Вы находитесь на странице: 1из 123

SECTION I

Page
1.1

INSTALLATION

1.2 1.3 1.4 1.5

Handling Cleaning Floor Plan Foundation Power Supply Initial Setting Anciliary Equipment

II

OPERATION

2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8

Machine Controls J-Head Controls 2J2-Head Controls Mechanical Table Feed Infinitely Variable Table Feed M-Head Controls E-Head Controls Heidenhain Digital Read Out VRZ 7 10

Ill

LUBRICATION

3.1 3.2 3.3 3.4 3.5

Basic Machine J-Head 2 J2-Head Feed Boxes M and E-Head

IV

MAINTENANCE GENERAL

4.1 4.2 4.3


J-HEAD

Table Screw Assembly Cross Screw Assembly Gib Strip Adjustment

4.4 4.5 4.6 4.7


ZJZ-HEAD

Belt Replacement Brake Shoe Replacement Balance Spring Replacement Feed Trip Adjustment Collet.Aligning Screw Quill Removal

4.8 4.9 4.10

Motor Removal Belt Replacement Brake Shoe Replacement

Index

Вам также может понравиться