelor of Science in Engineering (Electrical and Electronic) from Khulna University of Engineering and Technology (former B.I.T) and secured 2nd Class, held in the year 1988. Completed Higher Secondary School Certificate under Jessore Board and secured 1st division in the year 1983. Completed Secondary School Certificate under Jessore Board and secured 1st division in the year 1981.

H.S.C

S.S.C

TRANNING : Completed the Industrial attachment program from Barge Mounted Power Plant (2x28MW) under BPDB, Gawalpara, Khulna. Training on PLC, TICI, Ghorashal, Norshindi from MS word, MS Excel and AUTO CAD

: COMPUTER KNOWLEDGE :

WORKING EXPERIENCE
Company
Job Duration Position Major Responsibilities

: : : :

Otobi Limited, Shayampur, Bangladesh. June 2000 to September 2002. Manager (Engineering) Design, drawing, estimating & costing of distribution panel, starter panel, PFI panel & electrical distribution network. Installation testing & commissioning of 500KVA, 415V Gas Generator, different type of plastic molding machine, wood working PLC machine. I was also engaged in operation and maintenance of HVAC system. RAK Ceramics Bangladesh (Pvt.) Ltd. Gazipur, Bangladesh. July 1999 to December 2000. Electrical In Charge. Design, drawing, installation, testing & commissioning of sub-station 2.5 MVA (11/.415KV), installation & maintenance of 2 1279 KVA Gas Generator, trouble shooting & maintenance of Programmable

Company
Job Duration Position Major Responsibilities

: : : :

Logic Controller, installation of soft starter etc. At the same time I had to maintain all chiller and packages for HVAC system. Company
Job Duration Position Major Responsibilities

: : :

Bashundhara Steel Complex Limited, Manikgong. July 1996 to June 1999. Sr. Engineer

: Design, drawing, estimating & costing of 11KV&0.415 KV distribution panel, motor control starter panel, PFI panel, 11KV & 0.415 KV distribution network. Installation, testing & commissioning of 33KV outdoor type VCB, 14.7 MVA (33/11KV) transformer (01No.), 7.5 MVA (33/11KV) transformer (01 No.), 11KV indoor type VCB (06Nos.), 03MVA (11/0.415KV) transformer (02 Nos.). high frequency induction welding machine, different types of DC motors, Induction motor, slip ring motor with their starter panel. Operation, trouble shooting, maintenance & modification work of electrical distribution network, distribution panel & different types of starter panel. At the same time I have to manage all the spare parts of the electrical system.

Company
Job Duration Position Major Responsibilities

: : :

Idris Enterprise, Dhaka. Feb 1992 to April 1996. Asstt. Engineer

: Worked as an Asstt. Engineer and engaged in cable tray fitting fixing, repairing of H.T switchgear. In the same time I was

engaged in installation of Power Transformer 1000KVA, 11KV/0.415KV, Diesel Generator 1000KVA, 0.415KV, ATS panel, LT & HT switchgear, PFI unit, motor control panel board, LT distribution panel and different kinds of machinery. Installation, testing & commissioning of HVAC system for good manufacturing practice under the project of sanofi aventis and ESKAYEF BANGLADESH LTD.

Company
Job Duration Position Major Responsibilities

: : : :

Union Markentile Ltd. Gulshan 02, Dhaka. Feb. 1989 to Dec. 1991. Asstt. Engineer Worked as an Asstt. Engineer in the project of 71 MW Open Cycle Gas Turbine under BPDB, I was involved in installation, testing and commissioning of 33KV switchgear & 90 MVA 132/33 KV sub station.