D.

Reinforced Concrete Sewer, Storm Drain, and Culvert Pipe: 1. Pipe and Fittings: ASTM C76, or approved equal. Minimum wall thickness shall be per Class III, wall Type B. Pipe wall shall be designed to withstand HS20-44 loads for community areas and Ministry of Transport (MOT) truck wheel loads for the industrial areas. Cement used in concrete shall be sulfate resistant, Type V. Gaskets: ASTM C443

2. E. F. 2.3 A.

Ductile Iron Culvert Pipe: ASTM A716. Color coding of pipe materials shall be in accordance with Specifications Section 01086. MANHOLES (REFER TO MOT SECTION 6.05) All manholes shall have wall thickness designed to withstand AASHTO HS20-44 loads for the community areas and Ministry of Transport (MOT) truck wheel loads for the industrial areas and shall meet the dimensions shown on Standard Drawing RC-C-1. All concrete exterior surfaces in contact with backfill soil shall be corrosion protected to the extent specified in Sections 07100 or 07110, as applicable. Concrete Base and Collar: Cast-in-place concrete base and collar shall attain a 28-day compressive strength of not less than 21 MPa. Bricks collar shall be used only upon prior approval from Royal Commission. Pre-cast Concrete Manholes: ASTM C478; sized as indicated on Standard Reference RC-C-1. 1. Eccentric cone pre-cast top

B.

C.

D.

E.

Cast-in-Place Manholes: Shall be constructed to the configuration shown on Standard Reference RC-C-1 using Type I cement with pozzolan admixture. Fiber Glass Manholes: Shall have wall thickness to withstand AASHTO HS20-44 loads for the community areas and Ministry of Transport (MOT) truck wheel loads for the industrial areas and shall meet the dimensions shown on Standard Drawing RC-C-1. Where the cutouts for large size pipes meeting at a fiberglass manhole leave an uncut width of manhole wall less than 300 mm between adjacent pipes, the lower portions of manholes shall be made from cast-in-place reinforced concrete with a 3 mm thick fiberglass liner on the inside surface. For 02723-5 Contract No. RCL R-80000

F.

RCMYAS Guide Spec. Rev F. 06 Mar 06

damp proofing and waterproofing of underground concrete, see Division 3 specifications. G. Brick or Concrete Block Manholes: Shall be load bearing, sized and configured to dimensions shown on Standard Reference RC-C-1 and materials shall comply with the following: 1. 2. Concrete Masonry Units: ASTM C139 using sulphate resistant cement. Sewer and Manhole Brick: a. b. Sewer: Grade and Size and Size

Manhole: Grade

3. Mortar: ASTM C270 using sulphate resistant cement.

H.

Interior Lining: All concrete and masonry manholes shall be purged internally using sulphate resistant cement and coated with a bitumen coating or coal tar epoxy. Epoxy Mortar: Fosroc Nito-mortar or equal. Sealant: Fosroc Thioflex 600 or equal METAL ACCESSORIES (SEE MOT SECTION 605)

I. J. 2.4

A. Manhole Frame: See Royal Commission Standard Drawing RC-C-2.

1. 2. B.

Type: Style

Cover (Manholes): See Royal Commission Standard Drawing RC-C-2. 1. 2. Type: Style:

C. Grates (catch basins): See Royal Commission Standard Drawing RC-C-4 1. 2. Type: Style: 02723-6 Contract No. RCL R-80000

RCMYAS Guide Spec. Rev F. 06 Mar 06

D.

Accessories shall be designed for heavy duty loading to meet AASHTO HS20-44 loads for the community areas and Ministry of Transport (MOT) truck wheel loads for the industrial areas. Bricks or concrete blocks used for cover support rings shall be load bearing type, using Type V cement.

E.

PART 3 EXECUTION 3.1 A. INSTALLATION OF PIPE General: 1. Regardless of which pipe material is used, manufacturers installation instructions shall be followed. All buried pipes for sanitary sewer system shall have a minimum earth cover of 1.2 meters. If this cannot be obtained, the pipes shall be encased in concrete. In areas subject to vehicular traffic, concrete encasement shall be reinforced. Encasement shall be designed to withstand AASHTO HS20-44 loads for the community areas and the Ministry of Transport (MOT) truck wheel loads for the industrial areas. Earthwork and trenching shall be in accordance with Section 02200, except where more stringent requirements are indicated, or specified by the manufacturer of the pipe. Inspect pipe before installation to detect defects. Mark defective materials with white paint and promptly remove from the site. Lay pipe beginning at the low point of a system, true to the grades and alignment indicated with unbroken continuity of invert. Place bell ends of pipe or the groove end of concrete pipe facing upstream. Install gaskets in accordance with manufacturer's recommendations for the use of lubricants, cements, and other special installation requirements. Place outside lap of corrugated metal pipe facing upstream and longitudinal laps at the side.

2.

3.

4. 5.

6.

B. C.

Vitrified Clay Pipe: Install in accordance with applicable provisions of ASTM C12, unless otherwise indicated. Concrete Pipe: 02723-7 Contract No. RCL R-80000