Вы находитесь на странице: 1из 5

Status of Proposal of Wind Power Projects (In Chronological Order)

Sr. Name of the Company No. Proposed Capacity (MW) Govt/ Pvt. Wind Montoring WPD Categ Date of Date of at ory Registration Approval 50m.h. A/B/C/ a.g.l.w D/E/F att per meter square 21/04/96 to 371 C 11/8/2003 (i) Approval 19/08/97 A 12/7/2005 pending 6/08/98 to(ii)20/2/2006 20/3/2006 Duration Detail of Site Type of Land Status/ Installation Remark

1 Suzlon Developers Ltd.

14.3

Govt.

Nagda Distt. (i) Private (i) 6.25 MW Dewas (ii) Revenue Installed (i) 6.25 MW (ii) 3.05 MW (ii) 8.05 MW Installed

(i)Information sent to M P Govt for project approval. (ii)Approval of 8.05 MW issued.

2 M/s Suzlon Energy Ltd.

Pvt.

April 04 to March 06 Nov.05 to Oct. 06 Nov.05 to Oct. 07

221

14/01/2004

Palsodi Revenue Distt.Ratlam Ratedi Distt. Forest Dewas Ratedi Distt. Forest Dewas Mahuria Forest Distt. Shajpur Nagda Distt. Private & Dewas forest Sujapur Distt. Ratlam Bada Barkheda Pithampur Distt. Dhar Bagli Chapra Revenue

Nil

DEREGISTERED

3 M/s Enercon India Ltd.

91.2

Pvt.

205

13/08/2004 26/12/2005 10/9/04

9/7/2008 11/7/2008 -

51.2 MW Installed Nil

Permission for remaning 40 MW has cancelled DPR not received land detail not given DPR received/ Stage II Forest permission is yet to be received -

4 M/s Enercon India Ltd.

Pvt.

206

5 M/s Enercon India Ltd.

59.20

Govt.

24/04/96 to 217.00 4/08/98 21/04/96 to 371 19/08/97 6/08/98 to10/12/98 to 255 21/01/01 24/04/96 to 217.00 4/08/98 10/03/92 to 192 18/04/95 12/03/92 to 222 19/04/95

10/9/2004 19/3/2007 1/11/2004 8/2/2005 2/12/2004 3/3/2005 22/1/2005 22/1/2005 4/5/05

Nil

6 M/s Enercon India Ltd.

12

Govt.

20/9/2006 10/10/2006 28/2/2005 3/3/2005 -

9.6 MW Installed 4.95 MW

7 N.E.P.C. India Ltd./ Southern Windfarm Ltd. 8 M/s Suzlon Energy Ltd. 9 M/s Suzlon Energy Ltd. 10 M/s Enercon India Ltd.

20

Govt.

6 6 6

Govt. Govt. Govt.

D D D

Revenue Revenue Forest

Nil Nil nil

DEREGISTERED DEREGISTERED DPR not received

A:-Registered/ Approved/ Fully or Partially Commissioned Sr. Name of the Company No. Proposed Capacity (MW) Govt/ Pvt. Wind Montoring

11 N.E.P.C. India Ltd. 12 N.E.P.C. India Ltd. 13 M/s Suzlon Energy Ltd.

6 6 6.25

Govt. Govt. Govt.

14 M/s M.P.Windform Ltd.

15

Govt.

15 M/s Suzlon Energy Ltd.

2.4

Govt.

16 M/s Suzlon Energy Ltd. 17 N.E.G.Micon/ vestas India.

1.2 20

Govt. Govt.

18 M/s Pioneer Wincon P.Ltd. Channai 19 M/s S.E.Energy windFarm Ltd. 20 M/s Suzlon Energy Ltd.

20

Govt.

18 32.7

Govt. Pvt.

B:-Registered/ Approved/ C:-Registered but not sent for D:-Registered but not yet to be Commissioned approval (Active) sent for approval (Inactive) Duration WPD Categ Date of Date of Detail of Type of at ory Registration Approval Site Land 50m.h. A/B/C/ a.g.l.w D/E/F att per meter square 10/12/98 to 255 D 6/5/05 Ratlam Revenue 21/01/01 10/03/92 to 192 D 6/5/05 Dhar Revenue 18/04/95 21/04/96 to 371 C 8/9/05 25/7/2006 Nagda Forest 19/08/97 Approval of Distt.Dewas 6/08/98 torevised capacity is pending 21/04/96 to 371 C 10/1/2006 Approval is Nagda Private 19/08/97 14/2/2007 pending Distt.Dewas 6/08/98 to27/9/2008 21/04/96 to 371 D 13/1/2006 Nagda Forest 19/08/97 Distt.Dewas 6/08/98 to21/04/96 to 371 D 17/1/2006 Nagda Forest 19/08/97 Distt.Dewas 6/08/98 to24/04/96 to 217.00 D 8/2/06 Mahuria 4/08/98 Distt. Shajapur, Sendhva 10/12/98 to 255 A 23/12/2006 5/1/2009 Sujapur Revenue 21/01/01 17/2/2009 Distt. Ratlam 10/12/98 to 255 A 16/1/2007 29/3/2007 Jaora Private 21/01/01 29/3/2007 Ratlam April 04 to 221 A 17/1/2006 10/3/2008 Palsodi Forest March 06 15/10/2007 14/3/2008 Ratlam B:-Registered/ Approved/ C:-Registered but not sent for D:-Registered but not yet to be Commissioned approval (Active) sent for approval (Inactive)

E:-Applied for F- project Deregistered Registration Status/ Installation Remark

Nil Nil 6.25 MW Installed

DPR not received DPR not received Approval of 5.6 MW has been issued/ in view of enhanced capacity, Proposal being sent to NRED -

15.00 MW Installed Nil

DEREGISTERED

Nil

DEREGISTERED

Land detail not DPR, land details not given received

4 MW Installed DPR of 1.5 M.W. has been received being evaluated. 4.8 MW Installed 32.7 MW Installed -

A:-Registered/ Approved/ Fully or Partially Commissioned

E:-Applied for F- project Deregistered Registration

Sr. Name of the Company No.

Proposed Capacity (MW)

Govt/ Pvt. Wind Montoring

21 M/s Marut Shakti Energy 4.8 Ltd. 22 M/s M.P.Windfarm Ltd 4.8

Govt. Govt.

WPD Categ Date of at ory Registration 50m.h. A/B/C/ a.g.l.w D/E/F att per meter square 16/08/94 to 255 D 3/3/2007 27/08/97 7/5/2008 16/08/94 to 256 D 3/3/07 27/08/98 16/08/94 to 257 27/08/99 9/02/2000 287 to 17/03/02 9/02/2000 288 to 17/03/03 16/08/94 to 257 27/08/99 16/08/94 to 258 27/08/100 16/08/94 to 259 27/08/101 24/04/96 to 217.00 4/08/98 10/12/98 to 255 21/01/01 10/12/98 to 255 21/01/01 D 3/3/07

Duration

Date of Approval

Detail of Site

Type of Land

Status/ Installation

Remark

Kukru Distt. Private Betul Kukru Distt. Private Betul Kukru Distt. Private Betul Badwani Forest

Nil Nil DEREGISTERED Nil

23 M/s Consolidated Energy 4.8 Consultant 24 M/s Suzlon Infrastructure 91.5 Ltd. 25 M/s Suzlon Energy Ltd. 51

Govt.

Govt.

26/6/2007

Nil

Govt. Govt. Govt.

C D D

5/11/07 5/1/08 5/1/08

Niwali distt. Forest Badwani Kukru Kukru Forest Private & Revenue Private & Revenue Private & Revenue Revenue Revenue

Nil Nil Nil

26 M/s Suzlon Infrastructure 25 Ltd. 27 M/s Sarjan Realities Ltd. 40

DPR not received, Forest permission is yet to be received DPR not received Forest permission is yet to be received received Forest DPR not permission is yet to be The proposed revenue land has been identified as Forest/ the company has asked to apply under Land details and DPR not received Project approval issued/ land use permission yet to be given.

28 M/s N.H.D.C 29 M/s Suzlon Energy Ltd.

100 60

Govt. Govt.

D B

18/1/2008 9/6/08

25/9/2008 1/10/2008 -

30 M/s Southern Windfarm Ltd. 31 M/s D.J. Energy Ltd. New Delhi

10 25+25+50=1 00

Govt. Govt.

B C

25/4/2008 14/8/2008 5/9/2008 5/9/2008

Kukru & others sites of M P Mahuria distt. Shajapur Ratlam Ratlam & Mandsaur

Nil 22.5 MW installed 6.00 MW Nil

approval of 61.05 has been issued

A:-Registered/ Approved/ Fully or Partially Commissioned

B:-Registered/ Approved/ C:-Registered but not sent for D:-Registered but not yet to be Commissioned approval (Active) sent for approval (Inactive)

E:-Applied for F- project Deregistered Registration

Sr. Name of the Company No.

Proposed Capacity (MW)

Govt/ Pvt. Wind Montoring

32 M/s Abir Infrastructure

10+15=25

Govt.

WPD Categ Date of at ory Registration 50m.h. A/B/C/ a.g.l.w D/E/F att per meter square 10/12/98 to 255 D 19/12/2008 21/01/01 7/7/2009

Duration

Date of Approval

Detail of Site

Type of Land

Status/ Installation

Remark

Ratlam

Revenue

Nil

DPR submitted, the shortcoming communicated to the party DPR not received/ proposed revenue land is yet to be alloted Regetions of 10.4 M.W. has been cancelled DPR not received/ proposed revenue land is yet to be alloted DPR received/ under evaluation DPR not received proposal sent to collector for land allotment

33 M/s Abir Infrastructure

25

Govt.

9/02/2000 287 to 17/03/02 12/03/92 to 222 19/04/95

7/7/09

Badwani

Revenue

Nil

34 M/s Mega Power Transformer P.Ltd.

10.4+19.6 = 30

Govt.

15/9/2009

Jamgodani Revenue distt. Dewas

Nil

35 M/s Suzlon Energy Ltd.

10.20

Govt. Govt. Govt.

36 M/s Betul Windfarm Ltd. 50 + 21 =71 37 M/s Uttar Urja 80

10/12/98 to 255 21/01/01 16/08/94 to 256 27/08/98 10/12/98 to 255 21/01/01

A C C

15/10/2009 19/4/2010 29/4/2010

1/1/10 7/1/10 -

Ratlam

Private

Kukru Distt. Private Betul Ratlam & Revenue Mandsaur

9.6 MW Installed Nil Nil

38 M/s Suzlon Energy Ltd. 39 M/s Suzlon Energy Ltd.

6 18

Govt. Govt.

10/12/98 to 255 21/01/01 10/12/98 to 255 21/01/01

C C

22/6/2010 22/6/2010

Gopalpura Distt Ratlam Sailana, Puniakhedi Distt Ratlam

Forest Forest/ Revenue/ Private

4.8 Nil -

40 M/s Suzlon Energy Ltd. 41 M/s Regen Power

12 + 2.4 =14.4 30

Govt. Govt.

10/12/98 to 255 21/01/01 10/12/98 to 255 21/01/01

C C

22/6/2010 21/7/2010

Jaora Distt Revenue/ Ratlam Private Naweli distt. Private Ratlam

10.2 M.W. Nil

Approval issued DPR received short comingscommunicated to the party

42 M/s Suzlon Energy Ltd. 6 Tribal land A:-Registered/ Approved/ Fully or Partially Commissioned

A 04.01.11 Palsodi Tribal B:-Registered/ Approved/ C:-Registered but not sent for D:-Registered but not yet to be Commissioned approval (Active) sent for approval (Inactive)

1.2 MW E:-Applied for F- project Deregistered Registration

Sr. Name of the Company No.

Proposed Capacity (MW)

Govt/ Pvt. Wind Montoring

43 M/s Suzlon Energy Ltd. 44 M/s Suzlon Energy Ltd.

20+20=40 15+15=30

Govt. Govt.

WPD Categ Date of at ory Registration 50m.h. A/B/C/ a.g.l.w D/E/F att per meter square 10/12/98 to 255 C 26.10.10 21/01/01 17.01.11 10/12/98 to 255 C 26.10.10 21/01/01 17.01.11

Duration

Date of Approval

Detail of Site

Type of Land

Status/ Installation

Remark

Daloda Mandsour Jaora Distt Ratlam

Private/ Revanue Private/ Revanue

DPR not received land alloted to NRED DPR received proposal sent to NRED for apporval DPR not received DPR not received DPR not received Dircted to Subbmited DPR within 6 months for further action Dircted to Subbmited DPR within 6 months for further action Dircted to Subbmited DPR within 6 months for further action E:-Applied for F- project Deregistered Registration

45 Global Wind Power 46 Global Wind Power 47 Global Wind Power 48 Choksi energy & infrastructur Pvt.ltd. 49 Consolidated Energy Consultants

15+25=40 9+15=24 5.25+8.75=1 4 30

Govt. Govt. Govt. Govt.

10/12/98 to 21/01/01 10/12/98 to 21/01/01 10/12/98 to 21/01/01 -

255 255 255 255

C C C C

50

Pvt.

50 Marut-Shakti Energy India 14 Ltd

Pvt.

A:-Registered/ Approved/ Fully or Partially Commissioned

Village Kanser, Ratlam 200.08 C 4.8.2011 Village Katna Mandsaur 200.08 C 4.8.2011 Village Forest Thagi Mandsaur B:-Registered/ Approved/ C:-Registered but not sent for D:-Registered but not yet to be Commissioned approval (Active) sent for approval (Inactive)

26.10.10 06.05.11 26.10.10 06.05.11 26.10.10 06.05.11 20.04.11

Ratlam Ratlam Ratlam

Private/ Revanue Private/ Revanue Private/ Revanue Govt./ Revanue Land Forest

Summary
Category A B C D E Capacity MW 222.15 70 674 280 64.25 Nos 8 2 17 18 5